# Massachusetts Data Center Permits Tracker

Massachusetts has 14,479 MW of generation and storage requested in the interconnection queue and 727 MW of generation planned within 36 months. Every row below links to its primary source.

Last checked Oct 25, 2026

0

Data center & substation permits

of 0 total utility-scale permits tracked here

14,479MW

In the interconnection queue

21 active generation and storage positions

727MW

Planned generation

31 EIA-860M generators due within 36 months

#14

of 51 states with anything on record

Ranked by data center & substation permit count

## Where the activity is

Ranked by row count. Counts are never mixed with the MW figures above.

### Top counties · queue, substation & state air rows

NA 6

Norfolk 3

Barnstable 2

Berkshire 2

Middlesex 2

Bristol 1

Essex 1

Franklin 1

## Interconnection queue in Massachusetts

14,479 MW requested across 21 active generation and storage positions. Withdrawn and in-service rows are left out, matching the national page.

| ISO | Project | Fuel | MW | Status | Source |
| --- | --- | --- | --- | --- | --- |
| ISO-NE | SouthCoast Wind 1PDNA County | Onshore wind | 1,200 MW | Interconnection agreement |  |
| ISO-NE | Somerset Wind Link - 1200 MW HVDC Line (Controllable) into Brayton PointPDBristol County | Fuel not stated | 1,200 MW | Interconnection agreement |  |
| ISO-NE | Bay State Wind 4 Offshore WindPDNA County | Onshore wind | 1,200 MW | Interconnection agreement |  |
| ISO-NE | Northfield Mt. Equipment ReplacementFranklin County | Hydro and pumped storage | 1,180 MW | Interconnection agreement |  |
| ISO-NE | Vineyard Offshore Wind CNRNAN/A County | Onshore wind | 843 MW | Active |  |
| ISO-NE | Park City Offshore Wind CNRNA County | Onshore wind | 838 MW | Active |  |
| ISO-NE | Fore River CNR IncreaseNorfolk County | Natural gas | 800 MW | Active |  |
| ISO-NE | Vineyard Offshore WindPDNA County | Onshore wind | 800 MW | Interconnection agreement |  |
| ISO-NE | Fore River CNR UprateNorfolk County | Natural gas | 800 MW | Active |  |
| ISO-NE | Vineyard Offshore Wind CNR OnlyNA County | Onshore wind | 800 MW | Active |  |
| ISO-NE | Park City Offshore WindPDNA County | Onshore wind | 791 MW | Interconnection agreement |  |
| ISO-NE | Footprint Combined Cycle UnitBLEssex County | Natural gas | 716 MW | Interconnection agreement |  |
| ISO-NE | Battery StorageNAMiddlesex County | Battery storage | 508 MW | Interconnection agreement |  |
| ISO-NE | Battery StoragePDBarnstable County | Battery storage | 500 MW | Active |  |
| ISO-NE | Battery StoragePDMiddlesex County | Battery storage | 500 MW | Active |  |
| ISO-NE | Bear Swamp Pumping Load IncreaseBerkshire County | Hydro and pumped storage | 333 MW | Active |  |
| ISO-NE | Bear Swamp Pump Load increasePDBerkshire County | Hydro and pumped storage | 333 MW | System impact study complete |  |
| ISO-NE | Canal 3Barnstable County | Natural gas | 333 MW | Interconnection agreement |  |
| ISO-NE | Lite Brite Battery StorageSuffolk County | Battery storage | 300 MW | Interconnection agreement |  |
| ISO-NE | Battery StoragePDNorfolk County | Battery storage | 300 MW | Active |  |
| ISO-NE | Battery StoragePDWorcester County | Battery storage | 204 MW | Interconnection agreement |  |

