Alabama has 1,151 MW of generation planned within 36 months. Every row below links to its primary source.

Last checked Oct 25, 2026

0

Data center & substation permits

of 1 total utility-scale permits tracked here

0MW

In the interconnection queue

0 active generation and storage positions

1,151MW

Planned generation

12 EIA-860M generators due within 36 months

#14

of 51 states with anything on record

Ranked by data center & substation permit count

## Where the activity is

Ranked by row count. Counts are never mixed with the MW figures above.

### Permit categories

zoning 1

## Permits in Alabama

1 building and land-use permit tracked in Alabama.

| Date | Category | Address | Applicant | Source |
| --- | --- | --- | --- | --- |
| Sep 15, 2026 | Zoning | Near Brookwood Middle School, Brookwood, ALBrookwood City Council (news report) |  |  |

## Planned generation in Alabama

1,151 MW across 12 EIA-860M generators scheduled to enter service within 36 months.

| Plant | Technology | MW | Planned | Status | Source |
| --- | --- | --- | --- | --- | --- |
| Hillsboro Solar 3Lawrence County | Solar Photovoltaic | 200 MW | May 2027 | Regulatory approvals pending. Not under construction |  |
| Spring Valley Solar 2Colbert County | Solar Photovoltaic | 200 MW | Feb 2028 | Regulatory approvals pending. Not under construction |  |
| Crawfish Creek Energy StorageJackson County | Batteries | 200 MW | Jun 2029 | Regulatory approvals received. Not under construction |  |
| Lawrence County SolarLawrence County | Solar Photovoltaic | 193 MW | Dec 2027 | Planned for installation, but regulatory approvals not initiated |  |
| Old Hayneville Solar, LLCMontgomery County | Solar Photovoltaic | 80 MW | Aug 2026 | Construction complete, but not yet in commercial operation |  |
| Foley Solar, LLCBaldwin County | Solar Photovoltaic | 80 MW | Aug 2026 | Construction complete, but not yet in commercial operation |  |
| Alabama Creek SolarDallas County | Solar Photovoltaic | 80 MW | Oct 2027 | Regulatory approvals received. Not under construction |  |
| SR Hope HullMontgomery County | Solar Photovoltaic | 80 MW | Dec 2027 | Regulatory approvals received. Not under construction |  |
| SR Marion JunctionDallas County | Solar Photovoltaic | 15 MW | Dec 2027 | Regulatory approvals received. Not under construction |  |
| SR SipseyFayette County | Solar Photovoltaic | 10 MW | Dec 2027 | Regulatory approvals received. Not under construction |  |
| SR LottMobile County | Solar Photovoltaic | 8 MW | Dec 2027 | Regulatory approvals received. Not under construction |  |
| SR Bear CreekMarion County | Solar Photovoltaic | 4 MW | Dec 2027 | Regulatory approvals received. Not under construction |  |

### Where Alabama stands

Across the whole tracker, 738 data center and substation permits are on record in 51 states and DC. Alabama accounts for 0 of them, ranking #14 by that count. Ranking measures documented permit activity, not the size of the eventual buildout.

[← PreviousWyoming](https://savrn.com/data-center-permits-tracker/wyoming) [Next →Alaska](https://savrn.com/data-center-permits-tracker/alaska)

The SAVRN reference set

## Seven references, one system

Capital, delay, policy, water, grid, permits and scarcity are one system seen from seven sides. Each reference is primary-sourced, refreshed on a schedule, and links into the others, so a project can be followed from the money committed to the docket that stopped it.

Capital Atlas

Who is funding AI data centers: capital providers, named sites, financing transactions, and the blocked-and-delayed record, state by state and company by company.

[Open the atlas →](https://savrn.com/data-center-capital-atlas)

Delay Watchlist

Project-level slippage: named projects, jurisdictional actions, utility and federal dockets, SEC disclosures, and the interconnection queue.

Open the watchlist →

Moratorium Tracker

The policy layer: every state measure and local moratorium mapped and cited, with one page per state.

Open the tracker →

Water Tracker

Every federal, state, local and interstate water measure that touches a data center, plus a fifty-state water ledger.

Open the water tracker →

Grid Operator Watchlist

ERCOT, PJM, MISO, CAISO, SPP, NYISO, ISO-NE and FERC: the large-load rules, filings and queue positions that decide whether a site can energize.

Open the watchlist →

SAVRN Scarcity Tracker

Eleven primary-sourced indicators of AI infrastructure scarcity, one composite index, read against the token index, SAVRN's own cost basis and the frontier ceiling.

Open the scarcity tracker →

Have a specific address? Site Intelligence reads all seven references against one location, county, utility and grid operator included, and cites every finding.

[Check an address →](https://savrn.com/site-intelligence/alabama)