Every U.S. grid operator is rewriting its rules for data-center-scale load — interconnection queues, curtailment conditions, bring-your-own-power requirements, and audit pauses. This watchlist tracks all seven RTOs and ISOs plus FERC and NERC: the rulings, the filings, the transmission build, and the dates that matter. Each entry links to its primary source.

Last updated August 2026 Live · sources checked 1 h ago · 7 of 8 sources answered · 12 entries added in the last 7 days · last change 2026-10-08 9 operators & regulators tracked 1032 rulings & filings on record 1039 primary sources cited
THE SCALE OF THE QUEUE Large-load requests in the ERCOT queue 474 GW ERCOT’s all-time peak demand, July 2026 91 GW Roughly 5.2× the grid’s record peak. About 90% of it is data centers.
6
RTOs and ISOs ordered by FERC to justify or replace their large-load rules
50 MW
the threshold at which a load becomes a “large load” in most new frameworks
Oct 12
the date PJM asked FERC to make curtailment-first service effective
Dec 10
ERCOT’s audit report deadline — the date the Texas queue is waiting on
Every U.S. grid operator is rewriting its rules for data-center-scale load at once. On June 18, 2026 FERC issued Section 206 show-cause orders to all six jurisdictional RTOs and ISOs, preliminarily finding their tariffs unjust and unreasonable for lacking clear large-load rules, and required responses by August 17, 2026. The frameworks that came back converge on one bargain: connect faster if you bring your own generation, or accept being curtailed first when the grid is short.

Would you like the update?

When an RTO or ISO changes its rules for data center scale load, the watchlist is re-verified and republished. You get one email when it goes out.

Also send me

Receive a short introduction on days 3, 7 and 14, plus the updates you select. Unsubscribe in one click. Privacy ·

You're on the list. The next update will land in your inbox when it publishes.
You are subscribed. Read the latest tracker

Who runs the grid where you want to build

States colored by the operator serving most of the state's load. Several states are split between operators — click any state to see everyone with territory in it.

Territories follow utility service areas, not state lines — colors show the dominant operator by share of state load, and split states are itemized in the panel. Alaska and Hawaiʻi operate outside the interconnected grids.

The dates that matter

Every dated milestone on the calendar across all nine bodies, soonest first. This is the schedule a project in any U.S. queue is actually waiting on.

Aug 31, 2026
ERCOT
Original deadline for developers to return corrected dynamic model data (no extensions under PGRR145) — subject to the good-cause-exception extension of deficiency notifications granted August 20,…
Sep 2026
ERCOT
ERCOT issues Requests for Information (RFIs) to data center developers through TSPs/DSPs for the Batch Zero eligibility audit (≥75 MW) and community impact review (≥25 MW computational loads);…
Sep 2026
SPP
ERAS Generator Interconnection Agreements anticipated for execution (36 requests, ~13.3 GW of expedited resource-adequacy generation)
Sep 2026
SPP
Next quarterly SPP HILL Q&A session for large-load customers (series scheduled through at least September 2026)
Sep 2, 2026
CAISO
Comments due on CAISO Large Loads Considerations straw proposal (FILI/FLIP, 50 MW definition)
Sep 3, 2026
PJM
Comments due at FERC (5 p.m. ET) on PJM's Interim Resource Adequacy Service / Large Load Registry / BYONC filing, Docket ER26-3515-000
Sep 3, 2026
NERC
Deadline (8:00 p.m. Eastern) to join the Project 2026-02 ballot pool to vote on draft standards CLO-001-1, CLO-002-1, and CLO-003-1
Sep 8, 2026
MISO
Comments due at FERC on MISO's Zero-Injection GIA filing (ER26-3552-000)
Sep 12, 2026
NYISO
EO 62: DPS Data Center Interconnection Working Group to be established; ESD Community Investment Framework issued by mid-September
Sep 15, 2026
NERC
NERC Large Loads Working Group (LLWG) meeting; the Load Modeling Working Group hosts a Data Center Modeling workshop September 15-16
Sep 16, 2026
PJM
Interested-party responses due on the six RTO/ISO show-cause responses in EL26-67 through EL26-72, including PJM's EL26-67 filing
Sep 16, 2026
SPP
Interested-party comments on the Aug 17 show-cause responses (parties generally have ~30 days after the regional filings to respond in EL26-68)
Sep 16, 2026
FERC
Comment window closes for interested parties on the six RTO/ISO show-cause responses in Dockets EL26-67 through EL26-72 — data-center developers' primary opportunity to shape large-load…
Sep 18, 2026
NERC
Comments due (8:00 p.m. Eastern) on draft standards CLO-001-1/002-1/003-1 (ballot runs the final 10 days of the period), and close of the second 30-day comment period on revised Rules of Procedure…
Sep 18, 2026
NERC
Comment Period closes: Project 2026-02 Computational Loads, Formal Posting 1 (Aug 19, 2026 to Sep 18, 2026)
Sep 18, 2026
NERC
Computational Loads: NERC comment period closes (Aug 19, 2026 to Sep 18, 2026)
Sep 18, 2026
NERC
Initial Ballots and Non-binding Polls closes: Project 2026-02 Computational Loads, Formal Posting 1 (Sep 9, 2026 to Sep 18, 2026)
Sep 18, 2026
NERC
Registry Criteria: NERC comment period closes (Aug 19, 2026 to Sep 18, 2026)
Sep 21, 2026
CAISO
CAISO posts draft final proposal in the Large Loads initiative
Sep 24, 2026
NERC
Disturbance Performance for Computational Loads: NERC comment period closes (Aug 26, 2026 to Sep 24, 2026)
Sep 28, 2026
CAISO
Stakeholder meeting (hybrid) on the draft final proposal
Sep 30, 2026
PJM
Reliability Backstop Procurement central bid window (ER26-3380), pending FERC approval; PJM said it would seek approval to run the backstop in September
Sep 30, 2026
MISO
MISO's target for filing the Large Load Parallel Study Process tariff changes at FERC
Sep 30, 2026
FERC
MISO Large Load Parallel Study Process Section 205 filing at FERC
Oct 12, 2026
PJM
Requested effective date for IRAS, Large Load Registry, and BYONC tariff revisions (ER26-3515) — FERC action expected on or before this date under PJM's 60-day request
Oct 12, 2026
CAISO
Comments due on draft final proposal
Oct 12, 2026
NYISO
EO 62: DPS transmission report due
Oct 18, 2026
MISO
Requested effective date of the ZGIA (ER26-3552-000) if accepted by FERC
Oct 20, 2026
CAISO
Western Energy Market Governing Body meeting on the proposal (if necessary)
Oct 28, 2026
CAISO
CAISO Board of Governors vote on the Large Loads proposal
Nov 2026
MISO
MISO Large Load Working Group meetings scheduled (framework items: firm service step-up, reliability requirements, telemetry/PMU, forecasting, reserve products)
Nov 1, 2026
ERCOT
Quarterly Stability Assessment — up to 17 large-load projects (mostly data centers, ~6.6 GW peak over a five-year ramp) may participate under the PUCT-approved good cause exception
Nov 15, 2026
NYISO
End of any FERC-granted abeyance window in EL26-69 — NYISO/NYTOs would need their show-cause response or Section 205 package on file around mid-November 2026
Nov 16, 2026
MISO
MISO show-cause response due in EL26-70 under the granted 90-day abeyance (answers due December 16, 2026) — the deadline that will produce MISO's binding large-load tariff package
Nov 16, 2026
SPP
Target date (on or before) for SPP's PALS (Price Adaptive Load Service) FERC filing — new market participation model and lowest-priority non-firm service for flexible, price-responsive large loads
Nov 16, 2026
CAISO
CAISO Federal Power Act Section 205 filing at FERC responding to the EL26-71 show-cause order (the enforceable step following the abeyance FERC accepted August 14, 2026; abeyance capped at 90 days)
Nov 16, 2026
ISO-NE
ISO-NE/PTO Federal Power Act Section 205 filing of large-load and co-located-load tariff changes in response to show cause order EL26-72 (all five reform categories), following the NEPOOL…
Nov 16, 2026
FERC
SPP Price Adaptive Load Service (PALS) Section 205 filing target
Nov 16, 2026
FERC
CAISO Large Loads Stakeholder Initiative compliance filing target (follows its August 12, 2026 straw proposal with two flexible interconnection services and a 50 MW large-load definition)
Nov 17, 2026
NERC
NERC Load Modeling Working Group meeting (ongoing work on the computational-load modeling reference document and the data-center model quality tool)
Dec 2, 2026
PJM
Reliability Backstop Procurement results due, before the next Base Residual Auction opens
Dec 10, 2026
ERCOT
ERCOT's target to file the Batch Zero Eligibility Verification Report and Community Impact Review Report with the PUCT — the gate for the interconnection pause to lift and Batch Zero…
Dec 31, 2026
ERCOT
SB 6 statutory deadline for the PUCT to amend wholesale transmission cost-allocation rules (4CP review, Project 58484)
Dec 31, 2026
NERC
FERC-ordered deadline (Docket RD26-7-000, order issued July 16, 2026) for NERC to file new or modified Reliability Standards, Glossary changes, registry criteria, and Rules of Procedure revisions…
2027
ERCOT
Planned opening of Batch 1 applications (summer 2027) and publication of the final transmission plan for the entire batch (fall 2027), per ERCOT's June 18, 2026 announcement — timing now dependent…
2027
CAISO
CAISO cluster 17 generator interconnection application window opens; CAISO intends to launch IPE 6 stakeholder initiative in 2026 or early 2027 to have enhancements in place beforehand (relevant to…
2027
NYISO
NYISO target for FPA Section 205 filing of its large-load integration framework (per its July 2026 informational report to FERC)
2027
ISO-NE
Detailed implementing rules for the BYONG requirement and the exclusion of new large loads from the Installed Capacity Requirement to be filed with FERC after a full stakeholder process — the…
2027
ISO-NE
First point at which ISO-NE's forecast shows proposed large loads (two projects, up to 285 MW) affecting regional system demand
2027
FERC
NYISO Section 205 filing target for large-load planning reforms, including accelerated interconnection for reliability resources and potential large-load responsibility assignments
Jan 1, 2027
CAISO
CPUC assessment due under SB 57 (Stats. 2025, ch. 647) on cost impacts of new large transmission-connected data-center loads; being executed in R.26-04-009
Feb 12, 2027
NYISO
DPS Staff White Paper due in PSC Case 26-E-0045 — comprehensive proposal on large-load interconnection, cost allocation, and tariff structure
Mar 1, 2027
NERC
NERC informational filing due at FERC detailing its workplan for additional computational-load Reliability Standards (Phase II of the RD26-7 directive)
Apr 9, 2027
ERCOT
Original Batch Zero Interconnection Study results deadline (2028–2032 MW allocations + transmission plan) — ERCOT has stated 'We will not have the study done by April 9, 2027'; replacement date not…
Jun 1, 2027
PJM
New Large Load cutoff: loads entering service or adding incremental demand (≥50 MW at a single electrical site) after this date without sufficient capacity become subject to IRAS curtailment…
Jun 8, 2027
ERCOT
Original deadline for Interconnecting Large Load Entities to execute interconnection agreements and meet financial security and site-control standards to confirm Batch Zero capacity allocations…
Jul 14, 2027
NYISO
EO 62 one-year moratorium outer boundary — DEC permitting for 50 MW+ data centers can resume only after the DPS Generic Environmental Impact Statement is complete
Aug 31, 2027
MISO
ERAS (generation fast-lane) sunset or 68-project cap, per third-party tracker — relevant to developers pairing new generation with large loads
2028
ISO-NE
ISO-NE filing of updated net CONE and capacity market demand curve parameters ahead of the 2030-31 capacity commitment period
May 2028
ISO-NE
First prompt (and, if CAR-SA is approved, seasonal) capacity auction, administered one to two months before the capacity commitment period beginning June 1, 2028 — replaces the three-year-forward FCA
2029
SPP
Summer planning reserve margin requirement rises from 16% to 17%; SPP's 2025 Summer Resource Adequacy Report projects the existing-resources BA reserve margin at just 1.9% in 2029 and -1.6% by 2030…
2030
NYISO
Propel NY Energy targeted completion (construction mid-2026 through May 2030)
2032
ISO-NE
Potential in-service date for the preferred northern Maine-southern New England transmission project
No date set
FERC
FERC decisions on the six show-cause responses (EL26-67 through EL26-72) and on PJM's May 18, 2026 further co-location compliance filing (ER26-1088-001) — FERC has announced no decision deadline for…

The watchlist

One card per body: current posture toward data-center load, the queue, the binding rules and live filings, and the transmission being built to carry the load. Sorted grid operators first, then the federal layer.

ERCOT

Electric Reliability Council of Texas, Inc. (ERCOT) RTO / ISO

Interconnection of new data centers is paused statewide while ERCOT audits its entire large-load queue under Gov. Abbott's August 3, 2026 directive. The audit report is due to the PUCT by December 10, 2026, and ERCOT has told regulators the Batch Zero study will miss its April 9, 2027 deadline with no replacement date set. Texas law already lets ERCOT remotely disconnect non-critical loads of 75 MW or more during firm load shed.

