# Wisconsin Data Center Moratorium Tracker

Source: https://savrn.com/data-center-moratorium-tracker/wisconsin
Markdown alternate of the page above; the site index is https://savrn.com/llms.txt

---

Wisconsin has 1 state-level data-center restriction in force. 2 more bills are pending. 49 city and county measures are tracked here, 39 of them in force. Every entry below links to its primary source: a legislature page, a governor's office, a local government, or the reporting of record.

Last updated October 2026 9 state-level measures 49 local measures 54 primary sources

Wisconsin

WI

In force

9

State-level measures on record, 1 in force

49

City and county measures, 39 in force

54

Primary sources cited on this page

#8

of 50 states with anything on record, by measure count

## State-level measures in Wisconsin

Every statewide moratorium, pause, siting restriction, or tax-incentive rollback in Wisconsin we can verify against a primary source. Strongest status first.

| Measure | Status | What it does | Source |
| --- | --- | --- | --- |
| Wisconsin Legislature (Act 16 data-center TID exception)Wisconsin: Governor Tony Evers signed Assembly Bill 140 (now 2025 Wisconsin Act 16), which created statutory exceptions from the standard 12% equalized-value | In force 2025-07 | Governor Tony Evers signed Assembly Bill 140 (now 2025 Wisconsin Act 16), which created statutory exceptions from the standard 12% equalized-value cap on Tax Increment Districts specifically for TID No. 5 in Port Washington and TID No. 10 in Beaver Dam, but only if all project costs are tied to a 'certified data center.' This carve-out paved the way for the Vantage data center's $458 million TID financing structure, which would otherwise have been impossible under standard TID law. Critics argue the state-level subsidy was passed before residents had any meaningful chance to weigh in. |  |
| Wisconsin (statewide PSC rate hearing)Wisconsin: Two Wisconsin PSC dockets address data center rate structures. | Proposed 2026-02 | Two Wisconsin PSC dockets address data center rate structures. Docket 6630-TE-113: We Energies proposed a 'Very Large Customer' rate class for customers with electricity demands above 500 MW (targeting hyperscale data centers like Microsoft in Mount Pleasant). Over 200 people joined virtual hearings on Feb 10-11, 2026, with ~85% of speakers voicing concerns about the proposal, urging that tech companies pay their full share of infrastructure costs. Critics argue the proposal would only require data centers to pay 75% of infrastructure costs, leaving 25% subsidized by the public. Docket 6680-TE-115: Alliant Energy's Individual Contract Rate Agreement to serve a data center campus in Beaver Dam (widely assumed to be Meta). The PSC required Alliant to refile the contract with fewer redactions after advocates raised transparency concerns. A coalition of 42 environmental justice, faith, conservation, and community organizations submitted formal comments voicing concerns about the proposals. On April 24, 2026 the Wisconsin PSC adopted a "full-benefits" model requiring data centers to pay 100% of their costs, extended the minimum term to 15 years, and lowered the threshold from 500 MW to 100 MW (removing the 75% capacity-only option), a ratepayer-protection win. |  |
| Months after session, weeks before election, Republicans propose repeal of data center tax break | Proposed 2026-10 | A group of four legislative Republicans proposed legislation to repeal the sales tax exemption for data centers that was included in the 2023-25 budget. The proposal was announced weeks before an election and months after the legislative session ended. |  |
| AB 302Relating to: a sales and use tax exemption for data center equipment or software. (FE) | Failed / vetoed 2024-04 | Wisconsin AB 302 (2023): Relating to: a sales and use tax exemption for data center equipment or software. (FE). Last action 2024-04-15: Failed to concur in pursuant to Senate Joint Resolution 1. |  |
| AB 840Wisconsin AB 840 / SB 843 (Rep. Shannon Zimmerman R-River Falls, Sen. Romaine Quinn R-Birchwood), a GOP-led data center bill, passed the Assembly in January | Failed / vetoed 2026-01 | Wisconsin AB 840 / SB 843 (Rep. Shannon Zimmerman R-River Falls, Sen. Romaine Quinn R-Birchwood), a GOP-led data center bill, passed the Assembly in January 2026 by a 53-44 mostly party-line vote (2 Democrats yes, 1 Republican no). The bill would have prevented data center operators from passing energy costs onto residential consumers, required them to pay for their own generation/transmission infrastructure, mandated closed-loop water systems, required annual water use reporting, and required reclamation bonds. However, the Wisconsin Senate adjourned without taking up AB-840, or any data center regulation bill, on the floor. Democrats and several construction unions opposed the bill due to lack of prevailing wage requirements and concerns over energy consumption. The competing Democratic Data Center Accountability Act (SB 729/AB 722) by Sen. Habush Sinykin and Rep. Stroud, requiring 70% renewable sourcing and a new very-large-customer rate class, was heard in the Senate Utilities Committee on Feb 17, 2026 but never advanced. |  |
| SB 729Wisconsin SB 729 / AB 722, the Data Center Accountability Act, authored by Sen. Jodi Habush Sinykin (D-Whitefish Bay) and Rep. Angela Stroud (D-Ashland) | Failed / vetoed 2026-01 | Wisconsin SB 729 / AB 722, the Data Center Accountability Act, authored by Sen. Jodi Habush Sinykin (D-Whitefish Bay) and Rep. Angela Stroud (D-Ashland), would have required data centers to source at least 70% of electricity from renewables to qualify for state tax exemptions, created a 'very large customers' rate class with rate cases every 2 years, required prevailing wages, and required water/energy transparency. SB 729 was introduced Dec 2, 2025 (with ~12 senate cosponsors and ~25 House cosponsors) and received a Senate Utilities Committee hearing Feb 17, 2026. AB 722 (the Assembly companion) was introduced Dec 3, 2025. Both bills failed to pass pursuant to Senate Joint Resolution 1 on March 23, 2026, leaving Wisconsin without statewide data center regulation. |  |
| WisconsinWisconsin: Senate Bill 969, authored by Sen. Andre Jacque (R-New Franken), would prohibit NDAs between data center companies and municipalities | Failed / vetoed 2026-02 | Senate Bill 969, authored by Sen. Andre Jacque (R-New Franken), would prohibit NDAs between data center companies and municipalities, while still allowing withholding of genuine trade secrets. The bill was prompted by a Wisconsin Watch investigation revealing at least four communities had signed secrecy deals hiding billion-dollar data center plans. Rep. Clint Moses (R-Menomonie), author of the companion Assembly bill, called the measure 'really about trust.' Passed Senate Utilities Committee 4-1, but the Senate adjourned the 2026 session without a floor vote. |  |
| AB 1099 / SB 1061Moratorium on operation of data centers | Failed / vetoed 2026-03 | Would impose a moratorium on operating data centers absent a statewide planning authority, cost-shift prohibitions, and renewable-energy requirements; AB 1099 failed pursuant to Senate Joint Resolution 1. |  |
| SB 244Relating to: modifying the sales and use tax exemption for qualified data centers. (FE) | Failed / vetoed 2026-03 | Wisconsin SB 244 (2025): Relating to: modifying the sales and use tax exemption for qualified data centers. (FE). Last action 2026-03-23: Failed to pass pursuant to Senate Joint Resolution 1. |  |

