# Iowa Data Center Permits Tracker

Iowa has 8,892 MW of generation and storage requested in the interconnection queue and 1,064 MW of generation planned within 36 months. Every row below links to its primary source.

Last checked Oct 23, 2026

0

Data center & substation permits

of 0 total utility-scale permits tracked here

8,892MW

In the interconnection queue

36 active generation and storage positions

1,064MW

Planned generation

9 EIA-860M generators due within 36 months

#14

of 51 states with anything on record

Ranked by data center & substation permit count

## Where the activity is

Ranked by row count. Counts are never mixed with the MW figures above.

### Top counties · queue, substation & state air rows

Linn 7

Allamakee 2

Marshall 2

Sioux Center 2

Taylor 2

Wapello 2

Washington 2

Webster 2

## Interconnection queue in Iowa

8,892 MW requested across 36 active generation and storage positions. Withdrawn and in-service rows are left out, matching the national page.

| ISO | Project | Fuel | MW | Status | Source |
| --- | --- | --- | --- | --- | --- |
| MISO | KilldeerITC MIDWESTCerro Gordo County | Natural gas | 787 MW | Active |  |
| MISO | Duane Arnold 161 kVITC MIDWESTLinn County | Nuclear | 646 MW | Active |  |
| MISO | SUB T HASKINSMIDAMERICAN ENERGY CO. MECWashington County | Natural gas | 525 MW | Active |  |
| MISO | Duane ArnoldITC MIDWESTLinn County | Solar | 400 MW | Active; not started |  |
| MISO | ORIENT - NORTHBORO 345.0kVMIDAMERICAN ENERGY CO. MECTaylor County | Onshore wind | 400 MW | Active |  |
| MISO | SUB T 3 - HILLS 3 345.0kVWashington County | Natural gas | 350 MW | Active; not started |  |
| MISO | Bison - Colby 345kVITC MIDWESTWinnebago County | Onshore wind | 320 MW | Active |  |
| MISO | Lehigh - Marshalltown (Twinkle) 345kVTHE MUNICIPAL ELECTRIC UTILITY OF THE CITY OF CEDAR FALLS, IOWAMarshall County | Onshore wind | 310 MW | Active |  |
| MISO | Madison-Orient 345kVMIDAMERICAN ENERGY CO. MECTaylor County | Onshore wind | 300 MW | Active; not started |  |
| MISO | Webster-Lehigh 345kVMIDAMERICAN ENERGY CO. MECWebster County | Onshore wind | 300 MW | Active; not started |  |
| MISO | Sub K (Tiffin)-Duane Arnold 345kVITC MIDWESTLinn County | Battery storage | 300 MW | Active; not started |  |
| MISO | Orient - Denny 345kVMIDAMERICAN ENERGY CO. MECRinggold County | Onshore wind | 290 MW | Active |  |
| MISO | ORIENTMIDAMERICAN ENERGY CO. MECAdair County | Other hybrids | 263 MW | Active |  |
| MISO | Duane Arnold (ARNOLD 5)ITC MIDWESTLinn County | Nuclear | 251 MW | Active |  |
| MISO | SUB 93 LOUISA - SUB T HASKINS 345.0kVMIDAMERICAN ENERGY CO. MECLouisa County | Solar | 250 MW | Active |  |
| MISO | Lehigh - Marshalltown (Twinkle) 345kVMIDAMERICAN ENERGY CO.Marshall County | Onshore wind | 232 MW | Active |  |
| MISO | Bison - Colby 345kVITC MIDWESTWinnebago County | Onshore wind | 200 MW | Pending revision approval |  |
| MISO | Duane Arnold (ARNOLD 5)ITC MIDWESTLinn County | Nuclear | 200 MW | Active |  |
| MISO | Calamus EastITC MIDWESTClinton County | Battery storage | 200 MW | Active |  |
| MISO | QuinnITC MIDWESTFranklin County | Battery storage | 200 MW | Active |  |
| MISO | Duane ArnoldITC MIDWESTBuchanan County | Battery storage | 200 MW | Active; not started |  |
| MISO | Ottumwa Generating St. 161 kVITC MIDWESTWapello County | Battery storage | 199 MW | Pending revision approval |  |
| MISO | Prairie Creek - Stony Point 115kVITC MIDWESTLinn County | Battery storage | 195 MW | Pending revision approval |  |
| MISO | Grimes - Lehigh 345kVMIDAMERICAN ENERGY CO. MECWebster County | Onshore wind | 170 MW | Active |  |
| MISO | LITTLE SIOUX - CLIPPER 161.0kVMIDAMERICAN ENERGY CO. MECCherokee County | Solar | 160 MW | Active; not started |  |
| MISO | Sac - Pocahontas 161 kVMIDAMERICAN ENERGY CO. MECPocahontas County | Solar | 156 MW | Active; not started |  |
| MISO | MITCHELL COUNTY (ITCM) - HAZLETON (ITCM) 345.0kVITC MIDWESTHoward County | Onshore wind | 155 MW | Active |  |
| MISO | Enron SubstationMIDAMERICAN ENERGY CO. MECJohnson County | Solar | 150 MW | Active; not started |  |
| MISO | LansingITC MIDWESTAllamakee County | Battery storage | 150 MW | Done |  |
| MISO | Story CountyITC MIDWESTStory County | Battery storage | 150 MW | Active |  |
| MISO | LansingITC MIDWESTAllamakee County | Battery storage | 130 MW | Done |  |
| MISO | Ottumwa Generation - Tri-County 161kVITC MIDWESTWapello County | Solar | 120 MW | Pending revision approval |  |
| MISO | Wever - Burlington 161 kVITC MIDWESTLee County | Fuel not stated | 120 MW | Done |  |
| MISO | Duane Arnold (ARNOLD 5)ITC MIDWESTLinn County | Nuclear | 100 MW | Active |  |
| SPP | ASGI-2024-018Sioux Center County | Natural gas | 6 MW |  |  |
| SPP | ASGI-2024-019Sioux Center County | Natural gas | 6 MW |  |  |