Footprint: Serves more than 27 million Texas customers representing about 90% of the state's electric load, across 55,000+ miles of transmission lines and 1,460+ generation units (https://www.ercot.com/about). All-time hourly peak load record of 91,089 MW set July 22, 2026, exceeding the August 2023 record… Large-load queue: ~474 GW of large-load interconnection requests (ERCOT deck: 474.1 GW by 2031, 474.7 GW by 2033) — more than 5x the all-time peak demand record. Of that, only ~205 GW was preliminarily eligible for… · ~90% data centers — ERCOT's deck shows 90.2% (420,812 MW) of large-load MW identified as data center as of June 2026; ERCOT's June 18, 2026 release cited… (as of 2026-07-29)
Rulings, rules & filings
MeasureStatusWhat it doesSource
Texas Senate Bill 6 — large-load interconnection, curtailment, and remote-disconnect standardsSB 6, 89th Texas Legislature (2025) Effective · Jun 20, 2025
effective; PUCT implementation rulemakings ongoing through 2026
Applies to non-critical loads of 75 MW or greater in ERCOT. Requires remote-disconnect capability as a condition of interconnection for loads interconnecting after December 31, 2025, and authorizes utilities/ERCOT to disconnect eligible large loads during firm load shed events; creates a competitively procured voluntary curtailment/reliability service with a minimum 24-hour notice period. Also sets a $100,000 minimum interconnection study fee, mandatory disclosure of duplicative interconnection requests in Texas,…
Batch Zero large-load interconnection framework (PGRR145 + NPRR1325)ERCOT Planning Guide Revision Request 145; Nodal Protocol Revision… Effective · Jun 18, 2026
approved/effective; classification and study timelines now partially suspended by the August 2026 audit pause
Groups qualified large loads of 75 MW+ into a single batch study to allocate available grid capacity year-by-year (2028–2032) via Load Commissioning Plans, set financial commitments ($50,000/MW financial security), and produce an actionable transmission plan. Key milestones: developer submissions due July 10, 2026; TSP/DSP packages due July 24, 2026; ERCOT classification notices (Base Load / Studied Load) by August 7, 2026; study results April 9, 2027; interconnection agreements executed by June 8, 2027. ERCOT…
PUCT proposed rule 16 TAC §25.194 — large load interconnection standards (SB 6 implementation)PUCT Project No. 58481 Filed · Mar 12, 2026
proposed / pending adoption (adoption expected later in 2026)
Would establish interconnection standards for new or expanded loads of 75 MW+ in ERCOT: minimum study fees of $100,000 (75–249 MW) and $300,000 (250 MW+), CPI-adjusted every five years from 2027; financial security of $50,000 per MW of requested peak demand at intermediate-agreement execution plus additional security for long-lead equipment; a non-refundable interconnection fee of $50,000 per MW of contracted peak demand after study completion; site-control and development-readiness showings before studies begin;…
PUCT order in Docket 59220 — first SB 6 net-metering/co-location ruling, affirming curtailment authority over co-located data…PUCT Docket No. 59220 Effective · Jul 23, 2026
approved with conditions (binding on the applicants; first precedent for SB 6 co-location cases)
PUCT approved a net-metering arrangement for a Crusoe-developed AI data center co-located behind the ~265.5 MW Goodnight 1 wind farm (a 260 MW second facility at the campus), with conditions: the full campus load must curtail within 30 minutes during ERCOT grid emergencies, physical breaker disconnection authorized, ERCOT to give 60 minutes advance notice when practicable, and the project is barred from compensation for load reductions during grid emergencies. Establishes that emergency curtailment of co-located…
Gov. Abbott directive — comprehensive verification and audit of data centers in the ERCOT queue; pause on new data center…Gubernatorial directive to PUCT Chairman Thomas Gleeson and ERCOT… Effective · Aug 3, 2026
effective; audit in progress, pause remains pending audit completion
Directs PUCT and ERCOT to verify every data center project advancing through the interconnection process — power demand and sourcing, on-site generation progress, water use and cooling, state/local financial assistance, community protections, and ownership — before any additional data center is approved to advance. States that projects failing the verification and audit process 'must be denied' grid access. Binds ERCOT and the PUCT.
ERCOT Market Notice M-A080326-01 — suspension of Batch Zero classification deadlineERCOT Market Notice M-A080326-01 Effective · Aug 3, 2026 ERCOT announced it would not meet the August 7, 2026 deadline to notify service providers of Large Load classifications in the Batch Zero Interconnection Study, citing the Governor's directive to conduct a verification process before advancing any data center large loads. ERCOT committed to file a good cause exception request with the PUCT before the PUCT's August 20, 2026 open meeting, seeking modification of timelines in Planning Guide Sections 5 and 9.
ERCOT good-cause-exception filing and PUCT approval; audit timeline set (RFIs now, reports due December 10, 2026)PUCT Control No. 59142 (Item 42) Effective · Aug 10, 2026
approved
ERCOT requested relief from the August 7 classification deadline, authority for large loads to participate in the August and November Quarterly Stability Assessments (6 projects for August, up to 17 for November), and an extension for dynamic-data deficiency notifications; the PUCT granted the exceptions on August 20. ERCOT's timeline: RFIs to developers via TSPs/DSPs from late August through September, information gathering October–November, and filing of the Batch Zero Eligibility Verification Report and…
PUCT Project 58484 — evaluation of transmission cost recovery (4CP methodology) for large loadsPUCT Project No. 58484 Filed · Aug 1, 2025
pending rulemaking (SB 6 requires amended rules no later than December 31, 2026)
Evaluates whether the four-coincident-peak (4CP) wholesale transmission cost allocation method appropriately assigns costs given large-load growth. Draft recommendations under comment include moving to more coincident peaks over longer intervals, eliminating interconnection cost allowances for large loads, requiring large loads to pay a share of system upgrade costs, and minimum demand charges based on contracted peak demand for 10–15 years.
SB 6 companion rulemakings: Project 58479 (co-location net metering), Project 58480 (large-load forecasting, ≥10 MW definition),…PUCT Project Nos. 58479, 58480, 58482 Filed · Jan 2026
pending as of the December 23, 2025 source; mid-2026 adoption status not independently confirmed (see flags)
58479 requires PUCT approval of net-metering arrangements between new 75 MW+ customers and stand-alone generators, allowing conditional approvals (callable capacity, behind-the-meter curtailment) — the framework applied in Docket 59220. 58480 defines a large load customer as 10 MW+ at a single site for forecasting and sets documentation/milestones for inclusion in ERCOT forecasts. 58482 creates the SB 6 voluntary demand-reduction/reliability program for large loads.
ERCOT market notice M-A013126-02: Results of Final Ad Hoc Interim VRT Assessment for Large LoadsERCOT Market Notice M-A013126-02 Issued · Jun 26, 2026
Market notice
ERCOT issued market notice M-A013126-02, Results of Final Ad Hoc Interim VRT Assessment for Large Loads, on Jun 26, 2026.
ERCOT market notice M-A052026-02: Impact Analysis - Incorrect consideration of ECRS Ramp Rate Telemetry for Non-Controllable Load ResourcesERCOT Market Notice M-A052026-02 Issued · Jul 31, 2026
Market notice
ERCOT issued market notice M-A052026-02, Impact Analysis - Incorrect consideration of ECRS Ramp Rate Telemetry for Non-Controllable Load Resources, on Jul 31, 2026.
ERCOT market notice M-A080326-02: PUC Approval of Good Cause Exceptions Relating To Batch Zero ProcessERCOT Market Notice M-A080326-02 Issued · Aug 21, 2026
Market notice
ERCOT issued market notice M-A080326-02, PUC Approval of Good Cause Exceptions Relating To Batch Zero Process, on Aug 21, 2026.
ERCOT market notice M-A080326-03: Delayed Issuance of Batch Zero Conditional ClassificationsERCOT Market Notice M-A080326-03 Issued · Aug 31, 2026
Market notice
ERCOT issued market notice M-A080326-03, Delayed Issuance of Batch Zero Conditional Classifications, on Aug 31, 2026.
ERCOT market notice M-A080326-04: Batch Zero Conditional Classification issued to Transmission and/or Distribution Service ProvidersERCOT Market Notice M-A080326-04 Issued · Sep 3, 2026
Market notice
ERCOT issued market notice M-A080326-04, Batch Zero Conditional Classification issued to Transmission and/or Distribution Service Providers, on Sep 3, 2026.
ERCOT market notice M-A090226-01: Workshop to share proposed operational framework for implementing SB6-related Large Load curtailments, including registration requirementsERCOT Market Notice M-A090226-01 Issued · Sep 2, 2026
Market notice
ERCOT issued market notice M-A090226-01, Workshop to share proposed operational framework for implementing SB6-related Large Load curtailments, including registration requirements, on Sep 2, 2026.
ERCOT market notice M-A090926-01: Issuance of Batch Zero Verification Requests for InformationERCOT Market Notice M-A090926-01 Issued · Sep 9, 2026
Market notice
ERCOT issued market notice M-A090926-01, Issuance of Batch Zero Verification Requests for Information, on Sep 9, 2026.
ERCOT market notice M-B062326-01: Implementation of the Batch Zero Process (PGRR145/NPRR1325)ERCOT Market Notice M-B062326-01 Issued · Jun 23, 2026
Market notice
ERCOT issued market notice M-B062326-01, Implementation of the Batch Zero Process (PGRR145/NPRR1325), on Jun 23, 2026.
ERCOT market notice M-B062326-02: Batch Zero follow-up for WLPUN/BYOGERCOT Market Notice M-B062326-02 Issued · Jun 26, 2026
Market notice
ERCOT issued market notice M-B062326-02, Batch Zero follow-up for WLPUN/BYOG, on Jun 26, 2026.
ERCOT market notice M-B062326-03: Large Load Prerequisites for the Quarterly Stability Assessment with a Prerequisite Deadline of August 1, 2026ERCOT Market Notice M-B062326-03 Issued · Jul 8, 2026
Market notice
ERCOT issued market notice M-B062326-03, Large Load Prerequisites for the Quarterly Stability Assessment with a Prerequisite Deadline of August 1, 2026, on Jul 8, 2026.
ERCOT market notice M-B062326-04: Details for ending the Large Load Interconnection Study process under PGRR115 and submission deadlines for PGRR145 (Batch Zero) on July 10, 2026ERCOT Market Notice M-B062326-04 Issued · Jul 8, 2026
Market notice
ERCOT issued market notice M-B062326-04, Details for ending the Large Load Interconnection Study process under PGRR115 and submission deadlines for PGRR145 (Batch Zero) on July 10, 2026, on Jul 8, 2026.
ERCOT market notice M-B062326-05: Batch Zero submissions of Dynamic Model files to ERCOT for July 10, 2026 deadlineERCOT Market Notice M-B062326-05 Issued · Jul 10, 2026
Market notice
ERCOT issued market notice M-B062326-05, Batch Zero submissions of Dynamic Model files to ERCOT for July 10, 2026 deadline, on Jul 10, 2026.
ERCOT market notice M-B062326-06: Batch Zero Eligibility Submissions and Good Cause Exception Process for PGRR145ERCOT Market Notice M-B062326-06 Issued · Jul 23, 2026
Market notice
ERCOT issued market notice M-B062326-06, Batch Zero Eligibility Submissions and Good Cause Exception Process for PGRR145, on Jul 23, 2026.
ERCOT market notice M-B063026-01: Partial Implementation Details of PGRR145/NPRR1325, Batch Zero Process for Large Load InterconnectionsERCOT Market Notice M-B063026-01 Issued · Jun 30, 2026
Market notice
ERCOT issued market notice M-B063026-01, Partial Implementation Details of PGRR145/NPRR1325, Batch Zero Process for Large Load Interconnections, on Jun 30, 2026.
ERCOT market notice M-F073126-01: Revised Notice of Proposed Net Metering Arrangement Form relating to Net Metering Arrangements Involving a Large Load Customer Co-Located with an Existing Generation ResourceERCOT Market Notice M-F073126-01 Issued · Jul 31, 2026
Market notice
ERCOT issued market notice M-F073126-01, Revised Notice of Proposed Net Metering Arrangement Form relating to Net Metering Arrangements Involving a Large Load Customer Co-Located with an Existing Generation Resource, on Jul 31, 2026.
ERCOT news release: PUCT Approves ERCOT's Batch Zero Process for Connecting Large Electricity Users While Protecting System Reliability for TexansERCOT News Release 2026-06-18 06182026-puct-approves-ercots Published · Jun 18, 2026
News release
ERCOT published the news release PUCT Approves ERCOT's Batch Zero Process for Connecting Large Electricity Users While Protecting System Reliability for Texans on Jun 18, 2026.
PUCT Project 58481: Request for Control NumberPUCT Project 58481, Item 1 Filed · Jul 31, 2025
PUC RULES & PROJECTS
PUC RULES & PROJECTS filed Request for Control Number in PUCT Project 58481 on Jul 31, 2025.
PUCT Project 58481: Staff Memo and Questions for Comment w/Oct. 10 Comment DeadlinePUCT Project 58481, Item 2 Filed · Sep 12, 2025
PUC RULES & PROJECTS
PUC RULES & PROJECTS filed Staff Memo and Questions for Comment w/Oct. 10 Comment Deadline in PUCT Project 58481 on Sep 12, 2025.
PUCT Project 58481: OPUC NOTICE OF PARTICIPATION LETTERPUCT Project 58481, Item 3 Filed · Sep 24, 2025
OPUC
OPUC filed OPUC NOTICE OF PARTICIPATION LETTER in PUCT Project 58481 on Sep 24, 2025.
PUCT Project 59142: ERCOT LARGE LOAD BATCH STUDY PROCESS UPDATEPUCT Project 59142, Item 11 Filed · Feb 5, 2026
ERCOT
ERCOT filed ERCOT LARGE LOAD BATCH STUDY PROCESS UPDATE in PUCT Project 59142 on Feb 5, 2026.
PUCT Project 59142: TBC ERCOT Large Load Interconnection Batch Study CommentsPUCT Project 59142, Item 12 Filed · Feb 6, 2026
TEXAS BLOCKCHAIN COUNCIL
TEXAS BLOCKCHAIN COUNCIL filed TBC ERCOT Large Load Interconnection Batch Study Comments in PUCT Project 59142 on Feb 6, 2026.
PUCT Project 59142: ERCOT LARGE LOAD BATCH STUDY UPDATEPUCT Project 59142, Item 13 Filed · Feb 13, 2026
ERCOT
ERCOT filed ERCOT LARGE LOAD BATCH STUDY UPDATE in PUCT Project 59142 on Feb 13, 2026.
PUCT Project 59142: ERCOT LARGE LOAD BATCH STUDY UPDATEPUCT Project 59142, Item 14 Filed · Mar 5, 2026
ERCOT
ERCOT filed ERCOT LARGE LOAD BATCH STUDY UPDATE in PUCT Project 59142 on Mar 5, 2026.
PUCT Project 59142: PUC PROJECT NO. 59142 - BATCH STUDY CONSIDERATIONS AND PGRR145PUCT Project 59142, Item 15 Filed · Mar 9, 2026
SCHAPER ENERGY CONSULTING LLC
SCHAPER ENERGY CONSULTING LLC filed PUC PROJECT NO. 59142 - BATCH STUDY CONSIDERATIONS AND PGRR145 in PUCT Project 59142 on Mar 9, 2026.
PUCT Project 59142: Vistra Corp.'s Comments on Planning Guide Revision Request 145 for Project 59142PUCT Project 59142, Item 16 Filed · Mar 20, 2026
VISTRA CORP.
VISTRA CORP. filed Vistra Corp.'s Comments on Planning Guide Revision Request 145 for Project 59142 in PUCT Project 59142 on Mar 20, 2026.
PUCT Project 59142: ERCOT LARGE LOAD BATCH STUDY UPDATEPUCT Project 59142, Item 17 Filed · Mar 30, 2026
ERCOT
ERCOT filed ERCOT LARGE LOAD BATCH STUDY UPDATE in PUCT Project 59142 on Mar 30, 2026.
PUCT Project 59142: Vistra Corp.'s Comments on Planning Guide Revision Request 145 for Project 59142PUCT Project 59142, Item 18 Filed · Apr 9, 2026
VISTRA CORP.
VISTRA CORP. filed Vistra Corp.'s Comments on Planning Guide Revision Request 145 for Project 59142 in PUCT Project 59142 on Apr 9, 2026.
PUCT Project 59142: ONCOR ELECTRIC DELIVERY COMPANY LLC’S COMMENTS ON ERCOT’S PGRR 145PUCT Project 59142, Item 19 Filed · Apr 10, 2026
ONCOR ELECTRIC DELIVERY COMPANY LLC
ONCOR ELECTRIC DELIVERY COMPANY LLC filed ONCOR ELECTRIC DELIVERY COMPANY LLC’S COMMENTS ON ERCOT’S PGRR 145 in PUCT Project 59142 on Apr 10, 2026.
PUCT Project 59142: CONTROL NUMBER REQUESTPUCT Project 59142, Item 1 Filed · Dec 17, 2025
PUC EXECUTIVE DIRECTOR
PUC EXECUTIVE DIRECTOR filed CONTROL NUMBER REQUEST in PUCT Project 59142 on Dec 17, 2025.
PUCT Project 59142: ERCOT LARGE LOAD BATCH STUDY UPDATEPUCT Project 59142, Item 20 Filed · Apr 10, 2026
ERCOT
ERCOT filed ERCOT LARGE LOAD BATCH STUDY UPDATE in PUCT Project 59142 on Apr 10, 2026.
PUCT Project 59142: PGRR145 & ERCOT BATCH ZERO CRITERIA CONSIDERATIONPUCT Project 59142, Item 21 Filed · Apr 11, 2026
SCHAPER ENERGY CONSULTING LLC
SCHAPER ENERGY CONSULTING LLC filed PGRR145 & ERCOT BATCH ZERO CRITERIA CONSIDERATION in PUCT Project 59142 on Apr 11, 2026.
PUCT Project 59142: Staff MemoPUCT Project 59142, Item 22 Filed · Apr 13, 2026
PUC RULES & PROJECTS
PUC RULES & PROJECTS filed Staff Memo in PUCT Project 59142 on Apr 13, 2026.
PUCT Project 59142: Joint Comments of Google LLC, Lancium LLC, and Eolic Development LLCPUCT Project 59142, Item 24 Filed · Apr 16, 2026
Google LLC, Lancium LLC, Eolic Development LLC
Google LLC, Lancium LLC, Eolic Development LLC filed Joint Comments of Google LLC, Lancium LLC, and Eolic Development LLC in PUCT Project 59142 on Apr 16, 2026.
PUCT Project 59142: TRACT HOLDING COMPANY I, LLC’S COMMENTS ON THE COMMISSION’S STAFF MEMO DATED APRIL 12, 2026PUCT Project 59142, Item 25 Filed · Apr 16, 2026
Tract Holding Company I, LLC
Tract Holding Company I, LLC filed TRACT HOLDING COMPANY I, LLC’S COMMENTS ON THE COMMISSION’S STAFF MEMO DATED APRIL 12, 2026 in PUCT Project 59142 on Apr 16, 2026.
PUCT Project 59142: Comments in Response to Staff MemoPUCT Project 59142, Item 27 Filed · Apr 16, 2026
Engine No. 1
Engine No. 1 filed Comments in Response to Staff Memo in PUCT Project 59142 on Apr 16, 2026.
PUCT Project 59142: CyrusOne Project No. 59142 Batch Study Considerations and PGRR145PUCT Project 59142, Item 29 Filed · Apr 17, 2026
CyrusOne, LP
CyrusOne, LP filed CyrusOne Project No. 59142 Batch Study Considerations and PGRR145 in PUCT Project 59142 on Apr 17, 2026.
PUCT Project 59142: Joint Comments of Google LLC and Lancium LLC as it pertains to ERCOT's Large Load Process ReformsPUCT Project 59142, Item 2 Filed · Dec 18, 2025
GOOGLE LLC, LANCIUM LLC
GOOGLE LLC, LANCIUM LLC filed Joint Comments of Google LLC and Lancium LLC as it pertains to ERCOT's Large Load Process Reforms in PUCT Project 59142 on Dec 18, 2025.
PUCT Project 59142: Staff's April 29, 2026 comments on PGRR 145PUCT Project 59142, Item 30 Filed · Apr 29, 2026
PUC DEPUTY EXECUTIVE DIRECTOR
PUC DEPUTY EXECUTIVE DIRECTOR filed Staff's April 29, 2026 comments on PGRR 145 in PUCT Project 59142 on Apr 29, 2026.
PUCT Project 59142: TRACT HOLDING COMPANY I, LLC’S COMMENTS ON THE COMMISSION’S STAFF MEMO DATED APRIL 12, 2026PUCT Project 59142, Item 31 Filed · May 4, 2026
Tract Holding Company I, LLC
Tract Holding Company I, LLC filed TRACT HOLDING COMPANY I, LLC’S COMMENTS ON THE COMMISSION’S STAFF MEMO DATED APRIL 12, 2026 in PUCT Project 59142 on May 4, 2026.
PUCT Project 59142: ERCOT LARGE LOAD BATCH STUDY UPDATEPUCT Project 59142, Item 32 Filed · May 5, 2026
ERCOT
ERCOT filed ERCOT LARGE LOAD BATCH STUDY UPDATE in PUCT Project 59142 on May 5, 2026.
PUCT Project 59142: Staff memo on Batch 0 entry criteriaPUCT Project 59142, Item 33 Filed · May 6, 2026
PUC DEPUTY EXECUTIVE DIRECTOR
PUC DEPUTY EXECUTIVE DIRECTOR filed Staff memo on Batch 0 entry criteria in PUCT Project 59142 on May 6, 2026.
PUCT Project 59142: DCC Comments on Net Metering Arrangements in Batch ZeroPUCT Project 59142, Item 34 Filed · May 14, 2026
Data Center Coalition (DCC)
Data Center Coalition (DCC) filed DCC Comments on Net Metering Arrangements in Batch Zero in PUCT Project 59142 on May 14, 2026.
PUCT Project 59142: Comments on May 6th Staff MemorandumPUCT Project 59142, Item 36 Filed · May 26, 2026
Nightpeak Energy LLC
Nightpeak Energy LLC filed Comments on May 6th Staff Memorandum in PUCT Project 59142 on May 26, 2026.
PUCT Project 59142: Crusoe Technologies, LLC Comments on Recommended Approval of PGRR 145 by the ERCOT Board of DirectorsPUCT Project 59142, Item 37 Filed · Jun 12, 2026
Crusoe Technologies, LLC
Crusoe Technologies, LLC filed Crusoe Technologies, LLC Comments on Recommended Approval of PGRR 145 by the ERCOT Board of Directors in PUCT Project 59142 on Jun 12, 2026.
PUCT Project 59142: First Ammonia LLC's Comments on Commission Consideration of PGRR 145, Batch Zero Process for Large Load InterconnectionsPUCT Project 59142, Item 39 Filed · Jun 17, 2026
First Ammonia LLC
First Ammonia LLC filed First Ammonia LLC's Comments on Commission Consideration of PGRR 145, Batch Zero Process for Large Load Interconnections in PUCT Project 59142 on Jun 17, 2026.
PUCT Project 59142: Project Trailblazer - Request for Legacy and/or batch zero Interconnection Process ConsiderationPUCT Project 59142, Item 40 Filed · Jul 10, 2026
Trailblazer Infrastructure LLC
Trailblazer Infrastructure LLC filed Project Trailblazer - Request for Legacy and/or batch zero Interconnection Process Consideration in PUCT Project 59142 on Jul 10, 2026.
PUCT Project 59142: Notice of Withdrawal - This filing formally withdraws Trailblazer Infrastructure LLC's previously submitted Informational Memorandum in PUCT Project No. 59142. The notice advises the Commission that, due to ongoing discussions among the relevant parties.PUCT Project 59142, Item 41 Filed · Jul 13, 2026
Trailblazer Infrastrructure LLC.
Trailblazer Infrastrructure LLC. filed Notice of Withdrawal - This filing formally withdraws Trailblazer Infrastructure LLC's previously submitted Informational Memorandum in PUCT Project No. 59142. The notice advises the Commission that, due to ongoing discussions among the relevant parties. in PUCT Project 59142 on Jul 13, 2026.
PUCT Project 59142: ELECTRIC RELIABILITY COUNCIL OF TEXAS, INC.’S REQUESTS FOR GOOD CAUSE EXCEPTIONS RELATING TO BATCH ZERO DEADLINES AND STATUS UPDATE ON ADDITIONAL MATTERS INCLUDING THE LONG-TERM LOAD FORECASTPUCT Project 59142, Item 42 Filed · Aug 10, 2026
ERCOT
ERCOT filed ELECTRIC RELIABILITY COUNCIL OF TEXAS, INC.’S REQUESTS FOR GOOD CAUSE EXCEPTIONS RELATING TO BATCH ZERO DEADLINES AND STATUS UPDATE ON ADDITIONAL MATTERS INCLUDING THE LONG-TERM LOAD FORECAST in PUCT Project 59142 on Aug 10, 2026.
PUCT Project 59142: Letter regarding ERCOT's Requests for Exceptions Relating to Batch Zero DeadlinesPUCT Project 59142, Item 44 Filed · Aug 13, 2026
First Ammonia LLC
First Ammonia LLC filed Letter regarding ERCOT's Requests for Exceptions Relating to Batch Zero Deadlines in PUCT Project 59142 on Aug 13, 2026.
PUCT Project 59142: Octa's Comments on ERCOT's August 10, 2026 Status UpdatePUCT Project 59142, Item 45 Filed · Aug 13, 2026
Octa Data Center Development Company LLC
Octa Data Center Development Company LLC filed Octa's Comments on ERCOT's August 10, 2026 Status Update in PUCT Project 59142 on Aug 13, 2026.
PUCT Project 59142: Public Comment - Audit Standards Required Under Governor’s DirectivePUCT Project 59142, Item 46 Filed · Aug 16, 2026
Sandra Gail Gilbreath Wright
Sandra Gail Gilbreath Wright filed Public Comment - Audit Standards Required Under Governor’s Directive in PUCT Project 59142 on Aug 16, 2026.
PUCT Project 59142: Ionic Digital Inc.'s Comments Regarding ERCOT's Requests for Good Cause Exceptions Relating to Batch Zero DeadlinesPUCT Project 59142, Item 48 Filed · Aug 19, 2026
Ionic Digital Inc.
Ionic Digital Inc. filed Ionic Digital Inc.'s Comments Regarding ERCOT's Requests for Good Cause Exceptions Relating to Batch Zero Deadlines in PUCT Project 59142 on Aug 19, 2026.
PUCT Project 59142: Request for Commission Action on Batch Zero Eligibility (CloudPeak BZ-259 & BZ-180)PUCT Project 59142, Item 49 Filed · Aug 19, 2026
PowerHouse CloudPeak Venture Alpha LLC and PowerHouse CloudPeak Venture C LLC
PowerHouse CloudPeak Venture Alpha LLC and PowerHouse CloudPeak Venture C LLC filed Request for Commission Action on Batch Zero Eligibility (CloudPeak BZ-259 & BZ-180) in PUCT Project 59142 on Aug 19, 2026.
PUCT Project 59142: LETTER RE ERCOT LARGE LOAD BATCH STUDY PROCESS UPDATEPUCT Project 59142, Item 4 Filed · Jan 12, 2026
ERCOT
ERCOT filed LETTER RE ERCOT LARGE LOAD BATCH STUDY PROCESS UPDATE in PUCT Project 59142 on Jan 12, 2026.
PUCT Project 59142: ERCOT UPDATES - GOOD CAUSE EXCEPTIONS FOR PGRR 145, BATCH ZERO VERIFICATION AND AUDIT PROCESS, AND COMMUNITY IMPACT REVIEW PROCESSPUCT Project 59142, Item 52 Filed · Aug 20, 2026
ERCOT
ERCOT filed ERCOT UPDATES - GOOD CAUSE EXCEPTIONS FOR PGRR 145, BATCH ZERO VERIFICATION AND AUDIT PROCESS, AND COMMUNITY IMPACT REVIEW PROCESS in PUCT Project 59142 on Aug 20, 2026.
PUCT Project 59142: ORDER GRANTING GOOD CAUSE EXCEPTIONSPUCT Project 59142, Item 53 Filed · Aug 20, 2026
PUC OPDM
PUC OPDM filed ORDER GRANTING GOOD CAUSE EXCEPTIONS in PUCT Project 59142 on Aug 20, 2026.
PUCT Project 59142: SCHAPER ENERGY CONSULTING PROPOSED APPROACH TO PUBLIC BENEFIT DISCLOSURE IN THE COMMUNITY IMPACT COMPONENT OF THE LARGE LOAD AUDITPUCT Project 59142, Item 54 Filed · Aug 20, 2026
SCHAPER ENERGY CONSULTING LLC
SCHAPER ENERGY CONSULTING LLC filed SCHAPER ENERGY CONSULTING PROPOSED APPROACH TO PUBLIC BENEFIT DISCLOSURE IN THE COMMUNITY IMPACT COMPONENT OF THE LARGE LOAD AUDIT in PUCT Project 59142 on Aug 20, 2026.
PUCT Project 59142: ERCOT UPDATE FOR SEPTEMBER 11, 2026 OPEN MEETING - BATCH ZERO AND STATE AND COMMUNITY IMPACT RFI PROCESSPUCT Project 59142, Item 55 Filed · Sep 11, 2026
ERCOT
ERCOT filed ERCOT UPDATE FOR SEPTEMBER 11, 2026 OPEN MEETING - BATCH ZERO AND STATE AND COMMUNITY IMPACT RFI PROCESS in PUCT Project 59142 on Sep 11, 2026.
PUCT Project 59142: Request for Audit for Project RaptorPUCT Project 59142, Item 56 Filed · Sep 11, 2026
Laura Lindemann
Laura Lindemann filed Request for Audit for Project Raptor in PUCT Project 59142 on Sep 11, 2026.
PUCT Project 59142: Synergen's Request for Good Cause Exception Relating To Batch Zero Eligibility DeadlinesPUCT Project 59142, Item 57 Filed · Sep 11, 2026
Synergen Green Energy, Inc.
Synergen Green Energy, Inc. filed Synergen's Request for Good Cause Exception Relating To Batch Zero Eligibility Deadlines in PUCT Project 59142 on Sep 11, 2026.
PUCT Project 59142: LETTER RE FEBRUARY 3 2026 BATCH STUDY WORKSHOPPUCT Project 59142, Item 5 Filed · Jan 16, 2026
ERCOT
ERCOT filed LETTER RE FEBRUARY 3 2026 BATCH STUDY WORKSHOP in PUCT Project 59142 on Jan 16, 2026.
PUCT Project 59142: LETTER RE ERCOT LARGE LOAD BATCH STUDY PROCESS UPDATEPUCT Project 59142, Item 6 Filed · Jan 26, 2026
ERCOT
ERCOT filed LETTER RE ERCOT LARGE LOAD BATCH STUDY PROCESS UPDATE in PUCT Project 59142 on Jan 26, 2026.
PUCT Project 59142: OPEN LETTER TO THE COMMISSION REGARDING ERCOT'S INTERCONNECTION PROCESS FOR LARGE LOADSPUCT Project 59142, Item 7 Filed · Jan 29, 2026
Rose City Partners, Schaper Energy Consulting, Crusoe Energy Systems, Outlaw Ventures, Solomon Data Systems, Eolic Development Partners, Zero Emission Grid, Juvo Energy, Belisari, and V-Wire
Rose City Partners, Schaper Energy Consulting, Crusoe Energy Systems, Outlaw Ventures, Solomon Data Systems, Eolic Development Partners, Zero Emission Grid, Juvo Energy, Belisari, and V-Wire filed OPEN LETTER TO THE COMMISSION REGARDING ERCOT'S INTERCONNECTION PROCESS FOR LARGE LOADS in PUCT Project 59142 on Jan 29, 2026.
PUCT Project 59142: ERCOT LARGE LOAD BATCH STUDY PROCESS DRAFT FRAMEWORK PRESENTATIONSPUCT Project 59142, Item 8 Filed · Jan 30, 2026
ERCOT
ERCOT filed ERCOT LARGE LOAD BATCH STUDY PROCESS DRAFT FRAMEWORK PRESENTATIONS in PUCT Project 59142 on Jan 30, 2026.
PUCT Project 59142: OPUC NOTICE OF PARTICIPATION LETTERPUCT Project 59142, Item 9 Filed · Feb 2, 2026
OPUC
OPUC filed OPUC NOTICE OF PARTICIPATION LETTER in PUCT Project 59142 on Feb 2, 2026.
PUCT Project 58481: VOID SEE ITEM 205PUCT Project 58481, Item 204 Filed · Aug 24, 2026
PUC RULES & PROJECTS
PUC RULES & PROJECTS filed VOID SEE ITEM 205 in PUCT Project 58481 on Aug 24, 2026.
PUCT Project 58481: Memo Requesting CR Void Item No. 204PUCT Project 58481, Item 205 Filed · Aug 24, 2026
PUC RULES & PROJECTS
PUC RULES & PROJECTS filed Memo Requesting CR Void Item No. 204 in PUCT Project 58481 on Aug 24, 2026.
PUCT Project 58481: Staff Memo w/Draft Recommended Changes to Proposed RulePUCT Project 58481, Item 206 Filed · Aug 24, 2026
PUC RULES & PROJECTS
PUC RULES & PROJECTS filed Staff Memo w/Draft Recommended Changes to Proposed Rule in PUCT Project 58481 on Aug 24, 2026.
PUCT Project 58796: SOAH ORDER NO. 10 - EXTENDING BRIEFING DEADLINESPUCT Project 58796, Item 99 Filed · Aug 27, 2026
SOAH
SOAH filed SOAH ORDER NO. 10 - EXTENDING BRIEFING DEADLINES in PUCT Project 58796 on Aug 27, 2026.
PUCT Project 59948: EPE's Proof of NoticePUCT Project 59948, Item 11 Filed · Aug 27, 2026
EL PASO ELECTRIC COMPANY
EL PASO ELECTRIC COMPANY filed EPE's Proof of Notice in PUCT Project 59948 on Aug 27, 2026.
PUCT Project 58481: Comments of CenterPoint Energy Houston Electric, LLCPUCT Project 58481, Item 10 Filed · Oct 10, 2025
CENTERPOINT ENERGY HOUSTON ELECTRIC
CENTERPOINT ENERGY HOUSTON ELECTRIC filed Comments of CenterPoint Energy Houston Electric, LLC in PUCT Project 58481 on Oct 10, 2025.
PUCT Project 58481: ONCOR'S RESPONSE TO COMMISSION STAFF’S FIRST SET OF QUESTIONS FOR COMMENTSPUCT Project 58481, Item 11 Filed · Oct 10, 2025
ONCOR ELECTRIC DELIVERY COMPANY LLC
ONCOR ELECTRIC DELIVERY COMPANY LLC filed ONCOR'S RESPONSE TO COMMISSION STAFF’S FIRST SET OF QUESTIONS FOR COMMENTS in PUCT Project 58481 on Oct 10, 2025.
PUCT Project 58481: RESPONSE TO QUESTIONS FOR COMMENTPUCT Project 58481, Item 12 Filed · Oct 10, 2025
LCRA TRANSMISSION SERVICE CORPORATION
LCRA TRANSMISSION SERVICE CORPORATION filed RESPONSE TO QUESTIONS FOR COMMENT in PUCT Project 58481 on Oct 10, 2025.
PUCT Project 58481: DCC Comments on Project 58481, Rulemaking to Implement Large Load Interconnection StandardsPUCT Project 58481, Item 13 Filed · Oct 10, 2025
Data Center Coalition
Data Center Coalition filed DCC Comments on Project 58481, Rulemaking to Implement Large Load Interconnection Standards in PUCT Project 58481 on Oct 10, 2025.
PUCT Project 58481: Responses of Texas Electric Cooperatives, Inc.PUCT Project 58481, Item 15 Filed · Oct 10, 2025
Texas Electric Cooperatives, Inc.