## City and county moratoria in Wisconsin

Most of the movement is local, where a building pause or permit halt does not need a legislative session. 49 tracked measures in Wisconsin, each with its source.

Ashwaubenon

2026-01

In force

Local moratorium on data centers through June 2, 2027

12-month moratorium on hyperscale data centers (>100,000 sq ft and >20 MW); Plan Commission voted 7-0. The measure runs to June 2, 2027 and applies at a threshold of 100,000 sq ft.

Chippewa County

2026-08

In force

Local moratorium on data centers for a stated term

12-month moratorium, 19-0, first and second readings the same night (extended from the 10 months committee proposed). Applies only to the six towns under county zoning, Anson, Eagle Point, Hallie, Lafayette, Wheaton, Woodmohr. Coverage puts the effective date in September without naming it, so the end date is not derivable. The measure has a stated duration whose end date is not recorded.

City of Madison

2026-01

In force

12-month data center moratorium (10,000 sq ft+)

The Madison City Council approved a 12-month moratorium on Jan. 13, 2026 on zoning approvals for new data centers over 10,000 sq ft, to develop regulatory standards.

City of Superior

2026-06

In force

One-year data center moratorium

The Superior City Council unanimously approved a one-year moratorium on data centers at its June 16, 2026 meeting, acting before receiving any application.

Dane County

2026-06

In force

Local moratorium on data centers through December 4, 2027

18-month moratorium on hyperscale data centers in county zoning areas. Advisory committee to study benefits and pitfalls. The measure runs to December 4, 2027.

Dane County (18-month hyperscale data center moratorium passed), WI

2026-06

In force

Dane County (18-month hyperscale data center moratorium passed), WI data center moratorium

The Dane County Board unanimously approved Sub 1 to RES-039 on June 4, 2026, an 18-month moratorium pausing zoning permit applications for hyperscale data centers (defined as 5,000+ servers and 10,000+ sq ft) through roughly December 2027. It applies only to towns under county zoning, not self-zoning cities and villages; the county used a state-law workaround to enable it (zoning committee approved unanimously May 26). On June 4, the Dane County Board approved Sub 1 to 2026 RES-039, an 18-month pause on zoning permits for hyperscale data centers (defined as 5,000+ servers and 10,000+ sq ft) in towns subject to county zoning (excludes cities, villages, and self-zoned towns).

Dodge County

2026-08

In force

Local moratorium on data centers through February 10, 2028

18-month moratorium on data-center development in county-zoned unincorporated areas, approved 29-2 by the Board of Supervisors after a public hearing. Initiated by Supervisor Cathy Houchin following constituent concerns about a Beaver Dam-area data center's impact on water. The measure runs to February 10, 2028.

Door County

2026-01

In force

County moratorium on data centers through May 26, 2027

1-year moratorium on data centers and battery energy storage in unincorporated areas; board retains option to extend. The measure runs to May 26, 2027.

Grant County

2026-01

In force

County moratorium on data centers through June 18, 2027

Board of Supervisors voted 15-0 for 12-month moratorium on hyperscale data center zoning permits in unincorporated areas. Related to collapsed $1B data center proposal. The measure runs to June 18, 2027.

Green County

In force

County moratorium on data centers

Board voted 30-1 to approve 12-month moratorium. No data center proposals had been received. Chairman Jerry Guth said moratorium would allow time to review and update antiquated zoning codes. Part of broader Wisconsin trend (~24 communities with moratoriums). The measure has no documented term.

Janesville

2026-09

In force

Local moratorium on data centers through September 28, 2027

City council voted unanimously for a 12-month moratorium barring the city from accepting, processing, reviewing or approving data center applications (rezoning, permits, annexation). The end date is counted from the vote; the ordinance takes effect on publication, so the true end may fall a few days later. Separate from the Town of Janesville. The measure runs to September 28, 2027 and covers rezoning requests.

La Crosse County

2026-06

In force

Local moratorium on data centers through December 18, 2027

18-month pause in unincorporated areas; county stood up an ad hoc committee to study data centers, and the city of La Crosse is taking part in that work while drafting its own rules. The measure runs to December 18, 2027.

