# Data Center Permits Tracker: Permits, Queues and Planned Power
Source: https://savrn.com/data-center-permits-tracker
Markdown alternate of the page above; the site index is https://savrn.com/llms.txt

---

SAVRN Tracker

# U.S. Data Center Permits and Power Development Tracker

This tracker follows data center and substation building permits, large-load and power plant requests in the ISO and RTO interconnection queues, planned generators reported to the EIA, NRC reactor projects and EPA-registered data center facilities. It updates every hour from public records, and every row links to its source.

As of Oct 24, 2026 · 11,757 records from 21 public sources

Live · sources checked 7 h ago · 18 of 21 sources answered · 125 entries added in the last 7 days · last change 2026-10-24

Data center and substation permits Other utility-scale permits EIA-860M power plants, sized by MW

Lower 48 states. 1,499 plant locations; 375 of 1228 permits carry coordinates and are placed. Queue rows carry no coordinates.

737

Data center and substation permits

605 data center · 132 substation, from 80 city and county permit systems

756,801MW

Requested in interconnection queues

Generation and storage in 2,690 active queue positions across 7 ISO and RTO queues

474GW

Large loads seeking to connect in ERCOT

ERCOT, Jul 29, 2026, about 90% data centers. Operators count large loads differently, so no national total is added up.

232,373MW

Planned generating capacity, next 36 months

2,011 generators scheduled by Oct 2029, EIA-860M

## Data center and substation permits

Building, site plan and rezoning records from 80 city and county permit systems, classified by the work they describe. Data center and substation permits are listed first, then site plans and rezonings that name a data center, then utility-scale generation, battery, solar and wind permits.