Texas Electric Cooperatives, Inc. filed Responses of Texas Electric Cooperatives, Inc. in PUCT Project 58481 on Oct 10, 2025.
PUCT Project 58481: Sharyland Utilities, L.L.C's Comments to Commission Staff's Questions for CommentsPUCT Project 58481, Item 16 Filed · Oct 10, 2025
SHARYLAND UTILITIES, L.L.C.
SHARYLAND UTILITIES, L.L.C. filed Sharyland Utilities, L.L.C's Comments to Commission Staff's Questions for Comments in PUCT Project 58481 on Oct 10, 2025.
PUCT Project 58481: Eneus Response to Staff Questions on Project No. 58481PUCT Project 58481, Item 19 Filed · Oct 10, 2025
Eneus Energy
Eneus Energy filed Eneus Response to Staff Questions on Project No. 58481 in PUCT Project 58481 on Oct 10, 2025.
PUCT Project 58481: OPUC’S RESPONSES TO QUESTIONS FOR PUBLIC COMMENT RELATED TO THE IMPLEMENTATION OF PURA § 37.0561PUCT Project 58481, Item 20 Filed · Oct 10, 2025
OPUC
OPUC filed OPUC’S RESPONSES TO QUESTIONS FOR PUBLIC COMMENT RELATED TO THE IMPLEMENTATION OF PURA § 37.0561 in PUCT Project 58481 on Oct 10, 2025.
PUCT Project 58481: ELECTRIC RELIABILITY COUNCIL OF TEXAS, INC.’S RESPONSES TO STAFF QUESTIONSPUCT Project 58481, Item 21 Filed · Oct 10, 2025
ERCOT
ERCOT filed ELECTRIC RELIABILITY COUNCIL OF TEXAS, INC.’S RESPONSES TO STAFF QUESTIONS in PUCT Project 58481 on Oct 10, 2025.
PUCT Project 58481: AEP Texas Responses to Questions for Public CommentPUCT Project 58481, Item 22 Filed · Oct 10, 2025
AEP TEXAS INC.
AEP TEXAS INC. filed AEP Texas Responses to Questions for Public Comment in PUCT Project 58481 on Oct 10, 2025.
PUCT Project 58481: TEBA Responses to Staff Questions on Project 58481PUCT Project 58481, Item 24 Filed · Oct 10, 2025
TEXAS ENERGY BUYERS ALLIANCE
TEXAS ENERGY BUYERS ALLIANCE filed TEBA Responses to Staff Questions on Project 58481 in PUCT Project 58481 on Oct 10, 2025.
PUCT Project 58481: Texas-New Mexico Power Company's Comments to Commission Staff's Questions for CommentPUCT Project 58481, Item 27 Filed · Oct 10, 2025
TEXAS-NEW MEXICO POWER COMPANY
TEXAS-NEW MEXICO POWER COMPANY filed Texas-New Mexico Power Company's Comments to Commission Staff's Questions for Comment in PUCT Project 58481 on Oct 10, 2025.
PUCT Project 58481: Lancium Comments on Project No. 58481PUCT Project 58481, Item 28 Filed · Oct 10, 2025
LANCIUM, LLC
LANCIUM, LLC filed Lancium Comments on Project No. 58481 in PUCT Project 58481 on Oct 10, 2025.
PUCT Project 58481: Enchanted Rock, LLC's Responses to Commission Staff's Questions for CommentPUCT Project 58481, Item 30 Filed · Oct 14, 2025
ENCHANTED ROCK, LLC
ENCHANTED ROCK, LLC filed Enchanted Rock, LLC's Responses to Commission Staff's Questions for Comment in PUCT Project 58481 on Oct 14, 2025.
PUCT Project 58481: Discussion Draft w/12.19 Comment DeadlinePUCT Project 58481, Item 31 Filed · Dec 1, 2025
PUC RULES & PROJECTS
PUC RULES & PROJECTS filed Discussion Draft w/12.19 Comment Deadline in PUCT Project 58481 on Dec 1, 2025.
PUCT Project 58481: SCHAPER ENERGY CONSULTING LLC RESPONSE TO PROJECT NO. 58481, COMMENTS TO STAFF’s QUESTIONS AND DRAFT 16 TAC §25.194PUCT Project 58481, Item 32 Filed · Dec 8, 2025
Schaper Energy Consulting LLC
Schaper Energy Consulting LLC filed SCHAPER ENERGY CONSULTING LLC RESPONSE TO PROJECT NO. 58481, COMMENTS TO STAFF’s QUESTIONS AND DRAFT 16 TAC §25.194 in PUCT Project 58481 on Dec 8, 2025.
PUCT Project 58481: Notice of January 9 WorkshopPUCT Project 58481, Item 33 Filed · Dec 16, 2025
PUC RULES & PROJECTS
PUC RULES & PROJECTS filed Notice of January 9 Workshop in PUCT Project 58481 on Dec 16, 2025.
PUCT Project 58481: Cholla Comments on Draft RulePUCT Project 58481, Item 34 Filed · Dec 16, 2025
Cholla Petroleum, Inc.
Cholla Petroleum, Inc. filed Cholla Comments on Draft Rule in PUCT Project 58481 on Dec 16, 2025.
PUCT Project 58481: Cholla Comments on Draft Rule AmendedPUCT Project 58481, Item 35 Filed · Dec 17, 2025
Cholla Petroleum, Inc.
Cholla Petroleum, Inc. filed Cholla Comments on Draft Rule Amended in PUCT Project 58481 on Dec 17, 2025.
PUCT Project 58481: Comments on proposed staff draft on large load interconnection standards.PUCT Project 58481, Item 36 Filed · Dec 18, 2025
SIERRA CLUB
SIERRA CLUB filed Comments on proposed staff draft on large load interconnection standards. in PUCT Project 58481 on Dec 18, 2025.
PUCT Project 58481: Joint Comments of Google LLC and Lancium LLC to 58481 Large Load Interconnection StandardsPUCT Project 58481, Item 40 Filed · Dec 18, 2025
GOOGLE LLC, LANCIUM LLC
GOOGLE LLC, LANCIUM LLC filed Joint Comments of Google LLC and Lancium LLC to 58481 Large Load Interconnection Standards in PUCT Project 58481 on Dec 18, 2025.
PUCT Project 58481: TCPA Comments on Staff Questions & Discussion DraftPUCT Project 58481, Item 42 Filed · Dec 19, 2025
TCPA
TCPA filed TCPA Comments on Staff Questions & Discussion Draft in PUCT Project 58481 on Dec 19, 2025.
PUCT Project 58481: Comments of Texas Electric Cooperatives, Inc.PUCT Project 58481, Item 48 Filed · Dec 19, 2025
Texas Electric Cooperatives, Inc.
Texas Electric Cooperatives, Inc. filed Comments of Texas Electric Cooperatives, Inc. in PUCT Project 58481 on Dec 19, 2025.
PUCT Project 58481: Comments of CenterPoint Energy Houston Electric, LLCPUCT Project 58481, Item 49 Filed · Dec 19, 2025
CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC
CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC filed Comments of CenterPoint Energy Houston Electric, LLC in PUCT Project 58481 on Dec 19, 2025.
PUCT Project 58481: SCHAPER ENERGY CONSULTING LLC RESPONSE TO STAFF’s QUESTIONS ON PROJECT NO. 58481; RULEMAKING TO IMPLEMENT LARGE LOAD INTERCONNECTION STANDARDS UNDER PURA §37.0561PUCT Project 58481, Item 4 Filed · Sep 30, 2025
Schaper Energy Consulting LLC
Schaper Energy Consulting LLC filed SCHAPER ENERGY CONSULTING LLC RESPONSE TO STAFF’s QUESTIONS ON PROJECT NO. 58481; RULEMAKING TO IMPLEMENT LARGE LOAD INTERCONNECTION STANDARDS UNDER PURA §37.0561 in PUCT Project 58481 on Sep 30, 2025.
PUCT Project 58481: NRG Energy, Inc.'s Comments on Staff's Discussion DraftPUCT Project 58481, Item 50 Filed · Dec 19, 2025
NRG ENERGY, INC.
NRG ENERGY, INC. filed NRG Energy, Inc.'s Comments on Staff's Discussion Draft in PUCT Project 58481 on Dec 19, 2025.
PUCT Project 58481: BASF Comments on Rule Project 58481PUCT Project 58481, Item 52 Filed · Dec 19, 2025
BASF
BASF filed BASF Comments on Rule Project 58481 in PUCT Project 58481 on Dec 19, 2025.
PUCT Project 58481: RESPONSE TO QUESTIONS FOR COMMENT AND DRAFT NEW 16 TAC § 25.194PUCT Project 58481, Item 53 Filed · Dec 19, 2025
LCRA TRANSMISSION SERVICES CORPORATION
LCRA TRANSMISSION SERVICES CORPORATION filed RESPONSE TO QUESTIONS FOR COMMENT AND DRAFT NEW 16 TAC § 25.194 in PUCT Project 58481 on Dec 19, 2025.
PUCT Project 58481: Comments on Staff new Draft 16 TAC §25.194PUCT Project 58481, Item 55 Filed · Dec 19, 2025
Aperture
Aperture filed Comments on Staff new Draft 16 TAC §25.194 in PUCT Project 58481 on Dec 19, 2025.
PUCT Project 58481: ERCOT Steel Mills' Comments on Staff's Discussion Draft for Project No. 58481PUCT Project 58481, Item 57 Filed · Dec 19, 2025
ERCOT STEEL MILLS
ERCOT STEEL MILLS filed ERCOT Steel Mills' Comments on Staff's Discussion Draft for Project No. 58481 in PUCT Project 58481 on Dec 19, 2025.
PUCT Project 58481: Cholla, Inc. Response to Staff Questions on Project No. 58481; Large Load Interconnection Framework RecommendationsPUCT Project 58481, Item 5 Filed · Oct 9, 2025
Cholla, Inc.
Cholla, Inc. filed Cholla, Inc. Response to Staff Questions on Project No. 58481; Large Load Interconnection Framework Recommendations in PUCT Project 58481 on Oct 9, 2025.
PUCT Project 58481: ONCOR ELECTRIC DELIVERY'S COMMENTS ON COMMISSION STAFF'S RULE 25.194 DISCUSSION DRAFTPUCT Project 58481, Item 61 Filed · Dec 19, 2025
ONCOR ELECTRIC DELIVERY COMPANY LLC
ONCOR ELECTRIC DELIVERY COMPANY LLC filed ONCOR ELECTRIC DELIVERY'S COMMENTS ON COMMISSION STAFF'S RULE 25.194 DISCUSSION DRAFT in PUCT Project 58481 on Dec 19, 2025.
PUCT Project 58481: Provident Inc. comments on staff discussion draftPUCT Project 58481, Item 62 Filed · Dec 19, 2025
Provident Inc.
Provident Inc. filed Provident Inc. comments on staff discussion draft in PUCT Project 58481 on Dec 19, 2025.
PUCT Project 58481: OFFICE OF PUBLIC UTILITY COUNSEL’S COMMENTS ON DISCUSSION DRAFT AND QUESTIONS FOR PUBLIC COMMENTS RELATED TO NEW 16 TAC § 25.194PUCT Project 58481, Item 64 Filed · Dec 19, 2025
OPUC
OPUC filed OFFICE OF PUBLIC UTILITY COUNSEL’S COMMENTS ON DISCUSSION DRAFT AND QUESTIONS FOR PUBLIC COMMENTS RELATED TO NEW 16 TAC § 25.194 in PUCT Project 58481 on Dec 19, 2025.
PUCT Project 58481: DCC's Comments on the Discussion Draft (Project 58481)PUCT Project 58481, Item 66 Filed · Dec 19, 2025
Data Center Coalition
Data Center Coalition filed DCC's Comments on the Discussion Draft (Project 58481) in PUCT Project 58481 on Dec 19, 2025.
PUCT Project 58481: SPLIGHT COMMENTS ON STAFF'S DRAFT DISCUSSION RULE § 25.194PUCT Project 58481, Item 69 Filed · Dec 19, 2025
Splight Inc.
Splight Inc. filed SPLIGHT COMMENTS ON STAFF'S DRAFT DISCUSSION RULE § 25.194 in PUCT Project 58481 on Dec 19, 2025.
PUCT Project 58481: TCPA Response to Staff QuestionsPUCT Project 58481, Item 6 Filed · Oct 10, 2025
TCPA
TCPA filed TCPA Response to Staff Questions in PUCT Project 58481 on Oct 10, 2025.
PUCT Project 58481: AEP TEXAS INC.’S COMMENTS ON STAFF DISCUSSION DRAFTPUCT Project 58481, Item 71 Filed · Dec 19, 2025
AEP TEXAS INC.
AEP TEXAS INC. filed AEP TEXAS INC.’S COMMENTS ON STAFF DISCUSSION DRAFT in PUCT Project 58481 on Dec 19, 2025.
PUCT Project 58481: Targa Resources LLC's Comments in Response to Commission Staff's Discussion DraftPUCT Project 58481, Item 72 Filed · Dec 19, 2025
Targa Resources LLC
Targa Resources LLC filed Targa Resources LLC's Comments in Response to Commission Staff's Discussion Draft in PUCT Project 58481 on Dec 19, 2025.
PUCT Project 58481: Texas-New Mexico Power Company’s Comments To Commission Staff’s Questions For Comment On Draft New 16 Tac § 25.194PUCT Project 58481, Item 73 Filed · Dec 19, 2025
TEXAS-NEW MEXICO POWER COMPANY
TEXAS-NEW MEXICO POWER COMPANY filed Texas-New Mexico Power Company’s Comments To Commission Staff’s Questions For Comment On Draft New 16 Tac § 25.194 in PUCT Project 58481 on Dec 19, 2025.
PUCT Project 58481: CRUSOE ENERGY SYSTEMS LLC’S COMMENTS ON STAFF’S DRAFT DISCUSSION RULE 16 TAC § 25.194PUCT Project 58481, Item 75 Filed · Dec 19, 2025
CRUSOE ENERGY SYSTEMS LLC
CRUSOE ENERGY SYSTEMS LLC filed CRUSOE ENERGY SYSTEMS LLC’S COMMENTS ON STAFF’S DRAFT DISCUSSION RULE 16 TAC § 25.194 in PUCT Project 58481 on Dec 19, 2025.
PUCT Project 58481: ELECTRIC RELIABILITY COUNCIL OF TEXAS, INC.’S COMMENTS ON DISCUSSION DRAFTPUCT Project 58481, Item 76 Filed · Dec 19, 2025
ERCOT
ERCOT filed ELECTRIC RELIABILITY COUNCIL OF TEXAS, INC.’S COMMENTS ON DISCUSSION DRAFT in PUCT Project 58481 on Dec 19, 2025.
PUCT Project 58481: TEBA's Comments on Commission Staff's Questions and Discussion DraftPUCT Project 58481, Item 78 Filed · Dec 19, 2025
TEXAS ENERGY BUYERS ALLIANCE
TEXAS ENERGY BUYERS ALLIANCE filed TEBA's Comments on Commission Staff's Questions and Discussion Draft in PUCT Project 58481 on Dec 19, 2025.
PUCT Project 58481: EDGECONNEX RESPONSE TO STAFF’S QUESTIONS ON PROJECT NO. 58481; RULEMAKING TO IMPLEMENT LARGE LOAD INTERCONNECTION STANDARDS UNDER PURA §37.0561PUCT Project 58481, Item 7 Filed · Oct 10, 2025
EdgeConneX
EdgeConneX filed EDGECONNEX RESPONSE TO STAFF’S QUESTIONS ON PROJECT NO. 58481; RULEMAKING TO IMPLEMENT LARGE LOAD INTERCONNECTION STANDARDS UNDER PURA §37.0561 in PUCT Project 58481 on Oct 10, 2025.
PUCT Project 58481: SOLUNA DIGITAL’S SUPPORTIVE COMMENTS FOR COMMENTS SUBMITTED BY SATOSHI ENERGY ON STAFF'S DISCUSSION DRAFT NEW 16 TAC §25.194PUCT Project 58481, Item 81 Filed · Dec 19, 2025
Soluna Digital
Soluna Digital filed SOLUNA DIGITAL’S SUPPORTIVE COMMENTS FOR COMMENTS SUBMITTED BY SATOSHI ENERGY ON STAFF'S DISCUSSION DRAFT NEW 16 TAC §25.194 in PUCT Project 58481 on Dec 19, 2025.
PUCT Project 58481: Staff Memo and January 9 Workshop Agenda w/AttachmentsPUCT Project 58481, Item 82 Filed · Jan 2, 2026
PUC RULES & PROJECTS
PUC RULES & PROJECTS filed Staff Memo and January 9 Workshop Agenda w/Attachments in PUCT Project 58481 on Jan 2, 2026.
PUCT Project 58481: SATOSHI ENERGY COMMENTS ON STAFF'S SECOND DISCUSSION DRAFT ON PROJECT NO. 58481, RULEMAKING TO IMPLEMENT LARGE LOAD INTERCONNECTION STANDARDS UNDER PURA §37.0561PUCT Project 58481, Item 83 Filed · Jan 16, 2026
SATOSHI ENERGY CORP.
SATOSHI ENERGY CORP. filed SATOSHI ENERGY COMMENTS ON STAFF'S SECOND DISCUSSION DRAFT ON PROJECT NO. 58481, RULEMAKING TO IMPLEMENT LARGE LOAD INTERCONNECTION STANDARDS UNDER PURA §37.0561 in PUCT Project 58481 on Jan 16, 2026.
PUCT Project 58481: CRUSOE ENERGY SYSTEMS LLC’S COMMENTS ON STAFF’S SECOND DRAFT DISCUSSION RULE 16 TAC § 25.194PUCT Project 58481, Item 84 Filed · Jan 16, 2026
CRUSOE ENERGY SYSTEMS LLC
CRUSOE ENERGY SYSTEMS LLC filed CRUSOE ENERGY SYSTEMS LLC’S COMMENTS ON STAFF’S SECOND DRAFT DISCUSSION RULE 16 TAC § 25.194 in PUCT Project 58481 on Jan 16, 2026.
PUCT Project 58481: Google and Lancium Joint Comments to STaff Questions and 2nd Discussion DraftPUCT Project 58481, Item 87 Filed · Jan 16, 2026
GOOGLE LLC, LANCIUM LLC
GOOGLE LLC, LANCIUM LLC filed Google and Lancium Joint Comments to STaff Questions and 2nd Discussion Draft in PUCT Project 58481 on Jan 16, 2026.
PUCT Project 58481: NRG Energy, Inc.'s Comments on PUCT Staff's QuestionsPUCT Project 58481, Item 8 Filed · Oct 10, 2025
NRG ENERGY, INC.
NRG ENERGY, INC. filed NRG Energy, Inc.'s Comments on PUCT Staff's Questions in PUCT Project 58481 on Oct 10, 2025.
PUCT Project 58481: Texas Public Power Association (TPPA) Response to Questions for CommentPUCT Project 58481, Item 9 Filed · Oct 10, 2025
TPPA
TPPA filed Texas Public Power Association (TPPA) Response to Questions for Comment in PUCT Project 58481 on Oct 10, 2025.
PUCT Project 59142: Request of audit for Project RaptorPUCT Project 59142, Item 58 Filed · Sep 13, 2026
Ray Baggett
Ray Baggett filed Request of audit for Project Raptor in PUCT Project 59142 on Sep 13, 2026.
PUCT Project 59142: Audit Request- Project RaptorPUCT Project 59142, Item 59 Filed · Sep 13, 2026
Megan Atchison
Megan Atchison filed Audit Request- Project Raptor in PUCT Project 59142 on Sep 13, 2026.
PUCT Project 59142: Audit Request- Project RaptorPUCT Project 59142, Item 60 Filed · Sep 13, 2026
Andrew Atchison
Andrew Atchison filed Audit Request- Project Raptor in PUCT Project 59142 on Sep 13, 2026.
PUCT Project 59142: Audit Request- Project RaptorPUCT Project 59142, Item 61 Filed · Sep 13, 2026
Merri Dawn Bolton
Merri Dawn Bolton filed Audit Request- Project Raptor in PUCT Project 59142 on Sep 13, 2026.
PUCT Project 59142: Audit Request- Project RaptorPUCT Project 59142, Item 62 Filed · Sep 13, 2026
Brad Bolton
Brad Bolton filed Audit Request- Project Raptor in PUCT Project 59142 on Sep 13, 2026.
PUCT Project 59142: Audit Request- Project RaptorPUCT Project 59142, Item 63 Filed · Sep 13, 2026
Mark Steel
Mark Steel filed Audit Request- Project Raptor in PUCT Project 59142 on Sep 13, 2026.
PUCT Project 59142: Audit Request- Project RaptorPUCT Project 59142, Item 64 Filed · Sep 13, 2026
Holly Steel
Holly Steel filed Audit Request- Project Raptor in PUCT Project 59142 on Sep 13, 2026.
PUCT Project 59142: Request for audit -Project RaptorPUCT Project 59142, Item 65 Filed · Sep 14, 2026
Adam Lindemann
Adam Lindemann filed Request for audit -Project Raptor in PUCT Project 59142 on Sep 14, 2026.
PUCT Project 59142: Request for audit - Project RaptorPUCT Project 59142, Item 66 Filed · Sep 14, 2026
Katrina Farmer
Katrina Farmer filed Request for audit - Project Raptor in PUCT Project 59142 on Sep 14, 2026.
PUCT Project 58481: OM Item No. 24 - (Staff Recommendation) Order Adopting New §25.194PUCT Project 58481, Item 208 Filed · Sep 3, 2026
PUC RULES & PROJECTS
PUC RULES & PROJECTS filed OM Item No. 24 - (Staff Recommendation) Order Adopting New §25.194 in PUCT Project 58481 on Sep 3, 2026.
PUCT Project 58481: Vistra's Comments on Project 58481 Recommended Adoption OrderPUCT Project 58481, Item 211 Filed · Sep 8, 2026
VISTRA CORPORATE SERVICES COMPANY
VISTRA CORPORATE SERVICES COMPANY filed Vistra's Comments on Project 58481 Recommended Adoption Order in PUCT Project 58481 on Sep 8, 2026.
PUCT Project 58482: OFFICE OF PUBLIC UTILITY COUNSEL’S COMMENTS REGARDING THE PROPOSAL FOR PUBLICATION OF NEW 16 TAC §25.521PUCT Project 58482, Item 36 Filed · Sep 3, 2026
OPUC
OPUC filed OFFICE OF PUBLIC UTILITY COUNSEL’S COMMENTS REGARDING THE PROPOSAL FOR PUBLICATION OF NEW 16 TAC §25.521 in PUCT Project 58482 on Sep 3, 2026.
PUCT Project 58482: TAEBA'S COMMENTS ON PROPOSAL FOR PUBLICATION OF NEW 16 TAC §25.521PUCT Project 58482, Item 38 Filed · Sep 4, 2026
TEXAS ADVANCED ENERGY BUSINESS ALLIANCE
TEXAS ADVANCED ENERGY BUSINESS ALLIANCE filed TAEBA'S COMMENTS ON PROPOSAL FOR PUBLICATION OF NEW 16 TAC §25.521 in PUCT Project 58482 on Sep 4, 2026.
PUCT Project 58482: ERCOT Steel Mills Comments Project 58482_Proposal for PublicationPUCT Project 58482, Item 39 Filed · Sep 4, 2026
ERCOT STEEL MILLS
ERCOT STEEL MILLS filed ERCOT Steel Mills Comments Project 58482_Proposal for Publication in PUCT Project 58482 on Sep 4, 2026.
PUCT Project 58482: GOOGLE COMMENTS FOR THE 58482 PROPOSAL FOR PUBLICATIONPUCT Project 58482, Item 40 Filed · Sep 4, 2026
GOOGLE LLC
GOOGLE LLC filed GOOGLE COMMENTS FOR THE 58482 PROPOSAL FOR PUBLICATION in PUCT Project 58482 on Sep 4, 2026.
PUCT Project 58482: Comments of Texas Electric Cooperatives, Inc.PUCT Project 58482, Item 41 Filed · Sep 4, 2026
TEXAS ELECTRIC COOPERATIVES, INC.
TEXAS ELECTRIC COOPERATIVES, INC. filed Comments of Texas Electric Cooperatives, Inc. in PUCT Project 58482 on Sep 4, 2026.
PUCT Project 58482: Data Center Coalition's Comment on Proposal for Publication (Project 58482)PUCT Project 58482, Item 45 Filed · Sep 4, 2026
DATA CENTER COALITION
DATA CENTER COALITION filed Data Center Coalition's Comment on Proposal for Publication (Project 58482) in PUCT Project 58482 on Sep 4, 2026.
PUCT Project 58482: ENGIE North America Inc. Comments on Proposal for PublicationPUCT Project 58482, Item 46 Filed · Sep 4, 2026
ENGIE NORTH AMERICA INC.
ENGIE NORTH AMERICA INC. filed ENGIE North America Inc. Comments on Proposal for Publication in PUCT Project 58482 on Sep 4, 2026.
PUCT Project 58482: COMMENTS OF AEP TEXAS INC. ON COMMISSION STAFF’S PROPOSAL FOR PUBLICATIONPUCT Project 58482, Item 47 Filed · Sep 4, 2026
AEP TEXAS INC.
AEP TEXAS INC. filed COMMENTS OF AEP TEXAS INC. ON COMMISSION STAFF’S PROPOSAL FOR PUBLICATION in PUCT Project 58482 on Sep 4, 2026.
PUCT Project 58482: COMMENTS OF CENTERPOINT ENERGY HOUSTON ELECTRIC, LLCPUCT Project 58482, Item 48 Filed · Sep 4, 2026
CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC
CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC filed COMMENTS OF CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC in PUCT Project 58482 on Sep 4, 2026.
PUCT Project 58482: TCPA'S COMMENTS ON PROPOSAL FOR PUBLICATION OF NEW §25.521PUCT Project 58482, Item 49 Filed · Sep 4, 2026
TCPA
TCPA filed TCPA'S COMMENTS ON PROPOSAL FOR PUBLICATION OF NEW §25.521 in PUCT Project 58482 on Sep 4, 2026.
PUCT Project 58482: COMMENTS ON THE PROPOSAL FOR PUBLICATION OF NEW §25.521PUCT Project 58482, Item 52 Filed · Sep 4, 2026
LOWER COLORADO RIVER AUTHORITY
LOWER COLORADO RIVER AUTHORITY filed COMMENTS ON THE PROPOSAL FOR PUBLICATION OF NEW §25.521 in PUCT Project 58482 on Sep 4, 2026.
PUCT Project 58482: ONCOR ELECTRIC DELIVERY COMPANY'S COMMENTS ON THE PROPOSAL FOR PUBLICATION OF NEW 16 TAC § 25.521PUCT Project 58482, Item 53 Filed · Sep 4, 2026
ONCOR ELECTRIC DELIVERY COMPANY LLC
ONCOR ELECTRIC DELIVERY COMPANY LLC filed ONCOR ELECTRIC DELIVERY COMPANY'S COMMENTS ON THE PROPOSAL FOR PUBLICATION OF NEW 16 TAC § 25.521 in PUCT Project 58482 on Sep 4, 2026.
PUCT Project 58482: NRG Comments on Proposed RulePUCT Project 58482, Item 54 Filed · Sep 4, 2026
NRG ENERGY, INC.
NRG ENERGY, INC. filed NRG Comments on Proposed Rule in PUCT Project 58482 on Sep 4, 2026.
PUCT Project 58482: Vistra Corporate Services Company's Comments on the Proposal for Publication of new 16 TAC § 25.521PUCT Project 58482, Item 55 Filed · Sep 4, 2026
VISTRA CORPORATE SERVICES COMPANY
VISTRA CORPORATE SERVICES COMPANY filed Vistra Corporate Services Company's Comments on the Proposal for Publication of new 16 TAC § 25.521 in PUCT Project 58482 on Sep 4, 2026.
PUCT Project 58482: The Steering Committee of Cities Served by Oncor and Texas Coalition for Affordable Power's Comments on Proposal for Publication of New 16 TAC § 25.521PUCT Project 58482, Item 58 Filed · Sep 4, 2026
STEERING COMMITTEE OF CITIES SERVED BY ONCOR AND TEXAS COALITION FOR AFFORDABLE POWER
STEERING COMMITTEE OF CITIES SERVED BY ONCOR AND TEXAS COALITION FOR AFFORDABLE POWER filed The Steering Committee of Cities Served by Oncor and Texas Coalition for Affordable Power's Comments on Proposal for Publication of New 16 TAC § 25.521 in PUCT Project 58482 on Sep 4, 2026.
PUCT Project 58482: TNMP'S COMMENTS ON PROPOSAL FOR PUBLICATION OF NEW §25.521PUCT Project 58482, Item 59 Filed · Sep 4, 2026
TEXAS NEW MEXICO POWER COMPANY
TEXAS NEW MEXICO POWER COMPANY filed TNMP'S COMMENTS ON PROPOSAL FOR PUBLICATION OF NEW §25.521 in PUCT Project 58482 on Sep 4, 2026.
PUCT Project 58482: TEBA Comments on Proposal for Publication for Project No. 58482PUCT Project 58482, Item 60 Filed · Sep 4, 2026
TEXAS ENERGY BUYERS ALLIANCE
TEXAS ENERGY BUYERS ALLIANCE filed TEBA Comments on Proposal for Publication for Project No. 58482 in PUCT Project 58482 on Sep 4, 2026.
PUCT Project 58482: ELECTRIC RELIABILITY COUNCIL OF TEXAS, INC.’S COMMENTS ON THE PROPOSAL FOR PUBLICATIONPUCT Project 58482, Item 62 Filed · Sep 4, 2026
ERCOT
ERCOT filed ELECTRIC RELIABILITY COUNCIL OF TEXAS, INC.’S COMMENTS ON THE PROPOSAL FOR PUBLICATION in PUCT Project 58482 on Sep 4, 2026.
PUCT Project 58796: SOAH ORDER NO. 11- GRANTING MOTION TO ABATEPUCT Project 58796, Item 101 Filed · Sep 3, 2026
SOAH
SOAH filed SOAH ORDER NO. 11- GRANTING MOTION TO ABATE in PUCT Project 58796 on Sep 3, 2026.
PUCT Project 58481: OPUC’S COMMENTS ON STAFF’S SECOND SET OF QUESTIONS FOR PUBLIC COMMENT AND SECOND DISCUSSION DRAFT RELATED TO NEW 16 TAC § 25.194PUCT Project 58481, Item 100 Filed · Jan 16, 2026
OPUC
OPUC filed OPUC’S COMMENTS ON STAFF’S SECOND SET OF QUESTIONS FOR PUBLIC COMMENT AND SECOND DISCUSSION DRAFT RELATED TO NEW 16 TAC § 25.194 in PUCT Project 58481 on Jan 16, 2026.
PUCT Project 58481: Tract Post-Workshop Comments on Staff's Second Discussion DraftPUCT Project 58481, Item 104 Filed · Jan 17, 2026
Tract
Tract filed Tract Post-Workshop Comments on Staff's Second Discussion Draft in PUCT Project 58481 on Jan 17, 2026.
PUCT Project 58481: Comments of Texas-New Mexico Power CompanyPUCT Project 58481, Item 105 Filed · Jan 20, 2026
TEXAS-NEW MEXICO POWER COMPANY
TEXAS-NEW MEXICO POWER COMPANY filed Comments of Texas-New Mexico Power Company in PUCT Project 58481 on Jan 20, 2026.
PUCT Project 58481: OM Item No. 27 - Staff Memo & PFP w/March 27 Comment DeadlinePUCT Project 58481, Item 107 Filed · Feb 13, 2026
PUC RULES & PROJECTS
PUC RULES & PROJECTS filed OM Item No. 27 - Staff Memo & PFP w/March 27 Comment Deadline in PUCT Project 58481 on Feb 13, 2026.
PUCT Project 58481: Comments regarding Fee recommendation by StaffPUCT Project 58481, Item 108 Filed · Feb 17, 2026
Cholla, Inc.
Cholla, Inc. filed Comments regarding Fee recommendation by Staff in PUCT Project 58481 on Feb 17, 2026.
PUCT Project 58481: SCHAPER ENERGY ENERGY CONSULTING COMMENTS TO STAFF DISCUSSION DRAFT 16 (TAC) §25.194 DATED FEBRUARY 13, 2026PUCT Project 58481, Item 109 Filed · Feb 18, 2026
SCHAPER ENERGY CONSULTING LLC
SCHAPER ENERGY CONSULTING LLC filed SCHAPER ENERGY ENERGY CONSULTING COMMENTS TO STAFF DISCUSSION DRAFT 16 (TAC) §25.194 DATED FEBRUARY 13, 2026 in PUCT Project 58481 on Feb 18, 2026.
PUCT Project 58481: Google and Lancium Joint Comments to Proposed PFPPUCT Project 58481, Item 110 Filed · Feb 19, 2026
Google LLC, Lancium LLC
Google LLC, Lancium LLC filed Google and Lancium Joint Comments to Proposed PFP in PUCT Project 58481 on Feb 19, 2026.
PUCT Project 58481: Speed to Power Concept Paper for ERCOT Large Load Batch Study ProceedingsPUCT Project 58481, Item 111 Filed · Feb 26, 2026
Luminary Strategies,LLC
Luminary Strategies,LLC filed Speed to Power Concept Paper for ERCOT Large Load Batch Study Proceedings in PUCT Project 58481 on Feb 26, 2026.
PUCT Project 58481: Monarch Energy Comments on Proposal for PublicationPUCT Project 58481, Item 113 Filed · Mar 4, 2026
Monarch Energy Development LLC
Monarch Energy Development LLC filed Monarch Energy Comments on Proposal for Publication in PUCT Project 58481 on Mar 4, 2026.
PUCT Project 58481: Provident, Inc. Comments on Proposed Proposal for PublicationPUCT Project 58481, Item 114 Filed · Mar 4, 2026
Provident, Inc.
Provident, Inc. filed Provident, Inc. Comments on Proposed Proposal for Publication in PUCT Project 58481 on Mar 4, 2026.
PUCT Project 58481: JOINT REDLINES FOR THE PROPOSED PROPOSAL FOR PUBLICATIONPUCT Project 58481, Item 115 Filed · Mar 10, 2026
GOOGLE LLC, LANCIUM LLC
GOOGLE LLC, LANCIUM LLC filed JOINT REDLINES FOR THE PROPOSED PROPOSAL FOR PUBLICATION in PUCT Project 58481 on Mar 10, 2026.
PUCT Project 58481: CIPHER DIGITAL INC. COMMENTS TO STAFF PROPOSED PROPOSAL FOR PUBLICATIONPUCT Project 58481, Item 116 Filed · Mar 11, 2026
Cipher Digital
Cipher Digital filed CIPHER DIGITAL INC. COMMENTS TO STAFF PROPOSED PROPOSAL FOR PUBLICATION in PUCT Project 58481 on Mar 11, 2026.
PUCT Project 58481: EDGECONNEX COMMENTS TO STAFF'S PROPOSED PROPOSAL FOR PUBLICATIONPUCT Project 58481, Item 117 Filed · Mar 11, 2026
EdgeConnex
EdgeConnex filed EDGECONNEX COMMENTS TO STAFF'S PROPOSED PROPOSAL FOR PUBLICATION in PUCT Project 58481 on Mar 11, 2026.
PUCT Project 58481: CHAIRMAN GLEESON MEMORANDUMPUCT Project 58481, Item 118 Filed · Mar 11, 2026
PUC OPDM
PUC OPDM filed CHAIRMAN GLEESON MEMORANDUM in PUCT Project 58481 on Mar 11, 2026.
PUCT Project 58481: Engine 1's Comments on PUCT Staff's Proposal for PublicationPUCT Project 58481, Item 119 Filed · Mar 11, 2026
Engine 1
Engine 1 filed Engine 1's Comments on PUCT Staff's Proposal for Publication in PUCT Project 58481 on Mar 11, 2026.
PUCT Project 58481: Hut 8 Comments on Staff's Proposal for PublicationPUCT Project 58481, Item 120 Filed · Mar 11, 2026
Hut 8 Corp
Hut 8 Corp filed Hut 8 Comments on Staff's Proposal for Publication in PUCT Project 58481 on Mar 11, 2026.
PUCT Project 58481: Nightpeak Energy Comments on Staff's Proposal for PublicationPUCT Project 58481, Item 121 Filed · Mar 11, 2026
Nightpeak Energy
Nightpeak Energy filed Nightpeak Energy Comments on Staff's Proposal for Publication in PUCT Project 58481 on Mar 11, 2026.
PUCT Project 58481: PROPOSAL FOR PUBLICATION OF NEW 16 TAC §25.194PUCT Project 58481, Item 122 Filed · Mar 12, 2026
PUC OPDM
PUC OPDM filed PROPOSAL FOR PUBLICATION OF NEW 16 TAC §25.194 in PUCT Project 58481 on Mar 12, 2026.
PUCT Project 58481: Texas Register Acknowledgement of Receipt - Comments Due 04/17/2026PUCT Project 58481, Item 123 Filed · Mar 12, 2026
PUC RULES & PROJECTS
PUC RULES & PROJECTS filed Texas Register Acknowledgement of Receipt - Comments Due 04/17/2026 in PUCT Project 58481 on Mar 12, 2026.
PUCT Project 58481: Staff Memo w/MS Word Version of PFPPUCT Project 58481, Item 124 Filed · Mar 16, 2026
PUC RULES & PROJECTS
PUC RULES & PROJECTS filed Staff Memo w/MS Word Version of PFP in PUCT Project 58481 on Mar 16, 2026.
PUCT Project 58481: Monarch Energy Additional Comments on Proposal for PublicationPUCT Project 58481, Item 125 Filed · Mar 19, 2026
MONARCH ENERGY
MONARCH ENERGY filed Monarch Energy Additional Comments on Proposal for Publication in PUCT Project 58481 on Mar 19, 2026.
PUCT Project 58481: Vistra Corp.'s Comments on Planning Guide Revision Request 145 for Project 58481PUCT Project 58481, Item 127 Filed · Mar 20, 2026
VISTRA CORP.
VISTRA CORP. filed Vistra Corp.'s Comments on Planning Guide Revision Request 145 for Project 58481 in PUCT Project 58481 on Mar 20, 2026.
PUCT Project 58481: PUC Project No. 58481 - Interconnection Agreement Standards Applicability to Batch ZeroPUCT Project 58481, Item 129 Filed · Mar 29, 2026
SCHAPER ENERGY CONSULTING LLC
SCHAPER ENERGY CONSULTING LLC filed PUC Project No. 58481 - Interconnection Agreement Standards Applicability to Batch Zero in PUCT Project 58481 on Mar 29, 2026.
PUCT Project 58481: Comments on Proposal for Publication of 16 TAC §25.194 - Project No. 58481PUCT Project 58481, Item 130 Filed · Mar 30, 2026
Jason Buster
Jason Buster filed Comments on Proposal for Publication of 16 TAC §25.194 - Project No. 58481 in PUCT Project 58481 on Mar 30, 2026.
PUCT Project 58481: CPV Comments on Proposal for Publication of 16 TAC §25.194PUCT Project 58481, Item 132 Filed · Apr 6, 2026
Competitive Power Ventures
Competitive Power Ventures filed CPV Comments on Proposal for Publication of 16 TAC §25.194 in PUCT Project 58481 on Apr 6, 2026.
PUCT Project 58481: Cholla comments on Proposal for PublicationPUCT Project 58481, Item 133 Filed · Apr 7, 2026
Cholla, Inc.
Cholla, Inc. filed Cholla comments on Proposal for Publication in PUCT Project 58481 on Apr 7, 2026.
PUCT Project 58481: Vistra Corp.'s Additional Comments on Planning Guide Revision Request 145 for Project 58481PUCT Project 58481, Item 134 Filed · Apr 9, 2026
VISTRA CORP.
VISTRA CORP. filed Vistra Corp.'s Additional Comments on Planning Guide Revision Request 145 for Project 58481 in PUCT Project 58481 on Apr 9, 2026.
PUCT Project 58481: AEP COMPANIES’ COMMENTS ON COMMISSION’S PROPOSAL FOR PUBLICATIONPUCT Project 58481, Item 139 Filed · Apr 13, 2026
AEP COMPANIES
AEP COMPANIES filed AEP COMPANIES’ COMMENTS ON COMMISSION’S PROPOSAL FOR PUBLICATION in PUCT Project 58481 on Apr 13, 2026.