Manitowoc County

2026-04

In force

18-month data center moratorium

The County Board voted unanimously on April 29, 2026 to bar the county from accepting applications or issuing permits for data center construction or siting for 18 months, after the towns of Two Creeks, Two Rivers and Mishicot requested it.

Marathon County

In force

County moratorium on data centers

Marathon County Board adopted 12-month moratorium in late August 2026. Applies to 18 townships under county jurisdiction. Does not apply to existing data centers or facilities under 5,000 sq ft. Blocks new conditional use permits, zoning changes, and zoning permits. The measure has no documented term and applies at a threshold of 5,000 sq ft.

Middleton

In force

Local moratorium on data centers

City of Middleton Common Council adopted data center moratorium as of Jul 1, 2026. Pauses issuance of zoning certificates for data centers. Planning department directed to draft comprehensive data center ordinance. The measure has no documented term.

Mishicot

2026-02

In force

Mishicot data center moratorium

Mishicot, Wisconsin, joined Two Creeks and Two Rivers at a joint town board meeting after several hundred people packed the Grey Fox Bar and Grill on January 26, 2026 for an informational meeting on AI data centers, with organizers forced to change to a larger venue due to overwhelming turnout. Cloverleaf Infrastructure and NSI Land Services had been approaching local farmers to purchase property. Town Board Chair Dean Anhalt said residents are concerned about losing rural character and farmland, especially from retired farmers and landowners renting to active farming operations.

Monroe County

2026-01

In force

County moratorium on data centers through January 21, 2028

18-month moratorium on medium/large data centers and all battery storage; passed 10-3. Small-scale DCs (<500 kW, no crypto) exempt. Environmental concerns include trout streams in driftless area. The measure runs to January 21, 2028 and applies at a threshold of 500 kW.

Oneida County

2026-08

In force

County moratorium on data centers through August 19, 2027

1-year moratorium on data centers; unanimous vote; preemptive action with no known proposals. Excludes un-zoned areas of Sugar Camp, Monico, Enterprise, and City of Rhinelander. The measure runs to August 19, 2027.

Oshkosh

2026-09

In force

12-month moratorium on new data centers

The Oshkosh Common Council unanimously approved Ordinance 26-38 on September 8, 2026, establishing a 12-month moratorium on new data centers. The moratorium runs 12 months after publication unless the council ends it earlier, giving the city time to draft zoning and regulatory standards.

Polk County

2026-08

In force

Proposed county moratorium on data centers

The Polk County Board of Supervisors adopted Resolution 29-26 on August 18, 2026, creating Polk County Code Ch. 42-41 and enacting a temporary moratorium on data centers. The resolution provides for a 12-month moratorium while the county develops zoning and regulatory standards.

Port Washington

2026-04

In force

Referendum requiring a public vote on large tax incentives

Voters approved the nation's first anti-data-center referendum in April 2026 with roughly 66% support, requiring that approval of tax incremental financing for any project with a base value or cost above $10 million be put to a community vote. It followed Vantage Data Centers' announcement of a $15 billion AI campus with OpenAI and Oracle; the referendum does not stop that project, which was already under construction with $458 million in approved tax benefits.

Sauk County

2026-09

In force

County moratorium on data centers for a stated term

Ordinance 07-2026-0 amends the county zoning code to enact an 18-month moratorium on receipt of applications and the granting of all zoning permits or approvals for siting or placement of data centers. Effective on publication; runs 18 months from publication or until the board amends or rescinds it, whichever comes first. Publication date not recorded, so no end date is stored. The measure has a stated duration whose end date is not recorded.

Sawyer County

2026-08

In force

County moratorium on data centers for a stated term

County board adopted an 18-month temporary moratorium on development of large data centers and associated infrastructure, to give staff time to draft setback, permitting and performance standards. Zoning committee had recommended it 5-0 on Jul 15. Source is meeting coverage, not the county's own ordinance; end date is not stated in it. The measure has a stated duration whose end date is not recorded.

Shawano County

2026-01

In force

County moratorium on data centers through June 24, 2027

12-month moratorium on data centers in unincorporated towns under county zoning; does not affect cities, villages, or self-zoning towns. The measure runs to June 24, 2027.

Sheboygan

2026-01

In force

Local moratorium on data centers through July 23, 2027

12-month moratorium on data centers over 10,000 sq ft; unanimously approved. No existing zoning codes for data centers. The measure runs to July 23, 2027 and applies at a threshold of 10,000 sq ft.

St. Croix County

2026-09

In force

Local moratorium on data centers through September 1, 2027

1-year moratorium on medium- and large-scale data centers, 18-0, in unincorporated areas under county zoning -- does not apply to the towns of Forest, Hudson, St. Joseph, or Troy, which zone themselves. The measure runs to September 1, 2027.

Town of Beetown

2026-05

In force

Local moratorium on data centers

Interim zoning ordinance blocking large data centers. Grant County; related to collapsed $1B data center proposal. The measure has no documented term.

Town of Cassville

2026-04

In force

Local moratorium on data centers for a stated term

2-year moratorium, unanimous. 36 sq mi in Grant County. Residents mobilized against a \$1B proposed project. The measure has a stated duration whose end date is not recorded.

Town of Hampden

2026-05

In force

Local moratorium on data centers

Data center temporary moratorium (Chapter 18 ordinance). Columbia County. The measure has no documented term.

Town of Janesville (Rock County)

2026-08

In force

Town of Janesville (Rock County) data center moratorium (proposed)

The Town of Janesville board of supervisors approved a 12-month data center moratorium after its planning and zoning committee recommended one.

