Nebraska has 11 data center and substation permits on record, 7,996 MW of generation and storage requested in the interconnection queue and 1,615 MW of generation planned within 36 months. Every row below links to its primary source.

Last checked Oct 23, 2026

11

Data center & substation permits

of 11 total utility-scale permits tracked here

7,996MW

In the interconnection queue

33 active generation and storage positions

1,615MW

Planned generation

27 EIA-860M generators due within 36 months

#9

of 51 states with anything on record

Ranked by data center & substation permit count

## Where the activity is

Ranked by row count. Counts are never mixed with the MW figures above.

### Permit categories

Data center 9

Substation 2

### Top counties · queue, substation & state air rows

Lancaster 6

Gage 5

Cass 4

Burt 3

Douglas 2

Blair 1

Dodge 1

Funk 1

## Permits in Nebraska

11 building and land-use permits tracked in Nebraska.

| Date | Category | Address | Applicant | Source |
| --- | --- | --- | --- | --- |
| Sep 8, 2026 | Data center | City of Papillion NE Citizen Access records |  |  |
| Sep 8, 2026 | Data center | 11050 Cornhusker Rd NE 68046City of Papillion NE Citizen Access records |  |  |
| Aug 31, 2026 | Data center | City of Papillion NE Citizen Access records |  |  |
| Aug 31, 2026 | Data center | 11684 S 158th St Bldg , United States, NE 68138City of Papillion NE Citizen Access records |  |  |
| Aug 12, 2026 | Data center | City of Papillion NE Citizen Access records |  |  |
| Aug 12, 2026 | Data center | 10917 Harry Watanabe pkwy Wy, La Vista, NE 68128City of Papillion NE Citizen Access records |  |  |
| Aug 5, 2026 | Data center | 11050 Cornhusker Rd NE 68046City of Papillion NE Citizen Access records |  |  |
| Mar 16, 2026 | Substation | City of Papillion NE Citizen Access records |  |  |
| Mar 16, 2026 | Substation | 15235 Gold Coast Rd, Papillion, NE 68138City of Papillion NE Citizen Access records |  |  |
| Nov 25, 2025 | Data center | City of Papillion NE Citizen Access records |  |  |
| Nov 25, 2025 | Data center | 11684 S 158th St, Papillion, NE 68138City of Papillion NE Citizen Access records |  |  |

## Interconnection queue in Nebraska

7,996 MW requested across 33 active generation and storage positions. Withdrawn and in-service rows are left out, matching the national page.