PUCT Project 58481: CCNG Comments and Redlines for the Proposal for Publication in Project 58481PUCT Project 58481, Item 140 Filed · Apr 13, 2026
CCNG, Inc.
CCNG, Inc. filed CCNG Comments and Redlines for the Proposal for Publication in Project 58481 in PUCT Project 58481 on Apr 13, 2026.
PUCT Project 58481: TRACT HOLDING COMPANY I, LLC’S COMMENTS ON THE COMMISSION’S PROPOSAL FOR PUBLICATION TO IMPLEMENT LARGE LOAD INTERCONNECTION STANDARDS (“STANDARDS”)PUCT Project 58481, Item 141 Filed · Apr 13, 2026
Tract Holding Company I, LLC
Tract Holding Company I, LLC filed TRACT HOLDING COMPANY I, LLC’S COMMENTS ON THE COMMISSION’S PROPOSAL FOR PUBLICATION TO IMPLEMENT LARGE LOAD INTERCONNECTION STANDARDS (“STANDARDS”) in PUCT Project 58481 on Apr 13, 2026.
PUCT Project 58481: Project# Rule 25.194 The people demand full and extensive transparency on all water and gas studies, usage records and future plans pertaining to industrial use especially for large scale data centers in bell countyPUCT Project 58481, Item 142 Filed · Apr 14, 2026
SARAH DUNHAM
SARAH DUNHAM filed Project# Rule 25.194 The people demand full and extensive transparency on all water and gas studies, usage records and future plans pertaining to industrial use especially for large scale data centers in bell county in PUCT Project 58481 on Apr 14, 2026.
PUCT Project 58481: HUT 8 COMMENTS ON PUC PROPOSAL FOR PUBLICATIONPUCT Project 58481, Item 144 Filed · Apr 14, 2026
HUT 8 CORP
HUT 8 CORP filed HUT 8 COMMENTS ON PUC PROPOSAL FOR PUBLICATION in PUCT Project 58481 on Apr 14, 2026.
PUCT Project 58481: Suplement filing to comment XYAWFICE - Updated analytic methodology attribution of SVI/TRI addition to researchPUCT Project 58481, Item 146 Filed · Apr 15, 2026
Zack Butler | EnerShield AI
Zack Butler | EnerShield AI filed Suplement filing to comment XYAWFICE - Updated analytic methodology attribution of SVI/TRI addition to research in PUCT Project 58481 on Apr 15, 2026.
PUCT Project 58481: COMMENTS ON THE PROPOSAL FOR PUBLICATIONPUCT Project 58481, Item 147 Filed · Apr 15, 2026
LOWER COLORADO RIVER AUTHORITY AND LCRA TRANSMISSION SERVICES CORPORATION
LOWER COLORADO RIVER AUTHORITY AND LCRA TRANSMISSION SERVICES CORPORATION filed COMMENTS ON THE PROPOSAL FOR PUBLICATION in PUCT Project 58481 on Apr 15, 2026.
PUCT Project 58481: COMMENTS OF CENTERPOINT ENERGY HOUSTON ELECTRIC, LLCPUCT Project 58481, Item 148 Filed · Apr 15, 2026
CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC
CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC filed COMMENTS OF CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC in PUCT Project 58481 on Apr 15, 2026.
PUCT Project 58481: STACK INFRASTRUCTURE COMMENTS TO PROPOSAL FOR PUBLICATION IN PROJECT NO. 58481PUCT Project 58481, Item 151 Filed · Apr 15, 2026
STACK Infrastructure
STACK Infrastructure filed STACK INFRASTRUCTURE COMMENTS TO PROPOSAL FOR PUBLICATION IN PROJECT NO. 58481 in PUCT Project 58481 on Apr 15, 2026.
PUCT Project 58481: SATOSHI ENERGY COMMENTS ON STAFF'S PROPOSAL FOR PUBLICATION ON PROJECT NO. 58481, RULEMAKING TO IMPLEMENT LARGE LOAD INTERCONNECTION STANDARDS UNDER PURA §37.0561PUCT Project 58481, Item 156 Filed · Apr 16, 2026
SATOSHI ENERGY CORP.
SATOSHI ENERGY CORP. filed SATOSHI ENERGY COMMENTS ON STAFF'S PROPOSAL FOR PUBLICATION ON PROJECT NO. 58481, RULEMAKING TO IMPLEMENT LARGE LOAD INTERCONNECTION STANDARDS UNDER PURA §37.0561 in PUCT Project 58481 on Apr 16, 2026.
PUCT Project 58481: INFINIUM'S COMMENTS ON LARGE LOAD INTERCONNECTION STANDARDS PROPOSAL FOR PUBLICATIONPUCT Project 58481, Item 159 Filed · Apr 16, 2026
INFINIUM OPERATIONS, LLC
INFINIUM OPERATIONS, LLC filed INFINIUM'S COMMENTS ON LARGE LOAD INTERCONNECTION STANDARDS PROPOSAL FOR PUBLICATION in PUCT Project 58481 on Apr 16, 2026.
PUCT Project 58481: TCPA Comments on Large Load Interconnection PfP & IssuesPUCT Project 58481, Item 162 Filed · Apr 16, 2026
TCPA
TCPA filed TCPA Comments on Large Load Interconnection PfP & Issues in PUCT Project 58481 on Apr 16, 2026.
PUCT Project 58481: HUNT ENERGY NETWORK'S COMMENTS ON COMMISSION’S PROPOSAL FOR PUBLICATIONPUCT Project 58481, Item 164 Filed · Apr 16, 2026
HUNT ENERGY NETWORK L.L.C.
HUNT ENERGY NETWORK L.L.C. filed HUNT ENERGY NETWORK'S COMMENTS ON COMMISSION’S PROPOSAL FOR PUBLICATION in PUCT Project 58481 on Apr 16, 2026.
PUCT Project 58481: Joint Comments of Google LLC, Lancium LLC, and TotalEnergies Renewables USAPUCT Project 58481, Item 165 Filed · Apr 16, 2026
GOOGLE LLC, LANCIUM LLC, TOTALENERGIES RENEWABLES USA
GOOGLE LLC, LANCIUM LLC, TOTALENERGIES RENEWABLES USA filed Joint Comments of Google LLC, Lancium LLC, and TotalEnergies Renewables USA in PUCT Project 58481 on Apr 16, 2026.
PUCT Project 58481: TEBA's Comments on Commission Staff's Proposal for PublicationPUCT Project 58481, Item 166 Filed · Apr 16, 2026
TEXAS ENERGY BUYERS ALLIANCE
TEXAS ENERGY BUYERS ALLIANCE filed TEBA's Comments on Commission Staff's Proposal for Publication in PUCT Project 58481 on Apr 16, 2026.
PUCT Project 58481: Trammell Crow Company's Comments on Proposal for Publication of 16 TAC§ 25.194PUCT Project 58481, Item 169 Filed · Apr 17, 2026
Trammell Crow Company
Trammell Crow Company filed Trammell Crow Company's Comments on Proposal for Publication of 16 TAC§ 25.194 in PUCT Project 58481 on Apr 17, 2026.
PUCT Project 58481: PUCT 58481 Large Load Interconnection Standards PfP - NRG Comments - FINALPUCT Project 58481, Item 173 Filed · Apr 17, 2026
NRG ENERGY INC
NRG ENERGY INC filed PUCT 58481 Large Load Interconnection Standards PfP - NRG Comments - FINAL in PUCT Project 58481 on Apr 17, 2026.
PUCT Project 58481: Targa Resources LLC's Comments and Proposed Redlines in Response to Proposal for Publication of 16 TAC § 25.194PUCT Project 58481, Item 175 Filed · Apr 17, 2026
Targa Resources LLC
Targa Resources LLC filed Targa Resources LLC's Comments and Proposed Redlines in Response to Proposal for Publication of 16 TAC § 25.194 in PUCT Project 58481 on Apr 17, 2026.
PUCT Project 58481: Permian Basin Petroleum Association's Comments in Response to Proposal for Publication of 16 TAC § 25.194PUCT Project 58481, Item 176 Filed · Apr 17, 2026
Permian Basin Petroleum Association
Permian Basin Petroleum Association filed Permian Basin Petroleum Association's Comments in Response to Proposal for Publication of 16 TAC § 25.194 in PUCT Project 58481 on Apr 17, 2026.
PUCT Project 58481: BLACK MOUNTAIN POWER COMMENTS ON PROJECT NO. 58481 PROPOSAL FOR PUBLICATIONPUCT Project 58481, Item 177 Filed · Apr 17, 2026
BLACK MOUNTAIN POWER
BLACK MOUNTAIN POWER filed BLACK MOUNTAIN POWER COMMENTS ON PROJECT NO. 58481 PROPOSAL FOR PUBLICATION in PUCT Project 58481 on Apr 17, 2026.
PUCT Project 58481: CONSTELLATION ENERGY GENERATION, LLC’S COMMENTS ON COMMISSION STAFF’S PROPOSAL FOR PUBLICATION OF NEW 16 TAC § 25.194PUCT Project 58481, Item 178 Filed · Apr 17, 2026
CONSTELLATION ENERGY GENERATION, LLC
CONSTELLATION ENERGY GENERATION, LLC filed CONSTELLATION ENERGY GENERATION, LLC’S COMMENTS ON COMMISSION STAFF’S PROPOSAL FOR PUBLICATION OF NEW 16 TAC § 25.194 in PUCT Project 58481 on Apr 17, 2026.
PUCT Project 58481: POST-WORKSHOP COMMENTS OF TEXAS ELECTRIC COOPERATIVES, INC.PUCT Project 58481, Item 88 Filed · Jan 16, 2026
TEXAS ELECTRIC COOPERATIVES, INC.
TEXAS ELECTRIC COOPERATIVES, INC. filed POST-WORKSHOP COMMENTS OF TEXAS ELECTRIC COOPERATIVES, INC. in PUCT Project 58481 on Jan 16, 2026.
PUCT Project 58481: Comments of CenterPoint Energy Houston Electric, LLCPUCT Project 58481, Item 90 Filed · Jan 16, 2026
CENTERPOINT ENERGY HOUSTON ELECTRIC
CENTERPOINT ENERGY HOUSTON ELECTRIC filed Comments of CenterPoint Energy Houston Electric, LLC in PUCT Project 58481 on Jan 16, 2026.
PUCT Project 58481: ETT’S COMMENTS ON STAFF’S 2ND DISCUSSION DRAFTPUCT Project 58481, Item 92 Filed · Jan 16, 2026
ELECTRIC TRANSMISSION TEXAS, LLC
ELECTRIC TRANSMISSION TEXAS, LLC filed ETT’S COMMENTS ON STAFF’S 2ND DISCUSSION DRAFT in PUCT Project 58481 on Jan 16, 2026.
PUCT Project 58481: CPS Energy's Response to Questions for CommentPUCT Project 58481, Item 93 Filed · Jan 16, 2026
CPS ENERGY
CPS ENERGY filed CPS Energy's Response to Questions for Comment in PUCT Project 58481 on Jan 16, 2026.
PUCT Project 58481: Comments on Staff's Second Draft Discussion Rule in 16 TAC 25.194PUCT Project 58481, Item 94 Filed · Jan 16, 2026
ROWAN DIGITAL INFRASTRUCTURE LLC
ROWAN DIGITAL INFRASTRUCTURE LLC filed Comments on Staff's Second Draft Discussion Rule in 16 TAC 25.194 in PUCT Project 58481 on Jan 16, 2026.
PUCT Project 58481: ONCOR ELECTRIC DELIVERY’S COMMENTS ON COMMISSION STAFF’S SECOND RULE 25.194 DISCUSSION DRAFTPUCT Project 58481, Item 95 Filed · Jan 16, 2026
ONCOR ELECTRIC DELIVERY COMPANY LLC
ONCOR ELECTRIC DELIVERY COMPANY LLC filed ONCOR ELECTRIC DELIVERY’S COMMENTS ON COMMISSION STAFF’S SECOND RULE 25.194 DISCUSSION DRAFT in PUCT Project 58481 on Jan 16, 2026.
PUCT Project 58481: AEP TEXAS' COMMENTS ON STAFF’S SECOND DISCUSSION DRAFTPUCT Project 58481, Item 97 Filed · Jan 16, 2026
AEP TEXAS INC.
AEP TEXAS INC. filed AEP TEXAS' COMMENTS ON STAFF’S SECOND DISCUSSION DRAFT in PUCT Project 58481 on Jan 16, 2026.
PUCT Project 58481: Additional Comment's on Second Discussion DraftPUCT Project 58481, Item 98 Filed · Jan 16, 2026
Data Center Coalition
Data Center Coalition filed Additional Comment's on Second Discussion Draft in PUCT Project 58481 on Jan 16, 2026.
PUCT Project 59142: My name is Chad Peysen and I live at 1116 Three Way Rd, Wichita Falls, TX 76310. The 1000 MW request sits 1200 ft from my home. I would like the audit applied to Project Raptor specifically.PUCT Project 59142, Item 69 Filed · Sep 14, 2026
Chad Peysen
Chad Peysen filed My name is Chad Peysen and I live at 1116 Three Way Rd, Wichita Falls, TX 76310. The 1000 MW request sits 1200 ft from my home. I would like the audit applied to Project Raptor specifically. in PUCT Project 59142 on Sep 14, 2026.
PUCT Project 59142: My name is Heather Peysen and I live at 1116 Three Way Rd, Wichita Falls, TX 76310. The 1000 MW request sits 1200 ft from my home. I would like the audit applied to Project Raptor specifically.PUCT Project 59142, Item 70 Filed · Sep 14, 2026
Heather Peysen
Heather Peysen filed My name is Heather Peysen and I live at 1116 Three Way Rd, Wichita Falls, TX 76310. The 1000 MW request sits 1200 ft from my home. I would like the audit applied to Project Raptor specifically. in PUCT Project 59142 on Sep 14, 2026.
PUCT Project 59142: My name is John Peysen and I live at 433 Mahler Rd, Wichita Falls, TX 76310. The 1000 MW request sits 1 road over from my home. I would like the audit applied to Project Raptor specifically.PUCT Project 59142, Item 71 Filed · Sep 14, 2026
John Peysen
John Peysen filed My name is John Peysen and I live at 433 Mahler Rd, Wichita Falls, TX 76310. The 1000 MW request sits 1 road over from my home. I would like the audit applied to Project Raptor specifically. in PUCT Project 59142 on Sep 14, 2026.
PUCT Project 59142: My name is Rhonda Peysen and I live at 433 Mahler Rd, Wichita Falls, TX 76310. The 1000 MW request sits 1 road over from my home. I would like the audit applied to Project Raptor specifically.PUCT Project 59142, Item 72 Filed · Sep 14, 2026
Rhonda Peysen
Rhonda Peysen filed My name is Rhonda Peysen and I live at 433 Mahler Rd, Wichita Falls, TX 76310. The 1000 MW request sits 1 road over from my home. I would like the audit applied to Project Raptor specifically. in PUCT Project 59142 on Sep 14, 2026.
PUCT Project 58481: SOLUNA HOLDINGS, INC. COMMENTS TO PROPOSAL FOR ADOPTION OF NEW 16 TAC § 25.194PUCT Project 58481, Item 212 Filed · Sep 9, 2026
Soluna Holdings
Soluna Holdings filed SOLUNA HOLDINGS, INC. COMMENTS TO PROPOSAL FOR ADOPTION OF NEW 16 TAC § 25.194 in PUCT Project 58481 on Sep 9, 2026.
PUCT Project 58481: GOOD COMPANY ASSOOCIATES COMMENTS ON THE COMMISSION’S PROPOSAL FOR ADOPTION (PFA)PUCT Project 58481, Item 213 Filed · Sep 9, 2026
Good Company Associates
Good Company Associates filed GOOD COMPANY ASSOOCIATES COMMENTS ON THE COMMISSION’S PROPOSAL FOR ADOPTION (PFA) in PUCT Project 58481 on Sep 9, 2026.
PUCT Project 58481: SATOSHI ENERGY COMMENTS ON STAFF'S RECOMMENDED ADOPTION ORDER ON PROJECT NO. 58481, RULEMAKING TO IMPLEMENT LARGE LOAD INTERCONNECTION STANDARDS UNDER PURA §37.0561PUCT Project 58481, Item 214 Filed · Sep 9, 2026
SATOSHI ENERGY CORP.
SATOSHI ENERGY CORP. filed SATOSHI ENERGY COMMENTS ON STAFF'S RECOMMENDED ADOPTION ORDER ON PROJECT NO. 58481, RULEMAKING TO IMPLEMENT LARGE LOAD INTERCONNECTION STANDARDS UNDER PURA §37.0561 in PUCT Project 58481 on Sep 9, 2026.
PUCT Project 58481: Comments of Lancium LLC on Project 58481 Recommended Adoption OrderPUCT Project 58481, Item 215 Filed · Sep 9, 2026
Lancium LLC
Lancium LLC filed Comments of Lancium LLC on Project 58481 Recommended Adoption Order in PUCT Project 58481 on Sep 9, 2026.
PUCT Project 58796: Joint Status ReportPUCT Project 58796, Item 102 Filed · Sep 9, 2026
SOUTHWESTERN ELECTRIC POWER COMPANY
SOUTHWESTERN ELECTRIC POWER COMPANY filed Joint Status Report in PUCT Project 58796 on Sep 9, 2026.
PUCT Project 59948: PROTECTIVE ORDER CERTIFICATIONSPUCT Project 59948, Item 12 Filed · Sep 14, 2026
PUC LEGAL
PUC LEGAL filed PROTECTIVE ORDER CERTIFICATIONS in PUCT Project 59948 on Sep 14, 2026.
PUCT Project 59948: COMMISSION STAFF’S RECOMMENDATION ON FINAL DISPOSITIONPUCT Project 59948, Item 13 Filed · Sep 15, 2026
PUC LEGAL
PUC LEGAL filed COMMISSION STAFF’S RECOMMENDATION ON FINAL DISPOSITION in PUCT Project 59948 on Sep 15, 2026.
PUCT Project 54445: NOTICE OF RECOMMENDED APPROVAL OF REVISION REQUESTS BY ERCOT BOARD OF DIRECTORSPUCT Project 54445, Item 112 Filed · Jun 26, 2025
ERCOT
ERCOT filed NOTICE OF RECOMMENDED APPROVAL OF REVISION REQUESTS BY ERCOT BOARD OF DIRECTORS in PUCT Project 54445 on Jun 26, 2025.
PUCT Project 54445: Staff Memo and Proposed OrderPUCT Project 54445, Item 113 Filed · Jul 24, 2025
PUC MARKET ANALYSIS
PUC MARKET ANALYSIS filed Staff Memo and Proposed Order in PUCT Project 54445 on Jul 24, 2025.
PUCT Project 54445: ORDER APPROVING ERCOT REVISION REQUESTSPUCT Project 54445, Item 114 Filed · Jul 31, 2025
PUC OPDM
PUC OPDM filed ORDER APPROVING ERCOT REVISION REQUESTS in PUCT Project 54445 on Jul 31, 2025.
PUCT Project 54445: NOTICE OF RECOMMENDED APPROVAL OF REVISION REQUESTS BY ERCOT BOARD OF DIRECTORSPUCT Project 54445, Item 115 Filed · Sep 29, 2025
ERCOT
ERCOT filed NOTICE OF RECOMMENDED APPROVAL OF REVISION REQUESTS BY ERCOT BOARD OF DIRECTORS in PUCT Project 54445 on Sep 29, 2025.
PUCT Project 54445: ERCOT Request for Approval of 2026 Ancillary Service MethodologyPUCT Project 54445, Item 116 Filed · Oct 6, 2025
ERCOT
ERCOT filed ERCOT Request for Approval of 2026 Ancillary Service Methodology in PUCT Project 54445 on Oct 6, 2025.
PUCT Project 54445: Staff Memo and Proposed Order_1 (revision requests only)PUCT Project 54445, Item 117 Filed · Oct 30, 2025
PUC MARKET ANALYSIS
PUC MARKET ANALYSIS filed Staff Memo and Proposed Order_1 (revision requests only) in PUCT Project 54445 on Oct 30, 2025.
PUCT Project 54445: Staff Memo and Proposed Order_2 (2026 AS Methodology)PUCT Project 54445, Item 118 Filed · Oct 30, 2025
PUC MARKET ANALYSIS
PUC MARKET ANALYSIS filed Staff Memo and Proposed Order_2 (2026 AS Methodology) in PUCT Project 54445 on Oct 30, 2025.
PUCT Project 54445: ORDER APPROVING ERCOT REVISION REQUESTSPUCT Project 54445, Item 119 Filed · Nov 6, 2025
PUC OPDM
PUC OPDM filed ORDER APPROVING ERCOT REVISION REQUESTS in PUCT Project 54445 on Nov 6, 2025.
PUCT Project 54445: ORDER APPROVING 2026 ERCOT METHODOLOGIES FOR DETERMINING MINIMUM ANCILLARY SERVICE REQUIREMENTSPUCT Project 54445, Item 120 Filed · Nov 6, 2025
PUC OPDM
PUC OPDM filed ORDER APPROVING 2026 ERCOT METHODOLOGIES FOR DETERMINING MINIMUM ANCILLARY SERVICE REQUIREMENTS in PUCT Project 54445 on Nov 6, 2025.
PUCT Project 54445: Staff memo regarding ERCOT revision requests approval timelinesPUCT Project 54445, Item 121 Filed · Nov 19, 2025
PUC MARKET ANALYSIS
PUC MARKET ANALYSIS filed Staff memo regarding ERCOT revision requests approval timelines in PUCT Project 54445 on Nov 19, 2025.
PUCT Project 54445: NOTICE OF RECOMMENDED APPROVAL OF REVISION REQUESTS BY ERCOT BOARD OF DIRECTORSPUCT Project 54445, Item 122 Filed · Dec 15, 2025
ERCOT
ERCOT filed NOTICE OF RECOMMENDED APPROVAL OF REVISION REQUESTS BY ERCOT BOARD OF DIRECTORS in PUCT Project 54445 on Dec 15, 2025.
PUCT Project 54445: Staff Memo and Proposed OrderPUCT Project 54445, Item 123 Filed · Jan 8, 2026
PUC MARKET ANALYSIS
PUC MARKET ANALYSIS filed Staff Memo and Proposed Order in PUCT Project 54445 on Jan 8, 2026.
PUCT Project 54445: ORDER APPROVING ERCOT REVISION REQUESTSPUCT Project 54445, Item 124 Filed · Jan 15, 2026
PUC OPDM
PUC OPDM filed ORDER APPROVING ERCOT REVISION REQUESTS in PUCT Project 54445 on Jan 15, 2026.
PUCT Project 54445: NOTICE OF RECOMMENDED APPROVAL OF REVISION REQUESTS BY ERCOT BOARD OF DIRECTORSPUCT Project 54445, Item 125 Filed · Feb 13, 2026
ERCOT
ERCOT filed NOTICE OF RECOMMENDED APPROVAL OF REVISION REQUESTS BY ERCOT BOARD OF DIRECTORS in PUCT Project 54445 on Feb 13, 2026.
PUCT Project 54445: Staff Memo and Proposed OrderPUCT Project 54445, Item 126 Filed · Mar 19, 2026
PUC MARKET ANALYSIS
PUC MARKET ANALYSIS filed Staff Memo and Proposed Order in PUCT Project 54445 on Mar 19, 2026.
PUCT Project 54445: ORDER APPROVING ERCOT REVISION REQUESTSPUCT Project 54445, Item 127 Filed · Mar 26, 2026
PUC OPDM
PUC OPDM filed ORDER APPROVING ERCOT REVISION REQUESTS in PUCT Project 54445 on Mar 26, 2026.
PUCT Project 54445: NOTICE OF RECOMMENDED APPROVAL OF REVISION REQUESTS BY ERCOT BOARD OF DIRECTORSPUCT Project 54445, Item 128 Filed · Apr 28, 2026
ERCOT
ERCOT filed NOTICE OF RECOMMENDED APPROVAL OF REVISION REQUESTS BY ERCOT BOARD OF DIRECTORS in PUCT Project 54445 on Apr 28, 2026.
PUCT Project 54445: Staff Memo and Proposed OrderPUCT Project 54445, Item 129 Filed · May 21, 2026
PUC MARKET ANALYSIS
PUC MARKET ANALYSIS filed Staff Memo and Proposed Order in PUCT Project 54445 on May 21, 2026.
PUCT Project 54445: PROPOSED ORDER APPROVING ERCOT REVISION REQUESTSPUCT Project 54445, Item 130 Filed · May 29, 2026
PUC OPDM
PUC OPDM filed PROPOSED ORDER APPROVING ERCOT REVISION REQUESTS in PUCT Project 54445 on May 29, 2026.
PUCT Project 54445: NOTICE OF RECOMMENDED APPROVAL OF REVISION REQUESTS BY ERCOT BOARD OF DIRECTORSPUCT Project 54445, Item 131 Filed · Jun 2, 2026
ERCOT
ERCOT filed NOTICE OF RECOMMENDED APPROVAL OF REVISION REQUESTS BY ERCOT BOARD OF DIRECTORS in PUCT Project 54445 on Jun 2, 2026.
PUCT Project 54445: Commission Staff's Memo Regarding NOGRR282PUCT Project 54445, Item 132 Filed · Jun 3, 2026
PUC MARKET ANALYSIS
PUC MARKET ANALYSIS filed Commission Staff's Memo Regarding NOGRR282 in PUCT Project 54445 on Jun 3, 2026.
PUCT Project 54445: NOTICE OF RECOMMENDED APPROVAL OF REVISION REQUESTS BY ERCOT BOARD OF DIRECTORSPUCT Project 54445, Item 133 Filed · Jun 8, 2026
ERCOT
ERCOT filed NOTICE OF RECOMMENDED APPROVAL OF REVISION REQUESTS BY ERCOT BOARD OF DIRECTORS in PUCT Project 54445 on Jun 8, 2026.
PUCT Project 54445: Skybox Datacenters, LLC's Comments regarding Planning Guide Revision Request ("PGRR") 145 and Site Control Requirements for Batch Zero Large Load InterconnectionsPUCT Project 54445, Item 134 Filed · Jun 10, 2026
SKYBOX DATACENTERS, LLC
SKYBOX DATACENTERS, LLC filed Skybox Datacenters, LLC's Comments regarding Planning Guide Revision Request ("PGRR") 145 and Site Control Requirements for Batch Zero Large Load Interconnections in PUCT Project 54445 on Jun 10, 2026.
PUCT Project 54445: Staff Memo and Proposed Order for PGRR 145 and NPRR 1325PUCT Project 54445, Item 138 Filed · Jun 11, 2026
PUC MARKET ANALYSIS
PUC MARKET ANALYSIS filed Staff Memo and Proposed Order for PGRR 145 and NPRR 1325 in PUCT Project 54445 on Jun 11, 2026.
PUCT Project 54445: COMMENTS OF TEXAS ELECTRIC COOPERATIVES, INC. REGARDING NOGRR 282PUCT Project 54445, Item 142 Filed · Jun 12, 2026
TEXAS ELECTRIC COOPERATIVES, INC.
TEXAS ELECTRIC COOPERATIVES, INC. filed COMMENTS OF TEXAS ELECTRIC COOPERATIVES, INC. REGARDING NOGRR 282 in PUCT Project 54445 on Jun 12, 2026.
PUCT Project 54445: DCC Comments on NOGRR282 Large Computational Load Ride-Through RequirementsPUCT Project 54445, Item 148 Filed · Jun 12, 2026
DATA CENTER COALITION
DATA CENTER COALITION filed DCC Comments on NOGRR282 Large Computational Load Ride-Through Requirements in PUCT Project 54445 on Jun 12, 2026.
PUCT Project 54445: Crusoe Technologies, LLC Comments on Recommended Approval of PGRR 145 by the ERCOT Board of DirectorsPUCT Project 54445, Item 149 Filed · Jun 12, 2026
Crusoe Technologies, LLC
Crusoe Technologies, LLC filed Crusoe Technologies, LLC Comments on Recommended Approval of PGRR 145 by the ERCOT Board of Directors in PUCT Project 54445 on Jun 12, 2026.
PUCT Project 54445: ELECTRIC RELIABILITY COUNCIL OF TEXAS, INC.’S COMMENTS REGARDING NODAL OPERATING GUIDE REVISION REQUEST 282PUCT Project 54445, Item 150 Filed · Jun 12, 2026
ERCOT
ERCOT filed ELECTRIC RELIABILITY COUNCIL OF TEXAS, INC.’S COMMENTS REGARDING NODAL OPERATING GUIDE REVISION REQUEST 282 in PUCT Project 54445 on Jun 12, 2026.
PUCT Project 54445: Data Center Coalition's Comments Regarding PGRR 145PUCT Project 54445, Item 154 Filed · Jun 16, 2026
Data Center Coalition (DCC)
Data Center Coalition (DCC) filed Data Center Coalition's Comments Regarding PGRR 145 in PUCT Project 54445 on Jun 16, 2026.
PUCT Project 54445: ERCOT LETTER REGARDING PGRR145PUCT Project 54445, Item 155 Filed · Jun 16, 2026
ERCOT
ERCOT filed ERCOT LETTER REGARDING PGRR145 in PUCT Project 54445 on Jun 16, 2026.
PUCT Project 54445: First Ammonia LLC's Comments on Commission Consideration of PGRR 145, Batch Zero Process for Large Load InterconnectionsPUCT Project 54445, Item 157 Filed · Jun 17, 2026
First Ammonia LLC
First Ammonia LLC filed First Ammonia LLC's Comments on Commission Consideration of PGRR 145, Batch Zero Process for Large Load Interconnections in PUCT Project 54445 on Jun 17, 2026.
PUCT Project 54445: ORDER APPROVING ERCOT REVISION REQUESTSPUCT Project 54445, Item 158 Filed · Jun 18, 2026
PUC OPDM
PUC OPDM filed ORDER APPROVING ERCOT REVISION REQUESTS in PUCT Project 54445 on Jun 18, 2026.
PUCT Project 54445: Staff Memos and Proposed OrderPUCT Project 54445, Item 160 Filed · Jul 2, 2026
PUC MARKET ANALYSIS
PUC MARKET ANALYSIS filed Staff Memos and Proposed Order in PUCT Project 54445 on Jul 2, 2026.
PUCT Project 54445: PROPOSED ORDER APPROVING ERCOT REVISION REQUESTSPUCT Project 54445, Item 162 Filed · Jul 9, 2026
PUC OPDM
PUC OPDM filed PROPOSED ORDER APPROVING ERCOT REVISION REQUESTS in PUCT Project 54445 on Jul 9, 2026.
PUCT Project 58481: ROWAN DIGITAL INFRASTRUCTURE LLC COMMENTS ON PROPOSAL FOR PUBLICATION OF NEW 16 TAC § 25.194PUCT Project 58481, Item 179 Filed · Apr 17, 2026
ROWAN DIGITAL INFRASTRUCTURE LLC
ROWAN DIGITAL INFRASTRUCTURE LLC filed ROWAN DIGITAL INFRASTRUCTURE LLC COMMENTS ON PROPOSAL FOR PUBLICATION OF NEW 16 TAC § 25.194 in PUCT Project 58481 on Apr 17, 2026.
PUCT Project 58481: Comments on Proposal for Publication on Proposed New 16 TAC §25.194PUCT Project 58481, Item 180 Filed · Apr 17, 2026
Data Center Coalition (DCC)
Data Center Coalition (DCC) filed Comments on Proposal for Publication on Proposed New 16 TAC §25.194 in PUCT Project 58481 on Apr 17, 2026.
PUCT Project 58481: Comments of Texas Electric Cooperatives, Inc.PUCT Project 58481, Item 182 Filed · Apr 17, 2026
TEXAS ELECTRIC COOPERATIVES, INC.
TEXAS ELECTRIC COOPERATIVES, INC. filed Comments of Texas Electric Cooperatives, Inc. in PUCT Project 58481 on Apr 17, 2026.
PUCT Project 58481: The Steering Committee of Cities Served by Oncor and Texas Coalition for Affordable Power's Comments on Proposal for Publication of New 16 TAC § 25.194PUCT Project 58481, Item 183 Filed · Apr 17, 2026
STEERING COMMITTEE OF CITIES SERVED BY ONCOR AND TEXAS COALITION FOR AFFORDABLE POWER
STEERING COMMITTEE OF CITIES SERVED BY ONCOR AND TEXAS COALITION FOR AFFORDABLE POWER filed The Steering Committee of Cities Served by Oncor and Texas Coalition for Affordable Power's Comments on Proposal for Publication of New 16 TAC § 25.194 in PUCT Project 58481 on Apr 17, 2026.
PUCT Project 58481: ONCOR ELECTRIC DELIVERY'S COMMENTS ON THE PROPOSAL FOR PUBLICATION OF NEW 16 TAC §25.194PUCT Project 58481, Item 184 Filed · Apr 17, 2026
ONCOR ELECTRIC DELIVERY COMPANY LLC
ONCOR ELECTRIC DELIVERY COMPANY LLC filed ONCOR ELECTRIC DELIVERY'S COMMENTS ON THE PROPOSAL FOR PUBLICATION OF NEW 16 TAC §25.194 in PUCT Project 58481 on Apr 17, 2026.
PUCT Project 58481: ERCOT Steel Mills Comments on Proposal for Publication of New Rule 16 TAC §25.194PUCT Project 58481, Item 185 Filed · Apr 17, 2026
ERCOT STEEL MILLS
ERCOT STEEL MILLS filed ERCOT Steel Mills Comments on Proposal for Publication of New Rule 16 TAC §25.194 in PUCT Project 58481 on Apr 17, 2026.
PUCT Project 58481: TXOGA Comments on Proposal for Publication on Proposed New 16 TAC §25.194PUCT Project 58481, Item 188 Filed · Apr 17, 2026
TEXAS OIL & GAS ASSOCIATION
TEXAS OIL & GAS ASSOCIATION filed TXOGA Comments on Proposal for Publication on Proposed New 16 TAC §25.194 in PUCT Project 58481 on Apr 17, 2026.
PUCT Project 58481: GVEC's Comments on Proposal for PublicationPUCT Project 58481, Item 189 Filed · Apr 17, 2026
GUADALUPE VALLEY ELECTRIC COOPERATIVE, INC
GUADALUPE VALLEY ELECTRIC COOPERATIVE, INC filed GVEC's Comments on Proposal for Publication in PUCT Project 58481 on Apr 17, 2026.
PUCT Project 58481: Thor Equities’ Comments on PUCT Staff’s Proposal for PublicationPUCT Project 58481, Item 191 Filed · Apr 17, 2026
Thor Equities LLC
Thor Equities LLC filed Thor Equities’ Comments on PUCT Staff’s Proposal for Publication in PUCT Project 58481 on Apr 17, 2026.
PUCT Project 58481: Tesla, Inc. Comments on Proposal for Publication on Proposed New 16 TAC §25.194PUCT Project 58481, Item 192 Filed · Apr 17, 2026
TESLA
TESLA filed Tesla, Inc. Comments on Proposal for Publication on Proposed New 16 TAC §25.194 in PUCT Project 58481 on Apr 17, 2026.
PUCT Project 58481: TEXAS INDUSTRIAL ENERGY CONSUMERS’ PROPOSED COMMENTS TO PROPOSAL FOR PUBLICATION OF NEW 16 TAC § 25.194PUCT Project 58481, Item 193 Filed · Apr 17, 2026
TIEC
TIEC filed TEXAS INDUSTRIAL ENERGY CONSUMERS’ PROPOSED COMMENTS TO PROPOSAL FOR PUBLICATION OF NEW 16 TAC § 25.194 in PUCT Project 58481 on Apr 17, 2026.
PUCT Project 58481: Joint TSPs’ Comments on Proposal for PublicationPUCT Project 58481, Item 194 Filed · Apr 17, 2026
WIND ENERGY TRANSMISSION TEXAS, LLC
WIND ENERGY TRANSMISSION TEXAS, LLC filed Joint TSPs’ Comments on Proposal for Publication in PUCT Project 58481 on Apr 17, 2026.
PUCT Project 58481: OPUC’S COMMENTS REGARDING THE PROPOSAL FOR PUBLICATION OF NEW 16 TAC §25.194PUCT Project 58481, Item 195 Filed · Apr 17, 2026
OPUC
OPUC filed OPUC’S COMMENTS REGARDING THE PROPOSAL FOR PUBLICATION OF NEW 16 TAC §25.194 in PUCT Project 58481 on Apr 17, 2026.
PUCT Project 58481: TNMP’s Comments To Proposal For Publication Of New 16 TAC § 25.194PUCT Project 58481, Item 197 Filed · Apr 17, 2026
TEXAS-NEW MEXICO POWER COMPANY
TEXAS-NEW MEXICO POWER COMPANY filed TNMP’s Comments To Proposal For Publication Of New 16 TAC § 25.194 in PUCT Project 58481 on Apr 17, 2026.
PUCT Project 58481: CRUSOE TECHNOLOGIES LLC’S COMMENTS ON STAFF’S PROPOSAL FOR PUBLICATION OF NEW 16 TAC § 25.194PUCT Project 58481, Item 199 Filed · Apr 17, 2026
Crusoe Technologies LLC
Crusoe Technologies LLC filed CRUSOE TECHNOLOGIES LLC’S COMMENTS ON STAFF’S PROPOSAL FOR PUBLICATION OF NEW 16 TAC § 25.194 in PUCT Project 58481 on Apr 17, 2026.
PUCT Project 58481: Vistra's Comments - Project 58481PUCT Project 58481, Item 200 Filed · Apr 17, 2026
VISTRA CORPORATE SERVICES COMPANY
VISTRA CORPORATE SERVICES COMPANY filed Vistra's Comments - Project 58481 in PUCT Project 58481 on Apr 17, 2026.
PUCT Project 58481: Cormint Data Systems Comments on Staff PforP in 58481PUCT Project 58481, Item 203 Filed · Apr 20, 2026
Cormint Data Systems
Cormint Data Systems filed Cormint Data Systems Comments on Staff PforP in 58481 in PUCT Project 58481 on Apr 20, 2026.
PUCT Project 54445: Staff memo regarding ERCOT revision requests approval timelinesPUCT Project 54445, Item 163 Filed · Aug 11, 2026
PUC MARKET ANALYSIS
PUC MARKET ANALYSIS filed Staff memo regarding ERCOT revision requests approval timelines in PUCT Project 54445 on Aug 11, 2026.
PUCT Project 58317: Request for control numberPUCT Project 58317, Item 1 Filed · Jun 30, 2025
PUC RULES AND PROJECTS
PUC RULES AND PROJECTS filed Request for control number in PUCT Project 58317 on Jun 30, 2025.
PUCT Project 58317: Notice of July 21 WorkshopPUCT Project 58317, Item 2 Filed · Jul 8, 2025
PUC RULES AND PROJECTS
PUC RULES AND PROJECTS filed Notice of July 21 Workshop in PUCT Project 58317 on Jul 8, 2025.
PUCT Project 58317: July 21 Workshop AgendaPUCT Project 58317, Item 3 Filed · Jul 14, 2025
PUC RULES AND PROJECTS
PUC RULES AND PROJECTS filed July 21 Workshop Agenda in PUCT Project 58317 on Jul 14, 2025.
PUCT Project 58317: Response to Commission Request for Information Regarding Net Metering Arrangements Under PURA § 39.169PUCT Project 58317, Item 4 Filed · Jul 24, 2025
PUC RULES & PROJECTS
PUC RULES & PROJECTS filed Response to Commission Request for Information Regarding Net Metering Arrangements Under PURA § 39.169 in PUCT Project 58317 on Jul 24, 2025.
PUCT Project 58317: Staff Memo and RoadmapPUCT Project 58317, Item 5 Filed · Aug 1, 2025
PUC RULES & PROJECTS
PUC RULES & PROJECTS filed Staff Memo and Roadmap in PUCT Project 58317 on Aug 1, 2025.
PUCT Project 59220: ORDER NO. 3- GRANTING MOTIONS TO INTERVENEPUCT Project 59220, Item 10 Filed · Feb 9, 2026
PUC OPDM
PUC OPDM filed ORDER NO. 3- GRANTING MOTIONS TO INTERVENE in PUCT Project 59220 on Feb 9, 2026.
PUCT Project 59220: AMENDED APPLICATION FOR NET METERING APPROVAL BY FGE GOODNIGHT I, LLC (GOODNIGHT WIND) AND CRUSOE ENERGY SYSTEMS LLC, AND ENSIGN INFRASTRUCTURE LLCPUCT Project 59220, Item 11 Filed · Mar 26, 2026
CRUSOE ENERGY SYSTEMS LLC