Town of New Denmark

2026-06

In force

One-year data center moratorium (Resolution 2026-04)

The Town of New Denmark in Brown County adopted Resolution 2026-04 on June 8, 2026, imposing a one-year moratorium on the placing of data centers within the town. The moratorium may be extended for an additional six months.

Town of Westport

2026-04

In force

Local moratorium on data centers through April 6, 2027

1-year moratorium restricting new data centers and telecom centers to max 10,000 sq ft; voted 4-1. Catalyst was QTS Data Centers proposal in nearby DeForest. Dane County. The measure runs to April 6, 2027 and applies at a threshold of 10,000 sq ft.

Two Creeks

2026-02

In force

Two Creeks data center moratorium

Two Creeks, along with Two Rivers and Mishicot, held a joint town board meeting and approved identical resolutions calling on Manitowoc County to adopt a one-year moratorium on data center permits and construction, with option to extend 6 months (by Cloverleaf Infrastructure). These three northeast Wisconsin towns acted proactively to prevent data center siting in their communities.

Two Rivers

2026-02

In force

Two Rivers data center moratorium

Two Rivers, Wisconsin, joined Two Creeks and Mishicot at a joint town board meeting on February 12, 2026 in approving identical resolutions calling for a one-year moratorium on data center permits and construction in Manitowoc County, with option for a six-month extension. The action came after Texas-based Cloverleaf Infrastructure approached local farmers with offers to purchase land, with one Mishicot farmer reportedly offered $70-80 million for up to 6,000 acres. Over 70 residents attended the joint meeting, and the Manitowoc County Board's Park and Planning Commission took up the moratorium petition on March 30.

Village of Bellevue

2026-08

In force

12-month data center moratorium

The Village Board voted unanimously on Aug. 12, 2026 to bar all data center development for 12 months, extendable by six months, while a permanent ordinance is written. No proposal was pending.

Village of Cottage Grove

2026-07

In force

12-month data center moratorium

The Cottage Grove Village Board unanimously approved a 12-month data center moratorium on July 20, 2026, becoming one of three Dane County municipalities to pause data centers.

Village of Greenville (Outagamie County)

2026-07

In force

One-year data center moratorium (10,000 sq ft+)

The Greenville Village Board unanimously adopted a one-year moratorium on July 13, 2026 on new data centers of 10,000 sq ft or more to study impacts and develop regulations.

Village of Wrightstown

2026-07

In force

One-year data center moratorium

The Wrightstown Village Board unanimously approved a one-year data center moratorium on July 7, 2026 after a resident petition; an Aug. 11, 2026 advisory referendum then rejected a data center in the village.

Winnebago County

In force

County moratorium on data centers

County Board passed 12-month moratorium in voice vote at Aug 18, 2026 meeting. Applies to townships of Algoma, Neenah, Nekimi, and Omro. Cities must adopt own regulations. Preemptive, no known data center proposals in county. The measure has no documented term.

Calumet County

2026-09

Proposed

Why Calumet County hasn't passed a data center moratorium

De Pere

2026-09

Proposed

Proposed one-year data center moratorium

The De Pere Plan Commission approved a proposed one-year moratorium on large-scale data center development on September 28, 2026. The measure still needs final approval from the Common Council.

Eau Claire County

2026-09

Proposed

Committee directs drafting of data center moratorium resolution

The Eau Claire County Committee on Administration voted unanimously on September 8, 2026 to develop a resolution adopting a moratorium on data centers for a limited time. The county administrator said the timeframe and other details were still to be set.

Milwaukee

2026-09

Proposed

Proposed one-year pause on new data centers

The Milwaukee City Plan Commission unanimously approved a proposed one-year data center moratorium on Sept. 28, 2026, after a Common Council committee postponed action in July over a public hearing requirement. The measure still needs final approval from the Common Council.

Shawano County (committee recommends 1-year data center moratorium), WI

2026-06

Proposed

Shawano County (committee recommends 1-year data center moratorium), WI data center moratorium (proposed)

On June 3, 2026, the Shawano County Planning, Development & Zoning Committee unanimously recommended a one-year moratorium for unincorporated (county-zoned) areas after a public hearing at which no speakers opposed it. The full county board is set to vote June 24. The Planning, Development & Zoning Committee held a June 3 public hearing (no speakers opposed) and unanimously recommended a one-year moratorium to the full county board, which takes it up June 24.

Sheboygan Common Council, WI

2026-05

Proposed

Sheboygan Common Council, WI data center moratorium (proposed)

Sheboygan Common Council voted 7-3 to refer a proposed one-year moratorium on data centers >10,000 sq ft to the Plan Commission. No projects currently proposed. Plan Commission meeting May 12; back to Council for final say.

Town of Bloomer

2026-10

Proposed

Proposed moratorium on data center development, hearing set

The Town of Bloomer Town Board scheduled a public hearing for October 7, 2026 that includes discussion and action on a Planning Commission recommendation for a moratorium on data center development in the town.

Wisconsin Rapids

2026-09

Proposed

Proposed temporary development moratorium on data centers

The Wisconsin Rapids Planning Commission scheduled a public hearing for Oct. 5, 2026 on a temporary development moratorium for data centers within city limits, with notice posted Sept. 3, 2026. The moratorium could last up to 12 months. It has not been enacted; the outcome of the Oct. 5 hearing was not yet reported.

Brown County

2026-06

Failed / vetoed

County data center moratorium (declined)

The Planning, Development and Transportation Committee unanimously declined on June 2, 2026 to pursue a countywide moratorium, noting every municipality in the county has its own zoning; a subcommittee was formed instead.