| ISO | Project | Fuel | MW | Status | Source |
| --- | --- | --- | --- | --- | --- |
| SPP | GEN-2024-021Lancaster County | Natural gas | 540 MW | Disis stage |  |
| SPP | GEN-2018-043Burt County | Solar | 500 MW | Ia fully executed/on schedule |  |
| SPP | GEN-2023-222Gage County | Natural gas | 478 MW | Ia fully executed/on schedule |  |
| SPP | GEN-2023-224Lancaster County | Natural gas | 478 MW | Ia fully executed/on schedule |  |
| SPP | 2023-G1Scotts Bluff County County | Solar plus storage | 400 MW | Facility study stage |  |
| SPP | GEN-2024-020Lancaster County | Natural gas | 390 MW | Disis stage |  |
| SPP | GEN-2024-022Gage County | Natural gas | 390 MW | Disis stage |  |
| SPP | GEN-2024-213Cass County | Natural gas | 360 MW | Disis stage |  |
| SPP | GEN-2020-084Burt County | Solar | 350 MW | Ia fully executed/on schedule |  |
| SPP | GEN-2020-011Funk County | Solar plus storage | 320 MW | Ia fully executed/on schedule |  |
| SPP | GEN-2024-211Cass County | Natural gas | 303 MW | Disis stage |  |
| SPP | GEN-2024-212Cass County | Natural gas | 303 MW | Disis stage |  |
| SPP | GEN-2017-181Lancaster County | Onshore wind | 300 MW | Ia fully executed/on schedule |  |
| SPP | GEN-2024-023Gage County | Natural gas | 270 MW | Disis stage |  |
| SPP | GEN-2024-372Douglas County | Battery storage | 250 MW | Disis stage |  |
| SPP | GEN-2026-SR20Lincoln County | Battery storage | 225 MW | Special study |  |
| SPP | GEN-2024-234Burt County | Solar | 200 MW | Disis stage |  |
| SPP | GEN-2025-SR24Blair County | Other | 200 MW | Facility study stage |  |
| SPP | GEN-2025-SR26Plattsmouth County | Other | 200 MW | Facility study stage |  |
| SPP | GEN-2018-025Washington County | Battery storage | 200 MW | Ia fully executed/on schedule |  |
| SPP | GEN-2018-033Cass County | Battery storage | 200 MW | Ia fully executed/on schedule |  |
| SPP | GEN-2025-SR31Meadow Grove County | Battery storage | 170 MW | Special study |  |
| SPP | GEN-2024-065Dodge County | Battery storage | 150 MW | Disis stage |  |
| SPP | GEN-2023-SR7Wayne Co County | Battery storage | 135 MW | Ia fully executed/on schedule |  |
| SPP | GEN-2017-234Greeley County | Onshore wind | 115 MW | Ia fully executed/on suspension |  |
| SPP | ERAS-2025-001Lancaster County | Natural gas | 104 MW | Ia fully executed/on schedule |  |
| SPP | GEN-2025-SR20Omaha County | Other | 100 MW | Ia pending |  |
| SPP | GEN-2018-037Douglas County | Battery storage | 100 MW | Ia fully executed/on schedule |  |
| SPP | GEN-2024-SR8Greely County County | Battery storage | 70 MW | Ia fully executed/on schedule |  |
| SPP | GEN-2024-017Lancaster County | Natural gas | 62 MW | Disis stage |  |
| SPP | GEN-2024-019Gage County | Natural gas | 62 MW | Disis stage |  |
| SPP | GEN-2025-SR5Hallam County | Battery storage | 40 MW | Facility study stage |  |
| SPP | GEN-2024-018Gage County | Natural gas | 31 MW | Disis stage |  |

## Planned generation in Nebraska

1,615 MW across 27 EIA-860M generators scheduled to enter service within 36 months.

