Every measure in the U.S. Data Center Moratorium Tracker, with a direct link to its primary source — legislature pages, governors' offices, local governments, and reputable reporting. 1265 citations in all.

Back to the interactive tracker

Open data credits: AI GridWatch moratorium tracker, CC BY 4.0 (aigridwatch.com); Alaska Beacon; Axios Pro Energy; Bisnow National; CNBC Technology; CalMatters; Cardinal News VA; Colorado Newsline; Congress.gov (Library of Congress, public domain); Construction Dive; Data Center Dynamics; DataCenterTracker.org, CC BY 4.0; Energy Central; FOX19 | Cincinnati; GovTech; Law360; Law360 Energy; Maryland Matters; Michigan Advance; Montana Free Press; Nevada Current; Ohio Capital Journal; OpenStates v3 (openstates.org), CC BY 4.0; Pennsylvania Capital-Star; Politico Energy; Route Fifty; Source New Mexico; The Register; The Verge; Utility Dive; Virginia Business; Virginia Mercury; W.Media; citybiz.

State-level measures

312 measures across 49 states

  • Alabama · HB 399 — Alabama HB 399, sponsored by Rep. Hulsey (R-Helena), is the House companion to SB 265. (In force, 2026-02) legiscan.com →
  • Arizona · FY2027 budget — Three-year pause on data center sales-tax exemption (In force, 2026-07) azcapitoltimes.com →
  • Arizona · HB 4168 — Statewide moratorium on data centers through June 30, 2029 (In force, 2026-07) news.bloombergtax.com →
  • Arizona · Arizona statewide (3-year pause on new data center tax exemptions, signed in FY budget) — Arizona: On June 15, 2026 Gov. Katie Hobbs signed Arizona's ~$18B FY budget, which includes a three-year moratorium on NEW data center sales/use tax exemptions. (In force, 2026-06) news.bloomberglaw.com →
  • Arizona · HB 2649 — computer data centers; tax incentives (In force, 2021-04) apps.azleg.gov →
  • California · AB 1577 — Data center reporting requirements (In force, 2026-09) leginfo.legislature.ca.gov →
  • California · AB 2383 — Fair Share in Energy Act (In force, 2026-09) leginfo.legislature.ca.gov →
  • California · AB 2469 — Data centers: water use disclosures (In force, 2026-09) leginfo.legislature.ca.gov →
  • California · SB 1168 — Data center electricity rate structures (In force, 2026-09) leginfo.legislature.ca.gov →
  • California · SB 886 — California Technology Innovation and Ratepayer Protection Act (In force, 2026-09) leginfo.legislature.ca.gov →
  • California · SB 887 — CEQA treatment of data centers (In force, 2026-09) leginfo.legislature.ca.gov →
  • California · SB 57 — California SB 57 directs the CPUC to assess whether investor-owned utility costs from new data center loads result in cost shifts to other retail customers. (In force, 2025-10) sd18.senate.ca.gov →
  • California · AB 2619 — California AB 2619 would establish comprehensive water reporting requirements with three data center size categories: hyperscale (>25 MW), mid-range (2-25 MW) (In force, 2026-09) leginfo.legislature.ca.gov →
  • California · — Seven bills to improve data center transparency (In force, 2026-09) w.media →
  • California · — Newsom clamps down on California data centers as voters turn against the industry (In force, 2026-09) calmatters.org →
  • California · — Cities get more say in data center development under new California laws (In force, 2026-09) constructiondive.com →
  • California · — Data centers are black boxes, but California wants to change that (In force, 2026-09) theverge.com →
  • California · — Executive Order on AI Safety (In force, 2026-09) axios.com →
  • Delaware · HB 233 (Substitute 1) — Large energy-use facilities bear their own infrastructure costs (In force, 2026-08) legis.delaware.gov →
  • Delaware · HB 445 — 100% new energy requirement for large energy-use facilities (In force, 2026-08) news.delaware.gov →
  • Delaware · HB 310 — Large energy-use facilities barred from job-creation tax credits (In force, 2026-08) news.delaware.gov →
  • Florida · HB 7031 — Data-center sales-tax exemption rollback (In force, 2025-06) flsenate.gov →
  • Florida · SB 484 — Data center ratepayer, water and local-authority law (In force, 2026-06) flgov.com →
  • Idaho · HB 895 — Idaho House passed HB 895 (58-10) on March 20, requiring future data centers to design cooling systems for non-consumptive water use or use water (In force, 2026-03) capitalpress.com →
  • Idaho · H 521 — TAXATION, Adds to and amends existing law to provide a sales and use tax exemption for the purchase or use of eligible server equipment and new data center (In force, 2020-03) legislature.idaho.gov →
  • Illinois · Illinois (statewide) — Illinois: Governor J.B. Pritzker announced a two-year suspension of state tax incentives for new data centers, effective July 1, 2026. (In force, 2026-06) nrdc.org →
  • Indiana · HEA 1210 — Local payment in lieu of taxes from data centers (In force, 2026-03) ipm.org →
  • Indiana · HB 1210 — Indiana HB 1210 was signed into law March 12, 2026 by Gov. Braun. (In force, 2026-01) ibj.com →
  • Iowa · HF 976 — Limits data-center sales/use tax exemptions (In force, 2025-06) nyemaster.com →
  • Kansas · SB98 — Providing a sales tax exemption for the construction or remodeling of a qualified data center in Kansas and the purchase of data center equipment (In force, 2025-04) kslegislature.gov →
  • Kentucky · Executive Order 2026-494 — Data-center screening and permit-denial order (In force, 2026-08) lpm.org →
  • Louisiana · Executive Order 26-058 — Ratepayer and Community Protection Initiative (In force, 2026-06) lailluminator.com →
  • Louisiana · HB827 — Louisiana Legislature passed HB827 (Act 730 of the 2024 Regular Session), authored to attract data centers like Meta's Hyperion. (In force, 2024-06) legis.la.gov →
  • Louisiana · Louisiana (LPSC Lightning Amendment) — Louisiana's LPSC adopted the 'Lightning Amendment,' which shortens the review process for large-load electricity connections to 8 months. (In force, 2025-12) thelensnola.org →
  • Maine · LD 713 — Data centers excluded from state tax incentive programs (In force, 2026-04) mainesenate.org →
  • Maine · Maine — Maine: Governor Janet Mills SIGNED LD 713 on April 24, 2026, prohibiting data center projects from Maine's business development tax incentive programs. (In force, 2026-04) maine.gov →
  • Maryland · HB 1532 — Maryland: Governor Wes Moore signed HB 1532, the Utility RELIEF (Reducing Energy Load Inflation for Everyday Families) Act, into law on or about April 15 (In force, 2026-04) governor.maryland.gov →
  • Maryland · Executive Order 01.01.2026.16 — Responsible Data Center Development framework and review task force (In force, 2026-09) governor.maryland.gov →
  • Maryland · Maryland (Veto Override - Impact Study) — Maryland: The Maryland General Assembly overrode Governor Moore's veto (Senate 44-0, House 111-24), enacting a law requiring a comprehensive environmental (In force, 2025-12) marylandmatters.org →
  • Massachusetts · Executive Order No. 658 — Local approval and clean energy requirements for data centers (In force, 2026-09) mass.gov →
  • Massachusetts · Executive Order — Healey's New Data Center Rules (In force, 2026-09) bisnow.com →
  • Minnesota · HF 16 (2025 1st Special Session) — Data center energy, environmental and tax law (In force, 2025-06) house.mn.gov →
  • Montana · SB 212 — Montana: The Montana Right to Compute Act (SB 212), signed by Governor Gianforte on April 16, 2025, establishes a legal right to own and use computational (In force, 2025-04) legiscan.com →
  • Nebraska · Executive Order 26-17 — Ends ImagiNE Act tax incentives for new data centers (In force, 2026-07) governor.nebraska.gov →
  • Nebraska · State of Nebraska — Nebraska: Gov. Jim Pillen signed an executive order ending future ImagiNE Nebraska Act tax incentives for new data-center applications (In force, 2026-07) governor.nebraska.gov →
  • Nebraska · Nebraska — Nebraska: LB1261 was signed April 10, 2026, allowing private developers to build and own power plants to serve large-scale electricity users like data centers (In force, 2026-03) nebraskapublicmedia.org →
  • Nevada · Executive Order 2026-005 — Nevada Standard for Responsible Data Center Development (In force, 2026-09) gov.nv.gov →
  • New Jersey · Data Center Fair Share Act — Data center ratepayer class and cost obligations (In force, 2026-07) nj.gov →
  • New Jersey · S-3379 / A-4096 — Data center energy and water use reporting (In force, 2026-08) newjerseymonitor.com →
  • New Jersey · New Jersey — New Jersey: In New Jersey, Gov. Mikie Sherrill signed on her first day in office, Declaring a state of emergency on utility costs. (In force, 2026-01) nj.gov →
  • New Jersey · S4390/A5165 — New Jersey: NJ Assembly passed S4390/A5165 74-4 on 2026-06-30, redirecting $250M in uncommitted AI/data-center tax credits under the Next New Jersey Program (In force, 2026-06) nj.gov →
  • New York · EO 62 — Statewide moratorium on data centers until a condition is met (In force, 2026-07) governor.ny.gov →
  • North Dakota · HB 1579 — North Dakota's HB 1579, originally introduced to create a state siting process for large electricity users (50+ MW), was significantly amended (In force, 2025-01) ndlegis.gov →
  • Ohio · Ohio (Gov. DeWine pauses new data center sales-tax exemptions), OH — Ohio: On May 27, 2026, Gov. Mike DeWine directed the chair of the Ohio Tax Credit Authority to stop considering new data center sales-tax exemption requests (In force, 2026-05) governor.ohio.gov →
  • Ohio · HB 96 — Ohio Republican legislative leaders are pushing to override Governor DeWine's veto that repealed data center sales tax exemptions. (In force, 2026-03) statenews.org →
  • Oklahoma · HB 2992 — Data Center Customer Ratepayer Protection Act of 2026 (In force, 2026-05) okhouse.gov →
  • Oregon · HB 3546 (POWER Act) — Protecting Oregonians With Energy Responsibility Act (In force, 2025-06) olis.oregonlegislature.gov →
  • Oregon · HB 4084 — Pause on Enterprise Zone property-tax breaks for new data centers (In force, 2026-06) dwt.com →
  • Oregon · Oregon — Oregon: Governor Tina Kotek formally announced the Data Center Advisory Committee on January 20, 2026, with seven members co-chaired by Margaret Hoffmann (In force, 2025-03) opb.org →
  • Pennsylvania · Executive Order 2026-05 — GRID Requirements for data center permitting (In force, 2026-08) pa.gov →
  • Pennsylvania · Pennsylvania (Gov. Shapiro GRID standards) — Pennsylvania: In Pennsylvania, voluntary executive program offering expedited state permitting for data center developers who commit to bringing/paying (In force, 2026-02) spotlightpa.org →
  • Pennsylvania · Pennsylvania (Statewide) — Pennsylvania: In Pennsylvania, Governor Josh Shapiro announced GRID (Governor's Responsible Infrastructure Development) standards for data centers (In force, 2026-03) spotlightpa.org →
  • Pennsylvania · HB 262 — An Act amending the act of March 4, 1971 (P.L.6, No.2), known as the Tax Reform Code of 1971, in sales and use tax, further providing for definitions (In force, 2019-06) legis.state.pa.us →
  • South Dakota · SB 135 — Data Center Bill of Rights for Citizens (In force, 2026-03) sdpb.org →
  • South Dakota · HB 1005 — South Dakota: In South Dakota, multiple data center bills saw different outcomes: HB 1005 (50-year sales tax exemption for data centers) was rejected 9-3 (In force, 2026-02) kelo.com →
  • Tennessee · HB 1847 / SB 2128 — Data Center Cost Responsibility Act (In force, 2026-05) wkrn.com →
  • Texas · SB 6 — Large-load interconnection standards and grid curtailment (In force, 2025-06) utilitydive.com →
  • Texas · Texas (PUCT rulemaking) — Texas: The Texas Public Utility Commission is implementing SB 6 through multiple rulemaking dockets. (In force, 2026-03) ercot.com →
  • Texas · Governor's directive to Texas Water Development Board (Sept. 14, 2026) — Enforcement of data center water-use reporting requirements (In force, 2026-09) ksat.com →
  • Texas · Texas (Republican shift on data center regulation, Rep. David Cook commits 2027 county-authority legislation) — Texas Tribune analysis found 82 data centers (~60% of planned/under construction) sit in Trump-voting Texas House districts. (In force, 2026-05) texastribune.org →
  • Texas · Texas (State Republican Executive Committee) — Texas: The State Republican Executive Committee passed a near-unanimous resolution calling for 'rigorous independent assessments' of data center impacts (In force, 2026-02) kwtx.com →
  • Texas · — Order to pause data center permits for audit (In force, 2026-09) cnbc.com →
  • Texas · — Halt on Texas data center permits (In force, 2026-09) politico.com →
  • Utah · Executive Order 2026-03 — A higher bar for data-center development (In force, 2026-05) governor.utah.gov →
  • Utah · HB 76 — Utah: In Utah, Governor Cox signed HB 76 on March 23, 2026, Requiring new data centers (10,000+ sq ft) to notify water providers of projected demands (In force, 2026-02) le.utah.gov →
  • Virginia · HB 30 (2026 budget) — Data center electricity consumption tax (In force, 2026-06) gtlaw.com →
  • Virginia · Statewide moratorium on data centers with no end date — Data center electricity consumption tax in the 2026-28 budget (not a moratorium) (In force, 2026-06) williamsmullen.com →
  • Virginia · Executive Order 22 (Data Center Accountability Framework) — Executive order on data center accountability (no moratorium) (In force, 2026-09) governor.virginia.gov →
  • Virginia · Virginia (budget tax exemption fight) — Virginia: The Virginia Senate budget proposes accelerating the data center tax exemption sunset from 2035 to January 2027, which would redirect $1.6B/year (In force, 2026-02) virginiamercury.com →
  • Virginia · HB 507 — Virginia HB 507, sponsored by Del. John McAuliff (D-Fauquier), is the first state law mandating Tier IV emission standards for data center backup generators. (In force, 2026-03) virginiamercury.com →
  • Virginia · SB 94 — Virginia SB 94 / HB 153, sponsored by Sen. Danica Roem and Del. Josh Thomas, requires 100+ MW data center applicants seeking rezoning to submit site assessment (In force, 2026-02) cardinalnews.org →
  • Virginia · Executive Order — Hold data centers accountable, form AI task force (In force, 2026-09) cardinalnews.org →
  • Virginia · HB 2273 — Data centers; sales and use tax exemption, clarifies 'distressed locality,' report. (In force, 2021-03) lis.virginia.gov →
  • Virginia · — Virginia’s new data center rules (In force, 2026-09) constructiondive.com →
  • Washington · ESSB 6231 — Rolling back data-center tax exemptions (In force, 2026-04) app.leg.wa.gov →
  • Washington · Executive Order 25 — Washington: Governor Ferguson issued Executive Order 25-05 on February 3, 2025 creating the Data Center Workgroup, convened by the Department of Revenue (In force, 2025-02) governor.wa.gov →
  • West Virginia · HB 4983 — West Virginia: Governor Patrick Morrisey signed HB 4983 on March 27, 2026, cementing rulemaking that deems confidential all petitions seeking certification (In force, 2026-03) wvgazettemail.com →
  • Wisconsin · Wisconsin Legislature (Act 16 data-center TID exception) — Wisconsin: Governor Tony Evers signed Assembly Bill 140 (now 2025 Wisconsin Act 16), which created statutory exceptions from the standard 12% equalized-value (In force, 2025-07) docs.legis.wisconsin.gov →
  • Wyoming · Wyoming statewide (Gov. Gordon executive order on data center framework) — Wyoming: On June 3, 2026, Gov. Mark Gordon signed an executive order establishing a framework to develop data centers 'the Wyoming Way' (In force, 2026-06) wyomingpublicmedia.org →
  • California · — Governors take major actions on AI (Paused, 2026-09) route-fifty.com →
  • Illinois · Executive directive — Pause on new data center tax incentives (Paused, 2026-07) dmnews.com →
  • Maryland · — Executive Order on Data Centers (Paused, 2026-09) govtech.com →
  • Massachusetts · Administrative hold (June 2026) — Hold on data center sales and use tax exemption applications (Paused, 2026-06) wbur.org →
  • New York · Executive Order 62 — Statewide hyperscale data center moratorium (executive) (Paused, 2026-07) governor.ny.gov →
  • Ohio · Executive directive — Pause on new data center sales-tax exemptions (Paused, 2026-05) thehill.com →
  • Ohio · Statewide moratorium on data centers until a condition is met — Governor's pause on data center sales tax exemptions (not a construction moratorium) (Paused, 2025-01) signalcleveland.org →
  • Ohio · — Candidates run against data centers, but Ohio legislature didn’t get the memo (Paused, 2026-09) ohiocapitaljournal.com →
  • Oregon · Governor's directive (Sept. 8, 2026) — Pause on state land and property for data center projects (Paused, 2026-09) apps.oregon.gov →
  • Oregon · Statewide moratorium on data centers through July 1, 2027 — Governor's directive pausing state land actions for data centers (not a statewide moratorium) (Paused, 2026-09) klcc.org →
  • Texas · Executive directive (Gov. Abbott) — Freeze on new data center grid connections pending audit (Paused, 2026-08) gov.texas.gov →
  • Texas · Statewide moratorium on data centers until a condition is met — Governor's directive pausing ERCOT data center interconnection pending an audit (not a construction ban) (Paused, 2026-08) texastribune.org →
  • Texas · Governor's directive to TCEQ (Sept. 21, 2026) — Halt on state environmental permits for data center projects pending audits (Paused, 2026-09) gov.texas.gov →
  • Virginia · — Executive order puts the kibosh on NDAs, limits permitting, and calls for stiffer environmental protections (Paused, 2026-09) theregister.com →
  • Virginia · — Virginia lawmakers call for study on AI use in Virginia colleges and more headlines (Paused, 2026-09) virginiamercury.com →
  • Alabama · SB 270 — PSC review of large-load data center contracts (Proposed, 2026) afslaw.com →
  • Alaska · — Alaska senators question legality of state land transfer for possible Mat-Su data centers (Proposed, 2026-09) alaskabeacon.com →
  • Arizona · HB 2756 — Rules for extra high load factor customers (Proposed, 2026) afslaw.com →
  • Arizona · Arizona (Senate disclosure bill) — Arizona: On April 17, 2026, the Arizona Senate passed a bill that would require the state's major utilities to file reports every six months to the Arizona (Proposed, 2026-04) azcc.gov →
  • Arkansas · HB 1444 — TO AMEND THE SALES AND USE TAX EXEMPTION FOR DATA CENTERS. (Proposed, 2025-04) arkleg.state.ar.us →
  • Georgia · SB 476 — Elimination of state tax credits reaching data centers (Proposed, 2026-02) afslaw.com →
  • Idaho · H 609 — TAXATION, Amends existing law to revise a sales tax exemption for data center equipment and to revise a property tax exemption for certain capital investments. (Proposed, 2026-02) legislature.idaho.gov →
  • Idaho · H 897 — TAXATION, Amends existing law to revise a sales tax exemption for data center equipment and to revise a certain property tax exemption for certain capital (Proposed, 2026-04) legislature.idaho.gov →
  • Illinois · SB 4016 / HB 5513 — Hyperscale self-generation and water transparency (Proposed, 2026-02) afslaw.com →
  • Iowa · SSB 3181 — A bill for an act making certain sales and use tax exemptions relating to nuclear electric generation facilities, web search portal businesses (Proposed, 2026-04) legis.iowa.gov →
  • Iowa · HF 2198 — A bill for an act relating to the disclosure of tax incentives provided to web search portal businesses and data center businesses, and including effective (Proposed, 2026-01) legis.iowa.gov →
  • Iowa · HSB 727 — A bill for an act relating to investment requirements for data center businesses that claim certain sales tax exemptions and sales and use tax refunds. (Proposed, 2026-02) legis.iowa.gov →
  • Maryland · SB 596 — Demand response and storage for large-load customers (Proposed, 2026) afslaw.com →
  • Maryland · Frederick County (Pippy state moratorium bill) — Maryland: Frederick County Delegate Jesse Pippy introduced a bill proposing a data center moratorium specifically for Frederick County while the state conducts (Proposed, 2026-03) fredericknewspost.com →
  • Maryland · — New data centers in neighboring Maryland to get additional scrutiny under governor's order (Proposed, 2026-09) penncapital-star.com →
  • Michigan · HB 5594-5596 / SB 1018-1020 — Moratorium on new data center approvals (Proposed, 2026-06) legislature.mi.gov →
  • Michigan · SB 761-763 — Michigan Senate Bills 761, 762, and 763 (Sens. Rosemary Bayer D-West Bloomfield, Sue Shink D-Northfield Township, Erika Geiss D-Taylor) introduced December (Proposed, 2025-12) legislature.mi.gov →
  • Michigan · HB 5882 — Local government: other; requirements for a moratorium imposed by a local unit of government on large-scale data centers or cryptocurrency mining facilities (Proposed, 2026-04) legislature.mi.gov →
  • Michigan · SB 1020 — Public utilities: public service commission; moratorium on approvals by the Michigan public service commission of any new enterprise data centers (Proposed, 2026-06) legislature.mi.gov →
  • Michigan · HB 5398 — Property tax: exemptions; general property tax act; reflect repeal of data center tax exemptions. Amends sec. 7ff of 1893 PA 206 (MCL 211.7ff). TIE BAR (Proposed, 2025-12) legislature.mi.gov →
  • Michigan · HB 5595 — Public utilities: public service commission; moratorium on approvals by the Michigan public service commission of any new enterprise data centers (Proposed, 2026-03) legislature.mi.gov →
  • Michigan · HR 240 — A resolution to urge a temporary pause on discretionary state-level incentives for data center construction, request a comprehensive review of the fiscal (Proposed, 2026-02) legislature.mi.gov →
  • Michigan · — Environmentalists push Michigan lawmakers to forge ahead on moratorium and regulations for data centers (Proposed, 2026-09) route-fifty.com →
  • Michigan · — Environmentalists push lawmakers to forge ahead on moratorium and regulations for data centers (Proposed, 2026-09) michiganadvance.com →
  • Michigan · — Benson, James pitch tariff remedies, business boosts & data center limits at Detroit Economic Club (Proposed, 2026-09) michiganadvance.com →
  • Michigan · HB 5396-5398 — Michigan: ~200-person bipartisan 'People Over Data Centers' rally at the Michigan Capitol (gubernatorial candidate Perry Johnson, Rep. Wegela, Rep. DeSana) (Proposed, 2026-06) detroitnews.com →
  • Michigan · SB 1018-1020 — Michigan: On June 18, 2026 Michigan Senate Democrats introduced a seven-bill package to regulate data centers (Proposed, 2026-06) upnorthlive.com →
  • Michigan · Michigan (statewide) — Michigan: Bipartisan House Bills 5594-5596 would create the 'Data Center Regulation Act' and halt construction of new data centers in Michigan until April 1 (Proposed, 2026-02) bridgemi.com →
  • Minnesota · HF 5125 / SF 3265 — Repeal data center sales-and-use tax exemption (Proposed, 2026-05) revisor.mn.gov →
  • Minnesota · HF 1277 — Data centers sales and use tax exemption modified. (Proposed, 2025-03) revisor.mn.gov →
  • Minnesota · HF 3304 — Sustainable aviation fuel income tax credit and exemptions for data centers and construction of sustainable aviation fuel facilities repealed (Proposed, 2025-05) revisor.mn.gov →
  • Minnesota · HF 4888 — New data center moratorium established, and Public Utility Commission required to submit a report. (Proposed, 2026-05) revisor.mn.gov →
  • Minnesota · SF 5231 — Data centers tax exemption repeal; contingent reduction in special education aid appropriation repeal (Proposed, 2026-04) revisor.mn.gov →
  • Minnesota · SF 769 — Certain data centers tax exemption modification (Proposed, 2025-01) revisor.mn.gov →
  • Missouri · HB 3369 — Prohibits the issuance of permits for construction of data centers for one year in St. Louis (Proposed, 2026-05) house.mo.gov →
  • Missouri · Missouri Legislature (data center hearings on risks/rewards and energy demand) — Missouri lawmakers heard industry experts and consumer advocates on benefits/drawbacks of data centers, risks/rewards, and energy demand. (Proposed, 2026-05) kfvs12.com →
  • Nevada · — Executive Order on Data Centers (Proposed, 2026-09) nevadacurrent.com →
  • New Hampshire · Announced budget proposal (2027 session) — Proposed statewide multi-year data center moratorium (Proposed, 2026-09) nhpr.org →
  • New Hampshire · LSR 2027-0002 / LSR 2027-0048 — Proposed 24-month statewide moratorium on data center development (2027 session) (Proposed, 2026-09) indepthnh.org →
  • New Jersey · A 5482 — Establishes six month moratorium on approvals, construction, expansion, subsidies, and tax incentives for certain artificial intelligence data centers (Proposed, 2026-09) njleg.state.nj.us →
  • New Jersey · S680 — New Jersey: S-680 would mandate clean energy sourcing for new AI data centers, requiring all electricity from new renewable or nuclear generation measured (Proposed, 2026-01) nixonpeabody.com →
  • New Jersey · New Jersey (Democratic legislators announce AI data-center tax-credit repeal; Kenilworth CoreWeave protest), NJ — New Jersey: Three Democratic legislators announced a bill to repeal the state AI data-center tax credit (created under Murphy), amid residents protesting (Proposed, 2026-05) newjersey.news12.com →
  • New Jersey · New Jersey (Gov. Sherrill unveils statewide data center plan; no moratorium) — New Jersey: On May 28, 2026, Gov. Mikie Sherrill unveiled a four-part statewide data center plan: clean-energy/grid-cost requirements, mandatory energy (Proposed, 2026-05) jerseyvindicator.org →
  • New Mexico · Announced bill (2027 session) — Proposed statewide data center moratorium (Proposed, 2026-08) sourcenm.com →
  • New Mexico · Proposed statewide moratorium on data centers — Proposed statewide moratorium on data centers (Proposed, 2026-07) sourcenm.com →
  • New Mexico · Executive Order — Data center moratorium (Proposed, 2026-09) news.google.com →
  • New York · A 10141 / S 9144 — Three-year halt on data center construction (Proposed, 2025) afslaw.com →
  • New York · S10642 / A11560 — Responsible Data Center Development Act (one-year moratorium) (Proposed, 2026-08) nysenate.gov →
  • New York · New York — New York S6394A, the Sustainable Data Centers Act, would regulate energy consumption by data centers in the state. (Proposed, 2025-03) nysenate.gov →
  • New York · S8540 — New York S8540, the Accountability for Computing and Data Centers (ACDC) Act, would require electric and gas corporations to establish an independent (Proposed, 2025-10) nysenate.gov →
  • North Carolina · H 1063 — Ratepayer and Resource Protection Act (Proposed, 2026-04) ncleg.gov →
  • North Carolina · H 1189 — Datacenter Transparency Act: statewide siting moratorium (Proposed, 2026-04) lrs.sog.unc.edu →
  • North Carolina · SB 730 — Ratepayer Protection Act: sound and water standards (Proposed, 2026-06) ncleg.gov →
  • Ohio · SB 374 — End data center sales-tax exemption (Proposed, 2026) ohiosenate.gov →
  • Ohio · Ohio — Ohio: Sen. Kent Smith (D-Euclid) introduced a package of 6+ bills targeting data center impacts in Ohio: the Data Center Grid Cost Responsibility Act (Proposed, 2026-02) ohiosenate.gov →