## Planned generation in Iowa

1,064 MW across 9 EIA-860M generators scheduled to enter service within 36 months.

| Plant | Technology | MW | Planned | Status | Source |
| --- | --- | --- | --- | --- | --- |
| Silver Queen Wind FarmCrawford County | Onshore Wind Turbine | 252 MW | Oct 2028 | Regulatory approvals pending. Not under construction |  |
| Hawkeye Solar II, LLCClinton County | Solar Photovoltaic | 250 MW | Mar 2028 | Regulatory approvals pending. Not under construction |  |
| Hawkeye Solar, LLCClinton County | Solar Photovoltaic | 200 MW | Mar 2028 | Regulatory approvals pending. Not under construction |  |
| Rock Creek SolarClinton County | Solar Photovoltaic | 150 MW | Dec 2026 | Under construction, more than 50 percent complete |  |
| Coggon Solar LLCLinn County | Solar Photovoltaic | 100 MW | Dec 2027 | Under construction, less than or equal to 50 percent complete |  |
| Mills Solar ProjectMills County | Solar Photovoltaic | 50 MW | Dec 2026 | Under construction, less than or equal to 50 percent complete |  |
| Muscatine Plant #1Muscatine County | Natural Gas Fired Combustion Turbine | 35 MW | Sep 2027 | Regulatory approvals received. Not under construction |  |
| MPW Solar 1Muscatine County | Solar Photovoltaic | 24 MW | Jan 2028 | Regulatory approvals received. Not under construction |  |
| Teeple CreekAllamakee County | Solar Photovoltaic | 2 MW | Dec 2026 | Under construction, less than or equal to 50 percent complete |  |

## Other filings in Iowa

### State air permits (3)

| Facility | Agency | Generators | Status | Source |
| --- | --- | --- | --- | --- |
| Osmium Data Center | Iowa DNR |  | Submittal Received |  |
| Ginger West Data Center - 11100 Booneville Rd | Iowa DNR |  | Technical Review |  |
| Willow Creek / Ginger East Data Centers | Iowa DNR |  | Technical Review |  |

### Where Iowa stands

Across the whole tracker, 731 data center and substation permits are on record in 51 states and DC. Iowa accounts for 0 of them, ranking #14 by that count. Ranking measures documented permit activity, not the size of the eventual buildout.

[← PreviousIndiana](https://savrn.com/data-center-permits-tracker/indiana) [Next →Kansas](https://savrn.com/data-center-permits-tracker/kansas)

The SAVRN reference set

## Seven references, one system

Capital, delay, policy, water, grid, permits and scarcity are one system seen from seven sides. Each reference is primary-sourced, refreshed on a schedule, and links into the others, so a project can be followed from the money committed to the docket that stopped it.

Capital Atlas

Who is funding AI data centers: capital providers, named sites, financing transactions, and the blocked-and-delayed record, state by state and company by company.

[Open the atlas →](https://savrn.com/data-center-capital-atlas)

Delay Watchlist

Project-level slippage: named projects, jurisdictional actions, utility and federal dockets, SEC disclosures, and the interconnection queue.

Open the watchlist →

Moratorium Tracker

The policy layer: every state measure and local moratorium mapped and cited, with one page per state.

Open the tracker →

Water Tracker

Every federal, state, local and interstate water measure that touches a data center, plus a fifty-state water ledger.

Open the water tracker →

Grid Operator Watchlist

ERCOT, PJM, MISO, CAISO, SPP, NYISO, ISO-NE and FERC: the large-load rules, filings and queue positions that decide whether a site can energize.

Open the watchlist →

SAVRN Scarcity Tracker

Eleven primary-sourced indicators of AI infrastructure scarcity, one composite index, read against the token index, SAVRN's own cost basis and the frontier ceiling.

Open the scarcity tracker →

Have a specific address? Site Intelligence reads all seven references against one location, county, utility and grid operator included, and cites every finding.

[Check an address →](https://savrn.com/site-intelligence/iowa)