Brown County (committee declines countywide data center moratorium), WI

2026-06

Failed / vetoed

Brown County (committee declines countywide data center moratorium), WI data center moratorium (failed)

On June 2, 2026, the Brown County Planning, Development & Transportation Committee unanimously declined to advance Supervisor Christopher Welch’s proposed countywide data center moratorium, citing that no town, village, or city in Brown County is under county zoning (rendering it moot). It instead formed an informal three-person subcommittee to survey local governments. About 80 people attended and 21 commenters objected to the decision.

## Would you like the weekly update?

Every week we re-verify every state and local measure on this map and publish what changed. You get one email when it goes out.

Also send me

Receive a short introduction on days 3, 7 and 14, plus the updates you select. Unsubscribe in one click. [Privacy](https://savrn.com/privacy) ·

You're on the list. The next weekly update will land in your inbox when it publishes.

You are subscribed. [Read the latest tracker](https://savrn.com/data-center-moratorium-tracker)

### Where Wisconsin stands

Across the whole tracker we hold 334 state-level measures in 49 states and 1253 city and county measures, against 1419 primary sources. Wisconsin accounts for 9 of the state-level measures and 49 of the local ones.

By total measures on record it is #8 of the 50 states and DC carrying any tracked action, and #6 by city and county measures alone. Ranking is by count of sourced entries in this dataset, so it measures documented activity, not the size of the buildout.

## Sources for Wisconsin

54 citations behind the entries above. Each opens in a new tab.