| Date | Place | Category | Description | Value | Source |
| --- | --- | --- | --- | --- | --- |
| Oct 23, 2026 | 7251 GROVE HILL BLVD GAINESVILLE VA 20155Prince William County VA ePortal permits and plans | Data center | Install (2) building-mounted signs. (1) illuminated sign & (1) Non-illuminated sign for NTT Data CenterBuilding Commercial Sign, C - Sign BLD2027-01998 · Issued |  |  |
| Oct 23, 2026 | 7251 GROVE HILL BLVD GAINESVILLE VA 20155Prince William County VA ePortal permits and plans | Data center | Install (2) building-mounted signs. (1) illuminated sign & (1) Non-illuminated sign for NTT Data CenterElectrical Commercial Sign, C - Sign ELE2027-02003 · Issued |  |  |
| Oct 22, 2026 | 8819 WELLINGTON RD MANASSAS VA 20109Prince William County VA ePortal permits and plans | Data center | LV - PULLING COPPER AND FIBER CABLE IN DATA HALL 320Electrical Commercial Alteration/Repair, C - Alteration/Repair ELE2027-01801 · Issued |  |  |
| Oct 22, 2026 | 25190 MEADOWDALE CHANTILLYLoudoun County VA LandMARC submitted permits | Data center | Data Center TFO Extinguisher - Phase 01 - ContractorFire Protection (Commercial) FIREC-2026-051792 · Invoiced and Paid - Same Day |  |  |
| Oct 21, 2026 | City of Hillsboro OR Citizen Access records | Data center | DLR PDX10 Data Center Ste 130 ElectricalBuilding Commercial Electrical Permit ELE26-1286 · Inspection Phase |  |  |
| Oct 21, 2026 | 7060 WELLINGTON RD MANASSAS VA 20109Prince William County VA ePortal permits and plans | Data center | BFPE International will furnish the equipment, shop drawings, product data, load calculations, installation, and programming for the air sampling smoke detection renovation work…Electrical Commercial Alteration/Repair, C - Alteration/Repair ELE2027-01908 · Issued |  |  |
| Oct 20, 2026 | City of Goodyear AZ Citizen Access records | Data center | CAMELBACK INTERCHANGE BLDG A - DATA CENTER STORAGE AND LOGISTICS - TI - INDBuilding Industrial Construction B26-02801 · Prescreen Review Corrections |  |  |
| Oct 20, 2026 | 8210 BETHLEHEM RD MANASSAS VA 20109Prince William County VA ePortal permits and plans | Data center | Fire alarm alterationFire Protection - Fire Alarm FPP2027-00224 · Issued |  |  |
| Oct 20, 2026 | 8819 WELLINGTON RD MANASSAS VA 20109Prince William County VA ePortal permits and plans | Data center | STACK NVA05D FLOOR 2 & 3 DATA HALL BUILD-OUT BUILDING PERMITMechanical Commercial Alteration/Repair, C - Alteration/Repair MEC2027-00161 · Issued |  |  |
| Oct 20, 2026 | 8819 WELLINGTON RD MANASSAS VA 20109Prince William County VA ePortal permits and plans | Data center | STACK NVA05D FLOOR 2 & 3 DATA HALL BUILD-OUT BUILDING PERMITPlumbing Commercial Alteration/Repair, C - Alteration/Repair PLB2027-00184 · Issued |  |  |
| Oct 20, 2026 | 45695 RUSSELL BRANCH STERLINGLoudoun County VA LandMARC submitted permits | Data center | NEW DATA CENTERZoning (Commercial) New Construction ZONC-2026-051291 · Invoiced and Paid - Same Day |  |  |
| Oct 19, 2026 | City of Hillsboro OR Citizen Access records | Data center | NTT HIL11 Data CenterPlanning Development Review II DR26-0040 · Payment Received |  |  |
| Oct 19, 2026 | City of Hillsboro OR Citizen Access records | Data center | NTT Global Data Center Energy Storage SystemPlanning Development Review II DR26-0041 · Pending |  |  |
| Oct 19, 2026 | City of Hillsboro OR Citizen Access records | Data center | NTT Global Data Center Energy Storage SystemPlanning Development Review II TMP-00001-26-006338 |  |  |
| Oct 19, 2026 | 22916 INTERNATIONAL STERLINGLoudoun County VA LandMARC issued permits | Data center | Electrical equipment updates with related overhead cable supports, within existing 2-story data center building. Electronic copy.Building (Commercial) Alteration BLDC-2026-017626 · Issued | $24,000 |  |
| Oct 19, 2026 | 22916 INTERNATIONAL STERLINGLoudoun County VA LandMARC issued permits | Data center | Electrical equipment updates with related overhead cable supports, within existing 2-story data center building. Electronic copy.Zoning (Commercial) Alteration ZONC-2026-018485 · Issued | $24,000 |  |
| Oct 17, 2026 | 7675 DEACON FALLS DR GAINESVILLE VA 20155Prince William County VA ePortal permits and plans | Data center | IAD 113 8" UG FIRELINE PERMIT - UNDERGROUND FIRE MAIN FROM LESS THAN 10 FEET FROM THE BUILDING TO SPRINKLER SYSTEM FLANGE INSIDE THE BUILDINGFire Protection - Underground Fire Line FPP2027-00280 · Issued |  |  |
| Oct 16, 2026 | City of Hillsboro OR Citizen Access records | Data center | NTT HIL11 Data CenterPlanning Development Review II TMP-00001-26-006251 |  |  |
| Oct 16, 2026 | 10155 LINTON HALL RD BRISTOW VA 20136Prince William County VA ePortal permits and plans | Data center | YFT BUILDING C INSTALL SPRINKLER MONITORING SYSTEM IN SHELL BUILDINGFire Protection - Fire Alarm FPP2027-00261 · Issued |  |  |
| Oct 16, 2026 | 43705 EFFICIENCY STERLINGLoudoun County VA LandMARC issued permits | Data center | Low voltage for HVAC controls IAD 57 SHELL/ PBB; NEW DATA CENTER W/ CORE SHELL, OFFICE AREA WITH FUTURE FITOUTSElectrical (Commercial) Low Voltage - Other ELECC-2026-044604 · Issued | $85,071,825 |  |
| Oct 16, 2026 | 44525 LOW LATENCY STERLINGLoudoun County VA LandMARC issued permits | Data center | Tuna C&S - Scope of work includes the design and installation of a complete automatic fire sprinkler system, fire pump assembly, manual wet standpipe system, and manual dry…Fire Protection (Commercial) New Construction FIREC-2026-039291 · Issued |  |  |
| Oct 16, 2026 | 21271 SMITH SWITCH ASHBURNLoudoun County VA LandMARC issued permits | Data center | Fire permit for data centerFMO - Moderate/High Hazard Hazardous Material FMOMH-2026-050316 · Issued |  |  |
| Oct 15, 2026 | 8217 LINTON HALL RD BRISTOW VA 20136Prince William County VA ePortal permits and plans | Data center | DLR VA 4 LV ELECTRICAL PERMITElectrical Commercial Alteration/Repair, C - Alteration/Repair ELE2027-01858 · Issued |  |  |
| Oct 15, 2026 | City of Goodyear AZ Citizen Access records | Data center | Data Center Storage and LogisticsBuilding Commercial Construction 26TMP-008571 · Prescreen Review |  |  |
| Oct 15, 2026 | City of Goodyear AZ Citizen Access records | Data center | Data Center Storage and LogisticsBuilding Commercial Construction B26-02763 · Prescreen Review |  |  |
| Oct 15, 2026 | 25374 MEADOWDALE CHANTILLYLoudoun County VA LandMARC issued permits | Data center | New Data Center Shell Construction - IAD159 - VESDA PermitFire Protection (Commercial) New Construction FIREC-2026-046702 · Issued | $23,360,286 |  |
| Oct 15, 2026 | 21529 BEAUMEADE ASHBURNLoudoun County VA LandMARC submitted permits | Data center | Low voltage for BMS system - PHASE 2 of same project as permit #BLDC-2024-063845 - Interior datacenter fit-out of 1st floor data center and corresponding equipment infrastructure…Electrical (Commercial) Low Voltage - Other ELECC-2026-050449 · Submitted - Online | $4,931,479 |  |
| Oct 14, 2026 | 7675 DEACON FALLS DR GAINESVILLE VA 20155Prince William County VA ePortal permits and plans | Data center | PROJECT GAINESVILLE BLDG D - NS Includes IW piping and Liquid Cooling Systems NEW SINGLE TENANT TWO STORY DATA CENTER - BLDG DMechanical Commercial New Structure, C - New Structure MEC2026-00438 · Issued |  |  |
| Oct 14, 2026 | 22890 PLATFORM STERLINGLoudoun County VA LandMARC submitted permits | Data center | Electrical equipment updates with related overhead cable supports, within existing 1-story data center building. Electronic copy.Building (Commercial) Alteration BLDC-2026-050267 · Submitted - Online | $62,000 |  |
| Oct 14, 2026 | 21271 SMITH SWITCH ASHBURNLoudoun County VA LandMARC submitted permits | Data center | Fire permit for data centerFMO - Moderate/High Hazard Hazardous Material FMOMH-2026-050316 · Submitted - Online |  |  |
| Oct 14, 2026 | 7232 E ELLIOT RDCity of Mesa building permits | Data center | Civil improvements to existing site entrance at the MSA Data Center, to include driveway widening, additional parking expansion and install of (2) Pre-Engineered Metal Bldgs.: (32…COM PMT26-11309 · Issued |  |  |
| Oct 13, 2026 | City of Goodyear AZ Citizen Access records | Data center | STREAM DATA CENTER PHX 7Building Fire Protection Systems 26TMP-008468 · Prescreen Review |  |  |
| Oct 13, 2026 | City of Goodyear AZ Citizen Access records | Data center | AMENDMENT TO B26-00311 - STREAM DATA CENTER PHX 7 - FABuilding Fire Protection Systems B26-02730 · Prescreen Review Corrections |  |  |
| Oct 13, 2026 | 7725 DEACON FALLS DR GAINESVILLE VA 20155Prince William County VA ePortal permits and plans | Data center | "TGTD N/S PROJECT GAINESVILLE BLD 2" Generator Platforms associated with BPR2022-02229Building Commercial Accessory Structure, C - Accessory Structure BLD2026-05147 · Issued |  |  |
| Oct 13, 2026 | 7250 GROVE HILL BLVD GAINESVILLE VA 20155Prince William County VA ePortal permits and plans | Data center | NTT VA12 LV ELECTRICAL PERMIT; LINK TO BLD2026-05831Electrical Commercial New Structure, C - New Structure ELE2027-01809 · Issued |  |  |
| Oct 13, 2026 | 14435 JOHN MARSHALL HWY GAINESVILLE VA 20155Prince William County VA ePortal permits and plans | Data center | VPTP-TLO IAD 198 TI TLO - VPTP-TLO IAD 198 TI - New construction project, concrete tilt-up construction.Plumbing Commercial Tenant Layout, C - Tenant Layout PLB2026-02137 · Issued |  |  |
| Oct 13, 2026 | 7675 DEACON FALLS DR GAINESVILLE VA 20155Prince William County VA ePortal permits and plans | Data center | PROJECT GAINESVILLE BLDG D - NS NEW SINGLE TENANT TWO STORY DATA CENTER - BLDG DPlumbing Commercial New Structure, C - New Structure PLB2026-02253 · Issued |  |  |
| Oct 13, 2026 | 22715 RELOCATION STERLINGLoudoun County VA LandMARC issued permits | Data center | Low voltage control wiring for building automation systems (BAS). This consists of wiring connections between the control panels and the devices and equipment that monitor the…Electrical (Commercial) Low Voltage - Other ELECC-2026-043635 · Issued | $37,000,000 |  |
| Oct 13, 2026 | 10010 E PECOS RDCity of Mesa building permits | Data center | NTT Data Centers: +/- 6,000 cubic yard stockpileCOM PMT26-16525 · Issued |  |  |
| Oct 12, 2026 | 9301 FREEDOM CENTER BLVD MANASSAS VA 20110Prince William County VA ePortal permits and plans | Data center | Interior buildout of (3) storage roomsBuilding Commercial Alteration/Repair, C - Alteration/Repair BLD2027-01338 · Issued |  |  |
| Oct 12, 2026 | 7250 GROVE HILL BLVD GAINESVILLE VA 20155Prince William County VA ePortal permits and plans | Data center | NTT Global Data Centers BLD 3 **MODIFIED TARGETED** NEW DATA CENTERElectrical Commercial New Structure, C - New Structure ELE2027-00061 · Issued |  |  |
| Oct 12, 2026 | 22425 SOUS VIDE STERLINGLoudoun County VA LandMARC submitted permits | Data center | This project consists of a 260,000 sq.ft 42 MW new construction data center in Sterling, Virginia. AS02 will utilize the same structural precast information as AS01 and will have…Electrical (Commercial) Low Voltage - Other ELECC-2026-049966 · Submitted - Online |  |  |
| Oct 12, 2026 | 712 E 5TH ST CHARLOTTE NC 28202Mecklenburg County NC building permits (all towns) | Data center | (HR) CLT15 Shell/Core (WHITING-TURNER CONTRACTING ) Shell construction of data center building.Shell COM-SHL-26-000055 · Inspection Phase |  |  |
| Oct 9, 2026 | City of Goodyear AZ Citizen Access records | Data center | PHX16 DATA CENTER - ADMINBuilding Industrial Construction 26TMP-008400 · Prescreen Review |  |  |
| Oct 9, 2026 | City of Goodyear AZ Citizen Access records | Data center | PHX16 DATA CENTER - ADMINBuilding Industrial Construction B26-02710 · Prescreen Review |  |  |
| Oct 9, 2026 | 12701 N US 169 Hwy #1 Data CenterKansas City MO city issued permits | Data center | Rocky Branch Creek 3A Data CenterCPPU - Fire Sprinkler (Commercial) Fast Track Fire Sprinkler CPFC-2026-00430 · Awaiting Customer Response |  |  |
| Oct 9, 2026 | DATA CENTER USEPrince William County VA use permits (zoning cases) | Data center | DATA CENTER USENCU NCU2027-00032 · ACTIVE |  |  |
| Oct 8, 2026 | 10430 HARRY J PARRISH BLVD MANASSAS VA 20110Prince William County VA ePortal permits and plans | Data center | MDC- 1 TGTD Furnish and install 1 passenger and 2 freight elevators.Mechanical Commercial New Structure, C - New Structure MEC2027-00185 · Issued |  |  |
| Oct 8, 2026 | 42630 PATRIOT PARK LEESBURGLoudoun County VA LandMARC issued permits | Data center | Fifth building on the campus. Core/Shell 3-Story Flex Warehouse and Commercial Office. Future purpose of space: 3-story single tenant computer data center. Electronic CopyPlumbing (Commercial) New Construction PLUMC-2026-044918 · Issued | $65,605,395 |  |
| Oct 8, 2026 | 44751 ROUND TABLE ASHBURNLoudoun County VA LandMARC submitted permits | Data center | Interior fit-up for building owner Data Center Accessory Office Use, approximately 2,832 SFElectrical (Commercial) ELECC-2026-049508 · Submitted - Online | $121,658 |  |
| Oct 8, 2026 | 44751 ROUND TABLE ASHBURNLoudoun County VA LandMARC submitted permits | Data center | Interior fit-up for building owner Data Center Accessory Office Use, approximately 2,832 SFElectrical (Commercial) Low Voltage - Fire Alarm ELECC-2026-049515 · Submitted - Online | $121,658 |  |
| Oct 7, 2026 | 14435 JOHN MARSHALL HWY GAINESVILLE VA 20155Prince William County VA ePortal permits and plans | Data center | VPTP-TLO IAD 198 TI (23) Transformer Pads (2,162sqft) , (1) House Generator Pad (377sqft) , (2) MV Pad (1,561 sqft) , (12) Generator Pads (16,438sqft)Building Commercial Accessory Structure, C - Accessory Structure BLD2026-04240 · Issued |  |  |
| Oct 7, 2026 | 14435 JOHN MARSHALL HWY GAINESVILLE VA 20155Prince William County VA ePortal permits and plans | Data center | VPTP-TLO IAD 198 TI Exterior Yard Steel Framing and Screen WallBuilding Commercial Accessory Structure, C - Accessory Structure BLD2026-04241 · Issued |  |  |
| Oct 7, 2026 | City of Chandler AZ Citizen Access records | Data center | ALIGNED DATA CENTER PHX06 / PH2 - ADDITION 2955 W INNOVATION STDevServices Building Revision BLDREV26-0289 · In Review |  |  |
| Oct 7, 2026 | 21641 CHARLES VIEW STERLINGLoudoun County VA LandMARC submitted permits | Data center | Fire permit for Data centerFMO - Moderate/High Hazard Hazardous Material FMOMH-2026-049225 · Submitted - Online |  |  |
| Oct 7, 2026 | 14447 JOHN MARSHALL HWY GAINESVILLE VA 20155Prince William County VA ePortal permits and plans | Data center | VPTP-TLO IAD 198 TI Construction break tentBuilding Commercial Accessory Structure, C - Accessory Structure BLD2026-05719 · Issued |  |  |
| Oct 7, 2026 | 9040 FREEDOM CENTER BLVD MANASSAS VA 20110Prince William County VA ePortal permits and plans | Data center | Installation of additional communications cabling pathways between existing computer rooms on the first and second floors of this existing 2-story data center buildingBuilding Commercial Alteration/Repair, C - Alteration/Repair BLD2027-00272 · Issued |  |  |
| Oct 7, 2026 | 9020 FREEDOM CENTER BLVD MANASSAS VA 20110Prince William County VA ePortal permits and plans | Data center | Installation of additional communications cabling pathways between existing computer rooms on the first and second floors of this existing 2-story data center buildingBuilding Commercial Alteration/Repair, C - Alteration/Repair BLD2027-00275 · Issued |  |  |
| Oct 6, 2026 | 10430 HARRY J PARRISH BLVD MANASSAS VA 20110Prince William County VA ePortal permits and plans | Data center | MDC- 1 TGTD For Fuel Oil Piping, Pumps and Day Tanks **MODIFIED TARGETED/SUPERSEDED** SUPERSTRUCTURE BUILDING FOOTING AND FOUNDATION ONLY PERMIT FOR A 2 STORY DATA CENTER WITH…Mechanical Commercial New Structure, C - New Structure MEC2026-00978 · Issued |  |  |
| Oct 6, 2026 | 10430 HARRY J PARRISH BLVD MANASSAS VA 20110Prince William County VA ePortal permits and plans | Data center | MDC- 1 TGTD **MODIFIED TARGETED/SUPERSEDED** SUPERSTRUCTURE BUILDING FOOTING AND FOUNDATION ONLY PERMIT FOR A 2 STORY DATA CENTER WITH COMPLETE EXTERIOR PRECAST CONCRETE BUILDING…Mechanical Commercial New Structure, C - New Structure MEC2026-00979 · Issued |  |  |
| Oct 6, 2026 | 10430 HARRY J PARRISH BLVD MANASSAS VA 20110Prince William County VA ePortal permits and plans | Data center | MDC- 1 TGTD **MODIFIED TARGETED/SUPERSEDED** SUPERSTRUCTURE BUILDING FOOTING AND FOUNDATION ONLY PERMIT FOR A 2 STORY DATA CENTER WITH COMPLETE EXTERIOR PRECAST CONCRETE BUILDING…Storage Tanks Commercial New Structure, C - New Structure UGS2026-00127 · Issued |  |  |
| Oct 6, 2026 | 21660 CHARLES VIEW STERLINGLoudoun County VA LandMARC issued permits | Data center | EHS permit for data centerFMO - Moderate/High Hazard Hazardous Material FMOMH-2026-049129 · Issued |  |  |
| Oct 6, 2026 | 10155 LINTON HALL RD BRISTOW VA 20136Prince William County VA ePortal permits and plans | Data center | LOW VOLTAGE: BFPE WLL INSTALL SPRINKLER MONITORING SYSTEM IN SHELL BUILDINGElectrical Commercial Shell Building, C - Shell Building ELE2027-01714 · Issued |  |  |
| Oct 6, 2026 | 13746 UNIVERSITY BLVD GAINESVILLE VA 20155Prince William County VA ePortal permits and plans | Data center | GAINESVILLE CROSSING DATA CENTER (GCDC) Bldg 4 **SUPERSEDED** ****SITE WORK ONLY****TARGETED MODIFIED ** GCDC BUILDING 4 COLD DARK SHELL NEW DATA CENTER W/ FUTURE SUPERSEDED…Plumbing Commercial Shell Building, C - Shell Building PLB2027-00300 · Issued |  |  |
| Oct 6, 2026 | 10437 E ELLIOT RDCity of Mesa building permits | Data center | New data center civil site improvements. Installation of all off-site improvements and street frontage landscaping during the first phase of construction. Water Meters: (1) 2-inch…COM PMT26-08422 · Issued |  |  |
| Oct 6, 2026 | 3856 S EVERTON TERRCity of Mesa building permits | Data center | Install tape library at storage space in existing data center building. New structural, mechanical and electrical. Special inspections required: steel construction, concrete…COM PMT26-11828 · Issued |  |  |
| Oct 6, 2026 | City of Hillsboro OR Citizen Access records | Data center | Siemens: NE Starr (4735) Stacked Data Center Rooftop NACBuilding Commercial Fire Permit TMP-00001-26-005854 |  |  |
| Oct 5, 2026 | 8819 WELLINGTON RD MANASSAS VA 20109Prince William County VA ePortal permits and plans | Data center | Install Conduit and Wire for fire alarm devices and connect to existing fire alarm system. This is for Low Voltage Electrical. Building Permit BLD2027-00253.Electrical Commercial Alteration/Repair, C - Alteration/Repair ELE2027-01618 · Issued |  |  |
| Oct 5, 2026 | 42295 RIGGINS RIDGE ASHBURNLoudoun County VA LandMARC submitted permits | Data center | Home office for JSDC Consulting LLC, providing remote data center design management, review, and coordination of third-party design consultants. Work is performed by the owner…Zoning (Home Occupation) ZOHO-2026-049004 · Submitted - Online |  |  |
| Oct 5, 2026 | City of San Antonio TX BuildSA records | Data center | Amazon ALE60 BH Data Center BuildingFire Fire Systems Permit Application 26TMP-167788 |  |  |
| Oct 5, 2026 | City of San Antonio TX BuildSA records | Data center | Amazon ALE60 BH Data Center BuildingFire Fire Systems Permit Application FIR-FSP-APP26-22502230 · Under Review |  |  |
| Oct 3, 2026 | City of Goodyear AZ Citizen Access records | Data center | Stream Data CenterCivil Civil Construction Permit 26TMP-008243 · Prescreen Review |  |  |
| Oct 3, 2026 | City of Goodyear AZ Citizen Access records | Data center | Stream Data CenterCivil Civil Construction Permit E26-01420 · Prescreen Review |  |  |
| Oct 1, 2026 | 7751 DEACON FALLS DR GAINESVILLE VA 20155Prince William County VA ePortal permits and plans | Data center | LOW VOLTAGE - fire alarm system with horn strobes, strobes, SLC devices, and air sampling system.Electrical Commercial New Structure, C - New Structure ELE2027-01572 · Issued |  |  |
| Oct 1, 2026 | City of Atlanta GA Citizen Access records | Data center | T5 Data CenterBuilding Commercial - Electrical 26TMP-064796 |  |  |
| Oct 1, 2026 | City of Atlanta GA Citizen Access records | Data center | T5 Data CenterBuilding Commercial - Electrical BE-202606921 · Issued |  |  |
| Oct 1, 2026 | 22271 BRODERICK STERLINGLoudoun County VA LandMARC issued permits | Data center | BFPE is to add and relocate heads within segments E and C on the second floor of the QTS ASH1 DC1 data center to provide proper sprinkler coverage for the new HAC layout.Fire Protection (Commercial) FIREC-2026-044878 · Issued |  |  |
| Oct 1, 2026 | 4801 E THISTLE LANDING DRCity of Phoenix AZ planning and development permits | Data center | FL/COMBO THISTLE LANDING DATA CENTERFIRELINE CONN IN ROW W/PRIVATE BACKFLOW PRIVATE FIRELINE WITH BACKFLOW IN ROW T971866 · OPEN |  |  |
| Oct 1, 2026 | 8217 LINTON HALL RD BRISTOW VA 20136Prince William County VA ePortal permits and plans | Data center | REPLACEMENT OF EXISTING SITE FENCING AND GATESElectrical Commercial Accessory Structure, C - Accessory Structure ELE2027-00833 · Issued |  |  |
| Oct 1, 2026 | 8819 WELLINGTON RD MANASSAS VA 20109Prince William County VA ePortal permits and plans | Data center | Project Argonaut STACK NVA05D FLOOR 2 & 3 DATA HALL BUILD-OUT BUILDING PERMITElectrical Commercial Alteration/Repair, C - Alteration/Repair ELE2027-01012 · Issued |  |  |
| Oct 1, 2026 | 11920 BRADY LN MANASSAS VA 20109Prince William County VA ePortal permits and plans | Data center | Installation of new tippers in existing Amazon warehouseElectrical Commercial Alteration/Repair, C - Alteration/Repair ELE2027-01186 · Issued |  |  |
| Oct 1, 2026 | 7250 GROVE HILL BLVD GAINESVILLE VA 20155Prince William County VA ePortal permits and plans | Data center | NTT Global Data Centers BLD 2 TEMPLATE FOR ELE & UGS - Temporary Generator setup. All items below will be placed directly onto the ground. There are no additional structures or…Storage Tanks Commercial Accessory Structure, C - Accessory Structure UGS2027-00013 · Issued |  |  |
| Oct 1, 2026 | 7263 GROVE HILL BLVD GAINESVILLE VA 20155Prince William County VA ePortal permits and plans | Data center | NTT Global Data Centers BLD 3 TEMPLATE FOR ELE & UGS - Temporary Generator Setup next to VA12. All items below will be placed directly onto the ground. There are no additional…Storage Tanks Commercial Accessory Structure, C - Accessory Structure UGS2027-00014 · Issued |  |  |
| Oct 1, 2026 | 1501 W FRANCISCO STCity of Los Angeles building permits issued | Data center | The project consist of retrofitting an existing data center building where the scope of work consists of the removal of (8) existing end-of-life DX CRAC units and replacing with…Bldg-Alter/Repair Commercial 26016-10000-13551 · Issued | $7,000,000 |  |
| Sep 30, 2026 | City of Goodyear AZ Citizen Access records | Data center | Vantage AZ15 Data Center - INDBuilding Industrial Construction B26-02626 · Prescreen Review |  |  |
| Sep 30, 2026 | 43831 DEVIN SHAFRON ASHBURNLoudoun County VA LandMARC issued permits | Data center | Fire permit for data centerFMO - Moderate/High Hazard Hazardous Material FMOMH-2026-047772 · Issued |  |  |
| Sep 30, 2026 | 22080 PACIFIC STERLINGLoudoun County VA LandMARC issued permits | Data center | Hazardous Materials storage and use--80,000 gallons diesel fuel for data center.FMO - Moderate/High Hazard Hazardous Material FMOMH-2026-047850 · Issued |  |  |
| Sep 30, 2026 | 24555 HOWLING ROOSTER STERLINGLoudoun County VA LandMARC issued permits | Data center | Grading Permit for construction of a Data Center for Project Motion - Phase 4 EPLAN-2024-0212Grading Infrastructure/Commercial GRADE-2026-000014 · Issued |  |  |
| Sep 30, 2026 | 9710 N VIRGINIA ST, RENO, NV 89506City of Reno NV Citizen Access records | Data center | COLOVORE DATA CENTERBuilding Commercial Fire Sprinkler BLD27-03118E · Awaiting Payment |  |  |
| Sep 30, 2026 | City of Hillsboro OR Citizen Access records | Data center | OVH Data Center Restroom RefreshBuilding Commercial Plumbing Permit PLM26-0593 · In Review |  |  |
| Sep 29, 2026 | City of Hillsboro OR Citizen Access records | Data center | OVH Data Center Restroom RefreshBuilding Commercial Structural Permit STR26-0626 · Additional Info Required |  |  |
| Sep 29, 2026 | 7250 GROVE HILL BLVD GAINESVILLE VA 20155Prince William County VA ePortal permits and plans | Data center | TEMPORARY GENERATOR SETUPElectrical Commercial Accessory Structure, C - Accessory Structure ELE2027-00506 · Issued |  |  |
| Sep 29, 2026 | 7263 GROVE HILL BLVD GAINESVILLE VA 20155Prince William County VA ePortal permits and plans | Data center | NTT Global Data Centers BLD 3 TEMPLATE FOR ELE & UGS - Temporary Generator Setup next to VA12. All items below will be placed directly onto the ground. There are no additional…Electrical Commercial Accessory Structure, C - Accessory Structure ELE2027-01194 · Issued |  |  |
| Sep 29, 2026 | 14455 JOHN MARSHALL HWY GAINESVILLE VA 20155Prince William County VA ePortal permits and plans | Data center | low voltage for HVAC controlsElectrical Commercial Tenant Layout, C - Tenant Layout ELE2027-01523 · Issued |  |  |
| Sep 29, 2026 | 11800 BREWERS SPRING RD MANASSAS VA 20109Prince William County VA ePortal permits and plans | Data center | LOW VOLTAGE - FIRE ALARMElectrical Commercial Alteration/Repair, C - Alteration/Repair ELE2027-01586 · Issued |  |  |
| Sep 29, 2026 | 11580 HAYDEN RD MANASSAS VA 20109Prince William County VA ePortal permits and plans | Data center | Conversion of one hydro from a bi-parting freight to a passenger elevatorMechanical Commercial Alteration/Repair, C - Alteration/Repair MEC2026-01724 · Issued |  |  |
| Sep 29, 2026 | 3545 WISEMAN BLVD, City of San Antonio, TX 78251City of San Antonio TX permits issued | Data center | SP - Special Project - SAT14 Data Center Site Foundation & Shell - 3545 Wiseman Blvd., Bldgs 1-3 / PhasedComm Retaining Wall Permit New COM-RW-PMT26-41100031 | $90,801,000 |  |
| Sep 28, 2026 | 8819 WELLINGTON RD MANASSAS VA 20109Prince William County VA ePortal permits and plans | Data center | Project Argonaut STACK NVA05D FLOOR 2 & 3 DATA HALL BUILD-OUT BUILDING PERMITBuilding Commercial Alteration/Repair, C - Alteration/Repair BLD2027-00253 · Issued |  |  |
| Sep 28, 2026 | 10050 BRICKYARD WAY Unit: 210 MANASSAS VA 20110Prince William County VA ePortal permits and plans | Data center | BRICKYARD BUILDING B SUITE 210 EFO FULL FA/VESDA SYSTEM PERMITFire Protection - Fire Alarm FPP2027-00169 · Issued |  |  |
| Sep 28, 2026 | 21780 FILIGREE ASHBURNLoudoun County VA LandMARC issued permits | Data center | Fire extinguisher permit for new data center S100. This work is associated with Building Permit No. BLDC-2025-040075.Fire Protection (Commercial) Alteration FIREC-2026-029488 · Issued |  |  |
| Sep 28, 2026 | 21780 FILIGREE ASHBURNLoudoun County VA LandMARC issued permits | Data center | Fire extinguisher permit for new data center S200. This work is associated with Building Permit No. BLDC-2025-040078.Fire Protection (Commercial) Alteration FIREC-2026-029504 · Issued |  |  |
| Sep 28, 2026 | 21780 FILIGREE ASHBURNLoudoun County VA LandMARC issued permits | Data center | Fire extinguisher permit for new data center S110. This work is associated with Building Permit No. BLDC-2025-051482.Fire Protection (Commercial) Alteration FIREC-2026-029512 · Issued |  |  |
| Sep 28, 2026 | 19570 HYPERSPACE ASHBURNLoudoun County VA LandMARC issued permits | Data center | Data center, new construction, ABOVE GROUNDPlumbing (Commercial) New Construction PLUMC-2026-043083 · Issued |  |  |
| Sep 25, 2026 | 10050 BRICKYARD WAY MANASSAS VA 20110Prince William County VA ePortal permits and plans | Data center | 8" Fire line from the main to buildingFire Protection - Underground Fire Line FPP2027-00231 · Issued |  |  |
| Sep 25, 2026 | 44100 DIGITAL LOUDOUN ASHBURNLoudoun County VA LandMARC issued permits | Data center | Interior fit-up for tenant in Building J suite 145. Approximately 1835 square feet of data center accessory office use. Electronic CopyMechanical (Commercial) MECHC-2026-041744 · Issued | $38,635 |  |
| Sep 25, 2026 | 19560 HYPERSPACE ASHBURNLoudoun County VA LandMARC submitted permits | Data center | New 200A Bridging Power service for Data Center Building 4 SDC Bluefin - Reserve Medium Voltage Switchgear MDC-iElectrical (Commercial) Alteration ELECC-2026-047407 · Submitted - Online |  |  |
| Sep 25, 2026 | 2401 Gillham RdKansas City MO city issued permits | Data center | Childrens Mercy Data CenterCPPU - Fire Sprinkler (Commercial) Fire Protection System CPFC-2026-00413 · Pending |  |  |
| Sep 25, 2026 | 14460 HERITAGE PKWYCity of Fort Worth TX development permits | Data center | DFW SPE 2 LLC construct a 1 story 156,866 sf data center with attached administration area.Commercial Building Permit New PB26-13452 · Pending | $500,000,000 |  |
| Sep 24, 2026 | City of Atlanta GA Citizen Access records | Data center | T5 Data Centers - Suite 2550 - AVBuilding Commercial Miscellaneous BB-202608391 · ACA Pending |  |  |
| Sep 24, 2026 | 3344 PEACHTREE NE, ATLANTA, GA 30326City of Atlanta GA building permits | Data center | T5 Data Centers - Suite 2550 - AVCommercial Miscellaneous BB-202608391 · ACA Pending | $776,292 |  |
| Sep 24, 2026 | City of Goodyear AZ Citizen Access records | Data center | Vantage AZ15 Data Center - INDBuilding Commercial Construction 26TMP-008021 |  |  |
| Sep 24, 2026 | City of Goodyear AZ Citizen Access records | Data center | Vantage AZ15 Data Center - INDBuilding Commercial Construction 26TMP-008022 |  |  |
| Sep 24, 2026 | City of Goodyear AZ Citizen Access records | Data center | Vantage AZ15 Data Center - INDBuilding Commercial Construction 26TMP-008023 |  |  |
| Sep 24, 2026 | City of Goodyear AZ Citizen Access records | Data center | Vantage AZ15 Data Center - INDBuilding Commercial Construction B26-02572 · Prescreen Review |  |  |
| Sep 24, 2026 | 7250 GROVE HILL BLVD GAINESVILLE VA 20155Prince William County VA ePortal permits and plans | Data center | NTT Global Data Centers BLD 3 **MODIFIED TARGETED** NEW DATA CENTERBuilding Commercial New Structure, C - New Structure BLD2026-05831 · Issued |  |  |
| Sep 24, 2026 | 10050 BRICKYARD WAY MANASSAS VA 20110Prince William County VA ePortal permits and plans | Data center | Brickyard Yard Building B Screen WallBuilding Commercial Accessory Structure, C - Accessory Structure BLD2026-06174 · Issued |  |  |
| Sep 24, 2026 | 7250 GROVE HILL BLVD GAINESVILLE VA 20155Prince William County VA ePortal permits and plans | Data center | NTT Global Data Centers BLD 3 Electrical Yard Foundations (generator pads)Building Commercial Accessory Structure, C - Accessory Structure BLD2027-00731 · Issued |  |  |
| Sep 24, 2026 | 10050 BRICKYARD WAY Unit: 200 MANASSAS VA 20110Prince William County VA ePortal permits and plans | Data center | Brickyard Building B #200 ***SUPERSEDED*** DIGITAL SECOND MANASSAS LLC DBA: DIGITAL REALTY - UNIT 200Electrical Commercial Tenant Layout, C - Tenant Layout ELE2026-00808 · Issued |  |  |
| Sep 24, 2026 | 10050 BRICKYARD WAY Unit: 105 MANASSAS VA 20110Prince William County VA ePortal permits and plans | Data center | Brickyard Building B #105 ***SUPERSEDED*** DIGITAL SECOND MANASSAS LLC DBA: DIGITAL REALTY - UNIT 105Electrical Commercial Tenant Layout, C - Tenant Layout ELE2026-00809 · Issued |  |  |
| Sep 23, 2026 | 9020 FREEDOM CENTER BLVD MANASSAS VA 20110Prince William County VA ePortal permits and plans | Data center | ***BLD NOT ISSUED**Electrical Equipment and distribution upgrades to create more redundant electrical distribution system in existing 2 story data center buildingElectrical Commercial Alteration/Repair, C - Alteration/Repair ELE2026-04906 · Issued |  |  |
| Sep 23, 2026 | 8217 LINTON HALL RD BRISTOW VA 20136Prince William County VA ePortal permits and plans | Data center | ****See notes***Tennant Fit Out Low Voltage Security SystemElectrical Commercial Alteration/Repair, C - Alteration/Repair ELE2027-00059 · Issued |  |  |
| Sep 23, 2026 | 22291 SHELLHORN ASHBURNLoudoun County VA LandMARC issued permits | Data center | QTS Data Center ASH3 - Renewal FMOMH-2025-015573FMO - Moderate/High Hazard Hazardous Material FMOMH-2026-039159 · Issued |  |  |
| Sep 23, 2026 | 25374 MEADOWDALE CHANTILLYLoudoun County VA LandMARC submitted permits | Data center | New Data Center Shell Construction - IAD159Electrical (Commercial) Low Voltage - Fire Alarm ELECC-2026-046696 · Submitted - Online | $23,360,286 |  |
| Sep 23, 2026 | 25374 MEADOWDALE CHANTILLYLoudoun County VA LandMARC submitted permits | Data center | New Data Center Shell Construction - IAD159 - Fire Alarm PermitFire Protection (Commercial) New Construction FIREC-2026-046699 · Submitted - Online | $23,360,286 |  |
| Sep 23, 2026 | 25374 MEADOWDALE CHANTILLYLoudoun County VA LandMARC submitted permits | Data center | New Data Center Shell Construction - IAD159 - VESDA PermitFire Protection (Commercial) New Construction FIREC-2026-046702 · Submitted - Online | $23,360,286 |  |
| Sep 23, 2026 | 45795 OPTICS STERLINGLoudoun County VA LandMARC submitted permits | Data center | Data Center Tenant Fitout Construction Phase 09Zoning (Commercial) Tenant Fit-Up ZONC-2026-046686 · Fees Paid | $1,200,000 |  |
| Sep 23, 2026 | 45795 OPTICS STERLINGLoudoun County VA LandMARC submitted permits | Data center | Data Center Tenant Fitout Construction Phase 10 - Data HallZoning (Commercial) Tenant Fit-Up ZONC-2026-046689 · Fees Paid |  |  |
| Sep 23, 2026 | 45795 OPTICS STERLINGLoudoun County VA LandMARC submitted permits | Data center | Data Center Tenant Fitout Construction Phase 11 - Data HallZoning (Commercial) Tenant Fit-Up ZONC-2026-046697 · Fees Paid |  |  |
| Sep 23, 2026 | 45795 OPTICS STERLINGLoudoun County VA LandMARC submitted permits | Data center | Data Center Tenant Fitout Construction Phase 12 - Data HallZoning (Commercial) Tenant Fit-Up ZONC-2026-046703 · Fees Paid |  |  |
| Sep 22, 2026 | 7253 GROVE HILL BLVD GAINESVILLE VA 20155Prince William County VA ePortal permits and plans | Data center | NTT Global Data Centers BLD 1 Entry Monument Sign PadBuilding Commercial Accessory Structure, C - Accessory Structure BLD2023-06435 · Issued |  |  |
| Sep 22, 2026 | 10050 BRICKYARD WAY Unit: 100 MANASSAS VA 20110Prince William County VA ePortal permits and plans | Data center | Brickyard Building B #100 ***SUPERSEDED*** DIGITAL SECOND MANASSAS LLC DBA: DIGITAL REALTY - UNIT 100Electrical Commercial Tenant Layout, C - Tenant Layout ELE2026-00810 · Issued |  |  |
| Sep 22, 2026 | 11530 ELEVATE DR MANASSAS VA 20109Prince William County VA ePortal permits and plans | Data center | New Hydraulic Elevator InstallationMechanical Commercial New Structure, C - New Structure MEC2027-00475 · Issued |  |  |
| Sep 22, 2026 | 11530 ELEVATE DR MANASSAS VA 20109Prince William County VA ePortal permits and plans | Data center | New MRL Elevator InstallationMechanical Commercial New Structure, C - New Structure MEC2027-00482 · Issued |  |  |
| Sep 22, 2026 | City of San Antonio TX BuildSA records | Data center | Vantage Data CenterBuilding Complaint INV-COM-INV26-22703219 · Received |  |  |
| Sep 22, 2026 | 21780 FILIGREE ASHBURNLoudoun County VA LandMARC issued permits | Data center | Fire extinguisher permit for new data center S105/205. This work is associated with Building Permit BLDC-2026-008378.Fire Protection (Commercial) Alteration FIREC-2026-029557 · Issued |  |  |
| Sep 22, 2026 | 42376 PATRIOT PARK LEESBURGLoudoun County VA LandMARC submitted permits | Data center | low voltage for HVAC controls for Data Center Architectural and Structural Tenant Fit-Out for the office area and Phase 1 of the data center. There are a total of 18 phases in…Electrical (Commercial) Low Voltage - Other ELECC-2026-046615 · Submitted - Online | $8,757,831 |  |
| Sep 22, 2026 | 42376 PATRIOT PARK LEESBURGLoudoun County VA LandMARC submitted permits | Data center | low voltage for HVAC controls for Data Center Architectural and Structural Tenant Fit-Out for Phase 2 of the data center. There are a total of 18 phases in this project.Electrical (Commercial) Low Voltage - Other ELECC-2026-046616 · Submitted - Online | $2,072,466 |  |
| Sep 22, 2026 | 42376 PATRIOT PARK LEESBURGLoudoun County VA LandMARC submitted permits | Data center | low voltage for HVAC controls for Data Center Architectural and Structural Tenant Fit-Out for Phase 3 of the data center. There are a total of 18 phases in this project.Electrical (Commercial) Low Voltage - Other ELECC-2026-046617 · Submitted - Online | $2,072,466 |  |
| Sep 22, 2026 | 42376 PATRIOT PARK LEESBURGLoudoun County VA LandMARC submitted permits | Data center | low voltage for HVAC controls for Data Center Architectural and Structural Tenant Fit-Out for Phase 4 of the data center. There are a total of 18 phases in this project.Electrical (Commercial) Low Voltage - Other ELECC-2026-046618 · Submitted - Online | $2,072,466 |  |
| Sep 22, 2026 | 42376 PATRIOT PARK LEESBURGLoudoun County VA LandMARC submitted permits | Data center | low voltage for HVAC controls for Data Center Architectural and Structural Tenant Fit-Out for Phase 5 of the data center. There are a total of 18 phases in this project.Electrical (Commercial) Low Voltage - Other ELECC-2026-046619 · Submitted - Online | $2,072,466 |  |
| Sep 22, 2026 | 42376 PATRIOT PARK LEESBURGLoudoun County VA LandMARC submitted permits | Data center | low voltage for HVAC controls for Data Center Architectural and Structural Tenant Fit-Out for Phase 6 of the data center. There are a total of 18 phases in this project.Electrical (Commercial) Low Voltage - Other ELECC-2026-046620 · Submitted - Online | $2,072,466 |  |
| Sep 22, 2026 | 42376 PATRIOT PARK LEESBURGLoudoun County VA LandMARC submitted permits | Data center | low voltage for HVAC controls for Data Center Architectural and Structural Tenant Fit-Out for Phase 7 of the data center. There are a total of 18 phases in this project.Electrical (Commercial) Low Voltage - Other ELECC-2026-046621 · Submitted - Online | $2,072,466 |  |
| Sep 22, 2026 | 42376 PATRIOT PARK LEESBURGLoudoun County VA LandMARC submitted permits | Data center | low voltage for HVAC controls for Data Center Architectural and Structural Tenant Fit-Out for Phase 8 of the data center. There are a total of 18 phases in this project.Electrical (Commercial) Low Voltage - Other ELECC-2026-046622 · Submitted - Online | $2,072,466 |  |
| Sep 22, 2026 | 42376 PATRIOT PARK LEESBURGLoudoun County VA LandMARC submitted permits | Data center | low voltage for HVAC controls for Data Center Architectural and Structural Tenant Fit-Out for Phase 9 of the data center. There are a total of 18 phases in this project.Electrical (Commercial) Low Voltage - Other ELECC-2026-046623 · Submitted - Online | $2,072,466 |  |
| Sep 22, 2026 | 42376 PATRIOT PARK LEESBURGLoudoun County VA LandMARC submitted permits | Data center | low voltage for HVAC controls for Data Center Architectural and Structural Tenant Fit-Out for Phase 10 of the data center. There are a total of 18 phases in this project.Electrical (Commercial) Low Voltage - Other ELECC-2026-046624 · Submitted - Online | $2,072,466 |  |
| Sep 22, 2026 | 42376 PATRIOT PARK LEESBURGLoudoun County VA LandMARC submitted permits | Data center | low voltage for HVAC controls for Data Center Architectural and Structural Tenant Fit-Out for Phase 11 of the data center. There are a total of 18 phases in this project.Electrical (Commercial) Low Voltage - Other ELECC-2026-046625 · Submitted - Online | $2,072,466 |  |
| Sep 22, 2026 | 42376 PATRIOT PARK LEESBURGLoudoun County VA LandMARC submitted permits | Data center | low voltage for HVAC controls for Data Center Architectural and Structural Tenant Fit-Out for Phase 12 of the data center. There are a total of 18 phases in this project.Electrical (Commercial) Low Voltage - Other ELECC-2026-046626 · Submitted - Online | $2,072,466 |  |
| Sep 22, 2026 | 42376 PATRIOT PARK LEESBURGLoudoun County VA LandMARC submitted permits | Data center | low voltage for HVAC controls for Data Center Architectural and Structural Tenant Fit-Out for Phase 13 of the data center. There are a total of 18 phases in this project.Electrical (Commercial) Low Voltage - Other ELECC-2026-046627 · Submitted - Online | $2,072,466 |  |
| Sep 22, 2026 | 42376 PATRIOT PARK LEESBURGLoudoun County VA LandMARC submitted permits | Data center | low voltage for HVAC controls for Data Center Architectural and Structural Tenant Fit-Out for Phase 14 of the data center. There are a total of 18 phases in this project.Electrical (Commercial) Low Voltage - Other ELECC-2026-046628 · Submitted - Online | $2,072,466 |  |
| Sep 22, 2026 | 42376 PATRIOT PARK LEESBURGLoudoun County VA LandMARC submitted permits | Data center | low voltage for HVAC controls for Data Center Architectural and Structural Tenant Fit-Out for Phase 15 of the data center. There are a total of 18 phases in this project.Electrical (Commercial) Low Voltage - Other ELECC-2026-046629 · Submitted - Online | $2,072,466 |  |
| Sep 22, 2026 | 42376 PATRIOT PARK LEESBURGLoudoun County VA LandMARC submitted permits | Data center | low voltage for HVAC controls for Data Center Architectural and Structural Tenant Fit-Out for Phase 16 of the data center. There are a total of 18 phases in this project.Electrical (Commercial) Low Voltage - Other ELECC-2026-046630 · Submitted - Online | $2,072,466 |  |
| Sep 22, 2026 | 42376 PATRIOT PARK LEESBURGLoudoun County VA LandMARC submitted permits | Data center | low voltage for HVAC controls for Data Center Architectural and Structural Tenant Fit-Out for Phase 17 of the data center. There are a total of 18 phases in this project.Electrical (Commercial) Low Voltage - Other ELECC-2026-046631 · Submitted - Online | $2,072,466 |  |
| Sep 22, 2026 | 42376 PATRIOT PARK LEESBURGLoudoun County VA LandMARC submitted permits | Data center | low voltage for HVAC controls for Data Center Architectural and Structural Tenant Fit-Out for Phase 18 of the data center. There are a total of 18 phases in this project.Electrical (Commercial) Low Voltage - Other ELECC-2026-046632 · Submitted - Online | $2,072,466 |  |
| Sep 21, 2026 | 10450 HARRY J PARRISH BLVD MANASSAS VA 20110Prince William County VA ePortal permits and plans | Data center | MDC2 - DATA CENTER Tower Crane #3Electrical Commercial Accessory Structure, C - Accessory Structure ELE2027-01263 · Issued |  |  |
| Sep 21, 2026 | 10450 HARRY J PARRISH BLVD MANASSAS VA 20110Prince William County VA ePortal permits and plans | Data center | MDC2 - DATA CENTER Tower Crane #4Electrical Commercial Accessory Structure, C - Accessory Structure ELE2027-01264 · Issued |  |  |
| Sep 21, 2026 | 7751 DEACON FALLS DR GAINESVILLE VA 20155Prince William County VA ePortal permits and plans | Data center | low voltage for HVAC controls - assocaited with BLD2024-05622Electrical Commercial New Structure, C - New Structure ELE2027-01323 · Issued |  |  |
| Sep 21, 2026 | 10050 BRICKYARD WAY Unit: 110 MANASSAS VA 20110Prince William County VA ePortal permits and plans | Data center | Brickyard Building B #110 BRICKYARD BUILDING B SUITE 110 EFO FULL FA SYSTEM PERMITFire Protection - Fire Alarm FPP2027-00138 · Issued |  |  |
| Sep 21, 2026 | 20335 CELTIC PARK LEESBURGLoudoun County VA LandMARC submitted permits | Data center | Data Center Architectural and Structural Tenant Fit-Out for Phase 10Electrical (Commercial) Low Voltage - Other ELECC-2026-046309 · Submitted - Online | $10,686,270 |  |
| Sep 21, 2026 | 20335 CELTIC PARK LEESBURGLoudoun County VA LandMARC submitted permits | Data center | Data Center Architectural and Structural Tenant Fit-Out for Phase 11Electrical (Commercial) Low Voltage - Other ELECC-2026-046314 · Submitted - Online | $10,686,270 |  |
| Sep 18, 2026 | City of Hillsboro OR Citizen Access records | Data center | DLR PDX10 Data CenterROWCivil Public Infrastructure Permit PIP26-0029 · Pending |  |  |
| Sep 18, 2026 | City of Hillsboro OR Citizen Access records | Data center | DLR PDX10 Data CenterROWCivil Public Infrastructure Permit TMP-00001-26-005302 |  |  |
| Sep 18, 2026 | 9020 FREEDOM CENTER BLVD MANASSAS VA 20110Prince William County VA ePortal permits and plans | Data center | Electrical Equipment and distribution upgrades to create more redundant electrical distribution system in existing 2 story data center buildingBuilding Commercial Alteration/Repair, C - Alteration/Repair BLD2026-03937 · Issued |  |  |
| Sep 18, 2026 | 22190 LOUDOUN COUNTY ASHBURNLoudoun County VA LandMARC issued permits | Data center | DULLES BERRY LC8 DATA CENTER RETAINING WALL STANDALONE MISC. STRUCTURE PERMIT; CONTRACTOR IS: HOLDER CONSTRUCTION GROUP INC.Building (Commercial) Miscellaneous Structure BLDC-2026-029234 · Issued | $10,000 |  |
| Sep 18, 2026 | City of Goodyear AZ Citizen Access records | Data center | REVISION TO B26-00427 - PHXA7 STREAM DATA CENTER - TI - INDBuilding Commercial Construction B26-02512 · Withdrawn |  |  |
| Sep 17, 2026 | 9301 FREEDOM CENTER BLVD MANASSAS VA 20110Prince William County VA ePortal permits and plans | Data center | EQUIPMENT YARD CONCRETE SUPPORT PAD EXTENSIONS FOR THREE GENERATOR PADS.Building Commercial Accessory Structure, C - Accessory Structure BLD2026-06278 · Issued |  |  |
| Sep 17, 2026 | 15445 JOHN MARSHALL HWY HAYMARKET VA 20169Prince William County VA ePortal permits and plans | Data center | ADDING TWO VENT CONTROLLERS FOR NITROGEN SYSTEMFire Protection - Sprinkler FPP2027-00178 · Issued |  |  |
| Sep 17, 2026 | 9700 INNOVATION DR MANASSAS VA 20110Prince William County VA ePortal permits and plans | Data center | INSTALL VENT CONTROLLER FOR NITROGEN SYSTEMFire Protection - Sprinkler FPP2027-00179 · Issued |  |  |
| Sep 17, 2026 | 14495 JOHN MARSHALL HWY GAINESVILLE VA 20155Prince William County VA ePortal permits and plans | Data center | INSTALL VENT CONTROLLER FOR NITROGEN SYSTEM.Fire Protection - Sprinkler FPP2027-00180 · Issued |  |  |
| Sep 17, 2026 | 9680 INNOVATION DR MANASSAS VA 20110Prince William County VA ePortal permits and plans | Data center | INSTALL 4 VENT CONTROLLERS FOR NITROGEN SYSTEMFire Protection - Sprinkler FPP2027-00181 · Issued |  |  |
| Sep 17, 2026 | 8217 LINTON HALL RD BRISTOW VA 20136Prince William County VA ePortal permits and plans | Data center | BFPE WILL ADD A NEW 1 1/2'' BRANCHLINE TO AN EXISTING WET SYSTEM TO ADD AND RELOCATE PROTECTION IN AND AROUND A NEWLY BUILT VESTIBULEFire Protection - Sprinkler FPP2027-00204 · Issued |  |  |
| Sep 17, 2026 | 11600 HAYDEN RD MANASSAS VA 20109Prince William County VA ePortal permits and plans | Data center | Modernization of 1 hydraulic elevator at IAD 210-converting one hydro bi parting elevator to passenger doors. New controller, fixtures, pump, tank, entrances, and platform / shell.Mechanical Commercial Alteration/Repair, C - Alteration/Repair MEC2026-01518 · Issued |  |  |
| Sep 17, 2026 | 25145 WOODNOOK CHANTILLYLoudoun County VA LandMARC issued permits | Data center | IAD-327 \| Two story data center full build out. - Phase 03Fire Protection (Commercial) Alteration FIREC-2026-023446 · Issued |  |  |
| Sep 17, 2026 | 25145 WOODNOOK CHANTILLYLoudoun County VA LandMARC issued permits | Data center | IAD-327 \| Two story data center full build out - phase 04Fire Protection (Commercial) Alteration FIREC-2026-023448 · Issued |  |  |
| Sep 17, 2026 | 25145 WOODNOOK CHANTILLYLoudoun County VA LandMARC issued permits | Data center | IAD-327 \| Two story data center full build out. - phase 05Fire Protection (Commercial) Alteration FIREC-2026-023455 · Issued |  |  |
| Sep 17, 2026 | 25145 WOODNOOK CHANTILLYLoudoun County VA LandMARC issued permits | Data center | IAD-327 \| Two story data center full build out - phase 6Fire Protection (Commercial) Alteration FIREC-2026-023457 · Issued |  |  |
| Sep 17, 2026 | 25145 WOODNOOK CHANTILLYLoudoun County VA LandMARC issued permits | Data center | IAD-327 \| Two story data center full build out - phase 7Fire Protection (Commercial) Alteration FIREC-2026-023459 · Issued |  |  |
| Sep 17, 2026 | 25145 WOODNOOK CHANTILLYLoudoun County VA LandMARC issued permits | Data center | IAD-327 \| Two story data center full build out. - phase 8Fire Protection (Commercial) Alteration FIREC-2026-023465 · Issued |  |  |
| Sep 17, 2026 | 25145 WOODNOOK CHANTILLYLoudoun County VA LandMARC issued permits | Data center | IAD-327 \| Two story data center full build out - phase 9Fire Protection (Commercial) Alteration FIREC-2026-023468 · Issued |  |  |
| Sep 17, 2026 | 25145 WOODNOOK CHANTILLYLoudoun County VA LandMARC issued permits | Data center | IAD-327 \| Two-story data center full build-out. - Phase 10Fire Protection (Commercial) Alteration FIREC-2026-023477 · Issued |  |  |
| Sep 17, 2026 | 25145 WOODNOOK CHANTILLYLoudoun County VA LandMARC issued permits | Data center | IAD-327 \| Two-story data center full build-out. - Phase 11Fire Protection (Commercial) Alteration FIREC-2026-023479 · Issued |  |  |
| Sep 17, 2026 | 25145 WOODNOOK CHANTILLYLoudoun County VA LandMARC issued permits | Data center | IAD-327 \| Two-story data center full build-out. = Phase 12Fire Protection (Commercial) Alteration FIREC-2026-023481 · Issued |  |  |
| Sep 17, 2026 | 22190 LOUDOUN COUNTY ASHBURNLoudoun County VA LandMARC issued permits | Data center | DULLES BERRY LC8 DATA CENTER RETAINING WALL STANDALONE MISC. STRUCTURE PERMIT; CONTRACTOR IS: HOLDER CONSTRUCTION GROUP INC.Zoning (Commercial) Miscellaneous Structure ZONC-2026-031414 · Issued | $10,000 |  |
| Sep 16, 2026 | City of Atlanta GA Citizen Access records | Data center | North Decatur Building Data Center Chiller ReplacementBuilding Commercial - HVAC 26TMP-061129 |  |  |
| Sep 16, 2026 | City of Atlanta GA Citizen Access records | Data center | North Decatur Building Data Center Chiller ReplacementBuilding Commercial - HVAC BM-202604575 · ACA Pending |  |  |
| Sep 16, 2026 | 300 TRINITY CAMPUS CIRCity of Fort Worth TX development permits | Data center | Data Center Enclosure & MEP Upgrades/Tarrant County College District B1_WORK_DESCCommercial Building Permit Remodel PB26-13010 · Pending | $2,000,000 |  |
| Sep 16, 2026 | 11920 BRADY LN MANASSAS VA 20109Prince William County VA ePortal permits and plans | Data center | Installation of new tippers in existing Amazon warehouseBuilding Commercial Alteration/Repair, C - Alteration/Repair BLD2027-00360 · Issued |  |  |
| Sep 16, 2026 | 10450 HARRY J PARRISH BLVD MANASSAS VA 20110Prince William County VA ePortal permits and plans | Data center | MDC2 - DATA CENTER Tower Crane #3Building Commercial Accessory Structure, C - Accessory Structure BLD2027-00633 · Issued |  |  |
| Sep 16, 2026 | 10450 HARRY J PARRISH BLVD MANASSAS VA 20110Prince William County VA ePortal permits and plans | Data center | MDC2 - DATA CENTER Tower Crane #4Building Commercial Accessory Structure, C - Accessory Structure BLD2027-00634 · Issued |  |  |
| Sep 16, 2026 | 400 S LA SALLE STCity of Chicago building permits | Data center | PHASE 3 OF 3: INTERIOR ALTERATIONS TO EXISTING 7-STORY OFFICE BUILDING TO CONVERT TO A DATA CENTER. WORK TO INCLUDE NEW EQUIPMENT WITH ASSOCIATED MEP UPGRADES. PHASE 1 DEMOLITION…PERMIT - RENOVATION/ALTERATION 101084518 | $151,112,046 |  |
| Sep 16, 2026 | 44854 INTERCONNECTION ASHBURNLoudoun County VA LandMARC issued permits | Data center | Electrical equipment updates with related overhead cable supports, within existing 1-story data center building. Electronic copy.Building (Commercial) Alteration BLDC-2026-032512 · Issued | $46,000 |  |
| Sep 16, 2026 | 22190 LOUDOUN COUNTY ASHBURNLoudoun County VA LandMARC issued permits | Data center | Phase 2 Tenant Interiors Buildout of the LC8 Data Center Building. Phase 2 includes South DH, ER, GR, ChillersPlumbing (Commercial) PLUMC-2026-039196 · Issued | $5,359,220 |  |
| Sep 16, 2026 | 22190 LOUDOUN COUNTY ASHBURNLoudoun County VA LandMARC issued permits | Data center | Phase 3 Tenant Interiors Buildout of the LC8 Data Center Building. Phase 3 includes North DH, ER, GR, ChillersPlumbing (Commercial) PLUMC-2026-039204 · Issued | $4,776,055 |  |
| Sep 16, 2026 | 44854 INTERCONNECTION ASHBURNLoudoun County VA LandMARC issued permits | Data center | Electrical equipment updates with related overhead cable supports, within existing 1-story data center building. Electronic copy.Zoning (Commercial) Alteration ZONC-2026-035729 · Issued | $46,000 |  |
| Sep 15, 2026 | 10051 BRICKYARD WAY MANASSAS VA 20110Prince William County VA ePortal permits and plans | Data center | SCREEN WALLBuilding Commercial Accessory Structure, C - Accessory Structure BLD2026-05376 · Issued |  |  |
| Sep 15, 2026 | 22420 KIPPER STERLINGLoudoun County VA LandMARC issued permits | Data center | FIOA Exempt. Electrical equipment updates with related overhead cable supports, within existing 2-story data center building. Electronic copy.Building (Commercial) Alteration BLDC-2026-035969 · Issued | $48,000 |  |
| Sep 15, 2026 | 44395 GIGABIT ASHBURNLoudoun County VA LandMARC issued permits | Data center | Data Center Vault Phasing Package. Vault 1.3 - Phase 5. INSTALL 9 FIRE EXTINGUISHERSFire Protection (Commercial) FIREC-2026-039052 · Issued | $389,580 |  |
| Sep 15, 2026 | 22420 KIPPER STERLINGLoudoun County VA LandMARC issued permits | Data center | Electrical equipment updates with related overhead cable supports, within existing 2-story data center building. Electronic copy.Zoning (Commercial) Alteration ZONC-2026-038392 · Issued | $48,000 |  |
| Sep 14, 2026 | 9700 INNOVATION DR MANASSAS VA 20110Prince William County VA ePortal permits and plans | Data center | Low voltage for fire alarmElectrical Commercial Alteration/Repair, C - Alteration/Repair ELE2027-01162 · Issued |  |  |
| Sep 14, 2026 | 9720 INNOVATION DR MANASSAS VA 20110Prince William County VA ePortal permits and plans | Data center | LOW VOLTAGE FOR FIRE ALARMElectrical Commercial Alteration/Repair, C - Alteration/Repair ELE2027-01163 · Issued |  |  |
| Sep 14, 2026 | 15455 JOHN MARSHALL HWY HAYMARKET VA 20169Prince William County VA ePortal permits and plans | Data center | direct replacement of a lighting arrestorElectrical Commercial Alteration/Repair, C - Alteration/Repair ELE2027-01246 · Issued |  |  |
| Sep 14, 2026 | 42630 PATRIOT PARK LEESBURGLoudoun County VA LandMARC submitted permits | Data center | Fifth building on the campus. Core/Shell 3-Story Flex Warehouse and Commercial Office. Future purpose of space: 3-story single tenant computer data center. Electronic CopyPlumbing (Commercial) New Construction PLUMC-2026-044918 · Submitted - Online | $65,605,395 |  |
| Sep 10, 2026 | 1001 3RD AVE SCity of Minneapolis construction permits (CCS) | Data center | Expansion of data center space to 3rd and 4th Floors and roof top mechanical upgrades. certificate of occupancy required: yes special inspections required: yes const type: 1a…Commercial Remodel BLDG1181293 · Issued |  |  |
| Sep 10, 2026 | City of Goodyear AZ Citizen Access records | Data center | STREAM DATA CENTERBuilding Sign Permit 26TMP-007574 · Prescreen Review |  |  |
| Sep 10, 2026 | City of Goodyear AZ Citizen Access records | Data center | STREAM DATA CENTERBuilding Sign Permit B26-02424 · Prescreen Review |  |  |
| Sep 10, 2026 | 23825 ERINS RUN STERLINGLoudoun County VA LandMARC submitted permits | Data center | Installation of a new fire alarm system and VESDA systems for a ground up construction data centerElectrical (Commercial) Low Voltage - Fire Alarm ELECC-2026-044514 · Submitted - Online |  |  |
| Sep 10, 2026 | 43705 EFFICIENCY STERLINGLoudoun County VA LandMARC submitted permits | Data center | Low voltage for HVAC controls IAD 57 SHELL/ PBB; NEW DATA CENTER W/ CORE SHELL, OFFICE AREA WITH FUTURE FITOUTSElectrical (Commercial) Low Voltage - Other ELECC-2026-044604 · Submitted - Online | $85,071,825 |  |
| Sep 10, 2026 | 10050 BRICKYARD WAY Unit: 100 MANASSAS VA 20110Prince William County VA ePortal permits and plans | Data center | IAD 050 BRICKYARD BUILDING B SUITE #100 LV FIRE ALARM (CONDUIT & R/I ONLY) ELECTRICAL PERMIT; LINK TO BLD2026-00430Electrical Commercial Tenant Layout, C - Tenant Layout ELE2027-01196 · Issued |  |  |
| Sep 10, 2026 | City of Hillsboro OR Citizen Access records | Data center | DLR PDX10 Data Center Electrical for Temp Fire Alarm AffidavitBuilding Commercial Electrical Permit ELE26-1143 · Inspection Phase |  |  |
| Sep 9, 2026 | 15465 JOHN MARSHALL HWY HAYMARKET VA 20169Prince William County VA ePortal permits and plans | Data center | Interior Alterations to Existing TenantElectrical Commercial Alteration/Repair, C - Alteration/Repair ELE2026-03474 · Issued |  |  |
| Sep 9, 2026 | 11150 THOMASSON BARN RD MANASSAS VA 20109Prince William County VA ePortal permits and plans | Data center | Electrical equipment updates to include 43 new Power Distribution Cabinets (PDCs) powered from existing electrical line-ups and overhead busways, along with related overhead cable…Electrical Commercial Alteration/Repair, C - Alteration/Repair ELE2026-03773 · Issued |  |  |
| Sep 9, 2026 | 15395 JOHN MARSHALL HWY HAYMARKET VA 20169Prince William County VA ePortal permits and plans | Data center | Interior Alterations for Existing Tenant - NEW, PDC ACCELERATION EQUIPMENT INSTALLATION WITH HOT AISLE CONTAINMENT MODIFICATIONS.Electrical Commercial Alteration/Repair, C - Alteration/Repair ELE2026-03903 · Issued |  |  |
| Sep 9, 2026 | 9040 FREEDOM CENTER BLVD MANASSAS VA 20110Prince William County VA ePortal permits and plans | Data center | ELECTRICAL EQUIPMENT AND DISTRIBUTION UPGRADES TO CREATE MORE REDUNDANT ELECTRICAL DISTRIBUTION SYSTEM IN EXISTING 2 STORY DATA CENTER BUILDING. (***SEE INTERNAL NOTE -HXF…Electrical Commercial Alteration/Repair, C - Alteration/Repair ELE2026-04025 · Issued |  |  |
| Sep 9, 2026 | 8210 BETHLEHEM RD MANASSAS VA 20109Prince William County VA ePortal permits and plans | Data center | New electrical and mechanical equipment fit-out in existing spaces and areas that were originally intended for the installation of proposed equipment.Electrical Commercial Alteration/Repair, C - Alteration/Repair ELE2026-05032 · Issued |  |  |
| Sep 9, 2026 | 7725 DEACON FALLS DR GAINESVILLE VA 20155Prince William County VA ePortal permits and plans | Data center | **TARGETED/NDA** LOW VOLTAGE FOR HVAC CONTROLSElectrical Commercial New Structure, C - New Structure ELE2027-01177 · Issued |  |  |
| Sep 9, 2026 | City of Hillsboro OR Citizen Access records | Data center | ALIGNED DATA CENTER PDX01-02 PHASE 2Building Commercial Electrical Permit TMP-00001-26-004930 |  |  |
| Sep 8, 2026 | 19265 COMPASS CREEK LEESBURGLoudoun County VA LandMARC issued permits | Data center | Data CenterFMO - Moderate/High Hazard Hazardous Material FMOMH-2026-044004 · Issued |  |  |
| Sep 8, 2026 | City of Papillion NE Citizen Access records | Data center | Fidelity Data Center Phase 2Commercial New 26TMP-004607 |  |  |
| Sep 8, 2026 | 11050 Cornhusker Rd NE 68046City of Papillion NE Citizen Access records | Data center | Fidelity Data Center Phase 2Commercial New BLD-26-3827 · Submitted |  |  |
| Sep 8, 2026 | 10050 BRICKYARD WAY Unit: 100 MANASSAS VA 20110Prince William County VA ePortal permits and plans | Data center | IAD 050 BRICKYARD BUILDING B SUITE #100 LV SECURITY ELECTRICAL PERMIT; LINK TO BLD2026-00430Electrical Commercial Tenant Layout, C - Tenant Layout ELE2027-01197 · Issued |  |  |
| Sep 8, 2026 | 10050 BRICKYARD WAY Unit: 105 MANASSAS VA 20110Prince William County VA ePortal permits and plans | Data center | IAD 050 BRICKYARD BUILDING B SUITE #105 LV FIRE ALARM (CONDUIT & R/I ONLY) ELECTRICAL PERMIT; LINK TO BLD2026-00433Electrical Commercial Tenant Layout, C - Tenant Layout ELE2027-01198 · Issued |  |  |
| Sep 8, 2026 | 10050 BRICKYARD WAY Unit: 105 MANASSAS VA 20110Prince William County VA ePortal permits and plans | Data center | IAD 050 BRICKYARD BUILDING B SUITE #105 LV SECURITY ELECTRICAL PERMIT; LINK TO BLD2026-00433Electrical Commercial Tenant Layout, C - Tenant Layout ELE2027-01199 · Issued |  |  |
| Sep 8, 2026 | 10050 BRICKYARD WAY Unit: 200 MANASSAS VA 20110Prince William County VA ePortal permits and plans | Data center | IAD 050 BRICKYARD BUILDING B SUITE #200 LV FIRE ALARM (CONDUIT & R/I ONLY) ELECTRICAL PERMIT; LINK TO BLD2026-00434Electrical Commercial Tenant Layout, C - Tenant Layout ELE2027-01200 · Issued |  |  |
| Sep 8, 2026 | 10050 BRICKYARD WAY Unit: 200 MANASSAS VA 20110Prince William County VA ePortal permits and plans | Data center | IAD 050 BRICKYARD BUILDING B SUITE #200 LV SECURITY ELECTRICAL PERMIT; LINK TO BLD2026-00434Electrical Commercial Tenant Layout, C - Tenant Layout ELE2027-01201 · Issued |  |  |
| Sep 8, 2026 | 10050 BRICKYARD WAY Unit: 205 MANASSAS VA 20110Prince William County VA ePortal permits and plans | Data center | IAD 050 BRICKYARD BUILDING B SUITE #205 LV FIRE ALARM (CONDUIT & R/I ONLY) ELECTRICAL PERMIT; LINK TO BLD2026-00435Electrical Commercial Tenant Layout, C - Tenant Layout ELE2027-01202 · Issued |  |  |
| Sep 8, 2026 | 10050 BRICKYARD WAY Unit: 205 MANASSAS VA 20110Prince William County VA ePortal permits and plans | Data center | IAD 050 BRICKYARD BUILDING B SUITE #205 LV SECURITY ELECTRICAL PERMIT; LINK TO BLD2026-00435Electrical Commercial Tenant Layout, C - Tenant Layout ELE2027-01203 · Issued |  |  |
| Sep 8, 2026 | 11800 BREWERS SPRING RD MANASSAS VA 20109Prince William County VA ePortal permits and plans | Data center | Addition of (1) device for new bathroomFire Protection - Fire Alarm FPP2027-00115 · Issued |  |  |
| Sep 4, 2026 | 3500 N Arlington AveKansas City MO city issued permits | Data center | Edged Energy KC Data CenterCPPU - Certificate of Occupancy Certificate of Occupancy (Commercial) CICO-2026-00896 · Issued |  |  |
| Sep 4, 2026 | 22190 LOUDOUN COUNTY ASHBURNLoudoun County VA LandMARC issued permits | Data center | Phase 2 Tenant Interiors Buildout of the LC8 Data Center Building. Phase 2 includes South DH, ER, GR, ChillersMechanical (Commercial) MECHC-2026-039189 · Issued | $5,359,220 |  |
| Sep 4, 2026 | 22715 RELOCATION STERLINGLoudoun County VA LandMARC submitted permits | Data center | Low voltage control wiring for building automation systems (BAS). This consists of wiring connections between the control panels and the devices and equipment that monitor the…Electrical (Commercial) Low Voltage - Other ELECC-2026-043635 · Submitted - Online | $37,000,000 |  |
| Sep 4, 2026 | 21690 GRESHAM ASHBURNLoudoun County VA LandMARC submitted permits | Data center | Low voltage for HVAC controls for ACC11 Data Center Core & ShellElectrical (Commercial) Low Voltage - Other ELECC-2026-043783 · Submitted - Online | $50,351,155 |  |
| Sep 4, 2026 | 12899 MOORES CHAPEL RD CHARLOTTE NC 28214Mecklenburg County NC building permits (all towns) | Data center | CLT13 -Suite 200 Build out of data center data hall.Upfit COM-UPF-26-000353 · Inspection Phase | $41,106,038 |  |
| Sep 4, 2026 | 10050 BRICKYARD WAY Unit: 205 MANASSAS VA 20110Prince William County VA ePortal permits and plans | Data center | Brickyard Building B #205 ***SUPERSEDED*** DIGITAL SECOND MANASSAS LLC DBA: DIGITAL REALTY - UNIT 205Electrical Commercial Tenant Layout, C - Tenant Layout ELE2026-00807 · Issued |  |  |
| Sep 3, 2026 | 22190 LOUDOUN COUNTY ASHBURNLoudoun County VA LandMARC issued permits | Data center | Phase 3 Tenant Interiors Buildout of the LC8 Data Center Building. Phase 3 includes North DH, ER, GR, ChillersMechanical (Commercial) MECHC-2026-039200 · Issued | $4,776,055 |  |
| Sep 3, 2026 | 14475 JOHN MARSHALL HWY GAINESVILLE VA 20155Prince William County VA ePortal permits and plans | Data center | LOW VOLTAGE FOR BMS & EPMS MONITORING & CONTROLS - 730 Temperature Sensors/ 85 Low Voltage DropsElectrical Commercial Tenant Layout, C - Tenant Layout ELE2027-01123 · Issued |  |  |
| Sep 3, 2026 | City of Hillsboro OR Citizen Access records | Data center | DLR PDX10 Data Center Expansion Shell MechanicalBuilding Commercial Mechanical Permit MEC26-0727 · In Review |  |  |
| Sep 3, 2026 | City of Hillsboro OR Citizen Access records | Data center | DLR PDX10 Data Center Expansion TI MechanicalBuilding Commercial Mechanical Permit MEC26-0728 · In Review |  |  |
| Sep 3, 2026 | City of Hillsboro OR Citizen Access records | Data center | DLR PDX10 Data CenterBuilding Commercial Plumbing Permit TMP-00001-26-004756 |  |  |
| Sep 3, 2026 | City of Hillsboro OR Citizen Access records | Data center | DLR PDX10 Data Center TIBuilding Commercial Plumbing Permit TMP-00001-26-004759 |  |  |
| Sep 3, 2026 | City of Hillsboro OR Citizen Access records | Data center | DLR PDX10 Data CenterBuilding Commercial Mechanical Permit TMP-00001-26-004760 |  |  |
| Sep 3, 2026 | City of Hillsboro OR Citizen Access records | Data center | DLR PDX10 Data Center TIBuilding Commercial Mechanical Permit TMP-00001-26-004761 |  |  |
| Sep 3, 2026 | City of Hillsboro OR Citizen Access records | Data center | DLR PDX10 Data CenterBuilding Commercial Electrical Permit TMP-00001-26-004762 |  |  |
| Sep 3, 2026 | City of Hillsboro OR Citizen Access records | Data center | DLR PDX10 Data Center TIBuilding Commercial Electrical Permit TMP-00001-26-004764 |  |  |
| Sep 2, 2026 | 12701 N US 169 Hwy #1 Data CenterKansas City MO city issued permits | Data center | Rocky Branch Creek 2A Data CenterCPPU - Mechanical (Commercial) Mechanical General CPMC-2026-00531 · Issued |  |  |
| Sep 2, 2026 | 7232 E ELLIOT RDCity of Mesa building permits | Data center | Provide and install a new NFW-50X addressable fire alarm system for the protection at the Mesa MSA 2a data center - break tent.COM PMT26-13873 · Issued |  |  |
| Sep 2, 2026 | 45795 OPTICS STERLINGLoudoun County VA LandMARC submitted permits | Data center | Data Center Tenant Fitout Construction Phase 08Building (Commercial) Tenant Fit-Up BLDC-2026-043274 · Submitted - Online |  |  |
| Sep 2, 2026 | 45795 OPTICS STERLINGLoudoun County VA LandMARC submitted permits | Data center | Data Center Tenant Fitout Construction Phase 09Building (Commercial) Tenant Fit-Up BLDC-2026-043276 · Submitted - Online |  |  |
| Sep 2, 2026 | 45795 OPTICS STERLINGLoudoun County VA LandMARC submitted permits | Data center | Data Center Tenant Fitout Construction Phase 10 - Data HallBuilding (Commercial) Tenant Fit-Up BLDC-2026-043277 · Submitted - Online |  |  |
| Sep 2, 2026 | 45795 OPTICS STERLINGLoudoun County VA LandMARC submitted permits | Data center | Data Center Tenant Fitout Construction Phase 11 - Data HallBuilding (Commercial) Tenant Fit-Up BLDC-2026-043278 · Submitted - Online |  |  |
| Sep 2, 2026 | 45795 OPTICS STERLINGLoudoun County VA LandMARC submitted permits | Data center | Data Center Tenant Fitout Construction Phase 12 - Data HallBuilding (Commercial) Tenant Fit-Up BLDC-2026-043280 · Submitted - Online |  |  |
| Sep 2, 2026 | 7725 DEACON FALLS DR GAINESVILLE VA 20155Prince William County VA ePortal permits and plans | Data center | "TGTD N/S PROJECT GAINESVILLE BLD 2" Steel Tressel Frames associated with BPR2022-02229Building Commercial Accessory Structure, C - Accessory Structure BLD2026-05145 · Issued |  |  |
| Sep 2, 2026 | 7725 DEACON FALLS DR GAINESVILLE VA 20155Prince William County VA ePortal permits and plans | Data center | "TGTD N/S PROJECT GAINESVILLE BLD 2" Transformer Pads & Foundation associated with BPR2022-02229Building Commercial Accessory Structure, C - Accessory Structure BLD2026-05146 · Issued |  |  |
| Sep 2, 2026 | 7725 DEACON FALLS DR GAINESVILLE VA 20155Prince William County VA ePortal permits and plans | Data center | "TGTD N/S PROJECT GAINESVILLE BLD 2" Guard Booth associated with BPR2022-02229Building Commercial Accessory Structure, C - Accessory Structure BLD2026-05148 · Issued |  |  |
| Sep 2, 2026 | 15455 JOHN MARSHALL HWY HAYMARKET VA 20169Prince William County VA ePortal permits and plans | Data center | Electrical equipment updates to include 42 new Power Distribution Cabinets (PDCs) powered from existing electrical line-ups and overhead busways, along with related overhead cable…Electrical Commercial Alteration/Repair, C - Alteration/Repair ELE2026-05569 · Issued |  |  |
| Sep 2, 2026 | 10450 HARRY J PARRISH BLVD MANASSAS VA 20110Prince William County VA ePortal permits and plans | Data center | Install 75 feet of 8" DIP underground fire line from connection at main to sprinkler flange inside of buildingFire Protection - Underground Fire Line FPP2027-00167 · Issued |  |  |
| Sep 2, 2026 | 11530 ELEVATE DR MANASSAS VA 20109Prince William County VA ePortal permits and plans | Data center | Iron Mountain IMDC VA8/VA9 Sewer and Water included on this permit IMDC VA8 & VA9 Entrance Guard Booth Parent Permit # BLD2025-04553Plumbing Commercial Accessory Structure, C - Accessory Structure PLB2025-02754 · Issued |  |  |
| Sep 2, 2026 | City of San Antonio TX BuildSA records | Data center | ERRC - 5207 Rogers Road - Vantage Data Center TX-21 ERRCSFire Fire Systems Permit Application FIR-FSP-APP26-22501987 · Additional Info Required |  |  |
| Sep 1, 2026 | 3500 N Arlington AveKansas City MO city issued permits | Data center | Edged Energy KC Data CenterCPPU - Mechanical (Commercial) Mechanical General CPMC-2026-00540 · Issued |  |  |
| Sep 1, 2026 | 24400 HOWLING ROOSTER STERLINGLoudoun County VA LandMARC issued permits | Data center | Fire alarm interlock for VESDA system for Data Center. New construction.Fire Protection (Commercial) New Construction FIREC-2026-004475 · Issued | $413,877 |  |
| Sep 1, 2026 | 44100 DIGITAL LOUDOUN ASHBURNLoudoun County VA LandMARC issued permits | Data center | Interior fit-up for tenant in Building J suite 145. Approximately 1835 square feet of data center accessory office use. Electronic Copy Modify the existing sprinkler system for…Fire Protection (Commercial) FIREC-2026-039783 · Issued | $38,635 |  |
| Aug 31, 2026 | 22280 RANDOLPH STERLINGLoudoun County VA LandMARC issued permits | Data center | Tenant fit out in existing data center (DH3100)Electrical (Commercial) Alteration ELECC-2026-023720 · Issued |  |  |
| Aug 31, 2026 | 25145 WOODNOOK CHANTILLYLoudoun County VA LandMARC issued permits | Data center | IAD-327 \| Two story data center full build out. - Phase 02Fire Protection (Commercial) Alteration FIREC-2026-023444 · Issued |  |  |
| Aug 31, 2026 | 21690 GRESHAM ASHBURNLoudoun County VA LandMARC issued permits | Data center | Installation of a new fire sprinkler system for a new three-story core and shell data center. Scope includes wet, dry, and preaction sprinkler systems complete with fire pump and…Fire Protection (Commercial) New Construction FIREC-2026-036015 · Issued |  |  |
| Aug 31, 2026 | 44751 ROUND TABLE ASHBURNLoudoun County VA LandMARC submitted permits | Data center | Interior fit-up for building owner Data Center Accessory Office Use, approximately 2,832 SFBuilding (Commercial) Tenant Fit-Up BLDC-2026-042751 · Submitted - Online | $121,658 |  |
| Aug 31, 2026 | City of Papillion NE Citizen Access records | Data center | Oppidan Papillion - Data Center Phase 2-5Commercial New Tenant Finish (First Tenant) 26TMP-004442 |  |  |
| Aug 31, 2026 | 11684 S 158th St Bldg , United States, NE 68138City of Papillion NE Citizen Access records | Data center | Oppidan Papillion - Data Center Phase 2-5Commercial New Tenant Finish (First Tenant) BLD-26-3767 · Submitted |  |  |
| Aug 31, 2026 | 13710 UNIVERSITY BLVD GAINESVILLE VA 20155Prince William County VA ePortal permits and plans | Data center | **see notes** GCDC VA1.2 MNZ28 FA & VESDA SYSTEMS PERMITFire Protection - Fire Alarm FPP2026-00919 · Issued |  |  |
| Aug 31, 2026 | 9570 HORNBAKER RD MANASSAS VA 20109Prince William County VA ePortal permits and plans | Data center | EMERGENCY FIRE ALARM: REPLACED BAD VESDA DETECTORFire Protection - Fire Alarm FPP2027-00143 · Issued |  |  |
| Aug 31, 2026 | 10105 HARRY J PARRISH BLVD MANASSAS VA 20110Prince William County VA ePortal permits and plans | Data center | CloudHQ MCC7 ***MODIFIED TARGETED*** MCC 7****SITE WORK ONLY****Plumbing Commercial New Structure, C - New Structure PLB2027-00286 · Issued |  |  |
| Aug 28, 2026 | 44395 GIGABIT ASHBURNLoudoun County VA LandMARC issued permits | Data center | Low voltage for BMS system for Data Center Vault Phasing Package. Vault 1.1 - Phase 1. Tenant fit-out for a single Data Hall Vault and the alterations in the corridor.Electrical (Commercial) Low Voltage - Other ELECC-2026-035678 · Issued | $389,580 |  |
| Aug 28, 2026 | 44395 GIGABIT ASHBURNLoudoun County VA LandMARC issued permits | Data center | Low voltage for BMS system for Data Center Vault Phasing Package. Vault 1.2 - Phase 3.Electrical (Commercial) Low Voltage - Other ELECC-2026-035683 · Issued | $389,580 |  |
| Aug 28, 2026 | 44395 GIGABIT ASHBURNLoudoun County VA LandMARC issued permits | Data center | Low voltage for BMS system for Data Center Vault Phasing Package. Vault 1.3 - Phase 5.Electrical (Commercial) Low Voltage - Other ELECC-2026-035695 · Issued | $389,580 |  |
| Aug 28, 2026 | 44395 GIGABIT ASHBURNLoudoun County VA LandMARC issued permits | Data center | Low voltage for BMS system for Data Center Vault Phasing Package Vault 2.1 - Phase 2Electrical (Commercial) Low Voltage - Other ELECC-2026-035703 · Issued | $389,580 |  |
| Aug 28, 2026 | 44395 GIGABIT ASHBURNLoudoun County VA LandMARC issued permits | Data center | Low voltage for BMS system for Data Center Vault Phasing Package. Vault 2.2 - Phase 4.Electrical (Commercial) Low Voltage - Other ELECC-2026-035720 · Issued | $389,580 |  |
| Aug 28, 2026 | 44395 GIGABIT ASHBURNLoudoun County VA LandMARC issued permits | Data center | Low voltage for BMS system for Data Center Vault Phasing Package. Vault 2.3.Electrical (Commercial) Low Voltage - Other ELECC-2026-035725 · Issued | $389,580 |  |
| Aug 28, 2026 | 43649 LIGHT SPEED STERLINGLoudoun County VA LandMARC issued permits | Data center | Low Voltage for BMS and EPMS systems for 2 STORY SINGLE TENANT COMPUTER DATA CENTERElectrical (Commercial) Low Voltage - Other ELECC-2026-037593 · Issued | $40,434,386 |  |
| Aug 28, 2026 | 44525 LOW LATENCY STERLINGLoudoun County VA LandMARC issued permits | Data center | Low Voltage Electrical Permit associated with Fire Alarm Permit FIREC-2026-039277 (new fire alarm system for SDC2 Data Center).Electrical (Commercial) Low Voltage - Fire Alarm ELECC-2026-039474 · Issued |  |  |
| Aug 28, 2026 | 44525 LOW LATENCY STERLINGLoudoun County VA LandMARC issued permits | Data center | Low Voltage Electrical Permit associated with Fire Alarm Permit FIREC-2026-039280 (new VESDA system for SDC2 Data Center).Electrical (Commercial) Low Voltage - Fire Alarm ELECC-2026-039476 · Issued |  |  |
| Aug 28, 2026 | 10101 HARRY J PARRISH BLVD MANASSAS VA 20110Prince William County VA ePortal permits and plans | Data center | **DO NOT ISSUE UNTIL BLD2026-04432 ISSUED** ***MODIFIED TARGETED*** MCC7 8" UG FIRELINE PERMITFire Protection - Underground Fire Line FPP2026-00935 · Issued |  |  |
| Aug 28, 2026 | 10051 BRICKYARD WAY Unit: 210 MANASSAS VA 20110Prince William County VA ePortal permits and plans | Data center | BRICKYARD BUILDING A SUITE 210 FULL FA/VESDA SYSTEM PERMIT; LINK TO BLD2026-05308Fire Protection - Fire Alarm FPP2027-00139 · Issued |  |  |
| Aug 27, 2026 | 43715 EFFICIENCY STERLINGLoudoun County VA LandMARC issued permits | Data center | Low voltage for HVAC controls for 2-Story Data Center Core & Shell. Electronic copyElectrical (Commercial) Low Voltage - Other ELECC-2026-013369 · Issued | $85,283,726 |  |
| Aug 27, 2026 | 21780 FILIGREE ASHBURNLoudoun County VA LandMARC issued permits | Data center | Suite 105 Service A: New construction/electrical system for a new data hall suite with a newly built IAD56 data center building.Electrical (Commercial) Alteration ELECC-2026-033089 · Issued |  |  |
| Aug 27, 2026 | 21780 FILIGREE ASHBURNLoudoun County VA LandMARC issued permits | Data center | Suite 105, Service B. - New construction/electrical system for a new data hall suite with a newly built IAD56 data center building.Electrical (Commercial) Alteration ELECC-2026-033206 · Issued |  |  |
| Aug 27, 2026 | 21780 FILIGREE ASHBURNLoudoun County VA LandMARC issued permits | Data center | Suite 205, Service C: New construction/electrical system for a new data hall suite with a newly built IAD56 data center building.Electrical (Commercial) Alteration ELECC-2026-033226 · Issued |  |  |
| Aug 27, 2026 | 44525 LOW LATENCY STERLINGLoudoun County VA LandMARC issued permits | Data center | New Fire Alarm System for SDC2 Data Center.Fire Protection (Commercial) New Construction FIREC-2026-039277 · Issued |  |  |
| Aug 27, 2026 | 44525 LOW LATENCY STERLINGLoudoun County VA LandMARC issued permits | Data center | VESDA new installation for new SDC2 Data Center.Fire Protection (Commercial) New Construction FIREC-2026-039280 · Issued |  |  |
| Aug 27, 2026 | 11894 LEXINGTON VALLEY DR MANASSAS VA 20109Prince William County VA ePortal permits and plans | Data center | SIGN - 5' X 12.18' NEW FRONT WALL SIGN - DC DECOM (DATA CENTER DECOMMISSION SERVICES)Building Commercial Sign, C - Sign BLD2027-01031 · Issued |  |  |
| Aug 27, 2026 | 14475 JOHN MARSHALL HWY GAINESVILLE VA 20155Prince William County VA ePortal permits and plans | Data center | *LOW VOLTAGE* Install Security System containing cameras and card readers.Electrical Commercial Tenant Layout, C - Tenant Layout ELE2027-01055 · Issued |  |  |
| Aug 26, 2026 | 44395 GIGABIT ASHBURNLoudoun County VA LandMARC issued permits | Data center | Phasing Breakout - Phase 5, Vault 1-3 / Data CenterFire Protection (Commercial) Alteration FIREC-2026-030059 · Issued |  |  |
| Aug 26, 2026 | 44395 GIGABIT ASHBURNLoudoun County VA LandMARC issued permits | Data center | Phasing Breakout - Phase 6, Vault 2-3 / Data CenterFire Protection (Commercial) Alteration FIREC-2026-030063 · Issued |  |  |
| Aug 25, 2026 | 42630 PATRIOT PARK LEESBURGLoudoun County VA LandMARC issued permits | Data center | Fifth building on the campus. Core/Shell 3-Story Flex Warehouse and Commercial Office. Future purpose of space: 3-story single tenant computer data center. Electronic CopyBuilding (Commercial) New Construction BLDC-2026-025845 · Issued | $65,605,395 |  |
| Aug 25, 2026 | 21780 FILIGREE ASHBURNLoudoun County VA LandMARC issued permits | Data center | Suite 205, Service D-: New construction/electrical system for a new data hall suite with a newly built IAD56 data center building.Electrical (Commercial) Alteration ELECC-2026-033230 · Issued |  |  |
| Aug 25, 2026 | 21780 FILIGREE ASHBURNLoudoun County VA LandMARC issued permits | Data center | Suite 205, Service R: New construction/electrical system for a new data hall suite with a newly built IAD56 data center building.Electrical (Commercial) Alteration ELECC-2026-033233 · Issued |  |  |
| Aug 25, 2026 | 42630 PATRIOT PARK LEESBURGLoudoun County VA LandMARC issued permits | Data center | Fifth building on the campus. Core/Shell 3-Story Flex Warehouse and Commercial Office. Future purpose of space: 3-story single tenant computer data centerZoning (Commercial) New Construction ZONC-2026-026271 · Issued | $65,605,395 |  |
| Aug 25, 2026 | 4021 ROSE LAKE DR CHARLOTTE NC 28217Mecklenburg County NC building permits (all towns) | Data center | Lumen Data Center Sunland Fire Protection Inc. Small Fire Alarm upfit in the DC Power Room. FACP is existing. Adding 2 notification devices and 4 initiating devices.Electrical COM-ELC-26-008475 · Inspection Phase | $50,474 |  |
| Aug 25, 2026 | 15465 JOHN MARSHALL HWY HAYMARKET VA 20169Prince William County VA ePortal permits and plans | Data center | *DO NOT ISSUE UNTIL BLD2025-03520 IS FINALED* Interior Alterations to Existing TenantBuilding Commercial Alteration/Repair, C - Alteration/Repair BLD2026-03168 · Issued |  |  |
| Aug 25, 2026 | 15395 JOHN MARSHALL HWY HAYMARKET VA 20169Prince William County VA ePortal permits and plans | Data center | Installation of additional communications cabling pathways and related floor mounted supports between and through existing 1-story data center computer rooms.Building Commercial Alteration/Repair, C - Alteration/Repair BLD2026-03552 · Issued |  |  |
| Aug 25, 2026 | 10450 HARRY J PARRISH BLVD MANASSAS VA 20110Prince William County VA ePortal permits and plans | Data center | MDC2 - DATA CENTER TRASH ENCLOSUREBuilding Commercial Accessory Structure, C - Accessory Structure BLD2027-00796 · Issued |  |  |
| Aug 25, 2026 | 8217 LINTON HALL RD BRISTOW VA 20136Prince William County VA ePortal permits and plans | Data center | BFPE WILL MODIFY EXISTING SPRINKLER SYSTEM IN BATTERY ROOMFire Protection - Sprinkler FPP2026-00638 · Issued |  |  |
| Aug 24, 2026 | 25374 MEADOWDALE CHANTILLYLoudoun County VA LandMARC issued permits | Data center | PARENT PERMIT IAD-159 \| Data Center full build out.Fire Protection (Commercial) New Construction FIREC-2026-038113 · Issued |  |  |
| Aug 24, 2026 | 45775 OPTICS STERLINGLoudoun County VA LandMARC submitted permits | Data center | EXISTING DATA CENTER. SCOPE OF WORK: REPLACEMENT OF ALL ROOFTOP UP-BLAST EXHAUST FANS UTILIZING EXISTING ROOF CURBS, ALONG WITH NEW INTERIOR EXHAUST FAN CONTROLS IN EXISTING…Zoning (Commercial) Alteration ZONC-2026-041698 · Invoiced and Paid - Same Day | $7,215,000 |  |
| Aug 24, 2026 | 45795 OPTICS STERLINGLoudoun County VA LandMARC submitted permits | Data center | EXISTING DATA CENTER. SCOPE OF WORK: REPLACEMENT OF ALL ROOFTOP UP-BLAST EXHAUST FANS UTILIZING EXISTING ROOF CURBS, ALONG WITH NEW INTERIOR EXHAUST FAN CONTROLS IN EXISTING…Zoning (Commercial) Alteration ZONC-2026-041703 · Invoiced and Paid - Same Day | $7,215,000 |  |