  • Ohio · HB 999 — Prohibit property tax exemptions for data centers (Proposed, 2026-09) legislature.ohio.gov →
  • Ohio · HB957 — Prohibit new data center sales tax exemptions from being granted (Proposed, 2026-06) legislature.ohio.gov →
  • Ohio · HB 706 — Ohio: HB 706 bans utilities from recovering data center infrastructure costs by shifting them onto other customers and requires long-term service agreements (Proposed, 2026-02) ohiocapitaljournal.com →
  • Oregon · Announced bill (2027 session) — Proposed three-year moratorium on new large data centers (Proposed, 2026-08) oregoncapitalchronicle.com →
  • Oregon · Proposed statewide moratorium on data centers — Proposed statewide moratorium on data centers (Proposed, 2026-08) centraloregonian.com →
  • Pennsylvania · HB 2496 — Municipal authority to pause data center proposals (Proposed, 2026-06) palegis.us →
  • Pennsylvania · SB 1345 — Optional municipal moratorium on high impact data centers (Proposed, 2026-07) palegis.us →
  • Pennsylvania · SB 1359 — Statewide three-year hyperscale data center moratorium (Proposed, 2026-06) palegis.us →
  • Pennsylvania · HB 2533 — An Act amending the act of July 31, 1968 (P.L.805, No.247), known as the Pennsylvania Municipalities Planning Code, in zoning, providing for optional (Proposed, 2026-05) palegis.us →
  • Pennsylvania · HB 2650 — An Act amending the act of March 4, 1971 (P.L.6, No.2), known as the Tax Reform Code of 1971, in tax credit and tax benefit administration (Proposed, 2026-06) palegis.us →
  • Pennsylvania · SB 1384 — An Act amending the act of March 4, 1971 (P.L.6, No.2), known as the Tax Reform Code of 1971, in tax credit and tax benefit administration (Proposed, 2026-07) palegis.us →
  • Pennsylvania · HB 2198 — An Act amending the act of March 4, 1971 (P.L.6, No.2), known as the Tax Reform Code of 1971, repealing provisions relating to Computer Data Center Equipment (Proposed, 2026-06) palegis.us →
  • Pennsylvania · HB1667 — In sales and use tax, further providing for exclusions from tax; in gross receipts tax, further providing for imposition of tax and for establishment (Proposed, 2026-06) palegis.us →
  • Pennsylvania · HB 2532 — An Act amending the act of March 4, 1971 (P.L.6, No.2), known as the Tax Reform Code of 1971, repealing provisions relating to computer data center equipment (Proposed, 2026-05) palegis.us →
  • Pennsylvania · Pennsylvania (statewide moratorium proposal) — Pennsylvania: Proposes a three-year moratorium on hyperscale data center construction including associated power generation and transmission infrastructure. (Proposed, 2026-02) wvia.org →
  • Pennsylvania · HB 1834 — Pennsylvania's first-ever data center regulatory framework (HB 1834) passed the House 104-95 on March 24, 2026. (Proposed, 2026-03) cityandstatepa.com →
  • Pennsylvania · SB 1460 — An Act amending the act of July 31, 1968 (P.L.805, No.247), known as the Pennsylvania Municipalities Planning Code, in zoning, prohibiting the location of data (Proposed, 2026-09) palegis.us →
  • Rhode Island · H7695 — Establishes property, tangible, sales and use tax exemptions as incentives for the location of qualified data centers in Rhode Island. (Proposed, 2026-05) status.rilegislature.gov →
  • South Carolina · HJR 5526 — Data Center Moratorium (joint resolution) (Proposed, 2026-04) scstatehouse.gov →
  • South Carolina · S 867 — Data Center Development Act (Proposed, 2026-04) scstatehouse.gov →
  • South Carolina · S 902 — Data center siting permits through the PSC (Proposed, 2026) scstatehouse.gov →
  • South Dakota · HB1301 — Limit costs and risks associated with electricity use by data centers and impose a moratorium. (Proposed, 2026-02) sdlegislature.gov →
  • Tennessee · SB 2584 — Taxes, Sales - As introduced, authorizes a qualified data center that applies for job tax credits to certify electronically that it has (Proposed, 2026-04) wapp.capitol.tn.gov →
  • Texas · SB2888 — Relating to the temporary sales and use tax exemptions for certain tangible personal property related to data centers and large data center projects. (Proposed, 2025-04) capitol.texas.gov →
  • Virginia · HB 1515 — Temporary moratorium on local data center approvals (Proposed, 2026-02) lis.virginia.gov →
  • Virginia · HB 153 — High Energy Use Facility siting permit (Proposed, 2026-01) virginiamercury.com →
  • Virginia · SB465 — Retail Sales and Use Tax; exemption for data centers. (Proposed, 2026-02) lis.virginia.gov →
  • Virginia · HB 116 — Retail Sales and Use tax; exemption for data centers. (Proposed, 2024-11) lis.virginia.gov →
  • Virginia · SB 192 — Retail Sales and Use Tax; certain exemption for data centers. (Proposed, 2024-11) lis.virginia.gov →
  • Virginia · HB 1546 — Data centers; sales and use tax exemption for certain equipment or enabling software. (Proposed, 2024-11) lis.virginia.gov →
  • Virginia · HB 2715 — Retail Sales and Use Tax; exemption for data centers, definitions. (Proposed, 2025-02) lis.virginia.gov →
  • Virginia · HB 2685 — Retail Sales and Use Tax; commercial & industrial exemptions for data centers in Northern Virginia. (Proposed, 2025-02) lis.virginia.gov →
  • Virginia · — Microsoft appeal of data center transmission costs order (Proposed, 2026-09) utilitydive.com →
  • Virginia · — Virginia Takes Aim at Data Center Development, Energy Use (Proposed, 2026-09) govtech.com →
  • Virginia · — Spanberger proposes by-right approval ban for data centers (Proposed, 2026-09) virginiabusiness.com →
  • Virginia · — Spanberger presents slate of data center regulation proposals, puts first directives in motion (Proposed, 2026-09) virginiamercury.com →
  • Virginia · — Spanberger proposes slate of data center regulations, puts first directives in motion (Proposed, 2026-09) marylandmatters.org →
  • Washington · HB 2515 — Clean energy procurement and cost obligations (Proposed, 2026) afslaw.com →
  • Washington · HB 2655 — Providing a retail sales and use tax exemption for the construction and equipping of new data centers located in a county east of the Cascades that borders (Proposed, 2026-02) app.leg.wa.gov →
  • Washington · HB 2708 — Removing a tax exemption for the replacement of equipment for data centers. (Proposed, 2026-01) app.leg.wa.gov →
  • Wisconsin · Wisconsin (statewide PSC rate hearing) — Wisconsin: Two Wisconsin PSC dockets address data center rate structures. (Proposed, 2026-02) psc.wi.gov →
  • Wyoming · Wyoming (statewide) — Wyoming faces 12.8 GW of announced data center projects that would more than double statewide electrical demand, sparking fears of soaring residential electric (Proposed, 2026-01) cowboystatedaily.com →
  • Alabama · SB 354 — Alabama: In Alabama, SB 354 would impose a one-year moratorium on construction of new large-scale solar power facilities, Prompted by opposition (Failed / vetoed, 2026-03) alreporter.com →
  • Alaska · HB 259 — Alaska HB 259 (introduced January 2026 by Rep. Donna Mears) would require large energy facilities (peak demand ≥20 MW) to enter community benefit agreements (Failed / vetoed, 2026-01) akleg.gov →
  • Arizona · HB 2631 — Arizona: Governor Katie Hobbs called for repealing data center tax incentives which cost Arizona approximately $38.5 million per year. (Failed / vetoed, 2026-02) azleg.gov →
  • Arizona · HB 2795 — Arizona: In Arizona, HB 2795 would prohibit counties (<500K pop) from denying zoning approval for small modular reactors after federal design certification (Failed / vetoed, 2026-02) azleg.gov →
  • Arizona · SB 1463 — Arizona SB 1463 (Sen. Priya Sundareshan, D - Senate Minority Leader) would repeal the state's transaction privilege and use tax exemption for qualifying large (Failed / vetoed, 2026-01) azgovernor.gov →
  • Arkansas · HB 1476 — TO CREATE A SALES AND USE TAX EXEMPTION FOR ELECTRICITY SOLD TO A DATA CENTER; AND TO DECLARE AN EMERGENCY. (Failed / vetoed, 2023-05) arkleg.state.ar.us →
  • Arkansas · HB 1654 — TO PROVIDE SALES AND USE TAX EXEMPTIONS FOR DATA CENTERS; AND TO PROVIDE A SALES AND USE TAX EXEMPTION FOR DATA CENTER EQUIPMENT, DATA CENTER COSTS (Failed / vetoed, 2023-04) arkleg.state.ar.us →
  • California · AB 222 — California Assembly Bill 222 would require data center operators to report energy consumption and efficiency metrics, including Power Usage Effectiveness (Failed / vetoed, 2026-08) leginfo.legislature.ca.gov →
  • California · — Bill to create California PUC inspector general (Failed / vetoed, 2026-09) utilitydive.com →
  • Colorado · SB 26-102 — Large-load data-center conditions (Failed / vetoed, 2026-05) leg.colorado.gov →
  • Colorado · HB 1030 — Colorado: In Colorado, HB 1030 would offer a 100% state sales and use tax exemption for 20 years (extendable to 30) for data center operators investing (Failed / vetoed, 2026-02) leg.colorado.gov →
  • Connecticut · SB 245 — Repeal of data center tax incentives (Failed / vetoed, 2026-05) ctmirror.org →
  • Connecticut · SB 1292 — Connecticut enacted SB 1292, requiring AI data center owners and operators to submit quarterly reports to the Commissioner of Energy and Environmental (Failed / vetoed, 2025-01) legiscan.com →
  • Connecticut · SB 79 — AN ACT ELIMINATING THE TAX EXEMPTIONS FOR QUALIFIED DATA CENTERS. (Failed / vetoed, 2024-02) cga.ct.gov →
  • Delaware · SB 353 — Defeated statewide moratorium on data centers (Failed / vetoed, 2026-06) legis.delaware.gov →
  • Florida · HB 1007 — Florida HB 1007 (2026) regulates data center siting and operations by: (1) limiting the use of non-disclosure agreements in local permitting (Failed / vetoed, 2026-02) flhouse.gov →
  • Florida · HB 1517 — Florida SB 1517, 'Approval of Data Center Facilities,' sponsored by Rep. Joseph, required developers to disclose projected energy, water, carbon emissions (Failed / vetoed, 2026-02) flsenate.gov →
  • Florida · SB 1118 — Florida SB 1118 creates a public records exemption allowing local governments to keep data center siting plans confidential for up to 12 months when requested (Failed / vetoed, 2026-03) flsenate.gov →
  • Georgia · HB 1012 — One-year data center construction moratorium (Failed / vetoed, 2026-04) wabe.org →
  • Georgia · SB 410 — Phase-out of data center tax breaks (Failed / vetoed, 2026-04) georgiawatch.org →
  • Georgia · Georgia (statewide) — Georgia: Requires electric utilities and new data centers (100+ MWH peak annual demand) to agree on contract terms that shield other power customers (Failed / vetoed, 2026-02) legis.ga.gov →
  • Georgia · HB 559 — Georgia HB 559 would accelerate the sunset date for the state's data center sales and use tax exemption program, ending tax breaks for new data centers by 2026 (Failed / vetoed, 2026-02) legis.ga.gov →
  • Georgia · SB 408 — Georgia: SB 408, sponsored by Sen. Nan Orrock (D-Atlanta), would move the sunset date for Georgia's data center sales and use tax exemption from January 1 (Failed / vetoed, 2026-02) legis.ga.gov →
  • Georgia · SB34 — Georgia SB34 would have prohibited data center fuel generation and transmission costs from being included in residential electricity rates (Failed / vetoed, 2026-01) legis.ga.gov →
  • Georgia · SB436 — Georgia SB436 suspends new sales and use tax exemptions for data centers from July 1, 2026 through June 30, 2027, and prohibits local governments from entering (Failed / vetoed, 2026-02) legis.ga.gov →
  • Georgia · HB 1059 — Georgia HB 1059 (Rep. Derrick Jackson D-Tyrone) would have established a moratorium on new data center construction from July 1, 2026 through December 31 (Failed / vetoed, 2026-01) legiscan.com →
  • Georgia · HB 1192 — Sales and use tax; certain high-technology data center equipment; prohibit issuance of new certificates of exemption (Failed / vetoed, 2024-05) webservices.legis.ga.gov →
  • Idaho · H0739 — Idaho: Bipartisan bill H0739 would limit sales tax exemptions to data center-specific equipment (excluding construction materials), sunset the exemption (Failed / vetoed, 2026-02) legislature.idaho.gov →
  • Idaho · HB 756 — Idaho HB 756 (Rep. Stephanie Mickelsen R-Idaho Falls), introduced February 2026, would prohibit the Idaho PUC from approving any new customer requiring 20+ MW (Failed / vetoed, 2026-01) legislature.idaho.gov →
  • Idaho · HB 874 — Idaho: HB 874, introduced by Rep. Stephanie Mickelsen (R-Idaho Falls), would prevent Idaho's Public Utilities Commission from approving any new customer (Failed / vetoed, 2026-02) legislature.idaho.gov →
  • Illinois · SB 4004 — Illinois: In Illinois, SB 4004 would permanently ban data centers from using Mahomet Aquifer groundwater, The sole-source drinking water for ~1 million people (Failed / vetoed, 2026-02) ilga.gov →
  • Indiana · HB 1333 — Conditions and limits on data center tax exemptions (Failed / vetoed, 2026-02) yahoo.com →
  • Iowa · HF 2447 — Iowa HF 2447, proposed by Rep. Cindy Golding (R-Cedar Rapids), creates new reporting requirements and utility rate structures for data centers. (Failed / vetoed, 2026-02) axios.com →
  • Kansas · SB 531 — Ban on new large data centers in drought counties (Failed / vetoed, 2026-07) servercountry.org →
  • Kansas · SB 400 — Kansas SB 400 would require data centers to use closed-loop cooling systems (no water evaporation) and authorize municipalities, local district attorneys (Failed / vetoed, 2026-01) kslegislature.gov →
  • Kansas · SB 526 — Kansas: SB 526 adds a zoning requirement to Kansas's existing SB 98 data center sales tax exemption program, mandating that data centers must be located (Failed / vetoed, 2026-03) kslegislature.gov →
  • Kansas · HB 2450 — Substitute for HB 2450 by Committee on Commerce, Labor and Economic Development - Providing a sales tax exemption for the construction or remodeling (Failed / vetoed, 2024-04) kslegislature.org →
  • Kansas · SB 545 — Providing a sales tax exemption for the construction or remodeling of a qualified data center in Kansas and the purchase of data center equipment (Failed / vetoed, 2024-04) kslegislature.org →
  • Kentucky · HB 544 — Kentucky: Prohibits utilities from serving data centers with 100+ MW aggregate contract capacity unless the Public Service Commission approves a specific (Failed / vetoed, 2026-02) apps.legislature.ky.gov →
  • Kentucky · HB 593 — Kentucky: HB 593 (Rep. Josh Bray, R) requires data centers to cover transmission and infrastructure costs, generate their own power or purchase on the open (Failed / vetoed, 2026-02) lpm.org →
  • Maine · LD 307 — Maine Data Center Coordination Council; temporary limitation on data centers (Failed / vetoed, 2026-04) maine.gov →
  • Maine · Vetoed statewide moratorium on data centers — Vetoed statewide moratorium on data centers (Failed / vetoed, 2026-04) rockinst.org →
  • Maine · Maine (statewide) — Maine: Governor Janet Mills VETOED LD 307 on April 24, 2026, "An Act to Establish the Maine Data Center Coordination Council and Place a Temporary Limitation (Failed / vetoed, 2026-04) maine.gov →
  • Maryland · HB 120 — Moratorium on construction of new data centers (Failed / vetoed, 2026) mgaleg.maryland.gov →
  • Maryland · HB 1595 — Maryland HB1595 authorizes Baltimore City and county governing bodies to establish a special personal property tax subclass for qualified data centers and set (Failed / vetoed, 2026-02) mgaleg.maryland.gov →
  • Maryland · HB 560 — Maryland HB 560 (Del. Palakovich Karr, D - Ways & Means) would repeal the existing exemption from sales/use tax and property tax for personal property used (Failed / vetoed, 2026-01) stateline.org →
  • Maryland · HB 905 — Sales and Use Tax Exemption, Qualified Data Center Personal Property, Eligibility (Failed / vetoed, 2024-02) mgaleg.maryland.gov →
  • Maryland · HB 1411 — Maryland: In Maryland, HB 1411 would require large-scale data center operators to report environmental and resource impacts publicly. (Failed / vetoed, 2026-03) legiscan.com →
  • Massachusetts · Senate amendment — Proposed one-year data-center moratorium (Failed / vetoed, 2026-07) commonwealthbeacon.org →
  • Massachusetts · Massachusetts House (rejects Rep. Pease budget amendment for data center impact study commission) — Massachusetts House rejected without debate a Republican budget amendment (Rep. Kelly Pease) that would have created a commission to study data centers' (Failed / vetoed, 2026-05) agencychecklists.com →
  • Minnesota · SF 4298 — Minnesota SF 4298, introduced by Sen. Jennifer McEwen (DFL-Duluth), would establish a temporary statewide moratorium on new data centers by barring state (Failed / vetoed, 2026-03) revisor.mn.gov →
  • Minnesota · HF4077 — Minnesota: Bipartisan bill HF4077/SF4379 to ban local government officials from signing NDAs with data center developers is advancing through both chambers. (Failed / vetoed, 2026-03) keyc.com →
  • Minnesota · HF 4929 — Data center sales and use tax exemption modified. (Failed / vetoed, 2024-03) revisor.mn.gov →
  • Minnesota · SF 4983 — Data centers sales and use tax exemption modification (Failed / vetoed, 2024-04) revisor.mn.gov →
  • Minnesota · HF 1431 — Qualified data center tax exemption provided. (Failed / vetoed, 2013-03) revisor.mn.gov →
  • Minnesota · HF 3194 — Qualified data center sales and use tax exemptions modified. (Failed / vetoed, 2014-03) revisor.mn.gov →
  • Minnesota · SF 2934 — Sales tax exemption for data centers (Failed / vetoed, 2014-03) revisor.mn.gov →
  • Minnesota · SF 868 — Qualified data centers sales tax exemption expansion (Failed / vetoed, 2013-03) revisor.mn.gov →
  • Mississippi · HB 1239 — Data center enterprises; revise certain definitions and other provisions relating to tax exemptions. (Failed / vetoed, 2025-03) billstatus.ls.state.ms.us →
  • Mississippi · HB 1635 — Mississippi: In Mississippi, HB 1635 was introduced to redirect 80% of local ad-valorem taxes collected above $1B from large projects (including data centers) (Failed / vetoed, 2026-02) legiscan.com →
  • Mississippi · SB 3106 — Tax exemptions; revise qualifying standards for business enterprises operating data centers. (Failed / vetoed, 2024-04) billstatus.ls.state.ms.us →
  • Mississippi · HB 1429 — Tax exemptions; revise the requirements that a data center must meet to be eligible for. (Failed / vetoed, 2019-03) billstatus.ls.state.ms.us →
  • Missouri · HB 3362 — Missouri has multiple data center bills (proposed by Google / Meta / Metrobloks). (Failed / vetoed, 2026-02) house.mo.gov →
  • Nebraska · LB 1131 — Adopt the Domestic Violence and Human Trafficking Service Providers Tax Credit Act and eliminate personal property tax and sales and use tax exemptions (Failed / vetoed, 2026-04) nebraskalegislature.gov →
  • Nebraska · LB 468 — Change provisions relating to inheritance taxes, change certain fee and tax provisions, and eliminate a sales tax exemption relating to data centers (Failed / vetoed, 2026-04) nebraskalegislature.gov →
  • Nebraska · LB 1319 — Eliminate a sales and use tax exemption relating to data centers (Failed / vetoed, 2024-04) nebraskalegislature.gov →
  • Nebraska · LB 209 — Provide tax exemptions relating to data centers (Failed / vetoed, 2024-04) nebraskalegislature.gov →
  • New Hampshire · HB 1265 — One-year data center construction moratorium (Failed / vetoed, 2026-03) legiscan.com →
  • New Hampshire · HB 1724 — New Hampshire: In New Hampshire, HB 1724, Sponsored by Rep. Wendy Thomas, Requires public utilities to submit annual reports detailing transmission costs (Failed / vetoed, 2026-01) legiscan.com →
  • New Jersey · A5462 — New Jersey: Directs electric public utilities to file a new tariff for large load customers (100+ MW/month) with the BPU, designed to ensure non-data-center (Failed / vetoed, 2026-01) newjerseymonitor.com →
  • New Jersey · A 4033 — Establishes program in EDA providing tax credits and exemptions to certain qualified data centers. (Failed / vetoed, 2017-01) njleg.state.nj.us →
  • New Mexico · SB 235 — New Mexico: SB 235 (Microgrid Oversight Act) would have required the Public Regulation Commission to develop rules for any microgrid producing more than 20 MW (Failed / vetoed, 2026-01) sourcenm.com →
  • North Dakota · SB 2406 — Penalties for data center nondisclosure agreements (Failed / vetoed, 2026-09) northdakotamonitor.com →
  • North Dakota · Data center permitting moratorium (September 2026 special session, not introduced) — Proposed temporary pause on data center permitting through June 2027 (Failed / vetoed, 2026-09) inforum.com →
  • North Dakota · SB 2137 — Relating to a sales and use tax exemption for enterprise information technology equipment and computer software purchased for use in a qualified data center (Failed / vetoed, 2021-04) ndlegis.gov →
  • North Dakota · SB 2155 — Relating to a sales and use tax exemption for enterprise information technology equipment and computer software purchased for use in a qualified data center (Failed / vetoed, 2021-02) ndlegis.gov →
  • Oklahoma · HB 4424 — Sunset of data center tax incentives (Failed / vetoed, 2026-05) oklegislature.gov →
  • Oklahoma · SB 1488 — Moratorium on new data centers until Nov 1 2029 (Failed / vetoed, 2026-05) legiscan.com →
  • Oregon · SB 1586 — Oregon: SB 1586, which would have brought 373 acres of rural land into Hillsboro's UGB for tech industries, was shelved. (Failed / vetoed, 2026-02) opb.org →
  • Pennsylvania · HB 1282 — An Act amending the act of March 4, 1971 (P.L.6, No.2), known as the Tax Reform Code of 1971, in Computer Data Center Equipment Incentive Program (Failed / vetoed, 2023-09) palegis.us →
  • Pennsylvania · SB 654 — An Act amending the act of March 4, 1971 (P.L.6, No.2), known as the Tax Reform Code of 1971, in sales and use tax, further providing for exclusions from tax (Failed / vetoed, 2024-07) palegis.us →
  • Pennsylvania · HB 952 — An Act amending the act of March 4, 1971 (P.L.6, No.2), known as the Tax Reform Code of 1971, in sales and use tax, further providing for exclusions from tax (Failed / vetoed, 2021-06) legis.state.pa.us →
  • Pennsylvania · SB 1301 — An Act amending the act of March 4, 1971 (P.L.6, No.2), known as the Tax Reform Code of 1971, in Computer Data Center Equipment Incentive Program (Failed / vetoed, 2022-06) legis.state.pa.us →
  • Pennsylvania · SB 463 — An Act amending the act of March 4, 1971 (P.L.6, No.2), known as the Tax Reform Code of 1971, in computer data center equipment incentive program (Failed / vetoed, 2021-06) legis.state.pa.us →
  • Pennsylvania · SB 471 — An Act amending the act of March 4, 1971 (P.L.6, No.2), known as the Tax Reform Code of 1971, in Computer Data Center Equipment Incentive Program (Failed / vetoed, 2019-04) legis.state.pa.us →
  • Pennsylvania · HB 1088 — An Act amending the act of March 4, 1971 (P.L.6, No.2), known as the Tax Reform Code of 1971, in Computer Data Center Equipment Incentive Program (Failed / vetoed, 2019-12) legis.state.pa.us →
  • Rhode Island · S2776 — Data-center grid-cost and water guardrails (Failed / vetoed, 2026-06) webserver.rilegislature.gov →
  • Rhode Island · HB 6476 — AN ACT RELATING TO STATE AFFAIRS AND GOVERNMENT -- QUALIFIED DATA CENTERS LOCATION INCENTIVE (Establishes incentives for property sales and use tax exemptions) (Failed / vetoed, 2021-06) status.rilegislature.gov →
  • South Carolina · H 5286 — Data Center Moratorium (Failed / vetoed, 2026-02) scstatehouse.gov →
  • South Dakota · SB 232 — One-year hyperscale data center moratorium (Failed / vetoed, 2026-02) legiscan.com →
  • Tennessee · SB 2653 — Tennessee: SB2653 creates the Tennessee Data Center Impact Review Act, establishing a formal review process for data center impacts on communities (Failed / vetoed, 2026-02) wapp.capitol.tn.gov →
  • Tennessee · SB 2266 — Taxes, Sales - As enacted, specifies that any entity that qualifies for exemption as a spallation neutron source facility will not be eligible for a sales (Failed / vetoed, 2018-05) wapp.capitol.tn.gov →
  • Vermont · S.205 / H.727 — Moratorium on new data centers until 2030 (Failed / vetoed, 2026-05) legislature.vermont.gov →
  • Virginia · Rejected statewide moratorium on data centers — Rejected statewide moratorium on data centers (Failed / vetoed, 2026-08) valawyersweekly.com →
  • Virginia · HB 503 — Virginia: Prohibits Virginia utilities from recovering costs of transmission lines and energy generation serving data centers over 100 MW from residential (Failed / vetoed, 2026-01) vpm.org →
  • Virginia · SB 393 — Virginia SB 393, the Virginia's Great Outdoors Act (companion HB 641), was defeated in February 2026. (Failed / vetoed, 2026-01) multistate.us →
  • Virginia · SB 619 — Virginia SB 619 / HB 155 requires a State Corporation Commission certificate before data centers over 90 MW can operate. (Failed / vetoed, 2026-01) vpm.org →
  • Virginia · SB 1294 — Retail Sales and Use Tax; removes June 30, 2035, sunset on local exemption for data centers. (Failed / vetoed, 2023-02) lis.virginia.gov →
  • Virginia · SB 1425 — Data centers; expands sales and use tax exemption. (Failed / vetoed, 2021-03) lis.virginia.gov →
  • Washington · HB 1459 — Broadening the eligibility requirements and extending the expiration date for the data center tax incentive. (Failed / vetoed, 2022-01) apps.leg.wa.gov →
  • Washington · SB 5262 — Broadening the eligibility requirements and extending the expiration date for the data center tax incentive. (Failed / vetoed, 2022-02) apps.leg.wa.gov →
  • Washington · HB 2962 — Broadening the eligibility requirements and extending the expiration date for the data center tax incentive. (Failed / vetoed, 2020-03) apps.leg.wa.gov →
  • West Virginia · SB 658 — West Virginia: Would restore local government control over data center siting in West Virginia, reversing HB 2014, the Power Generation and Consumption Act (Failed / vetoed, 2026-02) mountainstatespotlight.org →
  • Wisconsin · AB 1099 / SB 1061 — Moratorium on operation of data centers (Failed / vetoed, 2026-03) docs.legis.wisconsin.gov →
  • Wisconsin · AB 840 — Wisconsin AB 840 / SB 843 (Rep. Shannon Zimmerman R-River Falls, Sen. Romaine Quinn R-Birchwood), a GOP-led data center bill, passed the Assembly in January (Failed / vetoed, 2026-01) docs.legis.wisconsin.gov →
  • Wisconsin · SB 244 — Relating to: modifying the sales and use tax exemption for qualified data centers. (FE) (Failed / vetoed, 2026-03) docs.legis.wisconsin.gov →
  • Wisconsin · Wisconsin — Wisconsin: Senate Bill 969, authored by Sen. Andre Jacque (R-New Franken), would prohibit NDAs between data center companies and municipalities (Failed / vetoed, 2026-02) wpr.org →
  • Wisconsin · SB 729 — Wisconsin SB 729 / AB 722, the Data Center Accountability Act, authored by Sen. Jodi Habush Sinykin (D-Whitefish Bay) and Rep. Angela Stroud (D-Ashland) (Failed / vetoed, 2026-01) wisconsinexaminer.com →
  • Wisconsin · AB 302 — Relating to: a sales and use tax exemption for data center equipment or software. (FE) (Failed / vetoed, 2024-04) docs.legis.wisconsin.gov →
  • Wyoming · HB0090 — Wyoming HB0090 would have appropriated $500K to the State Engineer to study how large-scale industrial water use by data centers, carbon capture (Failed / vetoed, 2026-02) legiscan.com →
  • Wyoming · HB 88 — Data center tax exemption-repeal. (Failed / vetoed, 2021-04) lso.wyoleg.gov →