CRUSOE ENERGY SYSTEMS LLC filed AMENDED APPLICATION FOR NET METERING APPROVAL BY FGE GOODNIGHT I, LLC (GOODNIGHT WIND) AND CRUSOE ENERGY SYSTEMS LLC, AND ENSIGN INFRASTRUCTURE LLC in PUCT Project 59220 on Mar 26, 2026.
PUCT Project 59220: SUPPLEMENT TO AMENDED APPLICATION FOR NET METERING APPROVAL BY FGE GOODNIGHT I, LLC (GOODNIGHT WIND) AND CRUSOE ENERGY SYSTEMS LLC, AND ENSIGN INFRASTRUCTURE LLCPUCT Project 59220, Item 12 Filed · Mar 26, 2026
CRUSOE ENERGY SYSTEMS LLC
CRUSOE ENERGY SYSTEMS LLC filed SUPPLEMENT TO AMENDED APPLICATION FOR NET METERING APPROVAL BY FGE GOODNIGHT I, LLC (GOODNIGHT WIND) AND CRUSOE ENERGY SYSTEMS LLC, AND ENSIGN INFRASTRUCTURE LLC in PUCT Project 59220 on Mar 26, 2026.
PUCT Project 59220: ORDER NO. 4 - RESTYLING DOCKETPUCT Project 59220, Item 13 Filed · Apr 8, 2026
PUC OPDM
PUC OPDM filed ORDER NO. 4 - RESTYLING DOCKET in PUCT Project 59220 on Apr 8, 2026.
PUCT Project 59220: PROTECTIVE ORDER CERTIFICATIONSPUCT Project 59220, Item 14 Filed · May 12, 2026
PUC LEGAL
PUC LEGAL filed PROTECTIVE ORDER CERTIFICATIONS in PUCT Project 59220 on May 12, 2026.
PUCT Project 59220: ERCOT NOTICE OF INTENT TO FILE STUDY RESULTS AND RECOMMENDATIONSPUCT Project 59220, Item 15 Filed · May 19, 2026
ERCOT
ERCOT filed ERCOT NOTICE OF INTENT TO FILE STUDY RESULTS AND RECOMMENDATIONS in PUCT Project 59220 on May 19, 2026.
PUCT Project 59220: ELECTRIC RELIABILITY COUNCIL OF TEXAS, INC.’S FILING OF STUDY RESULTS AND RECOMMENDATIONSPUCT Project 59220, Item 16 Filed · May 29, 2026
ERCOT
ERCOT filed ELECTRIC RELIABILITY COUNCIL OF TEXAS, INC.’S FILING OF STUDY RESULTS AND RECOMMENDATIONS in PUCT Project 59220 on May 29, 2026.
PUCT Project 59220: CONFIDENTIAL - ELECTRIC RELIABILITY COUNCIL OF TEXAS, INC.’S FILING OF STUDY RESULTS AND RECOMMENDATIONSPUCT Project 59220, Item 17 Filed · May 29, 2026
ERCOT
ERCOT filed CONFIDENTIAL - ELECTRIC RELIABILITY COUNCIL OF TEXAS, INC.’S FILING OF STUDY RESULTS AND RECOMMENDATIONS in PUCT Project 59220 on May 29, 2026.
PUCT Project 59220: ORDER NO. 5 - ESTABLISHING PROCEDURAL SCHEDULEPUCT Project 59220, Item 18 Filed · May 29, 2026
PUC OPDM
PUC OPDM filed ORDER NO. 5 - ESTABLISHING PROCEDURAL SCHEDULE in PUCT Project 59220 on May 29, 2026.
PUCT Project 59220: ENSIGN INFRASTRUCTURE LLC’S NOTICE OF FILING PROTECTIVE ORDER CERTIFICATIONSPUCT Project 59220, Item 19 Filed · May 30, 2026
ENSIGN INFRASTRUCTURE LLC
ENSIGN INFRASTRUCTURE LLC filed ENSIGN INFRASTRUCTURE LLC’S NOTICE OF FILING PROTECTIVE ORDER CERTIFICATIONS in PUCT Project 59220 on May 30, 2026.
PUCT Project 59220: JOINT APPLICATION FOR NET METERING APPROVAL BY FGE GOODNIGHT I, LLC AND CRUSOE ENERGY SYSTEMS LLCPUCT Project 59220, Item 1 Filed · Jan 9, 2026
FGE Goodnight I, LLC and Crusoe Energy Systems LLC
FGE Goodnight I, LLC and Crusoe Energy Systems LLC filed JOINT APPLICATION FOR NET METERING APPROVAL BY FGE GOODNIGHT I, LLC AND CRUSOE ENERGY SYSTEMS LLC in PUCT Project 59220 on Jan 9, 2026.
PUCT Project 59220: Direct Testimony of Bharath Kumar RavulapatiPUCT Project 59220, Item 22 Filed · Jun 3, 2026
CRUSOE ENERGY SYSTEMS
CRUSOE ENERGY SYSTEMS filed Direct Testimony of Bharath Kumar Ravulapati in PUCT Project 59220 on Jun 3, 2026.
PUCT Project 59220: ELECTRIC RELIABILITY COUNCIL OF TEXAS, INC.’S STATEMENT OF POSITION IN RESPONSE TO ORDER NO. 5PUCT Project 59220, Item 23 Filed · Jun 8, 2026
ERCOT
ERCOT filed ELECTRIC RELIABILITY COUNCIL OF TEXAS, INC.’S STATEMENT OF POSITION IN RESPONSE TO ORDER NO. 5 in PUCT Project 59220 on Jun 8, 2026.
PUCT Project 59220: Staff's Recommendation on Administrative Completeness and Sufficiency of NoticePUCT Project 59220, Item 24 Filed · Jun 8, 2026
PUC MARKET ANALYSIS
PUC MARKET ANALYSIS filed Staff's Recommendation on Administrative Completeness and Sufficiency of Notice in PUCT Project 59220 on Jun 8, 2026.
PUCT Project 59220: ENSIGN INFRASTRUCTURE, LLC’S AND CRUSOE ENERGY SYSTEMS LLC’S NOTICE OF HEARING AND NOTICE OF INTENT TO REQUEST COURT REPORTERPUCT Project 59220, Item 25 Filed · Jun 8, 2026
ENSIGN INFRASTRUCTURE LLC
ENSIGN INFRASTRUCTURE LLC filed ENSIGN INFRASTRUCTURE, LLC’S AND CRUSOE ENERGY SYSTEMS LLC’S NOTICE OF HEARING AND NOTICE OF INTENT TO REQUEST COURT REPORTER in PUCT Project 59220 on Jun 8, 2026.
PUCT Project 59220: ORDER NO. 6 - FINDING APPLICATION ADMINISTRATIVELY COMPLETE AND NOTICE SUFFICIENT, REQUIRING CORRECTED NOTICE OF HEARING, PROVIDING NOTICE OF PREHEARING CONFERENCE, AND REVISING PROCEDURAL SCHEDULEPUCT Project 59220, Item 28 Filed · Jun 9, 2026
PUC OPDM
PUC OPDM filed ORDER NO. 6 - FINDING APPLICATION ADMINISTRATIVELY COMPLETE AND NOTICE SUFFICIENT, REQUIRING CORRECTED NOTICE OF HEARING, PROVIDING NOTICE OF PREHEARING CONFERENCE, AND REVISING PROCEDURAL SCHEDULE in PUCT Project 59220 on Jun 9, 2026.
PUCT Project 59220: ORDER NO. 7- CLARIFYING DEADLINE FOR APPLICANTS TO FILE CORRECTED NOTICE OF HEARINGPUCT Project 59220, Item 29 Filed · Jun 10, 2026
PUC OPDM
PUC OPDM filed ORDER NO. 7- CLARIFYING DEADLINE FOR APPLICANTS TO FILE CORRECTED NOTICE OF HEARING in PUCT Project 59220 on Jun 10, 2026.
PUCT Project 59220: Correction to the Joint Application for Net Metering ApprovalPUCT Project 59220, Item 2 Filed · Jan 12, 2026
CRUSOE ENERGY SYSTEMS LLC
CRUSOE ENERGY SYSTEMS LLC filed Correction to the Joint Application for Net Metering Approval in PUCT Project 59220 on Jan 12, 2026.
PUCT Project 59220: ELECTRIC RELIABILITY COUNCIL OF TEXAS, INC.’S RESPONSE TO OTHER PARTIES’ FILINGSPUCT Project 59220, Item 32 Filed · Jun 15, 2026
ERCOT
ERCOT filed ELECTRIC RELIABILITY COUNCIL OF TEXAS, INC.’S RESPONSE TO OTHER PARTIES’ FILINGS in PUCT Project 59220 on Jun 15, 2026.
PUCT Project 59220: Commission Staff's Statement of Position and RecommendationsPUCT Project 59220, Item 33 Filed · Jun 17, 2026
PUC MARKET ANALYSIS
PUC MARKET ANALYSIS filed Commission Staff's Statement of Position and Recommendations in PUCT Project 59220 on Jun 17, 2026.
PUCT Project 59220: Commission Staff's Objections and Motion to StrikePUCT Project 59220, Item 34 Filed · Jun 18, 2026
PUC MARKET ANALYSIS
PUC MARKET ANALYSIS filed Commission Staff's Objections and Motion to Strike in PUCT Project 59220 on Jun 18, 2026.
PUCT Project 59220: ORDER NO. 8- DENYING REQUEST FOR A VIRTUAL PREHEARING CONFERENCEPUCT Project 59220, Item 36 Filed · Jun 18, 2026
PUC OPDM
PUC OPDM filed ORDER NO. 8- DENYING REQUEST FOR A VIRTUAL PREHEARING CONFERENCE in PUCT Project 59220 on Jun 18, 2026.
PUCT Project 59220: ENSIGN INFRASTRUCTURE, LLC RESPONSE TO COMMISSION STAFF’S MOTION TO STRIKEPUCT Project 59220, Item 37 Filed · Jun 19, 2026
ENSIGN INFRASTRUCTURE LLC
ENSIGN INFRASTRUCTURE LLC filed ENSIGN INFRASTRUCTURE, LLC RESPONSE TO COMMISSION STAFF’S MOTION TO STRIKE in PUCT Project 59220 on Jun 19, 2026.
PUCT Project 59220: ELECTRIC RELIABILITY COUNCIL OF TEXAS, INC.’S RESPONSE TO ENSIGN INFRASTRUCTURE, LLC’S INFORMAL FIRST SET OF REQUESTS FOR INFORMATIONPUCT Project 59220, Item 38 Filed · Jun 19, 2026
ERCOT
ERCOT filed ELECTRIC RELIABILITY COUNCIL OF TEXAS, INC.’S RESPONSE TO ENSIGN INFRASTRUCTURE, LLC’S INFORMAL FIRST SET OF REQUESTS FOR INFORMATION in PUCT Project 59220 on Jun 19, 2026.
PUCT Project 59220: Notice of Protective Order CertificationsPUCT Project 59220, Item 39 Filed · Jun 19, 2026
Greenbelt Electric Cooperative, Inc. and Golden Spread Electric Cooperative, Inc.
Greenbelt Electric Cooperative, Inc. and Golden Spread Electric Cooperative, Inc. filed Notice of Protective Order Certifications in PUCT Project 59220 on Jun 19, 2026.
PUCT Project 59220: ORDER NO. 1 - ESTABLISHING PROCEDURAL REQUIREMENTS AND ENTERING PROTECTIVE ORDERPUCT Project 59220, Item 3 Filed · Jan 13, 2026
PUC OPDM
PUC OPDM filed ORDER NO. 1 - ESTABLISHING PROCEDURAL REQUIREMENTS AND ENTERING PROTECTIVE ORDER in PUCT Project 59220 on Jan 13, 2026.
PUCT Project 59220: ORDER NO. 9 - MEMORIALIZING PREHEARING CONFERENCE, CANCELING HEARING ON THE MERITS, AND ADOPTING REVISED PROCEDURAL SCHEDULEPUCT Project 59220, Item 40 Filed · Jun 19, 2026
PUC OPDM
PUC OPDM filed ORDER NO. 9 - MEMORIALIZING PREHEARING CONFERENCE, CANCELING HEARING ON THE MERITS, AND ADOPTING REVISED PROCEDURAL SCHEDULE in PUCT Project 59220 on Jun 19, 2026.
PUCT Project 59220: CRUSOE ENERGY SYSTEMS LLC EXHIBIT LIST AND EXHIBITPUCT Project 59220, Item 41 Filed · Jun 22, 2026
CRUSOE ENERGY SYSTEMS LLC
CRUSOE ENERGY SYSTEMS LLC filed CRUSOE ENERGY SYSTEMS LLC EXHIBIT LIST AND EXHIBIT in PUCT Project 59220 on Jun 22, 2026.
PUCT Project 59220: ELECTRIC RELIABILITY COUNCIL OF TEXAS, INC.’S EXHIBIT LISTPUCT Project 59220, Item 44 Filed · Jun 22, 2026
ERCOT
ERCOT filed ELECTRIC RELIABILITY COUNCIL OF TEXAS, INC.’S EXHIBIT LIST in PUCT Project 59220 on Jun 22, 2026.
PUCT Project 59220: ELECTRIC RELIABILITY COUNCIL OF TEXAS, INC.’S NITIAL BRIEFPUCT Project 59220, Item 45 Filed · Jun 26, 2026
ERCOT
ERCOT filed ELECTRIC RELIABILITY COUNCIL OF TEXAS, INC.’S NITIAL BRIEF in PUCT Project 59220 on Jun 26, 2026.
PUCT Project 59220: Commission Staff's Initial BriefPUCT Project 59220, Item 47 Filed · Jun 26, 2026
PUC MARKET ANALYSIS
PUC MARKET ANALYSIS filed Commission Staff's Initial Brief in PUCT Project 59220 on Jun 26, 2026.
PUCT Project 59220: ONCOR ELECTRIC DELIVERY COMPANY LLC'S MOTION TO INTERVENEPUCT Project 59220, Item 4 Filed · Jan 21, 2026
ONCOR ELECTRIC DELIVERY COMPANY LLC
ONCOR ELECTRIC DELIVERY COMPANY LLC filed ONCOR ELECTRIC DELIVERY COMPANY LLC'S MOTION TO INTERVENE in PUCT Project 59220 on Jan 21, 2026.
PUCT Project 59220: ELECTRIC RELIABILITY COUNCIL OF TEXAS, INC.’S REPLY BRIEFPUCT Project 59220, Item 51 Filed · Jul 2, 2026
ERCOT
ERCOT filed ELECTRIC RELIABILITY COUNCIL OF TEXAS, INC.’S REPLY BRIEF in PUCT Project 59220 on Jul 2, 2026.
PUCT Project 59220: ELECTRIC RELIABILITY COUNCIL OF TEXAS, INC.’S AND COMMISSION STAFF’S JOINT PROPOSED FINDINGS OF FACT AND CONCLUSIONS OF LAWPUCT Project 59220, Item 52 Filed · Jul 2, 2026
ERCOT
ERCOT filed ELECTRIC RELIABILITY COUNCIL OF TEXAS, INC.’S AND COMMISSION STAFF’S JOINT PROPOSED FINDINGS OF FACT AND CONCLUSIONS OF LAW in PUCT Project 59220 on Jul 2, 2026.
PUCT Project 59220: Commission Staff's Reply BriefPUCT Project 59220, Item 54 Filed · Jul 2, 2026
PUC MARKET ANALYSIS
PUC MARKET ANALYSIS filed Commission Staff's Reply Brief in PUCT Project 59220 on Jul 2, 2026.
PUCT Project 59220: JOINT PROPOSED ORDERPUCT Project 59220, Item 56 Filed · Jul 2, 2026
ENSIGN INFRASTRUCTURE LLC
ENSIGN INFRASTRUCTURE LLC filed JOINT PROPOSED ORDER in PUCT Project 59220 on Jul 2, 2026.
PUCT Project 59220: Commission Staff's Change of CounselPUCT Project 59220, Item 59 Filed · Jul 8, 2026
PUC MARKET ANALYSIS
PUC MARKET ANALYSIS filed Commission Staff's Change of Counsel in PUCT Project 59220 on Jul 8, 2026.
PUCT Project 59220: NOTICE OF APPEARANCE OF COUNSEL ON BEHALF OF ELECTRIC RELIABILITY COUNCIL OF TEXAS, INC.PUCT Project 59220, Item 5 Filed · Jan 29, 2026
ERCOT
ERCOT filed NOTICE OF APPEARANCE OF COUNSEL ON BEHALF OF ELECTRIC RELIABILITY COUNCIL OF TEXAS, INC. in PUCT Project 59220 on Jan 29, 2026.
PUCT Project 59220: PROPOSED ORDER WITH MEMORANDUMPUCT Project 59220, Item 60 Filed · Jul 9, 2026
PUC OPDM
PUC OPDM filed PROPOSED ORDER WITH MEMORANDUM in PUCT Project 59220 on Jul 9, 2026.
PUCT Project 59220: ENSIGN INFRASTRUCTURE, LLC’S AND CRUSOE ENERGY SYSTEMS LLC’S CORRECTIONS AND EXCEPTIONS TO PROPOSED ORDERPUCT Project 59220, Item 61 Filed · Jul 14, 2026
ENSIGN INFRASTRUCTURE LLC
ENSIGN INFRASTRUCTURE LLC filed ENSIGN INFRASTRUCTURE, LLC’S AND CRUSOE ENERGY SYSTEMS LLC’S CORRECTIONS AND EXCEPTIONS TO PROPOSED ORDER in PUCT Project 59220 on Jul 14, 2026.
PUCT Project 59220: FGE Goodnight I, LLC's Corrections and Exceptions to the Proposed OrderPUCT Project 59220, Item 62 Filed · Jul 14, 2026
FGE Goodnight I, LLC
FGE Goodnight I, LLC filed FGE Goodnight I, LLC's Corrections and Exceptions to the Proposed Order in PUCT Project 59220 on Jul 14, 2026.
PUCT Project 59220: NOTICE MEMORANDUMPUCT Project 59220, Item 63 Filed · Jul 15, 2026
PUC OPDM
PUC OPDM filed NOTICE MEMORANDUM in PUCT Project 59220 on Jul 15, 2026.
PUCT Project 59220: PROPOSED ORDER MEMORANDUMPUCT Project 59220, Item 64 Filed · Jul 16, 2026
PUC OPDM
PUC OPDM filed PROPOSED ORDER MEMORANDUM in PUCT Project 59220 on Jul 16, 2026.
PUCT Project 59220: Amicus BriefPUCT Project 59220, Item 65 Filed · Jul 16, 2026
TEXAS COMPETITIVE POWER ADVOCATES
TEXAS COMPETITIVE POWER ADVOCATES filed Amicus Brief in PUCT Project 59220 on Jul 16, 2026.
PUCT Project 59220: Commission Staff's Motion to Strike Amicus BriefsPUCT Project 59220, Item 67 Filed · Jul 17, 2026
PUC MARKET ANALYSIS
PUC MARKET ANALYSIS filed Commission Staff's Motion to Strike Amicus Briefs in PUCT Project 59220 on Jul 17, 2026.
PUCT Project 59220: CHAIRMAN GLEESON MEMORANDUMPUCT Project 59220, Item 68 Filed · Jul 23, 2026
PUC OPDM
PUC OPDM filed CHAIRMAN GLEESON MEMORANDUM in PUCT Project 59220 on Jul 23, 2026.
PUCT Project 59220: ORDERPUCT Project 59220, Item 69 Filed · Jul 24, 2026
PUC OPDM
PUC OPDM filed ORDER in PUCT Project 59220 on Jul 24, 2026.
PUCT Project 59220: Protective Order Certifications for Crusoe Energy Systems and FGE Goodnight I, LLC (Goodnight Wind)PUCT Project 59220, Item 6 Filed · Jan 29, 2026
Crusoe Energy Systems and FGE Goodnight I, LLC
Crusoe Energy Systems and FGE Goodnight I, LLC filed Protective Order Certifications for Crusoe Energy Systems and FGE Goodnight I, LLC (Goodnight Wind) in PUCT Project 59220 on Jan 29, 2026.
PUCT Project 59220: OUTGOING COMMISSION-SIGNED ORDER MAIL LOGPUCT Project 59220, Item 70 Filed · Jul 24, 2026
PUC OPDM
PUC OPDM filed OUTGOING COMMISSION-SIGNED ORDER MAIL LOG in PUCT Project 59220 on Jul 24, 2026.
PUCT Project 59220: VOID SEE ITEM 72PUCT Project 59220, Item 71 Filed · Jul 24, 2026
ERCOT
ERCOT filed VOID SEE ITEM 72 in PUCT Project 59220 on Jul 24, 2026.
PUCT Project 59220: VOID LETTERPUCT Project 59220, Item 72 Filed · Jul 24, 2026
ERCOT
ERCOT filed VOID LETTER in PUCT Project 59220 on Jul 24, 2026.
PUCT Project 59220: BALLOT MEMORANDUMPUCT Project 59220, Item 74 Filed · Aug 31, 2026
PUC OPDM
PUC OPDM filed BALLOT MEMORANDUM in PUCT Project 59220 on Aug 31, 2026.
PUCT Project 59220: ELECTRIC RELIABILITY COUNCIL OF TEXAS, INC.’S NOTICE OF COMMENCEMENT OF STUDYPUCT Project 59220, Item 7 Filed · Jan 29, 2026
ERCOT
ERCOT filed ELECTRIC RELIABILITY COUNCIL OF TEXAS, INC.’S NOTICE OF COMMENCEMENT OF STUDY in PUCT Project 59220 on Jan 29, 2026.
PUCT Project 59220: ORDER NO. 2 - GRANTING MOTION TO INTERVENEPUCT Project 59220, Item 9 Filed · Feb 2, 2026
PUC OPDM
PUC OPDM filed ORDER NO. 2 - GRANTING MOTION TO INTERVENE in PUCT Project 59220 on Feb 2, 2026.
PUCT Project 58317: OPUC NOTICE OF PARTICIPATION LETTERPUCT Project 58317, Item 10 Filed · Sep 24, 2025
OPUC
OPUC filed OPUC NOTICE OF PARTICIPATION LETTER in PUCT Project 58317 on Sep 24, 2025.
PUCT Project 58317: Joint Comments of Google LLC and Lancium LLC on SB6 ImplementationPUCT Project 58317, Item 11 Filed · Dec 18, 2025
GOOGLE LLC, LANCIUM LLC
GOOGLE LLC, LANCIUM LLC filed Joint Comments of Google LLC and Lancium LLC on SB6 Implementation in PUCT Project 58317 on Dec 18, 2025.
PUCT Project 58317: OM Item No. 46 - Staff Memo and Updated RoadmapPUCT Project 58317, Item 12 Filed · Jan 30, 2026
PUC RULES & PROJECTS
PUC RULES & PROJECTS filed OM Item No. 46 - Staff Memo and Updated Roadmap in PUCT Project 58317 on Jan 30, 2026.
PUCT Project 58317: Staff Memo_New Rulemaking ProjectPUCT Project 58317, Item 14 Filed · May 27, 2026
PUC RULES & PROJECTS
PUC RULES & PROJECTS filed Staff Memo_New Rulemaking Project in PUCT Project 58317 on May 27, 2026.
PUCT Project 58317: Staff Memo and Updated RoadmapPUCT Project 58317, Item 15 Filed · May 27, 2026
PUC RULES & PROJECTS
PUC RULES & PROJECTS filed Staff Memo and Updated Roadmap in PUCT Project 58317 on May 27, 2026.
PUCT Project 58317: Governor Abbott's June 10, 2026 letter to PUCT and ERCOT re: Data Center Infrastructure CostsPUCT Project 58317, Item 16 Filed · Jun 22, 2026
PUC DEPUTY EXECUTIVE DIRECTOR
PUC DEPUTY EXECUTIVE DIRECTOR filed Governor Abbott's June 10, 2026 letter to PUCT and ERCOT re: Data Center Infrastructure Costs in PUCT Project 58317 on Jun 22, 2026.
PUCT Project 58317: Response to Governor Abbott's June 10, 2026 letterPUCT Project 58317, Item 18 Filed · Jul 20, 2026
PUC DEPUTY EXECUTIVE DIRECTOR
PUC DEPUTY EXECUTIVE DIRECTOR filed Response to Governor Abbott's June 10, 2026 letter in PUCT Project 58317 on Jul 20, 2026.
PUCT Project 58317: SB6 Implementation Roadmap Updated July 2026PUCT Project 58317, Item 19 Filed · Jul 21, 2026
PUC RULES & PROJECTS
PUC RULES & PROJECTS filed SB6 Implementation Roadmap Updated July 2026 in PUCT Project 58317 on Jul 21, 2026.
PUCT Project 58317: CHAIRMAN GLEESON MEMORANDUMPUCT Project 58317, Item 25 Filed · Aug 6, 2026
PUC OPDM
PUC OPDM filed CHAIRMAN GLEESON MEMORANDUM in PUCT Project 58317 on Aug 6, 2026.
PUCT Project 58317: Governor Abbott's August 3, 2026 letter to PUCT and ERCOT re: Verification of Data Center InformationPUCT Project 58317, Item 26 Filed · Aug 6, 2026
PUC DEPUTY EXECUTIVE DIRECTOR
PUC DEPUTY EXECUTIVE DIRECTOR filed Governor Abbott's August 3, 2026 letter to PUCT and ERCOT re: Verification of Data Center Information in PUCT Project 58317 on Aug 6, 2026.
PUCT Project 58317: ERCOT LETTER REGARDING PROJECT NO. 59142 FILINGPUCT Project 58317, Item 27 Filed · Aug 10, 2026
ERCOT
ERCOT filed ERCOT LETTER REGARDING PROJECT NO. 59142 FILING in PUCT Project 58317 on Aug 10, 2026.
PUCT Project 58317: SENATE BILL 6 IMPLEMENTATION WORKSHOP PROJECT NO. 58317 MONDAY, JULY 21, 2025PUCT Project 58317, Item 6 Filed · Aug 5, 2025
KENNEDY REPORTING SERVICE
KENNEDY REPORTING SERVICE filed SENATE BILL 6 IMPLEMENTATION WORKSHOP PROJECT NO. 58317 MONDAY, JULY 21, 2025 in PUCT Project 58317 on Aug 5, 2025.
PUCT Project 58317: ERCOT LETTER RE NET METERING STUDY DETAILSPUCT Project 58317, Item 7 Filed · Sep 2, 2025
ERCOT
ERCOT filed ERCOT LETTER RE NET METERING STUDY DETAILS in PUCT Project 58317 on Sep 2, 2025.
PUCT Project 58317: ERCOT LETTER RE STAND-ALONE GENERATION RESOURCE LIST UPDATEPUCT Project 58317, Item 9 Filed · Sep 19, 2025
ERCOT
ERCOT filed ERCOT LETTER RE STAND-ALONE GENERATION RESOURCE LIST UPDATE in PUCT Project 58317 on Sep 19, 2025.
PUCT Project 58480: EDF comments on large load forecast proposed rulePUCT Project 58480, Item 14 Filed · Oct 17, 2025
ENVIRONMENTAL DEFENSE FUND INC
ENVIRONMENTAL DEFENSE FUND INC filed EDF comments on large load forecast proposed rule in PUCT Project 58480 on Oct 17, 2025.
PUCT Project 58480: ERCOT STEEL MILLS’ COMMENTS ON PROJECT NO. 58480 - ERCOT LARGE LOAD FORECASTING CRITERIAPUCT Project 58480, Item 15 Filed · Oct 17, 2025
ERCOT STEEL MILLS
ERCOT STEEL MILLS filed ERCOT STEEL MILLS’ COMMENTS ON PROJECT NO. 58480 - ERCOT LARGE LOAD FORECASTING CRITERIA in PUCT Project 58480 on Oct 17, 2025.
PUCT Project 58480: Targa Resources LLC's Comments to Staff Recommendation for Proposal for Publication of New 16 TAC §25.370PUCT Project 58480, Item 16 Filed · Oct 17, 2025
Targa Resources LLC
Targa Resources LLC filed Targa Resources LLC's Comments to Staff Recommendation for Proposal for Publication of New 16 TAC §25.370 in PUCT Project 58480 on Oct 17, 2025.
PUCT Project 58480: NRG Energy, Inc.'s Comments on the Proposed RulePUCT Project 58480, Item 17 Filed · Oct 17, 2025
NRG ENERGY, INC.
NRG ENERGY, INC. filed NRG Energy, Inc.'s Comments on the Proposed Rule in PUCT Project 58480 on Oct 17, 2025.
PUCT Project 58480: Texas Public Policy Foundation Comments on Proposal for Publication of New 16 TAC §25.370PUCT Project 58480, Item 18 Filed · Oct 17, 2025
Texas Public Policy Foundation
Texas Public Policy Foundation filed Texas Public Policy Foundation Comments on Proposal for Publication of New 16 TAC §25.370 in PUCT Project 58480 on Oct 17, 2025.
PUCT Project 58480: Request for Control NumberPUCT Project 58480, Item 1 Filed · Jul 31, 2025
PUC RULES & PROJECTS
PUC RULES & PROJECTS filed Request for Control Number in PUCT Project 58480 on Jul 31, 2025.
PUCT Project 58480: OCSC and TCAP's Comments on Proposed Large Load Forecasting CriteriaPUCT Project 58480, Item 20 Filed · Oct 17, 2025
THE STEERING COMMITTEE OF CITIES SERVED BY ONCOR (CITIES)
THE STEERING COMMITTEE OF CITIES SERVED BY ONCOR (CITIES) filed OCSC and TCAP's Comments on Proposed Large Load Forecasting Criteria in PUCT Project 58480 on Oct 17, 2025.
PUCT Project 58480: SCHAPER ENERGY CONSULTING LLC SUPPLEMENTAL RESPONSE TO STAFF’s QUESTIONS ON PROJECT NO. 58480; ERCOT LARGE LOAD FORECASTING CRITERIA UNDER PROPOSED 16 TAC §25.370PUCT Project 58480, Item 21 Filed · Oct 17, 2025
Schaper Energy Consulting LLC
Schaper Energy Consulting LLC filed SCHAPER ENERGY CONSULTING LLC SUPPLEMENTAL RESPONSE TO STAFF’s QUESTIONS ON PROJECT NO. 58480; ERCOT LARGE LOAD FORECASTING CRITERIA UNDER PROPOSED 16 TAC §25.370 in PUCT Project 58480 on Oct 17, 2025.
PUCT Project 58480: TCPA Comments and Recommendations on PfPPUCT Project 58480, Item 22 Filed · Oct 17, 2025
TCPA
TCPA filed TCPA Comments and Recommendations on PfP in PUCT Project 58480 on Oct 17, 2025.
PUCT Project 58480: TEXAS INDUSTRIAL ENERGY CONSUMERS’ PROPOSED COMMENTS TO DRAFT RULE 25.504PUCT Project 58480, Item 23 Filed · Oct 17, 2025
TIEC
TIEC filed TEXAS INDUSTRIAL ENERGY CONSUMERS’ PROPOSED COMMENTS TO DRAFT RULE 25.504 in PUCT Project 58480 on Oct 17, 2025.
PUCT Project 58480: OFFICE OF PUBLIC UTILITY COUNSEL’S COMMENTS ON PROPOSAL FOR PUBLICATION OF NEW 16 TAC § 25.370PUCT Project 58480, Item 24 Filed · Oct 17, 2025
OPUC
OPUC filed OFFICE OF PUBLIC UTILITY COUNSEL’S COMMENTS ON PROPOSAL FOR PUBLICATION OF NEW 16 TAC § 25.370 in PUCT Project 58480 on Oct 17, 2025.
PUCT Project 58480: TEBA's Comments on Project No. 58480 Proposal for PublicationPUCT Project 58480, Item 25 Filed · Oct 17, 2025
TEXAS ENERGY BUYERS ALLIANCE
TEXAS ENERGY BUYERS ALLIANCE filed TEBA's Comments on Project No. 58480 Proposal for Publication in PUCT Project 58480 on Oct 17, 2025.
PUCT Project 58480: ONCOR ELECTRIC DELIVERY’S COMMENTS ON THE PROPOSAL FOR PUBLICATION OF NEW 16 TAC §25.370PUCT Project 58480, Item 26 Filed · Oct 17, 2025
ONCOR ELECTRIC DELIVERY COMPANY LLC
ONCOR ELECTRIC DELIVERY COMPANY LLC filed ONCOR ELECTRIC DELIVERY’S COMMENTS ON THE PROPOSAL FOR PUBLICATION OF NEW 16 TAC §25.370 in PUCT Project 58480 on Oct 17, 2025.
PUCT Project 58480: CenterPoint Energy Houston Electric CommentsPUCT Project 58480, Item 27 Filed · Oct 17, 2025
CENTERPOINT ENERGY HOUSTON ELECTRIC
CENTERPOINT ENERGY HOUSTON ELECTRIC filed CenterPoint Energy Houston Electric Comments in PUCT Project 58480 on Oct 17, 2025.
PUCT Project 58480: Comments of Texas Electric Cooperatives, Inc.PUCT Project 58480, Item 28 Filed · Oct 17, 2025
Texas Electric Cooperatives, Inc.
Texas Electric Cooperatives, Inc. filed Comments of Texas Electric Cooperatives, Inc. in PUCT Project 58480 on Oct 17, 2025.
PUCT Project 58480: AEP TEXAS’ COMMENTS ON PROPOSAL FOR PUBLICATIONPUCT Project 58480, Item 29 Filed · Oct 17, 2025
AEP TEXAS INC.
AEP TEXAS INC. filed AEP TEXAS’ COMMENTS ON PROPOSAL FOR PUBLICATION in PUCT Project 58480 on Oct 17, 2025.
PUCT Project 58480: OPUC NOTICE OF PARTICIPATION LETTERPUCT Project 58480, Item 2 Filed · Aug 11, 2025
OPUC
OPUC filed OPUC NOTICE OF PARTICIPATION LETTER in PUCT Project 58480 on Aug 11, 2025.
PUCT Project 58480: LCRA AND LCRA TSC COMMENTSPUCT Project 58480, Item 30 Filed · Oct 17, 2025
LOWER COLORADO RIVER AUTHORITY AND LCRA TRANSMISSION SERVICES CORPORATION
LOWER COLORADO RIVER AUTHORITY AND LCRA TRANSMISSION SERVICES CORPORATION filed LCRA AND LCRA TSC COMMENTS in PUCT Project 58480 on Oct 17, 2025.
PUCT Project 58480: Comments from the City of Red Oak on SB6 Rule Making Project 58480PUCT Project 58480, Item 31 Filed · Oct 17, 2025
CITY OF RED OAK
CITY OF RED OAK filed Comments from the City of Red Oak on SB6 Rule Making Project 58480 in PUCT Project 58480 on Oct 17, 2025.
PUCT Project 58480: ELECTRIC RELIABILITY COUNCIL OF TEXAS, INC.’S COMMENTS REGARDING PROPOSED 16 TAC § 25.370PUCT Project 58480, Item 32 Filed · Oct 17, 2025
ERCOT
ERCOT filed ELECTRIC RELIABILITY COUNCIL OF TEXAS, INC.’S COMMENTS REGARDING PROPOSED 16 TAC § 25.370 in PUCT Project 58480 on Oct 17, 2025.
PUCT Project 58480: Texas-New Mexico Power Company’s Public Comments Regarding Staff’s Proposal for Publication of New 16 TAC § 25.370PUCT Project 58480, Item 33 Filed · Oct 17, 2025
TEXAS- NEW MEXICO POWER COMPANY
TEXAS- NEW MEXICO POWER COMPANY filed Texas-New Mexico Power Company’s Public Comments Regarding Staff’s Proposal for Publication of New 16 TAC § 25.370 in PUCT Project 58480 on Oct 17, 2025.
PUCT Project 58480: Data Center Coalition's CommentsPUCT Project 58480, Item 35 Filed · Oct 17, 2025
Data Center Coalition
Data Center Coalition filed Data Center Coalition's Comments in PUCT Project 58480 on Oct 17, 2025.
PUCT Project 58480: Sharyland Utilities, L.L.C.'s Initial Comments on the Proposal for Publication of New 16 TAC § 25.370PUCT Project 58480, Item 36 Filed · Oct 17, 2025
SHARYLAND UTILITIES, L.L.C.
SHARYLAND UTILITIES, L.L.C. filed Sharyland Utilities, L.L.C.'s Initial Comments on the Proposal for Publication of New 16 TAC § 25.370 in PUCT Project 58480 on Oct 17, 2025.
PUCT Project 58480: REPLY COMMENTSPUCT Project 58480, Item 38 Filed · Oct 30, 2025
AEP TEXAS INC.
AEP TEXAS INC. filed REPLY COMMENTS in PUCT Project 58480 on Oct 30, 2025.
PUCT Project 58480: REPLY COMMENTSPUCT Project 58480, Item 39 Filed · Oct 31, 2025
CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC
CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC filed REPLY COMMENTS in PUCT Project 58480 on Oct 31, 2025.
PUCT Project 58480: Staff Memo and Notice of 9/2 WorkshopPUCT Project 58480, Item 3 Filed · Aug 15, 2025
PUC RULES & PROJECTS
PUC RULES & PROJECTS filed Staff Memo and Notice of 9/2 Workshop in PUCT Project 58480 on Aug 15, 2025.
PUCT Project 58480: ONCOR ELECTRIC DELIVERY’S REPLY COMMENTS ON THE PROPOSAL FOR PUBLICATION OF NEW 16 TAC §25.370PUCT Project 58480, Item 40 Filed · Oct 31, 2025
ONCOR ELECTRIC DELIVERY COMPANY LLC
ONCOR ELECTRIC DELIVERY COMPANY LLC filed ONCOR ELECTRIC DELIVERY’S REPLY COMMENTS ON THE PROPOSAL FOR PUBLICATION OF NEW 16 TAC §25.370 in PUCT Project 58480 on Oct 31, 2025.
PUCT Project 58480: TCPA REPLY COMMENTS TO THE PFP REGARDING LARGE LOAD FORECASTING CRITERIAPUCT Project 58480, Item 42 Filed · Oct 31, 2025
TCPA
TCPA filed TCPA REPLY COMMENTS TO THE PFP REGARDING LARGE LOAD FORECASTING CRITERIA in PUCT Project 58480 on Oct 31, 2025.
PUCT Project 58480: Joint Reply Comments of Wind Energy Transmission Texas, LLC; Cross Texas Transmission, LLC; and Lone Start Transmission, LLC on the Proposal for Publication of New 16 TAC § 25.370PUCT Project 58480, Item 43 Filed · Oct 31, 2025
WIND ENERGY TRANSMISSION LLC
WIND ENERGY TRANSMISSION LLC filed Joint Reply Comments of Wind Energy Transmission Texas, LLC; Cross Texas Transmission, LLC; and Lone Start Transmission, LLC on the Proposal for Publication of New 16 TAC § 25.370 in PUCT Project 58480 on Oct 31, 2025.
PUCT Project 58480: OCSC and TCAP's Reply CommentsPUCT Project 58480, Item 44 Filed · Oct 31, 2025
STEERING COMMITTEE OF CITIES SERVED BY ONCOR AND TEXAS COALITION FOR AFFORDABLE POWER
STEERING COMMITTEE OF CITIES SERVED BY ONCOR AND TEXAS COALITION FOR AFFORDABLE POWER filed OCSC and TCAP's Reply Comments in PUCT Project 58480 on Oct 31, 2025.
PUCT Project 58480: REPLY COMMENTSPUCT Project 58480, Item 45 Filed · Oct 31, 2025
LOWER COLORADO RIVER AUTHORITY AND LCRA TRANSMISSION SERVICES CORPORATION
LOWER COLORADO RIVER AUTHORITY AND LCRA TRANSMISSION SERVICES CORPORATION filed REPLY COMMENTS in PUCT Project 58480 on Oct 31, 2025.
PUCT Project 58480: OPUC’S REPLY COMMENTS ON THE PROPOSAL FOR PUBLICATION OF NEW 16 TAC § 25.370PUCT Project 58480, Item 48 Filed · Oct 31, 2025
OPUC
OPUC filed OPUC’S REPLY COMMENTS ON THE PROPOSAL FOR PUBLICATION OF NEW 16 TAC § 25.370 in PUCT Project 58480 on Oct 31, 2025.
PUCT Project 58480: CRUSOE ENERGY SYSTEMS LLC REPLY COMMENTSPUCT Project 58480, Item 49 Filed · Oct 31, 2025
CRUSOE ENERGY SYSTEMS LLC
CRUSOE ENERGY SYSTEMS LLC filed CRUSOE ENERGY SYSTEMS LLC REPLY COMMENTS in PUCT Project 58480 on Oct 31, 2025.
PUCT Project 58480: Staff memo, workshop agenda, and discussion draftPUCT Project 58480, Item 4 Filed · Aug 25, 2025
PUC RULES & PROJECTS
PUC RULES & PROJECTS filed Staff memo, workshop agenda, and discussion draft in PUCT Project 58480 on Aug 25, 2025.
PUCT Project 58480: ELECTRIC RELIABILITY COUNCIL OF TEXAS, INC.’S REPLY COMMENTS REGARDING PROPOSED 16 TAC § 25.370PUCT Project 58480, Item 50 Filed · Oct 31, 2025
ERCOT
ERCOT filed ELECTRIC RELIABILITY COUNCIL OF TEXAS, INC.’S REPLY COMMENTS REGARDING PROPOSED 16 TAC § 25.370 in PUCT Project 58480 on Oct 31, 2025.
PUCT Project 58480: Eolian L.P.'s Reply Comments on Proposal for PublicationPUCT Project 58480, Item 51 Filed · Oct 31, 2025
EOLIAN, L.P.
EOLIAN, L.P. filed Eolian L.P.'s Reply Comments on Proposal for Publication in PUCT Project 58480 on Oct 31, 2025.
PUCT Project 58480: Data Center Coalition's Reply CommentsPUCT Project 58480, Item 52 Filed · Oct 31, 2025
Data Center Coalition (DCC)
Data Center Coalition (DCC) filed Data Center Coalition's Reply Comments in PUCT Project 58480 on Oct 31, 2025.
PUCT Project 58480: OM Item No. 10 - (Staff Recommendation) Order Adopting New §25.370PUCT Project 58480, Item 53 Filed · Jan 22, 2026
PUC RULES & PROJECTS
PUC RULES & PROJECTS filed OM Item No. 10 - (Staff Recommendation) Order Adopting New §25.370 in PUCT Project 58480 on Jan 22, 2026.
PUCT Project 58480: ERCOT’S PROPOSED COMPLIANCE PLAN FOR INCLUDING LARGE LOADS IN THE LOAD FORECAST FOR THE 2026 REGIONAL TRANSMISSION PLANPUCT Project 58480, Item 54 Filed · Jan 22, 2026
ERCOT
ERCOT filed ERCOT’S PROPOSED COMPLIANCE PLAN FOR INCLUDING LARGE LOADS IN THE LOAD FORECAST FOR THE 2026 REGIONAL TRANSMISSION PLAN in PUCT Project 58480 on Jan 22, 2026.
PUCT Project 58480: COMMISSIONER HJALTMAN MEMORANDUMPUCT Project 58480, Item 56 Filed · Jan 28, 2026
PUC OPDM
PUC OPDM filed COMMISSIONER HJALTMAN MEMORANDUM in PUCT Project 58480 on Jan 28, 2026.
