# Utah Data Center Permits Tracker
Source: https://savrn.com/data-center-permits-tracker/utah
Markdown alternate of the page above; the site index is https://savrn.com/llms.txt

---

SAVRN Tracker

# Utah Data Center Permits Tracker

Utah has 3,345 MW of generation planned within 36 months. Every row below links to its primary source.

Last checked Oct 25, 2026

0

Data center & substation permits

of 1 total utility-scale permits tracked here

0MW

In the interconnection queue

0 active generation and storage positions

3,345MW

Planned generation

28 EIA-860M generators due within 36 months

#14

of 51 states with anything on record

Ranked by data center & substation permit count

## Where the activity is

Ranked by row count. Counts are never mixed with the MW figures above.

### Permit categories

zoning 1

### Top counties · queue, substation & state air rows

Millard 1

Salt Lake 1

## Permits in Utah

1 building and land-use permit tracked in Utah.

| Date | Category | Address | Applicant | Source |
| --- | --- | --- | --- | --- |
| Aug 25, 2026 | Zoning | Building J8, Freeport Center, Clearfield, UTClearfield City Council minutes |  |  |

## Planned generation in Utah

3,345 MW across 28 EIA-860M generators scheduled to enter service within 36 months.

| Plant | Technology | MW | Planned | Status | Source |
| --- | --- | --- | --- | --- | --- |
| Notch Peak Solar LLCMillard County | Solar Photovoltaic | 324 MW | Sep 2028 | Regulatory approvals received. Not under construction |  |
| Milford Solar Phase IIBeaver County | Solar Photovoltaic | 310 MW | Sep 2027 | Under construction, less than or equal to 50 percent complete |  |
| Utah Solar 1Millard County | Solar Photovoltaic | 300 MW | Dec 2027 | Planned for installation, but regulatory approvals not initiated |  |
| Red Butte Solar and StorageIron County | Solar Photovoltaic | 300 MW | Apr 2029 | Regulatory approvals pending. Not under construction |  |
| Red Butte Solar and StorageIron County | Batteries | 300 MW | Apr 2029 | Regulatory approvals pending. Not under construction |  |
| Intermountain Pumped Storage ProjectMillard County | Hydroelectric Pumped Storage | 250 MW | Jul 2028 | Planned for installation, but regulatory approvals not initiated |  |
| Intermountain Pumped Storage ProjectMillard County | Hydroelectric Pumped Storage | 250 MW | Jul 2028 | Planned for installation, but regulatory approvals not initiated |  |
| Intermountain Pumped Storage ProjectMillard County | Hydroelectric Pumped Storage | 250 MW | Jul 2028 | Planned for installation, but regulatory approvals not initiated |  |
| Intermountain Pumped Storage ProjectMillard County | Hydroelectric Pumped Storage | 250 MW | Jul 2028 | Planned for installation, but regulatory approvals not initiated |  |
| Fremont SolarIron County | Batteries | 198 MW | Jun 2027 | Under construction, less than or equal to 50 percent complete |  |
| Faraday Energy StorageUtah County | Batteries | 150 MW | Sep 2026 | Under construction, less than or equal to 50 percent complete |  |
| Fremont SolarIron County | Solar Photovoltaic | 99 MW | Jun 2027 | Under construction, less than or equal to 50 percent complete |  |
| Glen Canyon Solar A, LLCKane County | Solar Photovoltaic | 95 MW | Dec 2028 | Under construction, less than or equal to 50 percent complete |  |
| Parowan SolarIron County | Batteries | 58 MW | Feb 2028 | Planned for installation, but regulatory approvals not initiated |  |
| Parowan SolarIron County | Solar Photovoltaic | 58 MW | Feb 2028 | Planned for installation, but regulatory approvals not initiated |  |
| Cape Generating StationBeaver County | Geothermal | 43 MW | Oct 2026 | Construction complete, but not yet in commercial operation |  |
| Cape Generating StationBeaver County | Geothermal | 43 MW | Jan 2027 | Construction complete, but not yet in commercial operation |  |
| Cape Generating StationBeaver County | Geothermal | 43 MW | Jan 2027 | Under construction, more than 50 percent complete |  |
| Brigham City GasBox Elder County | Natural Gas Internal Combustion Engine | 2 MW | Aug 2027 | Regulatory approvals received. Not under construction |  |
| Brigham City GasBox Elder County | Natural Gas Internal Combustion Engine | 2 MW | Aug 2027 | Regulatory approvals received. Not under construction |  |
| Brigham City GasBox Elder County | Natural Gas Internal Combustion Engine | 2 MW | Aug 2027 | Regulatory approvals received. Not under construction |  |
| PaysonUtah County | Natural Gas Internal Combustion Engine | 2 MW | Aug 2026 | Construction complete, but not yet in commercial operation |  |
| PaysonUtah County | Natural Gas Internal Combustion Engine | 2 MW | Aug 2026 | Construction complete, but not yet in commercial operation |  |
| PaysonUtah County | Natural Gas Internal Combustion Engine | 2 MW | Aug 2026 | Construction complete, but not yet in commercial operation |  |
| PaysonUtah County | Natural Gas Internal Combustion Engine | 2 MW | Aug 2026 | Construction complete, but not yet in commercial operation |  |
| PaysonUtah County | Natural Gas Internal Combustion Engine | 2 MW | Aug 2026 | Construction complete, but not yet in commercial operation |  |
| PaysonUtah County | Natural Gas Internal Combustion Engine | 2 MW | Aug 2026 | Construction complete, but not yet in commercial operation |  |
| Rodatherm Milford 1Beaver County | Geothermal | 2 MW | Jan 2028 | Under construction, less than or equal to 50 percent complete |  |