| Plant | Technology | MW | Planned | Status | Source |
| --- | --- | --- | --- | --- | --- |
| Cass CountyCass County | Natural Gas Fired Combustion Turbine | 264 MW | Feb 2029 | Regulatory approvals received. Not under construction |  |
| Cass CountyCass County | Natural Gas Fired Combustion Turbine | 264 MW | Feb 2029 | Regulatory approvals received. Not under construction |  |
| Cass CountyCass County | Natural Gas Fired Combustion Turbine | 264 MW | Feb 2029 | Regulatory approvals received. Not under construction |  |
| Turtle CreekSarpy County | Natural Gas Fired Combustion Turbine | 264 MW | Aug 2028 | Regulatory approvals received. Not under construction |  |
| Big Elk SolarWashington County | Solar Photovoltaic | 100 MW | Dec 2027 | Regulatory approvals pending. Not under construction |  |
| Burt County WindBurt County | Onshore Wind Turbine | 75 MW | Jul 2027 | Regulatory approvals pending. Not under construction |  |
| Terry Bundy Generating StationLancaster County | Natural Gas Fired Combustion Turbine | 52 MW | Jun 2029 | Regulatory approvals pending. Not under construction |  |
| Terry Bundy Generating StationLancaster County | Natural Gas Fired Combustion Turbine | 52 MW | Jun 2029 | Regulatory approvals pending. Not under construction |  |
| Steele Flats Energy StorageJefferson County | Batteries | 50 MW | Dec 2026 | Under construction, more than 50 percent complete |  |
| Princeton Road StationLancaster County | Natural Gas Internal Combustion Engine | 18 MW | Jun 2029 | Planned for installation, but regulatory approvals not initiated |  |
| Princeton Road StationLancaster County | Natural Gas Internal Combustion Engine | 18 MW | Jun 2029 | Planned for installation, but regulatory approvals not initiated |  |
| Princeton Road StationLancaster County | Natural Gas Internal Combustion Engine | 18 MW | Jun 2029 | Planned for installation, but regulatory approvals not initiated |  |
| Princeton Road StationLancaster County | Natural Gas Internal Combustion Engine | 18 MW | Jun 2029 | Planned for installation, but regulatory approvals not initiated |  |
| Princeton Road StationLancaster County | Natural Gas Internal Combustion Engine | 18 MW | Jun 2029 | Planned for installation, but regulatory approvals not initiated |  |
| Princeton Road StationLancaster County | Natural Gas Internal Combustion Engine | 18 MW | Jun 2029 | Planned for installation, but regulatory approvals not initiated |  |
| Princeton Road StationLancaster County | Natural Gas Internal Combustion Engine | 18 MW | Jun 2029 | Planned for installation, but regulatory approvals not initiated |  |
| Princeton Road StationLancaster County | Natural Gas Internal Combustion Engine | 18 MW | Jun 2029 | Planned for installation, but regulatory approvals not initiated |  |
| Princeton Road StationLancaster County | Natural Gas Internal Combustion Engine | 18 MW | Jun 2029 | Planned for installation, but regulatory approvals not initiated |  |
| Princeton Road StationLancaster County | Natural Gas Internal Combustion Engine | 18 MW | Jun 2029 | Planned for installation, but regulatory approvals not initiated |  |
| Princeton Road StationLancaster County | Natural Gas Internal Combustion Engine | 18 MW | Jun 2029 | Planned for installation, but regulatory approvals not initiated |  |
| Princeton Road StationLancaster County | Natural Gas Internal Combustion Engine | 18 MW | Jun 2029 | Planned for installation, but regulatory approvals not initiated |  |
| Papillion Creek WastewaterSarpy County | Natural Gas Internal Combustion Engine | 2 MW | Nov 2026 | Under construction, more than 50 percent complete |  |
| Papillion Creek WastewaterSarpy County | Natural Gas Internal Combustion Engine | 2 MW | Nov 2026 | Under construction, more than 50 percent complete |  |
| Papillion Creek WastewaterSarpy County | Natural Gas Internal Combustion Engine | 2 MW | Nov 2026 | Under construction, more than 50 percent complete |  |
| TecumsehJohnson County | Petroleum Liquids | 2 MW | Aug 2027 | Regulatory approvals received. Not under construction |  |
| TecumsehJohnson County | Petroleum Liquids | 2 MW | Aug 2027 | Regulatory approvals received. Not under construction |  |
| WisnerCuming County | Petroleum Liquids | 2 MW | Dec 2026 | Construction complete, but not yet in commercial operation |  |

### Where Nebraska stands

Across the whole tracker, 734 data center and substation permits are on record in 51 states and DC. Nebraska accounts for 11 of them, ranking #9 by that count. Ranking measures documented permit activity, not the size of the eventual buildout.

[← PreviousMontana](https://savrn.com/data-center-permits-tracker/montana) [Next →Nevada](https://savrn.com/data-center-permits-tracker/nevada)

The SAVRN reference set

## Seven references, one system

Capital, delay, policy, water, grid, permits and scarcity are one system seen from seven sides. Each reference is primary-sourced, refreshed on a schedule, and links into the others, so a project can be followed from the money committed to the docket that stopped it.

Capital Atlas

Who is funding AI data centers: capital providers, named sites, financing transactions, and the blocked-and-delayed record, state by state and company by company.

[Open the atlas →](https://savrn.com/data-center-capital-atlas)

Delay Watchlist

Project-level slippage: named projects, jurisdictional actions, utility and federal dockets, SEC disclosures, and the interconnection queue.

Open the watchlist →

Moratorium Tracker

The policy layer: every state measure and local moratorium mapped and cited, with one page per state.

Open the tracker →

Water Tracker

Every federal, state, local and interstate water measure that touches a data center, plus a fifty-state water ledger.

Open the water tracker →

Grid Operator Watchlist

ERCOT, PJM, MISO, CAISO, SPP, NYISO, ISO-NE and FERC: the large-load rules, filings and queue positions that decide whether a site can energize.

Open the watchlist →

SAVRN Scarcity Tracker

Eleven primary-sourced indicators of AI infrastructure scarcity, one composite index, read against the token index, SAVRN's own cost basis and the frontier ceiling.

Open the scarcity tracker →

Have a specific address? Site Intelligence reads all seven references against one location, county, utility and grid operator included, and cites every finding.

[Check an address →](https://savrn.com/site-intelligence/nebraska)