PUCT Project 58480: OM Item No. 33 - Staff Memo with Proposed Redline ChangesPUCT Project 58480, Item 57 Filed · Feb 4, 2026
PUC RULES & PROJECTS
PUC RULES & PROJECTS filed OM Item No. 33 - Staff Memo with Proposed Redline Changes in PUCT Project 58480 on Feb 4, 2026.
PUCT Project 58480: ERCOT PRESENTATION ON SB 6 LOAD FORECASTING PROCESSESPUCT Project 58480, Item 5 Filed · Sep 2, 2025
ERCOT
ERCOT filed ERCOT PRESENTATION ON SB 6 LOAD FORECASTING PROCESSES in PUCT Project 58480 on Sep 2, 2025.
PUCT Project 58480: OPUC’S INITIAL COMMENTS ON DISCUSSION DRAFT ATTACHMENT B TO COMMISSION STAFF’S MEMORANDUM ON RULEMAKING TO ESTABLISH LARGE LOAD FORECASTING CRITERIAPUCT Project 58480, Item 6 Filed · Sep 3, 2025
OPUC
OPUC filed OPUC’S INITIAL COMMENTS ON DISCUSSION DRAFT ATTACHMENT B TO COMMISSION STAFF’S MEMORANDUM ON RULEMAKING TO ESTABLISH LARGE LOAD FORECASTING CRITERIA in PUCT Project 58480 on Sep 3, 2025.
PUCT Project 58480: OM Item No. 10 - Staff Memo & PFP w/Oct. 17 Comment DeadlinePUCT Project 58480, Item 7 Filed · Sep 12, 2025
PUC RULES & PROJECTS
PUC RULES & PROJECTS filed OM Item No. 10 - Staff Memo & PFP w/Oct. 17 Comment Deadline in PUCT Project 58480 on Sep 12, 2025.
PUCT Project 58480: PROPOSAL FOR PUBLICATION OF NEW 16 TAC §25.370PUCT Project 58480, Item 8 Filed · Sep 18, 2025
PUC OPDM
PUC OPDM filed PROPOSAL FOR PUBLICATION OF NEW 16 TAC §25.370 in PUCT Project 58480 on Sep 18, 2025.
PUCT Project 58481: ORDER ADOPTING NEW 16 TAC §25.194PUCT Project 58481, Item 218 Filed · Sep 18, 2026
PUC OPDM
PUC OPDM filed ORDER ADOPTING NEW 16 TAC §25.194 in PUCT Project 58481 on Sep 18, 2026.
PUCT Project 58479: SATOSHI ENERGY COMMENTS ON STAFF’S DRAFT DISCUSSION RULE § 25.205PUCT Project 58479, Item 10 Filed · Sep 10, 2025
SATOSHI ENERGY CORP.
SATOSHI ENERGY CORP. filed SATOSHI ENERGY COMMENTS ON STAFF’S DRAFT DISCUSSION RULE § 25.205 in PUCT Project 58479 on Sep 10, 2025.
PUCT Project 58479: OM Item No. 9 - Staff Memo & PFP w/Oct. 17 Comment DeadlinePUCT Project 58479, Item 11 Filed · Sep 12, 2025
PUC RULES & PROJECTS
PUC RULES & PROJECTS filed OM Item No. 9 - Staff Memo & PFP w/Oct. 17 Comment Deadline in PUCT Project 58479 on Sep 12, 2025.
PUCT Project 58479: LETTER & PRESENTATION REGARDING ERCOT STUDIES OF PROPOSED NET METERING ARRANGEMENTSPUCT Project 58479, Item 12 Filed · Sep 18, 2025
ERCOT
ERCOT filed LETTER & PRESENTATION REGARDING ERCOT STUDIES OF PROPOSED NET METERING ARRANGEMENTS in PUCT Project 58479 on Sep 18, 2025.
PUCT Project 58479: PROPOSAL FOR PUBLICATION OF NEW 16 TAC §25.205PUCT Project 58479, Item 13 Filed · Sep 18, 2025
PUC OPDM
PUC OPDM filed PROPOSAL FOR PUBLICATION OF NEW 16 TAC §25.205 in PUCT Project 58479 on Sep 18, 2025.
PUCT Project 58479: ERCOT LETTER RE STAND-ALONE GENERATION RESOURCE LIST UPDATEPUCT Project 58479, Item 15 Filed · Sep 19, 2025
ERCOT
ERCOT filed ERCOT LETTER RE STAND-ALONE GENERATION RESOURCE LIST UPDATE in PUCT Project 58479 on Sep 19, 2025.
PUCT Project 58479: SPLIGHT COMMENTS ON STAFF'S DRAFT DISCUSSION RULE § 25.205PUCT Project 58479, Item 17 Filed · Oct 17, 2025
Splight Inc.
Splight Inc. filed SPLIGHT COMMENTS ON STAFF'S DRAFT DISCUSSION RULE § 25.205 in PUCT Project 58479 on Oct 17, 2025.
PUCT Project 58479: Request for Control NumberPUCT Project 58479, Item 1 Filed · Jul 31, 2025
PUC RULES AND PROJECTS
PUC RULES AND PROJECTS filed Request for Control Number in PUCT Project 58479 on Jul 31, 2025.
PUCT Project 58479: VOID SEE ITEM 35PUCT Project 58479, Item 20 Filed · Oct 17, 2025
TCPA
TCPA filed VOID SEE ITEM 35 in PUCT Project 58479 on Oct 17, 2025.
PUCT Project 58479: Initial Comments of the Texas Advanced Energy Business Alliance on Commission Staff's Draft Rule §25.205PUCT Project 58479, Item 21 Filed · Oct 17, 2025
TEXAS ADVANCED ENERGY BUSINESS ALLIANCE
TEXAS ADVANCED ENERGY BUSINESS ALLIANCE filed Initial Comments of the Texas Advanced Energy Business Alliance on Commission Staff's Draft Rule §25.205 in PUCT Project 58479 on Oct 17, 2025.
PUCT Project 58479: TEXAS INDUSTRIAL ENERGY CONSUMERS’ PROPOSED COMMENTS TO DRAFT RULE 25.504PUCT Project 58479, Item 22 Filed · Oct 17, 2025
TIEC
TIEC filed TEXAS INDUSTRIAL ENERGY CONSUMERS’ PROPOSED COMMENTS TO DRAFT RULE 25.504 in PUCT Project 58479 on Oct 17, 2025.
PUCT Project 58479: SATOSHI'S COMMENTS ON STAFF'S PROPOSAL FOR PUBLICATIONPUCT Project 58479, Item 23 Filed · Oct 17, 2025
SATOSHI ENERGY CORP.
SATOSHI ENERGY CORP. filed SATOSHI'S COMMENTS ON STAFF'S PROPOSAL FOR PUBLICATION in PUCT Project 58479 on Oct 17, 2025.
PUCT Project 58479: EDGECONNEX COMMENTS ON COMMISSION STAFF'S DRAFT RULE 16 TAC § 25.205PUCT Project 58479, Item 24 Filed · Oct 17, 2025
EdgeConneX
EdgeConneX filed EDGECONNEX COMMENTS ON COMMISSION STAFF'S DRAFT RULE 16 TAC § 25.205 in PUCT Project 58479 on Oct 17, 2025.
PUCT Project 58479: CALPINE CORPORATION’S COMMENTS ON COMMISSION STAFF’S PROPOSAL FOR PUBLICATION OF NEW 16 TAC § 25.205PUCT Project 58479, Item 25 Filed · Oct 17, 2025
CALPINE CORPORATION
CALPINE CORPORATION filed CALPINE CORPORATION’S COMMENTS ON COMMISSION STAFF’S PROPOSAL FOR PUBLICATION OF NEW 16 TAC § 25.205 in PUCT Project 58479 on Oct 17, 2025.
PUCT Project 58479: ONCOR ELECTRIC DELIVERY’S COMMENTS ON THE PROPOSAL FOR PUBLICATION OF NEW 16 TAC §25.205 AND ACCOMPANYING QUESTIONSPUCT Project 58479, Item 26 Filed · Oct 17, 2025
ONCOR ELECTRIC DELIVERY COMPANY LLC
ONCOR ELECTRIC DELIVERY COMPANY LLC filed ONCOR ELECTRIC DELIVERY’S COMMENTS ON THE PROPOSAL FOR PUBLICATION OF NEW 16 TAC §25.205 AND ACCOMPANYING QUESTIONS in PUCT Project 58479 on Oct 17, 2025.
PUCT Project 58479: OFFICE OF PUBLIC UTILITY COUNSEL’S INITIAL COMMENTS ON PROPOSAL FOR PUBLICATION OF NEW 16 TAC §25.205PUCT Project 58479, Item 27 Filed · Oct 17, 2025
OPUC
OPUC filed OFFICE OF PUBLIC UTILITY COUNSEL’S INITIAL COMMENTS ON PROPOSAL FOR PUBLICATION OF NEW 16 TAC §25.205 in PUCT Project 58479 on Oct 17, 2025.
PUCT Project 58479: Comments of Texas Electric Cooperatives, Inc.PUCT Project 58479, Item 28 Filed · Oct 17, 2025
Texas Electric Cooperatives, Inc.
Texas Electric Cooperatives, Inc. filed Comments of Texas Electric Cooperatives, Inc. in PUCT Project 58479 on Oct 17, 2025.
PUCT Project 58479: LCRA RESPONSE TO PFPPUCT Project 58479, Item 29 Filed · Oct 17, 2025
LOWER COLORADO RIVER AUTHORITY AND LCRA TRANSMISSION SERVICES CORPORATION
LOWER COLORADO RIVER AUTHORITY AND LCRA TRANSMISSION SERVICES CORPORATION filed LCRA RESPONSE TO PFP in PUCT Project 58479 on Oct 17, 2025.
PUCT Project 58479: OPUC NOTICE OF PARTICIPATION LETTERPUCT Project 58479, Item 2 Filed · Aug 8, 2025
OPUC
OPUC filed OPUC NOTICE OF PARTICIPATION LETTER in PUCT Project 58479 on Aug 8, 2025.
PUCT Project 58479: Vistra Corp.'s CommentsPUCT Project 58479, Item 30 Filed · Oct 17, 2025
VISTRA CORP.
VISTRA CORP. filed Vistra Corp.'s Comments in PUCT Project 58479 on Oct 17, 2025.
PUCT Project 58479: CORRECTION: RESPONSE TO STAFF QUESTIONS & RECOMMENDATIONS FOR PFPPUCT Project 58479, Item 31 Filed · Oct 17, 2025
TCPA
TCPA filed CORRECTION: RESPONSE TO STAFF QUESTIONS & RECOMMENDATIONS FOR PFP in PUCT Project 58479 on Oct 17, 2025.
PUCT Project 58479: COMMENTS ON PROPOSAL FOR PUBLICATION OF NEW 16 TAC § 25.505PUCT Project 58479, Item 32 Filed · Oct 17, 2025
ELECTRIC TRANSMISSION TEXAS, LLC
ELECTRIC TRANSMISSION TEXAS, LLC filed COMMENTS ON PROPOSAL FOR PUBLICATION OF NEW 16 TAC § 25.505 in PUCT Project 58479 on Oct 17, 2025.
PUCT Project 58479: COMMENTS OF CENTERPOINT ENERGY HOUSTON ELECTRIC, LLCPUCT Project 58479, Item 33 Filed · Oct 17, 2025
CENTERPOINT ENERGY HOUSTON ELECTRIC
CENTERPOINT ENERGY HOUSTON ELECTRIC filed COMMENTS OF CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC in PUCT Project 58479 on Oct 17, 2025.
PUCT Project 58479: AEP TEXAS’ COMMENTS ON PROPOSAL FOR PUBLICATIONPUCT Project 58479, Item 34 Filed · Oct 17, 2025
AEP TEXAS INC.
AEP TEXAS INC. filed AEP TEXAS’ COMMENTS ON PROPOSAL FOR PUBLICATION in PUCT Project 58479 on Oct 17, 2025.
PUCT Project 58479: REQUEST TO VOID ITEM 20, FILED IN ERRORPUCT Project 58479, Item 35 Filed · Oct 17, 2025
TCPA
TCPA filed REQUEST TO VOID ITEM 20, FILED IN ERROR in PUCT Project 58479 on Oct 17, 2025.
PUCT Project 58479: ELECTRIC RELIABILITY COUNCIL OF TEXAS, INC.’S RESPONSES TO COMMISSION QUESTIONS AND COMMENTS REGARDING PROPOSED 16 TAC § 25.205PUCT Project 58479, Item 36 Filed · Oct 17, 2025
ERCOT
ERCOT filed ELECTRIC RELIABILITY COUNCIL OF TEXAS, INC.’S RESPONSES TO COMMISSION QUESTIONS AND COMMENTS REGARDING PROPOSED 16 TAC § 25.205 in PUCT Project 58479 on Oct 17, 2025.
PUCT Project 58479: Eolian, L.P.'s Comments on the Proposal for Publication and Request for HearingPUCT Project 58479, Item 37 Filed · Oct 17, 2025
EOLIAN, L.P.
EOLIAN, L.P. filed Eolian, L.P.'s Comments on the Proposal for Publication and Request for Hearing in PUCT Project 58479 on Oct 17, 2025.
PUCT Project 58479: Data Center Coalition's CommentsPUCT Project 58479, Item 38 Filed · Oct 17, 2025
Data Center Coalition
Data Center Coalition filed Data Center Coalition's Comments in PUCT Project 58479 on Oct 17, 2025.
PUCT Project 58479: Texas-New Mexico Power Company’s Comments to Commission Staff’s Questions and Comments on Proposal For PublicationPUCT Project 58479, Item 39 Filed · Oct 17, 2025
TEXAS- NEW MEXICO POWER COMPANY
TEXAS- NEW MEXICO POWER COMPANY filed Texas-New Mexico Power Company’s Comments to Commission Staff’s Questions and Comments on Proposal For Publication in PUCT Project 58479 on Oct 17, 2025.
PUCT Project 58479: Staff Memo and Notice of 9/2 WorkshopPUCT Project 58479, Item 3 Filed · Aug 15, 2025
PUC RULES & PROJECTS
PUC RULES & PROJECTS filed Staff Memo and Notice of 9/2 Workshop in PUCT Project 58479 on Aug 15, 2025.
PUCT Project 58479: TCPA Reply CommentsPUCT Project 58479, Item 42 Filed · Oct 31, 2025
TCPA
TCPA filed TCPA Reply Comments in PUCT Project 58479 on Oct 31, 2025.
PUCT Project 58479: REPLY COMMENTS OF CENTERPOINT ENERGY HOUSTON ELECTRIC, LLCPUCT Project 58479, Item 45 Filed · Oct 31, 2025
CENTERPOINT ENERGY HOUSTON ELECTRIC
CENTERPOINT ENERGY HOUSTON ELECTRIC filed REPLY COMMENTS OF CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC in PUCT Project 58479 on Oct 31, 2025.
PUCT Project 58479: ONCOR ELECTRIC DELIVERY’S REPLY COMMENTS ON THE PROPOSAL FOR PUBLICATION OF NEW 16 TAC §25.205 AND ACCOMPANYING QUESTIONSPUCT Project 58479, Item 46 Filed · Oct 31, 2025
ONCOR ELECTRIC DELIVERY COMPANY LLC
ONCOR ELECTRIC DELIVERY COMPANY LLC filed ONCOR ELECTRIC DELIVERY’S REPLY COMMENTS ON THE PROPOSAL FOR PUBLICATION OF NEW 16 TAC §25.205 AND ACCOMPANYING QUESTIONS in PUCT Project 58479 on Oct 31, 2025.
PUCT Project 58479: Vistra Reply CommentsPUCT Project 58479, Item 47 Filed · Oct 31, 2025
VISTRA CORP.
VISTRA CORP. filed Vistra Reply Comments in PUCT Project 58479 on Oct 31, 2025.
PUCT Project 58479: Comments of Texas Electric Cooperatives, Inc.PUCT Project 58479, Item 49 Filed · Oct 31, 2025
TEXAS ELECTRIC COOPERATIVES, INC.
TEXAS ELECTRIC COOPERATIVES, INC. filed Comments of Texas Electric Cooperatives, Inc. in PUCT Project 58479 on Oct 31, 2025.
PUCT Project 58479: Staff memo, workshop agenda, and discussion draftPUCT Project 58479, Item 4 Filed · Aug 25, 2025
PUC RULES & PROJECTS
PUC RULES & PROJECTS filed Staff memo, workshop agenda, and discussion draft in PUCT Project 58479 on Aug 25, 2025.
PUCT Project 58479: CALPINE CORPORATION’S REPLY COMMENTS ON COMMISSION STAFF’S PROPOSAL FOR PUBLICATION OF NEW 16 TAC § 25.205PUCT Project 58479, Item 52 Filed · Oct 31, 2025
CALPINE CORPORATION
CALPINE CORPORATION filed CALPINE CORPORATION’S REPLY COMMENTS ON COMMISSION STAFF’S PROPOSAL FOR PUBLICATION OF NEW 16 TAC § 25.205 in PUCT Project 58479 on Oct 31, 2025.
PUCT Project 58479: CRUSOE ENERGY SYSTEMS LLC REPLY COMMENTSPUCT Project 58479, Item 54 Filed · Oct 31, 2025
CRUSOE ENERGY SYSTEMS LLC
CRUSOE ENERGY SYSTEMS LLC filed CRUSOE ENERGY SYSTEMS LLC REPLY COMMENTS in PUCT Project 58479 on Oct 31, 2025.
PUCT Project 58479: ELECTRIC RELIABILITY COUNCIL OF TEXAS, INC.’S REPLY COMMENTS REGARDING PROPOSED 16 TAC § 25.205PUCT Project 58479, Item 55 Filed · Oct 31, 2025
ERCOT
ERCOT filed ELECTRIC RELIABILITY COUNCIL OF TEXAS, INC.’S REPLY COMMENTS REGARDING PROPOSED 16 TAC § 25.205 in PUCT Project 58479 on Oct 31, 2025.
PUCT Project 58479: Texas-New Mexico Power Company’s Reply Comments Regarding Proposal for PublicationPUCT Project 58479, Item 56 Filed · Oct 31, 2025
TEXAS NEW MEXICO POWER COMPANY
TEXAS NEW MEXICO POWER COMPANY filed Texas-New Mexico Power Company’s Reply Comments Regarding Proposal for Publication in PUCT Project 58479 on Oct 31, 2025.
PUCT Project 58479: OPUC’S REPLY COMMENTS ON PROPOSAL FOR PUBLICATION OF NEW 16 TAC §25.205PUCT Project 58479, Item 57 Filed · Oct 31, 2025
OPUC
OPUC filed OPUC’S REPLY COMMENTS ON PROPOSAL FOR PUBLICATION OF NEW 16 TAC §25.205 in PUCT Project 58479 on Oct 31, 2025.
PUCT Project 58479: ENCHANTED ROCK, LLC REPLY COMMENTS ON PROPOSAL FOR PUBLICATION OF NEW 16 TAC §25.205PUCT Project 58479, Item 58 Filed · Oct 31, 2025
ENCHANTED ROCK, LLC
ENCHANTED ROCK, LLC filed ENCHANTED ROCK, LLC REPLY COMMENTS ON PROPOSAL FOR PUBLICATION OF NEW 16 TAC §25.205 in PUCT Project 58479 on Oct 31, 2025.
PUCT Project 58479: Eolian's Reply Comments on Proposal for PublicationPUCT Project 58479, Item 59 Filed · Oct 31, 2025
EOLIAN, L.P.
EOLIAN, L.P. filed Eolian's Reply Comments on Proposal for Publication in PUCT Project 58479 on Oct 31, 2025.
PUCT Project 58479: ERCOT LETTER RE NET METERING STUDY DETAILSPUCT Project 58479, Item 5 Filed · Sep 2, 2025
ERCOT
ERCOT filed ERCOT LETTER RE NET METERING STUDY DETAILS in PUCT Project 58479 on Sep 2, 2025.
PUCT Project 58479: Data Center Coalition's Reply CommentsPUCT Project 58479, Item 60 Filed · Oct 31, 2025
Data Center Coalition (DCC)
Data Center Coalition (DCC) filed Data Center Coalition's Reply Comments in PUCT Project 58479 on Oct 31, 2025.
PUCT Project 58479: OM Item No. 26 - (Staff Recommendation) Order Adopting New §25.205PUCT Project 58479, Item 62 Filed · Feb 13, 2026
PUC RULES & PROJECTS
PUC RULES & PROJECTS filed OM Item No. 26 - (Staff Recommendation) Order Adopting New §25.205 in PUCT Project 58479 on Feb 13, 2026.
PUCT Project 58479: OM Item No. 43 - Staff Memo with Proposed Redline ChangesPUCT Project 58479, Item 63 Filed · Mar 5, 2026
PUC RULES & PROJECTS
PUC RULES & PROJECTS filed OM Item No. 43 - Staff Memo with Proposed Redline Changes in PUCT Project 58479 on Mar 5, 2026.
PUCT Project 58479: CHAIRMAN GLEESON MEMORANDUMPUCT Project 58479, Item 64 Filed · Mar 11, 2026
PUC OPDM
PUC OPDM filed CHAIRMAN GLEESON MEMORANDUM in PUCT Project 58479 on Mar 11, 2026.
PUCT Project 58479: Vistra Corp.'s Comments on Planning Guide Revision Request 145PUCT Project 58479, Item 65 Filed · Mar 20, 2026
VISTRA CORP.
VISTRA CORP. filed Vistra Corp.'s Comments on Planning Guide Revision Request 145 in PUCT Project 58479 on Mar 20, 2026.
PUCT Project 58479: ORDER ADOPTING NEW 16 TAC §25.205PUCT Project 58479, Item 66 Filed · Mar 26, 2026
PUC OPDM
PUC OPDM filed ORDER ADOPTING NEW 16 TAC §25.205 in PUCT Project 58479 on Mar 26, 2026.
PUCT Project 58479: Texas Register Acknowledgement of Receipt-Proposal for AdoptionPUCT Project 58479, Item 67 Filed · Mar 26, 2026
RULES & PROJECTS
RULES & PROJECTS filed Texas Register Acknowledgement of Receipt-Proposal for Adoption in PUCT Project 58479 on Mar 26, 2026.
PUCT Project 58479: ERCOT PRESENTATION ON SB6 NET METERING ARRANGEMENT REVIEW PROCESSPUCT Project 58479, Item 6 Filed · Sep 2, 2025
ERCOT
ERCOT filed ERCOT PRESENTATION ON SB6 NET METERING ARRANGEMENT REVIEW PROCESS in PUCT Project 58479 on Sep 2, 2025.
PUCT Project 58479: ONCOR'S COMMENTS ON STRANDED/UNDERUTILIZED ASSET COST TREATMENTPUCT Project 58479, Item 7 Filed · Sep 4, 2025
ONCOR ELECTRIC DELIVERY COMPANY LLC
ONCOR ELECTRIC DELIVERY COMPANY LLC filed ONCOR'S COMMENTS ON STRANDED/UNDERUTILIZED ASSET COST TREATMENT in PUCT Project 58479 on Sep 4, 2025.
PUCT Project 58479: OPUC’S INITIAL COMMENTS ON DISCUSSION DRAFT ATTACHMENT B TO COMMISSION STAFF’S MEMORANDUM ON RULEMAKING FOR NET METERING ARRANGEMENTS INVOLVING A LARGE LOAD CO-LOCATED WITH AN EXISTING GENERATION RESOURCEPUCT Project 58479, Item 8 Filed · Sep 4, 2025
OPUC
OPUC filed OPUC’S INITIAL COMMENTS ON DISCUSSION DRAFT ATTACHMENT B TO COMMISSION STAFF’S MEMORANDUM ON RULEMAKING FOR NET METERING ARRANGEMENTS INVOLVING A LARGE LOAD CO-LOCATED WITH AN EXISTING GENERATION RESOURCE in PUCT Project 58479 on Sep 4, 2025.
PUCT Project 58479: Crusoe's Comments on Staff's Draft Discussion Rule § 25.205PUCT Project 58479, Item 9 Filed · Sep 5, 2025
Crusoe Energy Systems, Inc.
Crusoe Energy Systems, Inc. filed Crusoe's Comments on Staff's Draft Discussion Rule § 25.205 in PUCT Project 58479 on Sep 5, 2025.
PUCT Project 58480: ORDER ADOPTING NEW 16 TAC § 25.370PUCT Project 58480, Item 58 Filed · Feb 6, 2026
PUC OPDM
PUC OPDM filed ORDER ADOPTING NEW 16 TAC § 25.370 in PUCT Project 58480 on Feb 6, 2026.
PUCT Project 58480: Texas Register Acknowledgement of Receipt-Proposal for AdoptionPUCT Project 58480, Item 59 Filed · Feb 9, 2026
PUC RULES & PROJECTS
PUC RULES & PROJECTS filed Texas Register Acknowledgement of Receipt-Proposal for Adoption in PUCT Project 58480 on Feb 9, 2026.
PUCT Project 58482: Request for Control NumberPUCT Project 58482, Item 1 Filed · Aug 1, 2025
PUC RULES AND PROJECTS
PUC RULES AND PROJECTS filed Request for Control Number in PUCT Project 58482 on Aug 1, 2025.
PUCT Project 58482: Staff Memo_Restyle RequestPUCT Project 58482, Item 2 Filed · Mar 23, 2026
PUC RULES & PROJECTS
PUC RULES & PROJECTS filed Staff Memo_Restyle Request in PUCT Project 58482 on Mar 23, 2026.
PUCT Project 58482: Staff Memo and Questions for Comment w/April 8 DeadlinePUCT Project 58482, Item 3 Filed · Mar 23, 2026
PUC RULES & PROJECTS
PUC RULES & PROJECTS filed Staff Memo and Questions for Comment w/April 8 Deadline in PUCT Project 58482 on Mar 23, 2026.
PUCT Project 58482: OPUC NOTICE OF PARTICIPATION LETTERPUCT Project 58482, Item 4 Filed · Mar 24, 2026
OPUC
OPUC filed OPUC NOTICE OF PARTICIPATION LETTER in PUCT Project 58482 on Mar 24, 2026.
PUCT Project 58482: DCC Comments Regarding the Large Load Demand Management ServicePUCT Project 58482, Item 10 Filed · Apr 8, 2026
Data Center Coalition
Data Center Coalition filed DCC Comments Regarding the Large Load Demand Management Service in PUCT Project 58482 on Apr 8, 2026.
PUCT Project 58482: RESPONSE TO QUESTIONS FOR COMMENTPUCT Project 58482, Item 11 Filed · Apr 8, 2026
LOWER COLORADO RIVER AUTHORITY
LOWER COLORADO RIVER AUTHORITY filed RESPONSE TO QUESTIONS FOR COMMENT in PUCT Project 58482 on Apr 8, 2026.
PUCT Project 58482: RESPONSES OF TEXAS ELECTRIC COOPERATIVES, INC.PUCT Project 58482, Item 13 Filed · Apr 8, 2026
TEXAS ELECTRIC COOPERATIVES, INC.
TEXAS ELECTRIC COOPERATIVES, INC. filed RESPONSES OF TEXAS ELECTRIC COOPERATIVES, INC. in PUCT Project 58482 on Apr 8, 2026.
PUCT Project 58482: NRG Energy, Inc.'s Comments in Response to Staff's QuestionsPUCT Project 58482, Item 14 Filed · Apr 8, 2026
NRG ENERGY, INC.
NRG ENERGY, INC. filed NRG Energy, Inc.'s Comments in Response to Staff's Questions in PUCT Project 58482 on Apr 8, 2026.
PUCT Project 58482: VOLTUS RESPONSE TO PUCT STAFF'S QUESTIONS ON PROPOSED LARGE LOAD DEMAND MANAGEMENT SERVICEPUCT Project 58482, Item 15 Filed · Apr 8, 2026
Voltus Inc.
Voltus Inc. filed VOLTUS RESPONSE TO PUCT STAFF'S QUESTIONS ON PROPOSED LARGE LOAD DEMAND MANAGEMENT SERVICE in PUCT Project 58482 on Apr 8, 2026.
PUCT Project 58482: Texas Energy Buyers Alliance Response to Commission Staff QuestionsPUCT Project 58482, Item 16 Filed · Apr 8, 2026
TEXAS ENERGY BUYERS ALLIANCE
TEXAS ENERGY BUYERS ALLIANCE filed Texas Energy Buyers Alliance Response to Commission Staff Questions in PUCT Project 58482 on Apr 8, 2026.
PUCT Project 58482: ONCOR ELECTRIC DELIVERY’S RESPONSE TO COMMISSION STAFF’S FIRST SET OF QUESTIONS FOR COMMENTSPUCT Project 58482, Item 18 Filed · Apr 8, 2026
ONCOR ELECTRIC DELIVERY COMPANY LLC
ONCOR ELECTRIC DELIVERY COMPANY LLC filed ONCOR ELECTRIC DELIVERY’S RESPONSE TO COMMISSION STAFF’S FIRST SET OF QUESTIONS FOR COMMENTS in PUCT Project 58482 on Apr 8, 2026.
PUCT Project 58482: Enchanted Rock, LLC's Comments to Commission Staff's March 23 Memo and Questions for CommentPUCT Project 58482, Item 20 Filed · Apr 8, 2026
ENCHANTED ROCK, LLC
ENCHANTED ROCK, LLC filed Enchanted Rock, LLC's Comments to Commission Staff's March 23 Memo and Questions for Comment in PUCT Project 58482 on Apr 8, 2026.
PUCT Project 58482: AEP Texas Inc.’s Responses to Commission Staff’s Memo and Questions for CommentPUCT Project 58482, Item 21 Filed · Apr 8, 2026
AEP TEXAS INC.
AEP TEXAS INC. filed AEP Texas Inc.’s Responses to Commission Staff’s Memo and Questions for Comment in PUCT Project 58482 on Apr 8, 2026.
PUCT Project 58482: ELECTRIC RELIABILITY COUNCIL OF TEXAS, INC.’S RESPONSE TO COMMISSION STAFF’S LIST OF QUESTIONSPUCT Project 58482, Item 22 Filed · Apr 8, 2026
ERCOT
ERCOT filed ELECTRIC RELIABILITY COUNCIL OF TEXAS, INC.’S RESPONSE TO COMMISSION STAFF’S LIST OF QUESTIONS in PUCT Project 58482 on Apr 8, 2026.
PUCT Project 58482: Vistra Corporate Services Company's Comments in Response to Commission Staff's QuestionsPUCT Project 58482, Item 23 Filed · Apr 8, 2026
VISTRA CORPORATE SERVICES COMPANY
VISTRA CORPORATE SERVICES COMPANY filed Vistra Corporate Services Company's Comments in Response to Commission Staff's Questions in PUCT Project 58482 on Apr 8, 2026.
PUCT Project 58482: EOLIAN, L.P.'s Comments to Commission Staff's March 23, 2026 Memo and Questions for CommentPUCT Project 58482, Item 24 Filed · Apr 8, 2026
EOLIAN, L.P.
EOLIAN, L.P. filed EOLIAN, L.P.'s Comments to Commission Staff's March 23, 2026 Memo and Questions for Comment in PUCT Project 58482 on Apr 8, 2026.
PUCT Project 58482: CyrusOne, LP Comments in Response to Commission Staff's QuestionsPUCT Project 58482, Item 25 Filed · Apr 8, 2026
CyrusOne, LP
CyrusOne, LP filed CyrusOne, LP Comments in Response to Commission Staff's Questions in PUCT Project 58482 on Apr 8, 2026.
PUCT Project 58482: Public Comments in Response to Staff's Questions for Comment - Project No. 58482PUCT Project 58482, Item 28 Filed · Jul 16, 2026
Fedor Mikheev | Texas A&M University Energy Institute
Fedor Mikheev | Texas A&M University Energy Institute filed Public Comments in Response to Staff's Questions for Comment - Project No. 58482 in PUCT Project 58482 on Jul 16, 2026.
PUCT Project 58482: OM Item No. 29 - Staff Memo & PFP w/Sept. 4 Comment DeadlinePUCT Project 58482, Item 29 Filed · Jul 24, 2026
PUC RULES & PROJECTS
PUC RULES & PROJECTS filed OM Item No. 29 - Staff Memo & PFP w/Sept. 4 Comment Deadline in PUCT Project 58482 on Jul 24, 2026.
PUCT Project 58482: PROPOSAL FOR PUBLICATION NEW §25.521PUCT Project 58482, Item 30 Filed · Jul 30, 2026
PUC OPDM
PUC OPDM filed PROPOSAL FOR PUBLICATION NEW §25.521 in PUCT Project 58482 on Jul 30, 2026.
PUCT Project 58482: Texas Register Acknowledgement of Receipt - Comment Deadline 09/04/2026PUCT Project 58482, Item 31 Filed · Jul 30, 2026
RULES & PROJECTS
RULES & PROJECTS filed Texas Register Acknowledgement of Receipt - Comment Deadline 09/04/2026 in PUCT Project 58482 on Jul 30, 2026.
PUCT Project 58482: Objection to rule changePUCT Project 58482, Item 33 Filed · Aug 3, 2026
Helen Bryant
Helen Bryant filed Objection to rule change in PUCT Project 58482 on Aug 3, 2026.
PUCT Project 58482: ERCOT Steel Mills Comments_Project 58482_4.8.2026PUCT Project 58482, Item 6 Filed · Apr 8, 2026
ERCOT STEEL MILLS
ERCOT STEEL MILLS filed ERCOT Steel Mills Comments_Project 58482_4.8.2026 in PUCT Project 58482 on Apr 8, 2026.
PUCT Project 58482: TCPA’S RESPONSES TO STAFF’S QUESTIONS REGARDING THE LARGE LOAD DEMAND MANAGEMENT SERVICEPUCT Project 58482, Item 7 Filed · Apr 8, 2026
TCPA
TCPA filed TCPA’S RESPONSES TO STAFF’S QUESTIONS REGARDING THE LARGE LOAD DEMAND MANAGEMENT SERVICE in PUCT Project 58482 on Apr 8, 2026.
PUCT Project 58482: Texas Public Power Association (TPPA) Response to Questions for CommentPUCT Project 58482, Item 9 Filed · Apr 8, 2026
TPPA
TPPA filed Texas Public Power Association (TPPA) Response to Questions for Comment in PUCT Project 58482 on Apr 8, 2026.
PUCT Project 58484: CPS Energy's Response to Questions for CommentPUCT Project 58484, Item 10 Filed · Sep 9, 2025
CPS ENERGY
CPS ENERGY filed CPS Energy's Response to Questions for Comment in PUCT Project 58484 on Sep 9, 2025.
PUCT Project 58484: TCPA Response to Staff QuestionsPUCT Project 58484, Item 11 Filed · Sep 9, 2025
TCPA
TCPA filed TCPA Response to Staff Questions in PUCT Project 58484 on Sep 9, 2025.
PUCT Project 58484: Texas Public Policy Foundation's Response to PUC Staff Questions for CommentPUCT Project 58484, Item 12 Filed · Sep 9, 2025
Texas Public Policy Foundation
Texas Public Policy Foundation filed Texas Public Policy Foundation's Response to PUC Staff Questions for Comment in PUCT Project 58484 on Sep 9, 2025.
PUCT Project 58484: Sharyland Utilities LLC's Initial Comments to Commission Staff's Questions for CommentPUCT Project 58484, Item 13 Filed · Sep 9, 2025
SHARYLAND UTILITIES LLC
SHARYLAND UTILITIES LLC filed Sharyland Utilities LLC's Initial Comments to Commission Staff's Questions for Comment in PUCT Project 58484 on Sep 9, 2025.
PUCT Project 58484: Comments of NRG Energy, Inc. in Response to Staff's August 5, 2025, QuestionsPUCT Project 58484, Item 14 Filed · Sep 9, 2025
NRG ENERGY, INC.
NRG ENERGY, INC. filed Comments of NRG Energy, Inc. in Response to Staff's August 5, 2025, Questions in PUCT Project 58484 on Sep 9, 2025.
PUCT Project 58484: TEXAS ADVANCED ENERGY BUSINESS ALLIANCE RESPONSES TO COMMISSION STAFF QUESTIONS AUG. 5 2025PUCT Project 58484, Item 17 Filed · Sep 9, 2025
TEXAS ADVANCED ENERGY BUSINESS ALLIANCE
TEXAS ADVANCED ENERGY BUSINESS ALLIANCE filed TEXAS ADVANCED ENERGY BUSINESS ALLIANCE RESPONSES TO COMMISSION STAFF QUESTIONS AUG. 5 2025 in PUCT Project 58484 on Sep 9, 2025.
PUCT Project 58484: Texas Public Power Association (TPPA) Comments on Transmission Cost Recovery Questions for CommentPUCT Project 58484, Item 18 Filed · Sep 9, 2025
TPPA
TPPA filed Texas Public Power Association (TPPA) Comments on Transmission Cost Recovery Questions for Comment in PUCT Project 58484 on Sep 9, 2025.
PUCT Project 58484: LCRA AND LCRA TRANSMISSION SERVICES CORPORATION'S RESPONSE TO QUESTIONS FOR COMMENTPUCT Project 58484, Item 19 Filed · Sep 9, 2025
LCRA AND LCRA TRANSMISSION SERVICES CORPORATION
LCRA AND LCRA TRANSMISSION SERVICES CORPORATION filed LCRA AND LCRA TRANSMISSION SERVICES CORPORATION'S RESPONSE TO QUESTIONS FOR COMMENT in PUCT Project 58484 on Sep 9, 2025.
PUCT Project 58484: Request for Control NumberPUCT Project 58484, Item 1 Filed · Aug 1, 2025
PUC RULES & PROJECTS
PUC RULES & PROJECTS filed Request for Control Number in PUCT Project 58484 on Aug 1, 2025.
PUCT Project 58484: Joint Comments of Wind Energy Transmission Texas, LLC; Lone Star Transmission Texas, LLC; and Cross Texas Transmission, LLC in Response to Commission Staff’s Request for CommentsPUCT Project 58484, Item 20 Filed · Sep 9, 2025
Wind Energy Transmission Texas, LLC; Lone Star Transmission Texas, LLC; and Cross Texas Transmission, LLC
Wind Energy Transmission Texas, LLC; Lone Star Transmission Texas, LLC; and Cross Texas Transmission, LLC filed Joint Comments of Wind Energy Transmission Texas, LLC; Lone Star Transmission Texas, LLC; and Cross Texas Transmission, LLC in Response to Commission Staff’s Request for Comments in PUCT Project 58484 on Sep 9, 2025.
PUCT Project 58484: AEP COMPANIES’ COMMENTS ON QUESTIONS FOR PUBLIC COMMENTPUCT Project 58484, Item 21 Filed · Sep 9, 2025
AEP COMPANIES
AEP COMPANIES filed AEP COMPANIES’ COMMENTS ON QUESTIONS FOR PUBLIC COMMENT in PUCT Project 58484 on Sep 9, 2025.
PUCT Project 58484: OPUC’S INITIAL COMMENTS ON QUESTIONS FOR PUBLIC COMMENT RELATING TO THE EVALUATION OF TRANSMISSION COST RECOVERYPUCT Project 58484, Item 23 Filed · Sep 9, 2025
OPUC
OPUC filed OPUC’S INITIAL COMMENTS ON QUESTIONS FOR PUBLIC COMMENT RELATING TO THE EVALUATION OF TRANSMISSION COST RECOVERY in PUCT Project 58484 on Sep 9, 2025.
PUCT Project 58484: ELECTRIC RELIABILITY COUNCIL OF TEXAS, INC.’S RESPONSES TO STAFF QUESTIONSPUCT Project 58484, Item 24 Filed · Sep 9, 2025
ERCOT
ERCOT filed ELECTRIC RELIABILITY COUNCIL OF TEXAS, INC.’S RESPONSES TO STAFF QUESTIONS in PUCT Project 58484 on Sep 9, 2025.
PUCT Project 58484: CenterPoint Energy Houston Electric, LLC’s Responses to Commission Staff’s Request for CommentsPUCT Project 58484, Item 26 Filed · Sep 9, 2025
CENTERPOINT ENERGY HOUSTON ELECTRIC
CENTERPOINT ENERGY HOUSTON ELECTRIC filed CenterPoint Energy Houston Electric, LLC’s Responses to Commission Staff’s Request for Comments in PUCT Project 58484 on Sep 9, 2025.
PUCT Project 58484: Staff Memo and First Set of Questions for CommentPUCT Project 58484, Item 2 Filed · Aug 5, 2025
PUC RULES & PROJECTS
PUC RULES & PROJECTS filed Staff Memo and First Set of Questions for Comment in PUCT Project 58484 on Aug 5, 2025.
PUCT Project 58484: OPUC NOTICE OF PARTICIPATION LETTERPUCT Project 58484, Item 3 Filed · Aug 8, 2025
OPUC
OPUC filed OPUC NOTICE OF PARTICIPATION LETTER in PUCT Project 58484 on Aug 8, 2025.
PUCT Project 58484: ONCOR ELECTRIC DELIVERY'S RESPONSE TO COMMISSION STAFF'S FIRST SET OF QUESTIONS FOR COMMENTSPUCT Project 58484, Item 5 Filed · Sep 9, 2025
ONCOR ELECTRIC DELIVERY COMPANY LLC
ONCOR ELECTRIC DELIVERY COMPANY LLC filed ONCOR ELECTRIC DELIVERY'S RESPONSE TO COMMISSION STAFF'S FIRST SET OF QUESTIONS FOR COMMENTS in PUCT Project 58484 on Sep 9, 2025.
PUCT Project 58484: ERCOT Steel Mills' Response to PUC Staff's Initial Request for Comments on Transmission Cost RecoveryPUCT Project 58484, Item 6 Filed · Sep 9, 2025
ERCOT STEEL MILLS
ERCOT STEEL MILLS filed ERCOT Steel Mills' Response to PUC Staff's Initial Request for Comments on Transmission Cost Recovery in PUCT Project 58484 on Sep 9, 2025.
PUCT Project 58484: RESPONSES OF TEXAS ELECTRIC COOPERATIVES, INC.PUCT Project 58484, Item 7 Filed · Sep 9, 2025
TEXAS ELECTRIC COOPERATIVES, INC.