Local & county measures

1115 measures across 49 states

Alabama (17)

  • Anniston — Twelve-month moratorium on data center permitting and licensing (In force, 2026-08) wbrc.com →
  • Birmingham — Six-month pause on large data center applications (In force, 2026-03) birminghamwatch.org →
  • Chelsea — One-year moratorium on data center licenses and permits (In force, 2026-07) 280living.com →
  • Cullman — One-year data center moratorium (In force, 2026-06) yellowhammernews.com →
  • Fairfield — Local moratorium on data centers (In force, 2026-07) thecooldown.com →
  • Foley — Six-month moratorium on data center applications (In force, 2026-09) utv44.com →
  • Fort Payne — Data center moratorium followed by conditional-use ordinance (In force, 2026-09) waff.com →
  • Harpersville — Six-month data center moratorium (In force, 2026-08) abc3340.com →
  • Homewood — Twelve-month moratorium on new data center applications (In force, 2026-06) wbrc.com →
  • Leeds — One-year moratorium on data center development (In force, 2026-06) wbrc.com →
  • Lowndes County — County moratorium on data centers through October 25, 2026 (In force, 2026-08) x.com →
  • Northport — Data center moratorium not pursued (Failed / vetoed, 2026-09) abc3340.com →
  • Pinson — One-year moratorium on data centers (In force, 2026-08) trussvilletribune.com →
  • Prichard — Local moratorium on data centers through February 4, 2027 (In force, 2026-01) utv44.com →
  • Springville — Moratorium on data centers (In force, 2026-07) newsaegis.com →
  • Tarrant — City moratorium on data centers through September 8, 2027 (In force, 2026-09) abc3340.com →
  • Westover — Six-month moratorium on data centers (In force, 2026-08) wbrc.com →

Alaska (2)

  • Anchorage — Local moratorium on data centers with no end date (In force, 2026-03) adn.com →
  • Fairbanks North Star Borough — Proposed local moratorium on data centers (Proposed, 2026-08) fm.kuac.org →

Arizona (6)

  • Chandler — Rejection of proposed AI data center (In force, 2025-12) deseret.com →
  • Hualapai Indian Reservation — Tribal moratorium on data centers with no end date (In force, 2026-08) knau.org →
  • Mesa — Proposed amendments to Chapters 6, 7, 22, 31, 32, and 86 of Title 11 of the Mesa City Code pertaining to Data Centers and Planned Area Development Overlay (Proposed, 2025-07) mesa.legistar.com →
  • Pima County — Proposed 120-day data center moratorium (In force, 2026-09) kjzz.org →
  • Pinal County — La Osa data center rezoning rejected (In force, 2026-08) kjzz.org →
  • Tucson — Rejection of Project Blue data center annexation (In force, 2025-08) azluminaria.org →

Arkansas (12)

  • Benton County — County moratorium on data centers through February 10, 2027 (In force, 2026-08) ky3.com →
  • Carroll County — 12-month data center moratorium (In force, 2026-06) ky3.com →
  • City of Harrison — City of Harrison data center moratorium (failed) (Failed / vetoed, 2023-05) harrisondaily.com →
  • Fayetteville — Conditional-use permit and siting rules for data centers (In force, 2026-06) arkansasonline.com →
  • Independence County — Five-year data center moratorium (In force, 2026-08) whiterivernow.com →
  • Little Rock — Data center moratorium (failed) (Failed / vetoed, 2026-06) ualrpublicradio.org →
  • Little Rock Board of Directors (hyperscale data center moratorium measure) — Little Rock Board of Directors (hyperscale data center moratorium measure) data center moratorium (pause) (Paused, 2026-07) arkansasonline.com →
  • Madison County — Three-year moratorium on data centers and digital asset mining (In force, 2026-08) nwahomepage.com →
  • Pulaski County — Data center moratorium (failed) (Failed / vetoed, 2026-08) ualrpublicradio.org →
  • Pulaski County Quorum Court (data center moratorium ordinance, failed on clerk miscount), AR — Pulaski County Quorum Court (data center moratorium ordinance, failed on clerk miscount), AR data center moratorium (failed) (Failed / vetoed, 2026-05) arkansasadvocate.com →
  • Russellville — Six-month data center moratorium (In force, 2026-07) arkansasadvocate.com →
  • Union County — One-year data center moratorium (In force, 2026-06) ualrpublicradio.org →

California (41)

  • Alhambra — City moratorium on data centers with no end date (In force, 2026-06) laist.com →
  • Arcata (Humboldt County) — 45-day urgency moratorium on data centers (In force, 2026-09) lostcoastoutpost.com →
  • Baldwin Park — City moratorium on data centers for a stated term (In force, 2026-04) citizenportal.ai →
  • Calaveras County — County moratorium on data centers through October 9, 2026 (In force, ) mymotherlode.com →
  • Calexico — Permanent citywide data center ban (In force, 2026-09) calexicochronicle.com →
  • Calipatria — Permanent data center ban (in development) (Proposed, 2026-07) kpbs.org →
  • Calipatria City Council (Imperial County, interim 5-year moratorium introduced), CA — Calipatria City Council (Imperial County, interim 5-year moratorium introduced), CA data center moratorium (proposed) (Proposed, 2026-05) inewsource.org →
  • City of Brawley (data center moratorium passed 3-2), CA — City of Brawley (data center moratorium passed 3-2), CA data center moratorium (In force, 2026-05) thedesertreview.com →
  • City of Calexico (proposed data center moratorium), CA — City of Calexico (proposed data center moratorium), CA data center moratorium (pause) (Paused, 2026-06) ivpressonline.com →
  • City of Imperial (hyperscale data center moratorium advancing), CA — City of Imperial (hyperscale data center moratorium advancing), CA data center moratorium (proposed) (Proposed, 2026-05) kyma.com →
  • Coachella — Permanent citywide ban on large-scale data centers (In force, 2026-08) kesq.com →
  • Commerce — 45-day urgency moratorium on data centers (In force, 2026-08) mynewsla.com →
  • Desert Hot Springs — Local moratorium on data centers through June 17, 2028 (In force, 2026-06) riversiderecord.org →
  • El Monte — City moratorium on data centers through February 2, 2027 (In force, 2026-03) ci.el-monte.ca.us →
  • Escondido — 45-day moratorium on data centers (In force, 2026-08) ncpipeline.substack.com →
  • Eureka — Local moratorium on data centers through October 17, 2026 (In force, ) lostcoastoutpost.com →
  • Fresno — Proposed 10-year citywide data center prohibition (Proposed, 2026-09) thebusinessjournal.com →
  • Gilroy — Proposed urgency moratorium on data center applications (In force, 2026-09) cityofgilroy.org →
  • Hayward — Council starts process to prohibit future data center approvals (Proposed, 2026-09) localnewsmatters.org →
  • Humboldt County — Proposed county moratorium on data centers (Proposed, ) lostcoastoutpost.com →
  • Imperial — Emergency data center moratorium (In force, 2026-06) kpbs.org →
  • Imperial County — County moratorium set aside by court; replacement under review (Failed / vetoed, 2026-08) imperialcounty.org →
  • Imperial County (data center moratorium + by-right elimination advancing), CA — Imperial County (data center moratorium + by-right elimination advancing), CA data center moratorium (In force, 2026-06) inewsource.org →
  • Indio — Urgency data center moratorium (In force, 2026-06) indio.org →
  • Lake Elsinore — City moratorium on data centers through October 9, 2026 (In force, 2026-08) elsinore247.com →
  • Los Angeles County — Interim prohibition on large-scale data centers in unincorporated areas (Paused, 2026-09) abc7.com →
  • Mendocino County — 45-day urgency moratorium on data centers (In force, 2026-09) pressdemocrat.com →
  • Montebello — Expired city moratorium on data centers through March 28, 2026 (Failed / vetoed, 2026-02) citizenportal.ai →
  • Monterey Park — Measure NDC permanent data center ban (In force, 2026-06) montereypark.ca.gov →
  • Morgan Hill — City moratorium on data centers through October 10, 2026 (In force, 2026-08) morganhilltimes.com →
  • Oakland — Oakland Weighs Data Center Moratorium as Opposition Mounts (Proposed, 2026-09) cbsnews.com →
  • Oakley — City moratorium on data centers through April 14, 2027 (In force, 2026-01) contracosta.news →
  • Palm Springs — 45-day urgency moratorium on data centers (In force, 2026-08) kesq.com →
  • Patterson — City moratorium on data centers through July 15, 2027 (In force, 2026-07) cbsnews.com →
  • Richmond — Richmond becomes 3rd Bay Area city to impose data center moratorium (In force, 2026-09) news.google.com →
  • Riverbank (Stanislaus County) — 45-day urgency moratorium on data centers (In force, 2026-09) news.theregistrysf.com →
  • Riverside — Proposed 90-day data center moratorium (Proposed, 2026-09) raincrossgazette.com →
  • San Francisco — San Francisco supervisors propose 45-day moratorium on new data centers (Proposed, 2026-09) news.google.com →
  • San Joaquin County — Proposed county moratorium on data centers (Proposed, 2026-09) sjgov.org →
  • Tulare County — 45-day data center moratorium (In force, 2026-09) recorderonline.com →
  • Whittier (Los Angeles County) — Council directs staff to draft data center urgency moratorium (Proposed, 2026-08) whittier360newsnetwork.com →

Colorado (21)

  • Archuleta County — County moratorium on data centers through December 16, 2026 (In force, 2026-01) pagosasun.com →
  • Arvada — Proposed local moratorium on data centers (Proposed, 2026-09) arvadaco.gov →
  • Aurora — Rejected local moratorium on data centers (Failed / vetoed, 2026-08) denver7.com →
  • Boulder County — Six-month data center moratorium (In force, 2026-06) kunc.org →
  • Broomfield — 18-month data center moratorium (Ordinance 2313) (In force, 2026-07) coloradopolitics.com →
  • Commerce City — Proposed city moratorium on data centers (In force, 2026-09) businessden.com →
  • Denver — One-year data center moratorium (In force, 2026-05) 9news.com →
  • Jefferson County — Jefferson County data center moratorium (In force, 2026-05) jeffco.us →
  • Larimer County — Temporary data center facilities moratorium (In force, 2026-01) larimer.gov →
  • Lochbuie — Local moratorium on data centers through July 21, 2031 (In force, 2026-07) rmpbs.org →
  • Logan County — Logan County data center moratorium (In force, 2025-10) journal-advocate.com →
  • Longmont — Longmont data center moratorium (In force, 2026-06) denver7.com →
  • Loveland — 12-month suspension of large data center applications (In force, 2026-09) bizwest.com →
  • Mead — 12-month data center moratorium (In force, 2026-08) berthoudsurveyor.com →
  • Moffat County — Proposed six- or 12-month data center moratorium (Proposed, 2026-09) craigdailypress.com →
  • Monument — Six-month data center pause (In force, 2026) kunc.org →
  • Phillips County — County moratorium on data centers through December 31, 2026 (In force, 2026-02) phillipscounty.colorado.gov →
  • South Fork — Local moratorium on data centers through June 18, 2027 (In force, 2026-01) alamosacitizen.com →
  • Thornton — Proposed city moratorium on data centers (In force, 2026-09) businessden.com →
  • Weld County — Weld County commissioners approve permit for Global AI data center (In force, 2026-09) coloradonewsline.com →
  • Woodland Park — 18-month data center pause (In force, 2026-07) kunc.org →