- Statewide · Wisconsin Legislature (Act 16 data-center TID exception) — Wisconsin: Governor Tony Evers signed Assembly Bill 140 (now 2025 Wisconsin Act 16), which created statutory exceptions from the standard 12% equalized-value (In force, 2025-07) [docs.legis.wisconsin.gov →](https://docs.legis.wisconsin.gov/2025/related/acts/16)
- Statewide · Wisconsin (statewide PSC rate hearing) — Wisconsin: Two Wisconsin PSC dockets address data center rate structures. (Proposed, 2026-02) [psc.wi.gov →](https://psc.wi.gov/Documents/PressReleases/04.24.2026PressRelease.PDF)
- Statewide — Months after session, weeks before election, Republicans propose repeal of data center tax break (Proposed, 2026-10) [wisconsinexaminer.com →](https://wisconsinexaminer.com/2026/10/09/months-after-session-weeks-before-election-republicans-propose-repeal-of-data-center-tax-break/)
- Statewide · AB 302 — Relating to: a sales and use tax exemption for data center equipment or software. (FE) (Failed / vetoed, 2024-04) [docs.legis.wisconsin.gov →](https://docs.legis.wisconsin.gov/2023/proposals/reg/asm/bill/ab302)
- Statewide · AB 840 — Wisconsin AB 840 / SB 843 (Rep. Shannon Zimmerman R-River Falls, Sen. Romaine Quinn R-Birchwood), a GOP-led data center bill, passed the Assembly in January (Failed / vetoed, 2026-01) [docs.legis.wisconsin.gov →](https://docs.legis.wisconsin.gov/2025/related/proposals/ab840.pdf)
- Statewide · SB 729 — Wisconsin SB 729 / AB 722, the Data Center Accountability Act, authored by Sen. Jodi Habush Sinykin (D-Whitefish Bay) and Rep. Angela Stroud (D-Ashland) (Failed / vetoed, 2026-01) [wisconsinexaminer.com →](https://wisconsinexaminer.com/2026/02/18/non-disclosure-agreements-energy-costs-focus-of-data-center-hearing/)
- Statewide · Wisconsin — Wisconsin: Senate Bill 969, authored by Sen. Andre Jacque (R-New Franken), would prohibit NDAs between data center companies and municipalities (Failed / vetoed, 2026-02) [wpr.org →](https://www.wpr.org/news/new-bill-ban-nondisclosure-agreements-wisconsin-data-centers-nda)
- Statewide · AB 1099 / SB 1061 — Moratorium on operation of data centers (Failed / vetoed, 2026-03) [docs.legis.wisconsin.gov →](https://docs.legis.wisconsin.gov/2025/related/proposals/sb1061)
- Statewide · SB 244 — Relating to: modifying the sales and use tax exemption for qualified data centers. (FE) (Failed / vetoed, 2026-03) [docs.legis.wisconsin.gov →](https://docs.legis.wisconsin.gov/2025/proposals/reg/sen/bill/sb244)
- Ashwaubenon — Local moratorium on data centers through June 2, 2027 (In force, 2026-01) [nbc26.com →](https://www.nbc26.com/ashwaubenon/ashwaubenon-plan-commission-votes-unanimously-to-pause-hyperscale-data-center-development-for-12-months)
- Chippewa County — Local moratorium on data centers for a stated term (In force, 2026-08) [leadertelegram.com →](http://www.leadertelegram.com/news/daily-updates/chippewa-county-board-approves-data-center-moratorium/article_91eb4e5d-9858-41ec-b515-d5d3fc97b747.html)
- City of Madison — 12-month data center moratorium (10,000 sq ft+) (In force, 2026-01) [cityofmadison.com →](https://www.cityofmadison.com/dpced/about/temporary-data-center-moratorium)
- City of Superior — One-year data center moratorium (In force, 2026-06) [wpr.org →](https://www.wpr.org/news/superior-joins-growing-number-of-wisconsin-communities-to-pass-data-center-moratorium)
- Dane County — Local moratorium on data centers through December 4, 2027 (In force, 2026-06) [isthmus.com →](https://isthmus.com/news/news/dane-county-board-approves-data-center-moratorium/)
- Dane County (18-month hyperscale data center moratorium passed), WI — Dane County (18-month hyperscale data center moratorium passed), WI data center moratorium (In force, 2026-06) [wisbusiness.com →](https://www.wisbusiness.com/2026/dane-county-board-approves-18-month-pause-on-hyperscale-data-center-development/)
- Dodge County — Local moratorium on data centers through February 10, 2028 (In force, 2026-08) [dailydodge.com →](https://dailydodge.com/dodge-county-to-hold-public-hearing-on-proposed-data-center-moratorium/)
- Door County — County moratorium on data centers through May 26, 2027 (In force, 2026-01) [wisconsinwatch.org →](https://wisconsinwatch.org/2026/04/latest-wisconsin-data-center-news-you-might-have-missed/)
- Grant County — County moratorium on data centers through June 18, 2027 (In force, 2026-01) [telegraphherald.com →](https://www.telegraphherald.com/news/tri-state/article_3404fac2-9efe-4bd9-82a0-4bafd5193038.html)
- Green County — County moratorium on data centers (In force, ) [beloitdailynews.com →](http://www.beloitdailynews.com/news/local-news/green-county-joins-the-growing-list-of-wisconsin-counties-passing-data-center-moratoriums/article_644bfc7d-ebfb-4fa4-8ac7-c46b9d28d300.html)
- Janesville — Local moratorium on data centers through September 28, 2027 (In force, 2026-09) [gazettextra.com →](https://www.gazettextra.com/news/local/janesville-city-council-approves-12-month-pause-for-data-centers/article_a2a675b4-4862-4f51-ada2-460aeee20a45.html)
- La Crosse County — Local moratorium on data centers through December 18, 2027 (In force, 2026-06) [wxow.com →](https://www.wxow.com/news/la-crosse-county-board-approves-data-center-moratorium/article_89162c21-3240-4d86-9e2d-8a6c3489ddc8.html)
- Manitowoc County — 18-month data center moratorium (In force, 2026-04) [wpr.org →](https://www.wpr.org/news/manitowoc-county-board-approves-18-month-data-center-moratorium)
- Marathon County — County moratorium on data centers (In force, ) [centralwinews.com →](https://www.centralwinews.com/main/2026/06/02/marathon-county-to-consider-data-center-moratorium/?destination=tribune-phonograph)
- Middleton — Local moratorium on data centers (In force, ) [middletontimes.com →](https://www.middletontimes.com/articles/2026/07/01/data-center-moratorium-adopted)
- Mishicot and 2 other localities — 3 separate measures, cited together (In force, 2026-02) [wpr.org →](https://www.wpr.org/news/northeast-wisconsin-towns-1-year-moratorium-data-centers)
- Monroe County — County moratorium on data centers through January 21, 2028 (In force, 2026-01) [news8000.com →](https://www.news8000.com/news/local-news/sparta/monroe-county-board-passes-18-month-moratorium-on-data-center-and-battery-storage-permits/article_c99ee674-946e-4422-b382-82f7737634d1.html)
- Oneida County — County moratorium on data centers through August 19, 2027 (In force, 2026-08) [wxpr.org →](https://www.wxpr.org/energy-environment/2026-08-19/oneida-county-passes-one-year-data-center-moratorium)
- Oshkosh — 12-month moratorium on new data centers (In force, 2026-09) [wbay.com →](https://www.wbay.com/2026/09/09/oshkosh-common-council-passes-temporary-moratorium-data-centers/)
- Polk County — Proposed county moratorium on data centers (In force, 2026-08) [polkcountywi.gov →](https://www.polkcountywi.gov/government/county_board_of_supervisors/resolutions.php)
- Port Washington — Referendum requiring a public vote on large tax incentives (In force, 2026-04) [wpr.org →](https://www.wpr.org/news/port-washington-referendum-concerns-data-center-project)
- Sauk County — County moratorium on data centers for a stated term (In force, 2026-09) [co.sauk.wi.us →](https://www.co.sauk.wi.us/resolutions/07-2026-0)
- Sawyer County — County moratorium on data centers for a stated term (In force, 2026-08) [citizenportal.ai →](https://citizenportal.ai/articles/9605659/Wisconsin/Sawyer-County/Sawyer-County-adopts-18-month-moratorium-on-large-data-centers)
- Shawano County — County moratorium on data centers through June 24, 2027 (In force, 2026-01) [newmedia-wi.com →](https://www.newmedia-wi.com/board-adopts-moratorium-data-center-development)
- Sheboygan — Local moratorium on data centers through July 23, 2027 (In force, 2026-01) [whbl.com →](https://whbl.com/2026/07/23/data-center-moratorium-passes-common-council/)
- St. Croix County — Local moratorium on data centers through September 1, 2027 (In force, 2026-09) [hudsonstarobserver.com →](https://www.hudsonstarobserver.com/news/st-croix-county-board-of-supervisors-approves-data-center-moratorium-unanimously/article_ffb0d3f1-77a5-43c7-8ba5-e9fd44b1aa32.html)
- Town of Beetown — Local moratorium on data centers (In force, 2026-05) [sustainruralwisconsin.org →](https://sustainruralwisconsin.org/data-centers)
- Town of Cassville — Local moratorium on data centers for a stated term (In force, 2026-04) [dailyreporter.com →](https://dailyreporter.com/2026/06/05/wisconsin-counties-impose-moratoriums-on-hyperscale-data-centers/)
- Town of Hampden — Local moratorium on data centers (In force, 2026-05) [townofhampden.wi.gov →](https://townofhampden.wi.gov/documents/ch-18-data-center-temporary-moratorium)
- Town of Janesville (Rock County) — Town of Janesville (Rock County) data center moratorium (proposed) (In force, 2026-08) [beloitdailynews.com →](http://www.beloitdailynews.com/news/business-news/town-of-rock-board-holds-off-on-data-center-moratorium-vote-town-of-janesville-approves/article_12a85823-374e-48bf-92a8-205b9519035b.html)
- Town of New Denmark — One-year data center moratorium (Resolution 2026-04) (In force, 2026-06) [townofnewdenmarkwi.gov →](https://townofnewdenmarkwi.gov/news-and-notices/notice-of-moratorium-of-data-centers/)
- Town of Westport — Local moratorium on data centers through April 6, 2027 (In force, 2026-04) [hngnews.com →](https://www.hngnews.com/tribune_enterprise/news/local/westport-enacts-data-center-moratorium/article_41bd7395-3dc5-4617-8fbd-72dcc27142f3.html)
- Village of Bellevue — 12-month data center moratorium (In force, 2026-08) [nbc26.com →](https://www.nbc26.com/bellevue/village-of-bellevue-bans-data-center-development-for-12-months)
- Village of Cottage Grove — 12-month data center moratorium (In force, 2026-07) [wmtv15news.com →](https://www.wmtv15news.com/2026/07/20/cottage-grove-considers-temporary-ban-data-centers-follows-growing-trend-statewide/)
- Village of Greenville (Outagamie County) — One-year data center moratorium (10,000 sq ft+) (In force, 2026-07) [wearegreenbay.com →](https://www.wearegreenbay.com/news/local-news/greenville-adopts-data-center-moratorium/)
- Village of Wrightstown — One-year data center moratorium (In force, 2026-07) [wearegreenbay.com →](https://www.wearegreenbay.com/news/local-news/wrightstown-places-moratorium-on-data-centers/)
- Winnebago County — County moratorium on data centers (In force, ) [fox11online.com →](https://fox11online.com/news/local/winnebago-county-to-pursue-12-month-data-center-moratorium)
- Calumet County — Why Calumet County hasn't passed a data center moratorium (Proposed, 2026-09) [news.google.com →](https://news.google.com/rss/articles/CBMizgFBVV95cUxQQ2JraGNTNmh5d1JlSWxjQlVtNWJuNnpxcGVyZC1PQ1RSZUtwMHZJNkY4QUFfUzB3TGlnd2hwei04QnNVODRaUVhHYU5SamZZYlAzN3AzQzF3NGRiZElZdmpzdVZKZ0JIeE1oLUFlTUhRUWltM0diWjFfQ0pkZVZwY1NtT2x3cC1oRHhNSzZXUEJ3emlZckJPVWl5OUNuX000QXd4ek5pZWl2WjZCREdyMTAxTnpnSEduTDlPeGg5NlVmcEtEemRZb3VJUENaZw)
- De Pere and 1 other locality — 2 separate measures, cited together (Proposed, 2026-09) [spectrumnews1.com →](https://spectrumnews1.com/wi/milwaukee/news/2026/09/29/de-pere-milwaukee-data-center-moratoriums)
- Eau Claire County — Committee directs drafting of data center moratorium resolution (Proposed, 2026-09) [yahoo.com →](https://www.yahoo.com/news/us/articles/eau-claire-county-enact-moratorium-035900375.html)
- Shawano County (committee recommends 1-year data center moratorium), WI — Shawano County (committee recommends 1-year data center moratorium), WI data center moratorium (proposed) (Proposed, 2026-06) [spectrumnews1.com →](https://spectrumnews1.com/wi/milwaukee/news/2026/06/03/wisconsin-data-center-shawano-county-moritorium)
- Sheboygan Common Council, WI — Sheboygan Common Council, WI data center moratorium (proposed) (Proposed, 2026-05) [whbl.com →](https://whbl.com/2026/05/05/city-of-sheboygan-sends-data-center-limits-to-plan-commission/)
- Town of Bloomer — Proposed moratorium on data center development, hearing set (Proposed, 2026-10) [weau.com →](https://www.weau.com/2026/10/03/town-bloomer-hold-public-hearing-about-data-centers/)
- Wisconsin Rapids — Proposed temporary development moratorium on data centers (Proposed, 2026-09) [yahoo.com →](https://www.yahoo.com/news/us/articles/wisconsin-rapids-schedules-public-hearing-192158075.html)
- Brown County and 1 other locality — 2 separate measures, cited together (Failed / vetoed, 2026-06) [dailyreporter.com →](https://dailyreporter.com/2026/06/03/brown-county-declines-data-center-moratorium-zoning/)