TEXAS ELECTRIC COOPERATIVES, INC. filed RESPONSES OF TEXAS ELECTRIC COOPERATIVES, INC. in PUCT Project 58484 on Sep 9, 2025.
PUCT Project 58484: Joint Responses to Staff Questions of H-E-B and STECPUCT Project 58484, Item 8 Filed · Sep 9, 2025
H-E-B, LP and South Texas Electric Cooperative, Inc.
H-E-B, LP and South Texas Electric Cooperative, Inc. filed Joint Responses to Staff Questions of H-E-B and STEC in PUCT Project 58484 on Sep 9, 2025.
PUCT Project 58484: Steering Committee of Cities Served by Oncor and Texas Coalition for Affordable Power's Responses to Commission Staff's First Set of Questions for CommentPUCT Project 58484, Item 9 Filed · Sep 9, 2025
STEERING COMMITTEE OF CITIES SERVED BY ONCOR AND TEXAS COALITION FOR AFFORDABLE POWER
STEERING COMMITTEE OF CITIES SERVED BY ONCOR AND TEXAS COALITION FOR AFFORDABLE POWER filed Steering Committee of Cities Served by Oncor and Texas Coalition for Affordable Power's Responses to Commission Staff's First Set of Questions for Comment in PUCT Project 58484 on Sep 9, 2025.
PUCT Project 54445: NOTICE OF RECOMMENDED APPROVAL OF REVISION REQUESTS BY ERCOT BOARD OF DIRECTORSPUCT Project 54445, Item 164 Filed · Sep 21, 2026
ERCOT
ERCOT filed NOTICE OF RECOMMENDED APPROVAL OF REVISION REQUESTS BY ERCOT BOARD OF DIRECTORS in PUCT Project 54445 on Sep 21, 2026.
PUCT Project 58484: Texas REP Coalition Response to PUC Staff Request for CommentsPUCT Project 58484, Item 100 Filed · Apr 13, 2026
TEXAS REP COALITION
TEXAS REP COALITION filed Texas REP Coalition Response to PUC Staff Request for Comments in PUCT Project 58484 on Apr 13, 2026.
PUCT Project 58484: RWE Americas, LLC's Comments to Commission Staff's Draft RecommendationsPUCT Project 58484, Item 102 Filed · Apr 13, 2026
RWE Americas, LLC
RWE Americas, LLC filed RWE Americas, LLC's Comments to Commission Staff's Draft Recommendations in PUCT Project 58484 on Apr 13, 2026.
PUCT Project 58484: Vistra's Third Set of Comments in Response to Staff's Second Set of QuestionsPUCT Project 58484, Item 103 Filed · Apr 13, 2026
VISTRA CORPORATE SERVICES COMPANY
VISTRA CORPORATE SERVICES COMPANY filed Vistra's Third Set of Comments in Response to Staff's Second Set of Questions in PUCT Project 58484 on Apr 13, 2026.
PUCT Project 58484: ONCOR ELECTRIC DELIVERY'S COMMENTS ON COMMISSION STAFF'S DRAFT SET OF RECOMMENDATIONSPUCT Project 58484, Item 105 Filed · Apr 13, 2026
ONCOR ELECTRIC DELIVERY COMPANY LLC
ONCOR ELECTRIC DELIVERY COMPANY LLC filed ONCOR ELECTRIC DELIVERY'S COMMENTS ON COMMISSION STAFF'S DRAFT SET OF RECOMMENDATIONS in PUCT Project 58484 on Apr 13, 2026.
PUCT Project 58484: CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC’S RESPONSES TO COMMISSON STAFF’S REQUEST FOR COMMENTSPUCT Project 58484, Item 106 Filed · Apr 13, 2026
CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC
CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC filed CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC’S RESPONSES TO COMMISSON STAFF’S REQUEST FOR COMMENTS in PUCT Project 58484 on Apr 13, 2026.
PUCT Project 58484: VOID SEE ITEM 114PUCT Project 58484, Item 107 Filed · Apr 13, 2026
OPUC
OPUC filed VOID SEE ITEM 114 in PUCT Project 58484 on Apr 13, 2026.
PUCT Project 58484: AEP COMPANIES’ RESPONSE TO COMMISSION STAFF’S DRAFT REPORTPUCT Project 58484, Item 108 Filed · Apr 13, 2026
AEP COMPANIES
AEP COMPANIES filed AEP COMPANIES’ RESPONSE TO COMMISSION STAFF’S DRAFT REPORT in PUCT Project 58484 on Apr 13, 2026.
PUCT Project 58484: Crusoe Technologies LLC's Responses to Staff's Request for Comments on Draft RecommendationsPUCT Project 58484, Item 110 Filed · Apr 13, 2026
Crusoe Technologies LLC
Crusoe Technologies LLC filed Crusoe Technologies LLC's Responses to Staff's Request for Comments on Draft Recommendations in PUCT Project 58484 on Apr 13, 2026.
PUCT Project 58484: TEBA Comments on Commission Staff's Draft RecommendationsPUCT Project 58484, Item 111 Filed · Apr 13, 2026
TEXAS ENERGY BUYERS ALLIANCE
TEXAS ENERGY BUYERS ALLIANCE filed TEBA Comments on Commission Staff's Draft Recommendations in PUCT Project 58484 on Apr 13, 2026.
PUCT Project 58484: Eolian, L.P.'s Response to Commission Staff's RecommendationsPUCT Project 58484, Item 112 Filed · Apr 13, 2026
EOLIAN, L.P.
EOLIAN, L.P. filed Eolian, L.P.'s Response to Commission Staff's Recommendations in PUCT Project 58484 on Apr 13, 2026.
PUCT Project 58484: Joint Comments of Google LLC and Lancium LLC to PUC Staff Memo and Draft Report in 58484PUCT Project 58484, Item 113 Filed · Apr 13, 2026
GOOGLE LLC, LANCIUM LLC
GOOGLE LLC, LANCIUM LLC filed Joint Comments of Google LLC and Lancium LLC to PUC Staff Memo and Draft Report in 58484 in PUCT Project 58484 on Apr 13, 2026.
PUCT Project 58484: PEC Responses to Commission Staff’s Request for CommentsPUCT Project 58484, Item 27 Filed · Sep 9, 2025
PEDERNALES ELECTRIC COOPERATIVE, INC
PEDERNALES ELECTRIC COOPERATIVE, INC filed PEC Responses to Commission Staff’s Request for Comments in PUCT Project 58484 on Sep 9, 2025.
PUCT Project 58484: Vistra CommentsPUCT Project 58484, Item 29 Filed · Sep 9, 2025
VISTRA CORPORATE SERVICES COMPANY LLC
VISTRA CORPORATE SERVICES COMPANY LLC filed Vistra Comments in PUCT Project 58484 on Sep 9, 2025.
PUCT Project 58484: Staff's Request for Information to TDUs w/11.14 Response DeadlinePUCT Project 58484, Item 35 Filed · Oct 17, 2025
PUC RULES & PROJECTS
PUC RULES & PROJECTS filed Staff's Request for Information to TDUs w/11.14 Response Deadline in PUCT Project 58484 on Oct 17, 2025.
PUCT Project 58484: Staff Memo & Notice of 11/10 WorkshopPUCT Project 58484, Item 36 Filed · Oct 21, 2025
PUC RULES & PROJECTS
PUC RULES & PROJECTS filed Staff Memo & Notice of 11/10 Workshop in PUCT Project 58484 on Oct 21, 2025.
PUCT Project 58484: Staff Memo & Nov. 10 Workshop Agenda w/Nov. 21 Written Comment DeadlinePUCT Project 58484, Item 37 Filed · Oct 28, 2025
PUC RULES & PROJECTS
PUC RULES & PROJECTS filed Staff Memo & Nov. 10 Workshop Agenda w/Nov. 21 Written Comment Deadline in PUCT Project 58484 on Oct 28, 2025.
PUCT Project 58484: Staff Memo Extending Comment Deadline to 11/25PUCT Project 58484, Item 38 Filed · Oct 31, 2025
PUC RULES & PROJECTS
PUC RULES & PROJECTS filed Staff Memo Extending Comment Deadline to 11/25 in PUCT Project 58484 on Oct 31, 2025.
PUCT Project 58484: RESPONSE TO COMMISSION STAFF’S REQUEST FOR INFORMATION ISSUED ON OCTOBER 17, 2025 RELATED TO WHOLESALE TRANSMISSION SERVICE CHARGESPUCT Project 58484, Item 39 Filed · Nov 12, 2025
AEP TEXAS INC.
AEP TEXAS INC. filed RESPONSE TO COMMISSION STAFF’S REQUEST FOR INFORMATION ISSUED ON OCTOBER 17, 2025 RELATED TO WHOLESALE TRANSMISSION SERVICE CHARGES in PUCT Project 58484 on Nov 12, 2025.
PUCT Project 58484: TNMP Response to Staff Request for InformationPUCT Project 58484, Item 40 Filed · Nov 13, 2025
TEXAS-NEW MEXICO POWER COMPANY
TEXAS-NEW MEXICO POWER COMPANY filed TNMP Response to Staff Request for Information in PUCT Project 58484 on Nov 13, 2025.
PUCT Project 58484: VOID SEE ITEM 44PUCT Project 58484, Item 41 Filed · Nov 14, 2025
CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC
CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC filed VOID SEE ITEM 44 in PUCT Project 58484 on Nov 14, 2025.
PUCT Project 58484: ONCOR'S RESPONSE TO STAFF'S REQUEST FOR INFORMATION RELATED TO WHOLESALE TRANSMISSION SERVICE CHARGESPUCT Project 58484, Item 42 Filed · Nov 14, 2025
ONCOR ELECTRIC DELIVERY COMPANY LLC
ONCOR ELECTRIC DELIVERY COMPANY LLC filed ONCOR'S RESPONSE TO STAFF'S REQUEST FOR INFORMATION RELATED TO WHOLESALE TRANSMISSION SERVICE CHARGES in PUCT Project 58484 on Nov 14, 2025.
PUCT Project 58484: SUPPLEMENTAL RESPONSE TO COMMISSION STAFF’S REQUEST FOR INFORMATION ISSUED ON OCTOBER 17, 2025 RELATED TO WHOLESALE TRANSMISSION SERVICE CHARGESPUCT Project 58484, Item 43 Filed · Nov 17, 2025
AEP TEXAS INC.
AEP TEXAS INC. filed SUPPLEMENTAL RESPONSE TO COMMISSION STAFF’S REQUEST FOR INFORMATION ISSUED ON OCTOBER 17, 2025 RELATED TO WHOLESALE TRANSMISSION SERVICE CHARGES in PUCT Project 58484 on Nov 17, 2025.
PUCT Project 58484: Letter to Void Item #41PUCT Project 58484, Item 44 Filed · Nov 20, 2025
CENTERPOINT ENERGY HOUSTON ELECTRIC
CENTERPOINT ENERGY HOUSTON ELECTRIC filed Letter to Void Item #41 in PUCT Project 58484 on Nov 20, 2025.
PUCT Project 58484: CEHE’s Updated Response to Commission Staff’s Request for Information Issued October 17, 2025, Regarding Wholesale Transmission Service ChargesPUCT Project 58484, Item 45 Filed · Nov 20, 2025
CENTERPOINT ENERGY HOUSTON ELECTRIC
CENTERPOINT ENERGY HOUSTON ELECTRIC filed CEHE’s Updated Response to Commission Staff’s Request for Information Issued October 17, 2025, Regarding Wholesale Transmission Service Charges in PUCT Project 58484 on Nov 20, 2025.
PUCT Project 58484: Comments and answers to staff questionsPUCT Project 58484, Item 50 Filed · Nov 25, 2025
Sierra Club
Sierra Club filed Comments and answers to staff questions in PUCT Project 58484 on Nov 25, 2025.
PUCT Project 58484: ONCOR'S RESPONSE TO COMMISSION STAFF’S SECOND SET OF QUESTIONS FOR COMMENTSPUCT Project 58484, Item 52 Filed · Nov 25, 2025
ONCOR ELECTRIC DELIVERY COMPANY LLC
ONCOR ELECTRIC DELIVERY COMPANY LLC filed ONCOR'S RESPONSE TO COMMISSION STAFF’S SECOND SET OF QUESTIONS FOR COMMENTS in PUCT Project 58484 on Nov 25, 2025.
PUCT Project 58484: LCRA AND LCRA TSC'S RESPONSE TO COMMISSION STAFF'S SECOND SET OF QUESTIONS FOR COMMENTPUCT Project 58484, Item 53 Filed · Nov 25, 2025
LOWER COLORADO RIVER AUTHORITY AND LCRA TRANSMISSION SERVICES CORPORATION
LOWER COLORADO RIVER AUTHORITY AND LCRA TRANSMISSION SERVICES CORPORATION filed LCRA AND LCRA TSC'S RESPONSE TO COMMISSION STAFF'S SECOND SET OF QUESTIONS FOR COMMENT in PUCT Project 58484 on Nov 25, 2025.
PUCT Project 58484: Joint Responses to Staff Questions of H-E-B, LP and South Texas Electric Cooperative, Inc.PUCT Project 58484, Item 54 Filed · Nov 25, 2025
H-E-B LP and South Texas Electric Cooperative, Inc.
H-E-B LP and South Texas Electric Cooperative, Inc. filed Joint Responses to Staff Questions of H-E-B, LP and South Texas Electric Cooperative, Inc. in PUCT Project 58484 on Nov 25, 2025.
PUCT Project 58484: Comments of NRG Energy, Inc. in Response to Staff's Second Set of Questions on Transmission Cost RecoveryPUCT Project 58484, Item 55 Filed · Nov 25, 2025
NRG ENERGY, INC.
NRG ENERGY, INC. filed Comments of NRG Energy, Inc. in Response to Staff's Second Set of Questions on Transmission Cost Recovery in PUCT Project 58484 on Nov 25, 2025.
PUCT Project 58484: Responses of Texas Electric Cooperatives, Inc.PUCT Project 58484, Item 57 Filed · Nov 25, 2025
Texas Electric Cooperatives, Inc.
Texas Electric Cooperatives, Inc. filed Responses of Texas Electric Cooperatives, Inc. in PUCT Project 58484 on Nov 25, 2025.
PUCT Project 58484: DCC's Comments in Response to Staff's Second Set of QuestionsPUCT Project 58484, Item 59 Filed · Nov 25, 2025
Data Center Coalition
Data Center Coalition filed DCC's Comments in Response to Staff's Second Set of Questions in PUCT Project 58484 on Nov 25, 2025.
PUCT Project 58484: TCA Comments on Staff QuestionsPUCT Project 58484, Item 60 Filed · Nov 25, 2025
TEXAS CONSUMER ASSOCIATION
TEXAS CONSUMER ASSOCIATION filed TCA Comments on Staff Questions in PUCT Project 58484 on Nov 25, 2025.
PUCT Project 58484: Texas Energy Association for Marketers' Response to Questions for CommentPUCT Project 58484, Item 61 Filed · Nov 25, 2025
TEXAS ENERGY ASSOCIATION FOR MARKETERS
TEXAS ENERGY ASSOCIATION FOR MARKETERS filed Texas Energy Association for Marketers' Response to Questions for Comment in PUCT Project 58484 on Nov 25, 2025.
PUCT Project 58484: Vistra's Comments in Response to Staff's Second Set of QuestionsPUCT Project 58484, Item 63 Filed · Nov 25, 2025
VISTRA CORPORATE SERVICES COMPANY LLC
VISTRA CORPORATE SERVICES COMPANY LLC filed Vistra's Comments in Response to Staff's Second Set of Questions in PUCT Project 58484 on Nov 25, 2025.
PUCT Project 58484: CPS Energy's Comments in Response to Second Set of Questions.PUCT Project 58484, Item 64 Filed · Nov 25, 2025
CPS ENERGY
CPS ENERGY filed CPS Energy's Comments in Response to Second Set of Questions. in PUCT Project 58484 on Nov 25, 2025.
PUCT Project 58484: ELECTRIC RELIABILITY COUNCIL OF TEXAS, INC.’S RESPONSE TO STAFF QUESTIONSPUCT Project 58484, Item 65 Filed · Nov 25, 2025
ERCOT
ERCOT filed ELECTRIC RELIABILITY COUNCIL OF TEXAS, INC.’S RESPONSE TO STAFF QUESTIONS in PUCT Project 58484 on Nov 25, 2025.
PUCT Project 58484: TAEBA Response to Staff's Second Set of Questions Proj. No. 58484PUCT Project 58484, Item 67 Filed · Nov 25, 2025
TEXAS ADVANCED ENERGY BUSINESS ALLIANCE
TEXAS ADVANCED ENERGY BUSINESS ALLIANCE filed TAEBA Response to Staff's Second Set of Questions Proj. No. 58484 in PUCT Project 58484 on Nov 25, 2025.
PUCT Project 58484: CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC’S RESPONSES TO COMMISSON STAFF’S REQUEST FOR COMMENTSPUCT Project 58484, Item 68 Filed · Nov 25, 2025
CENTERPOINT ENERGY HOUSTON ELECTRIC
CENTERPOINT ENERGY HOUSTON ELECTRIC filed CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC’S RESPONSES TO COMMISSON STAFF’S REQUEST FOR COMMENTS in PUCT Project 58484 on Nov 25, 2025.
PUCT Project 58484: RESPONSES TO COMMISSION STAFF’S SECOND SET OF QUESTIONS FOR COMMENTSPUCT Project 58484, Item 69 Filed · Nov 25, 2025
AEP TEXAS INC.
AEP TEXAS INC. filed RESPONSES TO COMMISSION STAFF’S SECOND SET OF QUESTIONS FOR COMMENTS in PUCT Project 58484 on Nov 25, 2025.
PUCT Project 58484: OPUC’S COMMENTS ON THE SECOND SET OF QUESTIONS FOR PUBLIC COMMENT TO ATTACHMENTS A AND B RELATING TO THE EVALUATION OF TRANSMISSION COST RECOVERYPUCT Project 58484, Item 70 Filed · Nov 25, 2025
OPUC
OPUC filed OPUC’S COMMENTS ON THE SECOND SET OF QUESTIONS FOR PUBLIC COMMENT TO ATTACHMENTS A AND B RELATING TO THE EVALUATION OF TRANSMISSION COST RECOVERY in PUCT Project 58484 on Nov 25, 2025.
PUCT Project 58484: ERCOT Steel Mills' Comments on Commission Staff Questions and Draft Report Outline for Project No. 58484 - Evaluation of Transmission Cost RecoveryPUCT Project 58484, Item 71 Filed · Nov 25, 2025
ERCOT STEEL MILLS
ERCOT STEEL MILLS filed ERCOT Steel Mills' Comments on Commission Staff Questions and Draft Report Outline for Project No. 58484 - Evaluation of Transmission Cost Recovery in PUCT Project 58484 on Nov 25, 2025.
PUCT Project 58484: CenterPoint Energy Houston Electric Second Updated Response to Commission Staff’s Request for CommentsPUCT Project 58484, Item 76 Filed · Jan 14, 2026
CENTERPOINT ENERGY HOUSTON ELECTRIC
CENTERPOINT ENERGY HOUSTON ELECTRIC filed CenterPoint Energy Houston Electric Second Updated Response to Commission Staff’s Request for Comments in PUCT Project 58484 on Jan 14, 2026.
PUCT Project 58484: Staff Memo and Draft Report w/April 13 Comment DeadlinePUCT Project 58484, Item 77 Filed · Mar 16, 2026
PUC RULES & PROJECTS
PUC RULES & PROJECTS filed Staff Memo and Draft Report w/April 13 Comment Deadline in PUCT Project 58484 on Mar 16, 2026.
PUCT Project 58484: Vitol Inc. comments in response Commission Staff's Draft Evaluation of Transmission Cost RecoveryPUCT Project 58484, Item 80 Filed · Apr 12, 2026
VITOL INC.
VITOL INC. filed Vitol Inc. comments in response Commission Staff's Draft Evaluation of Transmission Cost Recovery in PUCT Project 58484 on Apr 12, 2026.
PUCT Project 58484: Comments on Commission Staff Report Filed Jointly by Base Power Company, Octopus Energy, Rhythm Energy, and Tesla Energy Ventures, LLCPUCT Project 58484, Item 82 Filed · Apr 13, 2026
Retail Electric Providers for Affordable, Innovative Rates
Retail Electric Providers for Affordable, Innovative Rates filed Comments on Commission Staff Report Filed Jointly by Base Power Company, Octopus Energy, Rhythm Energy, and Tesla Energy Ventures, LLC in PUCT Project 58484 on Apr 13, 2026.
PUCT Project 58484: Texas Public Power Association (TPPA) Comments on Draft Report and RecommendationsPUCT Project 58484, Item 84 Filed · Apr 13, 2026
TPPA
TPPA filed Texas Public Power Association (TPPA) Comments on Draft Report and Recommendations in PUCT Project 58484 on Apr 13, 2026.
PUCT Project 58484: H-E-B and South Texas Electric Cooperative, Inc.'s Joint Comments on Staff's Memorandum and Draft ReportPUCT Project 58484, Item 87 Filed · Apr 13, 2026
H-E-B, LP AND SOUTH TEXAS ELECTRIC COOPERATIVE, INC.
H-E-B, LP AND SOUTH TEXAS ELECTRIC COOPERATIVE, INC. filed H-E-B and South Texas Electric Cooperative, Inc.'s Joint Comments on Staff's Memorandum and Draft Report in PUCT Project 58484 on Apr 13, 2026.
PUCT Project 58484: Comments of NRG Energy, Inc. in Response to Staff Memo and Draft Report on Transmission Cost RecoveryPUCT Project 58484, Item 88 Filed · Apr 13, 2026
NRG ENERGY, INC.
NRG ENERGY, INC. filed Comments of NRG Energy, Inc. in Response to Staff Memo and Draft Report on Transmission Cost Recovery in PUCT Project 58484 on Apr 13, 2026.
PUCT Project 58484: Comments on Staff's Report and RecommendationsPUCT Project 58484, Item 89 Filed · Apr 13, 2026
Data Center Coalition (DCC)
Data Center Coalition (DCC) filed Comments on Staff's Report and Recommendations in PUCT Project 58484 on Apr 13, 2026.
PUCT Project 58484: COMMENTS OF TEXAS ELECTRIC COOPERATIVES, INC.PUCT Project 58484, Item 90 Filed · Apr 13, 2026
TEXAS ELECTRIC COOPERATIVES, INC.
TEXAS ELECTRIC COOPERATIVES, INC. filed COMMENTS OF TEXAS ELECTRIC COOPERATIVES, INC. in PUCT Project 58484 on Apr 13, 2026.
PUCT Project 58484: Steering Committee of Cities Served by Oncor and Texas Coalition for Affordable Power's Comments on Commission Staff’s Draft Report on Transmission Cost RecoveryPUCT Project 58484, Item 91 Filed · Apr 13, 2026
STEERING COMMITTEE OF CITIES SERVED BY ONCOR AND TEXAS COALITION FOR AFFORDABLE POWER
STEERING COMMITTEE OF CITIES SERVED BY ONCOR AND TEXAS COALITION FOR AFFORDABLE POWER filed Steering Committee of Cities Served by Oncor and Texas Coalition for Affordable Power's Comments on Commission Staff’s Draft Report on Transmission Cost Recovery in PUCT Project 58484 on Apr 13, 2026.
PUCT Project 58484: LCRA'S COMMENTS ON COMMISSION STAFF'S DRAFT RECOMMENDATIONS FOR TRANSMISSION COST RECOVERYPUCT Project 58484, Item 92 Filed · Apr 13, 2026
LOWER COLORADO RIVER AUTHORITY
LOWER COLORADO RIVER AUTHORITY filed LCRA'S COMMENTS ON COMMISSION STAFF'S DRAFT RECOMMENDATIONS FOR TRANSMISSION COST RECOVERY in PUCT Project 58484 on Apr 13, 2026.
PUCT Project 58484: ERCOT Steel Mills Comments on PUCT Staff's Draft Report_Project 58484PUCT Project 58484, Item 93 Filed · Apr 13, 2026
ERCOT STEEL MILLS
ERCOT STEEL MILLS filed ERCOT Steel Mills Comments on PUCT Staff's Draft Report_Project 58484 in PUCT Project 58484 on Apr 13, 2026.
PUCT Project 58484: CPS Energy's Response to Staff's Draft RecommendationsPUCT Project 58484, Item 95 Filed · Apr 13, 2026
CPS ENERGY
CPS ENERGY filed CPS Energy's Response to Staff's Draft Recommendations in PUCT Project 58484 on Apr 13, 2026.
PUCT Project 58484: TCPA Comments on Staff Draft Report on Evaluation of Transmission Cost AllocationPUCT Project 58484, Item 96 Filed · Apr 13, 2026
TCPA
TCPA filed TCPA Comments on Staff Draft Report on Evaluation of Transmission Cost Allocation in PUCT Project 58484 on Apr 13, 2026.
PUCT Project 58484: TCA Comments on Draft Report for Transmission Cost RecoveryPUCT Project 58484, Item 97 Filed · Apr 13, 2026
TEXAS CONSUMER ASSOCIATION
TEXAS CONSUMER ASSOCIATION filed TCA Comments on Draft Report for Transmission Cost Recovery in PUCT Project 58484 on Apr 13, 2026.
PUCT Project 58484: Texas-New Mexico Power Company's Comments to Commission Staff's March 16, 2026 Request for Public CommentPUCT Project 58484, Item 98 Filed · Apr 13, 2026
TEXAS-NEW MEXICO POWER COMPANY
TEXAS-NEW MEXICO POWER COMPANY filed Texas-New Mexico Power Company's Comments to Commission Staff's March 16, 2026 Request for Public Comment in PUCT Project 58484 on Apr 13, 2026.
PUCT Project 58484: GVEC's Comments Regarding Staff's Memo & Draft ReportPUCT Project 58484, Item 99 Filed · Apr 13, 2026
GUADALUPE VALLEY ELECTRIC COOPERATIVE, INC
GUADALUPE VALLEY ELECTRIC COOPERATIVE, INC filed GVEC's Comments Regarding Staff's Memo & Draft Report in PUCT Project 58484 on Apr 13, 2026.
PUCT Project 59142: ERCOT UPDATE - BATCH ZERO ELIGIBILITY VERIFICATION AND STATE AND COMMUNITY IMPACT RFI PROCESSPUCT Project 59142, Item 73 Filed · Sep 21, 2026
ERCOT
ERCOT filed ERCOT UPDATE - BATCH ZERO ELIGIBILITY VERIFICATION AND STATE AND COMMUNITY IMPACT RFI PROCESS in PUCT Project 59142 on Sep 21, 2026.
PUCT Project 58317: SB6 Implementation Roadmap Updated September 2026PUCT Project 58317, Item 69 Filed · Sep 22, 2026
PUC RULES & PROJECTS
PUC RULES & PROJECTS filed SB6 Implementation Roadmap Updated September 2026 in PUCT Project 58317 on Sep 22, 2026.
PUCT Project 58317: Governor’s auditPUCT Project 58317, Item 71 Filed · Sep 22, 2026
Mary Balmain
Mary Balmain filed Governor’s audit in PUCT Project 58317 on Sep 22, 2026.
PUCT Project 58317: Public comments on data centers. 765kV Governor's auditPUCT Project 58317, Item 74 Filed · Sep 22, 2026
Toni Williams
Toni Williams filed Public comments on data centers. 765kV Governor's audit in PUCT Project 58317 on Sep 22, 2026.
PUCT Project 58484: OPUC'S LETTER TO CENTRAL RECORDS- REQUEST TO VOID ITEM NO. 107PUCT Project 58484, Item 114 Filed · Apr 14, 2026
OPUC
OPUC filed OPUC'S LETTER TO CENTRAL RECORDS- REQUEST TO VOID ITEM NO. 107 in PUCT Project 58484 on Apr 14, 2026.
PUCT Project 58484: OPUC’S INITIAL COMMENTS ON STAFF OF THE PUBLIC UTILITY COMMISSION OF TEXAS’S MEMORANDUM AND DRAFT EVALUATION OF TRANSMISSION COST RECOVERYPUCT Project 58484, Item 115 Filed · Apr 14, 2026
OPUC
OPUC filed OPUC’S INITIAL COMMENTS ON STAFF OF THE PUBLIC UTILITY COMMISSION OF TEXAS’S MEMORANDUM AND DRAFT EVALUATION OF TRANSMISSION COST RECOVERY in PUCT Project 58484 on Apr 14, 2026.
PUCT Project 58484: Staff Memo and Draft ReportPUCT Project 58484, Item 117 Filed · May 4, 2026
PUC RULES & PROJECTS
PUC RULES & PROJECTS filed Staff Memo and Draft Report in PUCT Project 58484 on May 4, 2026.
PUCT Project 58484: Staff Memo_New Rulemaking ProjectPUCT Project 58484, Item 118 Filed · May 27, 2026
PUC RULES & PROJECTS
PUC RULES & PROJECTS filed Staff Memo_New Rulemaking Project in PUCT Project 58484 on May 27, 2026.
PUCT Project 58484: LETTER REGARDING EVALUATION OF TRANSMISSION COST RECOVERYPUCT Project 58484, Item 119 Filed · Jun 30, 2026
CHAIRMAN DREW DARBY
CHAIRMAN DREW DARBY filed LETTER REGARDING EVALUATION OF TRANSMISSION COST RECOVERY in PUCT Project 58484 on Jun 30, 2026.
ERCOT market notice M-C092126-01: Batch Zero Verification and Community Impact RFIs: RIOO RFI Tool Update to Restrict Visibility of Other Respondents' Submissions, and Posting of Question Reference Guides on the ERCOT WebsiteERCOT Market Notice M-C092126-01 Issued · Sep 21, 2026
Market notice
ERCOT issued market notice M-C092126-01, Batch Zero Verification and Community Impact RFIs: RIOO RFI Tool Update to Restrict Visibility of Other Respondents' Submissions, and Posting of Question Reference Guides on the ERCOT Website, on Sep 21, 2026.
PUCT Project 59948: Joint Motion to Admit Evidence and Parties' Proposed Finding of Fact, Conclusions of Law, and Ordering ParagraphsPUCT Project 59948, Item 14 Filed · Sep 22, 2026
EL PASO ELECTRIC COMPANY
EL PASO ELECTRIC COMPANY filed Joint Motion to Admit Evidence and Parties' Proposed Finding of Fact, Conclusions of Law, and Ordering Paragraphs in PUCT Project 59948 on Sep 22, 2026.
PUCT Project 58317: Public comments on data centers, 765 kV, and the Governor’s auditPUCT Project 58317, Item 80 Filed · Sep 23, 2026
Tim Morin
Tim Morin filed Public comments on data centers, 765 kV, and the Governor’s audit in PUCT Project 58317 on Sep 23, 2026.
PUCT Project 58317: data centers, 765 kV, and the Governor's audit. I’m Very concerned and upset to find out that 8,300 acres has been purchased for a proposed DATA CENTER JIM HOGG. Co Property is surrounded by farms, wildlife and historic sites. Drought has been declared.PUCT Project 58317, Item 81 Filed · Sep 23, 2026
Lynda Soliz
Lynda Soliz filed data centers, 765 kV, and the Governor's audit. I’m Very concerned and upset to find out that 8,300 acres has been purchased for a proposed DATA CENTER JIM HOGG. Co Property is surrounded by farms, wildlife and historic sites. Drought has been declared. in PUCT Project 58317 on Sep 23, 2026.
PUCT Project 58317: Overwhelming the state with data centers. 765 kV, governors audit. 520 acres of data center near atmos gas line. Drought. Farm land/agriculture, wildlife and historical sites.PUCT Project 58317, Item 83 Filed · Sep 24, 2026
Ashly Sanchez
Ashly Sanchez filed Overwhelming the state with data centers. 765 kV, governors audit. 520 acres of data center near atmos gas line. Drought. Farm land/agriculture, wildlife and historical sites. in PUCT Project 58317 on Sep 24, 2026.
PUCT Project 58796: OPUC'S NOTICE OF CHANGE OF COUNSELPUCT Project 58796, Item 105 Filed · Sep 24, 2026
OPUC
OPUC filed OPUC'S NOTICE OF CHANGE OF COUNSEL in PUCT Project 58796 on Sep 24, 2026.
PUCT Project 59948: ORDER NO. 5- FINDING NOTICE SUFFICIENTPUCT Project 59948, Item 15 Filed · Sep 24, 2026
PUC OPDM
PUC OPDM filed ORDER NO. 5- FINDING NOTICE SUFFICIENT in PUCT Project 59948 on Sep 24, 2026.
PUCT Project 59142: Request for Audit for Project RaptorPUCT Project 59142, Item 74 Filed · Sep 25, 2026
Douglas Lindemann
Douglas Lindemann filed Request for Audit for Project Raptor in PUCT Project 59142 on Sep 25, 2026.
PUCT Project 59142: Request for Audit for Project RaptorPUCT Project 59142, Item 75 Filed · Sep 25, 2026
Jennifer Lindemann
Jennifer Lindemann filed Request for Audit for Project Raptor in PUCT Project 59142 on Sep 25, 2026.
PUCT Project 59142: Request for Audit for Project RaptorPUCT Project 59142, Item 76 Filed · Sep 25, 2026
Bob Lindemann
Bob Lindemann filed Request for Audit for Project Raptor in PUCT Project 59142 on Sep 25, 2026.
PUCT Project 59142: Request for Audit for Project RaptorPUCT Project 59142, Item 77 Filed · Sep 25, 2026
Becky Lindemann
Becky Lindemann filed Request for Audit for Project Raptor in PUCT Project 59142 on Sep 25, 2026.
PUCT Project 58317: I oppose the data centers, 765 kV, and I have no faith in the Governor’s audit. We moved to rural area to avoid what you are bringin here. I will not pay for these data centers to ruin our state!PUCT Project 58317, Item 87 Filed · Sep 26, 2026
Leslie Wiltse
Leslie Wiltse filed I oppose the data centers, 765 kV, and I have no faith in the Governor’s audit. We moved to rural area to avoid what you are bringin here. I will not pay for these data centers to ruin our state! in PUCT Project 58317 on Sep 26, 2026.
PUCT Project 58317: Public comments on data centers, 765 KV and Governors auditPUCT Project 58317, Item 101 Filed · Oct 2, 2026
Kimberly Weiland
Kimberly Weiland filed Public comments on data centers, 765 KV and Governors audit in PUCT Project 58317 on Oct 2, 2026.
PUCT Project 58796: SOAH ORDER NO. 12- ADMITTING EVIDENCE; REMANDING CASE TO THE COMMISSION; AND DISMISSING FROM SOAH’S DOCKETPUCT Project 58796, Item 106 Filed · Oct 5, 2026
SOAH
SOAH filed SOAH ORDER NO. 12- ADMITTING EVIDENCE; REMANDING CASE TO THE COMMISSION; AND DISMISSING FROM SOAH’S DOCKET in PUCT Project 58796 on Oct 5, 2026.
PUCT Project 58317: Public comments on data centers, 765 kV, and the Governor’s audit. Specifically near La Grange, TxPUCT Project 58317, Item 102 Filed · Oct 7, 2026
Mark D Owens
Mark D Owens filed Public comments on data centers, 765 kV, and the Governor’s audit. Specifically near La Grange, Tx in PUCT Project 58317 on Oct 7, 2026.
Transmission & interconnection build
Permian Basin Reliability Plan (including Texas's first 765 kV import paths) · approved; TSPs (including AEP Texas, LCRA) routing and constructing
PUCT approved the Permian Basin Reliability Plan on September 26, 2024 under HB 5066 (2023); at its April 24, 2025 open meeting the PUCT approved building the import paths at 765 kV — the first use of 765 kV in ERCOT. Three import paths: New Substation 2 (Dinosaur)–Longshore–Drill Hole; Bell East–Big Hill–Sand Lake; Howard–Solstice. Drivers: oil and gas electrification, data center growth, and industrial expansion. Phase I 765 kV projects target ~2030 in-service.
Texas 765 kV Strategic Transmission Expansion Plan (STEP) · plan adopted via ERCOT 2024 RTP; component projects moving through Regional Planning…
Estimated total cost $32.99 billion including approved Permian Basin Reliability Plan projects. Scope: 2,468 miles of new 765 kV lines, 649 miles of new 345 kV, 1,098 miles of 345 kV upgrades, 324 miles of new 138 kV, 1,287 miles of 138 kV upgrades, 446 miles of 69→138 kV conversions, 11.3 GVAr of reactive support; six substations (Longshore, Drill Hole, Bell East, Sand Lake, Howard, Solstice) each get two new 765/345 kV transformers. Sized in ERCOT's 2024 Regional Transmission Plan against large-load growth.
765 kV STEP Eastern Backbone (AEP Texas, CPS Energy, Oncor, CenterPoint Energy) · ERCOT Board approved Dec 9, 2025; CCN filings and construction phases follow
ERCOT Board approved December 9, 2025 — at ~$9.4 billion capital cost the most expensive project in ERCOT history. Approximately 1,109 miles of new 765 kV lines (~1,108.8 miles of new right-of-way per the ERCOT board recommendation) connecting Northeast Texas to the Permian Basin; estimated in-service 2030–2032. Explicitly justified by data-center-driven load growth.
Batch Zero actionable transmission plan (large-load interconnection study output) · in progress; timeline under revision due to the audit pause
The Batch Zero Interconnection Study is required to deliver, alongside 2028–2032 MW allocations per project, an actionable transmission plan identifying system constraints and buildable upgrades to serve batched large load. Original delivery date April 9, 2027 (now slipping — see deadlines); ERCOT planned Batch 1 applications for summer 2027 and a final transmission plan for the entire batch in fall 2027.