| Aug 24, 2026 | 8890 MIKE GARCIA DR MANASSAS VA 20109Prince William County VA ePortal permits and plans | Data center | Install new security system in new data centerElectrical Commercial Alteration/Repair, C - Alteration/Repair ELE2027-00063 · Issued |  |  |
| Aug 24, 2026 | 13710 UNIVERSITY BLVD GAINESVILLE VA 20155Prince William County VA ePortal permits and plans | Data center | low voltage for BMS / EPMS systemsElectrical Commercial Alteration/Repair, C - Alteration/Repair ELE2027-00864 · Issued |  |  |
| Aug 24, 2026 | 10161 LINTON HALL RD BRISTOW VA 20136Prince William County VA ePortal permits and plans | Data center | YFT - BUILDING B TGTD INSTALL NEW SPRINKLER SYSTEM IN SHELL BUILDINGFire Protection - Sprinkler FPP2026-00539 · Issued |  |  |
| Aug 24, 2026 | 10051 BRICKYARD WAY Unit: 110 MANASSAS VA 20110Prince William County VA ePortal permits and plans | Data center | **DO NOT ISSUE UNTIL BLD2026-05471 HAS BEEN ISSUED** BRICKYARD SUITE 110 EFO FULL FA/VESDA SYSTEM PERMITFire Protection - Fire Alarm FPP2026-00878 · Issued |  |  |
| Aug 24, 2026 | 10051 BRICKYARD WAY Unit: 210 MANASSAS VA 20110Prince William County VA ePortal permits and plans | Data center | *SEE HOLD* THE SCOPE OF WORK CONTAINED IN THIS PACKAGE OF DRAWINGS IS THE EQUIPMENT FIT OUT (EFO) IN AN EXISTING DATA HALLMechanical Commercial Alteration/Repair, C - Alteration/Repair MEC2026-02156 · Issued |  |  |
| Aug 23, 2026 | 45775 OPTICS STERLINGLoudoun County VA LandMARC submitted permits | Data center | Data Center Tenant Fitout Construction Phase 08Zoning (Commercial) Tenant Fit-Up ZONC-2026-041557 · Fees Paid |  |  |
| Aug 23, 2026 | 45775 OPTICS STERLINGLoudoun County VA LandMARC submitted permits | Data center | Data Center Tenant Fitout Construction Phase 11Zoning (Commercial) Tenant Fit-Up ZONC-2026-041566 · Fees Paid |  |  |
| Aug 23, 2026 | 45775 OPTICS STERLINGLoudoun County VA LandMARC submitted permits | Data center | Data Center Tenant Fitout Construction Phase 12Zoning (Commercial) Tenant Fit-Up ZONC-2026-041567 · Fees Paid |  |  |
| Aug 23, 2026 | 45775 OPTICS STERLINGLoudoun County VA LandMARC submitted permits | Data center | Data Center Tenant Fitout Construction Phase 09Zoning (Commercial) Tenant Fit-Up ZONC-2026-041568 · Fees Paid |  |  |
| Aug 23, 2026 | 45775 OPTICS STERLINGLoudoun County VA LandMARC submitted permits | Data center | Data Center Tenant Fitout Construction Phase 10Zoning (Commercial) Tenant Fit-Up ZONC-2026-041569 · Fees Paid |  |  |
| Aug 21, 2026 | 2401 Gillham RdKansas City MO city issued permits | Data center | Childrens Mercy Data CenterCPPU - Electrical (Commercial) Electrical General CPEC-2026-01307 · Issued |  |  |
| Aug 21, 2026 | 9700 INNOVATION DR MANASSAS VA 20110Prince William County VA ePortal permits and plans | Data center | Fire alarm for VRF projectFire Protection - Fire Alarm FPP2027-00088 · Issued |  |  |
| Aug 21, 2026 | 9720 INNOVATION DR MANASSAS VA 20110Prince William County VA ePortal permits and plans | Data center | Fire alarm for VRF projectFire Protection - Fire Alarm FPP2027-00089 · Issued |  |  |
| Aug 21, 2026 | 7305 GROVETON RD MANASSAS VA 20109Prince William County VA ePortal permits and plans | Data center | Fire alarm - relays for large fan shutdownFire Protection - Fire Alarm FPP2027-00123 · Issued |  |  |
| Aug 21, 2026 | 7070 WELLINGTON RD MANASSAS VA 20109Prince William County VA ePortal permits and plans | Data center | REPLACING THE EXISTING SILENT KNIGHTS 5014B WIT A NEW CLSS GATEWAYFire Protection - Fire Alarm FPP2027-00128 · Issued |  |  |
| Aug 20, 2026 | 9600 NE 48th StKansas City MO city issued permits | Data center | Shalerock 4A Data Center #4 MUW TanksCPPU - Mechanical (Commercial) Mechanical General CPMC-2026-00518 · Issued |  |  |
| Aug 20, 2026 | City of Atlanta GA Citizen Access records | Data center | Edged ATL5.6 MW Data Center (COM)(CO)Building Commercial Alteration BB-202607320 · Accepted |  |  |
| Aug 20, 2026 | City of Atlanta GA Citizen Access records | Data center | H5 Data Center - 345 COURTLAND NE STFire Fire Occupancy FIRE-INSPECT-26-04198 · Complete |  |  |
| Aug 20, 2026 | 1968 MARIETTA NW, ATLANTA, GA 30318City of Atlanta GA building permits | Data center | Edged ATL5.6 MW Data Center (COM)(CO)Commercial Alteration BB-202607320 · Accepted | $44,445,620 |  |
| Aug 20, 2026 | 9351 FREEDOM CENTER BLVD MANASSAS VA 20110Prince William County VA ePortal permits and plans | Data center | LOW VOLTAGE (Telecom) - (BPR2025-01312)Electrical Commercial New Structure, C - New Structure ELE2027-00819 · Issued |  |  |
| Aug 20, 2026 | 15455 JOHN MARSHALL HWY HAYMARKET VA 20169Prince William County VA ePortal permits and plans | Data center | VERIFY THE PITCH IS CORRECT ON THE EX. PRE-ACTION SYSTEMS AND ADD UP 9 LOW POINT DRAINS.Fire Protection - Sprinkler FPP2027-00070 · Issued |  |  |
| Aug 20, 2026 | 9630 N VIRGINIA ST, RENO, NV 89506City of Reno NV Citizen Access records | Data center | 5MW DATA CENTERBuilding Commercial Grading & Site Improvements BLD27-01732E · Submittal Incomplete |  |  |
| Aug 19, 2026 | 2401 Gillham RdKansas City MO city issued permits | Data center | Childrens Mercy Data CenterCPPU - Building (Commercial) Renovation CPBC-2026-00815 · Issued |  |  |
| Aug 19, 2026 | 3500 N Arlington AveKansas City MO city issued permits | Data center | Edged Energy KC Data CenterCPPU - Electrical (Commercial) Electrical Fire Alarm Commercial CPEC-2026-01281 · Issued |  |  |
| Aug 19, 2026 | 44595 LOW LATENCY STERLINGLoudoun County VA LandMARC issued permits | Data center | SDC Building 1 Datacenter Fit up permit 1 of 4. This permit encompasses all of level 4, roof and the level 1 & 2 mechanical areas. There will be 3 additional permits for the…Electrical (Commercial) Alteration ELECC-2026-017523 · Issued |  |  |
| Aug 19, 2026 | 44595 LOW LATENCY STERLINGLoudoun County VA LandMARC issued permits | Data center | SDC Building 1 Datacenter Fit up permit 2 of 4. This permit encompasses all of level 3. There will be 3 additional permits for the remaining 3 levels.Electrical (Commercial) Alteration ELECC-2026-017530 · Issued |  |  |
| Aug 19, 2026 | 44595 LOW LATENCY STERLINGLoudoun County VA LandMARC issued permits | Data center | SDC Building 1 Datacenter Fit up permit 3 of 4. This permit encompasses all of level 2. There will be 3 additional permits for the remaining 3 levels.Electrical (Commercial) Alteration ELECC-2026-017542 · Issued |  |  |
| Aug 19, 2026 | 44595 LOW LATENCY STERLINGLoudoun County VA LandMARC issued permits | Data center | SDC Building 1 Datacenter Fit up permit 4 of 4. This permit encompasses all of level 1. There will be 3 additional permits for the remaining 3 levels.Electrical (Commercial) Alteration ELECC-2026-017543 · Issued |  |  |
| Aug 19, 2026 | 44395 GIGABIT ASHBURNLoudoun County VA LandMARC issued permits | Data center | Data Center Vault Phasing Package. Vault 1.1 - Phase 1. INSTALL 9 FIRE EXTINGUISHERSFire Protection (Commercial) FIREC-2026-039029 · Issued | $389,580 |  |
| Aug 19, 2026 | 44395 GIGABIT ASHBURNLoudoun County VA LandMARC issued permits | Data center | Data Center Vault Phasing Package Vault 2.1 - Phase 2 INSTALL 9 FIRE EXTINGUISHERSFire Protection (Commercial) FIREC-2026-039034 · Issued | $389,580 |  |
| Aug 19, 2026 | 44395 GIGABIT ASHBURNLoudoun County VA LandMARC issued permits | Data center | Data Center Vault Phasing Package. Vault 1.2 - Phase 3 INSTALL 9 FIRE EXTINGUISHERSFire Protection (Commercial) FIREC-2026-039036 · Issued | $389,580 |  |
| Aug 19, 2026 | 44395 GIGABIT ASHBURNLoudoun County VA LandMARC issued permits | Data center | Data Center Vault Phasing Package. Vault 2.2 - Phase 4. INSTALL 9 FIRE EXTINGUISHERSFire Protection (Commercial) FIREC-2026-039040 · Issued | $389,580 |  |
| Aug 19, 2026 | 44395 GIGABIT ASHBURNLoudoun County VA LandMARC issued permits | Data center | Data Center Vault Phasing Package. Vault 2.3. PHASE 6 INSTALL 9 FIRE EXTINGUISHERSFire Protection (Commercial) FIREC-2026-039058 · Issued | $389,580 |  |
| Aug 19, 2026 | 7070 WELLINGTON RD MANASSAS VA 20109Prince William County VA ePortal permits and plans | Data center | LOW VOLTAGE - REPLACING THE EXISTING SILENT KNIGHT 5104B WITH A NEW CLSS GATEWAY CELL DIALERElectrical Commercial Alteration/Repair, C - Alteration/Repair ELE2027-00873 · Issued |  |  |
| Aug 18, 2026 | 44100 DIGITAL LOUDOUN ASHBURNLoudoun County VA LandMARC issued permits | Data center | Interior fit-up for tenant in Building J suite 145. Approximately 1835 square feet of data center accessory office use. Electronic CopyBuilding (Commercial) Tenant Fit-Up BLDC-2026-030035 · Issued | $38,635 |  |
| Aug 18, 2026 | 44100 DIGITAL LOUDOUN ASHBURNLoudoun County VA LandMARC issued permits | Data center | Interior fit-up for tenant in Building J suite 145. Approximately 1835 square feet of data center accessory office use.Zoning (Commercial) Tenant Fit-Up ZONC-2026-032899 · Issued | $38,635 |  |
| Aug 18, 2026 | 10051 BRICKYARD WAY Unit: 210 MANASSAS VA 20110Prince William County VA ePortal permits and plans | Data center | LOW VOLTAGE - SECURITY - BRICKYARD A1 SUITE #210 EFO LINKED TO BLD2026-05308Electrical Commercial Alteration/Repair, C - Alteration/Repair ELE2027-00885 · Issued |  |  |
| Aug 18, 2026 | 10051 BRICKYARD WAY Unit: 210 MANASSAS VA 20110Prince William County VA ePortal permits and plans | Data center | LOW VOLTAGE - FIRE ALARM - BRICKYARD A1 SUITE #210 EFO; LINK TO BLD2026-05308Electrical Commercial Alteration/Repair, C - Alteration/Repair ELE2027-00886 · Issued |  |  |
| Aug 17, 2026 | 10051 BRICKYARD WAY Unit: 210 MANASSAS VA 20110Prince William County VA ePortal permits and plans | Data center | *SEE HOLD* THE SCOPE OF WORK CONTAINED IN THIS PACKAGE OF DRAWINGS IS THE EQUIPMENT FIT OUT (EFO) IN AN EXISTING DATA HALLElectrical Commercial Alteration/Repair, C - Alteration/Repair ELE2027-00398 · Issued |  |  |
| Aug 17, 2026 | 10051 BRICKYARD WAY Unit: 115 MANASSAS VA 20110Prince William County VA ePortal permits and plans | Data center | Brickyard Building A1 #115 ***SUPERSEDED*** TLO FOR SR DESIGN MANAGER EAST REGION #115 10-10-10 TI (***LOW VOLTAGE CABLING PERMIT 8-14-26 -HXF***)Electrical Commercial Tenant Layout, C - Tenant Layout ELE2027-00853 · Finaled |  |  |
| Aug 17, 2026 | City of San Antonio TX BuildSA records | Data center | SPC Microsoft-SAT15 Data Center Package1 Admin, COLO1 & 2Building Temporary Certificate of Occupancy COO-TEMPCOO26-38200706 · Inactive |  |  |
| Aug 14, 2026 | 10430 HARRY J PARRISH BLVD MANASSAS VA 20110Prince William County VA ePortal permits and plans | Data center | MDC- 1 TGTD **MODIFIED TARGETED/SUPERSEDED** ELECTRICAL FOR DATA CENTERElectrical Commercial New Structure, C - New Structure ELE2027-00446 · Issued |  |  |
| Aug 14, 2026 | 7510 MASON KING CT MANASSAS VA 20109Prince William County VA ePortal permits and plans | Data center | FIRE ALARM UPGRADES FOR IAD 11 DALMATION. Structural component to fire protection upgradesFire Protection - Fire Alarm FPP2025-00087 · Issued |  |  |
| Aug 14, 2026 | 7610 MASON KING CT MANASSAS VA 20109Prince William County VA ePortal permits and plans | Data center | FIRE ALARM UPGRADES FOR IAD 24 DALMATION. Structural component to fire protection upgrades.Fire Protection - Fire Alarm FPP2025-00088 · Issued |  |  |
| Aug 13, 2026 | 21780 FILIGREE ASHBURNLoudoun County VA LandMARC issued permits | Data center | Fire extinguisher permit for new data center S210. This work is associated with Building Permit No. BLDC-2025-051484.Fire Protection (Commercial) Alteration FIREC-2026-032387 · Issued |  |  |
| Aug 13, 2026 | 7060 WELLINGTON RD MANASSAS VA 20109Prince William County VA ePortal permits and plans | Data center | INSTALL A NEW CLSS PATHWAY CELL DIALER TO REPLACE THE EXISTING 5104B DIGITAL DIALERFire Protection - Fire Alarm FPP2027-00091 · Issued |  |  |
| Aug 12, 2026 | 3500 N Arlington AveKansas City MO city issued permits | Data center | Edged Energy KC Data CenterCPPU - Electrical (Commercial) Electrical General CPEC-2026-01184 · Issued |  |  |
| Aug 12, 2026 | 3500 N Arlington AveKansas City MO city issued permits | Data center | Edged Energy KC Data CenterCPPU - Electrical (Commercial) Electrical General CPEC-2026-01236 · Issued |  |  |
| Aug 12, 2026 | City of Papillion NE Citizen Access records | Data center | Data Center T.ICommercial New 26TMP-004248 |  |  |
| Aug 12, 2026 | 10917 Harry Watanabe pkwy Wy, La Vista, NE 68128City of Papillion NE Citizen Access records | Data center | LaVista - Data Center T.ICommercial New BLD-26-3510 · Plan Review |  |  |
| Aug 12, 2026 | 10105 HARRY J PARRISH BLVD MANASSAS VA 20110Prince William County VA ePortal permits and plans | Data center | CloudHQ MCC7 ***MODIFIED TARGETED*** MCC 7Building Commercial New Structure, C - New Structure BLD2026-04432 · Issued |  |  |
| Aug 12, 2026 | 9101 FREEDOM CENTER BLVD MANASSAS VA 20110Prince William County VA ePortal permits and plans | Data center | STACK NVA05A TFO PH 3 (ADDED CORD REELS) STANDALONE ELECTRICAL PERMITElectrical Commercial Alteration/Repair, C - Alteration/Repair ELE2027-00490 · Issued |  |  |
| Aug 12, 2026 | 10155 LINTON HALL RD BRISTOW VA 20136Prince William County VA ePortal permits and plans | Data center | YFT BUILDING 312 UG FIRELINE PERMIT - UNDERGROUD FIRE MAIN FROM STREET CONNECTION TO SPRINKLER SYSTEM FLANGE INSIDE THE BUILDINGFire Protection - Underground Fire Line FPP2027-00119 · Issued |  |  |
| Aug 11, 2026 | City of Atlanta GA Citizen Access records | Data center | Edged ATL5.6 MW Data CenterBuilding Commercial Addition 26TMP-052049 |  |  |
| Aug 11, 2026 | City of Atlanta GA Citizen Access records | Data center | EverOn Data Center AT STAR METALS-SUITE 1110Building Commercial - Electrical 26TMP-052301 |  |  |
| Aug 11, 2026 | City of Atlanta GA Citizen Access records | Data center | EVERON DATA CENTER - SUITE 1100Building Commercial - Electrical 26TMP-052319 |  |  |
| Aug 11, 2026 | City of Atlanta GA Citizen Access records | Data center | EverOn Data Center AT STAR METALS-SUITE 1110Building Commercial - Electrical BE-202605531 · Issued |  |  |
| Aug 11, 2026 | City of Atlanta GA Citizen Access records | Data center | EVERON DATA CENTER - SUITE 1100Building Commercial - Electrical BE-202605533 · Issued |  |  |
| Aug 11, 2026 | 1968 MARIETTA NW, ATLANTA, GA 30318City of Atlanta GA building permits | Data center | Edged ATL5.6 MW Data CenterCommercial Addition BB-202607005 · ACA Pending | $44,445,620 |  |
| Aug 7, 2026 | 25145 WOODNOOK CHANTILLYLoudoun County VA LandMARC issued permits | Data center | Data Center Tenant Fit out Construction - Phase 09 USB 2.3BElectrical (Commercial) ELECC-2026-004713 · Issued |  |  |
| Aug 7, 2026 | 25145 WOODNOOK CHANTILLYLoudoun County VA LandMARC issued permits | Data center | Data Center Tenant Fit out Construction - Phase 10 USB 2.4AElectrical (Commercial) ELECC-2026-004714 · Issued |  |  |
| Aug 7, 2026 | 25145 WOODNOOK CHANTILLYLoudoun County VA LandMARC issued permits | Data center | Data Center Tenant Fit out Construction - Phase 11 USB 2.5BElectrical (Commercial) ELECC-2026-004718 · Issued |  |  |
| Aug 7, 2026 | 42090 REEDS FARM ALDIELoudoun County VA LandMARC issued permits | Data center | This is a three story data center that includes both core & shell and tenant fit-up. This is for the Phase 1./ Install low voltage wiring from VAV to Thermostat for Office SpacesElectrical (Commercial) Low Voltage - Other ELECC-2026-039164 · Issued |  |  |
| Aug 7, 2026 | 42090 REEDS FARM ALDIELoudoun County VA LandMARC issued permits | Data center | This is a three story data center that includes both core & shell and tenant fit-up. This is for the Phase 1. Install low voltage wiring from exhaust fan controller to exhaust fan…Electrical (Commercial) Low Voltage - Other ELECC-2026-039170 · Issued |  |  |
| Aug 7, 2026 | 42090 REEDS FARM ALDIELoudoun County VA LandMARC issued permits | Data center | This is a three story data center that includes both core & shell and tenant fit-up. This is for the Phase 1.Electrical (Commercial) Low Voltage - Other ELECC-2026-039175 · Issued |  |  |
| Aug 7, 2026 | City of San Antonio TX BuildSA records | Data center | $ - Vantage Data CenterFire Fire Sprinkler Permit FIR-FSS-PMT26-22600856 · Active |  |  |
| Aug 6, 2026 | 44395 GIGABIT ASHBURNLoudoun County VA LandMARC submitted permits | Data center | Data Center Vault Phasing Package. Vault 1.3 - Phase 5. INSTALL 9 FIRE EXTINGUISHERSFire Protection (Commercial) FIREC-2026-039052 · Fees Paid | $389,580 |  |
| Aug 6, 2026 | 7675 DEACON FALLS DR GAINESVILLE VA 20155Prince William County VA ePortal permits and plans | Data center | PROJECT GAINESVILLE BLDG D - NS NEW SINGLE TENANT TWO STORY DATA CENTER - BLDG DBuilding Commercial New Structure, C - New Structure BLD2026-00593 · Issued |  |  |
| Aug 6, 2026 | 7675 DEACON FALLS DR GAINESVILLE VA 20155Prince William County VA ePortal permits and plans | Data center | PROJECT GAINESVILLE BLDG D - NS DUMPSTER ENCLOSURE, LINK TO BPR2026 00231Building Commercial Accessory Structure, C - Accessory Structure BLD2026-03653 · Issued |  |  |
| Aug 6, 2026 | 7675 DEACON FALLS DR GAINESVILLE VA 20155Prince William County VA ePortal permits and plans | Data center | PROJECT GAINESVILLE BLDG D - NS GENERATOR PLATFORMSBuilding Commercial Accessory Structure, C - Accessory Structure BLD2026-03655 · Issued |  |  |
| Aug 6, 2026 | 7675 DEACON FALLS DR GAINESVILLE VA 20155Prince William County VA ePortal permits and plans | Data center | PROJECT GAINESVILLE BLDG D - NS TRANFORMER GENERATOR FOUNDATION PADS - LINK TO BPR2026-00231Building Commercial Accessory Structure, C - Accessory Structure BLD2026-03659 · Issued |  |  |
| Aug 6, 2026 | 7675 DEACON FALLS DR GAINESVILLE VA 20155Prince William County VA ePortal permits and plans | Data center | PROJECT GAINESVILLE BLDG D - NS Steel Tressel Frames linked to BPR2026-00231Building Commercial Accessory Structure, C - Accessory Structure BLD2026-06062 · Issued |  |  |
| Aug 6, 2026 | 7675 DEACON FALLS DR GAINESVILLE VA 20155Prince William County VA ePortal permits and plans | Data center | PROJECT GAINESVILLE BLDG D - NS Sunroom - Linked to BPR2026-00231Building Commercial Accessory Structure, C - Accessory Structure BLD2026-06359 · Issued |  |  |
| Aug 6, 2026 | 7060 WELLINGTON RD MANASSAS VA 20109Prince William County VA ePortal permits and plans | Data center | INSTALL A NEW CLSS PATHWAY COMMUNICATOR TO REPLACE THE EXISTING 5104B DIGITAL DIALERElectrical Commercial Alteration/Repair, C - Alteration/Repair ELE2027-00664 · Issued |  |  |
| Aug 5, 2026 | 22280 RANDOLPH STERLINGLoudoun County VA LandMARC issued permits | Data center | Tenant fit out in existing data center (DH2100)Electrical (Commercial) Alteration ELECC-2026-023679 · Issued |  |  |
| Aug 5, 2026 | 43715 EFFICIENCY STERLINGLoudoun County VA LandMARC issued permits | Data center | 2-Story Data Center Core & Shell and PBB fit-out.Zoning (Commercial) New Construction ZONC-2024-049131 · Issued | $50,000,000 |  |
| Aug 5, 2026 | 11050 Cornhusker Rd NE 68046City of Papillion NE Citizen Access records | Data center | El - 59119 - Outage for Fidelity Data CenterCommercial Electrical Permit BLD-26-3427 · Issued |  |  |
| Aug 5, 2026 | 10430 HARRY J PARRISH BLVD MANASSAS VA 20110Prince William County VA ePortal permits and plans | Data center | MDC- 1 TGTD LOW VOLTAGE - HVAC CONTROLSElectrical Commercial New Structure, C - New Structure ELE2026-05130 · Issued |  |  |
| Aug 5, 2026 | 10051 BRICKYARD WAY Unit: 210 MANASSAS VA 20110Prince William County VA ePortal permits and plans | Data center | Brickyard Building A1 #210 ***SUPERSEDED*** TLO FOR DIGITAL REALTY, Modified Targeted Industry (10-10)NDACertificate of Occupancy Commercial Tenant Layout, C - Tenant Layout OCC2026-00212 · Issued |  |  |
| Aug 4, 2026 | 12701 N US 169 Hwy #1 Data CenterKansas City MO city issued permits | Data center | Rocky Branch Creek 2A Data CenterCPPU - Plumbing (Commercial) Plumbing General CPPC-2026-00444 · Issued |  |  |
| Aug 4, 2026 | 712 E 5TH ST CHARLOTTE NC 28202Mecklenburg County NC building permits (all towns) | Data center | (HR) CLT15 Footing and Foundations Footing and foundations for new shell/PBB data center building.- Underground piping for footing and foundations for new buildingFootingFoundation COM-FF-FDN-26-000040 · Inspection Phase |  |  |
| Aug 4, 2026 | 10050 BRICKYARD WAY MANASSAS VA 20110Prince William County VA ePortal permits and plans | Data center | Brickyard Yard Building B Installation of a new fire sprinkler system for a two story multi-tenant building. Scope of work shall start at the incoming fire line flange inside the…Fire Protection - Sprinkler FPP2026-00844 · Issued |  |  |
| Aug 3, 2026 | 10200 HICKS FIELD RDCity of Fort Worth TX development permits | Data center | X TEAM /// ACS Data Center Phase I Substation X TEAM /// /// Control House Permit Related to PB26-06650Commercial Accessory Structure New PB26-11057 · Awaiting Client Reply | $3,500,000 |  |
| Aug 3, 2026 | 9700 TEAM ROCKBROOK PKWYCity of Fort Worth TX development permits | Data center | X TEAM /// Edged Energy Outpost Building 2 X TEAM /// 488,628 SF 196MW data centerCommercial Building Permit New PB26-11109 · Plan Review | $300,000,000 |  |
| Aug 3, 2026 | 11600 HAYDEN RD MANASSAS VA 20109Prince William County VA ePortal permits and plans | Data center | Remove existing freight elevator doors and install passenger elevator doors at Building 210 and Building 211.Building Commercial Alteration/Repair, C - Alteration/Repair BLD2026-04706 · Issued |  |  |
| Aug 3, 2026 | 11580 HAYDEN RD MANASSAS VA 20109Prince William County VA ePortal permits and plans | Data center | Replace elevator doorsBuilding Commercial Alteration/Repair, C - Alteration/Repair BLD2026-05420 · Issued |  |  |
| Aug 3, 2026 | 8870 HORNBAKER RD MANASSAS VA 20109Prince William County VA ePortal permits and plans | Data center | CHILD PROJECT - MANASSAS TECH CENTER 2 NEW DATA CENTER BUILDINGS MANASSAS TECH CENTER - PRECONSTRUCTION PLAN CONVERTED TO EARLY GRADING PLANLand - Grading/Infrastructure Permit, Grading/Infastructure Permit LND2027-00037 · Issued |  |  |
| Aug 2, 2026 | 24400 HOWLING ROOSTER STERLINGLoudoun County VA LandMARC issued permits | Data center | Low voltage for security and tele/data for Data Center. New construction, gen yard mech enclosure and cooling tower.Electrical (Commercial) New Construction ELECC-2026-032174 · Issued | $413,877 |  |
| Jul 31, 2026 | 43765 LIGHT SPEED STERLINGLoudoun County VA LandMARC issued permits | Data center | Underground fire line - section 5' outside of building, inside of building for New Data Center Build. Contractor license in associated folder.Fire Protection (Commercial) Underground Fire Line FIREC-2026-034277 · Issued | $72,741,474 |  |
| Jul 31, 2026 | 10051 BRICKYARD WAY Unit: 110 MANASSAS VA 20110Prince William County VA ePortal permits and plans | Data center | LOW VOLTAGE FOR DATA, VOICE, CAT6, DOOR CONTROLS, AND SECURITYElectrical Commercial Alteration/Repair, C - Alteration/Repair ELE2027-00551 · Issued |  |  |
| Jul 31, 2026 | 10051 BRICKYARD WAY Unit: 110 MANASSAS VA 20110Prince William County VA ePortal permits and plans | Data center | LOW VOLTAGE FOR FIRE ALARMElectrical Commercial Alteration/Repair, C - Alteration/Repair ELE2027-00552 · Issued |  |  |
| Jul 30, 2026 | City of Atlanta GA Citizen Access records | Data center | ATL1 Data Center ElectricalBuilding Commercial Alteration 26TMP-049738 |  |  |
| Jul 30, 2026 | 10051 BRICKYARD WAY Unit: 110 MANASSAS VA 20110Prince William County VA ePortal permits and plans | Data center | The scope of work contained in this package of drawings is the Equipment Fit Out (EFO) in an existing Data HallElectrical Commercial Alteration/Repair, C - Alteration/Repair ELE2027-00469 · Issued |  |  |
| Jul 29, 2026 | 22745 RELOCATION STERLINGLoudoun County VA LandMARC issued permits | Data center | Electrical equipment updates with related overhead cable supports, within existing 1-story data center building. Electronic copy.Building (Commercial) Alteration BLDC-2026-017621 · Issued | $46,000 |  |
| Jul 29, 2026 | 22900 PLATFORM STERLINGLoudoun County VA LandMARC issued permits | Data center | Electrical equipment updates with related overhead cable supports, within existing 1-story data center building. Electronic copy.Building (Commercial) Alteration BLDC-2026-018656 · Issued | $54,000 |  |
| Jul 29, 2026 | 21271 SMITH SWITCH ASHBURNLoudoun County VA LandMARC issued permits | Data center | Electrical equipment updates with related overhead cable supports, within existing 1-story data center building. Electronic copy.Building (Commercial) Alteration BLDC-2026-018991 · Issued | $38,000 |  |
| Jul 29, 2026 | 21320 BEAUMEADE ASHBURNLoudoun County VA LandMARC issued permits | Data center | Fire Alarm Installation for Datacenter IAD 179 - Office Phase.Fire Protection (Commercial) Alteration FIREC-2026-014271 · Issued |  |  |
| Jul 29, 2026 | 22745 RELOCATION STERLINGLoudoun County VA LandMARC issued permits | Data center | Electrical equipment updates with related overhead cable supports, within existing 1-story data center building. Electronic copy.Zoning (Commercial) Alteration ZONC-2026-018480 · Issued | $46,000 |  |
| Jul 29, 2026 | 22900 PLATFORM STERLINGLoudoun County VA LandMARC issued permits | Data center | Electrical equipment updates with related overhead cable supports, within existing 1-story data center building. Electronic copy.Zoning (Commercial) Alteration ZONC-2026-020227 · Issued | $54,000 |  |
| Jul 29, 2026 | 21271 SMITH SWITCH ASHBURNLoudoun County VA LandMARC issued permits | Data center | Electrical equipment updates with related overhead cable supports, within existing 1-story data center building. Electronic copy.Zoning (Commercial) Alteration ZONC-2026-021062 · Issued | $38,000 |  |
| Jul 29, 2026 | 13710 UNIVERSITY BLVD GAINESVILLE VA 20155Prince William County VA ePortal permits and plans | Data center | LOW VOLTAGE - SECURITY/ACCESS CONTROLElectrical Commercial Alteration/Repair, C - Alteration/Repair ELE2026-05261 · Issued |  |  |
| Jul 29, 2026 | 10051 BRICKYARD WAY Unit: 110 MANASSAS VA 20110Prince William County VA ePortal permits and plans | Data center | The scope of work contained in this package of drawings is the Equipment Fit Out (EFO) in an existing Data HallMechanical Commercial Alteration/Repair, C - Alteration/Repair MEC2026-02207 · Issued |  |  |
| Jul 29, 2026 | 10051 BRICKYARD WAY Unit: 110 MANASSAS VA 20110Prince William County VA ePortal permits and plans | Data center | The scope of work contained in this package of drawings is the Equipment Fit Out (EFO) in an existing Data HallPlumbing Commercial Alteration/Repair, C - Alteration/Repair PLB2026-02595 · Issued |  |  |
| Jul 28, 2026 | 9600 NE 48th StKansas City MO city issued permits | Data center | Shalerock 1A Data CenterCPPU - Certificate of Occupancy Certificate of Occupancy (Commercial) CICO-2026-00765 · Issued |  |  |
| Jul 28, 2026 | 43649 LIGHT SPEED STERLINGLoudoun County VA LandMARC issued permits | Data center | Underground fire line - section 5' outside of building, into building for 2 STORY SINGLE TENANT COMPUTER DATA CENTER. Contractor license in attachments folder.Fire Protection (Commercial) New Construction FIREC-2026-032184 · Issued | $40,434,386 |  |
| Jul 28, 2026 | 15455 JOHN MARSHALL HWY HAYMARKET VA 20169Prince William County VA ePortal permits and plans | Data center | Electrical equipment updates to include 42 new Power Distribution Cabinets (PDCs) powered from existing electrical line-ups and overhead busways, along with related overhead cable…Building Commercial Alteration/Repair, C - Alteration/Repair BLD2026-05340 · Issued |  |  |
| Jul 28, 2026 | 10051 BRICKYARD WAY Unit: 110 MANASSAS VA 20110Prince William County VA ePortal permits and plans | Data center | The scope of work contained in this package of drawings is the Equipment Fit Out (EFO) in an existing Data HallBuilding Commercial Alteration/Repair, C - Alteration/Repair BLD2026-05471 · Approved |  |  |
| Jul 28, 2026 | 10050 BRICKYARD WAY MANASSAS VA 20110Prince William County VA ePortal permits and plans | Data center | Brickyard Yard Building B BRICKYARD BUILDING B IAD 050 PBB FULL FA SYSTEM PERMITFire Protection - Fire Alarm FPP2026-00990 · Issued |  |  |
| Jul 27, 2026 | 9600 NE 48th St 3A-#2 MCPKansas City MO city issued permits | Data center | Shalerock 3A Data CenterCPPU - Electrical (Commercial) Electrical General CPEC-2026-01173 · Ready For Issuance |  |  |
| Jul 27, 2026 | 9600 NE 48th St 3A-#2 MCPKansas City MO city issued permits | Data center | Shalerock 3A Data CenterCPPU - Plumbing (Commercial) Plumbing General CPPC-2026-00426 · Issued |  |  |
| Jul 27, 2026 | City of Hillsboro OR Citizen Access records | Data center | Data Center Land Use MoratoriumPlanning Miscellaneous DSMISC26-0002 · Approved |  |  |
| Jul 27, 2026 | 43765 LIGHT SPEED STERLINGLoudoun County VA LandMARC issued permits | Data center | Scope of work includes the design and installation of a complete automatic fire sprinkler system, fire pump assembly, and standpipe system for a new three-story data center…Fire Protection (Commercial) New Construction FIREC-2026-019816 · Issued |  |  |
| Jul 24, 2026 | 10050 BRICKYARD WAY Unit: 110 MANASSAS VA 20110Prince William County VA ePortal permits and plans | Data center | Brickyard Building B #110 LOW VOLTAGE - FA CONDUIT & R/I ONLY - IAD 050 BRICKYARD BUILDING B SUITE #110Electrical Commercial Tenant Layout, C - Tenant Layout ELE2027-00458 · Issued |  |  |
| Jul 24, 2026 | 10050 BRICKYARD WAY Unit: 210 MANASSAS VA 20110Prince William County VA ePortal permits and plans | Data center | Brickyard Building B #210 LOW VOLTAGE - FA CONDUIT & R/I ONLY - IAD 050 BRICKYARD BUILDING B SUITE #210 LVElectrical Commercial Tenant Layout, C - Tenant Layout ELE2027-00459 · Issued |  |  |
| Jul 23, 2026 | 9600 NE 48th StKansas City MO city issued permits | Data center | Shalerock 4A Data Center #4 MUW TanksCPPU - Building (Commercial) New CPBC-2026-00725 · Issued |  |  |
| Jul 23, 2026 | 44395 GIGABIT ASHBURNLoudoun County VA LandMARC issued permits | Data center | NTT VA-7 DATA CENTER VAULT 1.2 ELECTRICAL PERMITElectrical (Commercial) ELECC-2026-023007 · Issued | $8,900,000 |  |
| Jul 22, 2026 | 12701 N US 169 Hwy #1 Data CenterKansas City MO city issued permits | Data center | Rocky Branch Creek 2A Data CenterCPPU - Electrical (Commercial) Electrical Fire Alarm Commercial CPEC-2026-01129 · Issued |  |  |
| Jul 22, 2026 | 3344 PEACHTREE NE, ATLANTA, GA 30326City of Atlanta GA building permits | Data center | T5 Data Centers - Suite 2550Commercial Alteration BB-202606355 · ACA Pending | $4,000,000 |  |
| Jul 22, 2026 | 44395 GIGABIT ASHBURNLoudoun County VA LandMARC issued permits | Data center | NTT VA-7 DATA CENTER VAULT 1.3 ELECTRICAL PERMITElectrical (Commercial) ELECC-2026-023009 · Issued | $8,900,000 |  |
| Jul 22, 2026 | 44395 GIGABIT ASHBURNLoudoun County VA LandMARC issued permits | Data center | NTT VA-7 DATA CENTER VAULT 2.1 ELECTRICAL PERMITElectrical (Commercial) ELECC-2026-023012 · Issued | $8,900,000 |  |
| Jul 22, 2026 | 44395 GIGABIT ASHBURNLoudoun County VA LandMARC issued permits | Data center | NTT VA-7 DATA CENTER VAULT 2.2 ELECTRICAL PERMITElectrical (Commercial) ELECC-2026-023014 · Issued | $8,900,000 |  |
| Jul 22, 2026 | 44395 GIGABIT ASHBURNLoudoun County VA LandMARC issued permits | Data center | NTT VA-7 DATA CENTER VAULT 2.3 ELECTRICAL PERMITElectrical (Commercial) ELECC-2026-023018 · Issued | $8,900,000 |  |
| Jul 22, 2026 | 21320 BEAUMEADE ASHBURNLoudoun County VA LandMARC issued permits | Data center | Fire Alarm Installation for Datacenter IAD 179 - Phase 01Fire Protection (Commercial) Alteration FIREC-2026-014272 · Issued |  |  |
| Jul 22, 2026 | 21320 BEAUMEADE ASHBURNLoudoun County VA LandMARC issued permits | Data center | Fire Alarm Installation for Datacenter IAD 179 - Phase 02Fire Protection (Commercial) Alteration FIREC-2026-014274 · Issued |  |  |
| Jul 22, 2026 | 21320 BEAUMEADE ASHBURNLoudoun County VA LandMARC issued permits | Data center | Fire Alarm Installation for Datacenter IAD 179 - Phase 03Fire Protection (Commercial) Alteration FIREC-2026-014279 · Issued |  |  |
| Jul 22, 2026 | 21320 BEAUMEADE ASHBURNLoudoun County VA LandMARC issued permits | Data center | Fire Alarm Installation for Datacenter IAD 179 - Phase 04Fire Protection (Commercial) Alteration FIREC-2026-014282 · Issued |  |  |
| Jul 22, 2026 | 21320 BEAUMEADE ASHBURNLoudoun County VA LandMARC issued permits | Data center | Fire Alarm Installation for Datacenter IAD 179 - Phase 05Fire Protection (Commercial) Alteration FIREC-2026-014285 · Issued |  |  |
| Jul 22, 2026 | 21320 BEAUMEADE ASHBURNLoudoun County VA LandMARC issued permits | Data center | Fire Alarm Installation for Datacenter IAD 179 - Phase 06Fire Protection (Commercial) Alteration FIREC-2026-014286 · Issued |  |  |
| Jul 22, 2026 | 21320 BEAUMEADE ASHBURNLoudoun County VA LandMARC issued permits | Data center | Fire Alarm Installation for Datacenter IAD 179 - Phase 07Fire Protection (Commercial) Alteration FIREC-2026-014287 · Issued |  |  |
| Jul 22, 2026 | 21320 BEAUMEADE ASHBURNLoudoun County VA LandMARC issued permits | Data center | Fire Alarm Installation for Datacenter IAD 179 - Phase 08Fire Protection (Commercial) Alteration FIREC-2026-014288 · Issued |  |  |
| Jul 22, 2026 | 23825 ERINS RUN STERLINGLoudoun County VA LandMARC issued permits | Data center | GRADING PERMIT FOR PROLOGIS PARK BUILDING 4 - A 1-STORY DATA CENTER BUILDING AND ASSOCIATED UTILITIES AND INFRASTRUCTURE.Grading Infrastructure/Commercial GRADE-2026-000059 · Issued |  |  |
| Jul 22, 2026 | 10051 BRICKYARD WAY Unit: 210 MANASSAS VA 20110Prince William County VA ePortal permits and plans | Data center | *ON HOLD UNTIL SHELL IS FINALED* THE SCOPE OF WORK CONTAINED IN THIS PACKAGE OF DRAWINGS IS THE EQUIPMENT FIT OUT (EFO) IN AN EXISTING DATA HALLBuilding Commercial Alteration/Repair, C - Alteration/Repair BLD2026-05308 · Approved |  |  |
| Jul 22, 2026 | 9710 N VIRGINIA ST, RENO, NV 89506City of Reno NV Citizen Access records | Data center | COLOVORE DATA CENTERBuilding Sign SGN27-00706E · Active/Permit Issued |  |  |
| Jul 21, 2026 | 9600 NE 48th StKansas City MO city issued permits | Data center | Shalerock 4A Data CenterCPPU - Electrical (Commercial) Electrical General CPEC-2026-01119 · Issued |  |  |
| Jul 21, 2026 | 9600 NE 48th StKansas City MO city issued permits | Data center | Shalerock 4A Data Center # 3EYDCPPU - Electrical (Commercial) Electrical General CPEC-2026-01120 · Issued |  |  |
| Jul 21, 2026 | 9600 NE 48th StKansas City MO city issued permits | Data center | Shalerock 4A Data Center # 3EYDCPPU - Fire Sprinkler (Commercial) Kitchen Hood Fire Protection System CPFC-2026-00328 · Issued |  |  |
| Jul 21, 2026 | 12701 N US 169 Hwy #1 Data CenterKansas City MO city issued permits | Data center | Rocky Branch Creek 2A Data CenterCPPU - Fire Sprinkler (Commercial) Fire Protection System CPFC-2026-00329 · Pending |  |  |
| Jul 21, 2026 | City of Chandler AZ Citizen Access records | Data center | ALIGNED DATA CENTER PHX06 / PH2 - FS MODULAR 12X56 S PRICE ROAD & W CONTINUMM STREETDevServices Building Permit BLD26-1844 · Awaiting Client Reply |  |  |
| Jul 21, 2026 | City of Chandler AZ Citizen Access records | Data center | ALIGNED DATA CENTER PHX06 / PH2 - FS MODULAR 24X60 PRICE & CONTINUUM STDevServices Building Permit BLD26-1845 · Awaiting Client Reply |  |  |
| Jul 21, 2026 | City of Chandler AZ Citizen Access records | Data center | ALIGNED DATA CENTER PHX06 / PH2 - FS MODULAR 30X60 PRICE & CONTINUUM STDevServices Building Permit BLD26-1846 · Awaiting Client Reply |  |  |
| Jul 21, 2026 | City of Chandler AZ Citizen Access records | Data center | ALIGNED DATA CENTER PHX06 / PH2 - FS MODULAR 120X60 PRICE & CONTINUUM STDevServices Building Permit BLD26-1847 · Awaiting Client Reply |  |  |
| Jul 21, 2026 | City of Hillsboro OR Citizen Access records | Data center | Wagon Data CenterPlanning Development Review II DR26-0030 · In Review |  |  |
| Jul 21, 2026 | City of Hillsboro OR Citizen Access records | Data center | Corny Data CenterPlanning Development Review II DR26-0031 · In Review |  |  |
| Jul 21, 2026 | City of Hillsboro OR Citizen Access records | Data center | Wagon Data CenterPlanning Development Review II TMP-00001-26-003177 |  |  |
| Jul 21, 2026 | City of Hillsboro OR Citizen Access records | Data center | Corny Data CenterPlanning Development Review II TMP-00001-26-003183 |  |  |
| Jul 21, 2026 | 7725 DEACON FALLS DR GAINESVILLE VA 20155Prince William County VA ePortal permits and plans | Data center | "TGTD N/S PROJECT GAINESVILLE BLD 2" IAD 110 BUILDING TEMPORARY POWER ELECTRICAL PERMITElectrical Commercial Alteration/Repair, C - Alteration/Repair ELE2027-00037 · Finaled |  |  |
| Jul 20, 2026 | 13710 UNIVERSITY BLVD GAINESVILLE VA 20155Prince William County VA ePortal permits and plans | Data center | GCDC VA1.2 MNZ28 FITOUT LV ELECTRICAL PERMIT; LINK TO BLD2026-04128; NO ADR OR CHECKLIST REQElectrical Commercial Alteration/Repair, C - Alteration/Repair ELE2027-00307 · Issued |  |  |
| Jul 17, 2026 | 22715 RELOCATION STERLINGLoudoun County VA LandMARC issued permits | Data center | Low voltage control wiring for building automation systems (BAS). This consists of wiring connections between the control panels and the You’re done ces and equipment that monitor…Electrical (Commercial) Low Voltage - Other ELECC-2025-047695 · Issued | $325,500 |  |
| Jul 17, 2026 | 42010 GROWTH MINDSET ALDIELoudoun County VA LandMARC issued permits | Data center | Telecommunication and Security Pathways and Details for COLO 1 Area in IAD 13 Microsoft Data Center BuildingElectrical (Commercial) Alteration ELECC-2026-029923 · Issued |  |  |
| Jul 17, 2026 | 42031 GROWTH MINDSET ALDIELoudoun County VA LandMARC issued permits | Data center | Telecommunication and Security Pathways for COLO 1 Building in IAD 12 Data Center BuildingElectrical (Commercial) Low Voltage - Other ELECC-2026-031164 · Issued |  |  |
| Jul 17, 2026 | 42031 GROWTH MINDSET ALDIELoudoun County VA LandMARC issued permits | Data center | Telecommunication and Security Pathways and Details for COLO 4 Building in IAD 12 Microsoft Data Center BuildingElectrical (Commercial) Low Voltage - Other ELECC-2026-031171 · Issued |  |  |
| Jul 17, 2026 | 10050 BRICKYARD WAY Unit: 110 MANASSAS VA 20110Prince William County VA ePortal permits and plans | Data center | Brickyard Building B #110 LOW VOLTAGE FOR FIRE ALARM - INSTALL VESDA AIR SAMPLING SYSTEMElectrical Commercial Tenant Layout, C - Tenant Layout ELE2027-00208 · Issued |  |  |
| Jul 17, 2026 | 3975 HEATHER ST, FOREST GROVE, OR 97116Washington County OR Citizen Access records | Data center | CRANE DATA CENTER - L/V WIRING FOR DAS CABLINGCommercial Electrical ELEC-2608614 · Final |  |  |
| Jul 16, 2026 | 42010 GROWTH MINDSET ALDIELoudoun County VA LandMARC issued permits | Data center | IAD 13 Admin - Telecommunication Pathways and Details for Admin Building in IAD 13 Microsoft Data Center BuildingElectrical (Commercial) Alteration ELECC-2026-029677 · Issued |  |  |
| Jul 16, 2026 | 42010 GROWTH MINDSET ALDIELoudoun County VA LandMARC issued permits | Data center | Telecommunication Pathways and Details for COLO 3 Area in IAD 13 Microsoft Data Center BuildingElectrical (Commercial) Alteration ELECC-2026-029926 · Issued |  |  |
| Jul 16, 2026 | 42031 GROWTH MINDSET ALDIELoudoun County VA LandMARC issued permits | Data center | Telecommunication and Security Pathways and Details for Admin Building in IAD 12 Microsoft Data Center BuildingElectrical (Commercial) Low Voltage - Other ELECC-2026-031148 · Issued |  |  |
| Jul 16, 2026 | 42031 GROWTH MINDSET ALDIELoudoun County VA LandMARC issued permits | Data center | Telecommunication and Security Pathways and Details for COLO 2 Building in IAD 12 Microsoft Data Center BuildingElectrical (Commercial) Low Voltage - Other ELECC-2026-031166 · Issued |  |  |
| Jul 16, 2026 | 42031 GROWTH MINDSET ALDIELoudoun County VA LandMARC issued permits | Data center | Telecommunication and Security Pathways and Details for COLO 3 Building in IAD 12 Microsoft Data Center BuildingElectrical (Commercial) Low Voltage - Other ELECC-2026-031169 · Issued |  |  |
| Jul 16, 2026 | 42031 GROWTH MINDSET ALDIELoudoun County VA LandMARC issued permits | Data center | Telecommunication and Security Pathways and Details for COLO 5 Building in IAD 12 Microsoft Data Center BuildingElectrical (Commercial) Low Voltage - Other ELECC-2026-031177 · Issued |  |  |
| Jul 16, 2026 | 11640 HAYDEN RD MANASSAS VA 20109Prince William County VA ePortal permits and plans | Data center | THESE STAIRS ARE INTERIOR GOING TO THE ROOF/DECK, THEN WE’LL BE CREATING AN OPENING/HATCH FOR ROOF ACCESSBuilding Commercial Alteration/Repair, C - Alteration/Repair BLD2026-03380 · Issued |  |  |
| Jul 15, 2026 | 42010 GROWTH MINDSET ALDIELoudoun County VA LandMARC issued permits | Data center | Telecommunication Pathways and Details for COLO 2 AREA in IAD 13 Microsoft Data Center BuildingElectrical (Commercial) Low Voltage - Other ELECC-2026-029925 · Issued |  |  |
| Jul 15, 2026 | 42010 GROWTH MINDSET ALDIELoudoun County VA LandMARC issued permits | Data center | Telecommunication and Security Pathways and Details for COLO 4 Area in IAD 13 Microsoft Data Center BuildingElectrical (Commercial) Low Voltage - Other ELECC-2026-029927 · Issued |  |  |
| Jul 15, 2026 | 22280 RANDOLPH STERLINGLoudoun County VA LandMARC issued permits | Data center | Tenant office fitout in existing data center (3rd Floor) - LV Fire AlarmElectrical (Commercial) Low Voltage - Fire Alarm ELECC-2026-030017 · Issued |  |  |
| Jul 15, 2026 | 22280 RANDOLPH STERLINGLoudoun County VA LandMARC issued permits | Data center | Tenant office fitout in existing data center (3rd Floor) - LV SecurityElectrical (Commercial) Low Voltage - Other ELECC-2026-030019 · Issued |  |  |
| Jul 15, 2026 | 22280 RANDOLPH STERLINGLoudoun County VA LandMARC issued permits | Data center | Tenant office fitout in existing data center (3rd Floor) - TelecomElectrical (Commercial) Low Voltage - Other ELECC-2026-030022 · Issued |  |  |
| Jul 15, 2026 | 10849 AIRMAN AVE MANASSAS VA 20110Prince William County VA ePortal permits and plans | Data center | MCC4 & MCC5- TEMP CONST TRAILERS (Master Case) MDC01 DATA CENTER TEMP. 8' X 40' E HOUSE #2 (FOR TEMP. ELECTRICAL EQUIPMENT) BUILDING PERMIT; NO ZONING OR LAND DEVELOPMENT REVIEW…Electrical Commercial Industrialized Building, C - Industrialized Building ELE2026-05502 · Finaled |  |  |
| Jul 14, 2026 | 8890 MIKE GARCIA DR MANASSAS VA 20109Prince William County VA ePortal permits and plans | Data center | Wellington Glen Building A1 - TLO **TARGETED** BFPE WILL MODIFY THE EXISTING SPRINKLER SYSTEM FOR TENANT FITOUTFire Protection - Sprinkler FPP2026-00839 · Issued |  |  |
| Jul 13, 2026 | 2401 Gillham RdKansas City MO city issued permits | Data center | Childrens Mercy Data CenterCPPU - Special Inspections External Special Inspections CISI-2026-00402 · Issued |  |  |
| Jul 10, 2026 | 9600 NE 48th St BLDG 3A#1Kansas City MO city issued permits | Data center | Shalerock 3A#1 Data CenterCPPU - Electrical (Commercial) Electrical Fire Alarm Commercial CPEC-2026-00892 · Issued |  |  |
| Jul 10, 2026 | 25190 MEADOWDALE CHANTILLYLoudoun County VA LandMARC issued permits | Data center | New 2 story Data Center - Phase 01Fire Protection (Commercial) Alteration FIREC-2026-014233 · Issued |  |  |
| Jul 10, 2026 | 25190 MEADOWDALE CHANTILLYLoudoun County VA LandMARC issued permits | Data center | New 2 story Data Center - Phase 02Fire Protection (Commercial) Alteration FIREC-2026-014234 · Issued |  |  |
| Jul 10, 2026 | 25190 MEADOWDALE CHANTILLYLoudoun County VA LandMARC issued permits | Data center | New 2 story Data Center - Phase 03Fire Protection (Commercial) Alteration FIREC-2026-014236 · Issued |  |  |
| Jul 10, 2026 | 25190 MEADOWDALE CHANTILLYLoudoun County VA LandMARC issued permits | Data center | New 2 story Data Center - Phase 04Fire Protection (Commercial) Alteration FIREC-2026-014237 · Issued |  |  |
| Jul 10, 2026 | 25190 MEADOWDALE CHANTILLYLoudoun County VA LandMARC issued permits | Data center | New 2 story Data Center - Phase 05Fire Protection (Commercial) Alteration FIREC-2026-014239 · Issued |  |  |
| Jul 10, 2026 | 25190 MEADOWDALE CHANTILLYLoudoun County VA LandMARC issued permits | Data center | New 2 story Data Center - Phase 06Fire Protection (Commercial) Alteration FIREC-2026-014241 · Issued |  |  |
| Jul 10, 2026 | 25190 MEADOWDALE CHANTILLYLoudoun County VA LandMARC issued permits | Data center | New 2 story Data Center - Phase 07Fire Protection (Commercial) Alteration FIREC-2026-014242 · Issued |  |  |
| Jul 10, 2026 | 25190 MEADOWDALE CHANTILLYLoudoun County VA LandMARC issued permits | Data center | New 2 story Data Center - Phase 8Fire Protection (Commercial) Alteration FIREC-2026-014244 · Issued |  |  |
| Jul 10, 2026 | 25190 MEADOWDALE CHANTILLYLoudoun County VA LandMARC issued permits | Data center | New 2 story Data Center - Phase 9Fire Protection (Commercial) Alteration FIREC-2026-014245 · Issued |  |  |
| Jul 10, 2026 | 25190 MEADOWDALE CHANTILLYLoudoun County VA LandMARC issued permits | Data center | New 2-Story Data Center, Phase 10Fire Protection (Commercial) Alteration FIREC-2026-014247 · Issued |  |  |
| Jul 10, 2026 | 25190 MEADOWDALE CHANTILLYLoudoun County VA LandMARC issued permits | Data center | New 2 story Data Center - Phase 11Fire Protection (Commercial) Alteration FIREC-2026-014251 · Issued |  |  |
| Jul 10, 2026 | 25190 MEADOWDALE CHANTILLYLoudoun County VA LandMARC issued permits | Data center | New 2 Story Data Center - Phase 12Fire Protection (Commercial) Alteration FIREC-2026-014257 · Issued |  |  |
| Jul 8, 2026 | 44395 GIGABIT ASHBURNLoudoun County VA LandMARC issued permits | Data center | New Construction Phasing Plan - Phase I Vault 1-1 / Data Center.Fire Protection (Commercial) Alteration FIREC-2026-029943 · Issued |  |  |
| Jul 8, 2026 | 44395 GIGABIT ASHBURNLoudoun County VA LandMARC issued permits | Data center | New Construction Phasing Plan - Phase 2 Vault 2-1 / Data Center.Fire Protection (Commercial) Alteration FIREC-2026-029944 · Issued |  |  |
| Jul 8, 2026 | 44395 GIGABIT ASHBURNLoudoun County VA LandMARC issued permits | Data center | Phasing Breakout - Phase III - Vault 1-2 / Data CenterFire Protection (Commercial) Alteration FIREC-2026-029945 · Issued |  |  |
| Jul 8, 2026 | 44395 GIGABIT ASHBURNLoudoun County VA LandMARC issued permits | Data center | Phasing Breakout - Phase 4, Vault 2-2 / Data CenterFire Protection (Commercial) Alteration FIREC-2026-029946 · Issued |  |  |
| Jul 8, 2026 | 44395 GIGABIT ASHBURNLoudoun County VA LandMARC issued permits | Data center | Phasing Breakout - Phase 5, Vault 1-3 / Data CenterFire Protection (Commercial) Alteration FIREC-2026-029948 · Issued |  |  |
| Jul 8, 2026 | 44395 GIGABIT ASHBURNLoudoun County VA LandMARC issued permits | Data center | Phasing Breakout - Phase 6, Vault 2-3 / Data CenterFire Protection (Commercial) Alteration FIREC-2026-029949 · Issued |  |  |
| Jul 8, 2026 | 10050 BRICKYARD WAY Unit: 110 MANASSAS VA 20110Prince William County VA ePortal permits and plans | Data center | Brickyard Building B #110 IAD 050 BRICKYARD BUILDING B SUITE #110 LV ELECTRICAL - DATA, VOICE, CAT6, DOOR CONTROLS, AND SECURITYElectrical Commercial Tenant Layout, C - Tenant Layout ELE2027-00055 · Issued |  |  |
| Jul 8, 2026 | 10050 BRICKYARD WAY Unit: 210 MANASSAS VA 20110Prince William County VA ePortal permits and plans | Data center | Brickyard Building B #210 IAD 050 BRICKYARD BUILDING B SUITE #210 LV ELECTRICAL FOR DATA, VOICE, CAT6, DOOR CONTROLS, AND SECURITYElectrical Commercial Tenant Layout, C - Tenant Layout ELE2027-00056 · Issued |  |  |
| Jul 7, 2026 | 22285 LOCKRIDGE STERLINGLoudoun County VA LandMARC issued permits | Data center | Phase 14 Data CenterElectrical (Commercial) Low Voltage - Other ELECC-2026-025026 · Issued |  |  |
| Jul 7, 2026 | 22285 LOCKRIDGE STERLINGLoudoun County VA LandMARC issued permits | Data center | Phase 15 Data CenterElectrical (Commercial) Low Voltage - Other ELECC-2026-025030 · Issued |  |  |
| Jul 7, 2026 | 44595 LOW LATENCY STERLINGLoudoun County VA LandMARC issued permits | Data center | Scope of work includes the design and installation of a complete automatic fire sprinkler system, fire pump assembly, manual wet standpipe system, and manual dry standpipe system…Fire Protection (Commercial) New Construction FIREC-2026-019675 · Issued |  |  |
| Jul 7, 2026 | 10470 HARRY J PARRISH BLVD MANASSAS VA 20110Prince William County VA ePortal permits and plans | Data center | MDC-3 SUPERSTRUCTURE BUILDING FOOTING AND FOUNDATION PERMIT FOR A 2-STORY DATA CENTER WITH COMPLETE EXTERIOR PRECAST CONCRETE BUILDING ENVELOPE, PRECAST FLOORS, AND UNDERGROUND…Plumbing Commercial New Structure, C - New Structure PLB2026-02110 · Issued |  |  |
| Jul 6, 2026 | 9600 NE 48th StKansas City MO city issued permits | Data center | Shalerock 4A Data CenterCPPU - Mechanical (Commercial) Mechanical General CPMC-2026-00405 · Issued |  |  |
| Jul 6, 2026 | 9600 NE 48th StKansas City MO city issued permits | Data center | Shalerock 4A Data CenterCPPU - Plumbing (Commercial) Plumbing General CPPC-2026-00370 · Issued |  |  |
| Jul 6, 2026 | 1055 HOWELL MILL NW, ATLANTA, GA 30318City of Atlanta GA building permits | Data center | EverOn Data Center Services, LLC. - Suite 1100Commercial Alteration BB-202605879 · ACA Pending | $100 |  |
| Jul 6, 2026 | 1055 HOWELL MILL NW, ATLANTA, GA 30318City of Atlanta GA building permits | Data center | EverOn Data Center Services, LLC. - Suite 1110Commercial Alteration BB-202605880 · ACA Pending | $100 |  |
| Jul 6, 2026 | 22285 LOCKRIDGE STERLINGLoudoun County VA LandMARC issued permits | Data center | Phase 7 Data CenterElectrical (Commercial) Low Voltage - Other ELECC-2026-025014 · Issued |  |  |
| Jul 6, 2026 | 22285 LOCKRIDGE STERLINGLoudoun County VA LandMARC issued permits | Data center | Phase 8 Data CenterElectrical (Commercial) Low Voltage - Other ELECC-2026-025017 · Issued |  |  |
| Jul 6, 2026 | 22285 LOCKRIDGE STERLINGLoudoun County VA LandMARC issued permits | Data center | Phase 9 Data CenterElectrical (Commercial) Low Voltage - Other ELECC-2026-025018 · Issued |  |  |
| Jul 6, 2026 | 22285 LOCKRIDGE STERLINGLoudoun County VA LandMARC issued permits | Data center | Phase 10 Data CenterElectrical (Commercial) Low Voltage - Other ELECC-2026-025019 · Issued |  |  |
| Jul 6, 2026 | 22285 LOCKRIDGE STERLINGLoudoun County VA LandMARC issued permits | Data center | Phase 11 Data CenterElectrical (Commercial) Low Voltage - Other ELECC-2026-025020 · Issued |  |  |
| Jul 6, 2026 | 22285 LOCKRIDGE STERLINGLoudoun County VA LandMARC issued permits | Data center | Phase 12 Data CenterElectrical (Commercial) Low Voltage - Other ELECC-2026-025021 · Issued |  |  |
| Jul 6, 2026 | 22285 LOCKRIDGE STERLINGLoudoun County VA LandMARC issued permits | Data center | Phase 13 Data CenterElectrical (Commercial) Low Voltage - Other ELECC-2026-025023 · Issued |  |  |
| Jul 6, 2026 | 10470 HARRY J PARRISH BLVD MANASSAS VA 20110Prince William County VA ePortal permits and plans | Data center | MDC-3 SUPERSTRUCTURE BUILDING FOOTING AND FOUNDATION PERMIT FOR A 2-STORY DATA CENTER WITH COMPLETE EXTERIOR PRECAST CONCRETE BUILDING ENVELOPE, PRECAST FLOORS, AND UNDERGROUND…Electrical Commercial New Structure, C - New Structure ELE2026-04569 · Issued |  |  |
| Jul 2, 2026 | 22285 LOCKRIDGE STERLINGLoudoun County VA LandMARC issued permits | Data center | Phase 2 Data CenterElectrical (Commercial) Low Voltage - Other ELECC-2026-025004 · Issued |  |  |
| Jul 2, 2026 | 22285 LOCKRIDGE STERLINGLoudoun County VA LandMARC issued permits | Data center | Phase 4 Data CenterElectrical (Commercial) Low Voltage - Other ELECC-2026-025008 · Issued |  |  |
| Jul 2, 2026 | 22285 LOCKRIDGE STERLINGLoudoun County VA LandMARC issued permits | Data center | Phase 5 Data CenterElectrical (Commercial) Low Voltage - Other ELECC-2026-025010 · Issued |  |  |
| Jul 2, 2026 | 22285 LOCKRIDGE STERLINGLoudoun County VA LandMARC issued permits | Data center | Phase 6 Data CenterElectrical (Commercial) Low Voltage - Other ELECC-2026-025011 · Issued |  |  |
| Jul 2, 2026 | 10470 HARRY J PARRISH BLVD MANASSAS VA 20110Prince William County VA ePortal permits and plans | Data center | MDC-3 SUPERSTRUCTURE BUILDING. NEW STRUCTURE - COMPLETE FIT OUTBuilding Commercial New Structure, C - New Structure BLD2026-02951 · Issued |  |  |
| Jul 1, 2026 | 12701 N US 169 Hwy Fire Pumphouse &TankKansas City MO city issued permits | Data center | Rocky Branch Creek Data CenterCPPU - Building (Commercial) New CPBC-2026-00569 · Issued |  |  |
| Jul 1, 2026 | 10200 HICKS FIELD RDCity of Fort Worth TX development permits | Data center | X TEAM /// ACS Data Center Campus - Substation Retaining Wall X TEAM /// New retaining wall for the ACS Data Center substation.Commercial Accessory Structure New PB26-09476 · Awaiting Client Reply | $60,000 |  |
| Jul 1, 2026 | 26060025 FOR REVIEW ONLY WAYCity of Fort Worth TX development permits | Data center | X TEAM /// ACS Data Center - Phase 2 Perimeter Fence X TEAM /// Refer to PB26-08604Commercial Accessory Structure New PB26-09538 · Awaiting Client Reply | $2,400,000 |  |
| Jul 1, 2026 | 10050 BRICKYARD WAY Unit: 100 MANASSAS VA 20110Prince William County VA ePortal permits and plans | Data center | Brickyard Building B #100 low voltage for BMS systemElectrical Commercial Tenant Layout, C - Tenant Layout ELE2026-06126 · Issued |  |  |
| Jul 1, 2026 | 10050 BRICKYARD WAY Unit: 105 MANASSAS VA 20110Prince William County VA ePortal permits and plans | Data center | Brickyard Building B #105 low voltage for BMS systemElectrical Commercial Alteration/Repair, C - Alteration/Repair ELE2026-06127 · Issued |  |  |
| Jul 1, 2026 | 10050 BRICKYARD WAY Unit: 200 MANASSAS VA 20110Prince William County VA ePortal permits and plans | Data center | Brickyard Building B #200 low voltage for BMS systemElectrical Commercial Tenant Layout, C - Tenant Layout ELE2026-06128 · Issued |  |  |
| Jul 1, 2026 | 10050 BRICKYARD WAY Unit: 205 MANASSAS VA 20110Prince William County VA ePortal permits and plans | Data center | Brickyard Building B #205 low voltage for BMS systemElectrical Commercial Tenant Layout, C - Tenant Layout ELE2026-06129 · Issued |  |  |
| Jul 1, 2026 | 13720 UNIVERSITY BLVD GAINESVILLE VA 20155Prince William County VA ePortal permits and plans | Data center | GCDC MANASSAS BUILDING 3 ***MODIFIED TARGETED 10-10-10*** GCDC 1.3. (SEE BLD2024-06223 FOR FOOTING/FOUNDATION) GCDC BUILDING 3Certificate of Occupancy Commercial New Structure, C - New Structure OCC2026-01095 · Issued |  |  |
| Jul 1, 2026 | 265 KEYSTONE AVE, RENO, NV 89503City of Reno NV Citizen Access records | Data center | KEYSTONE DATA CENTERBuilding Commercial Grading & Site Improvements BLD27-00052E · Closed |  |  |
| Jun 30, 2026 | 9600 NE 48th St 3A-#2 MCPKansas City MO city issued permits | Data center | Shalerock 3A Data CenterCPPU - Mechanical (Commercial) Mechanical General CPMC-2026-00402 · Issued |  |  |
| Jun 30, 2026 | 13760 UNIVERSITY BLVD GAINESVILLE VA 20155Prince William County VA ePortal permits and plans | Data center | **WITHDRAWN PER CONTRACTOR**GCDC VA1.1 TAPE LIBRARY TLO BUILDING PERMITPlumbing Commercial Alteration/Repair, C - Alteration/Repair PLB2026-01005 · Withdrawn |  |  |
| Jun 29, 2026 | 12701 N US 169 Hwy #1 Data CenterKansas City MO city issued permits | Data center | Rocky Branch Creek 2A Data CenterCPPU - Fire Sprinkler (Commercial) Fast Track Fire Sprinkler CPFC-2026-00287 · Issued |  |  |
| Jun 29, 2026 | 11530 ELEVATE DR MANASSAS VA 20109Prince William County VA ePortal permits and plans | Data center | Iron Mountain IMDC VA8/VA9 New MRL Elevator Installation P1Mechanical Commercial New Structure, C - New Structure MEC2026-01819 · Issued |  |  |
| Jun 26, 2026 | 9600 NE 48th StKansas City MO city issued permits | Data center | Shalerock 4A Data CenterCPPU - Plumbing (Commercial) Plumbing General CPPC-2026-00359 · Issued |  |  |
| Jun 22, 2026 | 9600 NE 48th St 3A-#2 MCPKansas City MO city issued permits | Data center | Shalerock 3A Data CenterCPPU - Building (Commercial) New CPBC-2026-00600 · Issued |  |  |
| Jun 22, 2026 | City of Charlotte NC Citizen Access records | Data center | CLT 16 12MW Data CenterLandDevelopment Land Disturbance Permit LDDP-2026-00189 · Issue Permit |  |  |
| Jun 16, 2026 | 2500 W UNION HILLS DRCity of Phoenix AZ planning and development permits | Data center | PHX05 - GENERATOR EXHAUSTSTRUC/MECH COMMERCIAL MISCELLANEOUS 26008239 · OPEN |  |  |
| Jun 12, 2026 | 9600 NE 48th StKansas City MO city issued permits | Data center | Shalerock 4A Data Center # 3EYDCPPU - Building (Commercial) New CPBC-2026-00578 · Issued |  |  |
| Jun 11, 2026 | 9600 NE 48th St 3A-EYDKansas City MO city issued permits | Data center | Shalerock 3A Data CenterCPPU - Building (Commercial) New CPBC-2026-00369 · Issued |  |  |
| Jun 10, 2026 | 9710 N VIRGINIA ST, RENO, NV 89506, 0 VIRGINIA ST, RENO, NV 89506City of Reno NV Citizen Access records | Data center | DATA CENTERBuilding Commercial Grading & Site Improvements BLD26-11712E · Active/Permit Issued |  |  |
| Jun 9, 2026 | 9600 NE 48th StKansas City MO city issued permits | Data center | Shalerock 4A Data Center #2 MCPCPPU - Building (Commercial) New CPBC-2026-00577 · Issued |  |  |
| Jun 9, 2026 | 1500 N 40TH STCity of Phoenix AZ planning and development permits | Data center | MCDOWELL ROAD DATA CENTERFIRE PREVENTION SERVICE REQUEST FPGI FP GENERAL INSPECTION 2602251 · OPEN |  |  |
| Jun 4, 2026 | 5207 ROGERS RD, City of San Antonio, TX 78251City of San Antonio TX permits issued | Data center | SP-Special Project-Vantage Data Centers TX21 - Lightspeed-5207 ROGERS RDComm Fence Permit Other COM-FEN-PMT26-40600084 | $18,600,000 |  |
| Jun 4, 2026 | 5207 ROGERS RD, City of San Antonio, TX 78251City of San Antonio TX permits issued | Data center | SP-Special Project-Vantage Data Centers TX21 - Lightspeed-5207 ROGERS RDComm Ice-Teller Machine Permit New COM-ITM-PMT26-40800032 | $18,600,000 |  |
| Jun 4, 2026 | 5207 ROGERS RD, City of San Antonio, TX 78251City of San Antonio TX permits issued | Data center | SP-Special Project-Vantage Data Centers TX21 - Lightspeed-5207 ROGERS RDComm Sitework Permit New COM-SIT-PMT26-40100192 | $18,600,000 |  |
| Jun 1, 2026 | 9600 NE 48th StKansas City MO city issued permits | Data center | Shalerock 4A Data CenterCPPU - Building (Commercial) New CPBC-2026-00551 · Issued |  |  |
| May 29, 2026 | 9600 NE 48th StKansas City MO city issued permits | Data center | Shalerock 4A Data CenterCPPU - Special Inspections City Special Inspections CISI-2026-00318 · Issued |  |  |
| May 29, 2026 | 9600 NE 48th StKansas City MO city issued permits | Data center | Shalerock 4A Data CenterCPPU - Special Inspections External Special Inspections CISI-2026-00319 · Issued |  |  |
| May 27, 2026 | City of Hillsboro OR Citizen Access records | Data center | Aligned Data Center BESS Temp 3/4" irrigation meterROWCivil Water Permit WM26-0017 · Closed |  |  |
| May 20, 2026 | 811 CLAYTON LNCity of Austin issued construction permits | Data center | ePlan: Commercial Expedited Review - [APPROVED] New Construction of Exterior Pad for Modular Data Center Foundation.Electrical Permit 2026-036762 EP · Active |  |  |
| May 19, 2026 | 12701 N US 169 Hwy #1 Data CenterKansas City MO city issued permits | Data center | Rocky Branch Creek 3A Data CenterCPPU - Electrical (Commercial) Electrical General CPEC-2026-00757 · Issued |  |  |
| May 18, 2026 | 11530 N Ambassador DrKansas City MO city issued permits | Data center | Mastercard HVAC Upgrades KC Data CenterCPPU - Electrical (Commercial) Electrical Fire Alarm Commercial CPEC-2026-00787 · Issued |  |  |
| May 14, 2026 | 12701 N US 169 Hwy #1 Data CenterKansas City MO city issued permits | Data center | Rocky Branch Creek 3A Data CenterCPPU - Mechanical (Commercial) Mechanical General CPMC-2026-00278 · Issued |  |  |
| May 14, 2026 | 12701 N US 169 Hwy #1 Data CenterKansas City MO city issued permits | Data center | Rocky Branch Creek 3A Data CenterCPPU - Plumbing (Commercial) Plumbing General CPPC-2026-00242 · Issued |  |  |
| May 13, 2026 | 8925 ANDREW CARNEGIE BV CHARLOTTE NC 28262Mecklenburg County NC building permits (all towns) | Data center | TIAA-Data Center-PDU Replacement Miller Electric Company Replace, 1 for 1 of 8 PDU'sElectrical COM-ELC-26-004503 · Inspection Phase | $399,000 |  |
| May 12, 2026 | 9630 N VIRGINIA ST, RENO, NV 89506City of Reno NV Citizen Access records | Data center | 5MW RENO DATA CENTERBuilding Commercial Remodel & Addition (Tenant Improvements) BLD26-10723E · Revisions Required |  |  |
| May 5, 2026 | 12701 N US 169 Hwy #1 Data CenterKansas City MO city issued permits | Data center | Rocky Branch Creek 3A Data CenterCPPU - Building (Commercial) New CPBC-2026-00423 · Issued |  |  |
| May 5, 2026 | 8925 ANDREW CARNEGIE BV CHARLOTTE NC 28262Mecklenburg County NC building permits (all towns) | Data center | TIAA-Data Center-PDU Replacement Miller Electric Company one for one change out of (9) PDU's to a newer modelElectrical COM-ELC-26-004144 · Inspection Phase | $400,000 |  |
| May 4, 2026 | 12701 N US 169 Hwy #1 Data CenterKansas City MO city issued permits | Data center | Rocky Branch Creek 3A Data CenterCPPU - Special Inspections City Special Inspections CISI-2026-00253 · Issued |  |  |
| May 4, 2026 | 12701 N US 169 Hwy #1 Data CenterKansas City MO city issued permits | Data center | Rocky Branch Creek 3A Data CenterCPPU - Special Inspections External Special Inspections CISI-2026-00254 · Issued |  |  |
| Apr 30, 2026 | 2500 W UNION HILLS DRCity of Phoenix AZ planning and development permits | Data center | PHX03-4 DH 160 EPO-BATTERY DEPLETION PLAELECTRICAL COMMERCIAL MISCELLANEOUS 26006850 · OPEN |  |  |
| Apr 29, 2026 | 2500 W UNION HILLS DRCity of Phoenix AZ planning and development permits | Data center | PHX03-5 DH 120 EPO-BATTERY DEPLETION PLAELECTRICAL COMMERCIAL MISCELLANEOUS 26006808 · OPEN |  |  |
| Apr 27, 2026 | City of Reno NV Citizen Access records | Data center | Data Centers Data CentersPlanning Planning/Text Amendment/NA/NA TXT26-00003 |  |  |
| Apr 24, 2026 | 3719 E LA SALLE STCity of Phoenix AZ planning and development permits | Data center | LA SALLE 1G SERVERS DATA CENTER T.I F/AFP FIRE ALARM INSTALLATION 26006606 · DONE |  |  |
| Apr 23, 2026 | 11155 N Airworld DrKansas City MO city issued permits | Data center | Blitz North KC Data Center RenovationCPPU - Electrical (Commercial) Electrical Fire Alarm Commercial CPEC-2026-00635 · Issued |  |  |
| Apr 22, 2026 | 4802 E VAN BUREN STCity of Phoenix AZ plan review | Data center | IRON MOUNTAIN DATA CENTER AZP2 SC02FIRE PLAN REVIEW AFP X EXPEDITED FP PLAN REVIEW 260823 · OPEN |  |  |
| Apr 21, 2026 | 9600 NE 48th StKansas City MO city issued permits | Data center | Shalerock 1A Data CenterCPPU - Temporary Certificate of Occupancy Temporary Certificate of Occupancy (Commercial) CITO-2026-00151 · Closed |  |  |
| Apr 14, 2026 | 12701 N US 169 Hwy 1A DatacenterKansas City MO city issued permits | Data center | Rock Branch Creek 1A Data CenterCPPU - Electrical (Commercial) Electrical Fire Alarm Commercial CPEC-2026-00532 · Issued |  |  |
| Apr 10, 2026 | 9600 NE 48th St BLDG 3A#1Kansas City MO city issued permits | Data center | Shalerock 3A#1 Data CenterCPPU - Electrical (Commercial) Electrical Fire Alarm Commercial CPEC-2026-00531 · Issued |  |  |
| Apr 10, 2026 | 2500 W UNION HILLS DRCity of Phoenix AZ plan review | Data center | PHX03-4 DH 160 EPO-BATTERY DEPLETION PLALARGE PLAN REVIEW-MISCELLANEOUS COMMERCIAL MISCELLANEOUS 2602040 · OPEN |  |  |
| Apr 10, 2026 | 2500 W UNION HILLS DRCity of Phoenix AZ plan review | Data center | PHX03-5 DH 120 EPO-BATTERY DEPLETION PLALARGE PLAN REVIEW-MISCELLANEOUS COMMERCIAL MISCELLANEOUS 2602042 · OPEN |  |  |
| Apr 8, 2026 | 720 N 40TH STCity of Phoenix AZ plan review | Data center | STACKS DATA CENTERREVISION TO PLAN REVIEW COMMERCIAL REVISION TO APPROVED PLAN 2305656-01 · OPEN |  |  |
| Apr 7, 2026 | 9600 NE 48th St 4AKansas City MO city issued permits | Data center | Shalerock 4A Data CenterCPPU - Electrical (Commercial) Electrical General CPEC-2026-00409 · Issued |  |  |
| Apr 7, 2026 | City of Hillsboro OR Citizen Access records | Data center | CoreSite Data CenterPlanning Development Review II DR-012-26 · Active |  |  |
| Mar 31, 2026 | 345 COURTLAND NE, ATLANTA, GA 30308City of Atlanta GA building permits | Data center | H5 Data Center Utility Bldg (COM) (CC)Commercial Alteration BB-202602841 · Routed for Review | $800,000 |  |
| Mar 30, 2026 | 265 KEYSTONE AVE, RENO, NV 89503 265 KEYSTONE AVEWashoe County NV Citizen Access records | Data center | Centra Digital Reno Data CenterStationary Source AAIR26-0003 · Applied |  |  |
| Mar 27, 2026 | 720 N 40TH STCity of Phoenix AZ plan review | Data center | STACK SKYWAY DATA CENTER - G&D RVSN 01REVISION TO PLAN REVIEW COMMERCIAL CIVIL 2303327-01 · OPEN |  |  |
| Mar 27, 2026 | 811 CLAYTON LNCity of Austin issued construction permits | Data center | ePlan: Commercial Expedited Review - [APPROVED] New Construction of Exterior Pad for Modular Data Center Foundation.Building Permit 2026-036762 BP · Active | $1,000,000 |  |
| Mar 26, 2026 | 3225 E ELWOOD STCity of Phoenix AZ planning and development permits | Data center | PHOENIX NAP II DATA CENTER - SHELLSHELL - STRUC/ELEC/PLMB/MECH COMMERCIAL NEW 26004695 · OPEN |  |  |
| Mar 24, 2026 | 9600 NE 48th St 3A-MUW TanksKansas City MO city issued permits | Data center | Shalerock 3A Data CenterCPPU - Building (Commercial) New CPBC-2026-00256 · Issued |  |  |
| Mar 19, 2026 | 7000 BURLESON RD BLDG B UNIT 100City of Austin issued construction permits | Data center | ePlan: Commercial Expedited Review - Finish out to Expand Data Center into existing Shell Areas. Scope of Work Includes 2 AE Transformers. (10000 SF) AE inspector: TNFM 1&2 is the…Electrical Permit 2025-155325 EP · Active |  |  |
| Mar 17, 2026 | 1200 N 40TH STCity of Phoenix AZ planning and development permits | Data center | QTS DATA CENTERSIGN PERMIT COMMERCIAL SIGN APPLICATON REVIEW 215264 · OPEN |  |  |
| Mar 17, 2026 | 1200 N 40TH STCity of Phoenix AZ planning and development permits | Data center | QTS DATA CENTERSIGN PERMIT COMMERCIAL SIGN APPLICATON REVIEW 215265 · OPEN |  |  |
| Mar 17, 2026 | 9630 N VIRGINIA ST NA, RENO, NV 89506City of Reno NV Citizen Access records | Data center | OPPIDAN DATA CENTERBuilding Commercial Fire Alarm BLD26-08815E · Active/Permit Issued |  |  |
| Mar 11, 2026 | 5100 E ROOSEVELT STCity of Phoenix AZ planning and development permits | Data center | IM DATA CENTER AZP3 SC33 PERMITSTRUC/ELEC/PLMB/MECH COMMERCIAL TI 26003918 · OPEN |  |  |
| Mar 10, 2026 | 5100 E ROOSEVELT STCity of Phoenix AZ planning and development permits | Data center | I M DATA CENTER-TI OF SUITE SC 37STRUC/ELEC/PLMB/MECH COMMERCIAL TI 26003848 · OPEN |  |  |
| Mar 4, 2026 | 2500 W UNION HILLS DRCity of Phoenix AZ plan review | Data center | PHX05 - GENERATOR EXHAUSTLARGE PLAN REVIEW-REMODEL COMMERCIAL MISCELLANEOUS 2601218 · OPEN |  |  |
| Feb 27, 2026 | 3719 E LA SALLE STCity of Phoenix AZ plan review | Data center | LA SALLE 1G SERVERS DATA CENTER T.I F/AFP PLAN REVIEW - PLANNING & DEVELOPMENT 260331 · OPEN |  |  |
| Feb 13, 2026 | 5207 ROGERS RD, City of San Antonio, TX 78251City of San Antonio TX permits issued | Data center | SPC Site Work - Vantage Data Center -TX-22 Site Work Only-5207 ROGERS RDComm Sitework Permit New COM-SIT-PMT25-40100446 | $3,950,000 |  |
| Feb 12, 2026 | 1200 N 40TH STCity of Phoenix AZ plan review | Data center | QTS DATA CENTERSIGN PLAN REVIEW COMMERCIAL SIGN APPLICATON REVIEW 260140 · OPEN |  |  |
| Feb 9, 2026 | 113 N MYERS ST CHARLOTTE NC 28202Mecklenburg County NC building permits (all towns) | Data center | (HR) DLR CLT 10 - Suite 101 Buildout Renovation of 3,115 SF on the first floor to include new data center space and equipment upgrades. Second and third floor scope includes…Electrical COM-ELC-26-000600 · Closed - Complete | $35,000 |  |
| Jan 26, 2026 | 775 S 6TH AVECity of Phoenix AZ plan review | Data center | PHX-MBA DATA CENTER - DR APPEALDSD APPEAL 26015 · OPEN |  |  |
| Jan 23, 2026 | 3975 HEATHER ST, FOREST GROVE, OR 97116Washington County OR Citizen Access records | Data center | CRANE DATA CENTER - (11) SIGNAL CKTS / LE PANEL FOR BMS CONTROLS INSTALLCommercial Electrical ELEC-2600774 · Final |  |  |
| Jan 21, 2026 | 3719 E LA SALLE STCity of Phoenix AZ planning and development permits | Data center | GSERVER LASALLE DATA CENTERSTRUC/ELEC/PLMB/MECH COMMERCIAL REMODEL 26000895 · DONE |  |  |
| Jan 12, 2026 | 7000 BURLESON RD BLDG B UNIT 100City of Austin issued construction permits | Data center | ePlan: Commercial Expedited Review - Finish out to Expand Data Center into existing Shell Areas. Scope of Work Includes 2 AE Transformers. (10000 SF)Mechanical Permit 2025-155325 MP · Active |  |  |
| Jan 8, 2026 | 7000 BURLESON RD BLDG B UNIT 100City of Austin issued construction permits | Data center | ePlan: Commercial Expedited Review - Finish out to Expand Data Center into existing Shell Areas. Scope of Work Includes 2 AE Transformers. (10000 SF)Plumbing Permit 2025-155325 PP · Active |  |  |
| Jan 7, 2026 | 4801 E THISTLE LANDING DRCity of Phoenix AZ planning and development permits | Data center | E THISTLE LANDING DATA CENTER G&DGRADING/DRAINAGE CIVIL PERMIT GRADING & DRAINAGE 26000265 · OPEN |  |  |
| Dec 22, 2025 | City of Chandler AZ Citizen Access records | Data center | ALIGNED DATA CENTER PHX06 / SRP SUBSTATION - SCREEN WALL W INNOVATION ST & ELLIS STDevServices Building Revision BLDREV25-0483 · Awaiting Client Reply |  |  |
| Dec 18, 2025 | 7000 BURLESON RD BLDG B UNIT 100City of Austin issued construction permits | Data center | ePlan: Commercial Expedited Review - Finish out to Expand Data Center into existing Shell Areas. Scope of Work Includes 2 AE Transformers. (10000 SF)Building Permit 2025-155325 BP · Active |  |  |
| Dec 12, 2025 | 775 S 6TH AVECity of Phoenix AZ plan review | Data center | PHX-MBA DATA CENTERPRELIMINARY SITE PLAN REVIEW PRELIMINARY PLAN REVIEW 2506977 · OPEN |  |  |
| Dec 9, 2025 | 3225 E ELWOOD STCity of Phoenix AZ planning and development permits | Data center | PHOENIX NAP II DATA CENTER - G&DGRADING/DRAINAGE CIVIL PERMIT GRADING & DRAINAGE 25020766 · OPEN |  |  |
| Dec 5, 2025 | 760 WEST PEACHTREE NW, ATLANTA, GA 30308City of Atlanta GA building permits | Data center | 4203-CBI - Google Data Center ATL-1 RenovationCommercial Alteration BB-202510259 · ACA Pending | $14,931 |  |
| Nov 25, 2025 | 760 WEST PEACHTREE NW, ATLANTA, GA 30308City of Atlanta GA building permits | Data center | 4203-CBI - Google Data Center ATL-1 RenovationCommercial Alteration BB-202510053 · ACA Pending | $14,931 |  |
| Nov 25, 2025 | City of Papillion NE Citizen Access records | Data center | OPPIDAN - 5MW Papillion Data CenterFire Alarm 25TMP-005805 |  |  |
| Nov 25, 2025 | 11684 S 158th St, Papillion, NE 68138City of Papillion NE Citizen Access records | Data center | OPPIDAN - 5MW Papillion Data CenterFire Alarm BLD-25-5036 · Issued |  |  |
| Nov 20, 2025 | 760 WEST PEACHTREE NW, ATLANTA, GA 30308City of Atlanta GA building permits | Data center | Google Data Center ATL-1 / Level 3 (LC)Commercial Alteration BB-202509900 · ACA Pending | $661,500 |  |
| Nov 19, 2025 | 4801 E THISTLE LANDING DRCity of Phoenix AZ plan review | Data center | THISTLE DATA CENTERREVISION TO PLAN REVIEW COMMERCIAL CIVIL 2405931-02 · OPEN |  |  |
| Nov 10, 2025 | 4030 LAFAYETTE CENTER DR CHANTILLYFairfax County VA PLUS building records | Data center | H5 Data Centers - 4030 Lafayette CenterCommercial Addition/Alteration ALTC-2025-02365 · Issued |  |  |
| Nov 6, 2025 | 5100 E ROOSEVELT STCity of Phoenix AZ planning and development permits | Data center | IRON MTN DATA CENTER-GATESFP VEHICLE ACCESS CONTROL DEVICE GATES 25019034 · OPEN |  |  |
| Nov 5, 2025 | 4801 E THISTLE LANDING DRCity of Phoenix AZ plan review | Data center | THISTLE DATA CENTERLANDSCAPE COMMERCIAL CIVIL 2506250 · OPEN |  |  |
| Oct 21, 2025 | 5100 E ROOSEVELT STCity of Phoenix AZ planning and development permits | Data center | IM DATA CENTER SPACE SC35 TI PERMITSTRUC/ELEC/PLMB/MECH COMMERCIAL TI 25017747 · OPEN |  |  |
| Oct 9, 2025 | 760 WEST PEACHTREE NW, ATLANTA, GA 30308City of Atlanta GA building permits | Data center | Google Data Center ATL-1/Level 3 (LC)(CC)Commercial Alteration BB-202508594 · ACA Pending | $17,400 |  |
| Oct 2, 2025 | 3033 N 3RD AVECity of Phoenix AZ planning and development permits | Data center | DATA CENTER CRAC ADDITIONSTRUC/MECH/ELEC COMMERCIAL MISCELLANEOUS 25016766 · DONE |  |  |
| Sep 29, 2025 | 5100 E ROOSEVELT STCity of Phoenix AZ planning and development permits | Data center | IRON MOUNTAIN DATA CENTER - PUMPFP FIRE PUMP INSTALLATION 25016543 · DONE |  |  |
| Oct 21, 2026 | 5000 E MCDOWELL RDCity of Mesa building permits | Substation | Install canopy (427 SF) over existing electrical switchgear at Boeing substation. Special inspections required: steel construction, concrete construction, soils, high strength…COM PMT26-12849 · Issued |  |  |
| Oct 21, 2026 | 42049 NOVA PARK LEESBURGLoudoun County VA LandMARC issued permits | Substation | Grading Permit for Project Celtics - Phase 2 Substation (EPLAN-2025-0058)Grading Infrastructure/Commercial GRADE-2025-000285 · Issued |  |  |
| Oct 20, 2026 | Washoe County NV Citizen Access records | Substation | FISH SPRINGS SUBSTATION BUILDINGAlternative Energy Permit 26TMP-020007 |  |  |
| Oct 20, 2026 | 36000 RAINBOW WAY, RENO, NV 89510Washoe County NV Citizen Access records | Substation | FISH SPRINGS SUBSTATION BUILDINGAlternative Energy Permit WBLD26-104584 · Received |  |  |
| Oct 20, 2026 | 9600 NE 48th St 3A SubstationKansas City MO city issued permits | Substation | Shalerock 3A Blucifer SubstationCPPU - Electrical (Commercial) Electrical General CPEC-2026-01647 · Ready For Issuance |  |  |
| Oct 19, 2026 | 12701 N US 169 Hwy DC-3Kansas City MO city issued permits | Substation | Rocky Branch 3A Brahman SubstationCPPU - Building (Commercial) Site Improvement CPBC-2026-01058 · Issued |  |  |
| Oct 15, 2026 | 12701 N US 169 HwyKansas City MO city issued permits | Substation | Rocky Branch 2A Angus SubstationCPPU - Building (Commercial) Site Improvement CPBC-2026-01059 · Ready For Issuance |  |  |
| Oct 13, 2026 | 12701 N US 169 Hwy DC-3Kansas City MO city issued permits | Substation | Rocky Branch 3A Brahman SubstationCPPU - Special Inspections External Special Inspections CISI-2026-00553 · Issued |  |  |
| Oct 9, 2026 | 12701 N US 169 Hwy DC-3Kansas City MO city issued permits | Substation | Rocky Branch 3A Brahman SubstationCPLD - Infrastructure Major - No Performance Bond CLDPMT-2026-00199 · Pending |  |  |
| Oct 6, 2026 | City of Charlotte NC Citizen Access records | Substation | Duke Alexander GIS SubstationPlanning Administrative Adjustment 26TMP-019095 |  |  |
| Oct 6, 2026 | City of San Antonio TX BuildSA records | Substation | T-0317 SAT 15 (Wiseman Substation) Transmission Loop Project Transmission Line ProjectBuilding Tree Affidavit/Permit Application 26TMP-168624 |  |  |
| Oct 6, 2026 | City of San Antonio TX BuildSA records | Substation | T-0317 SAT 15 (Wiseman Substation) Transmission Loop Project Transmission Line ProjectBuilding Tree Affidavit/Permit Application TRE-APP-APP26-38803361 · Under Review |  |  |
| Oct 6, 2026 | 9600 NE 48th St 4A SubstationKansas City MO city issued permits | Substation | Shalerock 3A Blucifer SubstationCPPU - Electrical (Commercial) Electrical General CPEC-2026-01560 · Ready For Issuance |  |  |
| Oct 1, 2026 | 8720 BELLS LAKE RDWake County NC building permits | Substation | Retaining wall along southern side of electrical substationCommercial Building Non-Building, Fences, Walls, Signs, Awnings CBPR-181175-2026 · In Review | $3,500,000 |  |
| Sep 30, 2026 | 9999 Chapin School RDCity of Fort Worth TX development permits | Substation | OUTPOST SUBSTATION /EDGED ENERGY B1_WORK_DESCCommercial Accessory Structure New PB26-13553 · Pending | $477,059 |  |
| Sep 29, 2026 | City of Goodyear AZ Citizen Access records | Substation | APS Goodyear Substation Wall ExpansionBuilding Commercial Construction 26TMP-008099 · Prescreen Review |  |  |
| Sep 29, 2026 | City of Goodyear AZ Citizen Access records | Substation | APS Goodyear Substation Wall ExpansionBuilding Commercial Construction B26-02598 · Prescreen Review |  |  |
| Sep 24, 2026 | Washoe County NV Citizen Access records | Substation | Dodge Flat Energy Storage SubstationAlternative Energy Permit 26TMP-018473 |  |  |
| Sep 24, 2026 | 3505 STATE ROUTE 447, RENO, NV 89510Washoe County NV Citizen Access records | Substation | Dodge Flat Energy Storage SubstationAlternative Energy Permit WBLD26-104164 · Received |  |  |
| Sep 18, 2026 | 800 E NORTHSIDE DRCity of Fort Worth TX development permits | Substation | Oncor Traders Oak Substation B1_WORK_DESCCommercial Grading Permit NA CG26-00206 · Pending |  |  |
| Sep 18, 2026 | 800 E NORTHSIDE DRCity of Fort Worth TX development permits | Substation | Oncor Traders Oak Substation B1_WORK_DESCUrban Forestry NA UFC26-0229 · Pending |  |  |
| Sep 18, 2026 | 7301 METRO CENTER DR UNIT 200City of Austin issued construction permits | Substation | ePlan: Commercial Expedited Review - [APPROVED] Phase 2- Interior De- Energized Substation Training Facility for Natural Resources company (5000 SF).Building Permit 2026-108573 BP · Active |  |  |
| Sep 11, 2026 | 9600 NE 48th St 4A SubstationKansas City MO city issued permits | Substation | Shalerock 4A Thoroughbred SubstationCPPU - Building (Commercial) Site Improvement CPBC-2026-00905 · Pending |  |  |
| Sep 3, 2026 | 4949 DEL RAY AVE BETHESDAMontgomery County MD commercial permits | Substation | Customer Wants To Use ePlans,TO FASCILITATE THE UPGRADE OF THE PEPCO BETHESDA SUBSTATION SITE AND INCLUDE THE CONSTRUCTION OF AN EXTERNAL STAIRCASECOMMERCIAL BUILDING ADD 1170451 · Open | $1,300,000 |  |
| Sep 3, 2026 | 9700 TEAM ROCKBROOK PKWYCity of Fort Worth TX development permits | Substation | Edged Energy Outpost Substation Vertical WorkCommercial Accessory Structure New PB26-12608 · Incomplete Submittal | $1,565,299 |  |
| Aug 31, 2026 | 5801 SYCAMORE SCHOOL RDCity of Fort Worth TX development permits | Substation | Oncor Primrose Substation Expansion of existing electrical substation, removal of all trees impacted by grading and drainage improvements and station footprintUrban Forestry NA UFC26-0207 · Pending |  |  |
| Aug 31, 2026 | 922 N 2ND STCity of Phoenix AZ plan review | Substation | COMBO FIRELINE - APS GARFIELD SUBSTATIONCIVIL PLAN FIRELINE COMMERCIAL CIVIL 2602667 · OPEN |  |  |
| Aug 30, 2026 | 1393 RUSSELL BRANCH LEESBURGLoudoun County VA LandMARC submitted permits | Substation | As part of the Solids Improvements Project, The Leesburg Water Pollution Control Facility is building a new standalone Solids Electrical Building that will replace the current…Building (Commercial) New Construction BLDC-2026-042651 · Submitted - Online | $236,911 |  |
| Aug 28, 2026 | 12701 N US 169 Hwy DC-3Kansas City MO city issued permits | Substation | Rocky Branch 3A Brahman SubstationCPPU - Special Inspections City Special Inspections CISI-2026-00482 · Issued |  |  |
| Aug 28, 2026 | 922 N 2ND STCity of Phoenix AZ planning and development permits | Substation | GARFIELD SUBSTATION REBUILDEXTENDED CONSTRUCTION WORK HOURS 260047 · OPEN |  |  |
| Aug 26, 2026 | 9600 NE 48th St 4A SubstationKansas City MO city issued permits | Substation | Shalerock 4A Thoroughbred SubstationCPPU - Special Inspections City Special Inspections CISI-2026-00475 · Issued |  |  |
| Aug 26, 2026 | 9600 NE 48th St 4A SubstationKansas City MO city issued permits | Substation | Shalerock 4A Thoroughbred SubstationCPPU - Special Inspections External Special Inspections CISI-2026-00476 · Issued |  |  |
| Aug 18, 2026 | City of San Antonio TX BuildSA records | Substation | COSA SubstationFire Fire Storage Tanks Permit FIR-UST-PMT26-37100156 · Active |  |  |
| Aug 18, 2026 | City of San Antonio TX BuildSA records | Substation | COSA SubstationFire Fire Storage Tanks Permit FIR-UST-PMT26-37100157 · Active |  |  |
| Aug 11, 2026 | 1300 BRIGHTON DAM RD BROOKEVILLEMontgomery County MD commercial permits | Substation | Customer Wants To Use ePlans,Install electrical equipment foundations at the Brighton Substation located at 1300 Brighton Dam Rd.COMMERCIAL BUILDING BUILD FOUNDATION 1167909 · Open | $70,000 |  |
| Aug 11, 2026 | City of San Antonio TX BuildSA records | Substation | COSA Substation UST InstallFire Fire Storage Tanks Application 26TMP-133602 |  |  |
| Aug 11, 2026 | City of San Antonio TX BuildSA records | Substation | COSA Substation UST InstallFire Fire Storage Tanks Application FIR-FTK-APP26-37000105 · Closed |  |  |
| Aug 4, 2026 | Montgomery County MD commercial permits | Substation | Customer Wants To Use ePlans,Install electrical equipment foundations at the existing Mt. Zion substation. These are a replacement in kind to the existing foundations.COMMERCIAL BUILDING BUILD FOUNDATION 1167118 · Open | $2,082,400 |  |
| Aug 4, 2026 | Montgomery County MD commercial permits | Substation | Customer Wants To Use ePlans Interior work only,Complete interior alterations and HVAC upgrades to the existing control house at the Mt. Zion Substation.COMMERCIAL BUILDING ALTER 1167123 · Open | $172,000 |  |