Connecticut (6)

  • Groton — Permanent zoning cap replacing 2022 moratorium (In force, 2023) datacenterdynamics.com →
  • Morris — Local moratorium on data centers through May 20, 2028 (In force, 2026-05) yahoo.com →
  • New Haven — Proposed local moratorium on data centers (In force, 2026-09) newhavenindependent.org →
  • New Haven Board of Alders (12-month data center moratorium ordinance) — New Haven Board of Alders (12-month data center moratorium ordinance) data center moratorium (proposed) (Proposed, 2026-07) newhavenindependent.org →
  • Trumbull — Local moratorium on data centers through September 9, 2028 (In force, 2026-09) ctmirror.org →
  • West Haven — City moratorium on data centers through June 8, 2027 (In force, 2026-01) hartfordbusiness.com →

Delaware (4)

  • Dover — Proposed 18-month pause on data center reviews (Proposed, 2026-08) spotlightdelaware.org →
  • Harrington — Rejection of ordinance allowing data centers (In force, 2026-08) wboc.com →
  • Kent County — County moratorium on data centers with no end date (In force, 2026-07) spotlightdelaware.org →
  • New Castle County — County moratorium on data centers with no end date (In force, 2026-03) delawarepublic.org →

Florida (43)

  • Alachua — Alachua City Commission moves to draft 12-month data center moratorium (Proposed, 2026-09) wcjb.com →
  • Bay County — County moratorium on data centers through January 8, 2027 (In force, 2026-01) wjhg.com →
  • Citrus County — One-year data center moratorium (In force, 2026-05) wfla.com →
  • Clay County — One-year data center moratorium (In force, 2026-06) firstcoastnews.com →
  • Collier County — County moratorium on data centers until a condition is met (In force, 2026-01) winknews.com →
  • DeSoto County — Local moratorium on data centers through July 29, 2027 (In force, 2026-07) wgcu.org →
  • Edgewater — Proposed city moratorium on data centers with no end date (In force, 2026-09) fox35orlando.com →
  • Escambia County — Local moratorium on data centers with no end date (In force, 2026-08) weartv.com →
  • Flagler County — Local moratorium on data centers through August 3, 2027 (In force, 2026-08) observerlocalnews.com →
  • Hendry County — Proposed county moratorium on data centers (Proposed, 2026-08) wgcu.org →
  • Hernando County — One-year data center moratorium (In force, 2026-06) wtsp.com →
  • Hernando County (1-year data center moratorium), FL — Hernando County (1-year data center moratorium), FL data center moratorium (proposed) (Proposed, 2026-06) hernandosun.com →
  • Hillsborough County — Proposed county moratorium on data centers (Proposed, 2026-08) businessobserverfl.com →
  • Holmes County — County moratorium on data centers through June 16, 2027 (In force, 2026-01) wjhg.com →
  • Holmes County (moving toward permanent AI data center ban), FL — Holmes County (moving toward permanent AI data center ban), FL data center moratorium (proposed) (Proposed, 2026-06) wjhg.com →
  • Indiantown — Rejected pause on large-scale data center applications (Failed / vetoed, 2026-09) wflx.com →
  • Jackson County — County moratorium on data centers with no end date (In force, 2026-01) wctv.tv →
  • Jackson County (1-year AI data center moratorium), FL — Jackson County (1-year AI data center moratorium), FL data center moratorium (In force, 2026-05) wctv.tv →
  • Lake County — Local moratorium on data centers through December 7, 2026 (In force, 2026-09) cfpublic.org →
  • Lakeland — Local moratorium on data centers through August 3, 2027 (In force, 2026-08) lkldnow.com →
  • Leon County — Eighteen-month moratorium on large-scale data centers (Proposed, 2026-09) fox49.tv →
  • Levy County — County moratorium on data centers through September 30, 2027 (In force, 2026-09) wcjb.com →
  • Madison County — County moratorium on data centers through July 22, 2027 (In force, 2026-01) greenepublishing.com →
  • Manatee County — Local moratorium on data centers (In force, 2026-09) wmnf.org →
  • Marion County — Proposed county moratorium on data centers (In force, 2026-09) 352today.com →
  • Martin County — Proposed county moratorium on data centers (Proposed, 2026-01) wflx.com →
  • Nassau County — Up to 12-month data center moratorium (In force, 2026) nassaucountyfl.com →
  • North Port — Proposed 18-month data center moratorium (In force, 2026-09) winknews.com →
  • Orange County — Proposed county moratorium on data centers (Proposed, 2026-09) cfpublic.org →
  • Palm Beach County — One-year moratorium on new hyperscale data centers (In force, 2026-09) wflx.com →
  • Pasco County — One-year data center moratorium (In force, 2026-06) wusf.org →
  • Putnam County — County moratorium on data centers through September 8, 2027 (In force, 2026-09) wcjb.com →
  • Santa Rosa County — 12-month data center moratorium (in development) (Proposed, 2026-06) wuwf.org →
  • Sarasota County — 12-month hyperscale data center moratorium (In force, 2026-07) businessobserverfl.com →
  • St. Johns County — Proposed county moratorium on data centers (Proposed, 2026-01) stjohnscountybuzz.com →
  • Tallahassee — Rejected proposal to define and prohibit AI data centers (Failed / vetoed, 2026-08) wtxl.com →
  • Taylor County — Rejected local moratorium on data centers (Failed / vetoed, 2026-07) wctv.tv →
  • Village of Palmetto Bay — Palmetto Bay weighs outright ban on data centers (Proposed, 2026-08) cbsnews.com →
  • Volusia County — Proposed county moratorium on data centers with no end date (Proposed, 2026-01) orlandoweekly.com →
  • Wakulla County — County moratorium on data centers with no end date (In force, 2026-09) fox49.tv →
  • Walton County — County moratorium on data centers with no end date (In force, 2026-01) wjhg.com →
  • Washington County — One-year moratorium on data center applications (In force, 2026-08) washingtoncounty.news →
  • Zephyrhills — One-year data center moratorium (In force, 2026-06) wusf.org →

Georgia (51)

  • Albany — Albany data center moratorium (proposed) (In force, 2026-07) walb.com →
  • Americus — 30-day data center moratorium (In force, 2026-09) americustimesrecorder.com →
  • Athens-Clarke County — Local moratorium on data centers until a condition is met (In force, 2026-03) flagpole.com →
  • Atlanta — Local moratorium on data centers with no end date (In force, 2024-09) gpb.org →
  • Augusta — Augusta data center moratorium (In force, 2026-07) theaugustapress.com →
  • Augusta-Richmond County — County moratorium on data centers through September 19, 2026 (In force, 2026-01) wrdw.com →
  • Bulloch County — Data center moratorium through Dec. 31, 2026 (In force, 2026-09) thegeorgiavirtue.com →
  • Bulloch County Commissioners (5-0 moratorium extension through Dec 31; 5-0 to draft permanent prohibition), GA — Bulloch County Commissioners (5-0 moratorium extension through Dec 31; 5-0 to draft permanent prohibition), GA data center moratorium (In force, 2026-05) statesboroherald.com →
  • Camden County — Six-month data center moratorium (In force, 2026-05) gpb.org →
  • Carroll County — 100-day data center and BESS moratorium (unincorporated areas) (In force, 2026-03) times-georgian.com →
  • Chatham County — 155-day moratorium on data centers of 10 MW or more (In force, 2026-09) thecurrentga.org →
  • Cherokee County — Data center moratorium extended by 180 days (In force, 2026-08) wsbtv.com →
  • City of LaGrange — City of LaGrange data center moratorium (failed) (Failed / vetoed, 2025-09) wsbtv.com →
  • Clayton County — Clayton County data center moratorium (In force, 2025-09) claytoncountyga.gov →
  • Cobb County — 180-day data center moratorium (unincorporated areas) (In force, 2026-02) fox5atlanta.com →
  • Colquitt County — County moratorium on data centers (In force, 2026-01) moultrieobserver.com →
  • Columbia County — Proposed local moratorium on data centers (Proposed, 2026-08) wfxg.com →
  • Covington — Expired city moratorium on data centers through July 19, 2026 (Failed / vetoed, 2026-01) rockdalenewtoncitizen.com →
  • Coweta County — 180-day moratorium on data center proposals (In force, 2025-05) wsbtv.com →
  • DeKalb County — Data center moratorium, repeatedly extended (In force, 2026-06) wabe.org →
  • Decatur County — County moratorium on data centers (In force, 2026-04) wctv.tv →
  • Dougherty County — Data center moratorium, extended (In force, 2026-08) walb.com →
  • Douglas County — 90-day data center moratorium (In force, 2026-03) fox5atlanta.com →
  • Fayetteville — 90-day moratorium, later permanent ban (In force, 2026-01) fayette-news.net →
  • Floyd County — Expired county moratorium on data centers through August 28, 2026 (Failed / vetoed, 2026-01) northwestgeorgianews.com →
  • Forest Park — 90-day data center moratorium (In force, 2026-08) news-daily.com →
  • Franklin County — County moratorium on data centers through December 31, 2028 (In force, 2026-09) 921wlhr.com →
  • Garden City — Six-month data center moratorium (In force, 2026-06) thecurrentga.org →
  • Gordon County — Local moratorium on data centers through January 29, 2027 (In force, 2026-05) discovergordoncounty.com →
  • Griffin — Expired local moratorium on data centers through July 12, 2026 (Failed / vetoed, 2026-01) griffindailynews.com →
  • Griffin (Spalding County) — Griffin (Spalding County) data center moratorium (In force, 2026-01) griffindailynews.com →
  • Hall County — 180-day moratorium (data centers, high-density residential, detention centers) (In force, 2026-02) accessnorthga.com →
  • Hart County — County moratorium on data centers (In force, 2026-01) 921wlhr.com →
  • Kingsland — Expired city moratorium on data centers through August 9, 2026 (Failed / vetoed, 2026-01) kingslandgeorgia.com →
  • Lamar County — Lamar County data center moratorium (In force, 2025-09) gpb.org →
  • Lee County (moratorium extension + dedicated data center zoning district), GA — Lee County (moratorium extension + dedicated data center zoning district), GA data center moratorium (proposed) (Proposed, 2026-06) leecountyga.gov →
  • Lowndes County — County moratorium on data centers through October 25, 2026 (In force, 2026-01) valdostadailytimes.com →
  • Madison County — County moratorium on data centers (In force, 2025-01) 921wlhr.com →
  • Marietta — Six-month data center moratorium (In force, 2026-07) fox5atlanta.com →
  • Meriwether County — Data center moratorium extended 90 days (In force, 2026-07) meriwethercountyga.gov →
  • Newton County — Data center moratorium (extended 180 days) (In force, 2026-02) covnews.com →
  • Palmetto — Local moratorium on data centers with no end date (In force, 2026-03) wabe.org →
  • Paulding County — Local moratorium on data centers through January 1, 2027 (In force, 2026-07) fox5atlanta.com →
  • Pike County — County moratorium on data centers (In force, 2025-01) gpb.org →
  • Rockdale County — Expired county moratorium on data centers through September 8, 2026 (Failed / vetoed, 2026-03) fox5atlanta.com →
  • Rockdale County (data center + battery-energy-storage moratorium extended through Sept 8), GA — Rockdale County (data center + battery-energy-storage moratorium extended through Sept 8), GA data center moratorium (In force, 2026-05) atlantanewsfirst.com →
  • Roswell — City moratorium on data centers through September 20, 2026 (In force, 2026-01) roswellconnections.com →
  • Savannah — 155-day moratorium on large-scale data centers (In force, 2026-08) wtoc.com →
  • Social Circle — Social Circle data center moratorium (In force, 2025-09) wsbtv.com →
  • Thomas County — Thomas County data center moratorium (In force, 2026-01) wctv.tv →
  • Walker County — Local moratorium on data centers through February 3, 2027 (In force, 2026-08) local3news.com →

Hawaii (1)

Idaho (3)

  • Bannock County — County moratorium on data centers through January 26, 2027 (In force, 2026-07) localnews8.com →
  • Kootenai County — Kootenai County data center moratorium (failed) (Failed / vetoed, 2025-03) khq.com →
  • Sandpoint — Proposed local moratorium on data centers (In force, 2026-09) bonnercountydailybee.com →

Illinois (25)

  • Aurora — Expired local moratorium on data centers through March 24, 2026 (Failed / vetoed, 2025-09) abc7chicago.com →
  • Bourbonnais — Village moratorium on data centers through January 31, 2027 (In force, 2026-06) wfav951.com →
  • Champaign County — 12-month data center moratorium (In force, 2026-04) nprillinois.org →
  • Chicago — Proposed local moratorium on data centers (Proposed, ) abc7chicago.com →
  • City of Bloomington — Six-month data center moratorium (In force, 2026-05) wglt.org →
  • City of Carbondale — One-year data center moratorium (In force, 2026-06) kfvs12.com →
  • City of Effingham — 12-month data center and crypto moratorium (In force, 2026) thexradio.com →
  • City of Galesburg — 180-day data center moratorium (In force, 2026-09) tspr.org →
  • City of West Chicago — 180-day moratorium (Ordinance 26-O-0011) (In force, 2026-07) westchicago.org →
  • Lake County — Ordinance amending Chapter 151: Unified Development Ordinance of the Lake County, Illinois, Code of Ordinances relating to defining and imposing a temporary (In force, 2026-09) lakecounty.legistar.com →
  • Lawrence County — Two-year moratorium on data centers (In force, 2026-09) wzdm.com →
  • Logan County — County moratorium on data centers through May 19, 2027 (In force, 2026-05) illinoistimes.com →
  • Mattoon — Moratorium on large-scale data center development (In force, 2026-09) mattoon.illinois.gov →
  • Ottawa — Local moratorium on data centers through August 25, 2027 (In force, 2026-03) shawlocal.com →
  • Peoria — Communication from the City Manager and Director of Community Development with a Request to Concur with the Planning & Zoning Commission and Staff to ADOPT (In force, 2022-09) peoriail.legistar.com →
  • Plainfield — Plainfield data center moratorium (In force, 2026-04) patch.com →
  • Rockford — Local moratorium on data centers through February 3, 2027 (In force, 2026-08) rockrivercurrent.com →
  • Tazewell County — Proposed county moratorium on data centers (Proposed, ) wmbdradio.com →
  • Tazewell County Board, IL — Tazewell County Board, IL data center moratorium (In force, 2026-05) 25newsnow.com →
  • Town of Normal — Six-month data center moratorium (In force, 2026-09) wglt.org →
  • Town of Normal, IL — Town of Normal, IL data center moratorium (In force, 2026-05) 25newsnow.com →
  • Troy — Troy data center moratorium (In force, 2026-03) timestribunenews.com →
  • Village of Godfrey — Data center application moratorium (In force, 2026) riverbender.com →
  • Windy City — Chicago proposes 12-month moratorium on data center construction (Proposed, 2026-09) energycentral.com →
  • Woodford County — Local moratorium on data centers through February 18, 2027 (In force, 2026-08) wmbdradio.com →

Indiana (33)

  • Boone County — One-year data center moratorium (Ordinance 2026-08) (In force, 2026-06) boonecounty.in.gov →
  • Boone County Area Plan Commission (moratorium recommendation), IN — Boone County Area Plan Commission (moratorium recommendation), IN data center moratorium (In force, 2026-06) ibj.com →
  • Cass County — Local moratorium on data centers with no end date (In force, 2026-04) in.gov →
  • Clark County — County moratorium on data centers (In force, ) newsandtribune.com →
  • Clarksville — Town moratorium on data centers with no end date (In force, 2026-07) townofclarksville.com →
  • DeKalb County (Auburn) — DeKalb County (Auburn) data center moratorium (proposed) (Proposed, 2026-04) kpcnews.com →
  • Dearborn County — Local moratorium on data centers through February 25, 2027 (In force, 2026-02) dearborncounty.org →
  • Elkhart — Moratorium on data centers and battery storage facilities (In force, 2026-08) wndu.com →
  • Fayette County — Local moratorium on data centers through May 18, 2027 (In force, 2026-05) newsexaminer.com →
  • Fort Wayne — Proposed one-year data center moratorium (Proposed, 2026-09) wboi.org →
  • Franklin County — Franklin County data center moratorium (In force, 2026-02) eaglecountryonline.com →
  • Fulton County — Local moratorium on data centers through March 2, 2027 (In force, 2026-03) wndu.com →
  • Grant County — Local moratorium on data centers through March 16, 2028 (In force, 2026-03) commissioners.grant.in.datapitstop.us →
  • Howard County — Local moratorium on data centers through August 18, 2027 (In force, 2026-08) kokomolantern.substack.com →
  • Indianapolis (Marion County) — Data center moratorium through 2027 (In force, 2026-08) wfyi.org →
  • Indianapolis Metropolitan Development Commission (data center development standards recommendation) — Indianapolis Metropolitan Development Commission (data center development standards recommendation) data center moratorium (proposed) (Proposed, 2026-07) wfyi.org →
  • Jeffersonville — One-year data center moratorium (In force, 2026-08) newsandtribune.com →
  • Madison County Plan Commission (moratorium requested by Citizens Action Coalition + 27 orgs), IN — Madison County Plan Commission (moratorium requested by Citizens Action Coalition + 27 orgs), IN data center moratorium (In force, 2026-06) heraldbulletin.com →
  • Marshall County — Local moratorium on data centers with no end date (In force, 2026-04) wndu.com →
  • Merrillville — Local moratorium on data centers through May 31, 2027 (In force, 2026-06) nwitimes.com →
  • Miami County — Local moratorium on data centers (In force, 2026-05) miamicountyin.gov →
  • Michigan City — Michigan City data center moratorium delay draws frustration during council meeting (Proposed, 2026-09) lpheralddispatch.com →
  • New Albany — Local moratorium on data centers through July 16, 2027 (In force, 2026-07) newsandtribune.com →
  • New Albany (Floyd County) — One-year data center moratorium (In force, 2026-07) newsandtribune.com →
  • Owen County — One-year data center moratorium (In force, 2026-09) ipm.org →
  • Pulaski County — Local moratorium on data centers through February 2, 2027 (In force, 2026-02) pulaskijournal.com →
  • Putnam County — Local moratorium on data centers through November 17, 2026 (In force, 2025-11) giant.fm →
  • Starke County — 12-month hyperscale data center moratorium (Ordinance 2025-37) (In force, 2026-01) starke.in.gov →
  • Vermillion County — Proposed county moratorium on data centers (Proposed, ) vermilioncountyfirst.com →
  • Warrick County — Local moratorium on data centers through February 7, 2027 (In force, 2026-08) 14news.com →
  • Washington City Council, IN — Washington City Council, IN data center moratorium (In force, 2026-05) ipm.org →
  • White County — Local moratorium on data centers through October 20, 2026 (In force, 2025-10) wrul.com →
  • Zionsville (Boone County) — One-year moratorium on data centers, solar, wind and battery storage (In force, 2026-09) youarecurrent.com →

Iowa (26)

  • Buchanan County — County moratorium on data centers for a stated term (In force, 2026-01) nbcnews.com →
  • City of Peosta — Six-month data center moratorium (In force, 2026-06) kwwl.com →
  • Clarke County — Local moratorium on data centers until a condition is met (In force, 2026-01) radioiowa.com →
  • Clayton County — Clayton County data center moratorium (In force, 2025-02) claytoncountyia.gov →
  • Clinton — Rejected local moratorium on data centers (Failed / vetoed, 2026-06) qctimes.com →
  • Council Bluffs (data center moratorium denied), IA — Council Bluffs (data center moratorium denied), IA data center moratorium (failed) (Failed / vetoed, 2026-06) kmaland.com →
  • Dickinson County — County moratorium on data centers through November 12, 2026 (In force, 2026-05) exploreokoboji.com →
  • Dubuque County — 12-month data center moratorium (In force, 2026-05) kcrg.com →
  • Emmet County — One-year data center moratorium (In force, 2026-08) ktiv.com →
  • Hancock County — Proposed data center moratorium (tabled) (Proposed, 2026-09) radioiowa.com →
  • Henry County — Henry County data center moratorium (In force, 2026-05) southeastiowaunion.com →
  • Ida County — Local moratorium on data centers until a condition is met (In force, 2026-06) radioiowa.com →
  • Iowa County — 12-month data center moratorium (Resolution 2026-07-31) (In force, 2026-07) iowacounty.iowa.gov →
  • Jefferson County — Local moratorium on data centers through August 11, 2027 (In force, 2026-08) kilj.com →
  • Johnson County — One-year data center moratorium (unincorporated) (In force, 2025-11) cbs2iowa.com →
  • Linn County — 18-month rezoning moratorium (EU-3 data center district) (In force, 2026-07) linncountyiowa.gov →
  • Linn County Board of Supervisors (18-month pause on EU-3 large-scale data center rezoning applications) — Linn County Board of Supervisors (18-month pause on EU-3 large-scale data center rezoning applications) data center moratorium (In force, 2026-07) linncountyiowa.gov →
  • Madison County — One-year data-processing-facility moratorium (In force, 2026-06) news.yahoo.com →
  • Marshall County — Proposed county moratorium on data centers (In force, 2026-09) timesrepublican.com →
  • Marshalltown — Local moratorium on data centers through November 23, 2026 (In force, 2026-08) marshalltown-ia.gov →
  • Mitchell County — County moratorium on data centers through December 31, 2026 (In force, 2025-01) mitchellcounty.iowa.gov →
  • Page County — Temporary data center moratorium (In force, 2026-07) kmaland.com →
  • Plymouth County — One-year revocable data center moratorium (In force, 2026-06) klem1410.com →
  • Salix — Rejected one-year data center moratorium (Failed / vetoed, 2026-08) iowapublicradio.org →
  • Sioux County — One-year data center and BESS moratorium (In force, 2026-06) ktiv.com →
  • Woodbury County — 12-month data center moratorium (Resolution 14064) (In force, 2026-06) woodburycountyiowa.gov →

Kansas (22)