[See all 1419 sources across every state →](https://savrn.com/data-center-moratorium-tracker/sources)

## What does bind large loads in Wisconsin

A moratorium is only one way a data center gets stopped. The grid operator decides whether it can connect at all, and on what terms. Wisconsin sits in 1 footprint.

MISODominant

Faster parallel studies and a co-located generation fast track, not a pause.

Effectively the entire state is MISO (ATC transmission in east/central; Xcel NSP-W in west) — not a genuine multi-RTO state.

[See the full Data Center Grid Operator Watchlist →](https://savrn.com/data-center-grid-operator-watchlist)

## States next door

4 of the 4 states bordering Wisconsin have at least one data-center measure on record. Restrictions tend to travel between neighbors, so this is usually where the next one comes from.

[Michigan 104](https://savrn.com/data-center-moratorium-tracker/michigan) [Minnesota 40](https://savrn.com/data-center-moratorium-tracker/minnesota) [Iowa 36](https://savrn.com/data-center-moratorium-tracker/iowa) [Illinois 33](https://savrn.com/data-center-moratorium-tracker/illinois)

## Data centers in Wisconsin

The US Data Center Map identifies 37 facilities run by 28 operators in Wisconsin, each one placed from primary sources and listed by city and by operator, with the measures on this page beside them.