| Aug 3, 2026 | 7232 E ELLIOT RDCity of Mesa building permits | Substation | New private utility substation. Scope of work includes the foundation, structural, and electrical. Work includes installation of a new prefabricated metal substation equipment…COM PMT26-08686 · Issued |  |  |
| Jul 31, 2026 | 922 N 2ND STCity of Phoenix AZ planning and development permits | Substation | APS GARFIELD SUBSTATION - SWMPSTORM WATER MGT CIVIL PERMIT STORM WATER MANAGEMENT 26009173 · OPEN |  |  |
| Jul 30, 2026 | City of Charlotte NC Citizen Access records | Substation | Duke Energy GIS SubstationPlanning UDO Administration Pre-Submittal 26TMP-014383 |  |  |
| Jul 30, 2026 | City of Charlotte NC Citizen Access records | Substation | Duke Energy GIS SubstationPlanning UDO Administration Pre-Submittal UDOPS-2026-00140 · In Process |  |  |
| Jul 29, 2026 | City of Goodyear AZ Citizen Access records | Substation | APS Goodyear Substation Phase 2 Wall ExpansionPlanning Pre-Application/Due Diligence 26TMP-006310 · Prescreen Review |  |  |
| Jul 29, 2026 | City of Goodyear AZ Citizen Access records | Substation | APS Goodyear Substation Phase 2 Wall Expansion - 08-27-2026Planning Pre-Application/Due Diligence PRJ26-00112 · Completed |  |  |
| Jul 27, 2026 | City of Charlotte NC Citizen Access records | Substation | Duke Energy GIS SubstationPlanning UDO Administration Pre-Submittal 26TMP-014378 |  |  |
| Jul 24, 2026 | 12899 MOORES CHAPEL RD CHARLOTTE NC 28214Mecklenburg County NC building permits (all towns) | Substation | (HR) DLR - CLT13 MV Substation RTAP 1 RTAP changes Medium Voltage transmission infrastructure from substation feeder through distribution to future building systems.Accessory COM-ACC-26-000141 · Inspection Phase |  |  |
| Jul 24, 2026 | 12899 MOORES CHAPEL RD CHARLOTTE NC 28214Mecklenburg County NC building permits (all towns) | Substation | (HR) DLR - CLT13 MV Substation RTAP (Aldridge) RTAP Changes Medium Voltage transmission infrastructure from substation feeder through distribution to future building systems.Electrical COM-ELC-26-007242 · Inspection Phase |  |  |
| Jul 24, 2026 | 12899 MOORES CHAPEL RD CHARLOTTE NC 28214Mecklenburg County NC building permits (all towns) | Substation | (HR) DLR - CLT13 MV Substation RTAP changes to electrical feedersFire COM-FIRE-LIFE-26-000181 · Inspection Phase |  |  |
| Jul 23, 2026 | 1001 TUCKASEEGEE RD 100 CHARLOTTE NC 28208Mecklenburg County NC building permits (all towns) | Substation | Renuity - Switchyard Walter Robinson Clark Commercial New Construction Permit related records: - COM-MEC-26-000899 - COM-ELC-26-001786 - COM-PLM-26-000616New COM-NEW-26-000067 · Closed - Complete | $4,150,000 |  |
| Jul 22, 2026 | City of Charlotte NC Citizen Access records | Substation | DLR Moores Chapel SubstationLandDevelopment Land Disturbance Permit LDDP-2026-00226 |  |  |
| Jul 21, 2026 | 12899 MOORES CHAPEL RD CHARLOTTE NC 28214Mecklenburg County NC building permits (all towns) | Substation | (HR) DLR - CLT13 Main Site Medium Voltage Distribution Rev1 RTAP Structural Changes Medium Voltage transmission infrastructure from substation feeder through distribution to…Accessory COM-ACC-26-000137 · Inspection Phase |  |  |
| Jul 21, 2026 | 12899 MOORES CHAPEL RD CHARLOTTE NC 28214Mecklenburg County NC building permits (all towns) | Substation | (HR) DLR - CLT13 Main Site Medium Voltage Distribution RTAP (Aldridge) Rev 1 RTAP Structural Changes Medium Voltage transmission infrastructure from substation feeder through…Electrical COM-ELC-26-007113 · Inspection Phase |  |  |
| Jul 21, 2026 | 12899 MOORES CHAPEL RD CHARLOTTE NC 28214Mecklenburg County NC building permits (all towns) | Substation | (HR) DLR - CLT13 Main Site Medium Voltage Distribution Rev1 RTAP Structural Changes Medium Voltage transmission infrastructure from substation feeder through distribution to…Fire COM-FIRE-LIFE-26-000152 · Inspection Phase |  |  |
| Jul 20, 2026 | City of Charlotte NC Citizen Access records | Substation | DLR Moores Chapel SubstationEnforcement Enforcement/Erosion Control/Notice of Violation/NA NOVEC-2026-00035 · Complete |  |  |
| Jul 20, 2026 | 5801 SYCAMORE SCHOOL RDCity of Fort Worth TX development permits | Substation | Oncor Primrose Substation Expansion of existing substation with grading and drainage improvementsCommercial Grading Permit NA CG26-00158 · Awaiting Client Reply |  |  |
| Jul 10, 2026 | Washoe County NV Citizen Access records | Substation | Dodge Flat Substation GradingGrading Permits 26TMP-013054 |  |  |
| Jul 7, 2026 | 1001 TUCKASEEGEE RD 100 CHARLOTTE NC 28208Mecklenburg County NC building permits (all towns) | Substation | Renuity Switchyard Siemens Industry Inc. Building Technologies Division Fire Alarm installElectrical COM-ELC-26-005761 · Inspection Phase | $18,560 |  |
| Jul 6, 2026 | Montgomery County MD commercial permits | Substation | Customer Wants To Use ePlans,This project will build a new data enclosure foundation within the existing substation.COMMERCIAL BUILDING CONSTRUCT 1163936 · Open | $7,000 |  |
| Jul 2, 2026 | 902 N 2ND STCity of Phoenix AZ planning and development permits | Substation | APS SUBSTATION SHADE STRUCTURE IN ROWSTRUC COMMERCIAL NEW 26008617 · OPEN |  |  |
| Jul 2, 2026 | City of San Antonio TX BuildSA records | Substation | T4S3 OSP FLC Ball Park Substation to Fern Substation Proposed Fiber UpgradePublicWorks RoW Permit Extension AMD-ROW-0005391 · Approved |  |  |
| Jun 26, 2026 | 17101 GERMANTOWN RD GERMANTOWNMontgomery County MD commercial permits | Substation | Customer Wants To Use ePlans,PEPCO proposes the installation of an un-manned pre-fabricated shelter, a 80kW diesel generator on a concrete pad with fuel storage at the existing…COMMERCIAL BUILDING INSTALL 1163105 · Open | $100,000 |  |
| Jun 26, 2026 | 17101 GERMANTOWN RD GERMANTOWNMontgomery County MD commercial permits | Substation | Customer Wants To Use ePlans,**Sister permit to COMBUILD-1157024** PEPCO proposes the installation of antennas, antenna mounts, and related equipment to the proposed tower permit…COMMERCIAL BUILDING INSTALL 1163106 · Open | $50,000 |  |
| Jun 26, 2026 | 10611 WESTLAKE DR BETHESDAMontgomery County MD commercial permits | Substation | Customer Wants To Use ePlans,PEPCO proposes the installation of an un-manned pre-fabricated shelter, a 35kW diesel generator on a concrete pad with fuel storage at the existing…COMMERCIAL BUILDING INSTALL 1163109 · Open | $100,000 |  |
| Jun 26, 2026 | 10611 WESTLAKE DR BETHESDAMontgomery County MD commercial permits | Substation | Customer Wants To Use ePlans,**Sister permit to COMBUILD-1145295** PEPCO proposes the installation of antennas, antenna mounts, and related equipment to the proposed tower permit…COMMERCIAL BUILDING INSTALL 1163111 · Open | $50,000 |  |
| Jun 26, 2026 | City of Goodyear AZ Citizen Access records | Substation | AZ21 Substation - FACPBuilding Fire Protection Systems B26-01704 · Prescreen Review Corrections |  |  |
| Jun 25, 2026 | 9600 NE 48th St 3A SubstationKansas City MO city issued permits | Substation | Shalerock 3A Blucifer SubstationCPPU - Building (Commercial) Site Improvement CPBC-2026-00595 · Issued |  |  |
| Jun 18, 2026 | Montgomery County MD commercial permits | Substation | Pepco aims to upgrade the security fencing around the substationCOMMERCIAL BUILDING CONSTRUCT 1162140 · Open |  |  |
| Jun 15, 2026 | 5088 W INNOVATION CIRCity of Phoenix AZ planning and development permits | Substation | APS WAFER SUBSTATION-GIS BLDG. PERMITSTRUC/ELEC/PLMB/MECH COMMERCIAL NEW 26008197 · OPEN |  |  |
| Jun 5, 2026 | 1109 E CAMPBELL AVECity of Phoenix AZ planning and development permits | Substation | APS MEADOWBROOK SUBSTATIONSTRUC/ELEC/PLMB/MECH COMMERCIAL NEW 26007946 · OPEN |  |  |
| May 29, 2026 | 4801 E THISTLE LANDING DRCity of Phoenix AZ planning and development permits | Substation | THISTLE DC SUBSTATION-VIRTICAL PERMITSTRUC/ELEC/PLMB/MECH COMMERCIAL MISCELLANEOUS T969689 · OPEN |  |  |
| May 14, 2026 | 4250 W DOVE VALLEY RDCity of Phoenix AZ planning and development permits | Substation | APS WAFER SUBSTATIONSITE PERMIT SITE CIVIL 26007356 · OPEN |  |  |
| May 7, 2026 | 8625 Troost Ave BKansas City MO city issued permits | Substation | Southtown Substation Retaining WallCPPU - Building (Commercial) Site Improvement CPBC-2026-00459 · Issued |  |  |
| May 7, 2026 | 902 N 2ND STCity of Phoenix AZ planning and development permits | Substation | APS GARFIELD SUBSTATIONSITE PERMIT SITE CIVIL 26007130 · OPEN |  |  |
| May 6, 2026 | 9600 NE 48th St 3A SubstationKansas City MO city issued permits | Substation | Shalerock 3A Blucifer SubstationCPPU - Special Inspections External Special Inspections CISI-2026-00258 · Issued |  |  |
| May 6, 2026 | 9600 NE 48th St 2A SubstationKansas City MO city issued permits | Substation | Shalerock 2A Bronco SubstationCPPU - Building (Commercial) Other CPBC-2026-00406 · Issued |  |  |
| May 5, 2026 | 17101 GERMANTOWN RD GERMANTOWNMontgomery County MD commercial permits | Substation | Customer Wants To Use ePlans,PEPCO proposes to install a 350' self-support tower *** THE FOLLOWING ITEMS UNDER SEPARATE PERMIT APPLICATION(S) *** [an un-manned pre-fabricated…COMMERCIAL BUILDING INSTALL 1157024 · Open | $810,000 |  |
| May 4, 2026 | 8625 Troost Ave BKansas City MO city issued permits | Substation | Southtown Substation Retaining WallCPPU - Special Inspections External Special Inspections CISI-2026-00255 · Issued |  |  |
| May 4, 2026 | 32200 N 43RD AVECity of Phoenix AZ planning and development permits | Substation | AP WAFER SUBSTATIONCIVIL LANDSCAPE PERMIT LANDSCAPE ON SITE T968984 · OPEN |  |  |
| Apr 30, 2026 | 9600 NE 48th St 3A SubstationKansas City MO city issued permits | Substation | Shalerock 3A Blucifer SubstationCPPU - Special Inspections City Special Inspections CISI-2026-00246 · Issued |  |  |
| Apr 22, 2026 | 12899 MOORES CHAPEL RD CHARLOTTE NC 28214Mecklenburg County NC building permits (all towns) | Substation | (HR) DLR CLT 13 - Substation Medium Voltage Distribution Commercial Accessory Structure Permit related records: - COM-ELC-26-003696Accessory COM-ACC-26-000062 · Inspection Phase |  |  |
| Apr 22, 2026 | 12899 MOORES CHAPEL RD CHARLOTTE NC 28214Mecklenburg County NC building permits (all towns) | Substation | (HR) DLR CLT 13 - Substation Medium Voltage Distribution (Aldridge Electric) Commercial Accessory Structure Permit for COM-ACC-26-000062Electrical COM-ELC-26-003696 · Inspection Phase |  |  |
| Apr 9, 2026 | 8625 Troost Ave BKansas City MO city issued permits | Substation | Southtown Substation Retaining WallCPPU - Special Inspections City Special Inspections CISI-2026-00206 · Issued |  |  |
| Apr 9, 2026 | City of Charlotte NC Citizen Access records | Substation | Duke Alexander GIS Substation Pre-Submittal MeetingLandDevelopment Request a Meeting 26TMP-006745 |  |  |
| Apr 9, 2026 | City of Charlotte NC Citizen Access records | Substation | Duke Alexander GIS Substation Pre-Submittal MeetingLandDevelopment Request a Meeting LDPSM-2026-00067 · Closed |  |  |
| Apr 7, 2026 | 9600 NE 48th St 3A SubstationKansas City MO city issued permits | Substation | Shalerock 3A Blucifer SubstationCPPU - Special Inspections City Special Inspections CISI-2026-00193 · Voided-City |  |  |
| Apr 7, 2026 | 1001 TUCKASEEGEE RD 100 CHARLOTTE NC 28208Mecklenburg County NC building permits (all towns) | Substation | Renuity - Switchyard Walter Robinson Clark Instrata Technologies, LLC first time interior upfit of a first-generation office space typical new interior partitions and office…Electrical COM-ELC-26-003102 · Closed - COC Issued | $1,500 |  |
| Apr 7, 2026 | 3939 W CAREFREE HWYCity of Phoenix AZ planning and development permits | Substation | PERIMETER WALL - APS WAFER SUBSTATIONSTRUC COMMERCIAL MISCELLANEOUS T967878 · OPEN |  |  |
| Apr 1, 2026 | 20735 SW BLANTON ST, BEAVERTON, OR 97078Washington County OR Citizen Access records | Substation | PGE SUBSTATION - (1) B/FBuilding Project P0309479 · Inactive |  |  |
| Apr 1, 2026 | 20735 SW BLANTON ST, BEAVERTON, OR 97078Washington County OR Citizen Access records | Substation | PGE SUBSTATION - (1) B/FCommercial Plumbing PLMB-2603456 · Final |  |  |
| Mar 17, 2026 | City of Chandler AZ Citizen Access records | Substation | INTEL MWOA DENVER PB ICR-039 SOW#12009 SOW#12009 CPK01-CH3 ELECTRICAL SUBSTATIONDevServices Large Facility Permit LFP26-0082 · Issued |  |  |
| Mar 16, 2026 | City of Papillion NE Citizen Access records | Substation | SRP6A SubstationCommercial New 26TMP-001094 |  |  |
| Mar 16, 2026 | 15235 Gold Coast Rd, Papillion, NE 68138City of Papillion NE Citizen Access records | Substation | SRP6A SubstationCommercial New BLD-26-0854 · Issued |  |  |
| Mar 16, 2026 | 9965 N VIRGINIA ST, RENO, NV 89506 9965 A N VIRGINIA STWashoe County NV Citizen Access records | Substation | NV Energy Peavine SubstationPollution Control Plans APCP26-0035 · Closed |  |  |
| Mar 11, 2026 | 0 SWEETWATER RD, INCLINE VILLAGE, NV 89451 SWEETWATER RD 130-151-03Washoe County NV Citizen Access records | Substation | CIVIL SITE/GRADING - SIERRA PACIFIC POWER CO-INCLINE SUBSTATIONCommercial New, Add or Tenant Improvement Permit WBLD26-100891 · Issued |  |  |
| Mar 6, 2026 | 902 N 2ND STCity of Phoenix AZ plan review | Substation | APS SUBSTATION SHADE STRUCTURE IN ROWLARGE PLAN REVIEW-EXPEDITED COMMERCIAL NEW 2601275 · OPEN |  |  |
| Mar 6, 2026 | 902 N 2ND STCity of Phoenix AZ plan review | Substation | GARFIELD SUBSTATION-TECHNICAL APPEALDSD APPEAL 26038 · OPEN |  |  |
| Mar 5, 2026 | 32200 N 43RD AVECity of Phoenix AZ plan review | Substation | APS WAFER SUBSTATIONLANDSCAPE COMMERCIAL CIVIL 2601265 · OPEN |  |  |
| Mar 3, 2026 | 711 W MAYFIELD BLVD, City of San Antonio, TX 78211City of San Antonio TX permits issued | Substation | Site Work - SAPD Substation Generator South SubstationComm Sitework Permit New COM-SIT-PMT26-40100085 | $253,000 |  |
| Mar 3, 2026 | 1111 W SLAUGHTER LNCity of Austin issued construction permits | Substation | Remove existing chain link fence and replace with 12 solid wall fence. A BOA variance code 25-2-899 for fence height of 8 feet increased to 12 feet between residential and Public…Building Permit 2026-007606 BP · Active | $1 |  |
| Mar 2, 2026 | 1001 TUCKASEEGEE RD 100 CHARLOTTE NC 28208Mecklenburg County NC building permits (all towns) | Substation | Renuity - Switchyard Walter Robinson Clark Commercial New Construction Permit for COM-NEW-26-000067Electrical COM-ELC-26-001786 · Closed - Complete |  |  |
| Mar 2, 2026 | 1001 TUCKASEEGEE RD 100 CHARLOTTE NC 28208Mecklenburg County NC building permits (all towns) | Substation | Renuity - Switchyard Walter Robinson Clark Commercial New Construction Permit for COM-NEW-26-000067Mechanical COM-MEC-26-000899 · Closed - Complete |  |  |
| Mar 2, 2026 | 1001 TUCKASEEGEE RD 100 CHARLOTTE NC 28208Mecklenburg County NC building permits (all towns) | Substation | Renuity - Switchyard Walter Robinson Clark Commercial New Construction Permit for COM-NEW-26-000067Plumbing COM-PLM-26-000616 · Closed - Complete |  |  |
| Mar 2, 2026 | 3939 W CAREFREE HWYCity of Phoenix AZ plan review | Substation | APS WAFER SUBSTATION - PERIMETER WALLLARGE PLAN REVIEW-MISCELLANEOUS COMMERCIAL MISCELLANEOUS 2601157 · OPEN |  |  |
| Feb 26, 2026 | City of Goodyear AZ Citizen Access records | Substation | APS WA813106 - Rainbow Valley Rd & Willis Rd SubstationCivil Civil Construction Permit E26-00346 · Withdrawn |  |  |
| Feb 24, 2026 | 32300 N 51ST AVECity of Phoenix AZ planning and development permits | Substation | APS WAFER SUBSTATION - LAYDOWN YARDCIVIL ENVIRONMENTALLY SENSITIVE PERMIT 26003019 · DONE |  |  |
| Feb 18, 2026 | 1001 TUCKASEEGEE RD 200 CHARLOTTE NC 28208Mecklenburg County NC building permits (all towns) | Substation | Switchyard Furniture Power Commercial Alteration Permit related records: - COM-ELC-26-001255Alteration COM-ALT-26-000227 · Inspection Phase | $16,900 |  |
| Feb 18, 2026 | 1001 TUCKASEEGEE RD 200 CHARLOTTE NC 28208Mecklenburg County NC building permits (all towns) | Substation | Switchyard Furniture Power Commercial Alteration Permit for COM-ALT-26-000227Electrical COM-ELC-26-001255 · Inspection Phase |  |  |
| Feb 13, 2026 | 1 LONE STAR PASS, City of San Antonio, TX 78264City of San Antonio TX permits issued | Substation | SPC TMMTX Switchyard Upgrade 501Comm Remodel Permit Existing COM-RML-PMT26-40000059 | $2,500,000 |  |
| Feb 13, 2026 | 1 LONE STAR PASS, City of San Antonio, TX 78264City of San Antonio TX permits issued | Substation | SPC EXPRESS-SP-Site Work-TMMTX Switchyard Upgrade-1 LONE STAR PASSComm Sitework Permit New COM-SIT-PMT26-40100037 | $2,500,000 |  |
| Jan 28, 2026 | 4250 W DOVE VALLEY RDCity of Phoenix AZ planning and development permits | Substation | APS WAFER SUBSTATION DRAINAGE FACILITIESDRAINAGE FACILITY CIVIL PERMIT 26001315 · OPEN |  |  |
| Jan 23, 2026 | 4250 W DOVE VALLEY RDCity of Phoenix AZ plan review | Substation | APS WAFER SUBSTATIONFINAL SITE PLAN - MAJOR MAJOR COMMERCIAL FINAL SITE PLAN 2600383 · OPEN |  |  |
| Jan 20, 2026 | 32300 N 51ST AVECity of Phoenix AZ plan review | Substation | APS WAFER SUBSTATION - LAYDOWN YARDSALVAGE COMMERCIAL CIVIL 2600316 · OPEN |  |  |
| Jan 14, 2026 | 4250 W DOVE VALLEY RDCity of Phoenix AZ planning and development permits | Substation | APS WAFER SUBSTATION SWMPSTORM WATER MGT CIVIL PERMIT STORM WATER MANAGEMENT 26000643 · OPEN |  |  |
| Jan 14, 2026 | 4250 W DOVE VALLEY RDCity of Phoenix AZ planning and development permits | Substation | APS WAFER SUBSTATION G&DGRADING/DRAINAGE CIVIL PERMIT GRADING & DRAINAGE 26000644 · OPEN |  |  |
| Jan 7, 2026 | 13101 MOORES CHAPEL RD CHARLOTTE NC 28214Mecklenburg County NC building permits (all towns) | Substation | DLR Moores Chapel Substation Retaining Wall Commercial General Building Permit related records:StandaloneBuilding COM-GBLD-25-001052 · Inspection Phase |  |  |
| Jan 7, 2026 | 13101 MOORES CHAPEL RD CHARLOTTE NC 28214Mecklenburg County NC building permits (all towns) | Substation | DLR Moores Chapel Substation Retaining Wall Site Works related records:COM-GBLD-25-001052Site Works COM-SITE-25-000298 · Inspection Phase |  |  |
| Jan 5, 2026 | 902 N 2ND STCity of Phoenix AZ plan review | Substation | APS GARFIELD SUBSTATION - W/S APPEALDSD APPEAL 26001 · OPEN |  |  |
| Dec 29, 2025 | 4250 W DOVE VALLEY RDCity of Phoenix AZ plan review | Substation | APS WAFER SUBSTATION SWMPCIVIL PLAN STORM WATER MANAGEMENT COMMERCIAL CIVIL 2507225 · OPEN |  |  |
| Dec 3, 2025 | 7000 CULEBRA RD, City of San Antonio, TX 78238City of San Antonio TX permits issued | Substation | SPC Site Work - SAPD Substation Generator West SubstationComm Sitework Permit New COM-SIT-PMT25-40100453 | $245,000 |  |
| Dec 3, 2025 | 515 S FRIO ST, City of San Antonio, TX 78207City of San Antonio TX permits issued | Substation | SPC Site Work - SAPD Substation Generator Central SubstationComm Sitework Permit New COM-SIT-PMT25-40100455 | $270,000 |  |
| Dec 3, 2025 | 3635 E HOUSTON ST, City of San Antonio, TX 78219City of San Antonio TX permits issued | Substation | SPC Site Work - SAPD Substation Generator East SubstationComm Sitework Permit New COM-SIT-PMT25-40100456 | $290,000 |  |
| Dec 3, 2025 | 5020 PRUE RD, City of San Antonio, TX 78240City of San Antonio TX permits issued | Substation | SPC Site Work - SAPD Substation Generator Northwest SubstationComm Sitework Permit New COM-SIT-PMT25-40100457 | $325,000 |  |
| Nov 21, 2025 | 13030 JONES MALTSBERGER RD, City of San Antonio, TX 78247City of San Antonio TX permits issued | Substation | SPC Site Work - SAPD Substation Generator North SubstationComm Sitework Permit New COM-SIT-PMT25-40100451 | $237,000 |  |
| Nov 17, 2025 | 2301 MAPLE ST, FOREST GROVE, OR 97116Washington County OR Citizen Access records | Substation | FOREST GROVE SUBSTATION - (1) 200A SVC & (4) CKTSCommercial Electrical ELEC-2514580 · Final |  |  |
| Nov 17, 2025 | 2301 MAPLE ST, FOREST GROVE, OR 97116Washington County OR Citizen Access records | Substation | FOREST GROVE SUBSTATION - (1) 200A SVC & (4) CKTSBuilding Project P0306119 · Inactive |  |  |
| Nov 11, 2025 | 4250 W DOVE VALLEY RDCity of Phoenix AZ plan review | Substation | APS WAFER SUBSTATION - LAYDOWN YARDINVENTORY COMMERCIAL CIVIL 2506361 · OPEN |  |  |
| Oct 24, 2025 | 32400 N 51ST AVECity of Phoenix AZ planning and development permits | Substation | APS WAFER SUBSTATIONCIVIL ENVIRONMENTALLY SENSITIVE PERMIT 25017995 · DONE |  |  |
| Oct 24, 2025 | 13030 JONES MALTSBERGER RD, City of San Antonio, TX 78247City of San Antonio TX permits issued | Substation | SPC North SubstationPlumbing Gas Permit MEP-GAS-PMT25-34231132 | $237,000 |  |
| Oct 24, 2025 | 7000 CULEBRA RD, City of San Antonio, TX 78238City of San Antonio TX permits issued | Substation | SPC West SubstationPlumbing Gas Permit MEP-GAS-PMT25-34231137 | $245,000 |  |
| Oct 24, 2025 | 711 W MAYFIELD, City of San Antonio, TX 78211City of San Antonio TX permits issued | Substation | SPC South SubstationPlumbing Gas Permit MEP-GAS-PMT25-34231138 | $253,000 |  |
| Oct 7, 2014 | MILESTONE COMM AT WELLINGTON SUBSTATIONPrince William County VA use permits (zoning cases) | Substation | MILESTONE COMM AT WELLINGTON SUBSTATIONSUP PLN2014-00352 · ACTIVE |  |  |
| Sep 8, 2026 | 9707 OLD GEORGETOWN RD BETHESDAMontgomery County MD commercial permits | Generation | Customer Wants To Use ePlans,AT&T is removing existing (9) antennas, (6) TMAs, (3) diplexers and (15) RRHs on the building. AT&T is adding (12) new antennas and (12) new RRHs on…COMMERCIAL BUILDING INSTALL 1157543 · Issued | $45,000 |  |
| Aug 31, 2026 | 11927 VEIRS MILL RD SILVER SPRINGMontgomery County MD commercial permits | Generation | Customer Wants To Use ePlans,AT&T is removing six antennas and nine RRHs at the building site. AT&T is also adding 6 antennas and nine RRHs at the building site. AT&T is also…COMMERCIAL BUILDING INSTALL 1170006 · Open | $25,000 |  |
| Jul 24, 2026 | 1515 S PACIFIC AVECity of Los Angeles building permits issued | Generation | EPLAN Modification to existing wireless facility for AT&T. Install, remove and replace antennas and ancillary equipment on an existing wireless facility Antenna Level:REMOVE (3)…Bldg-Alter/Repair Commercial 25016-10000-27460 · Issued | $25,000 |  |
| Jun 4, 2026 | 401 1/2 E OLTORF ST UNIT ATTCity of Austin issued construction permits | Generation | AT&T Proposes the following scope of work: Tower SOW- Install: new mount (8) CCI Antennas (4) air antennas (12) Radios (2) raycap surge arrestors (2) fiber trucks & (6)DC Trunks…Electrical Permit 2026-036725 EP · Active |  |  |
| May 21, 2026 | 4701 SANGAMORE RD BETHESDAMontgomery County MD commercial permits | Generation | Customer Wants To Use ePlans,On existing rooftop, AT&amp;T plans to remove (6) antennas and (2) cannisters. Add (6) new antennas, (6) Diplexers and (2) new cannisters. On existing…COMMERCIAL BUILDING INSTALL 1159049 · Open | $36,000 |  |
| Feb 13, 2026 | 1600 S PREUSS ROADCity of Los Angeles building permits issued | Generation | ePlan. Changes to (e) ATT wireless facility ; work includes the following : REMOVE (3) AIR 6449 B77D ANTENNAS REMOVE (1) KAELUS DBC0061F1V51 INSTALL (3) AIR6472 DB CBAND/DOD…Nonbldg-New Commercial 25020-10000-02227 · Permit Finaled | $25,000 |  |
| Jan 19, 2026 | 6318 S VERMONT AVECity of Los Angeles building permits issued | Generation | ePlan: ATT is proposing a modification to an existing wireless facility: REMOVE (3) RRUS-32 B66A REMOVE (3) RRUS-32 B2 RELOCATE (3) AIR6449 B77D (BOTTOM) INSTALL (3) AIR6419 B77G…Nonbldg-New Commercial 25020-10000-02056 · Permit Finaled | $30,000 |  |
| Jun 2, 2025 | 3656 E NOAKES STCity of Los Angeles building permits issued | Generation | AT&T proposes to install a new wireless communication facility consisting of the following:- (1) new 70'-0" tall monopine- (12) panel antennas - (9) RRUs- (4) surge supressors…Nonbldg-New Commercial 24020-10000-00963 · Permit Finaled | $90,000 |  |
| Jul 6, 2022 | 2315 S FLOWER STCity of Los Angeles building permits issued | Generation | Verizon proposes to modify its power upgrade: Install (1) Integrated Load Center (ILC), Install (1) 600A power plant upgrade, Install (1) proposed DC upconverter, Install Feed…Bldg-Alter/Repair Apartment 22016-10000-07367 · Permit Expired | $65,000 |  |
| Dec 1, 2021 | 1007 W MARTIN LUTHER KING, JR BLVDCity of Los Angeles building permits issued | Generation | MODIFICATION TO AN EXISTING VERIZON WIRELESS UNMANNED TELECOMMUNICATIONS FACILITY, TO CONSIST OF THE FOLLOWING:1. REMOVE (1) 2260 RACK MOUNTED RAYCAP REMOVE (1) 2260 RACK MOUNTED…Nonbldg-Alter/Repair Commercial 21026-10000-00242 · Permit Expired | $75,000 |  |
| Sep 30, 2020 | 8495 W 3RD ST D101City of Los Angeles building permits issued | Generation | MINOR MODIFICATION TO EXISTING WIRELESS FACILITY PER ZA 2000-1313REMOVE AND REPLACE (E) POWER PLT AND BATTERIES WITH CMD POWER PLANT AND BATTERIESREMOVE 9 (E) RRUSBldg-Alter/Repair Commercial 20016-10000-14461 · Permit Expired | $20,000 |  |
| Oct 23, 2026 | Whatcom CountyWashington State SEPA Register | Site plan or rezoning | Puget Sound Energy Glacier Energy Storage System: Demolition & removal of the Puget Sound Energy former battery (BESS) enclosure containers and associated reinforced concrete…SEPA ODNS 202604530 · ODNS |  |  |
| Oct 22, 2026 | 7600 DOANE DR MANASSAS VA 20109Prince William County VA ePortal permits and plans | Site plan or rezoning | Project Resto - Child Project WAIVER REQUEST FOR PATRIOT BUSINESS CENTER - PROJECT RESTO - Site Plan for the Patriot Business Center (Project Resto: The site includes a 5-building…Waiver - DCSM Sec 700, DCSM 700 WAI2027-00085 · Pending |  |  |
| Oct 22, 2026 | Whitman CountyWashington State SEPA Register | Site plan or rezoning | Avista Garfield Substation Relocation: Avista proposes to replace its existing substation with a new 115 kV electrical substation to provide transmission and distribution…SEPA DNS 202604485 · DNS |  |  |
| Oct 22, 2026 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | Prologis Park Building 4 PROLOGIS PARK BUILDING 4 - THE SUBJECT OF THIS APPLICATION CONSISTS OF THE DESIGN OF A 1-STORY DATA CENTER BUILDING AND ASSOCIATED UTILITIES AND…Performance Bond PBOND-2026-0172 · Submitted - Online |  |  |
| Oct 22, 2026 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | Prologis Park Building 4 PROLOGIS PARK BUILDING 4 - THE SUBJECT OF THIS APPLICATION CONSISTS OF THE DESIGN OF A 1-STORY DATA CENTER BUILDING AND ASSOCIATED UTILITIES AND…Performance Bond PBOND-2026-0173 · Submitted - Online |  |  |
| Oct 21, 2026 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | Sterling Technology Park (Conditional Approval) Sterling Technology Park - Proposed Construction of Data Center Building ,Mechanical Yards, Guard Booth, and related infrastructurePerformance Bond PBOND-2026-0163 · Submitted - Online |  |  |
| Oct 19, 2026 | 10145 LINTON HALL RD BRISTOW VA 20136Prince William County VA ePortal permits and plans | Site plan or rezoning | YOUTH FOR TOMORROW - DATA CENTER SITE PLAN - REVISION FOR DATA CENTER DEVELOPMENT. PROPOSED CONDUIT LINE REVISIONS IN APPROVED EASEMENTS AND LOD.Plan Counter Review - Counter Sign-Off PCR2027-00031 · Approved |  |  |
| Oct 19, 2026 | 10450 HARRY J PARRISH BLVD MANASSAS VA 20110Prince William County VA ePortal permits and plans | Site plan or rezoning | MDC1-3 SITE PLAN REVISION - Revision to approved SPR2024-00329 for the relocation of FDCs, additional fire hydrants, and easement changes.Site Plan - Administrative Review SPR2027-00103 · Pending |  |  |
| Oct 15, 2026 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | Aspen Substation Aspen Substation Site Plan within JLMA-20 zoning.Plat PLAT-2026-0157 · Submitted |  |  |
| Oct 13, 2026 | City of Red Oak TX council and planning agendas | Site plan or rezoning | Conduct a public hearing and consider approval of Ordinance No. 26-032 of the City Council of the City of Red Oak, Texas, approving a zoning change from “PD”, Planned Development…Agenda item, City Council agenda item 3008 · on agenda |  |  |
| Oct 13, 2026 | 6201 WELLINGTON RD GAINESVILLE VA 20155Prince William County VA ePortal permits and plans | Site plan or rezoning | WAIVER REQUEST FOR PROJECT ASTRID FINAL SITE PLAN - Construction of two data center buildingsWaiver - DCSM Sec 700, DCSM 700 WAI2027-00078 · Pending |  |  |
| Oct 12, 2026 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | Arcola Grove - Sanitary Sewer Extension Plan Pre-App Meeting to coordinate and discuss a Sanitary Sewer Extension Plan (extending from the proposed data center site plan…Premeeting PMTG-2026-0221 · Submitted - Online |  |  |
| Oct 9, 2026 | 7251 GROVE HILL BLVD GAINESVILLE VA 20155Prince William County VA ePortal permits and plans | Site plan or rezoning | NTT GLOBAL DATA CENTER VA10 LLCFire Lane Plan, New Plan FLP2027-00018 · Pending |  |  |
| Oct 8, 2026 | City of Buckeye AZ self service (EnerGov) | Site plan or rezoning | Powerplant and data center developmentPre-Application Conference (PAC) Meeting, Pre Application Conference PLZM-26-0126 · Applied |  |  |
| Oct 6, 2026 | 5547 WELLINGTON RD GAINESVILLE VA 20155Prince William County VA ePortal permits and plans | Site plan or rezoning | Electrical SubstationCultural Resources Assessment CRP2027-00025 · Draft |  |  |
| Sep 30, 2026 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | ME-DC Pacific Substation A Commission Permit Applications to permit the development of a substation on the property.Commission Permit CMPT-2026-0018 · Submitted |  |  |
| Sep 30, 2026 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | Dulles Electric Data Centers LSDOPA for EPLAN-2024-0154Performance Bond PBOND-2026-0150 · Submitted - Online |  |  |
| Sep 30, 2026 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | Dulles Electric Data Centers ZOPA for EPLAN-2024-0154Performance Bond PBOND-2026-0151 · Submitted - Online |  |  |
| Sep 30, 2026 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | ME-DC Pacific Substation Special Exception to permit a substationSpecial Exception SPEX-2026-0053 · Submitted |  |  |
| Sep 30, 2026 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | ME-DC Pacific Substation A Special Exception for parking reductionSpecial Exception SPEX-2026-0054 · Submitted |  |  |
| Sep 28, 2026 | City of Red Oak TX council and planning agendas | Site plan or rezoning | Conduct a public hearing and consider a zoning change from “PD”, Planned Development, 66 Revised 7 (PD, 66R 7) to “PD”, Planned Development, 66 Revised 8 (PD, 66R 8), For approval…Agenda item, Planning and Zoning Commission agenda item 3002 · on agenda |  |  |
| Sep 28, 2026 | 13080 ROLLINS FORD RD BRISTOW VA 20136Prince William County VA ePortal permits and plans | Site plan or rezoning | New 1-story commercial data center. Building 4.Building Commercial New Structure Plan, C - New Structure BPR2027-00568 · Pending |  |  |
| Sep 28, 2026 | 8961 WELLINGTON RD MANASSAS VA 20109Prince William County VA ePortal permits and plans | Site plan or rezoning | Mendez Enterprises of Virginia REZ Mendez Enterprise of Virginia-Wellington LLC REZ - This is a request to rezone ±2.43 acres from A-1, Agricultural, to M-2, Light Industrial, to…Rezoning - Non-Residential REZ2027-00008 · Under Review |  |  |
| Sep 28, 2026 | 8961 WELLINGTON RD MANASSAS VA 20109Prince William County VA ePortal permits and plans | Site plan or rezoning | Mendez Enterprises of Virginia SUP Mendez Enterprise of Virginia-Wellington LLC SUP - This is a request for a special use permit (SUP) to allow Commercial Parking in the M-2…Special Use Permit - New Application SUP2027-00009 · Under Review |  |  |
| Sep 24, 2026 | 14414 MCGRAWS CORNER DR GAINESVILLE VA 20155Prince William County VA ePortal permits and plans | Site plan or rezoning | Gardner Property Gardner Property - This is a request for a special use permit (SUP) to allow data centers and an electric substation outside of the Data Center Opportunity Zone…Special Use Permit - New Application SUP2027-00008 · Under Review |  |  |
| Sep 24, 2026 | Prince William County VA planning cases | Site plan or rezoning | Gardner Property Gardner Property - This is a request for a special use permit (SUP) to allow data centers and an electric substation outside of the Data Center Opportunity Zone…SUP SUP2027-00008 · Under Review |  |  |
| Sep 23, 2026 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | PROJECT CELTICS PHASE 2 SUBSTATION GRADE-2025-000285 - Grading Bond for Project Celtics - Phase 2 Substation (EPLAN-2025-0058).Grading Bond GBOND-2026-0221 · In Review |  |  |
| Sep 23, 2026 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | Project Motion - Phase 4 GRADE-2026-000014 - Grading Bond for construction of a Data Center for Project Motion - Phase 4 EPLAN-2024-0212.Grading Bond GBOND-2026-0222 · In Review |  |  |
| Sep 22, 2026 | 1024 North Bradford Street, Allentown, PALehigh Valley Planning Commission land development reviews (MPC) | Site plan or rezoning | City of Allentown land development application for a 146,000 square foot data center with an electrical substation area, on the LVPC Comprehensive Planning Committee agenda… |  |  |
| Sep 22, 2026 | 2184 Industrial Drive, Bethlehem, PALehigh Valley Planning Commission land development reviews (MPC) | Site plan or rezoning | City of Bethlehem land development application to redevelop about 6.8 acres with a 131,380 square foot, two-floor data center including a proposed substation and medium-voltage… |  |  |
| Sep 22, 2026 | City of Aurora planning filings (news report) | Site plan or rezoning | Planning documents filed with Aurora for the 143-acre Trident Data Center show two two-story buildings totaling 861,866 square feet with 334 MW of planned IT capacity; the city… |  |  |
| Sep 22, 2026 | Village of Indiantown (news report) | Site plan or rezoning | Revised proposal for the 606-acre Project Silver Fox data processing center; the site plan now rests with the Indiantown Village Council, which is expected to decide in the coming… |  |  |
| Sep 22, 2026 | 7561 DEACON FALLS DR GAINESVILLE VA 20155Prince William County VA ePortal permits and plans | Site plan or rezoning | MNZ07-08 - PASA for the MNZ07-08 ProjectAssessment or Study Plan - Preservation Area Assessment Study ASP2027-00015 · Awaiting Fees |  |  |
| Sep 22, 2026 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | Project Celtics Phase 2 Substation Site Plan LSDO Performance agreement and bond. Project name is Project Celtics Phase 2 Substation Site Plan. Associated grading permit is…Performance Bond PBOND-2026-0144 · In Review |  |  |
| Sep 22, 2026 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | Project Celtics Phase 2 Substation Site Plan ZO Performance agreement and Bond for Project Celtics Phase 2 Substation Site Plan. Associated Grading permit is GRADE-2025-000285Performance Bond PBOND-2026-0145 · In Review |  |  |
| Sep 22, 2026 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | Orbit Substation ORBIT SUBSTATION CHECKLIST WAIVER: A request to waive SPEX Checklist items J. Cultural Resources Survey and K.2. Endangered Species Habitat for a forthcoming…Planning Correspondence PCOR-2026-0091 · Submitted - Online |  |  |
| Sep 22, 2026 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | Twin Creeks Substation SEE LEGI-2025-0050 FOR TIMELINE, WORKFLOW AND DOCUMENTS. TWIN CREEKS SUBSTATION - A MINOR SPECIAL EXCEPTION TO MODIFY THE 40% MINIMUM FOR REQUIRED PLANT…Special Exception SPEX-2026-0049 · In Review |  |  |
| Sep 22, 2026 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | Twin Creeks Substation SEE LEGI-2025-0050 FOR DOCUMENTS, TIMELINE AND WORKFLOW. TWIN CREEKS SUBSTATION - PURSUANT TO SECTION 10.11.05 -REDUCE MINIMUM PARKING REQUIREMENT TO 1…Special Exception SPEX-2026-0050 · In Review |  |  |
| Sep 22, 2026 | 13800 DAVES STORE LN GAINESVILLE VA 20155Prince William County VA ePortal permits and plans | Site plan or rezoning | Zoning Determination Letter - Substation allowedZoning Review - Interpretation/Determination ZNR2027-00096 · Pending |  |  |
| Sep 22, 2026 | 7253 GROVE HILL BLVD GAINESVILLE VA 20155Prince William County VA ePortal permits and plans | Site plan or rezoning | Zoning Determination - Data Center UseZoning Review - Interpretation/Determination ZNR2027-00097 · Pending |  |  |
| Sep 21, 2026 | 13225 SKYLARK VIEW WAY GAINESVILLE VA 20155Prince William County VA ePortal permits and plans | Site plan or rezoning | (A/S/M/E/P - 20 DAYS; GIS - 10 DAYS) TWO STORY DATA CENTER - GAINESVILLE WESTBuilding Commercial New Structure Plan, C - New Structure BPR2027-00528 · QC Denied |  |  |
| Sep 21, 2026 | 7501 CENTURY PARK DR MANASSAS VA 20109Prince William County VA ePortal permits and plans | Site plan or rezoning | Site plan to remove food service warehouse and add a by-right two-story data center.Site Plan - Final SPR2027-00084 · Draft |  |  |
| Sep 21, 2026 | Behind Walker Valley High School, Bradley County, TNBradley County (news report) | Site plan or rezoning | Bradley County made public a site plan supplied by Project MidSpan's developers for a data center campus of about 306 acres; the developer was not named. |  |  |
| Sep 18, 2026 | 614 Prospect Road, Forward Township, PAButler County planning review (news report) | Site plan or rezoning | Proposed Misty Hollow Energy and Data Campus with a one million square foot data center, 80,000 square foot wastewater treatment facility, 23,800 square foot office building and… |  |  |
| Sep 17, 2026 | City of Buckeye AZ self service (EnerGov) | Site plan or rezoning | HAZEN SUBSTATION PAC - request for relocation of Hazen Substation project.Pre-Application Conference (PAC) Meeting, Pre Application Conference PLZM-26-0121 · Applied |  |  |
| Sep 17, 2026 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | Cross Mill Center This plan proposes the development of two data center buildings with associated infrastructure and construction of proffered road improvmeents along Sycolin RoadEngineering Plan EPLAN-2026-0140 · Submitted - Online |  |  |
| Sep 17, 2026 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | Allegro North Campus, Building 2A Site Plan ZOPA bond for Data CenterPerformance Bond PBOND-2026-0142 · Submitted - Online |  |  |
| Sep 17, 2026 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | Allegro North Campus Building 2A Site Plan LSDOPA bond for Data Center sitePerformance Bond PBOND-2026-0143 · Submitted - Online |  |  |
| Sep 17, 2026 | Storey County NV Planning Commission and Board of Commissioners agendas | Site plan or rezoning | Discussion/Possible Action: Special Use Permit 2026-017 to construct a natural gas fueled electrical generating facility.Agenda item, Planning Commission Meeting 2026-017 · on agenda |  |  |
| Sep 17, 2026 | Storey County NV Planning Commission and Board of Commissioners agendas | Site plan or rezoning | Discussion/Possible Action: Special Use Permit 2026-018 to construct a natural gas fueled electrical generating facility.Agenda item, Planning Commission Meeting 2026-018 · on agenda |  |  |
| Sep 17, 2026 | City of Temple City Council agenda (PrimeGov) | Site plan or rezoning | Resolution 2026-0268-R to approve a development agreement for about 316 acres (Project Lasso, Phase 1B), an infrastructure agreement covering about 1,443 acres across Project…Development agreement and utility services agreements Resolution 2026-0268-R · on agenda |  |  |
| Sep 16, 2026 | 10145 LINTON HALL RD BRISTOW VA 20136Prince William County VA ePortal permits and plans | Site plan or rezoning | SUBMISSION OF PREVIOUSLY APPROVED SITE PLANSHEETS UNDER SPR2025-00355Site Plan - Administrative Review SPR2027-00080 · Draft |  |  |
| Sep 16, 2026 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | Tech Park at Dulles Site plan for the construction of 3 Data Center buildings, a warehouse building, and associated infrastructurePlat PLAT-2026-0143 · Submitted |  |  |
| Sep 16, 2026 | 31.406296, -84.912908Georgia DCA Development of Regional Impact filings | Site plan or rezoning | DRI 4651 for a 12,000,000 SF data center project; additional DRI information form submitted 9/16/2026 with estimated value at build-out of $15,600,000,000. Action requested: site…Development of Regional Impact (Technological Facility, Including Data Centers) DRI 4651 · applied | $15,600,000,000 |  |
| Sep 15, 2026 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | ME-DC Pacific Substation Special Exception and Commission Permit Applications to permit the development of a substation on the property.Legislative Application LEGI-2026-0037 · Submitted - Online |  |  |
| Sep 15, 2026 | 5235 Stonewall Tell Rd, Union City, GAGeorgia DCA Development of Regional Impact filings | Site plan or rezoning | DRI 4843 initial form submitted by Union City for ATL50, a data center development on 88.01 acres with two 3-story buildings totaling 910,000 square feet. Action requested: permit.Development of Regional Impact (Technological Facility, Including Data Centers) DRI 4843 · applied |  |  |
| Sep 11, 2026 | 14790 FLINT LEE RD CHANTILLYFairfax County VA PLUS site records | Site plan or rezoning | Flint Lee Road Data Center (SU)Geotechnical Report SR-2026-00075 · Closed |  |  |
| Sep 10, 2026 | 8217 LINTON HALL RD BRISTOW VA 20136Prince William County VA ePortal permits and plans | Site plan or rezoning | **VOID, WRONG WORK CLASS, SEE ZNA2027-01481** Data Center - Trade Name: "Digital Realty"Zoning Approval - Certificate of Zoning Approval ZNA2027-01479 · Voided |  |  |
| Sep 10, 2026 | 8217 LINTON HALL RD BRISTOW VA 20136Prince William County VA ePortal permits and plans | Site plan or rezoning | Data Center - Trade Name: Digital Realty"Zoning Approval - Occupancy Permit Approval ZNA2027-01481 · QC Assigned |  |  |
| Sep 10, 2026 | Chelan CountyWashington State SEPA Register | Site plan or rezoning | Castlerock Substation Build and Transmission Line Upgrade: Chelan PUD is proposing to construct a substation to meet growing electricity demands in the City of Wenatchee and in…SEPA MDNS 202603836 · MDNS |  |  |
| Sep 9, 2026 | 11950 SUDLEY MANOR DR MANASSAS VA 20109Prince William County VA ePortal permits and plans | Site plan or rezoning | SUDLEY MANOR NORTH - Data center building and associated infrastructure.Site Plan - Final SPR2027-00078 · Awaiting Fees |  |  |
| Sep 9, 2026 | Clinton Township Board of Supervisors (news report) | Site plan or rezoning | Township planning commission recommended against and supervisors rejected the proposed 20-building, $6 billion data center campus application for not meeting subdivision and land… |  |  |
| Sep 8, 2026 | 3740 S Signal Butte RdCity of Mesa AZ pre-submittal cases | Site plan or rezoning | New logistics building for existing data centerPre-submittal case PRS26-00692 |  |  |
| Sep 4, 2026 | South of 61st Avenue, east of Colorado Street and north of 69th Avenue; Ewen Farm southeast of 61st and Arizona Street, Hobart, INHobart Plan Commission (news report) | Site plan or rezoning | Plan Commission tabled final plat for the AWS data center covering a 555-acre Hobart Tech Park parcel and a 168-acre Ewen Farm parcel (723 acres total); preliminary plat was… |  |  |
| Sep 3, 2026 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | Auto World Substation Easement Plat for (EPLAN-2025-0044) Auto World SubstationPlat PLAT-2026-0136 · Submitted |  |  |
| Sep 1, 2026 | Laramie County WY Planning Commission and Board of County Commissioners matters | Site plan or rezoning | PUBLIC HEARING regarding a zone change from LU - Land Use to PUD - Planned Unit Development, located in portions of Sects 1, 2, 3 and 11, T12N, R67W and portions of Sect 35, T13N…Land Use:Variances/Board App./Plats, Board of County Commissioners 26 - 451 · Passed |  |  |
| Sep 1, 2026 | 10470 HARRY J PARRISH BLVD MANASSAS VA 20110Prince William County VA ePortal permits and plans | Site plan or rezoning | (S) Structural Precast Connections Bearing PadsCode Mod Commercial New Structure, C - New Structure CMR2027-00087 · Denied |  |  |
| Sep 1, 2026 | 10470 HARRY J PARRISH BLVD MANASSAS VA 20110Prince William County VA ePortal permits and plans | Site plan or rezoning | (S) Structural Precast Connections ALP Quik CorbelCode Mod Commercial New Structure, C - New Structure CMR2027-00088 · Approved |  |  |
| Sep 1, 2026 | 7600 DOANE DR MANASSAS VA 20109Prince William County VA ePortal permits and plans | Site plan or rezoning | OPA - OK FOR OCCUPANCY FOR DATA CENTER USE - SUBJECT TO APPROVED SITE PLAN CONDITIONS (14-00101R00S03) - SUBJECT TO THE ISSUANCE OF THE CERTIFICATE OF USE AND OCCUPANCY BY COUNTY…Zoning Approval - Occupancy Permit Approval ZNA2027-01295 · QC Assigned |  |  |
| Sep 1, 2026 | 32.261081, -81.263903Georgia DCA Development of Regional Impact filings | Site plan or rezoning | DRI 4801 for a data center campus of 4 buildings totaling 4,400,000 square feet; RDC finding issued 9/1/2026 and review completed. Additional form lists estimated value at…Development of Regional Impact (Technological Facility, Including Data Centers) DRI 4801 · approved | $20,000,000,000 |  |
| Aug 29, 2026 | Whitman CountyWashington State SEPA Register | Site plan or rezoning | SEL Z-2 Parking Lot Expansion: Proposed construction of a parking lot with 214 stalls to service existing buildings in the area, as well as a 24,000 square foot switchyard pad for…SEPA DNS 202603637 · DNS |  |  |
| Aug 27, 2026 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | Orbit Substation ORBIT SUBSTATION: To discuss Special Exception and Commission Permit requests for a Major Utility (Utility Substation) use at 42050 Cochran Mill Road (PIN…Premeeting PMTG-2026-0199 · In Review |  |  |
| Aug 26, 2026 | Chesterfield County VA zoning cases | Site plan or rezoning | DOMINION SYCAMORE SPRINGS SWITCHING STATION REZONING + AOR + CUZoning case SN ZOCU 26SN2139 · Approved |  |  |
| Aug 26, 2026 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | Poland Road Substation Expansion SPEX agreementPerformance Bond Release PBORE-2026-0004 · In Review |  |  |
| Aug 26, 2026 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | POLAND ROAD SUBSTATION EXPANSIONPerformance Bond Release PBORE-2026-0005 · In Review |  |  |
| Aug 26, 2026 | 15395 JOHN MARSHALL HWY HAYMARKET VA 20169Prince William County VA ePortal permits and plans | Site plan or rezoning | NCU New Use Certification - Data CenterNon-Conforming Use Application for a Use, Use/New App NCU2027-00032 · Pending |  |  |
| Aug 25, 2026 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | 110 Terminal Drive Data Center 110 TERMINAL DRIVE DATA CENTER Easement Plat: Easement plat for offsite easements associated with EPLAN-2024-0105Plat PLAT-2026-0130 · In Review |  |  |
| Aug 25, 2026 | Pataskala Corporate Park, Pataskala, OHPataskala City Council (news report) | Site plan or rezoning | City council voted unanimously to accept the planning and zoning commission recommendation to reject the site plan for a 200 megawatt Aligned Data Centers facility of three… |  |  |
| Aug 21, 2026 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | Craig J. Blakeley, Esq. of Alliance Law Group LLC, on behalf of Isahm & Nelia Diab submitted an appeal to ZCOR-2026-0152 dated July 23, 2026 of vested rights for Tuscarora…Appeal APPL-2026-0005 · Submitted |  |  |
| Aug 20, 2026 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | 110 Terminal Drive Data Center 110 TERMINAL DRIVE DATA CENTER Easement Plat: Easement plat for onsite easements associated with EPLAN-2024-0105Plat PLAT-2026-0128 · In Review |  |  |
| Aug 19, 2026 | 11900 BRADY LN MANASSAS VA 20109Prince William County VA ePortal permits and plans | Site plan or rezoning | PREMIER BUSINESS PARK - The Project Area consists of four parcels (GPIN 7597-33-8570, 7597-34-9104, 7597-34-9837, and 7597-35-7115) totaling approximately 33 acres located at…Assessment or Study Plan - Perennial Flow Determination ASP2027-00007 · Pending |  |  |
| Aug 19, 2026 | 11900 BRADY LN MANASSAS VA 20109Prince William County VA ePortal permits and plans | Site plan or rezoning | PREMIER BUSINESS PARK - The Project Area consists of four parcels (GPIN 7597-33-8570, 7597-34-9104, 7597-34-9837, and 7597-35-7115) totaling approximately 33 acres located at…Assessment or Study Plan - Preservation Area Assessment Study ASP2027-00008 · Pending |  |  |
| Aug 19, 2026 | 10101 HARRY J PARRISH BLVD MANASSAS VA 20110Prince William County VA ePortal permits and plans | Site plan or rezoning | CloudHQ MCC7 - Child Project MANASSAS CORPORATE CENTER - MCC-7 - Site plan revision to include modifications to the loading dock and travel way configuration, dumpster location…Site Plan - Revision SPR2027-00059 · Pending |  |  |
| Aug 19, 2026 | Prince William County VA planning cases | Site plan or rezoning | Madera Farm Madera Farm SUP - There are two (2) concurrent requests for this proposal. The first request is to rezone ±228.88 acres from A-1, Agricultural, to M-1, Heavy…SUP SUP2027-00002 · Under Review |  |  |
| Aug 18, 2026 | Pend Oreille CountyWashington State SEPA Register | Site plan or rezoning | Forest Practice Application #FPA-NE-26-9195: Forest Practice Application #NE-FPA-26-9195 consists of Development and construction for a substation, 12.6-acre even-aged timber…SEPA DNS 202603473 · DNS |  |  |
| Aug 17, 2026 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | 24141 Upper Woodside Ln DETER Ben Wales of Curata Partners is requesting a zoning determination for 24141 Upper Woodside Lane, Sterling - PIN: 162-39-2026-000 if additional floor…Zoning Correspondence ZCOR-2026-0256 · In Review |  |  |
| Aug 17, 2026 | 8300 BUCKEYE TIMBER DR MANASSAS VA 20109Prince William County VA ePortal permits and plans | Site plan or rezoning | **VOID, DUPLICATE** Tenant Interior Fit Out for Phases 6-10Zoning Approval - Occupancy Permit Approval ZNA2027-00966 · Voided |  |  |
| Aug 14, 2026 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | 45415 Leesburg Pike DETER Dr. Nathan B. Wangusi is requsting a zoning determination for PINs: 039-47-4460, 039-37-0350, 039-46-6559, 039-45-6733, 039-26-3557, 039-16-8997…Zoning Correspondence ZCOR-2026-0246 · In Review |  |  |
| Aug 14, 2026 | 7200 INFANTRY RIDGE RD MANASSAS VA 20109Prince William County VA ePortal permits and plans | Site plan or rezoning | EQUINIX - DC 19 -1 Data Center (20 DAYS - A/S/M/E/P? -GIS 10)The DC19 Data Center Building is a two story data center with steel structure, concrete envelope, interior partitions…Building Commercial New Structure Plan, C - New Structure BPR2027-00285 · QC Denied |  |  |
| Aug 13, 2026 | Laramie County WY Planning Commission and Board of County Commissioners matters | Site plan or rezoning | Review and Recommendation on a Zone Change from Land Use (LU) to Planned Unit Development (PUD) zone district for Project Latigo, located in Portions of Section 1, 2, 3, and 11…Land Use:Variances/Board App./Plats, Planning Commission 26 - 426 · Passed |  |  |
| Aug 13, 2026 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | Thayer Road Substation SEE LEGI-2026-0025 FOR DOCUMENTS, TIMELINE, AND WORKFLOW. THAYER ROAD SUBSTATION: A Commission Permit to establish a "Utility, Major" distribution…Commission Permit CMPT-2026-0015 · In Review |  |  |
| Aug 13, 2026 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | Thayer Road Substation THAYER ROAD SUBSTATION: A Commission Permit to establish a "Utility, Major" distribution substation use within the IP zoning district/Route 28 Corridor…Legislative Application LEGI-2026-0025 · In Review |  |  |
| Aug 13, 2026 | 13001 ROLLINS FORD RD BRISTOW VA 20136Prince William County VA ePortal permits and plans | Site plan or rezoning | NOVA FARMS BUILDING FOUR - CHILD PROJECT PROJECT MANGO PHASE 4 - Early Grading Plan for the Project Mango Phase 4 data centerSite Plan - Early Grading Plan SPR2027-00055 · Pending |  |  |
| Aug 13, 2026 | King CountyWashington State SEPA Register | Site plan or rezoning | PSE Grand Ridge Substation: A new substation is proposed in a cleared area within the Issaquah Highlands (formerly known as Grand Ridge), originally planned through the Issaquah…SEPA ODNS 202603408 · ODNS |  |  |
| Aug 12, 2026 | BRADDOCK RD CHANTILLYFairfax County VA PLUS site records | Site plan or rezoning | Cub Run Substation (SU)Geotechnical Report SR-2026-00064 · Closed |  |  |
| Aug 12, 2026 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | Dulles Electric Data Centers Consolidation Consolidation of 4 properties to support EPLAN-2024-0154.Plat PLAT-2026-0121 · In Review |  |  |
| Aug 12, 2026 | 411 Pegasus Parkway, LaGrange, GA (Tax Parcel 0592000004)Georgia DCA Development of Regional Impact filings | Site plan or rezoning | DRI 4797 for an approximately 470,000 sq. ft. data center building; RDC finding 8/12/2026, review completed. Additional form lists estimated value at build-out of one billion…Development of Regional Impact (Technological Facility, Including Data Centers) DRI 4797 · approved | $1,000,000,000 |  |
| Aug 11, 2026 | 4030 LAFAYETTE CENTER DR CHANTILLYFairfax County VA PLUS site records | Site plan or rezoning | LAFAYETTE DATA CENTERS (SU)Public Improvement Plan PI-2025-00017 · Approved |  |  |
| Aug 11, 2026 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | AWS 42949 Fadeley Lane The applicant requests approval for a minor addition to a principal building on an approved Special Exception pursuant to Section 10.11.01.H.2. for a…Engineering Plan EPLAN-2026-0116 · In Review |  |  |
| Aug 11, 2026 | 13710 UNIVERSITY BLVD GAINESVILLE VA 20155Prince William County VA ePortal permits and plans | Site plan or rezoning | Modifications to the fire sprinkler system for the new GCDC (MNZ28) Data Center.Fire Protection - Sprinkler Plan FPR2027-00069 · Rejected |  |  |
| Aug 10, 2026 | Chesterfield County VA site plan cases | Site plan or rezoning | WHITE MOUNTIN SUBSTATION PADSite plan PR Industrial 25PR1355 · Approved |  |  |
| Aug 10, 2026 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | Wade Drive WADE DRIVE DATA CENTER CHECKLIST WAIVER: A request to waive checklist items J and K.2 for an anticipated Special Exception associated with PMTG-2026-0165.Planning Correspondence PCOR-2026-0078 · Approved |  |  |
| Aug 10, 2026 | 7250 GROVE HILL BLVD GAINESVILLE VA 20155Prince William County VA ePortal permits and plans | Site plan or rezoning | VUSBC Section 905.3.1 - Standpipe SystemsCode Mod Commercial New Structure, C - New Structure CMR2027-00069 · Approved |  |  |
| Aug 10, 2026 | 14300 JOHN MARSHALL HWY GAINESVILLE VA 20155Prince William County VA ePortal permits and plans | Site plan or rezoning | NTT GLOBAL DATA CENTER VA10 - Plat of Correction to add a [CSA] Conservation Area label that was not shown on Sheets 3 & 4 of the plat.Plat of Correction PLT2027-00012 · Pending |  |  |
| Aug 10, 2026 | 9480 GODWIN DR MANASSAS VA 20110Prince William County VA ePortal permits and plans | Site plan or rezoning | OPA - OK FOR OCCUPANCY FOR DATA CENTER USE - SUBJECT TO APPROVED SITE PLAN CONDITIONS (SPR2022-00267) - SUBJECT TO THE ISSUANCE OF THE CERTIFICATE OF USE AND OCCUPANCY BY COUNTY…Zoning Approval - Occupancy Permit Approval ZNA2027-00825 · Approved |  |  |
| Aug 10, 2026 | 11760 Panhandle Road, Lovejoy, GA 30228Georgia DCA Development of Regional Impact filings | Site plan or rezoning | DRI 4794 for approximately 3,465,000 square feet of data center buildings was withdrawn on 8/10/2026. Additional form had listed estimated value at build-out of $13,000,000,000.Development of Regional Impact (Technological Facility, Including Data Centers) DRI 4794 · withdrawn | $13,000,000,000 |  |
| Aug 7, 2026 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | RIDGETOP CENTER (Conditional Approval) RIDGETOP CENTER : REQUEST APPROVAL OF A SITE PLAN (STPL) FOR THE CONSTRUCTION OF TWO DATA CENTER BUILDINGS, IN THE PLANNED DEVELOPMENT…Performance Bond PBOND-2026-0121 · Submitted - Online |  |  |
| Aug 7, 2026 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | RIDGETOP CENTER (Conditional Approval) RIDGETOP CENTER : REQUEST APPROVAL OF A SITE PLAN (STPL) FOR THE CONSTRUCTION OF TWO DATA CENTER BUILDINGS, IN THE PLANNED DEVELOPMENT…Performance Bond PBOND-2026-0122 · Submitted - Online |  |  |
| Aug 7, 2026 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | MANEKIN PLAZA MANEKIN PLAZA : REQUEST APPROVAL FOR A SITE PLAN (STPL) TO CONSTRUCT ONE DATA CENTER, IN THE PLANNED DEVELOPMENT - INDUSTRIAL PARK (PDIP) ZONING DISTRICT. EKPerformance Bond PBOND-2026-0123 · Submitted - Online |  |  |
| Aug 7, 2026 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | MANEKIN PLAZA MANEKIN PLAZA : REQUEST APPROVAL FOR A SITE PLAN (STPL) TO CONSTRUCT ONE DATA CENTER, IN THE PLANNED DEVELOPMENT - INDUSTRIAL PARK (PDIP) ZONING DISTRICT. EKPerformance Bond PBOND-2026-0124 · Submitted - Online |  |  |
| Aug 7, 2026 | 7610 DOANE DR MANASSAS VA 20109Prince William County VA ePortal permits and plans | Site plan or rezoning | DOANE DRIVE - Data CenterSite Plan - Final SPR2027-00047 · Pending |  |  |
| Aug 7, 2026 | 9522 HORNBAKER RD MANASSAS VA 20109Prince William County VA ePortal permits and plans | Site plan or rezoning | AVANTI PHASE 4 - A revision to the previously approved plans (SPR2024-00205 & SPR2025-00246) for the addition of a gravel access path along the rear of the property to provide a…Site Plan - Revision SPR2027-00049 · Pending |  |  |
| Aug 6, 2026 | 4030 LAFAYETTE CENTER DR CHANTILLYFairfax County VA PLUS site records | Site plan or rezoning | LAFAYETTE DATA CENTERSBond BOND-2026-00021 · Approved |  |  |
| Aug 6, 2026 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | Beaumeade Substation BLAD/Consolidation Application proposing Boundary Line Adjustment/Consolidation of the Lands of Virginia Electric and Power CompanyPlat PLAT-2026-0116 · In Review |  |  |
| Aug 5, 2026 | 14901 BOGLE DR CHANTILLYFairfax County VA PLUS site records | Site plan or rezoning | BOGLE DRIVE DATA CENTER FACILITYBond BOND-2026-00029 · Approved |  |  |
| Aug 5, 2026 | 10450 HARRY J PARRISH BLVD MANASSAS VA 20110Prince William County VA ePortal permits and plans | Site plan or rezoning | MDC2 - DATA CENTER Tower Crane #3Building Commercial Accessory Structure Plan, C - Accessory Structure BPR2027-00233 · Approved |  |  |
| Aug 5, 2026 | 10450 HARRY J PARRISH BLVD MANASSAS VA 20110Prince William County VA ePortal permits and plans | Site plan or rezoning | MDC2 - DATA CENTER Tower Crane #4Building Commercial Accessory Structure Plan, C - Accessory Structure BPR2027-00235 · Approved |  |  |
| Aug 5, 2026 | 11900 BRADY LN MANASSAS VA 20109Prince William County VA ePortal permits and plans | Site plan or rezoning | PREMIER BUSINESS PARK - Site plan for data center developmentSite Plan - Final SPR2027-00041 · Pending |  |  |
| Aug 5, 2026 | Whatcom CountyWashington State SEPA Register | Site plan or rezoning | Glacier BESS Demolition: Demolition & removal of the Puget Sound Energy former battery (BESS) enclosure containers and associated reinforced concrete foundations; restoration of…SEPA ODNS/NOA 202603252 · ODNS/NOA |  |  |
| Aug 4, 2026 | City of Buckeye AZ self service (EnerGov) | Site plan or rezoning | BOA Appeal - Zoning Interpretation Request, Data Center and Accessory Power Generation Facility, General Commercial (GC) Zoning DistrictPlanning - Miscellaneous - Appeal Council PLZM-26-0102 · In Review |  |  |
| Jul 31, 2026 | 45020 S OLD US HIGHWAY 80 GILA BENDMaricopa County AZ planning and zoning cases | Site plan or rezoning | Southwest Bend I Solar Project The name of the project is the Southwest Bend I Solar Project. The Applicant requests to rezone approximately 308 acres of private land from Rural…Zoning Case Zone Change with Overlay Z260034 · In Review |  |  |
| Jul 31, 2026 | 47530 S US HIGHWAY 80 GILA BENDMaricopa County AZ planning and zoning cases | Site plan or rezoning | Southwest Bend II Solar Project The name of the project is the Southwest Bend II Solar Project. The Applicant requests to rezone approximately 72 acres of private land from Rural…Zoning Case Zone Change with Overlay Z260035 · Requires Customer Attention |  |  |
| Jul 31, 2026 | 7056 WELLINGTON RD MANASSAS VA 20109Prince William County VA ePortal permits and plans | Site plan or rezoning | SOUTH POINT PHASE 1 REDEVELOPMENT - Redevelopment of existing data center campus at 7056 Wellington Road. Construction of two data center buildings and associated infrastructureSite Plan - Final SPR2027-00035 · Pending |  |  |
| Jul 31, 2026 | 9301 FREEDOM CENTER BLVD MANASSAS VA 20110Prince William County VA ePortal permits and plans | Site plan or rezoning | QTS DC5 - EV CHARGERS - Install (2) electric vehicle chargersSite Plan - Minor SPR2027-00037 · Pending |  |  |
| Jul 31, 2026 | 13213 FARMVIEW RD NOKESVILLE VA 20181Prince William County VA ePortal permits and plans | Site plan or rezoning | Madera Farm SUP Madera Farm SUP - There are two (2) concurrent requests for this proposal. The first request is to rezone ±228.88 acres from A-1, Agricultural, to M-1, Heavy…Special Use Permit - New Application SUP2027-00002 · Under Review |  |  |
| Jul 30, 2026 | 1010 N ALEXANDER ST, CHARLOTTE, NC 28206City of Charlotte NC land development commercial projects | Site plan or rezoning | Duke Energy GIS SubstationUDO Administration Pre-Submittal UDOPS-2026-00140 · In Process |  |  |
| Jul 30, 2026 | 13746 UNIVERSITY BLVD GAINESVILLE VA 20155Prince William County VA ePortal permits and plans | Site plan or rezoning | Vacation of Access EasementPlat Vacation PLT2027-00009 · Pending |  |  |
| Jul 30, 2026 | Benton CountyWashington State SEPA Register | Site plan or rezoning | Farmland Reserve, Inc.: Construction of a new electrical substation including subgrade preparation (326,700 SF) and associated grading and infrastructure including 16,000 cubic…SEPA ODNS 202603245 · ODNS |  |  |
| Jul 29, 2026 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | Twin Creeks Buildings 1-3 Project proposing Data Center buildings 1-3 of the Twin Creeks site with associated landscaping and infrastructure.Engineering Plan EPLAN-2026-0111 · In Review |  |  |
| Jul 28, 2026 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | Bridgefield Tech Center BRIDGEFIELD TECH CENTER: Site plan application for the development of data center buildings.Engineering Plan EPLAN-2026-0110 · Submitted - Online |  |  |
| Jul 28, 2026 | 10470 HARRY J PARRISH BLVD MANASSAS VA 20110Prince William County VA ePortal permits and plans | Site plan or rezoning | MDC-3 Code Modification Request for (MDC3-Data Center) - ESS Installation Compliance with 2024 IFCCode Mod Commercial New Structure, C - New Structure CMR2027-00047 · Approved |  |  |
| Jul 28, 2026 | 11451 ELEVATE DR MANASSAS VA 20109Prince William County VA ePortal permits and plans | Site plan or rezoning | Building VA10 - Revision to add gate barrier arms, camera pole, sidewalk and pedestrian gate.Site Plan - Revision SPR2027-00029 · Pending |  |  |
| Jul 27, 2026 | City of Charlotte NC Citizen Access records | Site plan or rezoning | Duke Alexander SubstationLandDevelopment Land Development Construction Plan 26TMP-011410 |  |  |
| Jul 27, 2026 | 6201 WELLINGTON RD GAINESVILLE VA 20155Prince William County VA ePortal permits and plans | Site plan or rezoning | PROJECT ASTRID - TRAFFIC IMPACT STUDY for the proposed Industrial development. The TIA is submitted for the Site Plan# SPR2026-00360.Assessment or Study Plan - Traffic Impact Study ASP2027-00003 · Pending |  |  |
| Jul 27, 2026 | 7425 MERRITT PARK DR MANASSAS VA 20109Prince William County VA ePortal permits and plans | Site plan or rezoning | MERRITT I-66 BUSINESS PARK - Data Centers and associated infrastructureSite Plan - Final SPR2027-00028 · Pending |  |  |
| Jul 22, 2026 | Okanogan CountyWashington State SEPA Register | Site plan or rezoning | Code Amendment 2026-3 OCC 17.20 Definitions & 17.220 District Use Chart Data Centers: The proposal is a non-project legislative amendment to Okanogan County's zoning code. The…SEPA DNS 202603062 · DNS |  |  |
| Jul 20, 2026 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | Sterling Substation SEE LEGI-2025-0068 FOR DOCUMENTS, TIMELINE AN WORKFLOW. Sterling Substation: A Special Exception to reduce the parking requirements in conformance with…Special Exception SPEX-2026-0041 · Submitted |  |  |
| Jul 20, 2026 | 11536 ELEVATE DR MANASSAS VA 20109Prince William County VA ePortal permits and plans | Site plan or rezoning | BUILDING VA8/9 - Revision #2 to update roof drain connections and sanitary connection at buildingSite Plan - Revision SPR2027-00020 · Approved |  |  |
| Jul 20, 2026 | 8870 HORNBAKER RD MANASSAS VA 20109Prince William County VA ePortal permits and plans | Site plan or rezoning | CHILD PROJECT - MANASSAS TECH CENTER 2 NEW DATA CENTER BUILDINGS MANASSAS TECH CENTER - Revision set to address VDOT comments.Site Plan - Revision SPR2027-00022 · Pending |  |  |
| Jul 17, 2026 | City of Charlotte NC Citizen Access records | Site plan or rezoning | Lumen Data Center RenovationLandDevelopment Land Development Construction Plan 26TMP-013775 · In Progress |  |  |
| Jul 17, 2026 | 9040 FREEDOM CENTER BLVD MANASSAS VA 20110Prince William County VA ePortal permits and plans | Site plan or rezoning | Installation of additional communications cabling pathways between existing computer rooms on the first and second floors of this existing 2-story data center buildingBuilding Commercial Alteration/Repair Plan, C - Alteration/Repair BPR2027-00113 · Approved |  |  |
| Jul 17, 2026 | 9020 FREEDOM CENTER BLVD MANASSAS VA 20110Prince William County VA ePortal permits and plans | Site plan or rezoning | Installation of additional communications cabling pathways between existing computer rooms on the first and second floors of this existing 2-story data center buildingBuilding Commercial Alteration/Repair Plan, C - Alteration/Repair BPR2027-00115 · Approved |  |  |
| Jul 16, 2026 | 39029 W NARRAMORE RD TONOPAHMaricopa County AZ planning and zoning cases | Site plan or rezoning | Arlington Valley Solar Project Updated Site Plan and Narrative; relocation of substation, BESS and detention basins, addition of access on eastPlan of Development POD Minor PD260019 · Requires Customer Attention |  |  |
| Jul 16, 2026 | 13746 UNIVERSITY BLVD GAINESVILLE VA 20155Prince William County VA ePortal permits and plans | Site plan or rezoning | GAINESVILLE CROSSING DATA CENTER - BUILDING 4 GAINESVILLE CROSSING DATA CENTER - Showing substation infrastructure on the previosly approved substation pad.Plan Counter Review - Counter Sign-Off PCR2027-00007 · Approved |  |  |
| Jul 16, 2026 | 13461 HAVERSACK LN WOODBRIDGE VA 22192Prince William County VA ePortal permits and plans | Site plan or rezoning | BIORETENTION AREA, ESMT HOLDER TO MAINTAINSWM Inspection & Maintenance - Private SWM2027-00001 · Pending |  |  |
| Jul 16, 2026 | Skagit CountyWashington State SEPA Register | Site plan or rezoning | General Code Language Clean Up: • C26-1 General Code Language Clean Up: This petition contains proposed amendments to Title 14 as part of Skagit County’s annual General Code…SEPA DNS 202602948 · DNS |  |  |
| Jul 15, 2026 | Douglas CountyWashington State SEPA Register | Site plan or rezoning | Integrate Columbia II: This review is for a revision of the existing Notice of Construction (NOC) Approval Order No. 19AQ-C234. Sabey Data Center Properties (Sabey) has applied to…SEPA DNS, REVISED 202602961 · DNS, REVISED |  |  |
| Jul 13, 2026 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | Data Centers AO Buddy Rizer of Economic Development is requesting an advisory opinion on the applicability of the February 14, 2000 Zoning Administrator Determination on data…Zoning Correspondence ZCOR-2026-0210 · Approved |  |  |
| Jul 13, 2026 | 4038 E Virginia StCity of Mesa AZ planning and zoning cases | Site plan or rezoning | Data Center Council Use Permit Waiver Data Center Council Use Permit Waiver ApprovedPlanning and zoning case ZON26-00578 · COMPLETE |  |  |
| Jul 13, 2026 | 3904 S Ellsworth RdCity of Mesa AZ planning and zoning cases | Site plan or rezoning | Data Center Council Use Permit Waiver Data Center Council Use Permit Waiver ApprovedPlanning and zoning case ZON26-00663 · COMPLETE |  |  |
| Jul 10, 2026 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | 21580 Beaumeade Dr. Checklist Waiver Request 21580 BEAUMEADE CIRCLE CHECKLIST WAIVER: A request to waive SPEX Checklist Item J. Cultural Resources Survey for a proposed utility…Planning Correspondence PCOR-2026-0069 · Approved |  |  |
| Jul 7, 2026 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | JK Tech Park No. 1 Vesting DETER Colleen Gillis from Curata Partners is requesting a Vested Rights Determination for PINs 202-28-5740 and 202-26-0981 if data centers are vested…Zoning Correspondence ZCOR-2026-0188 · In Review |  |  |
| Jul 6, 2026 | City of Chandler AZ Citizen Access records | Site plan or rezoning | ALIGNED DATA CENTER - CONSTRUCTION TRAILER / FENCING Construction TrailerPlanning Administrative Use Permit: Construction Trailer,Sales Trailer, Temporary Use, Model Home Complex AUP26-0009 · Issued |  |  |
| Jul 6, 2026 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | Barrister Substation Barrister Substation: A request for a site plan approval for a utility substation.Engineering Plan EPLAN-2026-0092 · In Review |  |  |
| Jul 6, 2026 | 5131 S Hawes RdCity of Mesa AZ planning and zoning cases | Site plan or rezoning | Data Center Council Use Permit Waiver Data Center Council Use Permit Waiver ApprovedPlanning and zoning case ZON26-00563 · COMPLETE |  |  |
| Jul 6, 2026 | 3203 S Hawes RdCity of Mesa AZ planning and zoning cases | Site plan or rezoning | Data Center Council Use Permit Waiver Data Center Council Use Permit Waiver ApprovedPlanning and zoning case ZON26-00564 · COMPLETE |  |  |
| Jul 6, 2026 | 7154 S Ellsworth RdCity of Mesa AZ planning and zoning cases | Site plan or rezoning | Data Center Council Use Permit Waiver Data Center Council Use Permit Waiver ApprovedPlanning and zoning case ZON26-00565 · COMPLETE |  |  |
| Jul 6, 2026 | 10470 HARRY J PARRISH BLVD MANASSAS VA 20110Prince William County VA ePortal permits and plans | Site plan or rezoning | MDC-3 (S) Structural Precast Connections JVI PSA Slotted InsertCode Mod Commercial New Structure, C - New Structure CMR2027-00004 · Approved |  |  |
| Jul 6, 2026 | 10470 HARRY J PARRISH BLVD MANASSAS VA 20110Prince William County VA ePortal permits and plans | Site plan or rezoning | MDC-3 Structural Precast Connections MC ConnectorCode Mod Commercial New Structure, C - New Structure CMR2027-00006 · Approved |  |  |
| Jul 6, 2026 | 10849 AIRMAN AVE MANASSAS VA 20110Prince William County VA ePortal permits and plans | Site plan or rezoning | MCC4 & MCC5- TEMP CONST TRAILERS (Master Case) MDC01 DATA CENTER TEMP. 8' X 40' E HOUSE #2 (FOR TEMP. ELECTRICAL EQUIPMENT) BUILDING PERMIT; NO ZONING OR LAND DEVELOPMENT REVIEW…Electrical Commercial Alteration/Repair Plan, C - Alteration/Repair EPR2027-00002 · Approved |  |  |
| Jul 2, 2026 | 7250 GROVE HILL BLVD GAINESVILLE VA 20155Prince William County VA ePortal permits and plans | Site plan or rezoning | AHJ Approval sought for Exception #2, IFC1207.6.3 Explosion ControlCode Mod Commercial New Structure, C - New Structure CMR2027-00003 · Approved |  |  |
| Jul 2, 2026 | 7200 INFANTRY RIDGE RD MANASSAS VA 20109Prince William County VA ePortal permits and plans | Site plan or rezoning | EQUINIX DC19 - Equinix DC19 will involve the combination of 2 parcels into a single parcel campus, the development of a Data Center facility, and improvements to the associated…Site Plan - Final SPR2027-00006 · Pending |  |  |
| Jul 2, 2026 | 10145 LINTON HALL RD BRISTOW VA 20136Prince William County VA ePortal permits and plans | Site plan or rezoning | YOUTH FOR TOMORROW - DATA CENTER SITE PLAN - REVISION FOR DATA CENTER DEVELOPMENTSite Plan - Revision SPR2027-00007 · Pending |  |  |
| Jul 1, 2026 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | Davis Drive DETER This ZCOR approves minor changes to an approved Special Exception for Sterling Park Data Center on Davis Drive, PINs 033-385671, 033-38-7850 and 033-39-2929 (to…Zoning Correspondence ZCOR-2026-0202 · Approved |  |  |
| Jul 1, 2026 | 13407 VINT HILL RD NOKESVILLE VA 20181Prince William County VA ePortal permits and plans | Site plan or rezoning | NOVEC VINT HILL SUBSTATION - Site plan showing relocation of Conservation Area associated with plat instrument number 200707270086860 on the NOVEC Vint Hill Substation Property…Site Plan - Administrative Review SPR2027-00002 · Approved |  |  |
| Jul 1, 2026 | Benton CountyWashington State SEPA Register | Site plan or rezoning | Farmland Reserve, Inc.: Construction of a new electrical substation including subgrade preparation (326,700 SF) and associated grading and infrastructure including 16,000 cubic…SEPA ODNS/NOA 202602784 · ODNS/NOA |  |  |
| Jun 30, 2026 | 13720 UNIVERSITY BLVD GAINESVILLE VA 20155Prince William County VA ePortal permits and plans | Site plan or rezoning | GCDC MANASSAS BUILDING 3 **** SITE PERMIT PLEASE REFERENCE PLB2024-02193 *** ***MODIFIED TARGETED 10-10-10*** NEW DATA CENTER GCDC BUILDING 3Cross Connection - Annual Inspections CCX2026-00093 · Active |  |  |
| Jun 29, 2026 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | Vantage Data Centers VA16 Bria Burke of Cooley LLP (on behalf of the owner) is requesting a minor modification to a SPEX, EPLAN-2025-0217. Centers VA16 LLC (the “Owner”), to…Zoning Correspondence ZCOR-2026-0196 · In Review |  |  |
| Jun 29, 2026 | 8880 MIKE GARCIA DR MANASSAS VA 20109Prince William County VA ePortal permits and plans | Site plan or rezoning | Wellington Glen - Building B ***MODIFIED TARGETED*** TWO STORY DATA CENTER - MANASSAS TECH CENTERBuilding Commercial Shell Building Plan, C - Shell Building BPR2026-02191 · Awaiting Fees |  |  |
| Jun 29, 2026 | 9320 INDUSTRIAL CT MANASSAS VA 20109Prince William County VA ePortal permits and plans | Site plan or rezoning | MTP II - CHILD PROJECT FOR SOUTHERN SITE PLAN MANASSAS TECH PARK II SOUTH - Site Plan for Data Center CampusSite Plan - Final SPR2026-00406 · Awaiting Fees |  |  |
| Jun 26, 2026 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | Relocation Drive Data Center Relocation Drive Data Center: A Zoning Concept Plan Amendment and Special Exception to permit the redevelopment of existing Data Center uses at a 0.86…Legislative Application LEGI-2026-0019 · In Review |  |  |
| Jun 26, 2026 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | Relocation Drive Data Center SEE LEGI-2026-0019 FOR DOCUMENTS, TIMELINE AND WORKFLOW. Relocation Drive Data Center-- A Special Exception to permit the redevelopment of existing…Special Exception SPEX-2026-0038 · In Review |  |  |
| Jun 26, 2026 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | Relocation Drive Data Center SEE LEGI-2026-0019 FOR DOCUMENTS, TIMELINE AND WORKFLOW. Relocation Drive Data Center - A Zoning Concept Plan Amendment and Special Exception to…Zoning Concept Plan Amendment ZCPA-2026-0008 · In Review |  |  |
| Jun 26, 2026 | 8870 HORNBAKER RD MANASSAS VA 20109Prince William County VA ePortal permits and plans | Site plan or rezoning | CHILD PROJECT - MANASSAS TECH CENTER 2 NEW DATA CENTER BUILDINGS PERFORMANCE BONDBonds/Escrows Performance Bond LBE2027-00019 · Active |  |  |
| Jun 26, 2026 | 8870 HORNBAKER RD MANASSAS VA 20109Prince William County VA ePortal permits and plans | Site plan or rezoning | CHILD PROJECT - MANASSAS TECH CENTER 2 NEW DATA CENTER BUILDINGS SILTATION/EROSION ESCROW 50/50 REMAINDER OF S/E ESCROW POSTED WITH LBE2027-00020Bonds/Escrows Siltation/Erosion Control Escrow, Siltation/Erosion Escrow LBE2027-00021 · Active |  |  |
| Jun 26, 2026 | 8870 HORNBAKER RD MANASSAS VA 20109Prince William County VA ePortal permits and plans | Site plan or rezoning | CHILD PROJECT - MANASSAS TECH CENTER 2 NEW DATA CENTER BUILDINGS LANDSCAPE ESCROWBonds/Escrows Landscape Escrow LBE2027-00022 · Active |  |  |
| Jun 26, 2026 | 7400 INFANTRY RIDGE RD MANASSAS VA 20109Prince William County VA ePortal permits and plans | Site plan or rezoning | Zoning Determination (Data Center)Zoning Review - Interpretation/Determination ZNR2026-00191 · Closed |  |  |
| Jun 25, 2026 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | Thayer Road THAYER RD DATA CENTER SPAM: THIS SPAM IS TO ADJUST THE BUILDING HEIGHT OF THE PROPOSED BUILDING FROM 45' TO 65'. NOTE THAT THE SIGNING ENGINEER FOR GORDON IS ONLY…Engineering Plan EPLAN-2026-0084 · In Review |  |  |
| Jun 24, 2026 | City of Dallas TX specific use permits | Site plan or rezoning | Electrical substation Previous Ords: 7764Specific use permit Z-25-000142 · Permanent |  |  |
| Jun 24, 2026 | City of Dallas TX specific use permits | Site plan or rezoning | Electrical substation Previous Ords: 10909Specific use permit Z-26-000047 · Permanent |  |  |
| Jun 23, 2026 | 100 - 500 blocks Farmer Road (FM 3325) at Interstate 20City of Fort Worth TX zoning cases | Site plan or rezoning | From Unzoned to G, PD for R1, R2, D,G, I uses excluding "A-5" One-Family Residential development, permanent asphalt or concrete batch plant, data center; development waivers & MFD…Zoning case ZC-26-042 · Approved |  |  |
| Jun 18, 2026 | King CountyWashington State SEPA Register | Site plan or rezoning | 3625 1ST AVE S: Land Use Application to allow a 9-story Business Support Services (Data Center) building. Parking for 264 vehicles proposed.SEPA ODNS/NOA 202602594 · ODNS/NOA |  |  |
| Jun 17, 2026 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | Arcola Grove Data Centers Site Plan Site Plan for 2 proposed Data Center buildings, guard booth and all associated infrastructure.Engineering Plan EPLAN-2026-0083 · In Review |  |  |
| Jun 15, 2026 | AVION PKWY CHANTILLYFairfax County VA PLUS site records | Site plan or rezoning | Dominion Takeoff Substation (SU)Geotechnical Report SR-2026-00041 · Closed |  |  |
| Jun 12, 2026 | Maricopa County AZ planning and zoning cases | Site plan or rezoning | WINTERSBURG 313 WINTERSBURG 313- REZONE AND COMPREHENSIVE PLAN AMENDMENT TO FACILITATE WAREHOUSE, DATA CENTER, MANUFACTURING, AND ENERGY PRODUCTIONComprehensive Plan Amendment General CPA CPA250011 · Approved |  |  |
| Jun 12, 2026 | 2545 N WINTERSBURG DR TONOPAHMaricopa County AZ planning and zoning cases | Site plan or rezoning | WINTERSBURG 313 WINTERBURG 313 - REZONE TO FACILITATE WAREHOUSE, DATA CENTER, MANUFACTURING, AND ENERGY PRODUCTIONZoning Case Zone Change with Overlay Z250034 · Approved |  |  |
| Jun 11, 2026 | King CountyWashington State SEPA Register | Site plan or rezoning | 301 VIRGINIA ST: Land Use Application to allow a 6-story research and development laboratory, office with retail and Business Support Services (Data Center) building. Parking for…SEPA ODNS/NOA 202602408 · ODNS/NOA |  |  |
| Jun 10, 2026 | Chesterfield County VA site plan cases | Site plan or rezoning | DIGITAL DRIVE DATA CENTER SSP1Site plan PR Industrial 25PR1335 · Approved |  |  |
| Jun 10, 2026 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | Powerhouse Arcola Substation Right-of-Way Dedication platPlat PLAT-2026-0087 · In Review |  |  |
| Jun 8, 2026 | City of Buckeye AZ self service (EnerGov) | Site plan or rezoning | Cloud Cap Energy Storage Minor Subdivision - Cloud Cap Energy Storage Minor Subdivision - The Project sits on approximately fifty-eight (58) acres of private land owned by…Planning - Subdivisions - Minor Subdivision Administrative PLZS-26-0032 · Pending Revisions |  |  |
| Jun 8, 2026 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | Relocation Drive Data Center SEE LEGI-2026-0020 FOR DOCUMENTS, TIMELINE AND WORKFLOW. Relocation Drive Data Center-A Special Exception to permit the redevelopment of existing Data…Special Exception SPEX-2026-0037 · Submitted |  |  |
| Jun 8, 2026 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | Vantage Data Centers VA31 Vantage Data Centers VA3 LLC and Vantage Data Centers VA31 LLC (the “Owner”), request your office’s confirmation that the minor changes proposed and…Zoning Correspondence ZCOR-2026-0181 · In Review |  |  |
| Jun 3, 2026 | 14701 WILLARD RD CHANTILLYFairfax County VA PLUS site records | Site plan or rezoning | Dominion Singer Substation (SU)Geotechnical Report SR-2026-00039 · Closed |  |  |
| Jun 3, 2026 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | Twin Creeks Buildings 4 & 5 TWIN CREEKS DATA CENTERS: Site containing two data center buildings with associated infrastructure and landscaping. (REVISION OF APPROVED PLAN…Engineering Plan EPLAN-2026-0078 · In Review |  |  |
| Jun 3, 2026 | Prince William County VA planning cases | Site plan or rezoning | Southgate South Southgate South REZ & PRA and Southgate South SUP - There are two (2) concurrent requests for this proposal. The first request is to amend and supersede the…PRA REZ2026-00044 · Pending |  |  |
| Jun 3, 2026 | Prince William County VA planning cases | Site plan or rezoning | Southgate South SUP Southgate South PRA and Southgate South SUP - There are two (2) concurrent requests for this proposal. The first request is to amend and supersede the proffers…SUP SUP2026-00035 · Pending |  |  |
| May 28, 2026 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | Site Plan Amendment for NTT Global Data Centers VA Revision associated with this site plan revision include additional floor area for the guard shack booth at the secure entrance…Engineering Plan EPLAN-2026-0075 · In Review |  |  |
| May 22, 2026 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | This project is located at the parcel between Leesburg Pike, Ashburn Village Blvd, and Russell Branch Pkwy in Ashburn, VA 20147. Scope of development includes data center…GIS Update GISU-2026-0041 · Submitted |  |  |