## Planned generation in Massachusetts

727 MW across 31 EIA-860M generators scheduled to enter service within 36 months.

| Plant | Technology | MW | Planned | Status | Source |
| --- | --- | --- | --- | --- | --- |
| Energizar BESSSuffolk County | Batteries | 250 MW | Sep 2027 | Regulatory approvals pending. Not under construction |  |
| Taft BESSWorcester County | Batteries | 200 MW | Feb 2027 | Under construction, more than 50 percent complete |  |
| Salt Cod BESSBristol County | Batteries | 168 MW | Dec 2028 | Regulatory approvals pending. Not under construction |  |
| Town of Sharon Portfolio -Mt St LandfillNorfolk County | Batteries | 6 MW | Jan 2027 | Under construction, more than 50 percent complete |  |
| Sturbridge Road SolarWorcester County | Solar Photovoltaic | 5 MW | Oct 2026 | Construction complete, but not yet in commercial operation |  |
| Borrego - Highland AveBristol County | Solar Photovoltaic | 5 MW | Nov 2026 | Under construction, less than or equal to 50 percent complete |  |
| Borrego - Highland AveBristol County | Batteries | 5 MW | Nov 2026 | Under construction, less than or equal to 50 percent complete |  |
| Braley Hill North SolarPlymouth County | Batteries | 5 MW | Mar 2027 | Regulatory approvals pending. Not under construction |  |
| Braley Hill North SolarPlymouth County | Solar Photovoltaic | 5 MW | Mar 2027 | Regulatory approvals pending. Not under construction |  |
| Randall Lane SolarPlymouth County | Batteries | 5 MW | Mar 2027 | Regulatory approvals pending. Not under construction |  |
| Randall Lane SolarPlymouth County | Solar Photovoltaic | 5 MW | Mar 2027 | Regulatory approvals pending. Not under construction |  |
| Town of Sharon Portfolio -Mt St LandfillNorfolk County | Solar Photovoltaic | 5 MW | Jan 2027 | Under construction, more than 50 percent complete |  |
| Holyoke MA BESS 1Hampden County | Batteries | 5 MW | Sep 2026 | Under construction, less than or equal to 50 percent complete |  |
| Ipswich MA BESS 1Essex County | Batteries | 5 MW | Oct 2026 | Under construction, less than or equal to 50 percent complete |  |
| Chicopee BESSHampden County | Batteries | 5 MW | Sep 2026 | Under construction, less than or equal to 50 percent complete |  |
| Framingham BESSMiddlesex County | Batteries | 5 MW | Sep 2026 | Under construction, less than or equal to 50 percent complete |  |
| Clems Way SolarBristol County | Solar Photovoltaic | 5 MW | Jul 2027 | Regulatory approvals received. Not under construction |  |
| Logging Swamp NorthPlymouth County | Solar Photovoltaic | 5 MW | Aug 2027 | Regulatory approvals received. Not under construction |  |
| Logging Swamp SouthPlymouth County | Solar Photovoltaic | 5 MW | Aug 2027 | Regulatory approvals received. Not under construction |  |
| MA Acushnet 540R Main StBristol County | Solar Photovoltaic | 4 MW | Mar 2027 | Regulatory approvals pending. Not under construction |  |
| Snipatuit Road SolarPlymouth County | Batteries | 4 MW | Mar 2027 | Regulatory approvals pending. Not under construction |  |
| Snipatuit Road SolarPlymouth County | Solar Photovoltaic | 4 MW | Mar 2027 | Regulatory approvals pending. Not under construction |  |
| Cushman Road SolarPlymouth County | Batteries | 3 MW | May 2027 | Regulatory approvals pending. Not under construction |  |
| Cushman Road SolarPlymouth County | Solar Photovoltaic | 3 MW | May 2027 | Regulatory approvals pending. Not under construction |  |
| Solar Carver 1 HybridPlymouth County | Batteries | 2 MW | Sep 2026 | Under construction, more than 50 percent complete |  |
| Solar Carver 1 HybridPlymouth County | Solar Photovoltaic | 2 MW | Sep 2026 | Under construction, more than 50 percent complete |  |
| MA Acushnet 540R Main StBristol County | Batteries | 2 MW | Mar 2027 | Regulatory approvals pending. Not under construction |  |
| Solar Carver 3 HybridPlymouth County | Batteries | 1 MW | Sep 2026 | Under construction, more than 50 percent complete |  |
| Solar Carver 3 HybridPlymouth County | Solar Photovoltaic | 1 MW | Sep 2026 | Under construction, more than 50 percent complete |  |
| Featherbed Lane South SolarPlymouth County | Batteries | 1 MW | Mar 2027 | Regulatory approvals pending. Not under construction |  |
| Featherbed Lane South SolarPlymouth County | Solar Photovoltaic | 1 MW | Mar 2027 | Regulatory approvals pending. Not under construction |  |

### Where Massachusetts stands

Across the whole tracker, 738 data center and substation permits are on record in 51 states and DC. Massachusetts accounts for 0 of them, ranking #14 by that count. Ranking measures documented permit activity, not the size of the eventual buildout.

[← PreviousMaryland](https://savrn.com/data-center-permits-tracker/maryland) [Next →Michigan](https://savrn.com/data-center-permits-tracker/michigan)

The SAVRN reference set

## Seven references, one system

Capital, delay, policy, water, grid, permits and scarcity are one system seen from seven sides. Each reference is primary-sourced, refreshed on a schedule, and links into the others, so a project can be followed from the money committed to the docket that stopped it.

Capital Atlas

Who is funding AI data centers: capital providers, named sites, financing transactions, and the blocked-and-delayed record, state by state and company by company.

[Open the atlas →](https://savrn.com/data-center-capital-atlas)

Delay Watchlist

Project-level slippage: named projects, jurisdictional actions, utility and federal dockets, SEC disclosures, and the interconnection queue.

Open the watchlist →

Moratorium Tracker

The policy layer: every state measure and local moratorium mapped and cited, with one page per state.

Open the tracker →

Water Tracker

Every federal, state, local and interstate water measure that touches a data center, plus a fifty-state water ledger.

Open the water tracker →

Grid Operator Watchlist

ERCOT, PJM, MISO, CAISO, SPP, NYISO, ISO-NE and FERC: the large-load rules, filings and queue positions that decide whether a site can energize.

Open the watchlist →

SAVRN Scarcity Tracker

Eleven primary-sourced indicators of AI infrastructure scarcity, one composite index, read against the token index, SAVRN's own cost basis and the frontier ceiling.

Open the scarcity tracker →

Have a specific address? Site Intelligence reads all seven references against one location, county, utility and grid operator included, and cites every finding.

[Check an address →](https://savrn.com/site-intelligence/massachusetts)