  • Americus / Lyon County (Flint Hills Digital Campus), KS — Americus / Lyon County (Flint Hills Digital Campus), KS data center moratorium (In force, 2026-07) writing.strisker.com →
  • Bourbon County Commission — Bourbon County Commission data center moratorium (In force, 2026-06) bourboncountymonitor.com →
  • City of Lawrence (Douglas County) — City of Lawrence (Douglas County) data center moratorium (In force, 2026-07) lawrencekstimes.com →
  • Edgerton (DAMAC data center denied; 6-month moratorium also denied), KS — Edgerton (DAMAC data center denied; 6-month moratorium also denied), KS data center moratorium (proposed) (Proposed, 2026-06) johnsoncountypost.com →
  • El Dorado — City moratorium on data centers through November 30, 2026 (In force, 2026-07) kake.com →
  • Emporia — Proposed local moratorium on data centers (Proposed, 2026-08) wibw.com →
  • Franklin County — Moratorium on data center special use permits through 2028 (In force, 2026-09) ransonfinancial.com →
  • Gardner (data center moratorium failed for lack of a second), KS — Gardner (data center moratorium failed for lack of a second), KS data center moratorium (failed) (Failed / vetoed, 2026-06) johnsoncountypost.com →
  • Harvey County — Harvey County data center moratorium (In force, 2026-01) kwch.com →
  • Kingman County — County moratorium on data centers (In force, 2026-02) kcnonline.com →
  • Lawrence — City moratorium on data centers through July 14, 2028 (In force, 2026-07) lawrencekstimes.com →
  • Leavenworth County — Expired county moratorium on data centers through August 11, 2026 (Failed / vetoed, 2026-05) kshb.com →
  • Lyon County — Local moratorium on data centers through January 22, 2027 (In force, 2026-07) emporiagazette.com →
  • Marysville — 12-month moratorium on data center applications (In force, 2026-09) marysvilleonline.net →
  • McPherson County — County moratorium on data centers with no end date (In force, 2026-01) citizenjournal.us →
  • Miami County — County moratorium on data centers for a stated term (In force, 2026-01) kshb.com →
  • Pottawatomie County — Proposed county moratorium on data centers (Proposed, ) themercury.com →
  • Riley County — Temporary data center moratorium (In force, 2026-05) themercury.com →
  • Saline County — Three-year moratorium on data centers and energy facilities (In force, 2026-03) salina311.com →
  • Sedgwick County — Interim data center development moratorium (In force, 2026-01) kwch.com →
  • Shawnee County — Local moratorium on data centers through February 17, 2027 (In force, 2026-08) wibw.com →
  • South Hutchinson — City moratorium on data centers through May 26, 2027 (In force, 2026-05) hutchtribune.com →

Kentucky (40)

  • Allen County — Local moratorium on data centers through June 10, 2028 (In force, 2026-06) wnky.com →
  • Bell County — Two-year data center moratorium (In force, 2026-07) wymt.com →
  • Boone County — County moratorium on data centers through June 15, 2027 (In force, 2026-06) radiomom.org →
  • Bowling Green — Bowling Green data center moratorium (proposed) (Proposed, 2026-06) writing.strisker.com →
  • Boyd County (TeraWulf "Muskie" data campus opposition), KY — Boyd County (TeraWulf "Muskie" data campus opposition), KY data center moratorium (In force, 2026-06) wsaz.com →
  • Boyle County — One-year data center moratorium (In force, 2026-06) boylecountyky.gov →
  • Breckinridge County — One-year data center moratorium (In force, 2025-11) wkyufm.org →
  • Bullitt County — One-year data center moratorium (In force, 2026-07) spectrumnews1.com →
  • Burgin City Council (annexation for hyperscale data center) — Burgin City Council (annexation for hyperscale data center) data center moratorium (proposed) (Proposed, 2026-07) lpm.org →
  • Butler County — County moratorium on data centers through June 26, 2027 (In force, 2026-06) wbko.com →
  • Butler County Fiscal Court — Butler County Fiscal Court data center moratorium (In force, 2026-06) bgdailynews.com →
  • Cave City — One-year data center moratorium (In force, 2026-06) datacenterdynamics.com →
  • Cave City Council, KY — Cave City Council, KY data center moratorium (In force, 2026-07) bgdailynews.com →
  • Clark County — County moratorium on data centers for a stated term (In force, 2026-08) winchestersun.com →
  • Daviess County — 12-month data center moratorium (In force, 2026-05) 14news.com →
  • Edmonson County — One-year moratorium (Ordinance EC26-18) (In force, 2026-06) wnky.com →
  • Georgetown — City moratorium on data centers through December 31, 2026 (In force, 2026-07) wkyt.com →
  • Lexington (Fayette County) — Local moratorium on data centers through October 31, 2026 (In force, 2026-06) lex18.com →
  • Lexington-Fayette Urban County — Moratorium on data center development (In force, 2026-06) lex18.com →
  • Lexington-Fayette Urban County (no incentives for DartPoints + council moratorium), KY — Lexington-Fayette Urban County (no incentives for DartPoints + council moratorium), KY data center moratorium (In force, 2026-06) wkyt.com →
  • Logan County — Local moratorium on data centers through July 30, 2027 (In force, 2026-07) wbko.com →
  • London — Local moratorium on data centers through September 30, 2028 (In force, 2026-08) wkyt.com →
  • Louisville — Louisville's proposed data center regulations (Proposed, 2026-09) news.google.com →
  • Louisville Metro Council (Councilwoman Chappell reintroduces moratorium on telecom hotels / data centers), KY — Louisville Metro Council (Councilwoman Chappell reintroduces moratorium on telecom hotels / data centers), KY data center moratorium (proposed) (Proposed, 2026-05) louisvilleky.gov →
  • Louisville-Jefferson County Metro — Six-month moratorium on new data centers (In force, 2026-08) lpm.org →
  • Lyon County — Local moratorium on data centers for a stated term (In force, 2026-08) wpsdlocal6.com →
  • Meade County — Temporary moratorium (Ordinance 2025-07) (In force, 2026-01) meadeky.gov →
  • Meade County (moratorium) — Meade County (moratorium) data center moratorium (In force, 2026-01) lpm.org →
  • Mercer County — Local moratorium on data centers for a stated term (In force, 2026-08) wkms.org →
  • Mercer County Fiscal Court — Mercer County Fiscal Court data center moratorium (proposed) (Proposed, 2026-07) harrodsburgherald.com →
  • Nelson County — One-year data center moratorium (In force, 2026-07) spectrumnews1.com →
  • Nicholasville — Six-month data center moratorium (In force, 2026-08) wkyt.com →
  • Oldham County — 150-day data center moratorium (In force, 2026) datacenterdynamics.com →
  • Oldham County Fiscal Court (moratorium blocking 'Project Lincoln') — Oldham County Fiscal Court (moratorium blocking 'Project Lincoln') data center moratorium (In force, 2026-07) datacenterdynamics.com →
  • Rowan County — Two-year moratorium on large-scale data centers (In force, 2026-09) wtvq.com →
  • Scott County — County moratorium on data centers through September 13, 2026 (In force, 2026-09) wkyt.com →
  • Shelby County — County moratorium on data centers through December 31, 2026 (In force, 2026-07) pmg-ky1.com →
  • Versailles — Data center moratorium through end of 2026 (In force, 2026-06) lex18.com →
  • Winchester — One-year data center moratorium (In force, 2026-09) winchestersun.com →
  • Woodford County — Permanent countywide ban on data center construction (In force, 2026-09) wuky.org →

Louisiana (3)

  • Caddo Parish — Proposed two-year moratorium on data-center tax incentives (Failed / vetoed, 2026-08) ksla.com →
  • New Orleans — One-year data center moratorium (In force, 2026-01) wwno.org →
  • St. Charles Parish — Rejected county moratorium on data centers (Failed / vetoed, 2026-04) heraldguide.com →

Maine (20)

  • Bangor — 180-day data center moratorium (In force, 2026-04) bangordailynews.com →
  • Biddeford — Proposed city moratorium on data centers with no end date (Proposed, 2026-09) pressherald.com →
  • Brunswick — Town moratorium on data centers through November 29, 2026 (In force, 2026-06) pressherald.com →
  • City of Westbrook (180-day data center moratorium enacted), ME — City of Westbrook (180-day data center moratorium enacted), ME data center moratorium (In force, 2026-06) pressherald.com →
  • Dover-Foxcroft — Proposed six-month ban on large-scale data centers (Proposed, 2026-09) bangordailynews.com →
  • Eastport — Moratorium on the DeepGreen underwater data center proposal (In force, 2026-08) wabi.tv →
  • Ellsworth — Local moratorium on data centers through February 13, 2027 (In force, 2026-08) ellsworthamerican.com →
  • Gorham — Local moratorium on data centers through November 29, 2026 (In force, 2026-01) gorhamtimes.com →
  • Lewiston — City council rejection of proposed data center (In force, 2025-12) themainemonitor.org →
  • North Berwick — Proposed local moratorium on data centers (Proposed, ) wgme.com →
  • Old Town (Penobscot County) — Proposed six-month data center moratorium (Proposed, 2026-09) bangordailynews.com →
  • Peru — Proposed 180-day data center moratorium (November ballot) (Proposed, 2026-09) themainewire.com →
  • Sabattus (Androscoggin County) — Proposed temporary data center moratorium (Proposed, 2026-07) sunjournal.com →
  • Sanford — Local moratorium on data centers through January 31, 2027 (In force, 2026-08) pressherald.com →
  • Scarborough — Scarborough takes step towards zoning out data centers (Proposed, 2026-09) news.google.com →
  • Town of Brunswick (180-day data center moratorium), ME — Town of Brunswick (180-day data center moratorium), ME data center moratorium (In force, 2026-06) pressherald.com →
  • Town of Scarborough (180-day data center moratorium enacted), ME — Town of Scarborough (180-day data center moratorium enacted), ME data center moratorium (In force, 2026-06) pressherald.com →
  • Town of Warren (180-day data center moratorium) — Town of Warren (180-day data center moratorium) data center moratorium (In force, 2026-07) midcoastvillager.com →
  • Westbrook — City moratorium on data centers through November 28, 2026 (In force, 2026-06) pressherald.com →
  • Wiscasset — Wiscasset data center moratorium (In force, 2025-11) mainemorningstar.com →

Maryland (28)

  • Anne Arundel — Anne Arundel Steps Back From Ban on Data Center Development (Paused, 2026-09) news.google.com →
  • Baltimore City — One-year moratorium on data centers of 10 MW or more (In force, 2026-05) baltimorefishbowl.com →
  • Baltimore County — Freeze on data center permits pending planning study (In force, 2026-09) wypr.org →
  • Calvert County — Six-month data center moratorium (In force, 2026-08) calvertcountymd.gov →
  • Caroline County — One-year moratorium on new data centers (In force, 2026-07) wboc.com →
  • Carroll County — One-year data center moratorium (In force, 2026-02) baltimoresun.com →
  • Chesapeake Beach — Local moratorium on data centers with no end date (In force, 2026-01) southernmarylandchronicle.com →
  • Dickerson (Montgomery County) — Dickerson (Montgomery County) data center moratorium (In force, 2026-02) bethesdamagazine.com →
  • Dorchester County — Local moratorium on data centers for a stated term (In force, 2026-06) stardem.com →
  • Federalsburg — City moratorium on data centers through August 4, 2029 (In force, 2026-08) stardem.com →
  • Frederick County — Data center permitting pause through end of 2026 (In force, 2026-07) southernmarylandchronicle.com →
  • Harford County — Permanent ban on data centers in all zoning districts (In force, 2026-06) harfordcountymd.gov →
  • Harford County Executive Bob Cassilly (proposed legislation to permanently ban data centers countywide; public hearing May 18, vote June 1), MD — Harford County Executive Bob Cassilly (proposed legislation to permanently ban data centers countywide; public hearing May 18, vote June 1), MD data center moratorium (proposed) (Proposed, 2026-05) baltimoresun.com →
  • Howard County — S.M.A.R.T. Siting Act moratorium through Nov. 2, 2027 (In force, 2026-06) thebanner.com →
  • Howard County (temporary data center moratorium through Nov 2027), MD — Howard County (temporary data center moratorium through Nov 2027), MD data center moratorium (In force, 2026-06) foxbaltimore.com →
  • Montgomery County — 18-month data center moratorium (In force, 2026-06) southernmarylandchronicle.com →
  • Montgomery County (Executive Elrich 6-month data center moratorium EO), MD — Montgomery County (Executive Elrich 6-month data center moratorium EO), MD data center moratorium (In force, 2026-06) montgomerycountymd.gov →
  • Prince George's County — Two-year hyperscale data center moratorium (In force, 2026-07) marylandmatters.org →
  • Prince George's County (Landover) — Prince George's County (Landover) data center moratorium (In force, 2025-09) foxbaltimore.com →
  • Prince George's County Council (2-year data center moratorium) — Prince George's County Council (2-year data center moratorium) data center moratorium (In force, 2026-07) wtop.com →
  • Queen Anne's County — 12-month moratorium on data center applications (In force, 2026-06) qac.org →
  • Ridgely — Local moratorium on data centers through August 31, 2027 (In force, 2026-08) stardem.com →
  • Salisbury — Proposed local moratorium on data centers (Proposed, ) wboc.com →
  • Somerset County — Proposed county moratorium on data centers (Proposed, 2026-01) baytobaynews.com →
  • Talbot County — Proposed local moratorium on data centers (Proposed, 2026-09) stardem.com →
  • Washington County — 12-month data center moratorium (In force, 2026-06) thedailyrecord.com →
  • Wicomico County — County moratorium on data centers through August 6, 2027 (In force, 2026-08) baltimoresun.com →
  • Worcester County — County moratorium on data centers through July 21, 2027 (In force, 2026-01) worcestermd.gov →

Massachusetts (17)

  • Agawam — City moratorium on data centers through June 3, 2027 (In force, 2026-08) thereminder.com →
  • Ayer (Middlesex County) — Proposed temporary moratorium on data center applications (Proposed, 2026-09) ayer.ma.us →
  • Boston — Proposed citywide zoning ban on data centers (Proposed, 2026-09) wbur.org →
  • City of Westfield (1-year data center moratorium, final vote) — City of Westfield (1-year data center moratorium, final vote) data center moratorium (In force, 2026-07) westernmassnews.com →
  • Greenfield — Greenfield one-year data center moratorium (In force, 2026-09) recorder.com →
  • Holyoke — City moratorium on data centers with no end date (In force, 2026-06) westernmassnews.com →
  • Leominster — Proposed one-year data center pause (Proposed, 2026-07) thecooldown.com →
  • Lowell — 360-day data center moratorium (In force, 2026-03) lowellma.gov →
  • Mansfield — Zoning bylaw barring data centers above 2 MW (In force, 2026-05) boston.com →
  • Northampton — Proposed city moratorium on data centers (Proposed, 2026-09) gazettenet.com →
  • Plymouth — Proposed town moratorium on data centers (Proposed, 2026-08) southshore.news →
  • Salem — Data center permit revocation upheld; citywide ban proposed (In force, 2026-09) wgbh.org →
  • Shutesbury — Shutesbury data center moratorium (In force, 2025-09) recorder.com →
  • Southbridge — Proposed town moratorium on data centers (Proposed, 2026-08) thecitizenchronicle.substack.com →
  • Spencer — Proposed data center moratorium (Proposed, 2026-09) thecitizenchronicle.substack.com →
  • Westfield — City moratorium on data centers through July 6, 2027 (In force, 2026-07) westernmassnews.com →
  • Wilmington — Wilmington proposed zoning bylaw prohibiting data centers over 2 MW (Proposed, 2026-09) hoodline.com →

Michigan (85)

  • Allen Park — Proposed local moratorium on data centers (Proposed, ) planetdetroit.org →
  • Allendale Township — Local moratorium on data centers through June 8, 2027 (In force, 2026-06) hollander.news →
  • Ann Arbor Township — Ann Arbor Township data center moratorium (In force, 2026-02) wemu.org →
  • Armada Township — Local moratorium on data center approvals (In force, 2026-01) wkar.org →
  • Big Rapids Charter Township — Local moratorium on data centers through February 23, 2027 (In force, 2026-02) bigrapidstownshipmi.gov →
  • Big Rapids Township — Local moratorium on data center approvals (In force, 2026-02) wkar.org →
  • Brighton Township — Michigan Data Centers: The Weekly Download (In force, 2026-09) michiganadvance.com →
  • Brighton Township (Livingston County) — Six-month moratorium on data center applications (In force, 2026-09) whmi.com →
  • Burlington Township (Calhoun County) — Temporary moratorium on data centers and battery storage (In force, 2026-08) burlingtontownshipcalhouncountymi.com →
  • Caledonia Township — Expired local moratorium on data centers through July 1, 2026 (Failed / vetoed, 2026-02) fox17online.com →
  • City of Portage — City of Portage data center moratorium (In force, 2026-02) portagemi.gov →
  • Clark Township — Local moratorium on data center approvals (In force, 2025-06) wkar.org →
  • Dearborn — Dearborn City Council gives first reading to six-month data center construction halt ordinance (In force, 2026-09) yahoo.com →
  • Delta County — County moratorium on data centers through July 23, 2027 (In force, 2026-01) miningjournal.net →
  • Detroit — Proposed local moratorium on data centers (Proposed, 2026-03) planetdetroit.org →
  • Dexter Township — Dexter Township data center moratorium (In force, 2026-02) dextertownshipmi.gov →
  • Dundee Township — Local moratorium on data center approvals (In force, 2025-10) wkar.org →
  • Eagle Township (Clinton County) — One-year data center moratorium and interim zoning ordinance (In force, 2026-02) baldorilaw.com →
  • East Lansing — Local moratorium on data centers through March 17, 2027 (In force, 2026-08) wilx.com →
  • Elmwood Township — Elmwood Township data center moratorium (In force, 2026-02) tuscolatoday.com →
  • Erie Township — Erie Township data center moratorium (In force, 2026-02) wkar.org →
  • Filer Township — Local moratorium on data centers through June 2, 2027 (In force, 2026-06) shorelinemedia.net →
  • Flint — 12-month data center moratorium (In force, 2026-06) abc12.com →
  • Forsyth Township — Local moratorium on data centers through June 25, 2027 (In force, 2026-01) uppermichiganssource.com →
  • Garfield Township — One-year moratorium on data centers and cryptocurrency mining (In force, 2026-08) michiganadvance.com →
  • Genoa Township — Local moratorium on data centers (In force, ) whmi.com →
  • Gibraltar — Gibraltar data center moratorium (In force, 2026-03) planetdetroit.org →
  • Grand Blanc Township — Local moratorium on data center approvals (In force, 2026-01) wkar.org →
  • Green Charter Township — Local moratorium on data center approvals (In force, 2025-12) wkar.org →
  • Hagar Township — Local moratorium on data centers for a stated term (In force, 2026-01) tricityrecord.com →
  • Haring Township — Local moratorium on data centers through January 14, 2027 (In force, 2026-07) 9and10news.com →
  • Hart — Local moratorium on data centers through November 26, 2026 (In force, 2026-05) shorelinemedia.net →
  • Hayes Township — Local moratorium on data center approvals (In force, 2026-02) wkar.org →
  • Houghton — Local moratorium on data centers through July 9, 2027 (In force, 2026-01) uppermichiganssource.com →
  • Howell Township — Local moratorium on data center approvals (In force, 2025-11) wkar.org →
  • Huron County — County moratorium on data centers through May 27, 2029 (In force, 2026-01) huroncountyview.com →
  • Kalamazoo — One-year data center moratorium (In force, 2026-08) fox17online.com →
  • Lansing — 182-day data center moratorium (In force, 2026-07) wilx.com →
  • Lenox Township — Local moratorium on data center approvals (In force, 2026-02) wkar.org →
  • Lincoln Township — Local moratorium on data centers through April 11, 2027 (In force, 2026-06) wsbt.com →
  • Lodi Township — Local moratorium on data center approvals (In force, 2026-02) wkar.org →
  • Lyndon Township — Local moratorium on data centers through May 22, 2027 (In force, 2026-05) thesuntimesnews.com →
  • Lyon Charter Township — Expired local moratorium on data centers through August 30, 2026 (Failed / vetoed, 2026-03) detroitnews.com →
  • Lyon Township — Lyon Township data center moratorium (In force, 2026-03) whmi.com →
  • Manchester Township — Local moratorium on data center approvals (In force, 2025-10) wkar.org →
  • Mason — Data center moratorium lifted after zoning adopted (Failed / vetoed, 2026-02) wkar.org →
  • Meridian Township — Six-month data center and battery storage moratorium (In force, 2026-05) wkar.org →
  • Mich. City — Mich. City Says Data Center Moratorium Suit Is Premature (Paused, 2026-09) news.google.com →
  • Michigan city — Mich. City Says Data Center Moratorium Suit Is Premature (In force, 2026-09) law360.com →
  • New Buffalo Township — New Buffalo Township data center moratorium (In force, 2026-04) heraldpalladium.com →
  • Northville — Local moratorium on data center approvals (In force, 2026-01) wkar.org →
  • Orion Township — Six-month data center moratorium (In force, 2026-06) lakeorionreview.com →
  • Oshtemo Township — Oshtemo Township data center moratorium (In force, 2026-01) wwmt.com →
  • Parma Township — Local moratorium on data centers (In force, 2026-02) parmatwp.gov →
  • Penn Township Board (Cass County), MI — Penn Township Board (Cass County), MI data center moratorium (In force, 2026-05) wndu.com →
  • Pittsfield Township — Local moratorium on data center approvals (In force, 2025-11) wkar.org →
  • Pontiac — Six-month data center moratorium (In force, 2026-01) detroitnews.com →
  • Port Huron Township — Temporary data center moratorium (In force, 2026-09) wgrt.com →
  • Porter Township — Local moratorium on data centers through May 19, 2027 (In force, 2026-05) wsbt.com →
  • Porter Township Board (Cass County), MI — Porter Township Board (Cass County), MI data center moratorium (In force, 2026-05) wndu.com →
  • Rochester Hills — Local moratorium on data centers through March 15, 2027 (In force, 2026-08) detroitnews.com →
  • Saginaw — Local moratorium on data center approvals (In force, 2026-01) wkar.org →
  • Saline — Local moratorium on data center approvals (In force, 2026-01) wkar.org →
  • Saugatuck Township — Expired local moratorium on data centers through August 11, 2026 (Failed / vetoed, 2026-01) saugatucktownshipmi.gov →
  • Sault Ste. Marie Tribe of Chippewa Indians — Local moratorium on data centers with no end date (In force, 2026-01) myupnow.com →
  • Solon Township — Local moratorium on data center approvals (In force, 2026-02) wkar.org →
  • South Lyon — Local moratorium on data center approvals (In force, 2026-02) wkar.org →
  • Springfield Township — 180-day data center moratorium (In force, 2026-01) detroitnews.com →
  • Sterling Heights — One-year data center moratorium (In force, 2026-02) eu.detroitnews.com →
  • Sylvan Township — Local moratorium on data center approvals (In force, 2026-01) wkar.org →
  • Taylor — Local moratorium on data center approvals (In force, 2026-01) wkar.org →
  • Texas Township — Local moratorium on data centers through July 5, 2027 (In force, 2026-06) wkzo.com →
  • Tyrone Township — Local moratorium on data center approvals (In force, 2025-12) wkar.org →
  • Village of Romeo — Local moratorium on data center approvals (In force, 2026-01) wkar.org →
  • Warren (Macomb County) — Warren (Macomb County) data center moratorium (proposed) (Proposed, 2026-07) planetdetroit.org →
  • Washington Township (Macomb Co.) — Local moratorium on data centers through November 23, 2026 (In force, 2026-05) detroitnews.com →
  • Waterford Township — Temporary data center moratorium (Ord. 2026-Z-003) (In force, 2026) waterfordmi.gov →
  • Webster Township — Local moratorium on data centers through April 21, 2027 (In force, 2026-01) cms9files.revize.com →
  • Weekly Download. Dearborn City — Michigan Data Centers: The Weekly Download (Proposed, 2026-09) michiganadvance.com →
  • Wixom — Moratorium replaced by data center zoning restrictions (In force, 2026-08) detroitnews.com →
  • York Township — Local moratorium on data center approvals (In force, 2026-02) wkar.org →
  • Ypsilanti (YCUA) — Local moratorium on data centers through April 22, 2027 (In force, 2026-04) planetdetroit.org →
  • Ypsilanti Community Utilities Authority (YCUA) — Ypsilanti Community Utilities Authority (YCUA) data center moratorium (In force, 2026-04) easternecho.com →
  • Ypsilanti Township — 180-day moratorium on major electric utility infrastructure (In force, 2026-08) wemu.org →
  • Zeeland Township — One-year data center and energy facility moratorium (In force, 2026-09) fox17online.com →