| May 22, 2026 | Prince William County VA planning cases | Site plan or rezoning | Atlantic Funding Development PRA Atlantic Funding Development PRA & Atlantic Funding Development SUP - There are two (2) concurrent requests for this proposal. The first request…PRA REZ2026-00041 · Pending |  |  |
| May 22, 2026 | Prince William County VA planning cases | Site plan or rezoning | Atlantic Funding Development SUP Atlantic Funding Development PRA & Atlantic Funding Development SUP - There are two (2) concurrent requests for this proposal. The first request…SUP SUP2026-00033 · Pending |  |  |
| May 22, 2026 | Grant CountyWashington State SEPA Register | Site plan or rezoning | Wanapum-Mountain View 230-kV Transmission Line Project: Grant PUD is proposing to construct, operate, and maintain a new 230-kV transmission line between the Wanapum Switchyard…SEPA NEPA, SCOPING 202602182 · NEPA, SCOPING |  |  |
| May 19, 2026 | 14790 FLINT LEE RD CHANTILLYFairfax County VA PLUS site records | Site plan or rezoning | Flint Lee Road Data Center (SU)Waivers WAIV-2026-00115 · Closed |  |  |
| May 18, 2026 | City of Buckeye AZ self service (EnerGov) | Site plan or rezoning | BUCKEYE 436 DATA CENTER PAC West of Highway 85 (436 acres) Section 15 T3S R4WPre-Application Conference (PAC) Meeting, Pre Application Conference PLZM-26-0067 · Completed |  |  |
| May 15, 2026 | 54751 S PAINTED ROCK DAM RD GILA BENDMaricopa County AZ planning and zoning cases | Site plan or rezoning | Desert Sun Power Plant Major CPA from Rural Development to Utilities for Desert Sun Power Plant.Comprehensive Plan Amendment Major CPA CPA260009 · In Review |  |  |
| May 15, 2026 | 54751 S PAINTED ROCK DAM RD GILA BENDMaricopa County AZ planning and zoning cases | Site plan or rezoning | Desert Sun Power Plant Rezone from RU-190 to IND-2 IUPD for the development of the Desert Sun Power Plant.Zoning Case Zone Change with Overlay Z260022 · In Review |  |  |
| May 14, 2026 | 4030 LAFAYETTE CENTER DR CHANTILLYFairfax County VA PLUS site records | Site plan or rezoning | LAFAYETTE DATA CENTERSMinor Site Plan MSP-2025-00054 · Revised |  |  |
| May 11, 2026 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | Spring Valley Technology Park SEE LEGI-2024-0074 FOR DOCUMENTS, TIMELINE AND WORKFLOW. SPRING VALLEY TECHNOLOGY PARK: 4.06.02.D.2 Separation from Residential. Ground mounted Data…Special Exception SPEX-2026-0031 · In Review |  |  |
| May 4, 2026 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | Tech Park at Brambleton Christie Grucella of Bohler Engineering is requesting a minor modification to SPEX for Brambleton Tech Park, EPLAN-2026-0053. Pursuant to Table 3.02.05-1…Zoning Correspondence ZCOR-2026-0145 · Approved |  |  |
| Apr 30, 2026 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | Fractus-Lenticular Substations SEE LEGI-2026-0012 FOR DOCUMENTS, TIMELINE AND WORKFLOW. FRACTUS-LENTICULAR SUBSTATIONS - A Commission Permit for 1 of 2 substations.Commission Permit CMPT-2026-0013 · In Review |  |  |
| Apr 30, 2026 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | Fractus-Lenticular Substations SEE LEGI-2026-0012 FOR DOCUMENTS, TIMELINE AND WORKFLOW. FRACTUS-LENTICULAR SUBSTATIONS - A Commission Permit for 2 of 2 substations.Commission Permit CMPT-2026-0014 · In Review |  |  |
| Apr 30, 2026 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | Fractus-Lenticular Substations FRACTUS-LENTICULAR SUBSTATIONS: A Zoning Concept Plan Amendment, Special Exception, and Commission Permit applications to permit development of a…Legislative Application LEGI-2026-0012 · In Review |  |  |
| Apr 30, 2026 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | Fractus-Lenticular Substations SEE LEGI-2026-0012 FOR DOCUMENTS, TIMELINE AND WORKFLOW. FRACTUS-LENTICULAR SUBSTATIONS - A Special Exception for 1 of 2 substations (Utility…Special Exception SPEX-2026-0016 · In Review |  |  |
| Apr 30, 2026 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | Fractus-Lenticular Substations SEE LEGI-2026-0012 FOR DOCUMENTS, TIMELINE AND WORKFLOW. FRACTUS-LENTICULAR SUBSTATIONS - A Special Exception for 2 of 2 substations (Utility…Special Exception SPEX-2026-0017 · In Review |  |  |
| Apr 30, 2026 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | Fractus-Lenticular Substations SEE LEGI-2026-0012 FOR DOCUMENTS, TIMELINE AND WORKFLOW. FRACTUS-LENTICULAR SUBSTATIONS - A Zoning Concept Plan Amendment to modify the CDP for…Zoning Concept Plan Amendment ZCPA-2026-0004 · In Review |  |  |
| Apr 28, 2026 | 4500 & 8212 Anglin CircleCity of Fort Worth TX zoning cases | Site plan or rezoning | From AG, B to PD for certain I uses plus data center with development waivers for increased setbacks, height; site plan waivedZoning case ZC-25-205 · Approved |  |  |
| Apr 28, 2026 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | NOVEC - Southfork Substation Zoning Ordinance Performance Agreement for EPLAN-2024-0109Performance Bond PBOND-2026-0068 · In Review |  |  |
| Apr 24, 2026 | 4151 AUTO PARK CIR CHANTILLYFairfax County VA PLUS site records | Site plan or rezoning | CHANTILLY PREMIER DATA CENTER (SU)Site Plan Revision SP-2024-00048-2 · Closed |  |  |
| Apr 21, 2026 | Maricopa County AZ planning and zoning cases | Site plan or rezoning | Belmont 4 In alignment with its Comprehensive Plan designation of Industrial, this unique Property along the proposed I-11 and near the intersection of I-10 is envisioned to…Zoning Case Zone Change with Overlay Z260020 · In Review |  |  |
| Apr 20, 2026 | City of Buckeye AZ self service (EnerGov) | Site plan or rezoning | WESTERN TIGER ENERGY CENTER. A a proposed renewable energy development in Maricopa County, Arizona, involving solar generation, battery storage, and related infrastructure on…Pre-Application Conference (PAC) Meeting, Pre Application Conference PLZM-26-0043 · Completed |  |  |
| Apr 17, 2026 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | Spoonbill Energy Storage SEE LEGI-2026-0011 DOCUMENTS, TIMELINE, AND WORKFLOW. SPOONBILL ENERGY STORAGE: A Commission Permit to develop a supportive Utility Substation on the…Commission Permit CMPT-2026-0012 · In Review |  |  |
| Apr 17, 2026 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | Spoonbill Energy Storage SPOONBILL ENERGY STORAGE - A Special Exception, Minor Special Exception, and Commission Permit application to permit Energy Storage, Utility Scale and…Legislative Application LEGI-2026-0011 · In Review |  |  |
| Apr 17, 2026 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | Spoonbill Energy Storage LEGI-2026-0011 DOCUMENTS, TIMELINE, AND WORKFLOW. SPOONBILL ENERGY STORAGE:A Special Exception to develop a supportive Utility Substation on the Property…Special Exception SPEX-2026-0015 · In Review |  |  |
| Apr 16, 2026 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | Twin Creeks Substation TWIN CREEKS SUBSTATION: A request for site plan approval for a utility substation within the MRHI zoning district.Engineering Plan EPLAN-2026-0043 · In Review |  |  |
| Apr 16, 2026 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | Apollo and Lunar Substations APOLLO AND LUNAR SUBSTATIONS: A request for site plan approval for two utility substations within the A3 zoning district.Engineering Plan EPLAN-2026-0044 · In Review |  |  |
| Apr 14, 2026 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | Relocation Drive Data Center RELOCATION DRIVE CHECKLIST WAIVER: A request to waive Special Exception Checklist Items I, J, and K.2 for the upcoming Relocation Drive Data Center…Planning Correspondence PCOR-2026-0048 · Approved |  |  |
| Apr 9, 2026 | Tax map 41-103Town of Culpeper VA land development projects | Site plan or rezoning | Copper Ridge Data Center Campus 116.289 acres - Data Center ComplexSite Plan SS-6432-2026 · Under Review |  |  |
| Apr 8, 2026 | 3500 - 4712 (evens) Lon Stephenson Road, 7500 - 7524 (evens) Anglin Drive, 7701-7721 (odds) Forest Hill DriveCity of Fort Worth TX zoning cases | Site plan or rezoning | From PD 1420 Planned Development for Specific Uses including data center with development standards: Site plan required to Amend "PD1420" to add electrical substation, increase…Zoning case ZC-26-041 |  |  |
| Apr 6, 2026 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | BELMONT INNOVATION CAMPUS SUBSTATION BELMONT INNOVATION CAMPUS SUBSTATION - Dedication Plat to vacate Gloucester Parkway Reservation and revise easementsPlat PLAT-2026-0054 · In Review |  |  |
| Apr 6, 2026 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | Golden Substation Jack Story of Dewberry is requesting an administrative modification to the Plant Unit Composition requirements of the Type 2 and Type 3 Road Corridor Buffers for…Zoning Correspondence ZCOR-2026-0098 · In Review |  |  |
| Apr 1, 2026 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | Ashburn Data Center Floodplain Alteration KIMLEY-HORN HAS PREPARED THIS FLOODPLAIN ALTERATION TO DETERMINE THE PROPOSED 100-YEAR FLOOD ELEVATIONS AND EXTENTS WITHIN THE SITE BASED…Floodplain FLPL-2026-0008 · In Review |  |  |
| Apr 1, 2026 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | Aspen Substation Jack Story of Dewberry is requesting an administrative modification to the Plant Unit Composition requirements of the Type 2 Road Corridor Buffer for…Zoning Correspondence ZCOR-2026-0088 · In Review |  |  |
| Mar 31, 2026 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | LC9 & LC10 Data Center LC9 & LC10 DATA CENTER - CONSTRUCTION OF A TWO (2) 2-STORY DATA CENTER BUILDINGS AND ASSOCIATED INFRASTRUCTUREEngineering Plan EPLAN-2026-0039 · In Review |  |  |
| Mar 27, 2026 | Tax map 41-103, 41-104Town of Culpeper VA land development projects | Site plan or rezoning | Copper Ridge Data Center Campus 116.289 acres - consolidation of two parcelsRecord Plat 6220 · Recently Approved |  |  |
| Mar 26, 2026 | City of Buckeye AZ self service (EnerGov) | Site plan or rezoning | APS SIDNEY SUBSTATION APS Sidney Substation Re-PlatRe-Plat, Re-Plat Administration PLZS-26-0014 · Pending Recordation |  |  |
| Mar 24, 2026 | Benton CountyWashington State SEPA Register | Site plan or rezoning | Thayer Drive Substation Expansion: Expansion of an existing substation. Proposed expansion is in conjunction with the Bonneville Power Administration (BPA) Tri-Cities…SEPA DNS 202601172 · DNS |  |  |
| Mar 13, 2026 | Prince William County VA planning cases | Site plan or rezoning | NOVEC Javelin Substation Public Facility Review - NOVEC - Javelin Substation - this request is for Electrical Substation at 11950 Sudley Manor Drive, Manassas VA 20109, GPIN…PFR PFR2026-00007 · Pending |  |  |
| Mar 13, 2026 | Benton CountyWashington State SEPA Register | Site plan or rezoning | South of Tri-Cities Reinforcement Project: Bonneville Power Administration (BPA) is proposing to construct a new 18-mile-long 115-kilovolt (kV) transmission line and substation…SEPA NEPA, EA 202602859 · NEPA, EA |  |  |
| Mar 12, 2026 | City of Charlotte NC Citizen Access records | Site plan or rezoning | DLR Moores Chapel Substation RTAP, Non-SubdivisionLandDevelopment Land Development Construction Plan 26TMP-004867 |  |  |
| Mar 12, 2026 | City of Charlotte NC Citizen Access records | Site plan or rezoning | DLR Moores Chapel Substation RTAP, Non-SubdivisionLandDevelopment Land Development Construction Plan LDCP-2026-00161 · Approved |  |  |
| Mar 12, 2026 | City of Charlotte NC land development commercial projects | Site plan or rezoning | DLR Moores Chapel SubstationLand Development Construction Plan LDCP-2026-00161 · Approved |  |  |
| Mar 12, 2026 | 9903 E Elliot RdCity of Mesa AZ planning and zoning cases | Site plan or rezoning | Site Plan Review Expansion of data center campusPlanning and zoning case ZON25-00535 · COMPLETE |  |  |
| Mar 11, 2026 | AVION PKWY CHANTILLYFairfax County VA PLUS site records | Site plan or rezoning | Dominion Takeoff Substation (SU)Geotechnical Report SR-2026-00016 · Closed |  |  |
| Mar 11, 2026 | 10256 E Elliot RdCity of Mesa AZ planning and zoning cases | Site plan or rezoning | Site Plan Review/Modification Expansion of data center Planning Director ApprovedPlanning and zoning case ZON25-00890 · COMPLETE |  |  |
| Mar 11, 2026 | Franklin CountyWashington State SEPA Register | Site plan or rezoning | Big Bend Electric Cooperative Camp Electrical Substation: This proposal is to construct and interconnect a new substation to replace the aging BBEC Scooteney substation. The…SEPA DNS 202600971 · DNS |  |  |
| Mar 10, 2026 | 5621 Parker Henderson Road, 4612 & 4616 Maxey RoadCity of Fort Worth TX zoning cases | Site plan or rezoning | From B, I to I and Add Conditional Use Permit for electrial substationZoning case ZC-26-002 |  |  |
| Mar 9, 2026 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | Clintmar Project is called "Clintmar". It is a proposed datacenter encompassing 182,254 sf.Floodplain FLPL-2026-0004 · In Review |  |  |
| Mar 9, 2026 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | Clintmar Floodplain Alteration for Clintmar plan. Data Center encompassing 182,254 sf.Floodplain FLPL-2026-0005 · In Review |  |  |
| Mar 5, 2026 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | Loudoun Business Park LOUDOUN BUSINESS PARK CMPT-2026-0010: A Commission Permit to permit a public utility. CMPT-2025-0008: A Commission Permit to permit a public utility…Commission Permit CMPT-2026-0010 · In Review |  |  |
| Mar 5, 2026 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | Firehouse Substation FIREHOUSE SUBSTATION: A Special Exception and a Commission Permit to allow a Utility, Major (utility substation) on the PropertySpecial Exception SPEX-2026-0009 · Submitted |  |  |
| Mar 5, 2026 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | Terminal Drive Buffer Waiver Curtis Mason of Gordon is requesting an administrative buffer and Waiver to allow the placement of the required Type C Buffer closer to the proposed…Zoning Correspondence ZCOR-2026-0048 · In Review |  |  |
| Mar 4, 2026 | 14721 AVION PKWY CHANTILLYFairfax County VA PLUS site records | Site plan or rezoning | AVION DATA CENTER [EPLAN/SU]Bond Extension BONDEX-2025-00101 · Closed |  |  |
| Mar 2, 2026 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | Golden Substation A request for site plan approval of a transmission utility substation.Engineering Plan EPLAN-2026-0029 · In Review |  |  |
| Feb 25, 2026 | Prince William County VA planning cases | Site plan or rezoning | Manassas Corporate Center 8 Manassas Corporate Center 8 - This is a request to rezone from A-1 (Agricultural) to PBD (Planned Business District) for development of a proposed data…REZ REZ2026-00032 · Pending |  |  |
| Feb 20, 2026 | Spokane CountyWashington State SEPA Register | Site plan or rezoning | GRADING APPROX 1,290 CY, FOUNDATIONS & APPROX 3K CY TO RESTORE &/OR CREATE ACCESS RDS FOR NEW 230KV TRANSMISSION LINE BETWEEN BLUEBIRD & GARDEN SPRINGS SUBSTATION. COUNTY, SPOKANE…SEPA ODNS 202600658 · ODNS |  |  |
| Feb 19, 2026 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | Glenn Drive North & South GLENN DRIVE NORTH & SOUTH ZMAP-2024-0002: A Zoning Conversion in the Route 28 Tax District of 42.3 acres from the Planned Development, Industrial Park…Zoning Map Amendment ZMAP-2026-0001 · In Review |  |  |
| Feb 19, 2026 | 9560 E Pecos RdCity of Mesa AZ planning and zoning cases | Site plan or rezoning | Data Center Council Use Permit Waiver Data Center Council Use Permit Waiver ApprovedPlanning and zoning case ZON26-00164 · COMPLETE |  |  |
| Feb 18, 2026 | Tax map 41-105, 41-105A, 51-83D, 53-83ETown of Culpeper VA land development projects | Site plan or rezoning | Culpeper Technology Campus A site plan for an 8 building data center campus spanning properties in the Town and County.Site Plan SS-4534-2024 · Recently Approved |  |  |
| Feb 11, 2026 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | Dulles North Industrial Park - Lot 4 DETER Reina Hamayama of Bohler Engineering is requesting a determination seeking confirmation that pursuant to Section 4.06.02.D.2.d. of the…Zoning Correspondence ZCOR-2026-0037 · Approved |  |  |
| Feb 11, 2026 | 10256 E Elliot RdCity of Mesa AZ design review cases | Site plan or rezoning | NTT Data Centers PH6Design review case DRB25-00900 · COMPLETE |  |  |
| Feb 9, 2026 | 5459 N 419TH AVE TONOPAHMaricopa County AZ planning and zoning cases | Site plan or rezoning | Balterra Proposed development that may include commercial, mixed-use, warehouse, data center, and other commerce park uses.Pre-Application Meeting PA260002 · Completed |  |  |
| Feb 9, 2026 | Grant CountyWashington State SEPA Register | Site plan or rezoning | Mountain View Substation Expansion: This project consists of a substation expansion that will provide and serve electricity to Grant County. Critical to the completion of the…SEPA DNS 202600486 · DNS |  |  |
| Feb 9, 2026 | City of Red Oak TX council and planning agendas | Site plan or rezoning | Conduct a public hearing and consider approval of an Ordinance approving a zoning change from “PD”, Planned Development, 66 Revised 6 (PD, 66R6) to “PD”, Planned Development, 66…Agenda item, City Council ZC25-28 · on agenda |  |  |
| Feb 5, 2026 | Whitman CountyWashington State SEPA Register | Site plan or rezoning | Jerita Substation Expansion: Expand the existing Jerita Substation by constructing a gravel pad and fence to accommodate parking of a mobile substation.SEPA DNS 202600454 · DNS |  |  |
| Feb 4, 2026 | Spokane CountyWashington State SEPA Register | Site plan or rezoning | GRADING : SITE PREP, DRAINAGE AND BUILDING A PAD FOR A DISTRIBUTION SUBSTATION (PERMITTED SEPARATELY) AND STORAGE OF EQUIPMENT AND SUPPLIES RELATING TO PUBLIC FACILITY…SEPA ODNS 202600423 · ODNS |  |  |
| Feb 2, 2026 | Fairfax County VA PLUS zoning applications | Site plan or rezoning | Modify plans and proffers of RZ-75-7-004 to allow Data CenterRezoning Plan Applications and Amendments PCA-75-7-004-04 · Review In Progress See Parent |  |  |
| Feb 2, 2026 | Fairfax County VA PLUS zoning applications | Site plan or rezoning | Data Center and increase in FARSpecial Exception and Special Exception Amendment SE-2026-PR-00005 · In Review |  |  |
| Feb 2, 2026 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | Spring Valley Technology Park See LEGI-2024-0074 for all documents, timelines and workflow. Special Exception to permit data center use in the IP Zoning DistrictSpecial Exception SPEX-2026-0004 · In Review |  |  |
| Jan 29, 2026 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | DULLES BERRY LC8 DATA CENTER DULLES BERRY LC8 DATA CENTER - This application is for the revision to approved EPLAN-2024-0093 Dulles Berry LC8 Data Center. Revisions include a…Engineering Plan EPLAN-2026-0014 · In Review |  |  |
| Jan 27, 2026 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | Waterside Landbay B Substation SPAM to approved STMP-2020-0017 & SPAM-2021-0072; to incorporate the substation infrastructure authorized under ZCPA-2020-0014.Engineering Plan EPLAN-2026-0013 · In Review |  |  |
| Jan 27, 2026 | Spokane CountyWashington State SEPA Register | Site plan or rezoning | GRADING APPROX 1,290 CY, FOUNDATIONS & APPROX 3K CY TO RESTORE &/OR CREATE ACCESS RDS FOR NEW 230KV TRANSMISSION LINE BETWEEN BLUEBIRD & GARDEN SPRINGS SUBSTATION. COUNTY, SPOKANE…SEPA ODNS/NOA 202600306 · ODNS/NOA |  |  |
| Jan 23, 2026 | Douglas CountyWashington State SEPA Register | Site plan or rezoning | DCPUD Switchyard and Hydrogen Generation Facility: An application for an amendment to CUP-2020-05. DCPUD was issued a Conditional Use Permit for the “DCPUD Switchyard & Hydrogen…SEPA ODNS 202600258 · ODNS |  |  |
| Jan 22, 2026 | City of Charlotte NC land development commercial projects | Site plan or rezoning | DLR Moores Chapel SubstationLand Development Construction Plan LDCP-2026-00028 · Approved |  |  |
| Jan 22, 2026 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | Brambleton Business Campus Substation Matthew McElhaney of Urban LTD is requesting a landscape buffer modification for Brambleton Business Campus (EPLAN-2023-0112) under the…Zoning Correspondence ZCOR-2026-0017 · Approved |  |  |
| Jan 21, 2026 | City of Dallas TX DallasNow records | Site plan or rezoning | Oncor Hampton Road Substation AdditionPlanning Plat 26TMP-010831 |  |  |
| Jan 21, 2026 | City of Dallas TX DallasNow records | Site plan or rezoning | Oncor Hampton Road Substation AdditionPlanning Plat PLAT-26-000026 · In Review |  |  |
| Jan 21, 2026 | King CountyWashington State SEPA Register | Site plan or rezoning | PSE Grand Ridge Substation: A new substation is proposed in a cleared area within the Issaquah Highlands (formerly known as Grand Ridge), originally planned through the Issaquah…SEPA ODNS/NOA 202600218 · ODNS/NOA |  |  |
| Jan 20, 2026 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | Sterling Substation Sterling Substation: A Special Exception and Commission Permit application to permit a Utility Substation at PIN 033-39-2929.Commission Permit CMPT-2025-0013 · In Review |  |  |
| Jan 20, 2026 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | Sterling Substation Sterling Substation: A Special Exception and Commission Permit application to permit a Utility Substation at PIN 033-39-2929.Legislative Application LEGI-2025-0068 · In Review |  |  |
| Jan 20, 2026 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | Sterling Substation SEE LEGI-2025-0068 FOR TIMELINE, WORKFLOW AND DOCUMENTS. Sterling Substation: A Special Exception and Commission Permit application to permit a Utility…Special Exception SPEX-2025-0160 · In Review |  |  |
| Jan 15, 2026 | 37625 W ELLIOT RD ARLINGTONMaricopa County AZ planning and zoning cases | Site plan or rezoning | Mesquite Generating Station Mesquite Generation Station Z2000071 Status ReportStatus Report SR250007 · Approved |  |  |
| Jan 12, 2026 | 4151 AUTO PARK CIR CHANTILLYFairfax County VA PLUS site records | Site plan or rezoning | CHANTILLY PREMIER DATA CENTER (SU)Site Plan Revision SP-2024-00048-1 · Closed |  |  |
| Jan 9, 2026 | Douglas CountyWashington State SEPA Register | Site plan or rezoning | DCPUD Switchyard and Hydrogen Generation Facility: An application for an amendment to CUP-2020-05. DCPUD was issued a Conditional Use Permit for the “DCPUD Switchyard & Hydrogen…SEPA ODNS/NOA 202600079 · ODNS/NOA |  |  |
| Jan 8, 2026 | 4120 S Ellsworth RdCity of Mesa AZ planning and zoning cases | Site plan or rezoning | Site Plan Review/Modification Minor Site Plan Modification for revised substation and switchyard area and warehouse. Planning Director ApprovedPlanning and zoning case ZON25-00549 · COMPLETE |  |  |
| Jan 7, 2026 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | Lunar & Apollo Substation SEE LEGI-2025-0040 FOR TIMELINE, WORKFLOW AND DOCUMENTS. Lunar & Apollo Substations: A Commission Permit for the construction of two distribution…Commission Permit CMPT-2025-0011 · In Review |  |  |
| Jan 7, 2026 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | Lunar & Apollo Substation Lunar & Apollo Substations: A Special Exception and Commission Permit for the construction of two distribution substations within the A-3 zoning district.Legislative Application LEGI-2025-0040 · In Review |  |  |
| Jan 7, 2026 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | Lunar & Apollo Substation SEE LEGI-2025-0040 FOR TIMELINE, WORKFLOW, AND DOCUMENTS. Lunar & Apollo Substations: A Special Exception for the construction of one of two distribution…Special Exception SPEX-2025-0127 · In Review |  |  |
| Jan 7, 2026 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | Lunar & Apollo Substation Lunar & Apollo Substations: A Special Exception and Commission Permit for the construction of two of two distribution substations within the A-3 zoning…Special Exception SPEX-2025-0130 · In Review |  |  |
| Jan 7, 2026 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | Lunar & Apollo Substation SEE LEGI-2025-0040 FOR TIMELINE, WORKFLOW AND DOCUMENTS. Lunar & Apollo Substations: A Special Exception to reduce minimum parking requirements.Special Exception SPEX-2025-0131 · In Review |  |  |
| Jan 7, 2026 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | Lunar & Apollo Substation SEE LEGI-2025-0040 FOR TIMELINE, WORKFLOW AND DOCUMENTS. Lunar & Apollo Substations: A Minor Special Exception to modify buffer requirements including…Special Exception SPEX-2025-0132 · In Review |  |  |
| Jan 7, 2026 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | 22990 Indian Creek Dr DETER Christopher Churmusi of Urban Ltd. on behalf of the owner is requesting a zoning determination for the site plan amendment (EPLAN-2024-0178) is…Zoning Correspondence ZCOR-2026-0004 · Approved |  |  |
| Jan 7, 2026 | Spokane CountyWashington State SEPA Register | Site plan or rezoning | GRADING : SITE PREP, DRAINAGE AND BUILDING A PAD FOR A DISTRIBUTION SUBSTATION (PERMITTED SEPARATELY) AND STORAGE OF EQUIPMENT AND SUPPLIES RELATING TO PUBLIC FACILITY…SEPA ODNS/NOA 202600045 · ODNS/NOA |  |  |
| Jan 6, 2026 | Chesterfield County VA site plan cases | Site plan or rezoning | CHESTERFIELD SUBSTATION EXPANSIONSite plan PR Industrial 25PR1229 · Approved |  |  |
| Jan 6, 2026 | 9903 E Elliot RdCity of Mesa AZ planning and zoning cases | Site plan or rezoning | Data Center Council Use Permit Waiver Data Center Council Use Permit Waiver ApprovedPlanning and zoning case ZON25-01001 · COMPLETE |  |  |
| Dec 19, 2025 | SWC MILLER RD & SOUTHERN AVECity of Buckeye AZ self service (EnerGov) | Site plan or rezoning | APS SIDNEY SUBSTATION APS SIDNEY SUBSTATION SITE PLAN w-TISSite Plan Administrative PLZSP-25-0053 · Completed |  |  |
| Dec 17, 2025 | Douglas CountyWashington State SEPA Register | Site plan or rezoning | Lone Pine Substation to O’Malley Substation 115kV Transmission Line Project: Public Utility District No.1 of Douglas County proposes to expand the O'Malley Substation and…SEPA DNS 202505181 · DNS |  |  |
| Dec 16, 2025 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | Twin Creeks Substation Twin Creeks Substation: A Commission Permit and Special Exception for utility substation.Commission Permit CMPT-2025-0012 · In Review |  |  |
| Dec 16, 2025 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | Twin Creeks Substation Twin Creeks Substation: A Commission Permit and Special Exception for utility substation.Legislative Application LEGI-2025-0050 · In Review |  |  |
| Dec 16, 2025 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | Twin Creeks Substation Twin Creeks Substation: A Special Exception for a utility substation.Special Exception SPEX-2025-0143 · In Review |  |  |
| Dec 11, 2025 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | Sterling Substation K.2 Checklist Waiver A request to waive Checklist requirement K.2, "Endangered Species Habitat," for Sterling Substation (LEGI-2025-0068).Planning Correspondence PCOR-2025-0095 · Denied |  |  |
| Dec 10, 2025 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | LUCK STONE LEESBURG PLANT See LEGI-2023-0084 for all timelines, workflows, and documents - LUCK STONE LEESBURG PLANT: A Special Exception to permit Utility Major (Utility…Special Exception SPEX-2025-0159 · In Review |  |  |
| Dec 8, 2025 | 28702 W PATTERSON RD BUCKEYE AZ 85326City of Buckeye AZ self service (EnerGov) | Site plan or rezoning | WOOLSEY PEAK SUBSTATION WOOLSEY PEAK SUBSTATION SITE PLAN WITH TISSite Plan Administrative PLZSP-25-0048 · Pending Revisions |  |  |
| Dec 8, 2025 | City of Red Oak TX council and planning agendas | Site plan or rezoning | Conduct a Public Hearing and consider approval of an Ordinance of the City Council of the City of Red Oak, Texas, granting a zoning change request from “PD”, Planned Development…Agenda item, City Council ZC25-26 · on agenda |  |  |
| Dec 3, 2025 | 13775 MCLEAREN RD HERNDONFairfax County VA PLUS site records | Site plan or rezoning | MCLEAREN DATA CENTER (SU)Record Plat RP-2025-00070 · Recorded |  |  |
| Dec 3, 2025 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | Digital Dulles - Electric Generating Facility DIGITAL DULLES - ELECTRIC GENERATING PLANT: A Special Exception to Allow for an Electric Generating FacilityLegislative Application LEGI-2025-0059 · In Review |  |  |
| Dec 2, 2025 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | Digital Dulles - Electric Generating Facility SEE LEGI-2025-0059 FOR TIMELINE, WORKFLOW AND DOCUMENTS. DIGITAL DULLES - ELECTRIC GENERATING PLANT: A Special Exception to Allow for…Special Exception SPEX-2025-0145 · In Review |  |  |
| Dec 2, 2025 | 9832 E Pecos RdCity of Mesa AZ planning and zoning cases | Site plan or rezoning | Data Center Council Use Permit Waiver Data Center Council Use Permit Waiver ApprovedPlanning and zoning case ZON25-00782 · COMPLETE |  |  |
| Dec 2, 2025 | 10256 E Elliot RdCity of Mesa AZ planning and zoning cases | Site plan or rezoning | Data Center Council Use Permit Waiver Data Center Council Use Permit Waiver ApprovedPlanning and zoning case ZON25-00884 · COMPLETE |  |  |
| Dec 2, 2025 | east side S Signal Butte Rd btwn E Pecos Rd & E Germann RdCity of Mesa AZ planning and zoning cases | Site plan or rezoning | Data Center Council Use Permit Waiver Data Center Council Use Permit Waiver ApprovedPlanning and zoning case ZON25-00885 · COMPLETE |  |  |
| Dec 1, 2025 | 8440 TYCO RD VIENNAFairfax County VA PLUS site records | Site plan or rezoning | TYSONS SUBSTATION (EPLAN) (PR)Bond Extension BONDEX-2025-00099 · Closed |  |  |
| Nov 25, 2025 | 14520 AVION PKWY CHANTILLYFairfax County VA PLUS site records | Site plan or rezoning | Avion Substation Site Plan (SU)Geotechnical Report SR-2025-00093 · Closed |  |  |
| Nov 24, 2025 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | Digital Western Lands, LLC (IAD44) Data Center Need to obtain signatures from Loudoun County on both (1) Local Governing Body Certification Form and (2) Air Pollution Activity…Planning Correspondence PCOR-2025-0092 · Submitted - Online |  |  |
| Nov 24, 2025 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | Allegro North Campus- Building 2F Site Plan EASMEMENT PLAT FOR ALLEGRO NORTH CAMPUS BLDG 2F: Site Plan for a data center development on approximately 11.19 acres. Consists of…Plat PLAT-2025-0252 · In Review |  |  |
| Nov 18, 2025 | Chesterfield County VA site plan cases | Site plan or rezoning | MIDLOTHIAN SUBSTATIONSite plan PM Commercial 25PM0057 · Approved |  |  |
| Nov 18, 2025 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | Wishing Star Substation Site Plan Dedication Application Proposing Right of Way Dedication, Vacation of Various Easements, Creation of Various Easements and Trail Reservation on…Plat PLAT-2025-0251 · In Review |  |  |
| Nov 13, 2025 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | Firehouse Substation SEE LEGI-2025-0038 FOR TIMELINE, WORKFLOW AND DOCUMENTS. FIREHOUSE SUBSTATION: A Commission Permit to allow a Utility, Major (utility substation) on the…Commission Permit CMPT-2025-0010 · In Review |  |  |
| Nov 13, 2025 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | Powerhouse Arcola Substation Site Plan Site Plan for a Substation and extension of Azalea Lane, and all associated infrastructure.Engineering Plan EPLAN-2025-0198 · In Review |  |  |
| Nov 13, 2025 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | Firehouse Substation FIREHOUSE SUBSTATION: A Special Exception and a Commission Permit to allow a Utility, Major (utility substation) on the PropertyLegislative Application LEGI-2025-0038 · In Review |  |  |
| Nov 13, 2025 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | Firehouse Substation see LEGI-2025-0038 FOR TIMELINE, WORKFLOW AND DOCUMENTS. FIREHOUSE SUBSTATION: A Special Exception to allow a Utility, Major (utility substation) on the…Special Exception SPEX-2025-0108 · In Review |  |  |
| Nov 13, 2025 | 7232 E Eliot RdCity of Mesa AZ design review cases | Site plan or rezoning | Project Red Hawk Phase 3 of data centerDesign review case DRB25-00686 · COMPLETE |  |  |
| Nov 12, 2025 | Grant CountyWashington State SEPA Register | Site plan or rezoning | Monument Hill Switchyard: The Monument Hill Switchyard site will be approximately 14 acres inside a District owned 87.1-acre site. The existing Quincy Foothills Substation will be…SEPA DNS 202504780 · DNS |  |  |
| Nov 12, 2025 | Grant CountyWashington State SEPA Register | Site plan or rezoning | Monument Hill to Rocky Ford 230kV Transmission Line (QTEP): The proposed Monument Hill to Rocky Ford transmission line will construct approximately 2 miles of 230kV transmission…SEPA DNS 202504781 · DNS |  |  |
| Nov 11, 2025 | 4313 S. Segura CourtCity of Fort Worth TX zoning cases | Site plan or rezoning | From A-5, B to PD for A-5 uses plus electrial substation with development waivers, site plan requiredZoning case ZC-25-162 · Approved |  |  |
| Nov 10, 2025 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | YONDR-TARRING YONDR-TARRING SPEX-2025-0128: A Special Exception to permit a data center use in the General Industry (GI) Zoning District SPEX-2025-0144: A Minor Special Exception…Legislative Application LEGI-2025-0049 · In Review |  |  |
| Nov 10, 2025 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | Yondr - Tarring SEE LEGI-2025-0049 FOR TIMELINE, WORKFLOW AND DOCUMENTS. YONDR-TARRING: A Special Exception to permit a data center use in the General Industry (GI) Zoning…Special Exception SPEX-2025-0128 · In Review |  |  |
| Nov 7, 2025 | Prince William County VA planning cases | Site plan or rezoning | Six Towers Industrial Park Six Towers Industrial Park - This is a request to rezone +-23.8131 acres from Agricultural (A-1) and Industrial/Transportation (M/T) Zoning Districts to…REZ REZ2026-00019 · Under Review |  |  |
| Nov 5, 2025 | Chesterfield County VA site plan cases | Site plan or rezoning | CHESTER SOLAR PARK SWITCHYARDSite plan PR Industrial 24PR1173 · Approved |  |  |
| Nov 5, 2025 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | BELMONT INNOVATION CAMPUS BUILDINGS 1,2 & 5 BELMONT INNOVATION CAMPUS BUILDINGS 1, 2 and 5 - CONSTRUCTION OF 3 DATA CENTER BUILDINGS WITH ALL ASSOCIATED ACCESS & UTILITIES.Engineering Plan EPLAN-2025-0195 · In Review |  |  |
| Nov 5, 2025 | 3821 S Everton TerrCity of Mesa AZ planning and zoning cases | Site plan or rezoning | Data Center Council Use Permit Waiver Data Center Council Use Permit Waiver ApprovedPlanning and zoning case ZON25-00834 · COMPLETE |  |  |
| Nov 5, 2025 | 7154 E Elliot RdCity of Mesa AZ planning and zoning cases | Site plan or rezoning | Data Center Council Use Permit Waiver Data Center Council Use Permit Waiver ApprovedPlanning and zoning case ZON25-00853 · COMPLETE |  |  |
| Nov 4, 2025 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | Substation at Davis Drive Checklist Waiver DAVIS DRIVE SUBSTATION CHECKLIST WAIVER: A request to waive the Special Exception Checklist requirements for a Tree Survey, Cultural…Planning Correspondence PCOR-2025-0088 · Approved |  |  |
| Oct 31, 2025 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | Dulles Technology Park See LEGI-2025-0053 for all documents, timelines and workflow: A Commission Permit to establish a utility substation (Utility, Major) in the PD-IP and IP…Commission Permit CMPT-2025-0009 · In Review |  |  |
| Oct 31, 2025 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | Dulles North Technology Park DULLES NORTH TECHNOLOGY PARK: A rezoning, special exception, and commission permit application to allow the development of utility substation uses on…Legislative Application LEGI-2025-0053 · In Review |  |  |
| Oct 31, 2025 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | See LEGI-2025-0053 for all documents, timelines and workflow: A Special Exception to establish a utility substation (Utility, Major) in the IP Zoning District.Special Exception SPEX-2025-0102 · In Review |  |  |
| Oct 30, 2025 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | 1501 Moran Road - AS02 Final Site Plan REVISION Site Plan Amendment to previously approved EPLAN-2023-0087 which is a 42 megawatt data center with the associated infrastructure…Plat PLAT-2025-0241 · Approved |  |  |
| Oct 30, 2025 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | EPLAN-2025-0149 ZCOR-2025-0418 finds the revisions described in the request, including the adjustment to the location of a retaining wall, drive aisle and related revisions to the…Zoning Correspondence ZCOR-2025-0418 · Approved |  |  |
| Oct 29, 2025 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | H5 Data Center SPAM 2 Easement Plat Easement plat to dedicate and vacate easement associated with the H5 Data Center SPAM 2 EPLAN-2025-0180Plat PLAT-2025-0240 · In Review |  |  |
| Oct 27, 2025 | 13775 MCLEAREN RD HERNDONFairfax County VA PLUS site records | Site plan or rezoning | MCLEAREN DATA CENTERSite Plan Revision SP-2023-00087-2 · Closed |  |  |
| Oct 24, 2025 | 11220 UNIVERSITY CITY BV, MECKLENBURG, NC 28262City of Charlotte NC land development commercial projects | Site plan or rezoning | TL PH Charlotte Data Center Campus LPUDO Administration Pre-Submittal UDOPS-2025-00206 · In Process |  |  |
| Oct 23, 2025 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | Substation at Davis Drive Pre-Application Waiver DAVIS DRIVE SUBSTATION PREMEETING WAIVER: request to waive the Legislative Land Development Premeeting for a Special Exception and…Planning Correspondence PCOR-2025-0086 · Approved |  |  |
| Oct 20, 2025 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | BELMONT INNOVATION CAMPUS SUBSTATION BELMONT INNOVATION CAMPUS SUBSTATION - Site plan amendment for Belmont Innovation Campus Substation approved plan EPLAN-2023-0056 to revise…Engineering Plan EPLAN-2025-0183 · In Review |  |  |
| Oct 17, 2025 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | Site Plan Amendment for H5 Data Center Revisions to an approved Data Center Site plan to make minor site design adjustments to accommodate the updated security gate, gate…Engineering Plan EPLAN-2025-0180 · In Review |  |  |
| Oct 17, 2025 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | LC11 & LC12 DATA CENTER LC11 & LC12 DATA CENTER - REVISION TO APPROVED STPL-2023-0001. REVISIONS INCLUDEADDITION OF SECURITY FENCE AND GUARD SHACK, PAVEMENT/PARKING REVISIONS AND…Engineering Plan EPLAN-2025-0181 · In Review |  |  |
| Oct 17, 2025 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | Telos Data Center TELOS DATA CENTER (ESMT): Easement Plat Showing Creation and Vacation of Various Easements in relation to STPL-2023-0007.Plat PLAT-2025-0234 · Approved |  |  |
| Oct 14, 2025 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | Digital Dulles, Electric Generating Facility DIGITAL DULLES, ELECTRIC GENERATING FACILITY Premeeting Waiver Request: A request to waive the Legislative Land Development Premeeting…Planning Correspondence PCOR-2025-0083 · Approved |  |  |
| Oct 10, 2025 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | 21673 Beaumeade Cirlce Datacenter site revision updated building footprint for Building 2, revised storm sewer layout, revised parking, gate and fence location, access road and…Engineering Plan EPLAN-2025-0171 · In Review |  |  |
| Oct 10, 2025 | Chelan CountyWashington State SEPA Register | Site plan or rezoning | Leavenworth Substation Rebuild: Chelan PUD is proposing to rebuild its existing Leavenworth substation to meet growing electricity demands in the City of Leavenworth. The proposed…SEPA DNS 202504261 · DNS |  |  |
| Oct 7, 2025 | Chesterfield County VA site plan cases | Site plan or rezoning | CTP-03 DATA CENTER - PHASE 2Site plan PR Industrial 25PR1203 · Approved |  |  |
| Oct 7, 2025 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | Golden Substation SEE LEGI-2025-0012 FOR TIMELINE, WORKFLOW AND DOCUMENTS. SPEX-2025-0137: A Special Exception to reduce the required parking for a major utility use.Special Exception SPEX-2025-0137 · In Review |  |  |
| Oct 1, 2025 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | Spring Valley Technology Park See LEGI-2024-0074 for all documents, timelines and workflow. Minor Special Exception to Modify Type C Buffer requirements for Utility Substations…Special Exception SPEX-2025-0136 · In Review |  |  |
| Sep 26, 2025 | 725 E TRADE ST, CHARLOTTE, NC 28202City of Charlotte NC land development commercial projects | Site plan or rezoning | CLT 15 12MW Data CenterLand Development Construction Plan LDCP-2025-00716 · Approved |  |  |
| Sep 22, 2025 | Spokane CountyWashington State SEPA Register | Site plan or rezoning | Green Bluff Feeders: Inland Power and Light Co. plans to install 0.65 mile of new underground line from the Green Bluff Substation, along Day Mount Spokane Rd, along Sillman Rd…SEPA DNS, REVISED 202503920 · DNS, REVISED |  |  |
| Sep 19, 2025 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | Data Center Standards and Locations Phase 2 Comprehensive Plan Amendment Data Centers Standards and Locations Phase 2Comprehensive Plan Amendment CPAM-2025-0001 · In Review |  |  |
| Sep 17, 2025 | Chesterfield County VA zoning cases | Site plan or rezoning | COMMONWEALTH FUSION SYSTEMS FUSION POWERPLANT ELECTRIC POWER PLANT (FUSION)Zoning case SN CU 25SN1150 · Approved |  |  |
| Sep 16, 2025 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | Data Center Standards and Locations Phase 2 Zoning Ordinance Amendment - Data Center Standards and Locations Phase 2 - For more information and documentation please see…Zoning Ordinance Amendment ZOAM-2025-0002 · In Review |  |  |
| Sep 15, 2025 | Loudoun County VA land applications (LOLA) | Site plan or rezoning | Belmont Innovation Campus - Buildings 1, 2, & 5 Premeeting to discuss the upcoming submission of a Site Plan for Buildings 1, 2, & 5 of the Belmont Innovation Campus. Submission…Premeeting PMTG-2025-0197 · Approved |  |  |
| Sep 15, 2025 | Grant CountyWashington State SEPA Register | Site plan or rezoning | Columbia to Mountain View 230kV Transmission Line: The proposed Columbia to Mountain View transmission line will construct 3 miles of 230kV transmission line from the existing…SEPA DNS 202503815 · DNS |  |  |
|  | Chesterfield County VA site plan cases | Site plan or rezoning | OLD BERMUDA DATA CENTERSite plan PR Industrial 24PR1100 · Pending |  |  |
|  | Chesterfield County VA site plan cases | Site plan or rezoning | IRONBRIDGE SUBSTATION EXPANSIONSite plan PR Industrial 25PR1327 · Pending |  |  |
|  | Stafford County VA pending land use applications | Site plan or rezoning | Comprehensive Plan Compliance Review, Old Potomac Church Electric Substation: A request to review compliance with the Comprehensive Plan, in accordance with Virginia Code Section…Comprehensive Plan Compliance Review, Old Potomac Church Electric Substation COM23154992 · pending |  |  |
|  | Stafford County VA pending land use applications | Site plan or rezoning | Comprehensive Plan Compliance Review, Cranes Corner Electric Substation: A request to review compliance with the Comprehensive Plan, in accordance with Virginia Code Section…Comprehensive Plan Compliance Review, Cranes Corner Electric Substation COM24155728 · pending |  |  |
|  | Stafford County VA pending land use applications | Site plan or rezoning | Comprehensive Plan Compliance Review, Enon Road Electric Substation: A request to review compliance with the Comprehensive Plan, in accordance with Virginia Code Section…Comprehensive Plan Compliance Review, Enon Road Electric Substation COM24155780 · pending |  |  |
|  | Stafford County VA pending land use applications | Site plan or rezoning | Comprehensive Plan Compliance Review, Austin Ridge Logistics Center: A request to review compliance with the Comprehensive Plan, in accordance with Virginia Code Section…Comprehensive Plan Compliance Review, Austin Ridge Logistics Center COM24155874 · pending |  |  |
|  | Stafford County VA pending land use applications | Site plan or rezoning | Comprehensive Plan Compliance Review, GWV Data Center: A request to review compliance with the Comprehensive Plan, in accordance with Virginia Code Section 15.2-2232, for…Comprehensive Plan Compliance Review, GWV Data Center COM24155957 · pending |  |  |
|  | Stafford County VA pending land use applications | Site plan or rezoning | Comprehensive Plan Compliance Review, Accokeek Center: A request to review compliance with the Comprehensive Plan, in accordance with Virginia Code Section 15.2-2232, for…Comprehensive Plan Compliance Review, Accokeek Center COM24156541 · pending |  |  |
|  | Stafford County VA pending land use applications | Site plan or rezoning | Amendment to the Stafford County Comprehensive Plan, Blaisdell Data Center A proposal to amend the “Stafford County, Virginia, Comprehensive Plan 2016-2036 2021: Amendment to the…Amendment to the Stafford County Comprehensive Plan, Blaisdell Data Center A proposal to amend the “Stafford County, Virginia, Comprehensive Plan 2016-2036 2021 COM25156167 · pending |  |  |
|  | Stafford County VA pending land use applications | Site plan or rezoning | Comprehensive Plan Compliance Review, Blaisdell Data Center: A request to review compliance with the Comprehensive Plan, in accordance with Virginia Code Section 15.2-2232, for…Comprehensive Plan Compliance Review, Blaisdell Data Center COM25156168 · pending |  |  |
|  | Stafford County VA pending land use applications | Site plan or rezoning | Comprehensive Plan Compliance Review, Simms Farm: A request to review compliance with the Comprehensive Plan, in accordance with Virginia Code Section 15.2-2232, for placement of…Comprehensive Plan Compliance Review, Simms Farm COM25156310 · pending |  |  |
|  | Stafford County VA pending land use applications | Site plan or rezoning | Comprehensive Plan Compliance Review, Sisson South: A request to review compliance with the Comprehensive Plan, in accordance with Virginia Code Section 15.2-2232, for placement…Comprehensive Plan Compliance Review, Sisson South COM25156491 · pending |  |  |
|  | Stafford County VA pending land use applications | Site plan or rezoning | Comprehensive Plan Compliance Review, Sisson North: A request to review compliance with the Comprehensive Plan, in accordance with Virginia Code Section 15.2-2232, for placement…Comprehensive Plan Compliance Review, Sisson North COM25156496 · pending |  |  |
|  | Stafford County VA pending land use applications | Site plan or rezoning | Comprehensive Plan Compliance Review, Forest Lane Data Center: A request to review compliance with the Comprehensive Plan, in accordance with Virginia Code Section 15.2-2232, for…Comprehensive Plan Compliance Review, Forest Lane Data Center COM25156545 · pending |  |  |
|  | Stafford County VA pending land use applications | Site plan or rezoning | Comprehensive Plan Compliance Review, Pemberton Substation: A request to review compliance with the Comprehensive Plan, in accordance with Virginia Code Section 15.2-2232, for…Comprehensive Plan Compliance Review, Pemberton Substation COM25156609 · pending |  |  |
|  | Stafford County VA pending land use applications | Site plan or rezoning | Comprehensive Plan Compliance Review, Eskimo Hill Technology Center: A request to review compliance with the Comprehensive Plan, in accordance with Virginia Code Section…Comprehensive Plan Compliance Review, Eskimo Hill Technology Center COM25156773 · pending |  |  |
|  | Stafford County VA pending land use applications | Site plan or rezoning | Comprehensive Compliance Review, Vantage VA41 Substation: A request to review compliance with the Comprehensive Plan, in accordance with Virginia Code Section 15.2-2232, for…Comprehensive Compliance Review, Vantage VA41 Substation COM25156787 · pending |  |  |
|  | Stafford County VA pending land use applications | Site plan or rezoning | Conditional Use Permit, Enon Road Solar Farm: A request for a conditional use permit (CUP) to allow public utilities generating facility, specifically a solar energy facility…Conditional Use Permit, Enon Road Solar Farm CUP22154573 · pending |  |  |
|  | Stafford County VA pending land use applications | Site plan or rezoning | Conditional Use Permit, Kinglet Solar LLC: A request for a conditional use permit (CUP) to allow public utilities generating facility, specifically a solar energy facility, within…Conditional Use Permit, Kinglet Solar LLC CUP22154578 · pending |  |  |
|  | Stafford County VA pending land use applications | Site plan or rezoning | Conditional Use Permit, Dominion Energy Coal Landing Substation: A request for a Conditional Use Permit (CUP) to allow a public utility, specifically an electrical substation use…Conditional Use Permit, Dominion Energy Coal Landing Substation CUP23155011 · pending |  |  |
|  | Stafford County VA pending land use applications | Site plan or rezoning | Conditional Use Permit, Enon Road Solar Farm: A request for a conditional use permit (CUP) to allow a public utilities generating facility, specifically a solar energy facility…Conditional Use Permit, Enon Road Solar Farm CUP24155766 · pending |  |  |
|  | Stafford County VA pending land use applications | Site plan or rezoning | Conditional Use Permit, Austin Ridge Logistics Center: A request for a conditional use permit (CUP) to exceed the maximum height limitation, with a height of up to 95 feet for…Conditional Use Permit, Austin Ridge Logistics Center CUP24155875 · pending |  |  |
|  | Stafford County VA pending land use applications | Site plan or rezoning | Conditional Use Permit, GWV Data Center A conditional use permit (CUP) to allow a public utility, specifically an electrical substation, and exceed the maximum : Conditional Use…Conditional Use Permit, GWV Data Center A conditional use permit (CUP) to allow a public utility, specifically an electrical substation, and exceed the maximum CUP24155956 · pending |  |  |
|  | Stafford County VA pending land use applications | Site plan or rezoning | Conditional Use Permit, Blaisdell Data Center A conditional use permit (CUP) to allow a public facility/utility, specifically an electrical substation in the M-: Conditional Use…Conditional Use Permit, Blaisdell Data Center A conditional use permit (CUP) to allow a public facility/utility, specifically an electrical substation in the M- CUP25156166 · pending |  |  |
|  | Stafford County VA pending land use applications | Site plan or rezoning | Conditional Use Permit, Greenlaw Solar: A request for a conditional use permit (CUP) to allow a public utilities generating facility, specifically a solar energy facility, within…Conditional Use Permit, Greenlaw Solar CUP25156269 · pending |  |  |
|  | Stafford County VA pending land use applications | Site plan or rezoning | Conditional Use Permit, Simms Farm A conditional use permit (CUP) to allow a public facility/utility, specifically an electrical substation, in the M-2, Heavy I: Conditional Use…Conditional Use Permit, Simms Farm A conditional use permit (CUP) to allow a public facility/utility, specifically an electrical substation, in the M-2, Heavy I CUP25156308 · pending |  |  |
|  | Stafford County VA pending land use applications | Site plan or rezoning | Conditional Use Permit, Sisson South A conditional use permit (CUP) to allow a public facility/utility, specifically an electrical substation, in the M-2, Heavy: Conditional Use…Conditional Use Permit, Sisson South A conditional use permit (CUP) to allow a public facility/utility, specifically an electrical substation, in the M-2, Heavy CUP25156489 · pending |  |  |
|  | Stafford County VA pending land use applications | Site plan or rezoning | Conditional Use Permit, Wyatt Lane Solar: A request for a conditional use permit (CUP) to allow a public utility generating facility, specifically a solar energy facility, within…Conditional Use Permit, Wyatt Lane Solar CUP25156493 · pending |  |  |
|  | Stafford County VA pending land use applications | Site plan or rezoning | Conditional Use Permit, Sisson North A conditional use permit (CUP) to allow a public facility/utility, specifically an electrical substation, in the M-2, Heavy: Conditional Use…Conditional Use Permit, Sisson North A conditional use permit (CUP) to allow a public facility/utility, specifically an electrical substation, in the M-2, Heavy CUP25156494 · pending |  |  |
|  | Stafford County VA pending land use applications | Site plan or rezoning | Conditional Use Permit, Accokeek Center A conditional use permit (CUP) to allow a public utility, specifically an electrical substation in the M-2, Heavy Indust: Conditional Use…Conditional Use Permit, Accokeek Center A conditional use permit (CUP) to allow a public utility, specifically an electrical substation in the M-2, Heavy Indust CUP25156540 · pending |  |  |
|  | Stafford County VA pending land use applications | Site plan or rezoning | Conditional Use Permit, Forest Lane Data Center A conditional use permit (CUP) to allow a public facility/utility, specifically an electrical substation, in the: Conditional Use…Conditional Use Permit, Forest Lane Data Center A conditional use permit (CUP) to allow a public facility/utility, specifically an electrical substation, in the CUP25156542 · pending |  |  |
|  | Stafford County VA pending land use applications | Site plan or rezoning | Conditional Use Permit, Pemberton Substation: A request for a conditional use permit (CUP) to allow a public facility/utility, specifically an electrical substation, in the B-2…Conditional Use Permit, Pemberton Substation CUP25156610 · pending |  |  |
|  | Stafford County VA pending land use applications | Site plan or rezoning | Conditional Use Permit, Vantage VA41 Substation: A request for a conditional use permit (CUP) to allow a public facility/utility, specifically an electrical substation, in the…Conditional Use Permit, Vantage VA41 Substation CUP25156640 · pending |  |  |
|  | Stafford County VA pending land use applications | Site plan or rezoning | Conditional Use Permit, Pemberton Fence: A request for a conditional use permit (CUP) to allow a fence exception associated with a site plan approved data center, in the B-2…Conditional Use Permit, Pemberton Fence CUP25156691 · pending |  |  |
|  | Stafford County VA pending land use applications | Site plan or rezoning | Conditional Use Permit, Eskimo Hill Technology Center A conditional use permit (CUP) to allow a public facility/utility, specifically an electrical substation, : Conditional Use…Conditional Use Permit, Eskimo Hill Technology Center A conditional use permit (CUP) to allow a public facility/utility, specifically an electrical substation CUP25156774 · pending |  |  |
|  | Stafford County VA pending land use applications | Site plan or rezoning | Conditional Use Permit, Potomac Creek Campus A conditional use permit (CUP) to allow a public facility/utility, specifically an electrical substation, in the M-: Conditional Use…Conditional Use Permit, Potomac Creek Campus A conditional use permit (CUP) to allow a public facility/utility, specifically an electrical substation, in the M- CUP25156868 · pending |  |  |
|  | Stafford County VA pending land use applications | Site plan or rezoning | Conditional Use Permit, Cranes Corner Substation Expansion: A request for a conditional use permit (CUP) to allow a public facility/utility, specifically an electrical substation…Conditional Use Permit, Cranes Corner Substation Expansion CUP26156993 · pending |  |  |
|  | Stafford County VA pending land use applications | Site plan or rezoning | Conditional Use Permit- Kings Hill Substation - Cranes Corner Data Center: A request for a conditional use permit (CUP), for the placement of an electrical substation facility on…Conditional Use Permit- Kings Hill Substation CUP26157298 · pending |  |  |
|  | Stafford County VA pending land use applications | Site plan or rezoning | Zoning Reclassification, Old Potomac Church Data Center A proposal to amend proffered conditions on Tax Map Parcel No. 39-71A (Property), consisting of 49.9 acr: Zoning…Zoning Reclassification, Old Potomac Church Data Center A proposal to amend proffered conditions on Tax Map Parcel No. 39-71A (Property), consisting of 49.9 acr RC23154991 · pending |  |  |
|  | Stafford County VA pending land use applications | Site plan or rezoning | Zoning Reclassification, Dominion Energy Coal Landing Substation: A proposed zoning reclassification from the A-1, Agricultural Zoning District to the M-1, Light Industrial Zoning…Zoning Reclassification, Dominion Energy Coal Landing Substation RC23155010 · pending |  |  |
|  | Stafford County VA pending land use applications | Site plan or rezoning | Zoning Reclassification, Market at Austin Ridge (fka Courthouse Center): A proposed zoning reclassification from the A-1, Agricultural Zoning District to the B-2, Urban Commercial…Zoning Reclassification, Market at Austin Ridge (fka Courthouse Center) RC24155568 · pending |  |  |
|  | Stafford County VA pending land use applications | Site plan or rezoning | Zoning Reclassification - Cranes Corner Data Center: A proposed zoning reclassification from the A-1, Agricultural and M-1, Light Industrial Zoning Districts, to the M-2, Heavy…Zoning Reclassification RC24155726 · pending |  |  |
|  | Stafford County VA pending land use applications | Site plan or rezoning | Zoning Reclassification, Enon Road Tech Park: A proposed zoning reclassification from the A-1, Agricultural and M-1, Light Industrial Zoning Districts, to the M-2, Heavy…Zoning Reclassification, Enon Road Tech Park RC24155779 · pending |  |  |
|  | Stafford County VA pending land use applications | Site plan or rezoning | Zoning Reclassification, Austin Ridge Logistics Center: A proposed zoning reclassification from the M-1, Light Industrial Zoning District to the M-2, Heavy Industrial Zoning…Zoning Reclassification, Austin Ridge Logistics Center RC24155873 · pending |  |  |
|  | Stafford County VA pending land use applications | Site plan or rezoning | Zoning Reclassification, GWV Data Center: A proposed zoning reclassification from A-1, Agricultural, A-2, Rural Residential, R-3, Urban Residential- High Density, B-2, Urban…Zoning Reclassification, GWV Data Center RC24155954 · pending |  |  |
|  | Stafford County VA pending land use applications | Site plan or rezoning | Zoning Reclassification, Accokeek Center (AMENDED APPLICATION): A proposed zoning reclassification from A-1, Agricultural, A-2, Rural Residential, and B-3, Office Zoning Districts…Zoning Reclassification, Accokeek Center (AMENDED APPLICATION) RC24155981 · pending |  |  |
|  | Stafford County VA pending land use applications | Site plan or rezoning | Zoning Reclassification, Blaisdell Data Center: A proposed zoning reclassification from the A-1, Agricultural District, and B-2, Urban Commercial Zoning Districts to the M-2…Zoning Reclassification, Blaisdell Data Center RC25156157 · pending |  |  |
|  | Stafford County VA pending land use applications | Site plan or rezoning | Zoning Reclassification, Simms Farm: A proposed zoning reclassification from the A-1, Agricultural District Zoning District to the M-2, Heavy Industrial Zoning District on a…Zoning Reclassification, Simms Farm RC25156309 · pending |  |  |
|  | Stafford County VA pending land use applications | Site plan or rezoning | Zoning Reclassification and Proffer Amendment, Stafford Technology Campus: A proposed zoning reclassification from the A-1, Agricultural, and M-1, Light Industrial Zoning…Zoning Reclassification and Proffer Amendment, Stafford Technology Campus RC25156486 · pending |  |  |
|  | Stafford County VA pending land use applications | Site plan or rezoning | Zoning Reclassification, Sisson South: A proposed zoning reclassification from the A-1, Agricultural District Zoning District to the M-2, Heavy Industrial Zoning District on Tax…Zoning Reclassification, Sisson South RC25156488 · pending |  |  |
|  | Stafford County VA pending land use applications | Site plan or rezoning | Zoning Reclassification, Sisson North: A proposed zoning reclassification from the A-1, Agricultural District Zoning District to the M-2, Heavy Industrial Zoning District on Tax…Zoning Reclassification, Sisson North RC25156497 · pending |  |  |
|  | Stafford County VA pending land use applications | Site plan or rezoning | Zoning Reclassification, Forest Lane Data Center: A proposed zoning reclassification from A-1, Agricultural District, and M-1, Light Industrial District to the M-2, Heavy…Zoning Reclassification, Forest Lane Data Center RC25156546 · pending |  |  |
|  | Stafford County VA pending land use applications | Site plan or rezoning | Zoning Reclassification, Eskimo Hill Technology Center: A proposed zoning reclassification from the A-1, Agricultural District Zoning District to the M-2, Heavy Industrial Zoning…Zoning Reclassification, Eskimo Hill Technology Center RC25156775 · pending |  |  |
|  | Stafford County VA pending land use applications | Site plan or rezoning | Conditional Use Permit, Cool Springs Solar 1: A request for a conditional use permit (CUP) to allow an electrical generating facility, specifically a solar facility, within the…Conditional Use Permit, Cool Springs Solar 1 CUP26157446 · pending |  |  |
|  | Stafford County VA pending land use applications | Site plan or rezoning | Zoning Reclassification, Cool Springs Solar 1: A proposed zoning reclassification from R-1, Suburban Residential Zoning District, to M-1, Light Industrial Zoning District, on…Zoning Reclassification, Cool Springs Solar 1 RC26157447 · pending |  |  |
| Oct 19, 2026 | 24746 JAMES MONROE ALDIELoudoun County VA LandMARC submitted permits | Battery | Construction of a Battery Energy Storage System (BESS) facility and associated electrical infrastructure, including equipment foundations, access roads, stormwater management…Zoning (Commercial) Zoning Only ZONC-2026-051204 · Submitted - Online |  |  |
| Jul 29, 2026 | 3312 RAMONA DRCity of Fort Worth TX development permits | Battery | Marks Plumbing Parts - BESS Installation of a behind the meter battery energy storage system with a concrete equipment pad (approx 100 sq ft). No solar or EV charging. Battery…Commercial Accessory Structure New PB26-10893 · Awaiting Client Reply | $4,305 |  |
| Jul 22, 2026 | 3312 RAMONA DRCity of Fort Worth TX development permits | Battery | Marks Plumbing Parts - BESS Installation of a behind the meter battery energy storage system with a concrete equipment pad (approx 100 sq ft). No solar or EV charging. Battery…Commercial Building Permit New PB26-10505 · Void | $4,305 |  |
| Jul 22, 2026 | 1700 MEACHAM BLVDCity of Fort Worth TX development permits | Battery | Lasko Products BESS Installation of 2 behind the meter battery energy storage systems on an existing commercial property. Includes new concrete equipment pad. No solar or EV…Commercial Building Permit New PB26-10516 · Void | $41,332 |  |
| Jul 17, 2026 | 3312 RAMONA DRCity of Fort Worth TX development permits | Battery | Marks Plumbing Parts - BESS Installation of a behind the meter battery energy storage system with a concrete equipment pad (approx 100 sq ft). No solar or EV charging. Battery…Commercial Accessory Structure Addition PB26-10327 · Void | $4,305 |  |
| Jul 17, 2026 | 1700 MEACHAM BLVDCity of Fort Worth TX development permits | Battery | Lasko Products BESS Installation of 2 behind the meter battery energy storage systems on an existing commercial property. Includes new concrete equipment pad. No solar or EV…Commercial Accessory Structure Addition PB26-10340 · Void | $41,332 |  |
| Jul 9, 2026 | 5710 CARRY BACK LNCity of Austin issued construction permits | Battery | Installing 10.56 kW DC of solar (24 440 W modules 24 Enphase IQ8+ microinverters) on an existing residence. Line-side tap interconnection. No battery.Electrical Permit 2026-086041 EP · Active |  |  |
| Jul 7, 2026 | 1141 CHICON ST BLDG 1City of Austin issued construction permits | Battery | Rooftop Solar. No battery or energy storage. Two line side tap interconnection. Two Aux EP and Remodel EPs needed.Electrical Permit 2026-051202 EP · Final |  |  |
| Jun 23, 2026 | 1141 CHICON ST BLDG 1 UNIT HP3City of Austin issued construction permits | Battery | SMART HOUSING Rooftop Solar. No battery or energy storage. Line side tap interconnection. Aux EP Needed. Remodel EP not needed.Electrical Permit 2026-060881 EP · Active |  |  |
| Jun 22, 2026 | 1141 CHICON ST BLDG 2City of Austin issued construction permits | Battery | QT - Rooftop Solar. No battery or energy storage. Line side tap interconnection Aux EP needed. Remodel EP not needed. Existing multi family - OVAElectrical Permit 2026-051051 EP · Final |  |  |
| May 28, 2026 | 1141 CHICON ST BLDG 3City of Austin issued construction permits | Battery | Rooftop solar. No battery energy storage. Lineside tap interconnection. Aux EP needed. Remodel EP not needed. Multifamily Affordable Housing.Electrical Permit 2026-043769 EP · Final |  |  |
| May 22, 2026 | 1141 CHICON ST BLDG 1 UNIT HP3City of Austin issued construction permits | Battery | SMART HOUSING Rooftop Solar. No battery or energy storage. Line side tap interconnection. Aux EP Needed. Remodel EP not needed.Building Permit 2026-060881 BP · Final |  |  |
| May 20, 2026 | 4400 SHEARON HARRIS RDWake County NC building permits | Battery | ***RCB 9/1/2026 see email withdrawal request in files*** SP - DUKE - NEW HILL - P & E TRADES - permanent office trailer WITH ADA BATHROOM & WATER FOUNTAIN (***7-7-2026 RCB…Commercial Building New Building or Addition CBPR-171678-2026 · Withdrawn | $75,000 |  |
| Apr 28, 2026 | 1141 CHICON ST BLDG 1City of Austin issued construction permits | Battery | Rooftop Solar. No battery or energy storage. Two line side tap interconnection. Two Aux EP and Remodel EPs needed.Building Permit 2026-051201 BP · Active |  |  |
| Apr 27, 2026 | 1141 CHICON ST BLDG 2City of Austin issued construction permits | Battery | QT - Rooftop Solar. No battery or energy storage. Line side tap interconnection Aux EP needed. Remodel EP not needed. Existing multi family - OVABuilding Permit 2026-051051 BP · Final |  |  |
| Apr 22, 2026 | 5345 E HERRERA DRCity of Phoenix AZ planning and development permits | Battery | SOLAR/ NEW BATTERY ENERGY STORAGE SYSTEMSOLAR PHOTOVOLTAIC/BATTERY SYSTEM SOLAR PHOTOVOLTAIC/BATTERY SYSTEM OTC 2601519 · DONE |  |  |
| Apr 22, 2026 | 6029 RANDLEMAN DRCity of Austin issued construction permits | Battery | Installation of energy storage system into existing solar panel system. In order to interconnect the ESS equipment and perform a whole home backup for all customer loads we will…Electrical Permit 2026-048198 EP · Active |  |  |
| Oct 22, 2025 | 933 E RUNDBERG LNCity of Austin issued construction permits | Battery | ATT proposes to Tower SOW Remove 3 RRUs B2 3 RRUs B66 1 Antenna 3 TMAS 6 Diplexers 14 50A Coax Relocate 5 Antennas3 Air Antenna3 b5b12 Radios 3 RRUs B30 3 B14 Radio Install 1…Building Permit 2025-129598 BP · Active |  |  |
| Oct 17, 2025 | 8130 N LAMAR BLVD SBCity of Austin issued construction permits | Battery | ATT is proposing to install on tower 1 mount modification per plans attached 3 new radio antennas 3 remote radio units RRU 3 10 pipe arms for RRUs. Ground scope of work to install…Building Permit 2025-131716 BP · Active |  |  |
| Oct 3, 2025 | 8965 RESEARCH BLVD SVRD NBCity of Austin issued construction permits | Battery | ATT is proposing to install on tower: (1) mount modification per plans included (3) new radio antennas (3) new panel antennas (3) remote radio units rotate existing mount to align…Building Permit 2025-122753 BP · Active |  |  |
| Sep 26, 2025 | 1301 1/2 SHOAL CREEK BLVDCity of Austin issued construction permits | Battery | ATT is proposing to install on tower: 3) new radio antennas (3) new radio units install mount modification. Ground work: Install (5) DC converters in existing power plant (1) 48V…Building Permit 2025-116944 BP · Expired |  |  |
| Oct 6, 2026 | 6111 E US 290 HWY SVRD EBCity of Austin issued construction permits | Solar | Installation of a new roof top solar PV system 44.625 Kw DC and interconnection to the existing serviceElectrical Permit 2026-116479 EP · Active |  |  |
| Sep 24, 2026 | 6111 E US 290 HWY SVRD EBCity of Austin issued construction permits | Solar | Installation of a new roof top solar PV system 44.625 Kw DC and interconnection to the existing serviceElectrical Permit 2026-116477 EP · Active |  |  |
| Sep 21, 2026 | 6111 E US 290 HWY SVRD EBCity of Austin issued construction permits | Solar | Installation of a new roof top solar PV system 44.625 Kw DC and interconnection to the existing serviceBuilding Permit 2026-116477 BP · Active |  |  |
| Sep 16, 2026 | 17 DOUGLAS STERLINGLoudoun County VA LandMARC issued permits | Solar | Installation of a 63.07 kW DC / 50 kW AC rooftop solar PV system, including 106 modules, racking, and a SolarEdge inverter. Work includes full system installation, electrical…Electrical (Commercial) Alteration ELECC-2026-020939 · Issued |  |  |
| Sep 14, 2026 | 889 E 17TH AVECity of Columbus OH site engineering permits | Solar | Proposed solar parking canopy to replace existing parking canopy. Ten (10) new EV chargers to be located under new canopy. Associated new electrical panels & disconnects will be…Site Compliance Plan Final New Application 26345-00662 · Active |  |  |
| Sep 9, 2026 | 3104 PLEASANT RUN PLCity of Austin issued construction permits | Solar | Prewire permit for solar project.Electrical Permit 2026-116437 EP · Active |  |  |
| Aug 25, 2026 | 7100 DAMASCUS RD GAITHERSBURGMontgomery County MD commercial permits | Solar | Customer Wants To Use ePlans,2.5 MW DC (1.2 MW AC) ground-mounted solar facility consisting of 4704 panels and related AC and MV electrical equipment, an equipment pad, a fire…COMMERCIAL BUILDING CONSTRUCT 1169480 · Open | $1,784,422 |  |
| Aug 20, 2026 | 1309 CHICON STCity of Austin issued construction permits | Solar | Rooftop Solar Line-Side Tap Interconnection for Existing Multi-Family Building Requires Electrical Permit and Auxiliary Electrical Permit.Electrical Permit 2026-096756 EP · Active |  |  |
| Aug 20, 2026 | 1309 CHICON STCity of Austin issued construction permits | Solar | Rooftop Solar Line-Side Tap Interconnection for Existing Multi-Family Building Requires Electrical Permit and Auxiliary Electrical Permit.Electrical Permit 2026-096757 EP · Active |  |  |
| Aug 18, 2026 | 17 DOUGLAS STERLINGLoudoun County VA LandMARC issued permits | Solar | Installation of a 63.07 kW DC / 50 kW AC rooftop solar PV system, including 106 modules, racking, and a SolarEdge inverter. Work includes full system installation, electrical…Building (Commercial) Addition BLDC-2026-027595 · Issued | $254,380 |  |
| Aug 18, 2026 | 17 DOUGLAS STERLINGLoudoun County VA LandMARC issued permits | Solar | Installation of a 63.07 kW DC / 50 kW AC rooftop solar PV system, including 106 modules, racking, and a SolarEdge inverter. Work includes full system installation, electrical…Zoning (Commercial) Addition ZONC-2026-028754 · Issued |  |  |
| Aug 12, 2026 | 1309 CHICON STCity of Austin issued construction permits | Solar | Rooftop Solar Line-Side Tap Interconnection for Existing Multi-Family Building Requires Electrical Permit and Auxiliary Electrical Permit.Building Permit 2026-096756 BP · Active |  |  |
| Aug 11, 2026 | 431 BEATTIES FORD RD CHARLOTTE NC 28216Mecklenburg County NC building permits (all towns) | Solar | SCHU Solar Project Southern Energy Management, LLC SolarPv for COM-GBLD-26-000605Electrical COM-ELC-26-005368 · Inspection Phase |  |  |
| Aug 11, 2026 | 431 BEATTIES FORD RD CHARLOTTE NC 28216Mecklenburg County NC building permits (all towns) | Solar | SCHU Solar Project Southern Energy Management, LLC Southern Energy Management, LLC Commercial General Building Permit related records:StandaloneBuilding COM-GBLD-26-000605 · Inspection Phase | $78,702 |  |
| Aug 11, 2026 | 431 BEATTIES FORD RD CHARLOTTE NC 28216Mecklenburg County NC building permits (all towns) | Solar | SCHU Solar Project Southern Energy Management, LLC SolarPv related records:COM-GBLD-26-000605 - COM-ELC-26-005368SolarPV COM-SOLAR-26-000013 · Inspection Phase |  |  |
| Jul 31, 2026 | 12321 MIDDLEBROOK RD GERMANTOWNMontgomery County MD commercial permits | Solar | Customer Wants To Use ePlans,INSTALL SOLAR MODULES AND RACKING SYSTEM ON EXISTING TWO STORY BUILDING. INSTALL INVERTERS AND OTHER ELECTRICAL COMPONENTS AT THE REAR OF THE BUILDING…COMMERCIAL BUILDING ALTER 1166786 · Open | $248,400 |  |
| Jul 20, 2026 | 4001 BENBROOK HWYCity of Fort Worth TX development permits | Solar | Sunbelt Fort Worth #282 Installation of a 28.560KW rooftop PV solar system and interconnection into the existing serviceCommercial Building Permit Remodel PB26-10425 · Issued | $72,571 |  |
| Jul 8, 2026 | 6480 SLIGO MILL RD TAKOMA PARKMontgomery County MD commercial permits | Solar | Customer Wants To Use ePlans, INSTALLATION OF A PV ROOF MOUNTED SOLAR SYSTEM WITH A CAPACITY OF 6.16 kW DC / 6.912 kW AC. THE POWER GENERATED BY THE PV SYSTEM WILL BE…COMMERCIAL BUILDING ALTER 1155409 · Issued | $12,382 |  |
| Jul 8, 2026 | 8134 MESA DR UNIT BCity of Austin issued construction permits | Solar | Rooftop Solar Line side tap interconnection - Building BBuilding Permit 2026-085966 BP · Final |  |  |
| Apr 28, 2026 | 6480 SLIGO MILL RD TAKOMA PARKMontgomery County MD commercial permits | Solar | Customer Wants To Use ePlans, 6480 Sligo Mill Rd. Meter #7305 - INSTALLATION OF A PV ROOF MOUNTED SOLAR SYSTEM WITH A CAPACITY OF 15.4 kW DC / 11.21 kW AC. THE POWER GENERATED BY…COMMERCIAL BUILDING ALTER 1156269 · Open | $30,954 |  |
| Apr 3, 2026 | 7905 BURLESON RD BLDG TNFM2City of Austin issued construction permits | Solar | 127.33kW rooftop ballasted solar interconnected at TNFM2 via lineside tapElectrical Permit 2026-038568 EP · Active |  |  |
| Feb 12, 2026 | 24400 N 19TH AVECity of Phoenix AZ plan review | Solar | STE 115:GECKO CLIMBING GYM SOLAR PROJECTLARGE PLAN REVIEW-MISCELLANEOUS COMMERCIAL MISCELLANEOUS 2600805 · OPEN |  |  |
| Jan 29, 2026 | 11425 MT HOLLY-HUNTERSVILLE RD HUNTERSVILLE NC 28078Mecklenburg County NC building permits (all towns) | Solar | Burkert 469kW Rooftop Solar Procure, construct, interconnect, and commission a 469.2 kW_DC grid-connected, roof-mounted solar PV system.SolarPV COM-SOLAR-26-000003 · Closed - Complete |  |  |
| Jan 28, 2026 | 5125 E MADISON STCity of Phoenix AZ plan review | Solar | INTEPLAST SOLAR PROJECTFP PLAN REVIEW 260063 · OPEN |  |  |
| Oct 16, 2018 | NOKESVILLE SOLAR FACILITYPrince William County VA use permits (zoning cases) | Solar | NOKESVILLE SOLAR FACILITYSUP SUP2018-00049 · ACTIVE |  |  |
| Sep 21, 2026 | Cheyenne City Council Public Services Committee (news report) | Zoning | Council committee recommended annexation, agricultural initial zoning, and a light industrial zone change for the 162-acre Orchard Hills data center, overruling the Planning… |  |  |
| Sep 18, 2026 | Piedmont City Council (news report) | Zoning | Cloverleaf Infrastructure filed annexation and rezoning applications for the 633-acre Project Open Sky data center; the Piedmont City Council is expected to discuss the rezoning… |  |  |
| Sep 18, 2026 | City of Cleveland, TN (news report) | Zoning | Developers of Project River, a data center campus with on-site biomass and natural gas generation of up to 1,500 megawatts, are seeking annexation into Cleveland under a custom… |  |  |
| Sep 18, 2026 | 10050 Midway Road at I-95, Fort Pierce, FLFort Pierce Planning Board (news report) | Zoning | Planning Board item to rezone more than 200 acres for a proposed data center was tabled to an unspecified date at the applicant's request; the city said detailed site plans had… |  |  |
| Sep 17, 2026 | Bell County Appraisal District Parcels 7755, 24955, 106228, Temple, TXCity of Temple City Council agenda (PrimeGov) | Zoning | Second and final reading of rezoning and binding site development plan FY-26-36-ZC, AG to PD LI on 316.13 acres; attachments are titled Project Lasso PD Conditions. The same…Rezoning and binding site development plan (Planned Development) FY-26-36-ZC (Ordinance 2026-0054-O) · on agenda |  |  |
| Sep 17, 2026 | Maximo Moreno Survey, Abstract No. 14, Bell County, TX (Parcels 7755, 24955, 106228)City of Temple City Council agenda (PrimeGov) | Zoning | Second and final reading of voluntary annexation FY-26-4-ANX of 316.13 acres, the same parcels as the Project Lasso PD rezoning for Rowan's data center campus.Voluntary annexation FY-26-4-ANX (Ordinance 2026-0053-O) · on agenda |  |  |
| Sep 17, 2026 | 316 Old Cheraw Highway, Rockingham, NCRockingham City Council (news report) | Zoning | City council approved conditional rezoning of about 165 acres for a proposed four-building data center campus described as 460 megawatts with 192 diesel backup generators… |  |  |
| Sep 16, 2026 | Former Rapids mill site, Wisconsin Rapids, WIWisconsin Rapids Plan Commission (news report) | Zoning | Plan commission voted 7-0 to recommend denial of the conditional use permit for a data center; the common council is scheduled to vote October 20. |  |  |
| Sep 16, 2026 | Stokes County Board of Commissioners (news report) | Zoning | Stokes County commissioners voted 3-2 to move forward with a rezoning proposal for a hyperscale data center; the developer said it expects to obtain required permits over the next… |  |  |
| Sep 15, 2026 | Crooked Creek farm property, Highway O south of Pacific, Franklin County, MOFranklin County Commission (news report) | Zoning | Franklin County Commission approved the rezoning request for the Meramec Valley Technology Park data center proposed by developer Beltline on the Crooked Creek farm property; the… |  |  |
| Sep 15, 2026 | Near Villa Ridge off I-44, Franklin County, MOFranklin County Commission (news report) | Zoning | Franklin County Commission approved the rezoning request for the Gateway Digital Campus data center project near Villa Ridge; the county Zoning Commission had recommended approval… |  |  |
| Sep 15, 2026 | Near Brookwood Middle School, Brookwood, ALBrookwood City Council (news report) | Zoning | City council approved annexation and rezoning of property connected to a proposed data center development; city officials said no specific data center project has yet been… |  |  |
| Sep 15, 2026 | Butler County Commission (news report) | Zoning | Trenton withdrew its petition to annex about 600 acres from Madison and St. Clair Townships for an Amazon Web Services data center; the Butler County Commission unanimously… |  |  |
| Sep 15, 2026 | Lower Mount Bethel Township (news report) | Zoning | Developers are pressing for rezoning of nearly 240 acres of agricultural land for a hyperscale data center campus; the request was referred to the township planning commission… |  |  |
| Sep 14, 2026 | North side of Happy Jack Road, Cheyenne, WYCheyenne City Council (news report) | Zoning | Council voted 6-3 on September 14 to advance ordinances to annex the Cox Ranch property, assign base zoning and rezone it for a data center project; final approval is scheduled… |  |  |
| Sep 10, 2026 | Tax Parcel 0037-0197-001, Bartow County, GAGeorgia DCA Development of Regional Impact filings | Zoning | DRI 4835 for one approximately 350,000 square foot data center building on 559 acres; action requested is rezoning. Initial form 9/4/2026, DRI determination 9/9/2026, certified…Development of Regional Impact (Technological Facility, Including Data Centers) DRI 4835 · applied |  |  |
| Sep 10, 2026 | McCormick County Council (news report) | Zoning | County council approved the rezoning of roughly 1,000 acres for the Pollard data center project 3-2 and rejected a proposed nine-month pause on data center development. |  |  |
| Sep 9, 2026 | Burgin City Council (news report) | Zoning | Council vote to direct the city attorney to draft an annexation ordinance for parcels north of the city for Panattoni's hyperscale data center was stopped when the council lost a… |  |  |
| Sep 9, 2026 | Former Hynix plant, west Eugene, ORCity of Eugene (news report) | Zoning | City rejected a buyer's proposal for a data center at the former Hynix plant, ruling the use is not allowed under the site's employment zoning. |  |  |
| Aug 25, 2026 | Building J8, Freeport Center, Clearfield, UTClearfield City Council minutes | Zoning | Council work meeting review of a pending zoning determination request for a data center in an existing M-1 zoned building; minutes state the proposed facility would use no more… |  |  |
| Aug 24, 2026 | 1775 and 1779 Hwy. 67, Festus, MO (Parcels 18601300002023, 18601300002024, 18601300002025)Festus City Council (news report) | Zoning | City council voted 5-2 on Aug. 24 to approve voluntary annexation of three parcels totaling 6.55 acres that CRG confirmed are part of its planned hyperscale data center campus on… |  |  |
| Aug 18, 2026 | 6539 Burkhalter Road, Statesboro, GA (Tax Parcel 101 000001 000)Statesboro City Council action agenda | Zoning | Zoning map amendment from R-4 to O on 26.49 acres for a proposed data center; approved 3-2 with the mayor breaking the tie. A lawsuit challenging the rezoning was filed in…Zoning map amendment RZ 26-07-05 · approved |  |  |
| Aug 11, 2026 | Smithfield Gateway, East Stroudsburg area, PASmithfield Township Open Developer Projects | Zoning | Conditional use application for a single two-story 250,000 square foot data center; resubmission documents were filed by the applicant August 11, 2026 and the township page was… |  |  |

