# Delaware Data Center Permits Tracker

Delaware has 464 MW of generation and storage requested in the interconnection queue and 200 MW of generation planned within 36 months. Every row below links to its primary source.

Last checked Oct 25, 2026

0

Data center & substation permits

of 0 total utility-scale permits tracked here

464MW

In the interconnection queue

3 active generation and storage positions

200MW

Planned generation

10 EIA-860M generators due within 36 months

#14

of 51 states with anything on record

Ranked by data center & substation permit count

## Where the activity is

Ranked by row count. Counts are never mixed with the MW figures above.

### Top counties · queue, substation & state air rows

Sussex 2

New Castle 1

## Interconnection queue in Delaware

464 MW requested across 3 active generation and storage positions. Withdrawn and in-service rows are left out, matching the national page.

| ISO | Project | Fuel | MW | Status | Source |
| --- | --- | --- | --- | --- | --- |
| PJM | Maryland Offshore Wind Energy Project (MOWEP)Sussex County | Offshore wind | 255 MW | Suspended |  |
| PJM | Cedar Creek 138 kV VII AG2-447New Castle County | Solar | 134 MW | Active |  |
| PJM | Farmview 138 kV AH1-672Sussex County | Solar | 75 MW | Active |  |

## Planned generation in Delaware

200 MW across 10 EIA-860M generators scheduled to enter service within 36 months.

| Plant | Technology | MW | Planned | Status | Source |
| --- | --- | --- | --- | --- | --- |
| Cedar Creek SolarNew Castle County | Solar Photovoltaic | 114 MW | Jul 2028 | Regulatory approvals pending. Not under construction |  |
| Raceway SolarKent County | Solar Photovoltaic | 50 MW | Jul 2027 | Under construction, less than or equal to 50 percent complete |  |
| ENGIE Solidago Solar Project - HybridNew Castle County | Batteries | 12 MW | Jun 2027 | Planned for installation, but regulatory approvals not initiated |  |
| Delaware Ave SolarKent County | Solar Photovoltaic | 4 MW | Oct 2026 | Under construction, more than 50 percent complete |  |
| Rifle Range Road SolarSussex County | Solar Photovoltaic | 4 MW | Dec 2026 | Under construction, less than or equal to 50 percent complete |  |
| Grears Corner SolarNew Castle County | Solar Photovoltaic | 4 MW | Mar 2027 | Regulatory approvals pending. Not under construction |  |
| Chaberton Solar CrestoneKent County | Solar Photovoltaic | 4 MW | Nov 2026 | Under construction, more than 50 percent complete |  |
| Sunrise Magnolia DEKent County | Solar Photovoltaic | 3 MW | Jan 2027 | Under construction, more than 50 percent complete |  |
| Maryland Line Road SolarNew Castle County | Solar Photovoltaic | 2 MW | Mar 2027 | Regulatory approvals pending. Not under construction |  |
| DEL022-30423B Thorogoods Rd, LLCSussex County | Solar Photovoltaic | 2 MW | Dec 2026 | Under construction, more than 50 percent complete |  |

### Where Delaware stands

Across the whole tracker, 738 data center and substation permits are on record in 51 states and DC. Delaware accounts for 0 of them, ranking #14 by that count. Ranking measures documented permit activity, not the size of the eventual buildout.

[← PreviousConnecticut](https://savrn.com/data-center-permits-tracker/connecticut) [Next →Florida](https://savrn.com/data-center-permits-tracker/florida)

The SAVRN reference set

## Seven references, one system

Capital, delay, policy, water, grid, permits and scarcity are one system seen from seven sides. Each reference is primary-sourced, refreshed on a schedule, and links into the others, so a project can be followed from the money committed to the docket that stopped it.

Capital Atlas

Who is funding AI data centers: capital providers, named sites, financing transactions, and the blocked-and-delayed record, state by state and company by company.

[Open the atlas →](https://savrn.com/data-center-capital-atlas)

Delay Watchlist

Project-level slippage: named projects, jurisdictional actions, utility and federal dockets, SEC disclosures, and the interconnection queue.

Open the watchlist →

Moratorium Tracker

The policy layer: every state measure and local moratorium mapped and cited, with one page per state.

Open the tracker →

Water Tracker

Every federal, state, local and interstate water measure that touches a data center, plus a fifty-state water ledger.

Open the water tracker →

Grid Operator Watchlist

ERCOT, PJM, MISO, CAISO, SPP, NYISO, ISO-NE and FERC: the large-load rules, filings and queue positions that decide whether a site can energize.

Open the watchlist →

SAVRN Scarcity Tracker

Eleven primary-sourced indicators of AI infrastructure scarcity, one composite index, read against the token index, SAVRN's own cost basis and the frontier ceiling.

Open the scarcity tracker →

Have a specific address? Site Intelligence reads all seven references against one location, county, utility and grid operator included, and cites every finding.

[Check an address →](https://savrn.com/site-intelligence/delaware)