Minnesota (24)

  • Apple Valley — City moratorium on data centers through July 9, 2027 (In force, 2026-07) hometownsource.com →
  • Carlton County — Local moratorium on data centers through August 24, 2027 (In force, 2026-08) kaxe.org →
  • Carver — Local moratorium on data centers through April 6, 2027 (In force, 2026-04) fox9.com →
  • Eagan — Local moratorium on data centers through February 17, 2027 (In force, 2026-02) fox9.com →
  • Elk River — City moratorium on data centers through August 3, 2027 (In force, 2026-08) hometownsource.com →
  • Hastings — Local moratorium on data centers through August 17, 2027 (In force, 2026-08) kdwa.com →
  • Inver Grove Heights — Local moratorium on data centers through June 26, 2027 (In force, 2026-06) mprnews.org →
  • Inver Grove Heights City Council, MN — Inver Grove Heights City Council, MN data center moratorium (In force, 2026-06) cbsnews.com →
  • Le Sueur County — County moratorium on data centers through May 26, 2027 (In force, 2026-05) keyc.com →
  • Lonsdale City Council, MN — Lonsdale City Council, MN data center moratorium (In force, 2026-05) southernminn.com →
  • Mankato — Mankato data center moratorium (In force, 2026-07) keyc.com →
  • Minneapolis — Six-month large data center moratorium (In force, 2026-05) mprnews.org →
  • Minneapolis City Council, MN — Minneapolis City Council, MN data center moratorium (In force, 2026-05) startribune.com →
  • Minnetrista — City moratorium on data centers through August 3, 2027 (In force, 2026-08) hometownsource.com →
  • North Mankato — Proposed data center moratorium (In force, 2026-09) keyc.com →
  • Pine County — Interim ordinance imposing a 12-month data center moratorium (In force, 2026-08) pinecountynews.com →
  • Rosemount — City moratorium on data centers through April 21, 2027 (In force, 2026-04) rosemountmn.gov →
  • St. Joseph — Local moratorium on data centers for a stated term (In force, ) mix949.com →
  • Waite Park — City moratorium on data centers through May 4, 2027 (In force, 2026-01) stcloudlive.com →
  • Waite Park City Council, MN — Waite Park City Council, MN data center moratorium (In force, 2026-05) knsiradio.com →
  • Washington County — Local moratorium on data centers for a stated term (In force, 2026-07) startribune.com →
  • Woodbury — Proposed one-year interim moratorium on data centers (In force, 2026-09) woodburynewsnet.org →
  • Wright County — Local moratorium on data centers through May 19, 2027 (In force, 2026-05) wrightcountymn.gov →
  • Wright County Board, MN — Wright County Board, MN data center moratorium (In force, 2026-05) dasselcokato.com →

Mississippi (1)

Missouri (21)

  • Camdenton Board of Aldermen, MO — Camdenton Board of Aldermen, MO data center moratorium (In force, 2026-05) ky3.com →
  • City of Camdenton — One-year data center moratorium (In force, 2026-05) krcgtv.com →
  • City of Neosho — One-year data center moratorium (In force, 2026) joplinglobe.com →
  • City of Peculiar — Data centers removed from zoning ordinance (In force, 2026-05) kshb.com →
  • City of St. Charles — Zoning change banning data centers (In force, 2026-05) stlpr.org →
  • City of St. Peters — One-year data center moratorium (In force, 2026-05) midriversnewsmagazine.com →
  • Columbia — Local moratorium on data centers for a stated term (In force, 2026-05) columbiamissourian.com →
  • Independence — City moratorium on data centers through January 2, 2027 (In force, 2026-01) independencemo.gov →
  • Jackson County — 180-day data center moratorium (In force, 2026-06) kctv5.com →
  • Jackson County (moratorium vote delayed on two competing proposals), MO — Jackson County (moratorium vote delayed on two competing proposals), MO data center moratorium (In force, 2026-06) kctv5.com →
  • Kansas City — Sponsor: Director of City Planning and Development Department COMMITTEE SUBSTITUTE Amending Chapter 88, the Zoning and Development Code (In force, 2026-01) kansascity.legistar.com →
  • Marion County — Rescinded county moratorium on data centers (Failed / vetoed, 2026-01) nemonews.net →
  • Nodaway County — Six-month data center moratorium (In force, 2026-07) nwmissourinews.com →
  • Oak Grove — City moratorium on data centers through August 5, 2027 (In force, 2026-08) kshb.com →
  • Pacific — City moratorium on data centers through August 4, 2027 (In force, 2026-08) missourian.com →
  • Palmyra — City moratorium on data centers (In force, 2026-09) nemonews.net →
  • Ralls County — County moratorium on data centers through August 20, 2027 (In force, 2026-01) khqa.com →
  • Springfield — Local moratorium on data centers through November 17, 2026 (In force, 2026-06) ky3.com →
  • St. Charles County — Six-month data center moratorium (In force, 2026-07) stlpr.org →
  • St. Louis — St. Louis data center moratorium (In force, 2026-04) stlouis-mo.gov →
  • Webster County — Six-month moratorium (data centers and energy facilities) (In force, 2026) sbj.net →

Montana (5)

  • Butte-Silver Bow County — Proposed six-month interim zoning moratorium (Proposed, 2026-09) kxlf.com →
  • Fort Peck Reservation — Tribal moratorium on data centers with no end date (In force, 2026-08) montanafreepress.org →
  • Missoula County — One-year interim-zoning data center moratorium (In force, 2026-07) montanafreepress.org →
  • Montana County — Montana County Calls for More Power to Regulate Data Centers (In force, 2026-09) govtech.com →
  • Yellowstone County — How Montana’s ‘Right to Compute Act’ stymies data center regulation (In force, 2026-09) montanafreepress.org →

Nebraska (21)

Nevada (11)

  • Fallon Paiute-Shoshone Tribe — Tribal moratorium on data centers with no end date (In force, 2026-05) kunr.org →
  • Henderson — Rejected local moratorium on data centers (Failed / vetoed, 2026-07) thenevadaindependent.com →
  • Humboldt County — Local moratorium on data centers through July 13, 2027 (In force, 2026-07) thenevadaindependent.com →
  • Nye County — Ban on data centers in Pahrump Valley / Basin 162 (In force, 2026-08) nevadacurrent.com →
  • Nye County (Pahrump) — Local moratorium on data centers with no end date (In force, 2026-08) pvtimes.com →
  • Pyramid Lake Paiute Tribe — Tribal moratorium on data centers with no end date (In force, 2026-08) kunr.org →
  • Reno — Extended data center moratorium (In force, 2026-06) nevadacurrent.com →
  • Reno (Moratorium Rejection) — Reno (Moratorium Rejection) data center moratorium (In force, 2025-02) thisisreno.com →
  • Reno (data center moratorium extended into 2027), NV — Reno (data center moratorium extended into 2027), NV data center moratorium (In force, 2026-06) kunr.org →
  • Wells — City moratorium on data centers (In force, 2026-06) thenevadaindependent.com →
  • White Pine County — Local moratorium on data centers through January 18, 2027 (In force, 2026-07) elynews.com →

New Hampshire (5)

  • Bow — Proposed town moratorium on data centers (Proposed, 2026-09) nhpr.org →
  • Canterbury — Local moratorium on data centers with no end date (In force, 2026-03) nhpr.org →
  • Keene — Proposed local moratorium on data centers (Proposed, 2026-06) servercountry.org →
  • Nottingham — Local moratorium on data centers for a stated term (In force, 2026-09) nhpr.org →
  • Rochester — Local moratorium on data centers with no end date (In force, 2026-09) wzid.com →

New Jersey (98)

  • Allamuchy Township — Allamuchy Ordinance 2026-06 designating data centers a prohibited use (In force, 2026-06) allamuchynj.org →
  • Alpha — Local moratorium on data centers (In force, 2026-08) pinelandsalliance.org →
  • Andover — Municipal ban on data centers (In force, 2026) patch.com →
  • Andover Township Committee (Sussex County, ban announced after viral tense meeting at former Newton/Jump airport site), NJ — Andover Township Committee (Sussex County, ban announced after viral tense meeting at former Newton/Jump airport site), NJ data center moratorium (proposed) (Proposed, 2026-05) newjersey.news12.com →
  • Asbury Park — Municipal ban on data centers (In force, 2026) patch.com →
  • Bass River Township — Local moratorium on data centers (In force, 2026-08) pinelandsalliance.org →
  • Bayonne — Citywide ban on data centers (In force, 2026-08) hudsoncountyview.com →
  • Berkeley Heights — Municipal ban on data centers (In force, 2026) patch.com →
  • Berkeley Township — Local moratorium on data centers (In force, 2026-08) pinelandsalliance.org →
  • Bernards — Municipal ban on data centers (In force, 2026) patch.com →
  • Bridgewater Township — Proposed local moratorium on data centers (Proposed, 2026-01) patch.com →
  • Burlington — Municipal ban on data centers (In force, 2026) patch.com →
  • Carneys Point — Local moratorium on data centers (In force, 2026-08) pinelandsalliance.org →
  • Cherry Hill — Municipal ban on data centers (In force, 2026) patch.com →
  • Chesterfield — Local moratorium on data centers with no end date (In force, 2026-07) inquirer.com →
  • Cinnaminson — Proposed municipal ban on data centers (Proposed, 2026-07) cinnaminsonnj.org →
  • Collingswood — Collingswood Ordinance 1838 banning data centers and computing nodes (In force, 2026-08) collingswood.com →
  • Cranford — Local moratorium on data centers with no end date (In force, 2026-01) patch.com →
  • Deerfield — Municipal ban on data centers (In force, 2026) patch.com →
  • Delanco — Municipal ban on data centers (In force, 2026) patch.com →
  • Delaware Township — Local moratorium on data centers (In force, 2026-08) pinelandsalliance.org →
  • Downe Township — Local moratorium on data centers (In force, 2026-08) pinelandsalliance.org →
  • East Brunswick — Ordinance banning data centers (In force, 2026-08) patch.com →
  • East Greenwich — Municipal ban on data centers (In force, 2026) patch.com →
  • East Rutherford — Local moratorium on data centers (In force, 2026-08) pinelandsalliance.org →
  • Edgewater Park — Municipal ban on data centers (In force, 2026) patch.com →
  • Elsinboro — Local moratorium on data centers (In force, 2026-08) pinelandsalliance.org →
  • Franklin Township (Gloucester County) — Franklin Township Ordinance O-5-2026 prohibiting data centers in all zoning districts (In force, 2026-05) nj.gov →
  • Frelinghuysen Township — Local moratorium on data centers (In force, 2026-08) pinelandsalliance.org →
  • Galloway Township — Proposed six-month data center moratorium (In force, 2026-07) nj.gov →
  • Glassboro — Local moratorium on data centers with no end date (In force, 2026-09) thewhitonline.com →
  • Gloucester Township (Camden County) — Ordinance prohibiting large-scale data centers (In force, 2026-09) glotwp19.wpenginepowered.com →
  • Green Township — Local moratorium on data centers (In force, 2026-08) pinelandsalliance.org →
  • Greenwich Township (Warren County) — Ordinance prohibiting data centers (In force, 2026-05) greenwichtownship.org →
  • Hainesport — Local moratorium on data centers (In force, 2026-08) pinelandsalliance.org →
  • Hampton Township (Sussex County) — Ordinance prohibiting data centers in all zones (In force, 2026-06) hamptontownshipnj.info →
  • Hardyston Township (Sussex County) — Ordinance prohibiting data centers in all zones (In force, 2026-06) advertisernewssouth.com →
  • Harrison — Municipal ban on data centers (In force, 2026) patch.com →
  • Holland — Municipal ban on data centers (In force, 2026) patch.com →
  • Holmdel — Municipal ban on data centers (In force, 2026) patch.com →
  • Howell — Municipal ban on data centers (In force, 2026-08) patch.com →
  • Jackson — Ordinance banning data centers (In force, 2026-08) jerseyshoreonline.com →
  • Jersey City — Municipal ban on data centers (In force, 2026-08) patch.com →
  • Kingwood Township — Local moratorium on data centers (In force, 2026-08) pinelandsalliance.org →
  • Knowlton Township — Local moratorium on data centers (In force, 2026-08) pinelandsalliance.org →
  • Lebanon Township — Local moratorium on data centers (In force, 2026-08) pinelandsalliance.org →
  • Liberty Township — Local moratorium on data centers (In force, 2026-08) pinelandsalliance.org →
  • Linden — Proposed ordinance prohibiting AI data centers (Proposed, 2026-09) newjerseyglobe.com →
  • Logan Township — Municipal ban on data centers (In force, 2026) patch.com →
  • Madison — Local moratorium on data centers with no end date (In force, 2026-06) patch.com →
  • Manchester Township — Ordinance removing data centers as a permitted use (In force, 2026-09) jerseyshoreonline.com →
  • Mannington Township — Local moratorium on data centers (In force, 2026-08) pinelandsalliance.org →
  • Mansfield — Municipal ban on data centers (In force, 2026) patch.com →
  • Mansfield Township (Burlington Co.) — Local moratorium on data centers with no end date (In force, 2026-07) yahoo.com →
  • Mantua Township — Local moratorium on data centers with no end date (In force, 2026-05) mantuatownship.com →
  • Medford — Municipal ban on data centers (In force, 2026) patch.com →
  • Middletown Township (Monmouth County) — Proposed ordinance prohibiting data centers in all zones (Proposed, 2026-09) publicrecordnj.com →
  • Millburn Township (Essex County) — Proposed ordinance prohibiting large data centers (Proposed, 2026-09) twp.millburn.nj.us →
  • Millville — Municipal ban on data centers (In force, 2026) patch.com →
  • Millville Board of Commissioners (Cumberland County, total data center ban), NJ — Millville Board of Commissioners (Cumberland County, total data center ban), NJ data center moratorium (In force, 2026-05) newjersey.news12.com →
  • Monroe — Municipal ban on data centers (In force, 2026) patch.com →
  • Monroe Township (Gloucester Co.) — Local moratorium on data centers with no end date (In force, 2026-04) cbsnews.com →
  • Montgomery — Municipal ban on data centers (In force, 2026) patch.com →
  • Neptune — Municipal ban on data centers (In force, 2026) patch.com →
  • New Hanover Township — New Hanover Ordinance 2026-04 designating data centers a prohibited use (pending) (Proposed, 2026-08) nj.gov →
  • Newark — Dept/ Agency: Offices of Municipal Council/City Clerk Action: ( ) Ratifying (X) Authorizing ( ) Amending Type of Service: Expressing Support Purpose (In force, 2026-09) newark.legistar.com →
  • North Brunswick — Ordinance banning data centers (In force, 2026-08) roi-nj.com →
  • North Hanover Township — Local moratorium on data centers (In force, 2026-08) pinelandsalliance.org →
  • North Plainfield — Local moratorium on data centers with no end date (In force, 2026-07) northplainfieldnj.gov →
  • Old Bridge — Local moratorium on data centers (In force, 2026-01) oldbridge.com →
  • Oldmans Township — Local moratorium on data centers (In force, 2026-08) pinelandsalliance.org →
  • Peapack-Gladstone — Peapack-Gladstone Ordinance 1171-2026 designating data centers a non-permitted use in all zones (In force, 2026-08) peapackgladstone.org →
  • Pemberton — Municipal ban on data centers (In force, 2026) patch.com →
  • Pennsville — Local moratorium on data centers with no end date (In force, 2026-07) pennsville.org →
  • Phillipsburg — Phillipsburg ordinance prohibiting data centers (In force, 2026-04) wrnjradio.com →
  • Pilesgrove Township — Local moratorium on data centers (In force, 2026-08) pinelandsalliance.org →
  • Pittsgrove Township — Pittsgrove Ordinance 2026-06 prohibiting data centers in all zoning districts (In force, 2026-05) pittsgrovetownship.com →
  • Plainfield — Local moratorium on data centers with no end date (In force, 2026-08) pinelandsalliance.org →
  • Plumsted Township — Local moratorium on data centers (In force, 2026-08) pinelandsalliance.org →
  • Raritan Township (Hunterdon County) — Raritan Township ordinance adding data centers to prohibited uses (In force, 2026-09) wrnjradio.com →
  • Red Bank — Municipal ban on data centers (In force, 2026) patch.com →
  • Ridgefield Park (Bergen County) — Ordinance prohibiting data centers in all zones (In force, 2026-06) ridgefieldpark.org →
  • Roselle Park — Proposed local moratorium on data centers with no end date (Proposed, 2026-01) newjersey.news12.com →
  • Sayreville — 18-month data center moratorium (In force, 2026-06) magic983.com →
  • South Brunswick — Proposed municipal ban on data centers (Proposed, 2026) patch.com →
  • Sparta — Municipal ban on data centers (In force, 2026) patch.com →
  • Stafford Township — Ordinance banning data centers (In force, 2026-08) patch.com →
  • Summit — Municipal ban on data centers (In force, 2026) patch.com →
  • Union — Municipal ban on data centers (In force, 2026) patch.com →
  • Upper Pittsgrove Township — Local moratorium on data centers (In force, 2026-08) pinelandsalliance.org →
  • Upper Township — Upper Township Ordinance 015-2026 data center prohibition (In force, 2026-09) nj.gov →
  • Vernon — Municipal ban on data centers (In force, 2026) patch.com →
  • Warren — Municipal ban on data centers (In force, 2026) patch.com →
  • Washington — Local moratorium on data centers (In force, 2026-08) pinelandsalliance.org →
  • Waterford — Municipal ban on data centers (In force, 2026) patch.com →
  • Waterford Township (Camden Co.) — Local moratorium on data centers with no end date (In force, 2026-04) nj1015.com →
  • Winslow — Municipal ban on data centers (In force, 2026) patch.com →
  • Woodstown — Local moratorium on data centers (In force, 2026-08) pinelandsalliance.org →

New Mexico (12)

  • Clovis — 120-day data center moratorium voted down (Failed / vetoed, 2026-09) easternnewmexiconews.com →
  • Colfax County — Proposed local moratorium on data centers (Proposed, 2026-07) co.colfax.nm.us →
  • Doña Ana County — New Mexico Supreme Court rejects 2 Project Jupiter challenges, allows permitting process to resume (In force, 2026-09) sourcenm.com →
  • Grant County — Proposed one-year data center moratorium (Proposed, 2026-09) abqjournal.com →
  • Haaland — Haaland backs data center moratorium in New Mexico (Proposed, 2026-09) thehill.com →
  • Raton — Proposed city moratorium on data centers (Failed / vetoed, 2026-09) krtnradio.com →
  • Rio Communities — City moratorium on data centers through August 26, 2027 (In force, 2026-08) news-bulletin.com →
  • Santa Fe County — 18-month data center moratorium (In force, 2026-06) santafecountynm.gov →
  • Santa Fe County (yearlong data center moratorium advancing), NM — Santa Fe County (yearlong data center moratorium advancing), NM data center moratorium (In force, 2026-06) santafenewmexican.com →
  • Sierra County — 18-month data center moratorium (In force, 2026) dchieftain.com →
  • Socorro County — One-year data center moratorium (In force, 2026-06) sourcenm.com →
  • Socorro County Commission (moratorium process advanced; vote June 9), NM — Socorro County Commission (moratorium process advanced; vote June 9), NM data center moratorium (In force, 2026-06) sourcenm.com →

New York (27)