1228 permits shown

## Substations and switchyards for data centers

Permit and land-use records that name a substation, switchyard or transmission line together with a data center. Voltage and megawatts appear only where the record states them.

| Date | Name | Kind | Place | Record | kV | Status | Source |
| --- | --- | --- | --- | --- | --- | --- | --- |
| Sep 24, 2026 | Gardner Property Gardner PropertyGardner Property Gardner Property - This is a request for a special use permit (SUP) to allow data centers and an electric substation outside of the Data Center Opportunity Zone Overlay District, and… | Substation | Prince William, VA | SUP2027-00008 |  | Under review |  |
| Sep 14, 2026 | Elm Road-Racine Transmission Line ProjectAmerican Transmission Company LLCThe PSC Final Decision dated September 14, 2026 authorizes ATC to build the Elm Road-Racine 345 kV project (estimated $63,959,000), which the applicant said is needed partly to serve a new large data… | Cpcn | Milwaukee, Racine, WI | 137-CE-215 | 345 | Approved |  |
| Sep 14, 2026 | Ozaukee County Distribution Interconnection ProjectAmerican Transmission Company LLCATC filed a new CPCN application (PSC REF# 610442, received 9/14/2026) for two double-circuit 345 kV lines to a new Decker Substation in Port Washington and related substations, to serve the Vantage… | Cpcn | Ozaukee, Sheboygan, Washington, Fond du Lac, Calumet, Manitowoc, WI | 137-CE-229 | 345 | Filed |  |
| Sep 3, 2026 | Baku 765 kV Extension No. 1 Transmission Line ProjectAEP Ohio Transmission Company, Inc.AEP Ohio Transmission Company filed a letter of notification (e-filed 9/3/2026) to cut into the Baker-Don Marquis 765 kV line and build about 1.4 miles of new 765 kV line to the proposed Baku Station… | Transmission line | Pike, OH | 26-0869-EL-BLN | 765 | Filed |  |
| Sep 3, 2026 | Baku 765 kV Extension No. 2 Transmission Line ProjectAEP Ohio Transmission Company, Inc.AEP Ohio Transmission Company filed a letter of notification (e-filed 9/3/2026) to cut into the Baker-Don Marquis 765 kV line and build about 1.1 miles of new 765 kV line into the north side of the… | Transmission line | Pike, OH | 26-0868-EL-BLN | 765 | Filed |  |
| Sep 3, 2026 | Monza 345 kV Station ProjectAEP Ohio Transmission Company, Inc.AEP Ohio Transmission Company filed a letter of notification (e-filed 9/3/2026) for a new 345 kV station on customer property to serve a Piketon customer requesting about 800 MW, at an estimated $146… | Substation | Pike, OH | 26-0866-EL-BLN | 345 | Filed |  |
| Aug 27, 2026 | Baku 765 kV Station ProjectAEP Ohio Transmission Company, Inc.AEP Ohio Transmission Company filed a letter of notification (e-filed 8/27/2026) for a new 68-acre 765 kV substation in Scioto Township, Pike County, part of the Piketon Area Improvements that AEP… | Substation | Pike, OH | 26-0867-EL-BLN | 765 | Filed |  |
| Aug 19, 2026 | Madera Farm Madera Farm SUPThe second request is for a special use permit to allow for data centers up to 75 feet in height (not including rooftop mechanical equipment and rooftop screening walls) and electric substations… | Substation | Prince William, VA | SUP2027-00002 |  | Under review |  |
| Aug 3, 2026 | ACS Data Center Phase I SubstationX TEAM /// ACS Data Center Phase I Substation X TEAM /// /// Control House Permit Related to PB26-06650 Commercial Accessory Structure New | Substation | Tarrant, TX | PB26-11057 |  | Awaiting client reply |  |
| Jul 31, 2026 | Madera Farm SUP Madera Farm SUPThe second request is for a special use permit to allow for data centers up to 75 feet in height (not including rooftop mechanical equipment and rooftop screening walls) and electric substations… | Substation | Prince William, VA | SUP2027-00002 |  | Under review |  |
| Jul 24, 2026 | Baku-Gavin 765 kV Transmission Line ProjectAEP Ohio Transmission Company, Inc.AEP Ohio Transmission Company applied to the OPSB (e-filed 7/24/2026) for about 51 miles of 765 kV line from the proposed Baku Substation to Gavin Substation to serve data center development at the… | Transmission line | Pike, Jackson, Gallia, OH | 26-0426-EL-BTX | 765 | Filed |  |
| Jul 16, 2026 | GAINESVILLE CROSSING DATA CENTERGAINESVILLE CROSSING DATA CENTER - BUILDING 4 GAINESVILLE CROSSING DATA CENTER - Showing substation infrastructure on the previosly approved substation pad. | Substation | Prince William, VA | PCR2027-00007 |  | Approved |  |
| Jul 1, 2026 | X TEAM /// ACS Data Center CampusX TEAM /// ACS Data Center Campus - Substation Retaining Wall X TEAM /// New retaining wall for the ACS Data Center substation. | Substation | Tarrant, TX | PB26-09476 |  | Awaiting client reply |  |
| Jun 3, 2026 | Southgate South Southgate South REZ & PRA and Southgate South SUPThe first request is to amend and supersede the proffers associated with #REZ1980-0003 and #REZ1989-0035 to allow for the development of data centers, an electric substation, and secondary uses with… | Substation | Prince William, VA | REZ2026-00044 |  | Pending |  |
| Jun 3, 2026 | Southgate South SUP Southgate South PRA and Southgate South SUPThe first request is to amend and supersede the proffers associated with #REZ1980-0003 and #REZ1989-0035 to allow for the development of data centers, an electric substation, and secondary uses with… | Substation | Prince William, VA | SUP2026-00035 |  | Pending |  |
| May 22, 2026 | Atlantic Funding Development PRA Atlantic Funding Development PRA & Atlantic Funding Development SUPThe first request is to amend and supersede the proffers associated with #REZ1988-0009 to allow for the development of data centers, an electric substation, and secondary uses with associated… | Substation | Prince William, VA | REZ2026-00041 |  | Pending |  |
| May 22, 2026 | Atlantic Funding Development SUP Atlantic Funding Development PRA & Atlantic Funding Development SUPThe first request is to amend and supersede the proffers associated with #REZ1988-0009 to allow for the development of data centers, an electric substation, and secondary uses with associated… | Substation | Prince William, VA | SUP2026-00033 |  | Pending |  |
| May 22, 2026 | This project is located at the parcel between Leesburg Pike, Ashburn Village Blvd, and RussellScope of development includes data center buildings with one substation and improvements per applicable proffers. | Substation | Loudoun, VA | GISU-2026-0041 |  | Submitted |  |
| May 7, 2026 | Sugarloaf 500/230 kV Transmission Line ProjectPPL Electric Utilities CorporationPPL's siting application (filed 4/6/2026) for 11.2 miles of new double-circuit 230 kV line built for future 500 kV and related work in Luzerne County is contested; the OCA says the first Hazle… | Transmission line | Luzerne, PA | A-2026-3061547 | 500 | Pending |  |
| Apr 23, 2026 | Charlottesville-Gordonsville 230 kV Rebuild ProjectDominion Energy VirginiaDominion's application (Application No. 359, filed April 23, 2026) seeks to rebuild the Charlottesville-Gordonsville 230 kV line, citing 26 delivery point requests tied to new data center… | Transmission line | Albemarle, Orange, Louisa, VA | PUR-2026-00050 | 230 | Pending |  |
| Apr 8, 2026 | From PD 1420 Planned Development for Specific Uses including data center with development standardsFrom PD 1420 Planned Development for Specific Uses including data center with development standards: Site plan required to Amend "PD1420" to add electrical substation, increase maximum building… | Substation | Tarrant, TX | ZC-26-041 |  |  |  |
| Mar 12, 2026 | Culpeper Tech Zone 230 kV Electric Transmission ProjectDominion Energy VirginiaThe SCC issued its Final Order approving the project on March 12, 2026; it includes four new substations in the Culpeper Tech Zone and a 230 kV line to support data center load growth. | Transmission line | Culpeper, Orange, Fauquier, VA | PUR-2025-00032 | 230 | Approved |  |
| Mar 5, 2026 | Loudoun Business Park LOUDOUN BUSINESS PARK CMPT-2026-0010SPEX-2025-0073: A Special Exception to permit a utility substation in the IP Zoning District (Landbay A). | Substation | Loudoun, VA | CMPT-2026-0010 |  | In review |  |
| Feb 27, 2026 | 500 kV Morrisville-Wishing Star Line #5008 and related projectsDominion Energy VirginiaDominion filed on February 27, 2026 to add a 500 kV line in the existing Morrisville-Wishing Star corridor; the SCC set a public evidentiary hearing starting November 16, 2026 and a comment deadline… | Transmission line | Fauquier, Prince William, Loudoun, VA | PUR-2026-00021 | 500 | Pending |  |
| Feb 19, 2026 | Glenn Drive North & South GLENN DRIVE NORTH & SOUTH ZMAP-2024-0002SPEX-2024-0062: A Special Exception to permit a Utility Substation on PIN # 033-29-0948-000. | Substation | Loudoun, VA | ZMAP-2026-0001 |  | In review |  |
| Dec 22, 2025 | ALIGNED DATA CENTER PHX06 / SRP SUBSTATIONSRPALIGNED DATA CENTER PHX06 / SRP SUBSTATION - SCREEN WALL W INNOVATION ST & ELLIS ST DevServices Building Revision | Substation | Maricopa, AZ | BLDREV25-0483 |  | Awaiting client reply |  |
| Oct 1, 2025 | Spring Valley Technology Park See LEGI-2024-0074 for all documents, timelines and workflow. MinorMinor Special Exception to Modify Type C Buffer requirements for Utility Substations along portions of the proposed substation that are adjacent to compatible data center development Special Exception | Substation | Loudoun, VA | SPEX-2025-0136 |  | In review |  |
|  | Comprehensive Plan Compliance Review, Blaisdell Data Center...to review compliance with the Comprehensive Plan, in accordance with Virginia Code Section 15.2-2232, for placement of a proposed public utility or public service corporation specifically an… | Substation | Stafford, VA | COM25156168 |  | Pending |  |
|  | Comprehensive Plan Compliance Review, Forest Lane Data CenterComprehensive Plan Compliance Review, Forest Lane Data Center: A request to review compliance with the Comprehensive Plan, in accordance with Virginia Code Section 15.2-2232, for placement of a… | Substation | Stafford, VA | COM25156545 |  | Pending |  |
|  | Comprehensive Plan Compliance Review, GWV Data CenterComprehensive Plan Compliance Review, GWV Data Center: A request to review compliance with the Comprehensive Plan, in accordance with Virginia Code Section 15.2-2232, for placement of a proposed… | Substation | Stafford, VA | COM24155957 |  | Pending |  |
|  | Conditional Use Permit, Austin Ridge Logistics CenterConditional Use Permit, Austin Ridge Logistics Center: A request for a conditional use permit (CUP) to exceed the maximum height limitation, with a height of up to 95 feet for data center buildings… | Substation | Stafford, VA | CUP24155875 |  | Pending |  |
|  | Conditional Use Permit, Blaisdell Data Center A conditional use permit (CUP) to allow a publicConditional Use Permit, Blaisdell Data Center A conditional use permit (CUP) to allow a public facility/utility, specifically an electrical substation in the M-: Conditional Use Permit, Blaisdell… | Substation | Stafford, VA | CUP25156166 |  | Pending |  |
|  | Conditional Use Permit, Forest Lane Data Center A conditional use permit (CUP) to allow a publicConditional Use Permit, Forest Lane Data Center A conditional use permit (CUP) to allow a public facility/utility, specifically an electrical substation, in the: Conditional Use Permit, Forest Lane… | Substation | Stafford, VA | CUP25156542 |  | Pending |  |
|  | Conditional Use Permit, GWV Data Center A conditional use permit (CUP) to allow a public utilityConditional Use Permit, GWV Data Center A conditional use permit (CUP) to allow a public utility, specifically an electrical substation, and exceed the maximum : Conditional Use Permit, GWV Data… | Substation | Stafford, VA | CUP24155956 |  | Pending |  |
|  | Conditional Use Permit- Kings Hill SubstationConditional Use Permit- Kings Hill Substation - Cranes Corner Data Center: A request for a conditional use permit (CUP), for the placement of an electrical substation facility on a portion of Tax… | Substation | Stafford, VA | CUP26157298 |  | Pending |  |
|  | Old Potomac Church Electric SubstationComprehensive Plan Compliance Review, Old Potomac Church Electric Substation: A request to review compliance with the Comprehensive Plan, in accordance with Virginia Code Section 15.2-2232, for the… | Substation | Stafford, VA | COM23154992 |  | Pending |  |
|  | Vantage VA41 SubstationComprehensive Compliance Review, Vantage VA41 Substation: A request to review compliance with the Comprehensive Plan, in accordance with Virginia Code Section 15.2-2232, for placement of a proposed… | Substation | Stafford, VA | COM25156787 |  | Pending |  |
|  | Vantage VA41 SubstationConditional Use Permit, Vantage VA41 Substation: A request for a conditional use permit (CUP) to allow a public facility/utility, specifically an electrical substation, in the M-1, Light Industrial… | Substation | Stafford, VA | CUP25156640 |  | Pending |  |

## State air permits for data center generators

A data center's backup generators and on-site turbines need an air permit, so the permit is often the first public record of a campus's size. 407 records from 23 state and county air agencies, naming 788 generators where the record states a count.