[Open the Wisconsin data center map →](https://savrn.com/data-center-map/wisconsin) · [The US Data Center Map →](https://savrn.com/data-center-map)

[Alabama](https://savrn.com/data-center-moratorium-tracker/alabama) [Alaska](https://savrn.com/data-center-moratorium-tracker/alaska) [Arizona](https://savrn.com/data-center-moratorium-tracker/arizona) [Arkansas](https://savrn.com/data-center-moratorium-tracker/arkansas) [California](https://savrn.com/data-center-moratorium-tracker/california) [Colorado](https://savrn.com/data-center-moratorium-tracker/colorado) [Connecticut](https://savrn.com/data-center-moratorium-tracker/connecticut) [Delaware](https://savrn.com/data-center-moratorium-tracker/delaware) [Florida](https://savrn.com/data-center-moratorium-tracker/florida) [Georgia](https://savrn.com/data-center-moratorium-tracker/georgia) [Hawaii](https://savrn.com/data-center-moratorium-tracker/hawaii) [Idaho](https://savrn.com/data-center-moratorium-tracker/idaho) [Illinois](https://savrn.com/data-center-moratorium-tracker/illinois) [Indiana](https://savrn.com/data-center-moratorium-tracker/indiana) [Iowa](https://savrn.com/data-center-moratorium-tracker/iowa) [Kansas](https://savrn.com/data-center-moratorium-tracker/kansas) [Kentucky](https://savrn.com/data-center-moratorium-tracker/kentucky) [Louisiana](https://savrn.com/data-center-moratorium-tracker/louisiana) [Maine](https://savrn.com/data-center-moratorium-tracker/maine) [Maryland](https://savrn.com/data-center-moratorium-tracker/maryland) [Massachusetts](https://savrn.com/data-center-moratorium-tracker/massachusetts) [Michigan](https://savrn.com/data-center-moratorium-tracker/michigan) [Minnesota](https://savrn.com/data-center-moratorium-tracker/minnesota) [Mississippi](https://savrn.com/data-center-moratorium-tracker/mississippi) [Missouri](https://savrn.com/data-center-moratorium-tracker/missouri) [Montana](https://savrn.com/data-center-moratorium-tracker/montana) [Nebraska](https://savrn.com/data-center-moratorium-tracker/nebraska) [Nevada](https://savrn.com/data-center-moratorium-tracker/nevada) [New Hampshire](https://savrn.com/data-center-moratorium-tracker/new-hampshire) [New Jersey](https://savrn.com/data-center-moratorium-tracker/new-jersey) [New Mexico](https://savrn.com/data-center-moratorium-tracker/new-mexico) [New York](https://savrn.com/data-center-moratorium-tracker/new-york) [North Carolina](https://savrn.com/data-center-moratorium-tracker/north-carolina) [North Dakota](https://savrn.com/data-center-moratorium-tracker/north-dakota) [Ohio](https://savrn.com/data-center-moratorium-tracker/ohio) [Oklahoma](https://savrn.com/data-center-moratorium-tracker/oklahoma) [Oregon](https://savrn.com/data-center-moratorium-tracker/oregon) [Pennsylvania](https://savrn.com/data-center-moratorium-tracker/pennsylvania) [Rhode Island](https://savrn.com/data-center-moratorium-tracker/rhode-island) [South Carolina](https://savrn.com/data-center-moratorium-tracker/south-carolina) [South Dakota](https://savrn.com/data-center-moratorium-tracker/south-dakota) [Tennessee](https://savrn.com/data-center-moratorium-tracker/tennessee) [Texas](https://savrn.com/data-center-moratorium-tracker/texas) [Utah](https://savrn.com/data-center-moratorium-tracker/utah) [Vermont](https://savrn.com/data-center-moratorium-tracker/vermont) [Virginia](https://savrn.com/data-center-moratorium-tracker/virginia) [Washington](https://savrn.com/data-center-moratorium-tracker/washington) [Washington, DC](https://savrn.com/data-center-moratorium-tracker/washington-dc) [West Virginia](https://savrn.com/data-center-moratorium-tracker/west-virginia) [Wisconsin](https://savrn.com/data-center-moratorium-tracker/wisconsin) [Wyoming](https://savrn.com/data-center-moratorium-tracker/wyoming)

### How to read this page

In force = a moratorium, siting restriction, or tax-incentive rollback that is currently enacted, by statute or executive order. Paused = a temporary hold on new incentives or applications. Proposed = introduced and still pending. Failed / vetoed = died in committee, was voted down, or was vetoed.

This page is generated from the same primary-sourced dataset as the national [U.S. Data Center Moratorium Tracker](https://savrn.com/data-center-moratorium-tracker) and is re-checked on the same weekly cycle, whether or not anything changed. Legislative status changes quickly; it is informational, not legal advice. Spot something out of date in Wisconsin? [Tell us](https://savrn.com/contact).

Companion references: the [Data Center Grid Operator Watchlist](https://savrn.com/data-center-grid-operator-watchlist) for the interconnection and curtailment rules that bind here, the [Data Center Water Tracker](https://savrn.com/data-center-water-tracker) for water mandates, and the [Data Center Delay Watchlist](https://savrn.com/data-center-delay-tracker) for named projects.

## Why Wisconsin is pushing back

The objections repeat from state to state: strain on the electric grid, water drawn for cooling, and the sense that a facility takes local resources without giving much back. SAVRN builds AI factories designed around those three objections: on-site power that does not lean on the public grid, direct-to-chip cooling that does not consume municipal water, and a training institute that puts local people to work inside the building.