  • Canton — Town moratorium on data centers through May 31, 2027 (In force, 2026-07) northcountrynow.com →
  • City of Buffalo — Proposed two-year data center moratorium (Proposed, 2026-09) spectrumlocalnews.com →
  • City of North Tonawanda — North Tonawanda Local Law No. 3 of 2026: 12-month extension of data center and crypto mining moratorium (In force, 2026-06) theenergymag.com →
  • Highland — Local moratorium on data centers through June 18, 2027 (In force, 2026-01) townofhighlandny.gov →
  • Islip — Local moratorium on data centers through February 12, 2028 (In force, 2026-08) longisland.news12.com →
  • LeRay — Local moratorium on data centers through August 1, 2027 (In force, 2026-01) wwnytv.com →
  • Massena — Town of Massena six-month data center moratorium voted down (Failed / vetoed, 2026-09) northcountrypublicradio.org →
  • Mohawk (Montgomery Co.) — Local moratorium on data centers through February 13, 2027 (In force, 2026-08) dailygazette.com →
  • Newfield (Tompkins Co.) — Local moratorium on data centers through July 9, 2027 (In force, 2026-07) tompkinsweekly.com →
  • Perth (Fulton Co.) — Local moratorium on data centers through June 4, 2027 (In force, 2026-06) dailygazette.com →
  • Potsdam — Proposed town moratorium on data centers (Proposed, 2026-09) northcountrynow.com →
  • St. Lawrence County — Proposed local moratorium on data centers (Proposed, 2026-06) rockinst.org →
  • Tonawanda (Erie Co.) — Local moratorium on data centers through August 3, 2027 (In force, 2026-08) beenews.com →
  • Town of Brookhaven — 18-month data center moratorium (In force, 2026-07) tbrnewsmedia.com →
  • Town of Dryden (Tompkins County) — Ban on data centers and cryptocurrency mines (In force, 2026-02) ithacavoice.org →
  • Town of East Fishkill — Three-year data center moratorium (In force, 2026-06) spectrumlocalnews.com →
  • Town of East Greenbush — Six-month moratorium on data center land use approvals (In force, 2026-07) cbs6albany.com →
  • Town of Lysander — Six-month data center moratorium (In force, 2026-05) townoflysander.org →
  • Town of Manlius — 12-month data center and crypto moratorium (In force, 2026-07) townofmanlius.gov →
  • Town of Mohawk — Six-month moratorium on data center permitting (In force, 2026-08) dailygazette.com →
  • Town of Oneonta — One-year data center and crypto moratorium (In force, 2026-05) wbng.com →
  • Town of Orangetown — Six-month moratorium on data centers and battery energy storage (In force, 2026-08) westchester.news12.com →
  • Town of Perth — One-year data center moratorium (In force, 2025-06) dailygazette.com →
  • Town of Salina — One-year data center moratorium (In force, 2026) wrvo.org →
  • Town of Tonawanda — One-year moratorium on data centers of 20 MW or more (In force, 2026-08) btpm.org →
  • Town of Tyre — Tyre proposed Local Law 2 of 2026: one-year moratorium on data centers and AI computing facilities (Proposed, 2026-06) tyreny.gov →
  • Town of Van Buren — One-year data center moratorium (In force, 2026) wrvo.org →

North Carolina (59)

  • Alamance County — One-year data center moratorium (In force, 2026-08) elonnewsnetwork.com →
  • Asheville — One-year data center moratorium (In force, 2026-06) foxcarolina.com →
  • Beaufort County — Beaufort County proposes one-year data center moratorium (Proposed, 2026-09) wcti12.com →
  • Boiling Spring Lakes — One-year data center moratorium (In force, 2026-06) apdillon.substack.com →
  • Cary — Local moratorium on data centers through February 28, 2028 (In force, 2026-08) wral.com →
  • Charlotte — 150-day data center moratorium (In force, 2026-06) wbtv.com →
  • Charlotte (citywide 150-day data center moratorium, public hearing), NC — Charlotte (citywide 150-day data center moratorium, public hearing), NC data center moratorium (In force, 2026-06) wfae.org →
  • Chatham County — 12-month data center and crypto-mining moratorium (In force, 2026-02) wral.com →
  • City of Durham — Data center moratorium (60-day, extended to 12 months) (In force, 2026-05) wral.com →
  • City of Wilson — One-year data center moratorium (In force, 2026-05) wilsontimes.com →
  • Clay County — One-year data center moratorium (In force, 2025-09) apdillon.substack.com →
  • Clyde — 12-month data center moratorium (In force, 2026-04) smokymountainnews.com →
  • Columbus County — Proposed temporary data center moratorium (Proposed, 2026-09) borderbelt.org →
  • Cumberland County — 6-month data center moratorium (unincorporated areas) (In force, 2026-06) cityviewnc.com →
  • Davidson County — Failed six-month data center moratorium (Failed / vetoed, 2026-08) davidsonlocal.com →
  • Davie County — One-year data center moratorium (In force, 2026-07) wfdd.org →
  • Durham City Council (60-day moratorium on hyperscale data centers, cites Microsoft Woodsdale Township), NC — Durham City Council (60-day moratorium on hyperscale data centers, cites Microsoft Woodsdale Township), NC data center moratorium (In force, 2026-05) wral.com →
  • Durham County — Nine-month moratorium on new large data centers (In force, 2026-08) wunc.org →
  • Edgecombe County — Local moratorium on data centers through August 3, 2028 (In force, 2026-08) reflector.com →
  • Farmville — Local moratorium on data centers through August 3, 2027 (In force, 2026-08) witn.com →
  • Fayetteville — 120-day pause on data center approvals (In force, 2026-05) apdillon.substack.com →
  • Forsyth County — Project Iron Spur data center rezoning denied (In force, 2026-07) wfdd.org →
  • Gates County — 12-month moratorium on data center approvals (In force, 2026-01) apdillon.substack.com →
  • Greensboro — 120-day moratorium for data centers above 10 MW (In force, 2026-08) abc45.com →
  • Guilford County — Proposed data center moratorium of up to 180 days (Proposed, 2026-09) rhinotimes.com →
  • Harnett County — One-year data center moratorium (In force, 2026-05) apdillon.substack.com →
  • Henderson County — Henderson County data center moratorium (failed) (Failed / vetoed, 2023-05) hendersoncountync.gov →
  • Hendersonville — Proposed local moratorium on data centers (In force, 2026-09) wlos.com →
  • Holly Springs — One-year data center moratorium (In force, 2026-06) apdillon.substack.com →
  • Jackson County — One-year data center moratorium (In force, 2026-08) smokymountainnews.com →
  • Kings Mountain — Data center moratorium, extended one year (In force, 2026-08) qcnews.com →
  • Lee County — Lee County data center moratorium (In force, 2026-03) wunc.org →
  • Madison County — Expired local moratorium on data centers through June 13, 2024 (Failed / vetoed, 2023-06) news.yahoo.com →
  • McDowell County — County moratorium on data centers through February 11, 2027 (In force, 2026-01) wcabnews.com →
  • Nash County — Nash County adopts moratorium on data centers and crypto mining (In force, 2026-09) rockymounttelegram.com →
  • Northampton County — 32-month data center moratorium (In force, 2026-05) apdillon.substack.com →
  • Northampton County Commissioners, NC — Northampton County Commissioners, NC data center moratorium (In force, 2026-05) northcarolinahealthnews.org →
  • Orange County — One-year data center moratorium (In force, 2026-04) orangecountync.gov →
  • Raleigh — Proposed six-month data center moratorium (Proposed, 2026-09) wunc.org →
  • Rowan County — One-year data center moratorium (In force, 2026-04) apdillon.substack.com →
  • Statesville — Proposed local moratorium on data centers (In force, 2026-09) wbtv.com →
  • Stokes County — Rejected six-month data center moratorium (Failed / vetoed, 2026-07) wfdd.org →
  • Surry County — Two-year data center moratorium (In force, 2026-07) wfae.org →
  • Swain County — 12-month data center moratorium (In force, 2026-04) apdillon.substack.com →
  • Town of Apex — One-year data center moratorium (In force, 2026-04) apdillon.substack.com →
  • Town of Boone — One-year data center and crypto-mining moratorium (In force, 2026-03) wfae.org →
  • Town of Brevard — Data center and crypto mining moratorium (In force, 2025-09) apdillon.substack.com →
  • Town of Canton — One-year pause on data center projects (In force, 2026-02) apdillon.substack.com →
  • Town of Franklin — One-year data center moratorium (In force, 2026-07) apdillon.substack.com →
  • Town of Hillsborough — 60-day data center moratorium (later extended) (In force, 2026-06) chapelboro.com →
  • Town of Mayodan — Data center moratorium (In force, 2026-07) wfdd.org →
  • Town of Southport — Southport adopts 15-month data center moratorium (In force, 2026-09) portcitydaily.com →
  • Town of Spring Hope — One-year data center moratorium (In force, 2026-05) apdillon.substack.com →
  • Town of Waxhaw — 12-month data center moratorium (In force, 2026-08) wbtv.com →
  • Town of Wendell — Seven-month data center moratorium (In force, 2026-05) apdillon.substack.com →
  • Watauga County — County data center moratorium (In force, 2026) wunc.org →
  • Whiteville — 12-month moratorium on data centers and crypto mining (In force, 2026-08) wect.com →
  • Woodfin — 12-month data center moratorium (In force, 2026-05) wlos.com →
  • Yadkin County — Proposed one-year data center moratorium (In force, 2026-08) wfdd.org →

North Dakota (4)

  • Barnes County — Six-month data center moratorium (In force, 2026-05) newsdakota.com →
  • Mercer County — One-year data center moratorium (lifted) (Failed / vetoed, 2026-03) centralnordak.com →
  • Morton County — Morton County data center moratorium (In force, 2024-09) govtech.com →
  • Oliver County — Oliver County data center moratorium (failed) (Failed / vetoed, 2024-12) bismarcktribune.com →

Ohio (100)

  • Alliance — 18-month data center moratorium (In force, 2026-07) aol.com →
  • Archbold — Local moratorium on data centers for a stated term (In force, 2026-04) northwestsignal.net →
  • Athens — Local moratorium on data centers through August 4, 2027 (In force, 2026-08) woub.org →
  • Avon — Local moratorium on data centers through April 14, 2027 (In force, 2026-04) cityofavon.com →
  • Avon Lake — Local moratorium on data centers through June 22, 2027 (In force, 2026-06) avonlake.org →
  • Barberton — Barberton data center moratorium (In force, 2025-11) akron.com →
  • Berea — Local moratorium on data centers through June 15, 2027 (In force, 2026-06) cityofberea.org →
  • Blanchester — Data center moratorium (In force, 2026-02) wnewsj.com →
  • Boardman Township — Local moratorium on data centers through April 28, 2027 (In force, 2026-04) vindy.com →
  • Braceville Township — Local moratorium on data centers through December 2, 2026 (In force, 2026-06) tribtoday.com →
  • Bridgewater Township (Williams County) — 12-month data center moratorium (In force, 2026-09) thevillagereporter.com →
  • Butler County — Six-month data center moratorium (In force, 2026-06) wvxu.org →
  • Canton Township — Local moratorium on data centers for a stated term (In force, 2026-04) cantontwp-oh.gov →
  • Champaign County — Champaign County data center moratorium (In force, 2026-03) change.org →
  • Cincinnati — Temporary data center construction restrictions (In force, 2026-02) wcpo.com →
  • City of Hubbard (Trumbull County, moratorium drafted amid 'Project Milo' NDA controversy), OH — City of Hubbard (Trumbull County, moratorium drafted amid 'Project Milo' NDA controversy), OH data center moratorium (In force, 2026-06) tribtoday.com →
  • City of Springfield (Clark County) — City of Springfield (Clark County) data center moratorium (In force, 2026-06) springfieldnewssun.com →
  • City of Warren (Trumbull County) — One-year data center moratorium (In force, 2026-09) tribtoday.com →
  • Clay Township (Highland County) — Clay Township (Highland County) data center moratorium (In force, 2026-04) registerherald.com →
  • Cleveland — Three-month pause on standalone data centers (In force, 2026-07) clevelandohio.gov →
  • Cleveland City Council (1-yr moratorium proposed; Lakeland Equity permit rejected), OH — Cleveland City Council (1-yr moratorium proposed; Lakeland Equity permit rejected), OH data center moratorium (In force, 2026-05) spectrumnews1.com →
  • Conneaut — One-year data center moratorium (failed) (Failed / vetoed, 2026-08) starbeacon.com →
  • Cortland — Local moratorium on data centers for a stated term (In force, 2026-06) tribtoday.com →
  • Dayton — Dayton data center moratorium (proposed) (Proposed, 2026-04) daytondailynews.com →
  • Defiance — Local moratorium on data centers for a stated term (In force, 2026-09) wbnowqct.com →
  • Ellsworth Township — Local moratorium on data centers (In force, ) wfmj.com →
  • Fayette County — Temporary data center moratorium (seven townships) (In force, 2026-09) recordherald.com →
  • Findlay — Local moratorium on data centers through April 22, 2027 (In force, 2026-04) findlayohio.gov →
  • Girard — Local moratorium on data centers through July 13, 2027 (In force, 2026-07) cityofgirardoh.gov →
  • Grafton — Local moratorium on data centers through May 19, 2031 (In force, 2026-05) chroniclet.com →
  • Granville — Charter amendment capping data center load on November ballot (Proposed, 2026-09) highlandcountypress.com →
  • Green Township (Harrison County) — Moratorium on new development amid data center proposals (In force, 2026-08) wtov9.com →
  • Grove City — 12-month data center moratorium (In force, 2026-06) nbc4i.com →
  • Grove City (6-month data center moratorium), OH — Grove City (6-month data center moratorium), OH data center moratorium (In force, 2026-06) cwcolumbus.com →
  • Howland Township — Local moratorium on data centers through December 10, 2026 (In force, 2026-06) tribtoday.com →
  • Hubbard — Local moratorium on data centers through June 1, 2027 (In force, 2026-06) vindy.com →
  • Ironton — Ironton data center moratorium (In force, 2026-01) irontontribune.com →
  • Jackson Township (Franklin County) — One-year data center moratorium (In force, 2026-05) 614now.com →
  • Jerome Township — Nine-month data center moratorium, renewed (In force, 2025-09) ohiomfg.com →
  • Kent — Temporary AI data center permit moratorium (Ord. 2026-31) (In force, 2026) kentohio.gov →
  • Lake Township (Wood Co.) — Local moratorium on data centers through March 3, 2027 (In force, 2026-03) bgindependentmedia.org →
  • Lima — 18-month moratorium on new data centers (In force, 2026-09) hometownstations.com →
  • Lordstown — 180-day data center moratorium (extended) (In force, 2026-01) tribtoday.com →
  • Lordstown (Trumbull County) — Lordstown (Trumbull County) data center moratorium (proposed) (Proposed, 2026-06) tribtoday.com →
  • Lordstown Village Council, OH — Lordstown Village Council, OH data center moratorium (In force, 2026-06) vindy.com →
  • Madison Township (Lake County) — 12-month data center moratorium (In force, 2026-05) yahoo.com →
  • Massillon — Data center moratorium (reduced to 60 days) (In force, 2026-04) aol.com →
  • Maumee — Local moratorium on data centers through February 2, 2027 (In force, 2026-02) toledoblade.com →
  • McDonald — One-year moratorium on data center applications (In force, 2026-09) tribtoday.com →
  • Miamisburg — Nine-month data center moratorium (In force, 2026-09) cityofmiamisburg.com →
  • Middleton Township — Middleton Township data center moratorium (In force, 2025-04) 13abc.com →
  • Monroe Township (Adams County) — Monroe Township (Adams County) data center moratorium (In force, 2026-03) foodandwaterwatch.org →
  • Montgomery Township (Ashland Co.) — Local moratorium on data centers through July 1, 2028 (In force, 2026-06) ashlandsource.com →
  • Mount Orab — Expired local moratorium on data centers through August 30, 2026 (Failed / vetoed, 2026-03) wcpo.com →
  • Mt. Orab — Mt. Orab data center moratorium (In force, 2026-02) wcpo.com →
  • Muhlenberg Township — Muhlenberg Township data center moratorium (In force, 2026-02) change.org →
  • New Carlisle — Local moratorium on data centers through February 17, 2027 (In force, 2026-02) newcarlisleohio.gov →
  • Newton Falls — 12-month data center moratorium (In force, 2026-09) tribtoday.com →
  • Northwest Township (Williams County) — Data center moratorium (In force, 2026-09) thevillagereporter.com →
  • Norton — 180-day data center moratorium (In force, 2025-11) akron.com →
  • Ohio Supreme Court — Ohio Supreme Court rejects Wilmington data center lawsuit initiative (Failed / vetoed, 2026-09) news.google.com →
  • Oregon — Charter amendment capping data center load on November ballot (Proposed, 2026-09) highlandcountypress.com →
  • Painesville Township — Local moratorium on data centers for a stated term (In force, 2026-05) thecooldown.com →
  • Painesville Township Trustees (Lake County), OH — Painesville Township Trustees (Lake County), OH data center moratorium (In force, 2026-05) thecooldown.com →
  • Pataskala — Rejection of a 200 MW Aligned Data Centers campus (In force, 2026-08) thereportingproject.org →
  • Pierce Township — Data center zoning moratorium extended to May 31, 2027 (In force, 2026-09) wvxu.org →
  • Pioneer — Six-month pause on data center proposals (In force, 2026-09) thevillagereporter.com →
  • Piqua — Charter amendment banning large data centers sent to November ballot (Proposed, 2026-08) miamivalleytoday.com →
  • Plain City — Proposed local moratorium on data centers (In force, 2026-08) plain-city.com →
  • Plain Township (Stark Co.) — Local moratorium on data centers through March 24, 2027 (In force, 2026-03) news5cleveland.com →
  • Ravenna — One-year data center moratorium (In force, 2026-04) theportager.com →
  • Richfield Township — Local moratorium on data centers through February 17, 2027 (In force, 2026-02) toledoblade.com →
  • Scioto Township — Local moratorium on data centers through March 6, 2027 (In force, 2026-03) sciotopost.com →
  • Scioto Township (Pickaway County) — Scioto Township (Pickaway County) data center moratorium (In force, 2026-03) sciotopost.com →
  • Shawnee Township — Local moratorium on data centers through October 13, 2027 (In force, 2026-04) web.archive.org →
  • Sprigg Township — Local moratorium on data centers through February 24, 2027 (In force, 2026-02) wcpo.com →
  • Sprigg Township (Adams County) — Sprigg Township (Adams County) data center moratorium (In force, 2026-03) foodandwaterwatch.org →
  • Springfield — Local moratorium on data centers through January 14, 2027 (In force, 2026-07) springfieldnewssun.com →
  • Sunbury — Charter amendment capping data center load on November ballot (Proposed, 2026-09) highlandcountypress.com →
  • Tallmadge — Local moratorium on data centers through October 10, 2026 (In force, 2026-04) yahoo.com →
  • Tiffin — Local moratorium on data centers through April 20, 2027 (In force, 2026-04) tiffinohio.net →
  • Trenton — Charter amendment banning data centers placed on November ballot (Proposed, 2026-09) journal-news.com →
  • Twinsburg — Local moratorium on data centers for a stated term (In force, 2026-01) mytwinsburg.com →
  • Upper Sandusky — Local moratorium on data centers (In force, ) crawfordcountynow.com →
  • Urbana — Charter amendment banning data centers over 7.5 MW on November ballot (Proposed, 2026-09) highlandcountypress.com →
  • Vermilion — Local moratorium on data centers through March 23, 2027 (In force, 2026-04) cityofvermilionohio.gov →
  • Vienna Township — Vienna Township data center moratorium (In force, 2026-02) statenews.org →
  • Vienna Township (Trumbull Co.) — Local moratorium on data centers through October 16, 2026 (In force, 2026-08) tribtoday.com →
  • Village of Ashville — 180-day data center moratorium (In force, 2025-12) nbc4i.com →
  • Village of South Bloomfield — 180-day data center moratorium (In force, 2025-12) nbc4i.com →
  • Village of Yellow Springs, OH — Village of Yellow Springs, OH data center moratorium (In force, 2026-05) ysnews.com →
  • Warren County — Proposed temporary data center moratorium (Proposed, 2026-09) warrencountypost.com →
  • Washington Township (Butler Co.) — Local moratorium on data centers through April 16, 2027 (In force, 2026-04) journal-news.com →
  • Washington Township (Montgomery County) — Washington Township (Montgomery County) data center moratorium (In force, 2026-04) dayton247now.com →
  • Waterville — Expired local moratorium on data centers through June 8, 2026 (Failed / vetoed, 2025-12) 13abc.com →
  • Westlake — Six-month moratorium on data center approvals (In force, 2026-09) hoodline.com →
  • Williamsburg — Local moratorium on data centers through March 13, 2027 (In force, 2026-03) williamsburgohio.org →
  • Wilmington — Data center zoning initiative kept off the ballot (Failed / vetoed, 2026-09) courtnewsohio.gov →
  • Wood County (Bowling Green area) — Wood County (Bowling Green area) data center moratorium (In force, 2026-01) bgindependentmedia.org →
  • Yellow Springs — Local moratorium on data centers through May 18, 2027 (In force, 2026-05) ysnews.com →

Oklahoma (12)

  • Broken Arrow — Local moratorium on data centers through December 31, 2026 (In force, 2026-06) basentinel.com →
  • Cherokee Nation — Tribal moratorium on data centers with no end date (In force, 2026-08) kgou.org →
  • Cherokee Nation (tribal and trust lands) — Ban on hyperscale data centers (In force, 2026-08) kgou.org →
  • Choctaw — City moratorium on data centers through July 21, 2027 (In force, 2026-07) centraloklahomaweeklies.com →
  • Edmond — Data center permit moratorium (through Dec. 31, 2026) (In force, 2026-06) kfor.com →
  • Kickapoo Tribe of Oklahoma — Tribal moratorium on data centers with no end date (In force, 2026-07) tulsaflyer.org →
  • Luther — Local moratorium on data centers through December 31, 2026 (In force, 2026-06) news9.com →
  • Norman — Local moratorium on data centers through June 9, 2027 (In force, 2026-06) news9.com →
  • Oklahoma City — Data center moratorium through end of 2026 (In force, 2026) okc.gov →
  • Seminole Nation of Oklahoma — Local moratorium on data centers with no end date (In force, 2026-01) nativenewsonline.net →
  • Shawnee — City moratorium on data centers through December 31, 2027 (In force, 2026-08) news9.com →
  • Tulsa — Nine-month pause on new data center construction (In force, 2026-03) kosu.org →

Oregon (6)

  • City of Hillsboro — 120-day data center land-use moratorium (In force, 2026-07) opb.org →
  • Clackamas County — Proposed county moratorium on data centers (Proposed, 2026-08) opb.org →
  • Portland — Portland council votes to discourage data center NDAs, pursue moratorium (Proposed, 2026-09) news.google.com →
  • Salem — Move to impose a temporary data center moratorium (In force, 2026-09) salemreporter.com →
  • Washington County — County declines to pursue data center moratorium (Failed / vetoed, 2026-09) statelibraryeclips.wordpress.com →
  • Woodburn — 120-day data center moratorium (In force, 2026-09) opb.org →

Pennsylvania (29)