| Date | Facility | Place | Agency | Permit | Generators | Source |
| --- | --- | --- | --- | --- | --- | --- |
| Oct 16, 2026 | SA01 DATA CENTER (DECENNIAL TX LLC) | TX | Texas TCEQ | 185751ACTIVE |  |  |
| Oct 13, 2026 | BORDEN DATA CENTER (SE DC DEVCO LLC) | Gail, TX | Texas TCEQ | 185712PENDING |  |  |
| Oct 6, 2026 | Microsoft Corporation, CLT04 and CLT05 | Conover, NC | North Carolina DEQ Division of Air Quality | 10824R01Synthetic Minor permit, active |  |  |
| Oct 5, 2026 | EDC FORT WORTH (EDC FORT WORTH 2 LLC) | Fort Worth, TX | Texas TCEQ | 185604PENDING |  |  |
| Oct 2, 2026 | GEOPETRO LLC - ROSEBUD DATA CENTER | OH | Ohio EPA | CORRESPONDENCE |  |  |
| Sep 24, 2026 | Amazon Data Services, Inc. | IN | Indiana IDEM | 073-50413-00077Notice of 30-Day Public Comment Period for Draft Air Permit , comment period 09/24/2026 - 10/24/2026 |  |  |
| Sep 22, 2026 | Osmium Data Center | West Des Moines, IA | Iowa DNR | 69734Submittal Received |  |  |
| Sep 18, 2026 | CEMCO-348 CBP SWEETWATER 2 DATA CENTER (VAN EATON READY MIX INC) | TX | Texas TCEQ | 185401L001PENDING |  |  |
| Sep 18, 2026 | Valara Holdings High Performance Compute Center, 4000 S Pine StreetNatural gas | Spartanburg, SC | SC DES Bureau of Air Quality | CP-50000422 v1.0Issued |  |  |
| Sep 16, 2026 | MIDAS COMPUTE - BIG SPRING FACILITY (NDS VENTURES INC) | Big Spring, TX | Texas TCEQ | 185376PENDING |  |  |
| Sep 14, 2026 | VKU SITE (PLATON INVESTMENTS LLC) | TX | Texas TCEQ | 185353PENDING |  |  |
| Sep 14, 2026 | Takanock Tallmadge LLCDiesel | Strasburg, VA | Virginia DEQ | Planned |  |  |
| Sep 8, 2026 | COLOGIX | OH | Ohio EPA | P0140565APPROVAL OR ACKNOWLEDGEMENT |  |  |
| Aug 31, 2026 | ALIGNED DATA CENTERS - CMH01 | OH | Ohio EPA | P0140511APPROVAL OR ACKNOWLEDGEMENT |  |  |
| Aug 28, 2026 | Amazon Data Services, Inc. - Energy Way Tech Campus | Hamlet, NC | North Carolina DEQ Division of Air Quality | 10894R00Title V permit, active |  |  |
| Aug 26, 2026 | 2425 Busse Road LLC | Elk Grove Village, IL | Illinois EPA | 07100077Operating - FESOP, Renewal, public notice |  |  |
| Aug 25, 2026 | Westside Parkway Owner LLC | GA | Georgia EPD | 7374-121-0846-S-03-0issued, SIP permit |  |  |
| Aug 19, 2026 | EdgeConneX PHX11 | Mesa, AZ | Maricopa County Air Quality Department | P0015362Public Notice, comment period 08/19/2026 to 09/18/2026 |  |  |
| Aug 17, 2026 | Amazon Data Services, Inc. | IN | Indiana IDEM | 141-50312-00650Notice of 30-Day Public Comment Period for Draft Air Permit , comment period 08/17/2026 - 09/16/2026 |  |  |
| Aug 12, 2026 | SAT14 (CYRUSONE LLC) | TX | Texas TCEQ | 184983ACTIVE |  |  |
| Aug 12, 2026 | BLUESTEM TECHNOLOGY PARK (BLUESTEM TECHNOLOGY PARK LLC) | TX | Texas TCEQ | 184984PENDING |  |  |
| Aug 6, 2026 | AUS02 FACILITY (PRIME DATA CENTERS LLC) | TX | Texas TCEQ | 184914PENDING |  |  |
| Aug 6, 2026 | EDGECONNEX NEW ALBANY NORTH | OH | Ohio EPA | P0140005DRAFT FOR PUBLIC COMMENT |  |  |
| Jul 31, 2026 | AWS-PROJECT EAGLE (AMAZON DATA SERVICES INC) | TX | Texas TCEQ | 185226ACTIVE |  |  |
| Jul 29, 2026 | Ginger West Data Center - 11100 Booneville Rd | West Des Moines, IA | Iowa DNR | 69219Technical Review |  |  |
| Jul 23, 2026 | KMT AZURITE ENERGY (KMT AZURITE SOLAR LLC) | TX | Texas TCEQ | 184768PENDING |  |  |
| Jul 23, 2026 | KMT AZURITE ENERGY (KMT AZURITE SOLAR LLC) | TX | Texas TCEQ | 184915ACTIVE |  |  |
| Jul 21, 2026 | CyrusOne DFW20A DFW20B DFW20C | Fairfield, TX | TCEQ Office of Air | 184743Issued |  |  |
| Jul 10, 2026 | CEMCO-403 & 365 CBP CLOCKTOWER DATA CENTER (VAN EATON READY MIX INC) | TX | Texas TCEQ | 184640L001ACTIVE |  |  |
| Jul 10, 2026 | ROYSE CITY DATA CENTER (BT GATEWAY DATA CENTER LLC) | Royse City, TX | Texas TCEQ | 185291PENDING |  |  |
| Jul 6, 2026 | Skyward Holdings LLC | Moseley, VA | Virginia DEQ | Planned |  |  |
| Jul 2, 2026 | Amazon Data Services Inc IAD-310/311/312Diesel | Bristow, VA | Virginia DEQ | Planned |  |  |
| Jul 2, 2026 | Amazon Data Services Inc IAD-319Diesel | Manassas, VA | Virginia DEQ | Planned |  |  |
| Jul 2, 2026 | EDI Louisa 1 LLCDiesel | Louisa, VA | Virginia DEQ | Planned |  |  |
| Jul 2, 2026 | Hutto Data Center Campus, 4251 County Road 132 | Hutto, TX | TCEQ Office of Air | 174373Issued |  |  |
| Jul 1, 2026 | Twin Creeks CampusDiesel | Leesburg, VA | Virginia DEQ | Planned |  |  |
| Jun 30, 2026 | Equinix Atlanta Data Center | GA | Georgia EPD | 7374-151-0068-E-01-0issued, SIP permit |  |  |
| Jun 30, 2026 | Rosewall Pines Holdings LLC | GA | Georgia EPD | 7374-285-0109-S-01-0issued, SIP permit |  |  |
| Jun 30, 2026 | Flint Road Owner LLCDiesel | Chantilly, VA | Virginia DEQ | Planned |  |  |
| Jun 29, 2026 | SDC ATLA | GA | Georgia EPD | 7374-097-0103-S-01-0issued, SIP permit |  |  |
| Jun 29, 2026 | Amazon Data Services, Inc. ATL089 Campus | GA | Georgia EPD | 7374-217-0078-E-01-0issued, SIP permit |  |  |
| Jun 29, 2026 | ATL2 Data Center | GA | Georgia EPD | 7374-217-0079-S-01-0issued, SIP permit |  |  |
| Jun 26, 2026 | Laidley LLC / Laidley Data Center | LA | Louisiana DEQ | 2460-00035-01PROPOSED SYNTHETIC MINOR SOURCE AIR OPERATING PERMIT, comment deadline 7/30/2026 |  |  |
| Jun 19, 2026 | SCHLACHTER REALTY (SCHLACHTER REALTY LTD) | TX | Texas TCEQ | 184454PENDING |  |  |
| Jun 19, 2026 | SCHLACHTER REALTY (SCHLACHTER REALTY LTD) | TX | Texas TCEQ | N334PENDING |  |  |
| Jun 17, 2026 | Amazon Data Services Inc IAD-264Diesel | Gainesville, VA | Virginia DEQ | Under Construction |  |  |
| Jun 15, 2026 | STAMPEDE DATA CENTER (ROWAN STAMPEDE LLC) | TX | Texas TCEQ | 184409ACTIVE |  |  |
| Jun 12, 2026 | WESTLINE 2335 (WESTLINE TX HOLDINGS LLC) | TX | Texas TCEQ | 184380PENDING |  |  |
| Jun 12, 2026 | WESTLINE 2335 (WESTLINE TX HOLDINGS LLC) | TX | Texas TCEQ | GHGPSDTX275PENDING |  |  |
| Jun 12, 2026 | WESTLINE 2335 (WESTLINE TX HOLDINGS LLC) | TX | Texas TCEQ | HAP93PENDING |  |  |
| Jun 12, 2026 | WESTLINE 2335 (WESTLINE TX HOLDINGS LLC) | TX | Texas TCEQ | PSDTX1710PENDING |  |  |
| Jun 12, 2026 | Vantage Data Centers Lighthouse campusDiesel | Port Washington, WI | Wisconsin DNR Air Management | 25-MIN-094; 24618528A-F01Issued |  |  |
| Jun 11, 2026 | Core Scientific-Dalton 4 Enterprise Drive | GA | Georgia EPD | 7374-313-0172-S-01-0issued, SIP permit |  |  |
| Jun 10, 2026 | LBB120 HORIZON JUNCTION TECHNOLOGY PARK (AMAZON DATA SERVICES INC) | TX | Texas TCEQ | 184356ACTIVE |  |  |
| Jun 1, 2026 | DataBank Data Center Culpeper LLCDiesel | Culpeper, VA | Virginia DEQ | Planned |  |  |
| May 21, 2026 | GOLDENEYE (MONTERA INFRASTRUCTURE II LLC) | TX | Texas TCEQ | 184146ACTIVE |  |  |
| May 18, 2026 | WOODROW DATA CENTER & POWER PLANT (NOLAN RANCH DC OWNER LLC) | TX | Texas TCEQ | 184114ACTIVE |  |  |
| May 14, 2026 | Helio Capital LLC | Daleville, VA | Virginia DEQ | Planned |  |  |
| May 13, 2026 | JAKE FACILITY (NYDIG DFM LLC) | TX | Texas TCEQ | 184050ACTIVE |  |  |
| May 6, 2026 | MILAM COUNTY DC (HAYS CITY CORPORATION) | Burlington, TX | Texas TCEQ | 183969ACTIVE |  |  |
| May 6, 2026 | Equinix CH-5 Data Center | Elk Grove Village, IL | Illinois EPA | 26010002Operating - FESOP, New, public notice |  |  |
| May 5, 2026 | PLATON SITE (PLATON INVESTMENTS LLC) | TX | Texas TCEQ | 183941ACTIVE |  |  |
| May 5, 2026 | Flexential Corporation | GA | Georgia EPD | 7374-097-0100-S-01-1issued, SIP permit |  |  |
| May 1, 2026 | MEITNER ENERGY CENTER (FOUNDATIONAL SITE GROUP LLC) | TX | Texas TCEQ | 183910ACTIVE |  |  |
| May 1, 2026 | MEITNER ENERGY CENTER (IP MEITNER GAS LLC) | TX | Texas TCEQ | 184049ACTIVE |  |  |
| Apr 21, 2026 | DUNAMIS GAS (DUNAMIS BESS LLC) | Stockdale, TX | Texas TCEQ | 183795ACTIVE |  |  |
| Apr 13, 2026 | ADP Appomattox Data Hub LLC | Appomattox, VA | Virginia DEQ | Planned |  |  |
| Apr 6, 2026 | Sabey Intergate | Quincy, WA | Washington Ecology | 26AQ-E016Notice of Construction permit (approval order) and technical support document |  |  |
| Mar 26, 2026 | Elk Grove Village (CHI10-11-12) Data Center | Elk Grove, IL | Illinois EPA | 20120039Operating - FESOP, New, public notice |  |  |
| Mar 25, 2026 | Edgeconnex ATL11, LLC | GA | Georgia EPD | 7374-121-0977-S-01-1issued, SIP permit |  |  |
| Mar 18, 2026 | Iron Mountain Information Management LLC | Sandston, VA | Virginia DEQ | Planned | 130 |  |
| Mar 9, 2026 | CIRCE ENERGY DATA CENTERS E MONAHANS CAMPUS (CIRCE ENERGY LLC) | TX | Texas TCEQ | 183234ACTIVE |  |  |
| Mar 9, 2026 | POOLSIDE DATA CENTER PECOS COUNTY II (POOLSIDE LF PHASE 2 DC OPS LLC) | TX | Texas TCEQ | 183235ACTIVE |  |  |
| Mar 5, 2026 | HARVEY DFM (NYDIG DFM LLC) | TX | Texas TCEQ | 183213ACTIVE |  |  |
| Feb 20, 2026 | WURLDWIDE (WURLDWIDE LLC) | TX | Texas TCEQ | 183096ACTIVE |  |  |
| Feb 10, 2026 | Edged Energy Atlanta Data Center | GA | Georgia EPD | 7374-121-0972-S-01-1issued, SIP permit |  |  |
| Feb 5, 2026 | JOURNEY SITE (HOMEBOUND GROUP LLC) | Haskell, TX | Texas TCEQ | 182922ACTIVE |  |  |
| Jan 28, 2026 | DCB Atlanta West, LLC | GA | Georgia EPD | 7374-097-0102-S-01-0issued, SIP permit |  |  |
| Jan 22, 2026 | CyrusOne | Quincy, WA | Washington Ecology | 26AQ-E008Notice of Construction permit (approval order), Technical Support Document, and Response to Comments |  |  |
| Jan 22, 2026 | Joule Capital Partners, LLCNatural gas; diesel | Fillmore, UT | Utah Division of Air Quality | DAQE-AN162810001-26Issued |  |  |
| Jan 15, 2026 | TEMPLE DATA CENTER (ROWAN TEMPLE LLC) | TX | Texas TCEQ | 182703ACTIVE |  |  |
| Jan 6, 2026 | VANTAGE DATA CENTERS TX3 (VANTAGE DATA CENTERS TX301 LLC) | Abilene, TX | Texas TCEQ | 182627ACTIVE |  |  |
| Jan 2, 2026 | T5@Chicago II LP | Elk Grove Village, IL | Illinois EPA | 21080029Operating - FESOP, New, public notice |  |  |
| Dec 22, 2025 | COLOVORE AUSTIN 1 (COLOVORE AUSTIN 1 LLC) | Hutto, TX | Texas TCEQ | 182558ACTIVE |  |  |
| Dec 19, 2025 | PointOne Richmond LLC | Charles City, VA | Virginia DEQ | Planned |  |  |
| Dec 18, 2025 | MISAE WILSON DC 500MW (MISAE GAS POWER LLC) | Stockdale, TX | Texas TCEQ | 182518ACTIVE |  |  |
| Dec 8, 2025 | Amazon Data Services, Inc. IAD-110, IAD-111, IAD-112, and IAD-113Diesel | Gainesville, VA | Virginia DEQ | Planned |  |  |
| Dec 4, 2025 | CINCO SITE (STREAMLINE UTILITY HOLDINGS LLC) | TX | Texas TCEQ | 182375ACTIVE |  |  |
| Dec 3, 2025 | Clean Arc Data Centers - VA-1 CampusDiesel | Ruther Glen, VA | Virginia DEQ | Planned |  |  |
| Dec 2, 2025 | Amazon Data Services Inc. IAD-557Diesel | Louisa, VA | Virginia DEQ | Planned |  |  |
| Nov 25, 2025 | QTS Richmond V LLCDiesel | Sandston, VA | Virginia DEQ | Planned | 255 |  |
| Nov 24, 2025 | Amazon Data Services Inc IAD-170Diesel | Stone Ridge, VA | Virginia DEQ | Planned |  |  |
| Nov 24, 2025 | Vantage Data Centers VA41 LLCDiesel | Fredericksburg, VA | Virginia DEQ | Planned |  |  |
| Nov 21, 2025 | Word of Grace Data CenterDiesel | Herndon, VA | Virginia DEQ | Planned |  |  |
| Nov 10, 2025 | Peanut LLC | Chester, VA | Virginia DEQ | Planned | 108 |  |
| Nov 4, 2025 | ACS - DFW CAMPUS HICKS FIELD (TURNER CONSTRUCTION COMPANY) | Fort Worth, TX | Texas TCEQ | 184913PENDING |  |  |
| Oct 22, 2025 | CLOUDBURST DATA CENTERS (EVOLVE HOLDINGS INC) | New Braunfels, TX | Texas TCEQ | 181930ACTIVE |  |  |
| Oct 22, 2025 | CLOUDBURST DATA CENTERS (CLOUDBURST INC) | New Braunfels, TX | Texas TCEQ | 182284CANCELLED |  |  |
| Oct 22, 2025 | SDC Ashburn I - SE Parcel CampusDiesel | Sterling, VA | Virginia DEQ | Planned |  |  |
| Oct 10, 2025 | SI DFW02A (SI DFW02A LLC) | TX | Texas TCEQ | 181818ACTIVE |  |  |
| Oct 10, 2025 | CIRCE PERMIAN DATA CENTER (CIRCE ENERGY LLC) | TX | Texas TCEQ | 181822ACTIVE |  |  |
| Oct 10, 2025 | SI DFW02A (SI DFW02A LLC) | TX | Texas TCEQ | 183396ACTIVE |  |  |
| Sep 17, 2025 | Herndon Technology Partners LLCDiesel | Herndon, VA | Virginia DEQ | Planned |  |  |
| Sep 17, 2025 | Amazon Data Services Inc IAD-45Diesel | Manassas, VA | Virginia DEQ | Planned |  |  |
| Sep 17, 2025 | Valara Holdings High Performance Compute Center, 4000 S Pine StreetNatural gas | Spartanburg, SC | SC DES Bureau of Air Quality | CP-50000316Issued |  |  |
| Sep 3, 2025 | Westfax Property Owner A LP/Westfax 4-5ADiesel | Chantilly, VA | Virginia DEQ | Planned |  |  |
| Aug 27, 2025 | Tapaha Dynamics, LLC | Lenoir, NC | North Carolina DEQ Division of Air Quality | 09733T11Title V permit, active |  |  |
| Aug 27, 2025 | BARBER LAKE DATA CENTER PROJECT (CIPHER BARBER LAKE LLC) | Colorado City, TX | Texas TCEQ | 182754ACTIVE |  |  |
| Aug 18, 2025 | Amazon Data Services, Inc. ATL068 and ATL078 Campuses | GA | Georgia EPD | 7374-097-0101-S-01-0issued, SIP permit |  |  |
| Aug 15, 2025 | THELMA SITE (HOMEBOUND GROUP LLC) | TX | Texas TCEQ | 181174ACTIVE |  |  |
| Aug 12, 2025 | ADC DFW03 (ALIGNED DATA CENTERS MANSFIELD PROPCO LLC) | Mansfield, TX | Texas TCEQ | 182341ACTIVE |  |  |
| Aug 11, 2025 | Amazon Data Services IAD-870 | Fredericksburg, VA | Virginia DEQ | Planned |  |  |
| Aug 6, 2025 | Aligned Data Center (EGV) PropCo LLC | Elk Grove Village, IL | Illinois EPA | 24050021Construction, New, public notice |  |  |
| Aug 4, 2025 | GW RANCH ENERGY CENTER (PACIFICO GW LLC) | TX | Texas TCEQ | 181033ACTIVE |  |  |
| Aug 4, 2025 | GW RANCH ENERGY CENTER (PACIFICO GW LLC) | TX | Texas TCEQ | GHGPSDTX255ACTIVE |  |  |
| Aug 4, 2025 | GW RANCH ENERGY CENTER (PACIFICO GW LLC) | TX | Texas TCEQ | PSDTX1672ACTIVE |  |  |
| Aug 1, 2025 | FERMI AMERICA PROJECT MATADOR (FERMI EQUIPMENT HOLDCO LLC) | TX | Texas TCEQ | 181009ACTIVE |  |  |
| Aug 1, 2025 | FERMI AMERICA PROJECT MATADOR (FERMI EQUIPMENT HOLDCO LLC) | TX | Texas TCEQ | 183462PENDING |  |  |
| Aug 1, 2025 | FERMI AMERICA PROJECT MATADOR (FERMI EQUIPMENT HOLDCO LLC) | TX | Texas TCEQ | GHGPSDTX254ACTIVE |  |  |
| Aug 1, 2025 | FERMI AMERICA PROJECT MATADOR (FERMI EQUIPMENT HOLDCO LLC) | TX | Texas TCEQ | GHGPSDTX271PENDING |  |  |
| Aug 1, 2025 | FERMI AMERICA PROJECT MATADOR (FERMI EQUIPMENT HOLDCO LLC) | TX | Texas TCEQ | PSDTX1670ACTIVE |  |  |
| Aug 1, 2025 | FERMI AMERICA PROJECT MATADOR (FERMI EQUIPMENT HOLDCO LLC) | TX | Texas TCEQ | PSDTX1704PENDING |  |  |
| Jul 29, 2025 | GA1 | GA | Georgia EPD | 7374-157-0077-S-01-0issued, SIP permit |  |  |
| Jul 1, 2025 | DFW10 DFW11 DFW17A DFW17B DFW17C (CYRUSONE LLC) | TX | Texas TCEQ | 180711ACTIVE |  |  |
| Jul 1, 2025 | DFW10 DFW11 DFW17A DFW17B DFW17C (CYRUSONE LLC) | TX | Texas TCEQ | 4941PENDING |  |  |
| Jun 20, 2025 | QUANTUM EXPEDITIONS SILSBEE FACILITY (QUANTUM EXPEDITIONS INC) | TX | Texas TCEQ | 180587ACTIVE |  |  |
| Jun 11, 2025 | PROJECT LLANO (ROBINSON CONSTRUCTION) | Claude, TX | Texas TCEQ | 182124ACTIVE |  |  |
| Jun 11, 2025 | PROJECT LLANO (ROBINSON CONSTRUCTION) | Claude, TX | Texas TCEQ | 182880PENDING |  |  |
| Jun 11, 2025 | PROJECT LLANO (AGRILAND FS INC) | Claude, TX | Texas TCEQ | GHGPSDTX268PENDING |  |  |
| Jun 11, 2025 | PROJECT LLANO (CRUSOE TECHNOLOGIES LLC) | Claude, TX | Texas TCEQ | PSDTX1698PENDING |  |  |
| Jun 9, 2025 | Amazon Data Services Inc - IAD-457Diesel | Woodford, VA | Virginia DEQ | Planned |  |  |
| Jun 6, 2025 | DB Data Center Boulder Park, LLC | GA | Georgia EPD | 7374-121-0984-S-01-0issued, SIP permit |  |  |
| May 29, 2025 | NEXUS DATA CENTER HUBBARD (NEXUS HUBBARD POWER LLC) | Hubbard, TX | Texas TCEQ | 180320ACTIVE |  |  |
| May 29, 2025 | NEXUS DATA CENTER HUBBARD (NEXUS HUBBARD POWER LLC) | Hubbard, TX | Texas TCEQ | 180353ACTIVE |  |  |
| May 29, 2025 | NEXUS DATA CENTER HUBBARD (NEXUS HUBBARD POWER LLC) | Hubbard, TX | Texas TCEQ | 183046PENDING |  |  |
| May 29, 2025 | NEXUS DATA CENTER HUBBARD (NEXUS HUBBARD POWER LLC) | Hubbard, TX | Texas TCEQ | GHGPSDTX269PENDING |  |  |
| May 29, 2025 | NEXUS DATA CENTER HUBBARD (NEXUS HUBBARD POWER LLC) | Hubbard, TX | Texas TCEQ | HAP91PENDING |  |  |
| May 29, 2025 | NEXUS DATA CENTER HUBBARD (NEXUS HUBBARD POWER LLC) | Hubbard, TX | Texas TCEQ | PSDTX1700PENDING |  |  |
| May 21, 2025 | Amazon Data Services Inc IAD-180, IAD-181, IAD-182, & IAD-183Diesel | Sterling, VA | Virginia DEQ | Planned |  |  |
| May 6, 2025 | Vantage Data Centers GA1, LLC | GA | Georgia EPD | 7374-121-0981-S-01-0issued, SIP permit |  |  |
| May 6, 2025 | Vantage Data Centers GA2, LLC | GA | Georgia EPD | 7374-121-0982-S-01-0issued, SIP permit |  |  |
| Apr 25, 2025 | Flexential Corporation | GA | Georgia EPD | 7374-097-0100-S-01-0issued, SIP permit |  |  |
| Apr 10, 2025 | Belmont Innovation CampusDiesel | Ashburn, VA | Virginia DEQ | Planned |  |  |
| Mar 28, 2025 | Microsoft Columbia | Quincy, WA | Washington Ecology | 25AQ-E009Notice of Construction permit (approval order), Technical Support Document, Response to Comments |  |  |
| Mar 26, 2025 | Stream Data Centers | Elk Grove Village, IL | Illinois EPA | 21040035Operating - FESOP, New, public notice |  |  |
| Feb 27, 2025 | Amazon Data Services Inc IAD-205/307/317/612/612xDiesel | Manassas, VA | Virginia DEQ | Planned |  |  |
| Feb 26, 2025 | DCB Atlanta East, LLC | GA | Georgia EPD | 7374-247-0076-B-01-0issued, SIP permit |  |  |
| Feb 20, 2025 | 1501 Moran Road Development Owner LLCDiesel | Sterling, VA | Virginia DEQ | Planned |  |  |
| Feb 4, 2025 | TEMPLE 5MW DATA CENTER (CLOP TEMPLE TX LLC) | Temple, TX | Texas TCEQ | 179065ACTIVE |  |  |
| Jan 21, 2025 | Microsoft Corporation - LYH03 Datacenter | Chase City, VA | Virginia DEQ | Planned |  |  |
| Dec 19, 2024 | DFW9 - DFW12 (DATABANK HOLDINGS LTD) | TX | Texas TCEQ | 178644ACTIVE |  |  |
| Dec 6, 2024 | Amazon Data Services Inc IAD-350Diesel | Stafford, VA | Virginia DEQ | Planned |  |  |
| Nov 26, 2024 | H5 (formerly Intuit) | Quincy, WA | Washington Ecology | 24AQ-E040Notice of Construction permit (approval order), Technical Support Document, and Response to Comments |  |  |
| Nov 22, 2024 | Digital Filigree LLCDiesel | Ashburn, VA | Virginia DEQ | Planned |  |  |
| Nov 15, 2024 | MECP1 Ashburn 2 LLCDiesel | Sterling, VA | Virginia DEQ | Planned |  |  |
| Oct 17, 2024 | QTS Fayetteville I, LLC | GA | Georgia EPD | 7374-113-0073-S-01-2issued, SIP permit |  |  |
| Oct 15, 2024 | DFW7 DFW8 (CYRUSONE LLC) | TX | Texas TCEQ | 177882ACTIVE |  |  |
| Oct 15, 2024 | SDC DFWB CAMPUS (SDC DFW VIII LP) | Wilmer, TX | Texas TCEQ | 178352CANCELLED |  |  |
| Oct 11, 2024 | Amazon Data Services Inc - IAD-243/244/290/291/292Diesel | Sterling, VA | Virginia DEQ | Planned |  |  |
| Sep 26, 2024 | Edgeconnex ATL11, LLC | GA | Georgia EPD | 7374-121-0977-S-01-0issued, SIP permit |  |  |
| Sep 18, 2024 | ALIGNED PLANO DFW04 (ALIGNED DATA CENTERS PLANO PROPCO LLC) | TX | Texas TCEQ | 181676ACTIVE |  |  |
| Sep 17, 2024 | EL PASO 5MW DATA CENTER (CLOP EL PASO TX LLC) | TX | Texas TCEQ | 177565ACTIVE |  |  |
| Aug 22, 2024 | Kincora Data CenterDiesel | Dulles, VA | Virginia DEQ | Planned |  |  |
| Aug 15, 2024 | LONGHORN DATA CENTER (ORACLE AMERICA INC) | Abilene, TX | Texas TCEQ | 177262ACTIVE |  |  |
| Aug 15, 2024 | LONGHORN DATA CENTER (ORACLE AMERICA INC) | Abilene, TX | Texas TCEQ | 177263ACTIVE |  |  |
| Aug 15, 2024 | LONGHORN DATA CENTER (ORACLE AMERICA INC) | Abilene, TX | Texas TCEQ | 182126PENDING |  |  |
| Aug 15, 2024 | LONGHORN DATA CENTER (CRUSOE TECHNOLOGIES LLC) | Abilene, TX | Texas TCEQ | 182267CANCELLED |  |  |
| Aug 15, 2024 | LONGHORN DATA CENTER (CRUSOE TECHNOLOGIES LLC) | Abilene, TX | Texas TCEQ | 4721ACTIVE |  |  |
| Aug 15, 2024 | LONGHORN DATA CENTER (ABILENE DATA CENTER CAMPUS MASTER ASSOCIATION) | Abilene, TX | Texas TCEQ | 4844100274ACTIVE |  |  |
| Aug 15, 2024 | LONGHORN DATA CENTER (ABILENE DATA CENTER CAMPUS MASTER ASSOCIATION) | Abilene, TX | Texas TCEQ | GHGPSDTX263PENDING |  |  |
| Aug 15, 2024 | LONGHORN DATA CENTER (ORACLE AMERICA INC) | Abilene, TX | Texas TCEQ | HAP89PENDING |  |  |
| Aug 15, 2024 | LONGHORN DATA CENTER (ORACLE AMERICA INC) | Abilene, TX | Texas TCEQ | PSDTX1688PENDING |  |  |
| Aug 15, 2024 | LONGHORN DATA CENTER (ABILENE DATA CENTER CAMPUS MASTER ASSOCIATION) | Abilene, TX | Texas TCEQ | TBA009IACTIVE |  |  |
| Jul 18, 2024 | Microsoft Corporation, CLT10 | Maiden, NC | North Carolina DEQ Division of Air Quality | 10849R00Synthetic Minor permit, active |  |  |
| Jul 18, 2024 | Microsoft Corporation, CLT17 | Newton, NC | North Carolina DEQ Division of Air Quality | 10850R00Synthetic Minor permit, active |  |  |
| Jul 11, 2024 | Ensono Data Center | Downers Grove, IL | Illinois EPA | 20020002Operating - FESOP, New, public notice |  |  |
| Jul 5, 2024 | Compass Datacenters ORD I LLC | Hoffman Estates, IL | Illinois EPA | 23110012Construction, New, public notice |  |  |
| Jun 12, 2024 | DFW6 (CYRUSONE LLC) | Richardson, TX | Texas TCEQ | 176645ACTIVE |  |  |
| May 15, 2024 | LANCASTER DATA CENTER (LANCASTER DATA CENTER CAMPUS LP) | Lancaster, TX | Texas TCEQ | 177874ACTIVE |  |  |
| May 3, 2024 | CyrusOne, NVA14Diesel | Ashburn, VA | Virginia DEQ | Planned |  |  |
| Apr 25, 2024 | KLONDIKE PAD 1 (NYDIG DFM LLC) | TX | Texas TCEQ | 176185ACTIVE |  |  |
| Mar 12, 2024 | Microsoft Corporation, CLT04 and CLT05 | Conover, NC | North Carolina DEQ Division of Air Quality | 10824R00Synthetic Minor permit, active |  |  |
| Mar 7, 2024 | Edged Energy Atlanta Data Center | GA | Georgia EPD | 7374-121-0972-S-01-0issued, SIP permit |  |  |
| Feb 29, 2024 | VANTAGE DATA CENTER TX2 (VANTAGE DATA CENTERS TX21 LLC) | San Antonio, TX | Texas TCEQ | 175524ACTIVE |  |  |
| Feb 29, 2024 | VANTAGE DATA CENTER TX2 (VANTAGE DATA CENTERS TX21 LLC) | San Antonio, TX | Texas TCEQ | 4790PENDING |  |  |
| Feb 29, 2024 | VANTAGE DATA CENTER TX2 (VANTAGE DATA CENTERS TX21 LLC) | San Antonio, TX | Texas TCEQ | 4802900727ACTIVE |  |  |
| Feb 29, 2024 | VANTAGE DATA CENTER TX2 (VANTAGE DATA CENTERS TX21 LLC) | San Antonio, TX | Texas TCEQ | BGA040NACTIVE |  |  |
| Feb 19, 2024 | Aligned Data Centers ATL01 | GA | Georgia EPD | 7374-097-0098-S-01-0issued, SIP permit |  |  |
| Feb 16, 2024 | QTS Fayetteville I, LLC | GA | Georgia EPD | 7374-113-0073-S-01-1issued, SIP permit |  |  |
| Feb 15, 2024 | Vantage Data Centers VA16 LLCDiesel | Sterling, VA | Virginia DEQ | Planned |  |  |
| Feb 1, 2024 | MICROSOFT SAT 8990 DATA CENTER PROJECT SITE (LEMARTEC CORPORATION) | TX | Texas TCEQ | 182686ACTIVE |  |  |
| Jan 3, 2024 | Data Center Fulton, LLC | GA | Georgia EPD | 7374-121-0973-S-01-0issued, SIP permit |  |  |
| Dec 20, 2023 | Morning Hornet, LLC | GA | Georgia EPD | 7374-217-0072-S-01-5issued, SIP permit |  |  |
| Nov 28, 2023 | VANTAGE TX 11 (VANTAGE DATA CENTERS TX11 LLC) | San Antonio, TX | Texas TCEQ | 175523ACTIVE |  |  |
| Nov 28, 2023 | VANTAGE TX 11 (THE WHITING-TURNER CONTRACTING COMPANY) | San Antonio, TX | Texas TCEQ | 4791PENDING |  |  |
| Nov 28, 2023 | VANTAGE TX 11 (THE WHITING-TURNER CONTRACTING COMPANY) | San Antonio, TX | Texas TCEQ | 4802900726ACTIVE |  |  |
| Nov 28, 2023 | VANTAGE TX 11 (THE WHITING-TURNER CONTRACTING COMPANY) | San Antonio, TX | Texas TCEQ | BGA039MACTIVE |  |  |
| Nov 16, 2023 | Stadion LLC - Eagle Mountain Data Center | UT | Utah Division of Air Quality | DAQE-FF159410008-23document |  |  |
| Oct 30, 2023 | XENERGY MONAHANS 1 (XENERGY PLUS INC) | Monahans, TX | Texas TCEQ | 174494ACTIVE |  |  |
| Oct 24, 2023 | STREAM SAT03 (SDC SA III LP) | San Antonio, TX | Texas TCEQ | 178964ACTIVE |  |  |
| Oct 19, 2023 | Aligned Energy Data Centers (SLC), LLC- West Jordan Data Center | UT | Utah Division of Air Quality | DAQ-2023-009509document |  |  |
| Oct 11, 2023 | QTS Fayetteville I, LLC | GA | Georgia EPD | 7374-113-0073-S-01-0issued, SIP permit |  |  |
| Sep 21, 2023 | SDC DFW VIII (STREAM DATA CENTERS LP) | Wilmer, TX | Texas TCEQ | 174043ACTIVE |  |  |
| Sep 21, 2023 | Amazon Data Services, Inc. ATL057 | GA | Georgia EPD | 7374-117-0093-B-01-0issued, SIP permit |  |  |
| Sep 20, 2023 | Willow Creek / Ginger East Data Centers | West Des Moines, IA | Iowa DNR | 58850Technical Review |  |  |
|  | CHEROKEE DATA CENTER | OK | Oklahoma DEQ | 2001-002-OISSUED, SYN MINOR |  |  |
|  | PRY DATA STORAGE FACILITY | OK | Oklahoma DEQ | 2007-021-ADISSUED, MAJOR |  |  |
|  | PRY DATA STORAGE FACILITY | OK | Oklahoma DEQ | 2007-021-CISSUED, SYN MINOR |  |  |
|  | DXC TECH SERVICES LLC | OK | Oklahoma DEQ | 2010-011-OISSUED, SYN MINOR |  |  |
|  | PRY DATA STORAGE FACILITY | OK | Oklahoma DEQ | 2014-0047-CISSUED, MAJOR |  |  |
|  | PRY DATA STORAGE FACILITY | OK | Oklahoma DEQ | 2015-1514-CISSUED, MAJOR |  |  |
|  | MYALL LLC | OK | Oklahoma DEQ | 2019-0668-ADISSUED, MINOR |  |  |
|  | PRY DATA STORAGE FACILITY | OK | Oklahoma DEQ | 2021-0235-CISSUED, MAJOR |  |  |
|  | PRY DATA STORAGE FACILITY | OK | Oklahoma DEQ | 2021-0235-TVRISSUED, MAJOR |  |  |
|  | TIERPOINT LLC OKC | OK | Oklahoma DEQ | 2022-0496-OISSUED, MINOR |  |  |
|  | KIPPER FACILITY | OK | Oklahoma DEQ | 2024-1253-CISSUED, SYN MINOR |  |  |
|  | PIONEER FACILITY | OK | Oklahoma DEQ | 2025-0113-CISSUED, SYN MINOR |  |  |
|  | CORE SCIENTIFIC MSK1 MSK2 | OK | Oklahoma DEQ | 2025-0466-CISSUED, SYN MINOR |  |  |
|  | SOLARITY POWER SYSTEMS | OK | Oklahoma DEQ | 2025-0806-ADISSUED, MAJOR |  |  |
|  | ROLAND OK | OK | Oklahoma DEQ | 2025-0940-OISSUED, MINOR |  |  |
|  | ACACIA FACILITY OSG | OK | Oklahoma DEQ | 2025-0947-CISSUED, MINOR |  |  |
|  | ATMOSS DATA CENTER | OK | Oklahoma DEQ | 2026-0025-OISSUED, MINOR |  |  |
|  | OKC2 | OK | Oklahoma DEQ | 6000 N SHARTEL AVE LLCREVIEW, SYN MINOR |  |  |
|  | Cologix ASH1Diesel | Ashburn, VA | Virginia DEQ | Operating |  |  |
|  | Microsoft - Gainesville Data Center - MNZ03Diesel | Bristow, VA | Virginia DEQ | Operating |  |  |
|  | Microsoft - Manassas Data Center - MNZ01Diesel | Manassas, VA | Virginia DEQ | Planned |  |  |
|  | Amazon Data Services Inc - IAD-134/135/136Diesel | Chantilly, VA | Virginia DEQ | Operating |  |  |
|  | Amazon Data Services Inc - IAD-104/105/106Diesel | Manassas, VA | Virginia DEQ | Operating |  |  |
|  | Gainesville Crossing Data Campus - GCDCDiesel | Gainesville, VA | Virginia DEQ | Operating |  |  |
|  | Vantage Data Centers VA2 LLCDiesel | Sterling, VA | Virginia DEQ | Operating |  |  |
|  | Amazon Data Services Inc IAD-169/179Diesel | Ashburn, VA | Virginia DEQ | Operating |  |  |
|  | SI NVA05A, LLC and SI NVA05D, LLCDiesel | Manassas, VA | Virginia DEQ | Operating |  |  |
|  | Aligned Data Centers IAD03Diesel | Sterling, VA | Virginia DEQ | Operating |  |  |
|  | Amazon Data Services IAD-156, IAD-157, IAD-158, IAD-159, and IAD-327Diesel | Chantilly, VA | Virginia DEQ | Operating |  |  |
|  | Amazon Data Services IAD-215Diesel | Ashburn, VA | Virginia DEQ | Operating |  |  |
|  | NTT Global Data Centers VA10 LLCDiesel | Gainesville, VA | Virginia DEQ | Operating |  |  |
|  | Digital Third Second Manassas, LLC & Digital Carver Brickyard, LLC.Diesel | Manassas, VA | Virginia DEQ | Operating |  |  |
|  | Digital Realty - Sterling Premiere LLCDiesel | Sterling, VA | Virginia DEQ | Operating |  |  |
|  | Yondr Data CenterDiesel | Aldie, VA | Virginia DEQ | Operating |  |  |
|  | STACK Infrastructure - SI NVA06A LLCDiesel | Leesburg, VA | Virginia DEQ | Operating |  |  |
|  | Amazon Data Services Inc - DCA-060Diesel | Stevensburg, VA | Virginia DEQ | Operating |  |  |
|  | Amazon Data Services Inc - DCA-64Diesel | Springfield, VA | Virginia DEQ | Operating |  |  |
|  | Amazon Data Services Inc - IAD-165/166/167/168/613Diesel | Herndon, VA | Virginia DEQ | Operating |  |  |
|  | Amazon Data Services Inc IAD-124/125/126/127Diesel | Aldie, VA | Virginia DEQ | Planned |  |  |
|  | H5 Data Centers - AshburnDiesel | Ashburn, VA | Virginia DEQ | Planned |  |  |
|  | Amazon Data Services Inc IAD-195/196/197/198Diesel | Gainesville, VA | Virginia DEQ | Operating |  |  |
|  | Amazon Data Services Inc IAD-210/211Diesel | Manassas, VA | Virginia DEQ | Operating |  |  |
|  | Vantage Data Center VA3 LLCDiesel | Ashburn, VA | Virginia DEQ | Operating |  |  |
|  | Amazon Data Services Inc. IAD450-456 Cosner Tech CampusDiesel | Fredericksburg, VA | Virginia DEQ | Operating |  |  |
|  | Amazon Data Services Inc., IAD 550 Louisa REBDiesel | Mineral, VA | Virginia DEQ | Operating |  |  |
|  | Amazon Data Services Inc - IAD-500/501Diesel | Herndon, VA | Virginia DEQ | Operating |  |  |
|  | Amazon Data Services Inc IAD-667, IAD-668, IAD-669, IAD-670, and IAD-671Diesel | Leesburg, VA | Virginia DEQ | Operating |  |  |
|  | GCDC Purchaser Phase 1 LLCDiesel | Gainesville, VA | Virginia DEQ | Operating |  |  |
|  | Cardinal Energy Corporation | Middletown, VA | Virginia DEQ | Operating |  |  |
|  | Anthem CDC 3 | Harrisonburg, VA | Virginia DEQ | Operating |  |  |
|  | ACACIA HOUSE GROUP LLC | OK | Oklahoma DEQ | ACACIA FACILIT YREVIEW, MAJOR |  |  |
|  | SWITCH RENO DATA CENTER CAMPUS | NV | Nevada NDEP | AP14424523PERMIT APPLICATION AND CORRESPONDENCE, class 2 |  |  |
|  | POWERHOUSE DATA CENTER | NV | Nevada NDEP | AP16294696PERMIT, class SAD |  |  |
|  | DATA CENTER | NV | Nevada NDEP | AP73744057PERMIT APPLICATION AND CORRESPONDENCE, class 1 |  |  |
|  | NOVVA DATA CENTER | NV | Nevada NDEP | AP73744667COMPLIANCE, class 2 |  |  |
|  | AMAZON DATA CENTER - TRIC | NV | Nevada NDEP | AP73744768PERMIT APPLICATION AND CORRESPONDENCE, class 1 |  |  |
|  | NEW GREEN FIELD FACILITY DATA CENTER | NV | Nevada NDEP | AP73745002PERMIT APPLICATION AND CORRESPONDENCE, class SAD |  |  |
|  | DATA CENTER | NV | Nevada NDEP | AP73753672PERMIT APPLICATION AND CORRESPONDENCE, class 1 |  |  |
|  | OKX1 | OK | Oklahoma DEQ | BLUE BIRD TRAIL LLCADMIN REVIEW, SYN MINOR |  |  |
|  | CITADEL FACILITY | OK | Oklahoma DEQ | CITADEL ASSET VENTURES LLCREVIEW, SYN MINOR |  |  |
|  | PRY DATA STORAGE FACILITY | OK | Oklahoma DEQ | MYALL LLCPENDING, MAJOR |  |  |
|  | PIONEER FACILITY | OK | Oklahoma DEQ | PIONEER TRAIL LLCREVIEW, MAJOR |  |  |
|  | Comcast Cablevision of Virginia IncorporatedDiesel | Manassas, VA | Virginia DEQ | Operating |  |  |
|  | Chantilly Technology Partners, LLC/H5 VA | Chantilly, VA | Virginia DEQ | Operating |  |  |
|  | 22810-22860 International Drive LLC | Sterling, VA | Virginia DEQ | Operating |  |  |
|  | 21110 Ridgetop Circle LLC | Sterling, VA | Virginia DEQ | Operating |  |  |
|  | Digital Realty - Lemur Properties, LLC (VA3)Diesel | Reston, VA | Virginia DEQ | Operating |  |  |
|  | H5 Data Centers | Herndon, VA | Virginia DEQ | Operating |  |  |
|  | Digital Realty - Porpoise Ventures LLC (VA4) | Gainesville, VA | Virginia DEQ | Operating |  |  |
|  | Equinix LLC | Ashburn, VA | Virginia DEQ | Operating |  |  |
|  | Equinix, LLC - DC 14 | Manassas, VA | Virginia DEQ | Operating |  |  |
|  | Valo Park | Mclean, VA | Virginia DEQ | Operating |  |  |
|  | Equinix LLC | Ashburn, VA | Virginia DEQ | Operating |  |  |
|  | 22995 Wilder Court LLCDiesel | Dulles, VA | Virginia DEQ | Operating |  |  |
|  | Amazon Data Services, Inc. IAD-1 IAD-9 | Chantilly, VA | Virginia DEQ | Operating |  |  |
|  | VeriSign Incorporated Broad Run Facility2 | Washington Dulles International Airport, VA | Virginia DEQ | Operating |  |  |
|  | Amazon Data Services, Inc. IAD-6 IAD-13 IAD-54 | Ashburn, VA | Virginia DEQ | Operating |  |  |
|  | Inova Health Care Systems - IT Operations | Dulles, VA | Virginia DEQ | Operating |  |  |
|  | Digital Realty - Ashburn Campus | Ashburn, VA | Virginia DEQ | Operating |  |  |
|  | StratCap | Reston, VA | Virginia DEQ | Operating |  |  |
|  | Visa USA Incorporated | Ashburn, VA | Virginia DEQ | Operating |  |  |
|  | Digital Loudoun Pkwy Center N LLC | Ashburn, VA | Virginia DEQ | Operating |  |  |
|  | Corporate Office Properties Trust (COPT - DC6) | Manassas, VA | Virginia DEQ | Operating | 26 |  |
|  | Zayo Group, LLCDiesel | Mclean, VA | Virginia DEQ | Operating |  |  |
|  | Amazon Data Services, Inc. IAD-7 IAD-11 IAD-24 | Manassas, VA | Virginia DEQ | Operating |  |  |
|  | Zayo Group, LLC | Ashburn, VA | Virginia DEQ | Operating |  |  |
|  | QTS Dulles, LLC | Washington Dulles International Airport, VA | Virginia DEQ | Operating |  |  |
|  | Northrop Grumman Systems Corporation | Mclean, VA | Virginia DEQ | Operating |  |  |
|  | Equinix, LLC - DC 97 | Herndon, VA | Virginia DEQ | Operating |  |  |
|  | Northrop Grumman Services Corporation | Fairfax, VA | Virginia DEQ | Operating |  |  |
|  | Level 3 Commuications Herndon Gateway | Herndon, VA | Virginia DEQ | Operating |  |  |
|  | Amazon Data Services, Inc. IAD-10 IAD-32 IAD-98 IAD-99 IAD-118 IAD-119 IAD-129 | Sterling, VA | Virginia DEQ | Operating |  |  |
|  | Amazon Data Services, Inc. IAD-12 IAD-15 IAD-16 IAD-76 IAD-230 | Sterling, VA | Virginia DEQ | Operating |  |  |
|  | VADATA Inc MEG Four | Ashburn, VA | Virginia DEQ | Operating |  |  |
|  | Intergate - Ashburn, LLCDiesel | Ashburn, VA | Virginia DEQ | Operating |  |  |
|  | Equinix, LLC - AshburnDiesel | Ashburn, VA | Virginia DEQ | Operating |  |  |
|  | VA1 Data Center | Ashburn, VA | Virginia DEQ | Operating |  |  |
|  | The Aerospace Corporation | Chantilly, VA | Virginia DEQ | Operating |  |  |
|  | Amazon Data Services, Inc. IAD-14 IAD-52 IAD-59 | Manassas, VA | Virginia DEQ | Operating |  |  |
|  | Amazon Data Services, Inc. IAD 50 IAD 60 IAD-71 IAD-78 IAD-79 IAD-80 | Ashburn, VA | Virginia DEQ | Operating |  |  |
|  | Amazon Data Services, Inc. IAD-55 IAD-64 IAD-84 | Haymarket, VA | Virginia DEQ | Operating |  |  |
|  | Amazon Data Services, Inc. IAD-51 IAD-56 IAD-88 IAD-89 | Sterling, VA | Virginia DEQ | Operating |  |  |
|  | Amazon Data Services, Inc. IAD-57 IAD-58 | Sterling, VA | Virginia DEQ | Operating |  |  |
|  | SI NVA01 ABS, LLC | Sterling, VA | Virginia DEQ | Operating |  |  |
|  | Amazon Data Services, Inc. IAD-61, IAD-63, IAD-65, IAD-86, IAD-155, IAD-600, IAD-018 | Chantilly, VA | Virginia DEQ | Operating |  |  |
|  | Amazon Data Services, Inc. IAD-73 IAD-74 IAD-602 IAD-193 IAD-194 | Manassas, VA | Virginia DEQ | Operating |  |  |
|  | Amazon Data Services Inc IAD-62/68/81/83/93/609/614 | Seattle, VA | Virginia DEQ | Operating |  |  |
|  | CyrusOne Loudoun Tech Center | Sterling, VA | Virginia DEQ | Operating |  |  |
|  | NTT Global Data Centers VA2, LLC | Ashburn, VA | Virginia DEQ | Operating |  |  |
|  | Cloud HQDiesel | Manassas, VA | Virginia DEQ | Operating |  |  |
|  | CyrusOne Northern Virginia Data Center - Shaw RoadDiesel | Sterling, VA | Virginia DEQ | Operating |  |  |
|  | Iron Mountain Information Management LLCDiesel | Manassas, VA | Virginia DEQ | Operating |  |  |
|  | CyrusOne KincoraDiesel | Sterling, VA | Virginia DEQ | Operating |  |  |
|  | Amazon Data Services, Inc. IAD-75 IAD-85 IAD-95 IAD-96Diesel | Manassas, VA | Virginia DEQ | Operating |  |  |
|  | Cashvad Ventures LLCDiesel | Manassas, VA | Virginia DEQ | Planned |  |  |
|  | NTT Global Data Centers Americas, Inc.Diesel | Ashburn, VA | Virginia DEQ | Operating |  |  |
|  | Amazon Data Services, Inc. IAD-90 IAD-91 IAD-92Diesel | Sterling, VA | Virginia DEQ | Operating |  |  |
|  | Digital Realty (Digital Loudoun 3 & 4, LLC)Diesel | Ashburn, VA | Virginia DEQ | Operating |  |  |
|  | Data Center Vint Hill LLC | Warrenton, VA | Virginia DEQ | Operating |  |  |
|  | Amazon Data Services, Inc. IAD-100 IAD-101 IAD-102 IAD-103Diesel | Manassas, VA | Virginia DEQ | Operating |  |  |
|  | CoreSite Real Estate Sunrise Technology Park, LLC | Reston, VA | Virginia DEQ | Operating |  |  |
|  | QTS Investment Properties Ashburn LLCDiesel | Sterling, VA | Virginia DEQ | Operating |  |  |
|  | Equinix LLC - DC 13 | Ashburn, VA | Virginia DEQ | Operating |  |  |
|  | Amazon Data Services, Inc. IAD-114 IAD-115Diesel | Ashburn, VA | Virginia DEQ | Operating |  |  |
|  | Wheeler Data CenterDiesel | Sterling, VA | Virginia DEQ | Operating |  |  |
|  | Amazon Data Services, Inc. IAD-144 IAD-145Diesel | Sterling, VA | Virginia DEQ | Operating |  |  |
|  | Aerospace Data Facility - EastDiesel | Fort Belvoir, VA | Virginia DEQ | Operating |  |  |
|  | Iskander (LC-1A) Jamshid (LC-1B) Kaveh (LC2) Lohrasp Ventures (LC3)Diesel | Ashburn, VA | Virginia DEQ | Operating |  |  |
|  | Sentinel Ashburn NexusDiesel | Sterling, VA | Virginia DEQ | Operating |  |  |
|  | Compass IAD DatacenterDiesel | Leesburg, VA | Virginia DEQ | Operating |  |  |
|  | QTS Investment Properties Manassas LLCDiesel | Manassas, VA | Virginia DEQ | Operating |  |  |
|  | Vantage Data Centers VA11, VA12, VA13, VA14, & VA15Diesel | Sterling, VA | Virginia DEQ | Operating |  |  |
|  | Hayden Technologies, LLC.Diesel | Leesburg, VA | Virginia DEQ | Operating |  |  |
|  | CyrusOne Northern Virginia Data Center - Maries Road | Sterling, VA | Virginia DEQ | Operating |  |  |
|  | Amazon Data Services, Inc. IAD-132 IAD-133Diesel | Manassas, VA | Virginia DEQ | Operating |  |  |
|  | Aligned Energy Data Centers (Ashburn), LLCDiesel | Ashburn, VA | Virginia DEQ | Operating |  |  |
|  | Amazon Data Services, Inc. IAD-116 IAD-117Diesel | Sterling, VA | Virginia DEQ | Operating |  |  |
|  | Amazon Data Services (IAD-130, IAD-131, IAD-313, and DCA-072)Diesel | Manassas, VA | Virginia DEQ | Operating |  |  |
|  | Remington Technology Park Limited PartnershipNatural gas | Remington, VA | Virginia DEQ | Planned |  |  |
|  | CyrusOne Sterling IX/X/XIDiesel | Sterling, VA | Virginia DEQ | Operating |  |  |
|  | Amazon Data Services, Inc. IAD-150 IAD-151 IAD-152Diesel | Chantilly, VA | Virginia DEQ | Operating |  |  |
|  | Amazon Data Services, Inc.Diesel | Sterling, VA | Virginia DEQ | Operating |  |  |
|  | Amazon Data Services, Inc. IAD-140/141/143 | Sterling, VA | Virginia DEQ | Operating |  |  |
|  | Equinix LLC (DC-21/DC-22)Diesel | Ashburn, VA | Virginia DEQ | Operating |  |  |
|  | Amazon DCA-50Diesel | Elkwood, VA | Virginia DEQ | Operating |  |  |
|  | QTS LLC - Ashburn-Shellhorn Data CenterDiesel | Ashburn, VA | Virginia DEQ | Operating |  |  |
|  | Amazon Data Services - DCA-51 | Warrenton, VA | Virginia DEQ | Operating |  |  |
|  | MicrosoftDiesel | Warrenton, VA | Virginia DEQ | Operating |  |  |
|  | Amazon Data Services Inc IAD-120/121/122Diesel | Sterling, VA | Virginia DEQ | Operating |  |  |
|  | Amazon DCA-54Diesel | Fort Belvoir, VA | Virginia DEQ | Operating |  |  |
|  | Digital Western Lands LLC | Sterling, VA | Virginia DEQ | Operating |  |  |
|  | Amazon Data Services Inc IAD-161, IAD-162, IAD-606, IAD-285, IAD-286, IAD-299, IAD-611 | Ashburn, VA | Virginia DEQ | Operating |  |  |
|  | Nova Mango Farms LLCDiesel | Bristow, VA | Virginia DEQ | Operating |  |  |
|  | Microsoft Corporation, Leesburg Data Center (IAD01-02-03-04-05)Diesel | Leesburg, VA | Virginia DEQ | Operating |  |  |
|  | Microsoft Blue Ridge (IAD11-12-13) Data CenterDiesel | Aldie, VA | Virginia DEQ | Operating |  |  |
|  | SI NVA02D, LLCDiesel | Manassas, VA | Virginia DEQ | Operating |  |  |
|  | Amazon Data Services Inc - IAD-163/164/174Diesel | Sterling, VA | Virginia DEQ | Operating |  |  |
|  | ASH2 Lockridge Data Center - QTS Investment Properties Ashburn II LLCDiesel | Dulles, VA | Virginia DEQ | Operating |  |  |
|  | Darab Ventures One, Two, Six LLCDiesel | Ashburn, VA | Virginia DEQ | Operating |  |  |
|  | Amazon Data Center, Keystone Trade CenterNatural gas; diesel | Falls Township, PA | PA DEP Southeast Regional Office Air Quality | 09-0261APublic notice |  |  |
|  | VoltaGrid SAT-1 EGU, 14720 Omicron DrNatural gas | San Antonio, TX | TCEQ Office of Air | 177637Issued |  |  |
|  | VoltaGrid SAT-2 EGU, 5207 Rogers RdNatural gas | San Antonio, TX | TCEQ Office of Air | 181707Issued |  |  |
|  | PCXAUS-11 Energy Center (Burr Computer Environments Properties LLC)Natural gas | Cedar Creek, TX | TCEQ Office of Air | 184208Issued |  |  |
|  | Roman Energy Center (IP Roman III Gas, LLC)Natural gas | Hereford, TX | TCEQ Office of Air | 184403; PSDTX1712; GHGPSDTX276Applied |  |  |
|  | Nscale Ward County IINatural gas | Barstow, TX | TCEQ Office of Air | 184871Applied |  |  |
|  | Roman Energy Center (Google LLC)Natural gas | Hereford, TX | TCEQ Office of Air | 185289; PSDTX1722; GHGPSDTX278Applied |  |  |
|  | Microsoft Mount Pleasant Data Centers, 4800 90th StreetDiesel | Mount Pleasant, WI | Wisconsin DNR Air Management | 25-MIN-133; 25230249A-F05Public notice |  |  |
|  | Apollo Power Generation Facility (Will-Power OH, LLC)Natural gas | Middleton Township, OH | Ohio EPA Division of Air Pollution Control | Draft |  |  |
|  | YGI Microgrid (Yucca Growth Infrastructure, LLC)Natural gas | Santa Teresa, NM | NMED Air Quality Bureau | NSR 10883Draft |  |  |
|  | Amazon Data Services, Inc, 31100 State Road Highway 2Diesel | New Carlisle, IN | IDEM Office of Air Quality | 141-50312-00650Public notice |  |  |
|  | Aligned Data Centers (WJU) PropCo, LLC West Jordan Data Center, 6800 West 9800 SouthNatural gas; diesel | West Jordan, UT | Utah Division of Air Quality | DAQE-NN162210002-25Public notice |  |  |
|  | Amazon Cosgray Road campus fuel cell array (AEP subsidiary)Natural gas (fuel cells) | Hilliard, OH | Ohio EPA Division of Air Pollution Control | Issued |  |  |
|  | ELN Generation Plant (Applied Digital Corporation), 9663 87th Ave. SEDiesel | Ellendale, ND | ND DEQ Division of Air Quality | ACP-18296 v1.0Draft |  |  |
|  | VoltaGrid power plant for Serverfarm data centerNatural gas | Covington, GA | Georgia EPD Air Protection Branch | Under review |  |  |
|  | Northrop Grumman Systems Corporation | Lebanon, VA | Virginia DEQ | Temporarily Shutdown |  |  |
|  | DP Facilities Inc South LLCDiesel | Wise, VA | Virginia DEQ | Operating | 7 |  |
|  | Microsoft Corporation - East Coast Data Center | Boydton, VA | Virginia DEQ | Operating |  |  |
|  | TECfusions Clarksville LLC | Clarksville, VA | Virginia DEQ | Operating |  |  |
|  | Equinix, LLC - CU 1-4 | Culpeper, VA | Virginia DEQ | Operating |  |  |
|  | QTS Richmond Data Center | Sandston, VA | Virginia DEQ | Operating |  |  |
|  | 11751 Meadowville Owner LLC c/o GFH Capital Ltd | Chester, VA | Virginia DEQ | Operating |  |  |
|  | Bank of America - Villa Park Data Center | Richmond, VA | Virginia DEQ | Operating |  |  |
|  | Capital One Services Incorporated | Glen Allen, VA | Virginia DEQ | Operating |  |  |
|  | Peak 10 Incorporated | Richmond, VA | Virginia DEQ | Operating |  |  |
|  | Chirisa Richmond LLC | Chester, VA | Virginia DEQ | Operating |  |  |
|  | Scout Development LLC | Sandston, VA | Virginia DEQ | Operating |  |  |
|  | Microsoft Corp - LVL Data Center | Boydton, VA | Virginia DEQ | Operating |  |  |
|  | Microsoft Corporation - Timber Data Center | Boydton, VA | Virginia DEQ | Operating | 4 |  |
|  | Microsoft Corporation - AVC Data Center | South Hill, VA | Virginia DEQ | Operating | 60 |  |
|  | Microsoft Corp DCS - AVC09-AVC13 DatacenterDiesel | La Crosse, VA | Virginia DEQ | Operating | 63 |  |
|  | Microsoft Corporation - AVC43 DatacenterDiesel | South Hill, VA | Virginia DEQ | Operating |  |  |
|  | Microsoft Corp - LYH10 DatacenterDiesel | Boydton, VA | Virginia DEQ | Operating |  |  |
|  | Microsoft Corp - AVC17 DatacenterDiesel | Boydton, VA | Virginia DEQ | Operating | 135 |  |
|  | CLOP Ashland VA LLC | Ashland, VA | Virginia DEQ | Operating |  |  |
|  | Sentara Healthcare | Virginia Beach, VA | Virginia DEQ | Operating |  |  |
|  | Vienna Cloud | Vienna, VA | Virginia DEQ | Operating |  |  |
|  | Coresite Real Estate 12100 Sunrise Valley Drive | Reston, VA | Virginia DEQ | Operating |  |  |
|  | Verizon Business Network Services, Inc.Diesel | Ashburn, VA | Virginia DEQ | Operating |  |  |
|  | Oath, Inc.Diesel | Manassas, VA | Virginia DEQ | Operating |  |  |
|  | Smithsonian Institution | Herndon, VA | Virginia DEQ | Operating |  |  |
|  | U.S. Customs and Border Protection | Springfield, VA | Virginia DEQ | Operating |  |  |
|  | COLA #3216 - SOUTH VALLEY DATA CENTER | NV | Nevada NDEP | AP14425011PERMIT APPLICATION AND CORRESPONDENCE, class COLA |  |  |

## Large loads by grid operator

Large loads, mostly data centers, are counted by each grid operator in its own reports and under its own definitions: requests to connect, loads eligible for a study, projects listed in a queue file. The figures below are shown side by side as each operator or utility reports them and are never added together: a utility's requests are also counted inside its grid operator's figure. Each row opens the document it comes from.

### Grid operators

| Operator | What is counted | Reported | Projects | As of | Source |
| --- | --- | --- | --- | --- | --- |
| ERCOT | Requests to connectLarge loads of 75 MW or more at a single point of interconnection that ERCOT tracks as seeking interconnection to its grid. About 90% data centers. | 474 GW |  | Jul 29, 2026 |  |
| ERCOT | Requests to connect, by 2033Large-load interconnection applications in ERCOT's Large Load Interconnection Queue. | 446 GW |  | May 13, 2026 |  |
| ERCOT | Under studyLarge-load applications whose interconnection studies are under ERCOT review. | 94 GW |  | May 13, 2026 |  |
| ERCOT | No studies submitted yetLarge-load applications tracked by ERCOT that have not yet submitted studies for review. | 321 GW |  | May 13, 2026 |  |
| ERCOT | Eligible for Batch Zero studyLarge load ERCOT found eligible for inclusion in its Batch Zero study, based on existing studies (preliminary). | 205 GW |  | Aug 19, 2026 |  |
| ERCOT | Conditionally in Batch Zero as base loadLarge-load projects ERCOT conditionally classified as base load in Batch Zero. | 66 GW | 204 | Sep 11, 2026 |  |
| ERCOT | Excluded from Batch ZeroLarge load ERCOT excluded from Batch Zero in its conditional classification. | 302 GW | 373 | Sep 11, 2026 |  |
| ERCOT | Finished review, awaiting approval to energizeData center and crypto mining large loads that finished every ERCOT process but have not received approval to energize while those approvals are paused. | 6.6 GW | 17 | Aug 25, 2026 |  |
| ERCOT | Approved to energizeLarge-load MW that have received Approval to Energize from ERCOT Operations. | 8.9 GW |  | Jun 18, 2026 |  |
| ERCOT | EnergizedNon-simultaneous monthly peak of loads approved to energize (the sum of each load's maximum in the month), which ERCOT uses to represent how much approved load is operational. | 3.9 GW |  | Jun 18, 2026 |  |
| PJM | Load forecast adjustment, by 2031PJM's adjustment above the load embedded in its forecast model to the summer peak, for large, unanticipated load changes such as data center growth, market adjustments and peak shaving, in MW. | 41 GW |  | Feb 6, 2026 |  |
| PJM | Load forecast adjustment, by 2036PJM's adjustment above the load embedded in its forecast model to the summer peak, for large, unanticipated load changes such as data center growth, market adjustments and peak shaving, in MW. | 67 GW |  | Feb 6, 2026 |  |
| PJM | Load forecast adjustment, by 2038Large Loads are defined as end-use customer load that has a cumulative peak load quantity of at least 50 MW at a single site behind one or more delivery points/points of interconnection within a one-mile radius. | 70 GW |  | Jul 27, 2026 |  |
| PJMPJM, AEP zone | Load forecast adjustment, by 2031PJM's adjustment above the load embedded in its forecast model to the summer peak, for large, unanticipated load changes such as data center growth, market adjustments and peak shaving, in MW. | 9.3 GW |  | Feb 6, 2026 |  |
| PJMPJM, AEP zone | Load forecast adjustment, by 2036PJM's adjustment above the load embedded in its forecast model to the summer peak, for large, unanticipated load changes such as data center growth, market adjustments and peak shaving, in MW. | 17 GW |  | Feb 6, 2026 |  |
| PJMPJM, ComEd zone | Load forecast adjustment, by 2031PJM's adjustment above the load embedded in its forecast model to the summer peak, for large, unanticipated load changes such as data center growth, market adjustments and peak shaving, in MW. | 6.5 GW |  | Feb 6, 2026 |  |
| PJMPJM, ComEd zone | Load forecast adjustment, by 2036PJM's adjustment above the load embedded in its forecast model to the summer peak, for large, unanticipated load changes such as data center growth, market adjustments and peak shaving, in MW. | 10 GW |  | Feb 6, 2026 |  |
| PJMPJM, Dominion (DOM) zone | Load forecast adjustment, by 2031PJM's adjustment above the load embedded in its forecast model to the summer peak, for large, unanticipated load changes such as data center growth, market adjustments and peak shaving, in MW. | 12 GW |  | Feb 6, 2026 |  |
| PJMPJM, Dominion (DOM) zone | Load forecast adjustment, by 2036PJM's adjustment above the load embedded in its forecast model to the summer peak, for large, unanticipated load changes such as data center growth, market adjustments and peak shaving, in MW. | 20 GW |  | Feb 6, 2026 |  |
| MISO | Requests to connectLoad requested through Transmission Owners' Expedited Project Review submissions in the MTEP study cycle. | 19 GW |  | May 13, 2026 |  |
| NYISO | Requests to connectLarge load projects in the NYISO interconnection queue and the load they would add to the grid. | 13 GW | 51 | May 1, 2026 |  |
| NYISO | Load projects in the queue fileLoad projects listed in the NYISO interconnection queue workbook, not withdrawn. | 18 GW | 74 | Sep 14, 2026 |  |
| NYISO | Load forecast adjustment, by 2040Large-load demand from the interconnection queue that NYISO's load forecasters anticipate on the system. | 2.9 GW |  | May 1, 2026 |  |
| CAISO | Load forecast adjustment, by 2030California Energy Commission forecast of data center load growth in the CAISO grid, as CAISO states it. | 1.8 GW |  | Jan 1, 2026 |  |
| CAISO | Load forecast adjustment, by 2040California Energy Commission forecast of data center load growth in the CAISO grid, as CAISO states it. | 4.9 GW |  | Jan 1, 2026 |  |
| ISO-NE | Requests to connectProposed large-load projects in the formal study phase, at their maximum combined demand. | 285 MW | 2 | May 18, 2026 |  |
| ISO-NE | Load forecast adjustment, by 2031Large-load component of ISO New England's summer coincident peak forecast at the 50th percentile, in MW. | 108 MW |  | Jun 5, 2026 |  |
| ISO-NE | Load forecast adjustment, by 2036Large-load component of ISO New England's summer coincident peak forecast at the 50th percentile, in MW. | 114 MW |  | Jun 5, 2026 |  |

### Utilities

| Utility | What is counted | Reported | Projects | As of | Source |
| --- | --- | --- | --- | --- | --- |
| AEPAmerican Electric Power service territories | Contracted by the utility, by 2030Load growth backed by signed load agreements with customers including hyperscalers, data centers and industrials. | 69 GW |  | Jul 30, 2026 |  |
| Ameren MissouriMissouri | Contracted by the utility, by 2029Demand under electric service agreements Ameren Missouri executed with large load customers under its large primary service tariff. | 2.8 GW |  | Jun 30, 2026 |  |
| Black Hills Energy (Wyoming)Wyoming | Utility pipelineLarge-load demand pipeline in Wyoming, reported as more than 3 GW; the financial plan includes 600 MW by 2030. | 3.0 GW |  | Aug 5, 2026 |  |
| CenterPoint Houston ElectricHouston, Texas (ERCOT) | Utility pipeline, by 2031Base or studied load of potential large-load customers eligible for ERCOT's Batch Zero process. | 14 GW |  | Jul 28, 2026 |  |
| Consumers EnergyMichigan (MISO) | Utility pipelineEconomic development pipeline of new load, spanning data centers, semiconductor and manufacturing projects. | 9.0 GW |  | Jul 28, 2026 |  |
| DTE ElectricMichigan (MISO) | Contracted by the utilityOracle data center agreement approved and in DTE's plan, with construction started; a separate 1 GW Google contract was submitted to the Michigan PSC for approval. | 1.4 GW |  | Jul 28, 2026 |  |
| Dominion EnergyVirginia (Dominion Energy Virginia) | Contracted by the utilityLarge-load capacity under signed Electric Service Agreements (ESA) with Dominion Energy. | 10 GW |  | Mar 31, 2026 |  |
| Dominion Energy VirginiaVirginia (PJM) | Contracted by the utilityData center capacity under signed Electric Service Agreements, the most advanced of Dominion Energy Virginia's three contract stages. | 12 GW |  | Jul 31, 2026 |  |
| Dominion Energy VirginiaVirginia (PJM) | Utility pipelineTotal data center contracted capacity across all three stages (SELOA 32.4 GW, CLOA 9.4 GW, ESA 12.0 GW) as Dominion Energy Virginia reports it. | 54 GW |  | Jul 31, 2026 |  |
| Duke EnergyCarolinas, Florida, Midwest | Contracted by the utilityData center load under signed electric service agreements (up 0.2 GW since the Q1 call), of which about 5.2 GW of data centers are under construction. | 7.8 GW |  | Aug 4, 2026 |  |
| Duke EnergyCarolinas, Florida, Midwest | Utility pipelineHigh-confidence, late-stage large load pipeline, which includes the 7.8 GW of signed ESAs. | 15 GW |  | Aug 4, 2026 |  |
| Duke EnergyDuke Energy service territories | Contracted by the utilityEconomic development projects, including data centers, secured under Electric Service Agreements. | 7.6 GW |  | May 5, 2026 |  |
| EvergyKansas and Missouri (SPP) | Contracted by the utilityProjected peak steady state data center load under electric service agreements signed in 2026. | 2.6 GW |  | Jun 30, 2026 |  |
| ExelonIllinois and Mid-Atlantic (PJM) | Under studyFuture Pipeline: data center load within current or future cluster studies concluding in 2026 and 2027 (about 17 GW at ComEd and 8 GW in the Mid-Atlantic). | 25 GW |  | Jul 30, 2026 |  |
| ExelonIllinois and Mid-Atlantic (PJM) | Utility pipelineHigh Probability Load: data center load in advanced phases of design or backed by FERC-approved transmission security agreements (about 9 GW at ComEd and 2 GW in the Mid-Atlantic). | 11 GW |  | Jul 30, 2026 |  |
| FPLFlorida | Utility pipelineLarge-load customer interest reported by Florida Power & Light. | 21 GW |  | Jul 24, 2026 |  |
| FirstEnergyOhio, Pennsylvania, Maryland, West Virginia, New Jersey (PJM) | Contracted by the utilityData center demand under a contract to construct facilities and/or an electric service agreement. | 6.4 GW |  | Jul 28, 2026 |  |
| FirstEnergyOhio, Pennsylvania, Maryland, West Virginia, New Jersey (PJM) | Utility pipelineCumulative data center demand through 2035 counting both contracted load and pipeline load. | 25 GW |  | Jul 28, 2026 |  |
| Georgia PowerGeorgia (Southeast) | Contracted by the utilityLarge load customer commitments (Contracts for Electric Service plus Requests for Electric Service) through the mid-2030s. | 16 GW | 32 | Jun 30, 2026 |  |
| Georgia PowerGeorgia (Southeast) | Utility pipelineLarge load share of the 84,800 MW total economic development pipeline through the mid-2030s. | 80 GW |  | Jun 30, 2026 |  |
| LG&E and KUKentucky | Contracted by the utilityPortion of the LG&E and KU economic development pipeline under signed agreements. | 1.3 GW |  | Jun 30, 2026 |  |
| LG&E and KUKentucky | Utility pipelinePotential economic development pipeline in the LG&E and KU service territories, of which 11.6 GW is tied to data center opportunities. | 14 GW |  | Jun 30, 2026 |  |
| OncorTexas (ERCOT), Oncor service territory | Requests to connectData center load in Oncor's active transmission large commercial and industrial interconnection queue. | 282 GW |  | Jun 30, 2026 |  |
| PG&ENorthern and Central California | Utility pipelineNew data center projects in PG&E's service area in its interconnection pipeline. | 12 GW |  | Jul 23, 2026 |  |
| PPL Electric UtilitiesPennsylvania (PJM) | Contracted by the utilityData center load under signed electric service agreements, reported as over 11 GW; more than 6.5 GW is under construction. | 11 GW |  | Jun 30, 2026 |  |
| PPL Electric UtilitiesPennsylvania (PJM) | Utility pipelineData center projects in advanced stages of planning in the PPL Electric Utilities service territory. | 32 GW |  | Jun 30, 2026 |  |
| Southern CompanySoutheast (Georgia Power, Alabama Power, Mississippi Power) | Contracted by the utilityContracts with new data centers and other large load customers of the traditional electric operating companies, each over 100 MW, reviewed by or subject to review by the state PSC. | 16 GW |  | Jun 30, 2026 |  |
| Xcel EnergyUpper Midwest, Colorado, Texas-New Mexico | Contracted by the utilityData center load contracted or under construction. | 2.0 GW |  | Jul 30, 2026 |  |
| Xcel EnergyUpper Midwest, Colorado, Texas-New Mexico | Utility pipelineAdditional data center pipeline beyond contracted load, reported as more than 20 GW. | 20 GW |  | Jul 30, 2026 |  |

### Load projects in the NYISO queue file

The only published queue workbook that lists individual load requests: 74 projects for 17,672 MW. Other operators handle large loads outside their generation queue files.