## Other filings in Utah

### State air permits (4)

| Facility | Agency | Generators | Status | Source |
| --- | --- | --- | --- | --- |
| Joule Capital Partners, LLCMillard County | Utah Division of Air Quality |  | Issued |  |
| Stadion LLC - Eagle Mountain Data Center | Utah Division of Air Quality |  | document |  |
| Aligned Energy Data Centers (SLC), LLC- West Jordan Data Center | Utah Division of Air Quality |  | document |  |
| Aligned Data Centers (WJU) PropCo, LLC West Jordan Data Center, 6800 West 9800 SouthSalt Lake County | Utah Division of Air Quality |  | Public notice |  |

### Where Utah stands

Across the whole tracker, 738 data center and substation permits are on record in 51 states and DC. Utah accounts for 0 of them, ranking #14 by that count. Ranking measures documented permit activity, not the size of the eventual buildout.

[← PreviousTexas](https://savrn.com/data-center-permits-tracker/texas) [Next →Vermont](https://savrn.com/data-center-permits-tracker/vermont)

The SAVRN reference set

## Seven references, one system

Capital, delay, policy, water, grid, permits and scarcity are one system seen from seven sides. Each reference is primary-sourced, refreshed on a schedule, and links into the others, so a project can be followed from the money committed to the docket that stopped it.

Capital Atlas

Who is funding AI data centers: capital providers, named sites, financing transactions, and the blocked-and-delayed record, state by state and company by company.

[Open the atlas →](https://savrn.com/data-center-capital-atlas)

Delay Watchlist

Project-level slippage: named projects, jurisdictional actions, utility and federal dockets, SEC disclosures, and the interconnection queue.

Open the watchlist →

Moratorium Tracker

The policy layer: every state measure and local moratorium mapped and cited, with one page per state.

Open the tracker →

Water Tracker

Every federal, state, local and interstate water measure that touches a data center, plus a fifty-state water ledger.

Open the water tracker →

Grid Operator Watchlist

ERCOT, PJM, MISO, CAISO, SPP, NYISO, ISO-NE and FERC: the large-load rules, filings and queue positions that decide whether a site can energize.

Open the watchlist →

SAVRN Scarcity Tracker

Eleven primary-sourced indicators of AI infrastructure scarcity, one composite index, read against the token index, SAVRN's own cost basis and the frontier ceiling.

Open the scarcity tracker →

Have a specific address? Site Intelligence reads all seven references against one location, county, utility and grid operator included, and cites every finding.