  • Allegheny County — Proposed county moratorium on data centers (Proposed, 2026-01) wesanews.org →
  • Allentown — Bill 52 Amending Part II General Legislation, Chapter 660 Zoning, Article 5 Uses, Table 660-4 Use Table and Section 660-38 Manufacturing & Industry Group (In force, 2026-08) allentownpa.legistar.com →
  • Bensalem Township — 180-day data center curative-amendment moratorium (In force, 2026-06) suburbanrealtorsalliance.com →
  • Brookville — Borough moratorium on data centers through December 14, 2026 (In force, 2026-01) explorejeffersonpa.com →
  • Buffalo Township — Township moratorium on data centers through February 8, 2027 (In force, 2026-08) butlereagle.com →
  • Butler Township — Township moratorium on data centers through November 8, 2026 (In force, 2026-05) fox56.com →
  • Center Township — Local moratorium on data centers through December 7, 2026 (In force, 2026-01) butlereagle.com →
  • Clinton Township (Wayne County) — Linde data center land development plan rejected (In force, 2026-09) keystonenewsroom.com →
  • Cummings Township (Lycoming County) — 180-day moratorium on data center applications (In force, 2026-07) cummingstownship-pa.com →
  • Dorrance Township — Dorrance Township data center moratorium (In force, 2025-08) alleghenyfront.org →
  • East Vincent Township (Chester County) — Denial of Pennhurst data center conditional use (In force, 2026-05) inquirer.com →
  • East Whiteland Township — Local moratorium on data centers for a stated term (In force, 2026-03) foodandwaterwatch.org →
  • Gregg Township — Local moratorium on data centers through February 16, 2027 (In force, 2026-01) standard-journal.com →
  • Gregg Township (Union County) — 180-day moratorium on data center applications (In force, 2026-08) northcentralpa.com →
  • Hazle Township — 180-day curative-amendment data center pause (In force, 2026-06) fox56.com →
  • Jessup Borough (Lackawanna County) — Denial of Breaker Street data center campus (In force, 2025-12) yahoo.com →
  • Little Britain Township — Township moratorium on data centers through December 6, 2026 (In force, 2026-01) lancasteronline.com →
  • Lycoming County — County moratorium on data centers through December 15, 2026 (In force, 2026-01) sungazette.com →
  • Montour County — Expired county moratorium on data centers through April 30, 2026 (Failed / vetoed, 2025-11) dailyitem.com →
  • Mount Carmel Township — Mount Carmel Township data center moratorium (In force, 2026-05) newsitem.com →
  • Muncy Township — Local moratorium on data centers through February 1, 2027 (In force, 2026-01) sungazette.com →
  • Olyphant Borough (Lackawanna County) — Six-month data center moratorium (In force, 2026-04) yahoo.com →
  • Philadelphia — Activists rally at City Hall, demand Philadelphia data center moratorium (Proposed, 2026-09) news.google.com →
  • Smithfield Township — Township moratorium on data centers through November 2, 2026 (In force, 2026-05) smithfieldtownship.com →
  • Upper Burrell Township — Local moratorium on data centers through November 2, 2026 (In force, ) publicsource.org →
  • Warrington Township — Local moratorium on data centers until a condition is met (In force, 2026-01) warringtontwp.org →
  • West Hempfield Township — Data center zoning ordinance with size and buffer limits (In force, 2026-09) lancasteronline.com →
  • West Mahanoy Township — West Mahanoy Township 180-day curative amendment moratorium on data centers and solar farms (In force, 2026-09) shensentinel.com →
  • West Whiteland Township — Township moratorium on data centers through November 1, 2026 (In force, 2026-05) citizenportal.ai →

Rhode Island (4)

South Carolina (20)

  • Anderson County — Six-month data center moratorium (In force, 2026-08) foxcarolina.com →
  • Chester County — Six-month data center moratorium (In force, 2026-07) wbtv.com →
  • Chesterfield County — County moratorium on data centers through January 1, 2028 (In force, 2026-06) scdailygazette.com →
  • Clarendon County — Clarendon County Council adopts data center moratorium (In force, 2026-09) wistv.com →
  • Colleton County — Local moratorium on data centers through January 7, 2027 (In force, 2026-07) scdailygazette.com →
  • Colleton County Council (first-reading 6-month moratorium on 850-acre Eagle Rock proposal in ACE Basin), SC — Colleton County Council (first-reading 6-month moratorium on 850-acre Eagle Rock proposal in ACE Basin), SC data center moratorium (proposed) (Proposed, 2026-05) aol.com →
  • Colleton County Council (moratorium finalized, related SELC lawsuit paused) — Colleton County Council (moratorium finalized, related SELC lawsuit paused) data center moratorium (In force, 2026-07) live5news.com →
  • Fairfield County — Proposed county moratorium on data centers for a stated term (In force, 2026-09) wltx.com →
  • Greenwood County — County moratorium on data centers through July 21, 2027 (In force, 2026-01) foxcarolina.com →
  • Jasper County — Proposed county moratorium on data centers (Proposed, 2026-09) yahoo.com →
  • Kershaw County — Proposed county moratorium on data centers (In force, 2026-09) wistv.com →
  • Laurens County — Proposed county moratorium on data centers (In force, 2026-09) foxcarolina.com →
  • Mount Pleasant — Proposed local moratorium on data centers (Proposed, 2026-09) charlestoncitypaper.com →
  • Newberry County — Local moratorium on data centers through July 16, 2027 (In force, 2026-07) foxcarolina.com →
  • Newberry County (1-year moratorium + land-purchase denial), SC — Newberry County (1-year moratorium + land-purchase denial), SC data center moratorium (In force, 2026-06) wrdw.com →
  • Orangeburg County — Orangeburg County data center moratorium (proposed) (In force, 2026-09) wltx.com →
  • Spartanburg County — Proposed 12-month data center moratorium (In force, 2026-09) foxcarolina.com →
  • Spartanburg County (Council directs drafting of data center moratorium), SC — Spartanburg County (Council directs drafting of data center moratorium), SC data center moratorium (proposed) (Proposed, 2026-06) postandcourier.com →
  • Spartanburg County Council (moratorium, first reading) — Spartanburg County Council (moratorium, first reading) data center moratorium (proposed) (Proposed, 2026-07) foxcarolina.com →
  • York County — Nine-month data center moratorium (In force, 2026-07) wsoctv.com →

South Dakota (4)

  • Lincoln County — Lincoln County data center moratorium (failed) (Failed / vetoed, 2026-02) mitchellrepublic.com →
  • Minnehaha County — Proposed county moratorium on data centers (Proposed, 2026-08) siouxfallslive.com →
  • Yankton County — Six-month data center and crypto moratorium (In force, 2026-07) ktiv.com →
  • Yankton County (temporary data center moratorium, first reading), SD — Yankton County (temporary data center moratorium, first reading), SD data center moratorium (proposed) (Proposed, 2026-06) kynt1450.com →

Tennessee (34)

  • Anderson County — Two-year data center moratorium (In force, 2026-06) wvlt.tv →
  • Anderson County (2-year moratorium on data centers, crypto mining, battery storage), TN — Anderson County (2-year moratorium on data centers, crypto mining, battery storage), TN data center moratorium (In force, 2026-06) wvlt.tv →
  • Bristol — Local moratorium on data centers through October 24, 2027 (In force, 2025-01) supertalk929.com →
  • Carter County — Local moratorium on data centers through August 17, 2027 (In force, 2026-08) elizabethton.com →
  • Cedar Hill — Local moratorium on data centers through June 1, 2028 (In force, 2026-01) mainstreetmediatn.com →
  • Cedar Hill (Robertson County, mayor proposing 2-year data center + crypto moratorium), TN — Cedar Hill (Robertson County, mayor proposing 2-year data center + crypto moratorium), TN data center moratorium (In force, 2026-06) fox17.com →
  • Clinton — Local moratorium on data centers through December 22, 2026 (In force, 2026-01) mycouriernews.com →
  • Coffee County — One-year data center moratorium (In force, 2026-06) newschannel5.com →
  • Crossville — Local moratorium on data centers through August 12, 2028 (In force, 2026-08) 1025wowcountry.com →
  • Dickson County — Six-month moratorium on data center rezonings (In force, 2026-07) mainstreetmediatn.com →
  • Gallatin — Proposed twelve-month moratorium on new data centers (Proposed, 2026-09) newschannel5.com →
  • Grundy County — County moratorium on data centers through May 18, 2028 (In force, 2026-01) sewaneemessenger.com →
  • Hamblen County — County moratorium on data centers through July 7, 2027 (In force, 2026-01) hamblencountytn.gov →
  • Hamilton County — County moratorium on data centers through July 15, 2027 (In force, 2026-01) local3news.com →
  • Johnson City — Data center moratorium extended to Dec. 3, 2026 (In force, 2026-05) supertalk929.com →
  • Jonesborough — Local moratorium on data centers with no end date (In force, 2026-01) servercountry.org →
  • Knox County — One-year data center moratorium (through June 30, 2027) (In force, 2026-07) wate.com →
  • Knoxville — One-year moratorium on large data centers (10 MW+) (In force, 2026-07) knoxvilletn.gov →
  • Loudon County — County moratorium on data centers through December 30, 2026 (In force, 2026-01) wvlt.tv →
  • Maury County — County moratorium on data centers through July 19, 2027 (In force, 2026-01) frontporchradiotn.com →
  • McMinnville — Local moratorium on data centers through December 3, 2027 (In force, 2026-06) wsmv.com →
  • McMinnville (18-month data center moratorium, first reading), TN — McMinnville (18-month data center moratorium, first reading), TN data center moratorium (In force, 2026-06) theucnow.com →
  • Memphis — Proposed 12-month data center pause (Proposed, 2026-09) actionnews5.com →
  • Moore County — Moore County data center moratorium (proposed) (Proposed, 2026-03) mcobserver.news →
  • Morgan County — County moratorium on data centers through June 12, 2028 (In force, 2026-01) themountainpress.com →
  • Nashville — Local moratorium on data centers through December 1, 2026 (In force, 2026-07) nashvillebanner.com →
  • Nashville-Davidson County — Data center permit moratorium plus zoning regulations (In force, 2026-07) wsmv.com →
  • Roane County — Roane County data center moratorium (In force, 2026-07) wvlt.tv →
  • Shelbyville — Local moratorium on data centers for a stated term (In force, 2026-01) wsmv.com →
  • Sullivan County — Sullivan County data center moratorium (proposed) (Proposed, 2025-11) heraldcourier.com →
  • Warren County — County moratorium on data centers through June 22, 2027 (In force, 2026-01) servercountry.org →
  • Washington County — One-year data center moratorium (through June 30, 2027) (In force, 2026-03) wjhl.com →
  • White County — County moratorium on data centers with no end date (In force, 2026-01) wsmv.com →
  • Wilson County — Temporary data center moratorium (In force, 2026-07) mainstreetmediatn.com →

Texas (23)

  • Abbott — Abbott halts new Texas data center permits pending ERCOT audit (In force, 2026-09) datacenterdynamics.com →
  • Athens — Local moratorium on data centers with no end date (In force, 2026-08) kltv.com →
  • Austin — Proposed local moratorium on data centers (Proposed, 2026-08) kut.org →
  • Austin County — Moratorium on AI data centers and battery energy storage systems (In force, 2026-07) kwhi.com →
  • Bell County (Murray Industries construction moratorium) — Bell County (Murray Industries construction moratorium) data center moratorium (In force, 2026-07) wymt.com →
  • Brownsville — Brownsville starts 90-day data center moratorium process (Proposed, 2026-09) myrgv.com →
  • Corpus Christi — Proposed local moratorium on data centers (Proposed, 2026-01) kristv.com →
  • Denton — Proposed local moratorium on data centers (Proposed, 2026-09) cbsnews.com →
  • El Paso — Local moratorium on data centers with no end date (In force, 2026-01) elpasomatters.org →
  • Forney — Proposed local moratorium on data centers with no end date (Proposed, 2026-01) inforney.com →
  • Fort Worth — Proposed 90-day data center moratorium (Proposed, 2026-08) keranews.org →
  • Harlingen — Local moratorium on data centers for a stated term (In force, 2026-05) krgv.com →
  • Hays County — Hays County data center moratorium (failed) (Failed / vetoed, 2026-02) kut.org →
  • Hill County — One-year data center moratorium (rescinded) (Failed / vetoed, 2026-06) texastribune.org →
  • Hill County Commissioners Court (first Texas county data center moratorium), TX — Hill County Commissioners Court (first Texas county data center moratorium), TX data center moratorium (In force, 2026-05) texastribune.org →
  • Hood County — Hood County data center moratorium (failed) (Failed / vetoed, 2026-02) texastribune.org →
  • Lewisville — Local moratorium on data centers with no end date (In force, 2026-01) keranews.org →
  • Lubbock — Citizen-petitioned 18-month data center moratorium (Proposed, 2026-09) tpr.org →
  • Mesquite — Proposed local moratorium on data centers (Proposed, 2026-01) keranews.org →
  • Milam County — County moratorium on data centers (In force, 2026-01) multistate.us →
  • Princeton — Local moratorium on data centers with no end date (In force, 2026-01) princetonherald.com →
  • San Marcos — Zoning ban on data centers (In force, 2026-06) texastribune.org →
  • Tom Green County — Rejected county moratorium on data centers (Failed / vetoed, 2026-01) sanangelolive.com →

Utah (10)

  • Box Elder County — 180-day data center moratorium (In force, 2026-06) sltrib.com →
  • Box Elder County (180-day data center moratorium; Stratos/MIDA exempt), UT — Box Elder County (180-day data center moratorium; Stratos/MIDA exempt), UT data center moratorium (In force, 2026-06) ksl.com →
  • Cache County — 180-day data center moratorium (In force, 2026-06) hjnews.com →
  • Clearfield — City moratorium on data centers through March 7, 2027 (In force, 2026-09) standard.net →
  • Grand County — Local moratorium on data centers through January 3, 2027 (In force, 2026-07) moabtimes.com →
  • Iron County — Iron County is making new rules while data center development is paused (Paused, 2026-09) news.google.com →
  • Logan — Local moratorium on data centers through December 27, 2026 (In force, 2026-06) loganutah.gov →
  • Milford — City moratorium on data centers through December 13, 2026 (In force, 2026-06) utah.gov →
  • Salt Lake County — Proposed 180-day data center temporary land use regulation (In force, 2026-09) sltrib.com →
  • Wayne County — Local moratorium on data centers through January 17, 2027 (In force, 2026-07) ironcountytoday.com →

Vermont (3)

  • Morristown — Town moratorium on data centers (In force, 2026-09) sevendaysvt.com →
  • Royalton — Royalton data center moratorium (In force, 2026-03) vnews.com →
  • South Burlington — City moratorium on data centers with no end date (In force, 2026-08) sevendaysvt.com →

Virginia (13)

  • City of Chesapeake — Eight-month data center application pause (In force, 2026-07) virginiabusiness.com →
  • Culpeper County — Local moratorium on data centers with no end date (In force, 2025-09) starexponent.com →
  • Fairfax County — Local moratorium on data centers with no end date (In force, 2024-09) fairfaxcounty.gov →
  • Fluvanna County — Expired local moratorium on data centers through January 31, 2026 (Failed / vetoed, 2025-09) bisnow.com →
  • Front Royal — Local moratorium on data centers through October 4, 2026 (In force, 2026-07) nvdaily.com →
  • Hanover County — Rejection of Mountain Road Technology Park data center (In force, 2026-05) virginiabusiness.com →
  • Loudoun County — Virginia’s Loudoun County board votes to pause new data center applications (In force, 2026-09) news.google.com →
  • Mecklenburg County — Mecklenburg County data center moratorium (In force, 2025-03) sovanow.com →
  • Prince William County — Rejection of Dulles Cloud South data center rezoning (In force, 2026-07) virginiamercury.com →
  • Spotsylvania County — Local moratorium on data centers with no end date (In force, 2026-08) wjla.com →
  • Stafford County — Local moratorium on data centers with no end date (In force, 2025-10) staffordcountyva.gov →
  • Suffolk — Proposed local moratorium on data centers (Proposed, 2026-06) whro.org →
  • Virginia Beach — Local moratorium on data centers through August 18, 2027 (In force, 2026-08) wtkr.com →

Washington (20)

  • Burien — Local moratorium on data centers through June 29, 2027 (In force, 2026-06) b-townblog.com →
  • Cle Elum — Local moratorium on data centers through January 31, 2027 (In force, 2026-07) dailyrecordnews.com →
  • Federal Way — Local moratorium on data centers through July 7, 2027 (In force, 2026-07) rentonreporter.com →
  • Kittitas County — Local moratorium on data centers through February 12, 2027 (In force, 2026-08) dailyrecordnews.com →
  • La Conner — City moratorium on data centers through January 29, 2027 (In force, 2026-07) goskagit.com →
  • Lincoln County — County moratorium on data centers through March 10, 2027 (In force, 2026-09) odessarecord.com →
  • Marysville — Local moratorium on data centers through January 14, 2027 (In force, 2026-07) heraldnet.com →
  • Moses Lake — City moratorium on data centers for a stated term (In force, 2026-01) mrsc.org →
  • Mount Vernon — Local moratorium on data centers through February 12, 2027 (In force, 2026-08) cascadiadaily.com →
  • Pasco — Local moratorium on data centers through January 20, 2027 (In force, 2026-07) datacenterdynamics.com →
  • Pierce County — County moratorium on data centers through August 25, 2027 (In force, 2026-08) piercecountywa.gov →
  • Port Angeles — Six-month data center moratorium (In force, 2026-09) peninsuladailynews.com →
  • Renton — Local moratorium on data centers through August 17, 2027 (In force, 2026-08) rentonreporter.com →
  • Seattle — Emergency one-year data center moratorium (Council Bill 121214) (In force, 2026-06) council.seattle.gov →
  • Skagit County — Six-month data center moratorium (In force, 2026-06) chronline.com →
  • Skamania County — Six-month data center moratorium (Resolution 2026-22) (In force, 2026-08) skamania-dispatch.ghost.io →
  • Snohomish County — Emergency six-month data center moratorium (In force, 2026-06) heraldnet.com →
  • Spokane — One-year data center permit moratorium (In force, 2026-06) my.spokanecity.org →
  • Spokane County — Four-month data center moratorium (In force, 2026-08) rangemedia.co →
  • Yakima County — Local moratorium on data centers through February 12, 2027 (In force, 2026-08) yakimaherald.com →

Wisconsin (42)

  • Ashwaubenon — Local moratorium on data centers through June 2, 2027 (In force, 2026-01) nbc26.com →
  • Brown County — County data center moratorium (declined) (Failed / vetoed, 2026-06) dailyreporter.com →
  • Brown County (committee declines countywide data center moratorium), WI — Brown County (committee declines countywide data center moratorium), WI data center moratorium (failed) (Failed / vetoed, 2026-06) dailyreporter.com →
  • Chippewa County — Local moratorium on data centers for a stated term (In force, 2026-08) leadertelegram.com →
  • City of Madison — 12-month data center moratorium (10,000 sq ft+) (In force, 2026-01) cityofmadison.com →
  • City of Superior — One-year data center moratorium (In force, 2026-06) wpr.org →
  • Dane County — Local moratorium on data centers through December 4, 2027 (In force, 2026-06) isthmus.com →
  • Dane County (18-month hyperscale data center moratorium passed), WI — Dane County (18-month hyperscale data center moratorium passed), WI data center moratorium (In force, 2026-06) wisbusiness.com →
  • Dodge County — Local moratorium on data centers through February 10, 2028 (In force, 2026-08) dailydodge.com →
  • Door County — County moratorium on data centers through May 26, 2027 (In force, 2026-01) wisconsinwatch.org →
  • Grant County — County moratorium on data centers through June 18, 2027 (In force, 2026-01) telegraphherald.com →
  • Green County — County moratorium on data centers (In force, ) beloitdailynews.com →
  • La Crosse County — Local moratorium on data centers through December 18, 2027 (In force, 2026-06) wxow.com →
  • Manitowoc County — 18-month data center moratorium (In force, 2026-04) wpr.org →
  • Marathon County — County moratorium on data centers (In force, ) centralwinews.com →
  • Middleton — Local moratorium on data centers (In force, ) middletontimes.com →
  • Milwaukee — A substitute ordinance relating to a temporary pause in the establishment and development of data centers. (Proposed, 2026-03) milwaukee.legistar.com →
  • Mishicot — Mishicot data center moratorium (In force, 2026-02) wpr.org →
  • Monroe County — County moratorium on data centers through January 21, 2028 (In force, 2026-01) news8000.com →
  • Oneida County — County moratorium on data centers through August 19, 2027 (In force, 2026-08) wxpr.org →
  • Oshkosh — 12-month moratorium on new data centers (In force, 2026-09) wbay.com →
  • Polk County — Proposed county moratorium on data centers (In force, 2026-08) polkcountywi.gov →
  • Port Washington — Referendum requiring a public vote on large tax incentives (In force, 2026-04) wpr.org →
  • Sauk County — County moratorium on data centers for a stated term (In force, 2026-09) co.sauk.wi.us →
  • Sawyer County — County moratorium on data centers for a stated term (In force, 2026-08) citizenportal.ai →
  • Shawano County — County moratorium on data centers through June 24, 2027 (In force, 2026-01) newmedia-wi.com →
  • Shawano County (committee recommends 1-year data center moratorium), WI — Shawano County (committee recommends 1-year data center moratorium), WI data center moratorium (proposed) (Proposed, 2026-06) spectrumnews1.com →
  • Sheboygan — Local moratorium on data centers through July 23, 2027 (In force, 2026-01) whbl.com →
  • Sheboygan Common Council, WI — Sheboygan Common Council, WI data center moratorium (proposed) (Proposed, 2026-05) whbl.com →
  • St. Croix County — Local moratorium on data centers through September 1, 2027 (In force, 2026-09) hudsonstarobserver.com →
  • Town of Beetown — Local moratorium on data centers (In force, 2026-05) sustainruralwisconsin.org →
  • Town of Cassville — Local moratorium on data centers for a stated term (In force, 2026-04) dailyreporter.com →
  • Town of Hampden — Local moratorium on data centers (In force, 2026-05) townofhampden.wi.gov →
  • Town of Janesville (Rock County) — Town of Janesville (Rock County) data center moratorium (proposed) (In force, 2026-08) beloitdailynews.com →
  • Town of Westport — Local moratorium on data centers through April 6, 2027 (In force, 2026-04) hngnews.com →
  • Two Creeks — Two Creeks data center moratorium (In force, 2026-02) wpr.org →
  • Two Rivers — Two Rivers data center moratorium (In force, 2026-02) wpr.org →
  • Village of Bellevue — 12-month data center moratorium (In force, 2026-08) nbc26.com →
  • Village of Cottage Grove — 12-month data center moratorium (In force, 2026-07) wmtv15news.com →
  • Village of Greenville (Outagamie County) — One-year data center moratorium (10,000 sq ft+) (In force, 2026-07) wearegreenbay.com →
  • Village of Wrightstown — One-year data center moratorium (In force, 2026-07) wearegreenbay.com →
  • Winnebago County — County moratorium on data centers (In force, ) fox11online.com →

Wyoming (1)

  • Cheyenne — Rejected local moratorium on data centers (Failed / vetoed, 2026-05) wyofile.com →