| ISO | Queue ID | Project | MW | County, state | Status | Queue date | Source |
| --- | --- | --- | --- | --- | --- | --- | --- |
| NYISO | 1743 | St. Lawrence Infrastructure 2St. Lawrence Infrastructure, LLC | 1,935 MW | St. Lawrence, NY | status code 4 | Sep 2, 2025 |  |
| NYISO | 1738 | 1 Gig Data Center East Fishkill, NYDonovan Drive Holdings LLC | 1,000 MW | Dutchess, NY | status code 5 | Jul 17, 2025 |  |
| NYISO | 1757 | NY-Route 9W Load CenterNY-Route 9W LLC | 1,000 MW | Greene, NY | status code 0 | Jan 7, 2026 |  |
| NYISO | 1742 | St. Lawrence Infrastructure 1St. Lawrence Infrastructure, LLC | 860 MW | St. Lawrence, NY | status code 4 | Sep 2, 2025 |  |
| NYISO | 1765 | Micron Fab 3Eldo Varghese | 606 MW | Onondaga, NY | status code 1 | Aug 28, 2026 |  |
| NYISO | 1627 | Micron Fab 2Micron New York Semiconductor Manufacturing LLC | 576 MW | Onondaga, NY | status code 9 | Oct 31, 2023 |  |
| NYISO | 1741 | North East Data LLC Data CenterNorth East Data LLC | 500 MW | Niagara, NY | status code 4 | Aug 29, 2025 |  |
| NYISO | 1536 | White Pine Phase 1Micron New York Semiconductor Manufacturing LLC | 480 MW | Onondaga, NY | status code 12 | Mar 11, 2023 |  |
| NYISO | 1730 | Arsenal Data Site 1000Arconic Corporation | 467 MW | St Lawrence, NY | status code 5 | Mar 7, 2025 |  |
| NYISO | 0979 | North Country Data CenterNorth Country Data Center | 435 MW | St. Lawrence, NY | status code 12 | Jan 22, 2020 |  |
| NYISO | 1740 | Incremental Load Request for Remington Factory RedevelopmentTurin Management LLC | 400 MW | Herkimer, NY | status code 5 | Aug 29, 2025 |  |
| NYISO | 1762 | Highwall Data CenterHighwall Energy, LLC | 400 MW | Clearfield, PA | status code 4 | May 12, 2026 |  |
| NYISO | 1763 | Patriot ForgePatriot Forge PA, LLC | 350 MW | Tioga, PA | status code 4 | May 29, 2026 |  |
| NYISO | 0580 | WNY STAMPGenesee County Economic Devel. | 300 MW | Genesee, NY | status code 12 | Sep 27, 2016 |  |
| NYISO | 1484 | 580 STAMP load increaseGCEDC | 300 MW | Genesee, NY | status code 12 | Dec 2, 2022 |  |
| NYISO | 1719 | New York State Artificial Intelligence Data CenterZeroC Data Centers, LLC | 300 MW | St. Lawrence, NY | status code 0 | Sep 18, 2024 |  |
| NYISO | 1723 | Olean Digital Data CenterOlean Digital LLC | 300 MW | Cattaraugus, NY | status code 0 | Nov 7, 2024 |  |
| NYISO | 1726 | Data & Technology CampusRiverview Innovation & Technology Campus, Inc. | 300 MW | Erie, NY | status code 5 | Jan 31, 2025 |  |
| NYISO | 1731 | New York State Artificial Intelligence Data CenterZeroC Data Centers, LLC | 300 MW | St. Lawrence, NY | status code 5 | Mar 14, 2025 |  |
| NYISO | 1744 | Brookhaven Data CenterBrookhaven Logistics Center, LLC | 300 MW | Suffolk, NY | status code 0 | Sep 5, 2025 |  |
| NYISO | 1736 | Ranalli SuperDCRanalli SuperDC LLC | 270 MW | Onondaga, NY | status code 5 | May 7, 2025 |  |
| NYISO | 1670 | Lake Mariner Data IILake Mariner Data LLC | 250 MW | Niagara, NY | status code 6 | Jan 23, 2024 |  |
| NYISO | 1732 | Wulf Compute Data Center IITeraWulf Brookings LLC | 250 MW | Niagara, NY | status code 5 | Mar 29, 2025 |  |
| NYISO | 1745 | Pontoon Bridge Road Data CenterAmerican Data Center Partners LLC | 250 MW | St Lawrence, NY | status code 4 | Oct 9, 2025 |  |
| NYISO | 1752 | Broome County Tech ParkThe Agency | 250 MW | Broome, NY | status code 5 | Oct 30, 2025 |  |
| NYISO | 849 | Somerset LoadSomerset Operating Company, LLC | 250 MW | Niagara, NY | status code 14 | May 21, 2019 |  |
| NYISO | 1728 | Arsenal Data Site 250Arconic Corporation | 233 MW | St Lawrence, NY | status code 5 | Mar 7, 2025 |  |
| NYISO | 1729 | Arsenal Data Site 500Arconic Corporation | 233 MW | St Lawrence, NY | status code 5 | Mar 7, 2025 |  |
| NYISO | 0909 | Massena LoadPetaWatt Holdings, Inc. | 200 MW | St. Lawrence, NY | status code 0 | Sep 18, 2019 |  |
| NYISO | 1213 | St Lawrence Data and Agricultural CenterZeroC Data Centers, LLC | 200 MW | St. Lawrence, NY | status code 10 | Jun 28, 2021 |  |
| NYISO | 1633 | Suffern Quarry Data CenterRobert Delcalzo | 200 MW | Rockland, NY | status code 0 | Nov 13, 2023 |  |
| NYISO | 1717 | Proposed Datacenters at 450 Broadway, Buchanan, NY, 10511Holtec Decommissioning International (HDI) | 200 MW | Westchester, NY | status code 6 | Aug 7, 2024 |  |
| NYISO | 1724 | Alcoa East Energy Allocation ProjectAlcoa | 200 MW | St. Lawrence, NY | status code 0 | Dec 9, 2024 |  |
| NYISO | 1725 | Greenidge 200 MW Data Center ProjectGreenidge Generation, LLC | 200 MW | Yates, NY | status code 5 | Dec 20, 2024 |  |
| NYISO | 1751 | Massena Development LLC Power AllocationNorth Country Data Center LLC | 200 MW | St; Lawrence, NY | status code 4 | Oct 21, 2025 |  |
| NYISO | 1747 | Globe Digital Holdings - 1GLOBE DH LLC | 192 MW | Niagara, NY | status code 4 | Oct 17, 2025 |  |
| NYISO | 1748 | GLOBE DH 2GLOBE DH LLC | 192 MW | NIAGARA FALLS, NY | status code 4 | Oct 17, 2025 |  |
| NYISO | 1749 | Globe DH 3GLOBE DH LLC | 192 MW | niagara falls, NY | status code 4 | Oct 17, 2025 |  |
| NYISO | 1754 | Kenwood Tech CenterEKG Group LLC | 180 MW | Albany, NY | status code 4 | Nov 11, 2025 |  |
| NYISO | 1721 | Brookhaven Logistics CenterWF Industrial XII LLC | 177 MW | Suffolk, NY | status code 9 | Oct 28, 2024 |  |
| NYISO | 1733 | Cayuga DataCayuga Operating Company, LLC | 162 MW | Tompkins, NY | status code 5 | Mar 29, 2025 |  |
| NYISO | 1760 | iPark 84 Data Center InterconnectioniPark East Fishkill LLC | 150 MW | Dutchess, NY | status code 5 | Mar 25, 2026 |  |
| NYISO | 1761 | NYISO Load Interconnection Process - Data Center InquiryURI TALY | 150 MW | Horseheads, NY | status code 1 | Apr 12, 2026 |  |
| NYISO | 1681 | Niagara Digital CampusNiagara Falls Redevelopment LLC | 140 MW | Niagara, NY | status code 9 | Apr 9, 2024 |  |
| NYISO | 1315 | SDC St. LawrenceSabey Data Center Properties, LLC | 120 MW | St. Lawrence, NY | status code 8 | Dec 20, 2021 |  |
| NYISO | 1739 | Brookhaven National Laboratory Electron Ion Collider ProjectBrookhaven Science Associates on behalf of US Department of Energy | 120 MW | Suffolk, NY | status code 0 | Jul 30, 2025 |  |
| NYISO | 1446 | Massena Green HydrogenAir Products and Chemicals Inc | 110 MW | St Lawrence, NY | status code 0 | Oct 5, 2022 |  |
| NYISO | 1735 | Remington Factory RedevelopmentTurin Management LLC | 100 MW | Herkimer, NY | status code 5 | May 2, 2025 |  |
| NYISO | 1756 | Site Master Plan Expansion Phase IIResearch Foundation of SUNY | 90 MW | Albany, NY | status code 0 | Dec 18, 2025 |  |
| NYISO | 1683 | Cayuga ComputeCayuga Operating Company, LLC | 88 MW | Tompkins, NY | status code 6 | Apr 24, 2024 |  |
| NYISO | 1753 | New York State Dept. of Health Lab (Harriman Campus, Albany NY)New York State Office of General Services | 87 MW | Albany, NY | status code 4 | Nov 4, 2025 |  |
| NYISO | 0359 | Verizon - Project OasisNational Grid | 75 MW | Niagara, NY | status code 0 | Dec 20, 2010 |  |
| NYISO | 1737 | Griffiss Park Triangle DevelopmentGriffiss Utility Services Corporation | 66 MW | Oneida, NY | status code 5 | Jun 3, 2025 |  |
| NYISO | 0776 | Greenidge LoadGreenidge Generation LLC | 60 MW | Yates, NY | status code 7 | Oct 22, 2018 |  |
| NYISO | 1750 | Al Tech Steel SiteAdvance Albany County Alliance | 60 MW | Albany, NY | status code 4 | Oct 21, 2025 |  |
| NYISO | 1465 | Digihost loadDigihost Technologies, Inc. | 50 MW | Niagara, NY | status code 14 | Nov 14, 2022 |  |
| NYISO | 0850 | Cayuga LoadCayuga Operating Company, LLC | 50 MW | Cayuga, NY | status code 7 | May 21, 2019 |  |
| NYISO | 1646 | POWI ProjectP&M Brick LLC | 50 MW | Albany, NY | status code 6 | Nov 30, 2023 |  |
| NYISO | 1682 | Hudson Valley Data CenterEquity Suffern Developers, LLC | 50 MW | Rockland, NY | status code 0 | Apr 24, 2024 |  |
| NYISO | 1714 | Hudson Valley Data CenterRobert Delcalzo | 50 MW | Rockland, NY | status code 10 | Jul 2, 2024 |  |
| NYISO | 1746 | OOWWTP Expansion ProgramOnondaga County Department of Water Environment Protection | 50 MW | Onondaga, NY | status code 5 | Oct 15, 2025 |  |
| NYISO | 0311 | Concord CasinoNY State Electric & Gas | 48 MW | Sullivan, NY | status code 0 | Sep 24, 2008 |  |
| NYISO | 1755 | Site Master Plan Expansion Phase IResearch Foundation of SUNY | 45 MW | Albany, NY | status code 4 | Dec 18, 2025 |  |
| NYISO | 1759 | Saratoga ExpansionRobert Grant | 40 MW | Saratoga, NY | status code 4 | Mar 25, 2026 |  |
| NYISO | 205 | Luther ForestNational Grid | 40 MW | Saratoga, NY | status code 14 | Nov 2, 2005 |  |
| NYISO | 1715 | 1547 CSR - Orangeburg LLCJerry Martin | 30 MW | Rockland, NJ | status code 10 | Jul 2, 2024 |  |
| NYISO | 1716 | Orangeburg Expansion Phase 2DataBank Holdings, LLC | 30 MW | Orange, NY | status code 0 | Aug 5, 2024 |  |
| NYISO | 0423 | University of RochesterRochester Gas & Electric | 25 MW | Monroe, NY | status code 0 | Nov 17, 2013 |  |
| NYISO | 1713 | Project Sycamore OrangeburgProject Sycamore - Orangeburg | 22 MW | Rockland, NY | status code 10 | Jun 19, 2024 |  |
| NYISO | 0290A | Green Island PowerGreen Island Power Authority | 20 MW | Albany, NY | status code 14 | Apr 7, 2008 |  |
| NYISO | 1758 | GE Vernova 2690 Balltown Road High Yard UpgradeGE Vernova | 20 MW | Schenectady, NY | status code 4 | Jan 29, 2026 |  |
| NYISO | 1522 | GTS Dover EMD CompressorIroquois Gas Transmission System | 16 MW | Dutchess, NY | status code 0 | Feb 15, 2023 |  |
| NYISO | 1764 | Kilbourne Graphite Concentrator PlantTitan Mining Corporation | 15 MW | ST LAWRENCE, NY | status code 1 | Jul 16, 2026 |  |
| NYISO | 1521 | IGTS Wright EMD CompressorIroquois Gas Transmission System | 14 MW | Schoharie, NY | status code 0 | Feb 14, 2023 |  |

## What is queued to power them

Megawatts requested in active queue positions, by fuel, for each operator. Rows marked withdrawn or in service and transmission service requests are left out. 915 active projects request 300 MW or more, 512,153 MW in all.

Generation 587,358 MW in 1,997 positionsStorage 125,010 MW in 525 positionsHybrid 44,433 MW in 168 positions

### ERCOT 230,885 MW requested · 758 positions

Battery storage69,771 MW

Solar67,903 MW

Natural gas66,686 MW

Onshore wind23,686 MW

Nuclear2,657 MW

Oil132 MW

Other50 MW

### MISO 183,253 MW requested · 571 positions

Fuel not stated67,833 MW

Solar32,594 MW

Natural gas27,870 MW

Battery storage27,018 MW

Onshore wind15,150 MW

Other hybrids10,856 MW

Nuclear1,932 MW

### PJM 135,233 MW requested · 693 positions

Solar53,959 MW

Natural gas33,803 MW

Battery storage21,130 MW

Nuclear9,984 MW

Onshore wind6,357 MW

Solar plus storage5,285 MW

Offshore wind3,992 MW

Coal538 MW

Hydro and pumped storage105 MW

Oil50 MW

Other30 MW

### SPP 96,101 MW requested · 376 positions

Natural gas29,785 MW

Battery storage21,172 MW

Onshore wind13,797 MW

Solar13,152 MW

Solar plus storage12,807 MW

Other hybrids2,524 MW

Other2,255 MW

Coal450 MW

Oil150 MW

Fuel not stated8 MW

### CAISO 54,498 MW requested · 113 positions

Solar plus storage32,470 MW

Battery storage16,205 MW

Other hybrids2,500 MW

Onshore wind2,273 MW

Solar550 MW

Hydro and pumped storage500 MW

### NYISO 28,846 MW requested · 137 positions

Battery storage14,213 MW

Offshore wind4,327 MW

Natural gas3,527 MW

Onshore wind2,756 MW

Solar2,542 MW

Other1,480 MW

### ISO-NE 27,985 MW requested · 42 positions

Natural gas9,033 MW

Onshore wind7,927 MW

Nuclear3,992 MW

Battery storage2,762 MW

Fuel not stated2,400 MW

Hydro and pumped storage1,846 MW

Solar25 MW

### Queue positions

| ISO | Project | MW | Fuel | County, state | Status | Queue date | Source |
| --- | --- | --- | --- | --- | --- | --- | --- |
| CAISO1402 | ATLAS COMPLEX | 3,200 MW | Solar plus storageBattery; Solar | La Paz, AZ | ACTIVE | May 1, 2017 |  |
| ERCOT28INR0456 | Brazos Energy SecurityGolden Spread Electric | 3,000 MW | Natural gasGAS CC | Fisher, TX | SS Completed, FIS Started, No IA | Oct 21, 2025 |  |
| PJMAH1-710 | Salem 500kV AH1-710 | 2,651 MW | Nuclear | Salem, NJ | Active | Apr 9, 2025 |  |
| PJMAH1-698 | Braidwood 345 kV AH1-698 | 2,584 MW | Nuclear | Will, IL | Active | Apr 8, 2025 |  |
| PJMAH1-702 | Byron 345 kV AH1-702 | 2,530 MW | Nuclear | Ogle, IL | Active | Apr 7, 2025 |  |
| MISOJ3996 | SIOUXAMEREN MISSOURI | 2,220 MW | Natural gasGas | St. Charles, MO | Active | Apr 29, 2025 |  |
| MISOJ4241 | SIOUXAMEREN MISSOURI | 2,220 MW | Fuel not stated | St. Charles | Active | May 28, 2026 |  |
| PJMAG2-582 | Flint Run 500 kV AG2-582 | 2,100 MW | Natural gasNatural Gas | Doddridge, WV | Active | Mar 31, 2021 |  |
| MISOJ4256 | MISO J4256 | 2,015 MW | Fuel not stated |  | Active | Aug 10, 2026 |  |
| ERCOT30INR0091 | BM Great Rock Energy CenterBlack Mountain Energy Storage II | 1,981 MW | Natural gasGAS CC | Leon, TX | SS Completed, FIS Started, No IA | Mar 3, 2026 |  |
| PJMAH1-677 | Rogers Road 500 kV AH1-677 | 1,756 MW | Natural gasNatural Gas | Greensville, VA | Active | Apr 7, 2025 |  |
| ERCOT30INR0071 | Prairie Ridge (Gas - CC)Tenaska Power Generation, LLC | 1,660 MW | Natural gasGAS CC | Franklin, TX | SS Completed, FIS Started, No IA | Dec 1, 2025 |  |
| MISOJ3999 | Sugar Creek - Cayuga CT 345.0kVDUKE ENERGY INDIANA, LLC CIN | 1,540 MW | Natural gasGas | Vermillion, IN | Active | Apr 14, 2025 |  |
| PJMAH1-678 | Heritage 500 kV AH1-678 | 1,526 MW | Natural gasNatural Gas; Other | Brunswick, VA | Active | Apr 7, 2025 |  |
| ERCOT30INR0018 | Big Canyon WindLongfellow Wind, LLC | 1,500 MW | Onshore windWIN WT | Pecos, TX | SS Completed, FIS Started, IA | Jan 13, 2025 |  |
| ERCOT30INR0031 | Caldwell County Energy CenterCaldwell County Energy Center, LLC | 1,500 MW | Natural gasGAS CC | Caldwell, TX | SS Completed, FIS Started, No IA | Feb 3, 2025 |  |
| CAISO1889 | HOLMAN | 1,500 MW | Other hybridsBattery; Wind Turbine | Monterey, CA | ACTIVE | Apr 15, 2021 |  |
| MISOJ4216 | MISO J4216ENTERGY SERVICES, LLC. | 1,500 MW | Fuel not stated |  | Active | Feb 23, 2026 |  |
| MISOJ4219 | MISO J4219ENTERGY LOUISIANA, LLC | 1,500 MW | Fuel not stated |  | Active | Feb 24, 2026 |  |
| MISOJ4221 | MISO J4221ENTERGY ARKANSAS, LLC | 1,500 MW | Fuel not stated |  | Active | Feb 26, 2026 |  |
| MISOJ4024 | Other_ITC | 1,499 MW | Natural gasGas | Monroe, MI | Active | May 5, 2025 |  |
| MISOJ4025 | Other_ITC | 1,499 MW | Natural gasGas | Monroe, MI | Active | May 5, 2025 |  |
| MISOJ3799 | BLACKFOOT - MADRID 345.0kVITC | 1,452 MW | Natural gasGas | Livingston, MI | Pending Revision Approval | Apr 18, 2024 |  |
| MISOJ3922 | HIPLEMETC | 1,445 MW | Natural gasGas | Branch, MI | Pending Revision Approval | Mar 4, 2025 |  |
| MISOJ4296 | MISO J4296DUKE ENERGY INDIANA, LLC CIN | 1,440 MW | Fuel not stated | Vermillion | Active | Aug 29, 2026 |  |
| MISOJ4331 | MISO J4331ITC MIDWEST | 1,435 MW | Fuel not stated |  | Active | Sep 1, 2026 |  |
| MISOJ3923 | Majestic-Milan 345 kV LineITC | 1,414 MW | Natural gasGas | Washtenaw, MI | Active | Feb 28, 2025 |  |
| ERCOT33INR0005 | Bullock GasBullock Data Center, LLC | 1,400 MW | Natural gasGAS CC | Hill, TX | SS Completed, FIS Started, No IA | Jun 12, 2026 |  |
| ERCOT33INR0006 | Liberty Thermal Energy CenterLiberty Data Center I, LLC | 1,400 MW | Natural gasGAS CC | Hill, TX | SS Completed, FIS Started, No IA | Jun 12, 2026 |  |
| SPPGEN-2024-340 | GEN-2024-340 | 1,400 MW | Natural gasGas | Creek, OK | DISIS STAGE | Mar 1, 2025 |  |
| CAISO1632 | SANBORN HYBRID 3 | 1,400 MW | Solar plus storageBattery; Solar | Kern, CA | ACTIVE | Apr 15, 2019 |  |
| PJMAH1-686 | Hanging Rock 765 kV AH1-686 | 1,364 MW | Natural gasNatural Gas | Lawrence, OH | Active | Apr 3, 2025 |  |
| PJMAH1-714 | Lasalle 345 kV AH1-714 | 1,360 MW | Nuclear | Lasalle, IL | Active | Apr 9, 2025 |  |
| ERCOT30INR0020 | Willow Oak GasWillow Oak Energy LLC | 1,350 MW | Natural gasGAS CC | Jefferson, TX | SS Completed, FIS Started, No IA | Sep 9, 2025 |  |
| SPPGEN-2024-377 | GEN-2024-377 | 1,350 MW | Natural gasGas | Harrison, TX | DISIS STAGE | Mar 1, 2025 |  |
| SPPGEN-2024-379 | GEN-2024-379 | 1,350 MW | Natural gasGas | Bossier Parish, LA | DISIS STAGE | Mar 1, 2025 |  |
| ERCOT27INR0557 | STP Unit2 High Pressure Turbine UpgradeConstellation South Texas, LLC | 1,337 MW | NuclearNUC ST | Matagorda, TX | SS Completed, FIS Started, No IA | Apr 30, 2026 |  |
| NYISOC24-003 | Vineyard Mid-Atlantic WestVineyard Mid-Atlantic LLC | 1,321 MW | Offshore windOffshore Wind | Nassu, NY | status code 7 | Aug 1, 2024 |  |
| ERCOT33INR0007 | Blue Energy Center - Phase 3, Steam Stage 2Sister 1, LLC | 1,320 MW | NuclearNUC ST | Victoria, TX | SS Started, FIS Started, No IA | Sep 10, 2026 |  |
| NYISOC24-021 | Bluepoint Wind 1Bluepoint Wind LLC | 1,310 MW | Offshore windOffshore Wind | Kings, NY | status code 7 | Aug 1, 2024 |  |
| ERCOT30INR0077 | Moon HammerMoon Hammer LLC | 1,300 MW | Natural gasGAS GT | Wheeler, TX | SS Completed, FIS Started, IA | Jan 13, 2026 |  |
| ERCOT30INR0105 | The Giant Arc-IIPowering Knowledge, LLC | 1,300 MW | Natural gasGAS IC | Pecos, TX | SS Completed, FIS Started, No IA | Apr 22, 2026 |  |
| ERCOT30INR0113 | The Giant Arc IPowering Knowledge, LLC | 1,300 MW | Natural gasGAS IC | Pecos, TX | SS Completed, FIS Started, No IA | May 8, 2026 |  |
| PJMAH1-680 | Sammis - South Canton 345 kV AH1-680 | 1,300 MW | Natural gasNatural Gas | Carroll, OH | Active | Apr 3, 2025 |  |
| ERCOT29INR0361 | Aurelius 3 Natural GasIP Roman III Gas, LLC | 1,275 MW | Natural gasGAS IC | Deaf Smith, TX | SS Started, FIS Started, No IA | Jun 29, 2026 |  |
| ERCOT29INR0150 | Jewett Energy Center 1 GasJewett Energy Center LLC | 1,274 MW | Natural gasGAS CC | Freestone, TX | SS Completed, FIS Started, IA | Oct 21, 2025 |  |
| ERCOT28INR0509 | Thunder Bird 2 GasKalnin Ventures, LLC | 1,274 MW | Natural gasGAS CC | Jack, TX | SS Completed, FIS Started, No IA | May 26, 2026 |  |
| ERCOT30INR0110 | Thunder Bird 1 GasKalnin Ventures, LLC | 1,273 MW | Natural gasGAS CC | Jack, TX | SS Started, FIS Started, No IA | Jul 8, 2026 |  |
| PJMAE1-105 | Maidsville CCGT | 1,270 MW | Natural gasNatural Gas | Preston, WV | Engineering and Procurement | Sep 6, 2018 |  |
| ISO-NE101 | Seabrook Power Uprate7 | 1,265 MW | NuclearNUC ST | Rockingham, NH | interconnection agreement | Jan 15, 2003 |  |

2,188 positions · page 1 of 44

## Planned generation

Generators reported to the U.S. Energy Information Administration as planned to enter service by Oct 2029, from the EIA-860M monthly generator inventory for Jul 2026. The inventory covers utility-scale plants of 1 MW and more, so residential and rooftop systems do not appear.

0MW

Fuel cells

No planned generators in this month's file

42,456MW

Natural gas turbines

236 planned generators

0MW

Nuclear

No planned generators in this month's file

58,816MW

Batteries

455 planned generators

### By technology MW planned

Solar Photovoltaic108,071 MW

Batteries58,816 MW

Natural Gas Fired Combined Cycle22,563 MW

Natural Gas Fired Combustion Turbine19,893 MW

Onshore Wind Turbine13,429 MW

Offshore Wind Turbine5,089 MW

Hydroelectric Pumped Storage2,600 MW

Natural Gas Internal Combustion Engine911 MW

Conventional Hydroelectric318 MW

Petroleum Liquids189 MW

Geothermal157 MW

Other Waste Biomass147 MW

All Other138 MW

Landfill Gas26 MW

Municipal Solid Waste17 MW

Natural Gas Steam Turbine9 MW

### By state top 15, MW planned

Texas78,100 MW

California18,645 MW

Arizona13,813 MW

New York6,590 MW

Nevada6,472 MW

Virginia6,200 MW

Colorado5,808 MW

Pennsylvania5,581 MW

Illinois5,163 MW

Indiana5,003 MW

Oregon4,979 MW

Georgia4,641 MW

Wisconsin4,568 MW

Arkansas4,278 MW

Mississippi4,253 MW

### Planned generators

| Plant | Technology | MW | County, state | Planned | Status | Source |
| --- | --- | --- | --- | --- | --- | --- |
| Coastal Virginia Offshore Wind (CVOW) Commercial ProjectDominion Energy Inc. | Offshore Wind Turbine | 2,640 MW | VA | Jan 2027 | Under construction, less than or equal to 50 percent complete |  |
| Sunstone SolarSunstone Solar, LLC | Batteries | 1,200 MW | Morrow, OR | Dec 2027 | Regulatory approvals pending. Not under construction |  |
| Sunstone SolarSunstone Solar, LLC | Solar Photovoltaic | 1,200 MW | Morrow, OR | Dec 2027 | Regulatory approvals pending. Not under construction |  |
| Vista Sands SolarVista Sands Solar LLC | Solar Photovoltaic | 1,182 MW | Portage, WI | Dec 2028 | Regulatory approvals pending. Not under construction |  |
| Sycamore Riverside Energy, LLCInvenergy Services LLC | Natural Gas Fired Combustion Turbine | 964 MW | Sullivan, IN | Mar 2029 | Planned for installation, but regulatory approvals not initiated |  |
| Sunrise WindOrsted Wind Power North America LLC | Offshore Wind Turbine | 924 MW | Suffolk, NY | Oct 2027 | Under construction, less than or equal to 50 percent complete |  |
| Empire Wind 1Empire Offshore Wind LLC | Offshore Wind Turbine | 810 MW | Kings, NY | Sep 2027 | Under construction, more than 50 percent complete |  |
| Viola Generating StationEvergy Kansas Central, Inc | Natural Gas Fired Combined Cycle | 765 MW | Sumner, KS | Jan 2029 | Regulatory approvals received. Not under construction |  |
| Legend Power StationEntergy Texas Inc. | Natural Gas Fired Combined Cycle | 754 MW | Jefferson, TX | Jul 2028 | Regulatory approvals pending. Not under construction |  |
| Mill Creek (KY)Louisville Gas & Electric Co | Natural Gas Fired Combined Cycle | 740 MW | Jefferson, KY | Jun 2027 | Under construction, more than 50 percent complete |  |
| CPV Basin Ranch Energy CenterCPV Basin Ranch | Natural Gas Fired Combined Cycle | 722 MW | Ward, TX | Feb 2029 | Under construction, less than or equal to 50 percent complete |  |
| CPV Basin Ranch Energy CenterCPV Basin Ranch | Natural Gas Fired Combined Cycle | 722 MW | Ward, TX | Feb 2029 | Under construction, less than or equal to 50 percent complete |  |
| Cedar Bayou 5Cedar Bayou 5 LLC | Natural Gas Fired Combined Cycle | 721 MW | Chambers, TX | Aug 2028 | Under construction, less than or equal to 50 percent complete |  |
| Revolution WindOrsted Wind Power North America LLC | Offshore Wind Turbine | 715 MW | Washington, RI | Nov 2026 | Under construction, more than 50 percent complete |  |
| Libra SolarLibra Solar LLC | Batteries | 700 MW | Lyon, NV | Dec 2027 | Under construction, less than or equal to 50 percent complete |  |
| Libra SolarLibra Solar LLC | Solar Photovoltaic | 700 MW | Lyon, NV | Dec 2027 | Under construction, less than or equal to 50 percent complete |  |
| IP Roman WindIntersect USA, LLC | Onshore Wind Turbine | 670 MW | Deaf Smith, TX | Sep 2028 | Regulatory approvals pending. Not under construction |  |
| Sandow Lakes Energy StationSL Energy Power Plant I, LLC | Natural Gas Fired Combined Cycle | 645 MW | Lee, TX | Oct 2028 | Planned for installation, but regulatory approvals not initiated |  |
| Sandow Lakes Energy StationSL Energy Power Plant I, LLC | Natural Gas Fired Combined Cycle | 645 MW | Lee, TX | Dec 2028 | Planned for installation, but regulatory approvals not initiated |  |
| Tehuacana Creek SolarParliament Energy Holdings LLC | Solar Photovoltaic | 645 MW | Navarro, TX | May 2027 | Under construction, more than 50 percent complete |  |
| Illinois Generation LLCPattern Operators LP | Onshore Wind Turbine | 616 MW | Livingston, IL | Apr 2028 | Regulatory approvals received. Not under construction |  |
| Shady Hills Combined Cycle FacilityShady Hills Energy Center, LLC | Natural Gas Fired Combined Cycle | 612 MW | Pasco, FL | Nov 2026 | Under construction, more than 50 percent complete |  |
| Short Creek SolarWichita Solar I, LLC | Solar Photovoltaic | 606 MW | Wichita, TX | Mar 2028 | Regulatory approvals pending. Not under construction |  |
| Singing Grass WindPublic Service Co of Colorado | Onshore Wind Turbine | 603 MW | Kit Carson, CO | Aug 2026 | Under construction, less than or equal to 50 percent complete |  |
| Danish Fields Solar, LLCDanish Fields Solar, LLC | Solar Photovoltaic | 600 MW | Wharton, TX | Aug 2026 | Construction complete, but not yet in commercial operation |  |
| Clear Fork Creek Solar and BESS SLFClear Fork | Batteries | 600 MW | Wilson, TX | Mar 2027 | Under construction, less than or equal to 50 percent complete |  |
| Clear Fork Creek Solar and BESS SLFClear Fork | Solar Photovoltaic | 600 MW | Wilson, TX | Mar 2027 | Under construction, less than or equal to 50 percent complete |  |
| Arkansas Cypress Solar StationEntergy Arkansas LLC | Solar Photovoltaic | 600 MW | Jefferson, AR | Jan 2029 | Planned for installation, but regulatory approvals not initiated |  |
| Swenson SolarSwenson Solar LLC | Solar Photovoltaic | 600 MW | Stonewall, TX | Nov 2026 | Under construction, less than or equal to 50 percent complete |  |
| GRECGrand River Dam Authority | Natural Gas Fired Combustion Turbine | 594 MW | Mayes, OK | Sep 2026 | Construction complete, but not yet in commercial operation |  |
| Hecate Energy Cider Solar LLCGreenbacker Renewable Energy Corporation | Solar Photovoltaic | 557 MW | Genesee, NY | Oct 2026 | Under construction, less than or equal to 50 percent complete |  |
| Maricopa SolarMaricopa Solar | Batteries | 550 MW | Maricopa, AZ | Sep 2026 | Under construction, less than or equal to 50 percent complete |  |
| Renegade Solar Project (Dawn)Renegade Renewables, LLC | Solar Photovoltaic | 515 MW | Deaf Smith, TX | Dec 2027 | Regulatory approvals received. Not under construction |  |
| Hecate Energy Harley Hand Solar LLCHecate Energy Harley Hand Solar LLC | Solar Photovoltaic | 514 MW | Nolan, TX | Nov 2028 | Planned for installation, but regulatory approvals not initiated |  |
| Rail Tie WindRepsol Renewables NA | Onshore Wind Turbine | 504 MW | Albany, WY | Jun 2029 | Regulatory approvals pending. Not under construction |  |
| Bellefield 2 Solar & Energy Storage Farm26SB 8me LLC | Solar Photovoltaic | 500 MW | Kern, CA | Sep 2026 | Under construction, more than 50 percent complete |  |
| Roseland Solar Project, LLCEnel Green Power Roseland Solar, LLC | Solar Photovoltaic | 500 MW | Falls, TX | Sep 2026 | Construction complete, but not yet in commercial operation |  |
| Bellefield 2 Solar & Energy Storage Farm26SB 8me LLC | Batteries | 500 MW | Kern, CA | Nov 2026 | Under construction, more than 50 percent complete |  |
| Hecate Energy Ramsey StorageHecate Energy Ramsey Storage, LLC | Batteries | 500 MW | Wharton, TX | Dec 2027 | Planned for installation, but regulatory approvals not initiated |  |
| Sunscape Renewable EnergyVesper Energy Development LLC | Batteries | 500 MW | Nueces, TX | Oct 2028 | Planned for installation, but regulatory approvals not initiated |  |
| Sunscape Renewable EnergyVesper Energy Development LLC | Solar Photovoltaic | 500 MW | Nueces, TX | Oct 2028 | Planned for installation, but regulatory approvals not initiated |  |
| IP Roman SolarIntersect USA, LLC | Solar Photovoltaic | 500 MW | Deaf Smith, TX | Jun 2028 | Regulatory approvals pending. Not under construction |  |
| IP Meitner SolarIntersect USA, LLC | Solar Photovoltaic | 500 MW | Gray, TX | Apr 2028 | Regulatory approvals pending. Not under construction |  |
| IP Meitner WindIntersect USA, LLC | Onshore Wind Turbine | 500 MW | Roberts, TX | Feb 2028 | Regulatory approvals pending. Not under construction |  |
| La Salle ESSLa Salle ESS LLC | Batteries | 500 MW | LaSalle, TX | Jul 2029 | Planned for installation, but regulatory approvals not initiated |  |
| La Salle SolarLa Salle Solar LLC | Solar Photovoltaic | 500 MW | LaSalle, TX | Sep 2028 | Planned for installation, but regulatory approvals not initiated |  |
| Rising Star SolarRising Star Solar, LLC | Solar Photovoltaic | 500 MW | Starr, TX | Dec 2028 | Regulatory approvals received. Not under construction |  |
| Grace Energy CenterGrace Orchard Interconnection, LLC | Solar Photovoltaic | 500 MW | Riverside, CA | Aug 2027 | Regulatory approvals pending. Not under construction |  |
| Grace Energy CenterGrace Orchard Interconnection, LLC | Batteries | 500 MW | Riverside, CA | Oct 2027 | Regulatory approvals pending. Not under construction |  |
| Steel River Solar Phase 1Cypress Creek Renewables | Solar Photovoltaic | 500 MW | Mississippi, AR | Aug 2028 | Under construction, less than or equal to 50 percent complete |  |

2,026 generators · page 1 of 41

## Nuclear and small reactors

New and advanced reactor projects the U.S. Nuclear Regulatory Commission lists with applicants: pre-application (40), construction permit (13), early site permit (5), combined license (3). Pre-application engagement is not an application.

| Project | Stage | Status | Date | Docket | Source |
| --- | --- | --- | --- | --- | --- |
| Project Matador Advanced Energy and Intelligence Campus AP1000 Units 1-4Fermi America LLC (dba Fermi America)The U.S. Nuclear Regulatory Commission (NRC) is issuing for public comment a draft Environmental Impact Statement (EIS). | Combined license | Draft Environmental Impact Statement | Oct 9, 2026 | NRC-2026-0100 |  |
| Project Matador Nuclear Units 1-4Fermi America LLC · TXThe NRC opened EIS scoping (comments due April 20, 2026) on Fermi America's COL application for four AP1000 reactors at the Project Matador campus, which the notice ties to demand for hyperscale data center-aligned… | Combined license | under review; EIS scoping | Mar 20, 2026 | 05200051, 05200052, 05200053, 05200054 |  |
| Project Matador Advanced Energy and Intelligence Campus AP1000 Units 1-4, Project Matador Nuclear Units 1-4Fermi America LLC (dba Fermi America)Pursuant to the National Environmental Policy Act (NEPA) of 1969, the U.S. | Combined license | Notice of Intent To Conduct Scoping Process and Prepare an Environmental Impact Statement | Mar 20, 2026 | NRC-2026-0100 |  |
| Blue Energy Center-Port of Victoria Nuclear Unit 1Blue Energy Global, Inc.The U.S. Nuclear Regulatory Commission (NRC) has received the first part of a phased construction permit application, including a limited work authorization (LWA) request, from Blue Energy Global, Inc., for a… | Construction permit | Phased Construction Permit Application-Limited Work Authorization | Oct 8, 2026 | NRC-2026-4654 |  |
| Clinch River Nuclear Unit 1Tennessee Valley AuthorityThe U.S. Nuclear Regulatory Commission (NRC or the Commission) is providing notice of the issuance of Construction Permit (CP) No. CPAR-2 to Tennessee Valley Authority (TVA) for the Clinch River Nuclear Unit 1 reactor… | Construction permit | Construction Permit and Record of Decision | Oct 5, 2026 | 50-615 |  |
| Clinch River Nuclear Site, Unit 1Tennessee Valley Authority · TNThe NRC noticed an uncontested hearing on TVA's Clinch River Unit 1 construction permit application beginning August 13, 2026 in Oak Ridge. | Construction permit | uncontested hearing scheduled | Jul 7, 2026 | 05000615 |  |
| Pioneer Units 1 and 2Palisades SMR, LLC (SMR, LLC) · MIThe NRC announced an EIS and a 30-day scoping period (comments due July 15, 2026) for the phased construction permit application and LWA request for the dual-unit SMR-300 Pioneer plant. | Construction permit | under review; EIS scoping | Jun 15, 2026 | 50-616, 50-617 |  |
| Long Mott Generating StationLong Mott Energy, LLC · TXThe NRC issued an environmental assessment, finding of no significant impact and exemptions on May 18, 2026 for the construction permit review of four Xe-100 reactors at Long Mott. | Construction permit | under review; EA and FONSI issued | May 20, 2026 | 50-614 |  |
| Hermes Test ReactorKairos Power LLC · TNThe NRC approved an amendment to Construction Permit No. CPTR-6 (order issued May 13, 2026) extending the Hermes latest construction completion date from December 31, 2026 to April 30, 2029. | Construction permit | permit amended | May 18, 2026 | 50-7513 |  |
| Eden Radioisotopes, LLC, Eden Isotope Production ComplexEden Radioisotopes, LLC · NMThe staff of the U.S. Nuclear Regulatory Commission (NRC) is currently engaged in review activities for the construction permit application from Eden Radioisotopes, LLC (Eden) for a non-power reactor and production… | Construction permit | under review | May 5, 2026 | eden |  |
| Clinch River Nuclear Site, Unit 1Tennessee Valley Authority · TNThe NRC issued the final supplemental EIS (available April 1, 2026) for TVA's construction permit application for one BWRX-300 at Clinch River. | Construction permit | under review; final SEIS issued | Apr 6, 2026 | 50-615 |  |
| University of Illinois Urbana-Champaign, KRONOS Micro Modular Reactor (KRONOS MMR™)University of Illinois Urbana-Champaign · ILThe staff of the U.S. Nuclear Regulatory Commission (NRC) is currently engaged in review activities for the construction permit application from the University of Illinois Urbana-Champaign (U. | Construction permit | under review | Mar 31, 2026 | kronos |  |
| Kemmerer Power Station, Unit 1US SFR Owner, LLC (application filed by TerraPower, LLC) · WYThe NRC issued Construction Permit No. CPAR-1 on March 9, 2026 authorizing US SFR Owner, LLC to construct Kemmerer Unit 1 in Lincoln County, Wyoming, with notice published March 16, 2026. | Construction permit | permit issued | Mar 16, 2026 | 50-613 |  |
| Pioneer Units 1 and 2 Limited Work Authorization ApplicationPalisades SMR, LLCThe U.S. Nuclear Regulatory Commission (NRC) is currently engaged in review activities for the first part of a phased construction permit application, including a limited work authorization request, from Palisades SMR… | Construction permit | under review | Dec 31, 2025 | 05000616 |  |
| Clinch River Nuclear Site ApplicationTennessee Valley Authority (TVA)The U.S. Nuclear Regulatory Commission (NRC) is currently engaged in review activities for Tennessee Valley Authority’s (TVA) construction permit application for the Clinch River Nuclear Site in Oak Ridge, Tennessee. | Construction permit | under review | Apr 2025 | 99902056 |  |
| Long Mott Energy, LLC, Long Mott Generating Station Xe-100 Power Reactor ApplicationLong Mott Energy, LLC · TXThe staff of the U.S. Nuclear Regulatory Commission (NRC) is currently engaged in review activities for the construction permit application from Long Mott Energy, LLC (LME), for the Xe-100 power reactor to be located in… | Construction permit | under review | Mar 31, 2025 | long-mott |  |
| North Anna SiteVirginia Electric and Power Company, (Doing Business as Dominion Energy Virginia) · VAThe U.S. Nuclear Regulatory Commission (NRC or Commission) is considering an application for the renewal of Early Site Permit (ESP) No. | Early site permit | Early Site Permit Renewal Application | Sep 11, 2026 | 52-008 |  |
| Belews CreekDuke Energy Carolinas, LLCThe U.S. Nuclear Regulatory Commission (NRC) is providing public notice for an uncontested hearing on NRC staff's review of the early site permit (ESP) application, from Duke Energy Carolinas, LLC, (Duke Energy) for the… | Early site permit | Notice of Hearing | Aug 6, 2026 | 52-055 |  |
| North Anna ESP-003 renewalVirginia Electric and Power Company (Dominion Energy Virginia) · VAThe NRC noticed receipt of Dominion's application (available July 14, 2026) to renew ESP-003 for another 20 years; the current permit expires November 27, 2027. | Early site permit | renewal application received | Aug 5, 2026 | 52-008 |  |
| Belews Creek Early Site PermitDuke Energy Carolinas, LLC · NCThe NRC announced an EIS and 30-day scoping period (comments due June 8, 2026) for Duke Energy's Belews Creek ESP application. | Early site permit | under review; EIS scoping | Apr 27, 2026 | 52-055 |  |
| Duke Energy's Belews Creek Early Site Permit ApplicationDuke EnergyThe U.S. Nuclear Regulatory Commission (NRC) is currently reviewing the Duke Energy's Early Site Permit (ESP) application for the Belews Creek Site in Stokes County, North Carolina. | Early site permit | issued | Dec 30, 2025 | 99902121 |  |
| Aalo AtomicsAalo AtomicsAalo Atomics is listed by the NRC as an advanced reactor pre-application applicant or vendor engaging staff before a licensing application. | Pre-application | pre-application engagement | Aug 27, 2026 | aalo-atomics |  |
| Abilene Christian UniversityAbilene Christian UniversityAbilene Christian University is listed by the NRC as an advanced reactor pre-application applicant or vendor engaging staff before a licensing application. | Pre-application | pre-application engagement | Aug 27, 2026 | acu-preapp |  |
| Advance Energy Bridge (AEB)Advance Energy Bridge (AEB)Advance Energy Bridge (AEB) is listed by the NRC as an advanced reactor pre-application applicant or vendor engaging staff before a licensing application. | Pre-application | pre-application engagement | Aug 27, 2026 | advanced-energy-bridge-nvs |  |
| Antares Nuclear, Inc.Antares Nuclear, Inc.Antares Nuclear, Inc. is listed by the NRC as an advanced reactor pre-application applicant or vendor engaging staff before a licensing application. | Pre-application | pre-application engagement | Aug 27, 2026 | antares-nuclear |  |
| Appalachian Power CompanyAppalachian Power CompanyAppalachian Power Company is listed by the NRC as an advanced reactor pre-application applicant or vendor engaging staff before a licensing application. | Pre-application | pre-application engagement | Aug 27, 2026 | apco-joshua-falls |  |
| Apollo AtomicsApollo AtomicsApollo Atomics is listed by the NRC as an advanced reactor pre-application applicant or vendor engaging staff before a licensing application. | Pre-application | pre-application engagement | Aug 27, 2026 | apollo-atomics |  |
| ARC Clean TechnologyARC Clean TechnologyARC Clean Technology is listed by the NRC as an advanced reactor pre-application applicant or vendor engaging staff before a licensing application. | Pre-application | pre-application engagement | Aug 27, 2026 | arc-100 |  |
| AtkinsRéalis - Enhanced CANDU 6AtkinsRéalis - Enhanced CANDU 6AtkinsRéalis - Enhanced CANDU 6 is listed by the NRC as an advanced reactor pre-application applicant or vendor engaging staff before a licensing application. | Pre-application | pre-application engagement | Aug 27, 2026 | atkinsrealis |  |
| Blue Energy, Inc.Blue Energy, Inc.Blue Energy, Inc. is listed by the NRC as an advanced reactor pre-application applicant or vendor engaging staff before a licensing application. | Pre-application | pre-application engagement | Aug 27, 2026 | blue-energy |  |
| GVH BWRX-300GVH BWRX-300GVH BWRX-300 is listed by the NRC as an advanced reactor pre-application applicant or vendor engaging staff before a licensing application. | Pre-application | pre-application engagement | Aug 27, 2026 | bwrx-300 |  |
| Deep FissionDeep FissionDeep Fission is listed by the NRC as an advanced reactor pre-application applicant or vendor engaging staff before a licensing application. | Pre-application | pre-application engagement | Aug 27, 2026 | deep-fission |  |
| Deployable EnergyDeployable EnergyDeployable Energy is listed by the NRC as an advanced reactor pre-application applicant or vendor engaging staff before a licensing application. | Pre-application | pre-application engagement | Aug 27, 2026 | deployableenergy |  |
| Duke Energy - Belews Creek, NCDuke Energy - Belews Creek, NCDuke Energy - Belews Creek, NC is listed by the NRC as an advanced reactor pre-application applicant or vendor engaging staff before a licensing application. | Pre-application | pre-application engagement | Aug 27, 2026 | duke-energy-belews-creek |  |
| ELYON-5ELYON-5ELYON-5 is listed by the NRC as an advanced reactor pre-application applicant or vendor engaging staff before a licensing application. | Pre-application | pre-application engagement | Aug 27, 2026 | elyon-5 |  |
| Energy Northwest New NuclearEnergy Northwest New NuclearEnergy Northwest New Nuclear is listed by the NRC as an advanced reactor pre-application applicant or vendor engaging staff before a licensing application. | Pre-application | pre-application engagement | Aug 27, 2026 | energy-northwest |  |
| Westinghouse eVinciWestinghouse eVinciWestinghouse eVinci is listed by the NRC as an advanced reactor pre-application applicant or vendor engaging staff before a licensing application. | Pre-application | pre-application engagement | Aug 27, 2026 | evinci |  |
| First American Nuclear Co.First American Nuclear Co.First American Nuclear Co. is listed by the NRC as an advanced reactor pre-application applicant or vendor engaging staff before a licensing application. | Pre-application | pre-application engagement | Aug 27, 2026 | first-american |  |
| General AtomicsGeneral AtomicsGeneral Atomics is listed by the NRC as an advanced reactor pre-application applicant or vendor engaging staff before a licensing application. | Pre-application | pre-application engagement | Aug 27, 2026 | genatom |  |
| General Atomics Electromagnetic SystemsGeneral Atomics Electromagnetic SystemsGeneral Atomics Electromagnetic Systems is listed by the NRC as an advanced reactor pre-application applicant or vendor engaging staff before a licensing application. | Pre-application | pre-application engagement | Aug 27, 2026 | general-atomics |  |
| Hadron Energy, Inc.Hadron Energy, Inc.Hadron Energy, Inc. is listed by the NRC as an advanced reactor pre-application applicant or vendor engaging staff before a licensing application. | Pre-application | pre-application engagement | Aug 27, 2026 | hadron |  |
| Terrestrial Energy USA, INC.Terrestrial Energy USA, INC.Terrestrial Energy USA, INC. is listed by the NRC as an advanced reactor pre-application applicant or vendor engaging staff before a licensing application. | Pre-application | pre-application engagement | Aug 27, 2026 | imsr |  |
| Japan Atomic Energy AgencyJapan Atomic Energy AgencyJapan Atomic Energy Agency is listed by the NRC as an advanced reactor pre-application applicant or vendor engaging staff before a licensing application. | Pre-application | pre-application engagement | Aug 27, 2026 | jaea-fsis |  |
| Kairos Power, LLCKairos Power, LLCKairos Power, LLC is listed by the NRC as an advanced reactor pre-application applicant or vendor engaging staff before a licensing application. | Pre-application | pre-application engagement | Aug 27, 2026 | kairos |  |
| Radiant Industries, INC.Radiant Industries, INC.Radiant Industries, INC. is listed by the NRC as an advanced reactor pre-application applicant or vendor engaging staff before a licensing application. | Pre-application | pre-application engagement | Aug 27, 2026 | kaleidos |  |
| Last EnergyLast EnergyLast Energy is listed by the NRC as an advanced reactor pre-application applicant or vendor engaging staff before a licensing application. | Pre-application | pre-application engagement | Aug 27, 2026 | last-energy |  |
| TerraPower, LLCTerraPower, LLCTerraPower, LLC is listed by the NRC as an advanced reactor pre-application applicant or vendor engaging staff before a licensing application. | Pre-application | pre-application engagement | Aug 27, 2026 | mcfr |  |
| TerraPower & GE - Hitachi NatriumTerraPower & GE - Hitachi NatriumTerraPower & GE - Hitachi Natrium is listed by the NRC as an advanced reactor pre-application applicant or vendor engaging staff before a licensing application. | Pre-application | pre-application engagement | Aug 27, 2026 | natrium |  |
| Natura ResourcesNatura ResourcesNatura Resources is listed by the NRC as an advanced reactor pre-application applicant or vendor engaging staff before a licensing application. | Pre-application | pre-application engagement | Aug 27, 2026 | natura-resources |  |
| Newcleo AmericasNewcleo AmericasNewcleo Americas is listed by the NRC as an advanced reactor pre-application applicant or vendor engaging staff before a licensing application. | Pre-application | pre-application engagement | Aug 27, 2026 | newcleo-americas |  |
| Oklo Inc.Oklo Inc.Oklo Inc. is listed by the NRC as an advanced reactor pre-application applicant or vendor engaging staff before a licensing application. | Pre-application | pre-application engagement | Aug 27, 2026 | okla-aurora-powerhouse |  |
| REPLOY Power, Inc.REPLOY Power, Inc.REPLOY Power, Inc. is listed by the NRC as an advanced reactor pre-application applicant or vendor engaging staff before a licensing application. | Pre-application | pre-application engagement | Aug 27, 2026 | reploy-power |  |
| Rolls-Royce SMR LimitedRolls-Royce SMR LimitedRolls-Royce SMR Limited is listed by the NRC as an advanced reactor pre-application applicant or vendor engaging staff before a licensing application. | Pre-application | pre-application engagement | Aug 27, 2026 | rolls-royce-smr-limited |  |
| Shepherd Power, LLCShepherd Power, LLCShepherd Power, LLC is listed by the NRC as an advanced reactor pre-application applicant or vendor engaging staff before a licensing application. | Pre-application | pre-application engagement | Aug 27, 2026 | shepherd-power |  |
| SMR, LLC (Holtec)SMR, LLC (Holtec)SMR, LLC (Holtec) is listed by the NRC as an advanced reactor pre-application applicant or vendor engaging staff before a licensing application. | Pre-application | pre-application engagement | Aug 27, 2026 | smr300 |  |
| Terra Innovatum (SOLO)Terra Innovatum (SOLO)Terra Innovatum (SOLO) is listed by the NRC as an advanced reactor pre-application applicant or vendor engaging staff before a licensing application. | Pre-application | pre-application engagement | Aug 27, 2026 | terra-innovatum |  |
| Texas A&M University - RELLIS CampusTexas A&M University - RELLIS CampusTexas A&M University - RELLIS Campus is listed by the NRC as an advanced reactor pre-application applicant or vendor engaging staff before a licensing application. | Pre-application | pre-application engagement | Aug 27, 2026 | texas-am-system |  |
| University of Illinois Urbana-Champaign - NANO Nuclear Energy Inc.University of Illinois Urbana-Champaign - NANO Nuclear Energy Inc.University of Illinois Urbana-Champaign - NANO Nuclear Energy Inc. is listed by the NRC as an advanced reactor pre-application applicant or vendor engaging staff before a licensing application. | Pre-application | pre-application engagement | Aug 27, 2026 | university-of-illinois-at-urbana-champaign |  |
| Westinghouse AP300Westinghouse AP300Westinghouse AP300 is listed by the NRC as an advanced reactor pre-application applicant or vendor engaging staff before a licensing application. | Pre-application | pre-application engagement | Aug 27, 2026 | westinghouse |  |
| X-Energy, LLC (XE-100)X-Energy, LLC (XE-100)X-Energy, LLC (XE-100) is listed by the NRC as an advanced reactor pre-application applicant or vendor engaging staff before a licensing application. | Pre-application | pre-application engagement | Aug 27, 2026 | xe-100 |  |
| X-Energy, LLC (XENITH)X-Energy, LLC (XENITH)X-Energy, LLC (XENITH) is listed by the NRC as an advanced reactor pre-application applicant or vendor engaging staff before a licensing application. | Pre-application | pre-application engagement | Aug 27, 2026 | xenith |  |

## Federal environmental records

Facilities registered with the U.S. EPA's Enforcement and Compliance History Online (ECHO) under data processing codes or data center names, with the regulatory programs each record lists. 333 of 464 records list at least one program. CAA is the Clean Air Act, SIP a state implementation plan, NSPS and MACT federal air emission standards, TVP a Title V operating permit, CWA the Clean Water Act and RCRA hazardous waste rules. A listed program is a registration, not a permit for a specific project.

| Facility | City | State | Programs | Source |
| --- | --- | --- | --- | --- |
| AT&T HOOVER | Hoover | AL | CAA, CWA, NSPS, RCRA, SIP |  |
| AVALAN | Madison | AL |  |  |
| WIESSNER ENTERPRISES, LLC | Bridgeport | AL | CAA, NSPS, SIP, TVP |  |
| ARVEST DATA CENTER | Lowell | AR |  |  |
| WAL- MART STORES, INC. - EAST DATA CENTER | Bentonville | AR | CAA, CWA, MACT, NSPS, SIP |  |
| ADOA DATA CENTER | Phoenix | AZ |  |  |
| ALIGNED ENERGY DATA CENTERS (PHOENIX) | Phoenix | AZ |  |  |
| ALIGNED PHX06 | Unknown | AZ |  |  |
| AMERICAN AIRLINES - PHX DATA CENTER BLDG 1920 | Tempe | AZ |  |  |
| APPLE DATA CENTER | Mesa | AZ |  |  |
| APS - ALIGNED ENERGY DATA CENTER | Phoenix | AZ | CAA, NSPS, RCRA |  |
| CYRUSONE - CHANDLER | Maricopa County | AZ | CAA, NSPS, NSPSM, OTH |  |
| IRON MOUNTAIN DATA CENTER | Phoenix | AZ | CAA, NSPS, RCRA, SIP |  |
| LINCOLN RACKHOUSE | Chandler | AZ | CAA, RCRA, SIP, TRI |  |
| LMK_PHX | Maricopa County | AZ | CAA, FESOP, NSPS, NSPSM, OTH, SIP |  |
| PHX01 / PHX02 / PHX03 / PHX05 | Phoenix | AZ | CAA, CWA, FESOP, NSPS, NSPSM, OTH |  |
| ASB FORTUNE DATA CENTER | San Jose | CA |  |  |
| AT&T FAIRFIELD DATA CENTER | Fairfield | CA |  |  |
| AWS DATA CENTER GILROY - SFO069 | Gilroy | CA |  |  |
| AWS DATA CENTER GILROY - SFO069 | Gilroy | CA |  |  |
| CHINA MOBILE INTERNATIONAL SAN JOSE DATA CENTER | San Jose | CA |  |  |
| CHINA MOBILE INTERNATIONAL SAN JOSE DATA CENTER | San Jose | CA |  |  |
| CUESTA COLLEGE | San Luis Obispo | CA |  |  |
| CUESTA COLLEGE DATA CENTER | San Luis Obispo | CA |  |  |
| EDGECORE DATA CENTER MECP1 SANTA CLARA 1 PROJECT | Santa Clara | CA |  |  |
| EDGECORE DATA CENTER MECP1 SANTA CLARA 1 PROJECT | Santa Clara | CA |  |  |
| HAYWARD DATA CENTER | Hayward | CA |  |  |
| HAYWARD DATA CENTER | Hayward | CA |  |  |
| PRIME DATA CENTER | Santa Clara | CA |  |  |
| PRIME DATA CENTER | Santa Clara | CA |  |  |
| PRIME DATA CENTER SJC03 1 | Santa Clara | CA |  |  |
| PRIME DATA CENTER SJC03 1 | Santa Clara | CA |  |  |
| PRIME DATA CENTER VERNON | Vernon | CA |  |  |
| PRIME DATA CENTER VERNON | Vernon | CA |  |  |
| PRIME DATA CENTERS | Santa Clara | CA |  |  |
| PRIME DATA CENTERS | Santa Clara | CA |  |  |
| PRIME DATA CENTERS (DBA SVO) | Mcclellan | CA | CAA, SIP |  |
| RAGING WIRE | Sacramento | CA | CAA, NSPS, NSR, SIP, TVP |  |
| SJC02 & SJC03 DATA CENTER | San Jose | CA |  |  |
| SJC02 & SJC03 DATA CENTER | San Jose | CA |  |  |
| SKYBOX DATA CENTER | Santa Clara | CA |  |  |
| SKYBOX DATA CENTER | Santa Clara | CA |  |  |
| SV8 DATA CENTER | Santa Clara | CA |  |  |
| SV8 DATA CENTER | Santa Clara | CA |  |  |
| VANTAGE DATA CENTERS MANAGEMENT CO LLC | Santa Clara | CA | CAA |  |
| VANTAGE V5 DATA CENTER | Santa Clara | CA |  |  |
| VANTAGE V5 DATA CENTER | Santa Clara | CA |  |  |
| VANTAGE V6 DATA CENTER | Santa Clara | CA |  |  |
| VANTAGE V6 DATA CENTER | Santa Clara | CA |  |  |
| AGILENT TECHNOLOGIES INC - CO SPRINGS DATA CENTER | Colorado Springs | CO |  |  |

464 facilities · page 1 of 10

## Every state, one page each

All 52 states, DC and Puerto Rico have their own page: permits, queue positions, planned generation and every other filing tracked here, filtered to that state. Where nothing is on record, the page says so.

[Alabama 0](https://savrn.com/data-center-permits-tracker/alabama) [Alaska 0](https://savrn.com/data-center-permits-tracker/alaska) [Arizona 92](https://savrn.com/data-center-permits-tracker/arizona) [Arkansas 0](https://savrn.com/data-center-permits-tracker/arkansas) [California 1](https://savrn.com/data-center-permits-tracker/california) [Colorado 0](https://savrn.com/data-center-permits-tracker/colorado) [Connecticut 0](https://savrn.com/data-center-permits-tracker/connecticut) [Delaware 0](https://savrn.com/data-center-permits-tracker/delaware) [Florida 0](https://savrn.com/data-center-permits-tracker/florida) [Georgia 24](https://savrn.com/data-center-permits-tracker/georgia) [Hawaii 0](https://savrn.com/data-center-permits-tracker/hawaii) [Idaho 0](https://savrn.com/data-center-permits-tracker/idaho) [Illinois 1](https://savrn.com/data-center-permits-tracker/illinois) [Indiana 0](https://savrn.com/data-center-permits-tracker/indiana) [Iowa 0](https://savrn.com/data-center-permits-tracker/iowa) [Kansas 0](https://savrn.com/data-center-permits-tracker/kansas) [Kentucky 0](https://savrn.com/data-center-permits-tracker/kentucky) [Louisiana 0](https://savrn.com/data-center-permits-tracker/louisiana) [Maine 0](https://savrn.com/data-center-permits-tracker/maine) [Maryland 11](https://savrn.com/data-center-permits-tracker/maryland) [Massachusetts 0](https://savrn.com/data-center-permits-tracker/massachusetts) [Michigan 0](https://savrn.com/data-center-permits-tracker/michigan) [Minnesota 1](https://savrn.com/data-center-permits-tracker/minnesota) [Mississippi 0](https://savrn.com/data-center-permits-tracker/mississippi) [Missouri 67](https://savrn.com/data-center-permits-tracker/missouri) [Montana 0](https://savrn.com/data-center-permits-tracker/montana) [Nebraska 11](https://savrn.com/data-center-permits-tracker/nebraska) [Nevada 16](https://savrn.com/data-center-permits-tracker/nevada) [New Hampshire 0](https://savrn.com/data-center-permits-tracker/new-hampshire) [New Jersey 0](https://savrn.com/data-center-permits-tracker/new-jersey) [New Mexico 0](https://savrn.com/data-center-permits-tracker/new-mexico) [New York 0](https://savrn.com/data-center-permits-tracker/new-york) [North Carolina 35](https://savrn.com/data-center-permits-tracker/north-carolina) [North Dakota 0](https://savrn.com/data-center-permits-tracker/north-dakota) [Ohio 0](https://savrn.com/data-center-permits-tracker/ohio) [Oklahoma 0](https://savrn.com/data-center-permits-tracker/oklahoma) [Oregon 33](https://savrn.com/data-center-permits-tracker/oregon) [Pennsylvania 0](https://savrn.com/data-center-permits-tracker/pennsylvania) [Puerto Rico 0](https://savrn.com/data-center-permits-tracker/puerto-rico) [Rhode Island 0](https://savrn.com/data-center-permits-tracker/rhode-island) [South Carolina 0](https://savrn.com/data-center-permits-tracker/south-carolina) [South Dakota 0](https://savrn.com/data-center-permits-tracker/south-dakota) [Tennessee 0](https://savrn.com/data-center-permits-tracker/tennessee) [Texas 49](https://savrn.com/data-center-permits-tracker/texas) [Utah 0](https://savrn.com/data-center-permits-tracker/utah) [Vermont 0](https://savrn.com/data-center-permits-tracker/vermont) [Virginia 396](https://savrn.com/data-center-permits-tracker/virginia) [Washington 0](https://savrn.com/data-center-permits-tracker/washington) [Washington, DC 0](https://savrn.com/data-center-permits-tracker/washington-dc) [West Virginia 0](https://savrn.com/data-center-permits-tracker/west-virginia) [Wisconsin 0](https://savrn.com/data-center-permits-tracker/wisconsin) [Wyoming 0](https://savrn.com/data-center-permits-tracker/wyoming)

The number is data center and substation permits on record in that state. Queue, generation and other filings are on the page itself.

## Common questions

How many data center permits does the tracker list?

737 building and land-use permits are classified as data center (605) or substation (132) work, out of 1,228 utility-scale permits read from 80 city and county open-data feeds in 27 states, as of Oct 24, 2026.

How much generation and storage is waiting in U.S. interconnection queues?

756,801 MW of generation and storage is requested in 2,690 active queue positions across 7 ISO and RTO queues, led by ERCOT with 230,885 MW. This is requested capacity, not built capacity: 4,304 rows marked withdrawn and 245 marked in service are left out.

How many large loads have asked to connect to the grid?

There is no single national count. Each grid operator counts large loads in its own documents and definitions: ERCOT reports 474 GW (requests to connect, Jul 29, 2026); ERCOT reports 446 GW (requests to connect, by 2033, May 13, 2026); MISO reports 19 GW (requests to connect, May 13, 2026); NYISO reports 13 GW, 51 projects (requests to connect, May 1, 2026); NYISO reports 18 GW, 74 projects (load projects in the queue file, Sep 14, 2026); ISO-NE reports 285 MW, 2 projects (requests to connect, May 18, 2026); Oncor reports 282 GW (requests to connect, Jun 30, 2026). The figures are listed side by side on this page and are not added together.

How much new generating capacity is planned in the next 36 months?

The EIA-860M generator inventory lists 232,373 MW across 2,011 planned generators scheduled to enter service by Oct 2029. The largest technologies are solar photovoltaic (108,071 MW), batteries (58,816 MW), natural gas fired combined cycle (22,563 MW).

## Methodology

Sources. Building and land-use permits come from city and county open-data portals. Queue rows come from the public queue files of PJM, MISO, SPP, CAISO, NYISO, ISO New England and ERCOT. Planned generators come from EIA Form 860M, reactor projects from the NRC's new and advanced reactor pages, and facilities from EPA ECHO.

Cadence. The tracker engine runs every hour. Each source is checked on its own schedule, so a monthly dataset such as EIA-860M changes once a month while an open-data permit feed can change daily. The live line under the page title shows when sources were last checked.

Utility-scale rule. A building permit is kept only when it describes data center, substation or utility-scale generation, battery, solar or wind work. Residential and rooftop solar, home batteries and standby generators are excluded.

Queue megawatts. Queue megawatts are requested capacity, not built capacity. A queue position records a request to connect, and many requests are withdrawn before anything is built: 4,304 of the 7,459 queue rows in these files are marked withdrawn. Withdrawn rows, rows marked in service and transmission service requests are left out of the totals. Megawatts, permits and facilities are counted in their own sections and are never added together.

[Every source, license and row count →](https://savrn.com/data-center-permits-tracker/sources)

The SAVRN reference set

## Seven references, one system

Capital, delay, policy, water, grid, permits and scarcity are one system seen from seven sides. Each reference is primary-sourced, refreshed on a schedule, and links into the others, so a project can be followed from the money committed to the docket that stopped it.

Capital Atlas

Who is funding AI data centers: capital providers, named sites, financing transactions, and the blocked-and-delayed record, state by state and company by company.

[Open the atlas →](https://savrn.com/data-center-capital-atlas)

Delay Watchlist

Project-level slippage: named projects, jurisdictional actions, utility and federal dockets, SEC disclosures, and the interconnection queue.

Open the watchlist →

Moratorium Tracker

The policy layer: every state measure and local moratorium mapped and cited, with one page per state.

Open the tracker →

Water Tracker

Every federal, state, local and interstate water measure that touches a data center, plus a fifty-state water ledger.

Open the water tracker →

Grid Operator Watchlist

ERCOT, PJM, MISO, CAISO, SPP, NYISO, ISO-NE and FERC: the large-load rules, filings and queue positions that decide whether a site can energize.

Open the watchlist →

SAVRN Scarcity Tracker

Eleven primary-sourced indicators of AI infrastructure scarcity, one composite index, read against the token index, SAVRN's own cost basis and the frontier ceiling.

Open the scarcity tracker →

Have a specific address? Site Intelligence reads all seven references against one location, county, utility and grid operator included, and cites every finding.

[Check an address →](https://savrn.com/site-intelligence)