PJM

PJM Interconnection, L.L.C. RTO / ISO

Filed the most restrictive large-load framework in the country on August 13, 2026: new loads of 50 MW or more entering service after June 1, 2027 either bring their own new capacity or take Interim Resource Adequacy Service, under which their unsupported demand is curtailed at EEA1 — ahead of residential customers. Pending at FERC with a requested October 12, 2026 effective date.

Footprint: Coordinates wholesale electricity and transmission in all or parts of 13 states (DE, IL, IN, KY, MD, MI, NJ, NC, OH, PA, TN, VA, WV) and the District of Columbia, serving more than 67 million people over 88,417 miles of transmission lines; largest U.S. grid operator by load. Large-load queue: 715 projects, 201.5 GW nameplate accepted for study (Cycle 1) · 811 proposals received before the window closed (as of Aug 3, 2026)
Rulings, rules & filings
MeasureStatusWhat it doesSource
PJM Interim Resource Adequacy Service (IRAS), Large Load Registry, and Bring Your Own New Capacity filingER26-3515-000 Effective · Aug 13, 2026
Pending at FERC; comments due 5 p.m. ET Sept. 3, 2026; requested effective date Oct. 12, 2026
Defines a New Large Load as end-use demand entering service or adding incremental demand after June 1, 2027 with cumulative peak demand of at least 50 MW at a single electrical site (affiliated facilities within one mile treated as one location). New Large Loads that do not bring qualifying capacity under Bring Your Own New Capacity (new generation, uprates, surplus interconnection service, repowering/fuel conversions, storage, certain demand resources and DER aggregations) take IRAS: their unsupported demand is…
PJM Reliability Backstop Procurement (RBP)ER26-3380-000 Filed · Jul 31, 2026
Pending at FERC; one-time procurement with central bid window Sept. 30 - Oct. 21, 2026 and results due by Dec. 2, 2026, before the next Base…
One-time special capacity procurement to address the shortfall against the 1-in-10 reliability requirement identified in the 2028/2029 Base Residual Auction (target equals that shortfall, excluding FRR load and supply, and adjusts downward for bilateral contracts and self-supply secured by new large loads through PJM's matchmaking RFP launched June 9, 2026). States determine which retail customers may fund the program, with limited opt-out mechanics developed at stakeholder request. PJM's July 14, 2026 auction…
FERC show-cause order to PJM on large-load interconnection (FPA Section 206)EL26-67-000 Filed · Jun 18, 2026
Pending; PJM 30-day informational report filed July 2026; substantive show-cause response was due Aug. 17, 2026; interested-party responses due 30…
FERC preliminarily found RTO/ISO tariffs may be unjust, unreasonable, or unduly discriminatory because they lack features needed to timely, reliably, and safely interconnect and serve new large loads. PJM's order is tailored: a four-item directive list covering transmission service application/study processes, cost-shift prevention and transparency, and flexible-load transmission services, limited to large loads NOT co-located with generation (co-location in PJM was addressed separately in EL25-49). PJM's…
FERC order directing PJM co-located load tariff reformEL25-49-000 Effective · Dec 18, 2025
Order effective; compliance process ongoing through 2026
FERC found PJM's tariff unjust and unreasonable for lacking clarity and consistency on rates, terms, and conditions for co-location arrangements (generation serving data centers and other large loads at the plant site). It directed a 30-day compliance filing (due Jan. 20, 2026) on provisional and surplus interconnection service for generators serving co-located load, and a 60-day compliance filing (due Feb. 16, 2026) setting specific terms for co-location, including three transmission service options for…
FERC order on PJM co-location compliance filing (accepting in part, rejecting in part)EL25-49-002 Proposed · Jun 18, 2026
Further PJM compliance filing directed within 60 days (i.e., by mid-August 2026)
FERC accepted in part and rejected in part PJM's co-location compliance filing, validated PJM's general direction toward structured co-located load service, and established rates, terms, and conditions for the new transmission services (Firm Contract Demand, Non-Firm Contract Demand, and interim service) while finding no service product fully finalized. This order was issued the same day as the EL26-67 show-cause order, which carved co-location out of PJM's show-cause directives because it is being handled in…
PJM Expedited Interconnection Track (EIT) Effective · Jun 9, 2026
Approved/effective; protested by NRDC and others during the proceeding
Temporary fast-track interconnection for up to 10 state-sponsored, shovel-ready, high-capacity generation projects. All EIT projects must have a commercial operation date within three years and be online by 2030. PJM cites the EIT in its EL26-67 informational report as a supply-acceleration measure responsive to data-center-driven load growth.
Talen-Amazon Susquehanna co-location saga (amended ISA rejection and front-of-meter restructuring)ER24-2172 Proposed · Nov 1, 2024
Resolved outside FERC: converted to a front-of-the-meter PPA not requiring FERC ISA approval
FERC rejected (2-1, Commissioners Christie and See in the majority, then-Chairman Phillips dissenting) the amended ISA that would have raised co-located load at Talen's Susquehanna nuclear plant serving an AWS data center from 300 MW to 480 MW, holding PJM had not justified the non-conforming provisions; FERC reaffirmed on rehearing in April 2025. On June 11, 2025 Talen and Amazon restructured as a 1,920-MW front-of-the-meter PPA running through 2042 (deliveries ramping to 840-1,200 MW by 2029 and 1,680-1,920 MW…
Capacity auction price records driven by data-center load (2025/26 through 2028/29 Base Residual Auctions) Effective · Jul 30, 2024
Cleared/final; price collar (FERC-approved cap and floor agreed with the 13 PJM states) applies for four auctions, third consecutive collared…
2025/26 BRA cleared at a then-record $269.92/MW-day (~$14.7B total). 2026/27 BRA cleared at the $329.17/MW-day cap, 134,311 MW procured, $16.1B total (PJM estimated ~$389/MW-day absent the cap; retail bill impact 1.5-5%), with forecast peak growth of ~5,500 MW driven primarily by data centers. 2027/28 BRA (Dec. 2025) cleared at the $333.44/MW-day cap, ~$16.4B, ~6,500 MW short of the reliability requirement — the first RTO-wide shortfall in PJM history; the Independent Market Monitor's Jan. 2026 report attributed…
DOE emergency orders during July 2026 heat wave (data-center curtailment authority) Effective · Jul 2026
Issued (emergency orders, time-limited)
During the heat wave that produced PJM's 168,158 MW all-time peak on July 2, 2026, the Department of Energy issued two emergency orders allowing PJM to curtail data centers and waive certain power plant pollution limits. Forced generation outages ran 18,100-19,400 MW over July 2-4, above the ~12,800 MW average of recent top-10 peak days.
PJM Proposes Reliability Standards to Manage Large Load Disconnection Events Proposed · Sep 10, 2026
PJM has proposed changes to interconnection reliability requirements for Large Loads.
PJM proposed new reliability standards for Large Loads, including data centers and crypto-mining facilities, following a recent event where nearly 4,000 MW of data center load disconnected unexpectedly from the grid. The proposal requires these facilities to remain connected during transmission disturbances and is in response to an FERC order.
PJM targets data centre demand with 6GW backstop auction; BESS expected to have competitive edge Proposed · Sep 8, 2026
PJM proposed a major overhaul of capacity procurement in response to surging data centre demand.
PJM has proposed a major overhaul of its power capacity procurement process to address rapidly rising electricity demand from data centers, which has driven auction prices up over 1,000% in two years and threatens to increase average household bills. The proposal includes a 6GW backstop auction where battery energy storage systems (BESS) are expected to have a competitive edge.
PJM faces 2030 reliability crisis if data center load growth continues: report Filed · Sep 15, 2026
Study commissioned by the Pennsylvania PUC and reported by Utility Dive.
A report commissioned by the Pennsylvania Public Utility Commission warns that PJM could face a severe reliability crisis by 2030 if data center load growth continues. In a worst-case scenario, the study projects more than 13 days per year of loss of load events, far exceeding PJM’s planning criteria.
PJM’s reliability could start failing by 2030 if data center growth continues: report Filed · Sep 15, 2026
Study commissioned by the Pennsylvania PUC and reported by Utility Dive.
A study commissioned by the Pennsylvania PUC warns that PJM’s reliability could fail by 2030 if data center growth continues. In a worst-case scenario, the study projects over 13 days per year of loss of load events, far exceeding PJM’s planning criteria.
PUC Study Examines Electric Reliability Risks From Data Center Growth Filed · Sep 21, 2026
Independent analysis released by Pennsylvania Public Utility Commission
The Pennsylvania Public Utility Commission released a study examining whether the state and the PJM region will have enough electric resources to meet growing demand and maintain reliability as data centers expand. The study finds that under current forecasts, reliability standards may not be met from 2027 to 2030, with risks increasing significantly if demand growth outpaces supply.
Coal Plants Have a Role; Forcing Them to Remain Online is Bad Business and Bad Policy Filed · Sep 25, 2026 The article discusses the Trump administration's use of emergency orders to force coal plants to remain online due to rising load from data centers. It argues that such orders are generally not warranted and that coal plants are being phased out for economic reasons.
PJM Kicks Off Annual Process of Vetting Large Load Requests Filed · Sep 29, 2026
PJM has begun its annual review of proposed Large Load adjustments.
PJM initiated its annual review of proposed Large Load adjustments to assess their impact on the 2027 Long-Term Load Forecast using updated guidelines. Utilities submitted proposals primarily for data centers, and PJM will evaluate these with additional analysis from an independent consultant.
FERC chair slams PJM ‘mess’ as country’s largest grid operator delays power auction Filed · Sep 30, 2026
FERC partially approved PJM's plan due to cost allocation concerns.
PJM delayed its power auction after not meeting reserve margin targets due to data center load growth. FERC partially approved the plan, focusing on cost allocation issues.
PJM’s ‘unexpected twist’ is a win for distributed capacity Filed · Oct 1, 2026 PJM has delayed a one-time capacity auction. The delay gives aggregators more time to sign bilateral deals with data center customers.
Transmission & interconnection build
2024 RTEP Window 1 awards (765-kV west-east backbone: MARL and Valley Link) · Approved Feb. 25, 2025; in development
$5.9 billion in new baseline transmission projects approved by the PJM Board Feb. 25, 2025 ($6.7 billion total RTEP with scope/cost changes to existing projects). Introduces 765-kV lines connecting the AEP system in western PJM to central/southern PJM, primarily Virginia, to raise west-to-east transfer capability into northern Virginia; demand growth there is almost entirely attributable to data centers. Valley Link (AEP/Dominion/FirstEnergy joint venture) spans 261 miles of 765-kV construction at a developer-estimated $1.9 billion (PJM independent…
2025 RTEP Window 1 awards ($11.8B, including Dominion 525-kV HVDC to Data Center Alley) · Approved Feb. 12, 2026; in development, completion by June 2032 (Dominion HVDC)
$11.8 billion in baseline transmission projects approved by the PJM Board Feb. 12, 2026, driven by accelerated load growth across the Mid-Atlantic and Midwest footprint. Largest award: Dominion Energy Virginia, ~$4.8 billion, for a 185-mile 525-kV underground HVDC line from Brunswick County to a converter station at the Mosby substation in Loudoun County (Data Center Alley), delivering 3,000 MW into northern Virginia — the world's largest data center market — with two converter stations costing ~$1.5 billion; completion slated June 2032. NextEra and…
Cycle 1 interconnection process and queue acceleration (supply side) · In progress (cited in PJM's July 2026 EL26-67 informational report)
PJM's restructured first-ready, first-served cycle process received 829 applications totaling ~212 GW under Cycle 1 as of May 15, 2026 (Transition Cycle 2 in Phase III), with PJM using a collaboration with Google's Tapestry to apply AI to reduce interconnection study timelines — capacity PJM cites as its route to serving data-center-driven load growth.

MISO

Midcontinent Independent System Operator, Inc. (MISO) RTO / ISO

Building a faster path rather than a pause: a zero-injection interconnection agreement for co-located generation and a parallel study process that runs large-load analysis concurrently instead of sequentially. MISO reports it is currently resource adequate but says new tools are needed to keep pace with large-load growth.

Footprint: Operates the grid and wholesale markets across all or part of 15 U.S. states and Manitoba, Canada; ~45 million people served; ~77,000-79,000 miles of transmission; 471 market participants. Record peak demand 127.1 GW (July 20, 2011). 2026 forecast peak ~124 GW; MISO's 2026 Long-Term Load Forecast… Large-load queue: Generation interconnection queue: 192 GW of pending interconnection requests plus 87 GW of signed GIAs not yet built (2026 OMS-MISO Survey). Large-load (data center) connection requests: no… · Not disclosed as a queue share. Forecast context: FERC's June 18, 2026 show cause order cited 43% compound annual growth in MISO data center capacity since… (as of 2026-07-09)
Rulings, rules & filings
MeasureStatusWhat it doesSource
FERC Order to Show Cause on large-load integration (MISO)EL26-70-000 (195 FERC ¶ 61,212) Filed · Jun 18, 2026
Pending — held in abeyance (see abeyance entry)
FPA Section 206 order preliminarily finding the MISO tariff unjust and unreasonable because it lacks a consistent, transparent framework for large-load application, study, cost-transparency, co-location, and operational requirements. Defines 'Large Load' as a new commercial or industrial customer at a single site with peak load of 50 MW or greater, interconnecting above 69 kV, not part of a co-location arrangement. Required a generation-adequacy informational report by July 20, 2026 and a show-cause response by…
MISO generation-adequacy informational report (EL26-70)EL26-70-000 Filed · Jul 20, 2026 Report required by the June 18 order on how MISO will ensure adequate generation for existing and new large loads. It acknowledged that concentrated, fast-moving large-load demand requires new tools and previewed two filings: a Zero-Injection GIA (then targeted on or about July 31, 2026) and a Large Load Parallel Study Process (targeted on or about end of September 2026). It stated the region is currently resource adequate.
MISO abeyance motion and FERC grant — show-cause response deadline moved to November 16, 2026EL26-70-000 Proposed · Aug 3, 2026
Granted — proceeding in full abeyance; response due November 16, 2026, answers due December 16, 2026
MISO (like every RTO/ISO) moved on August 3, 2026 to hold the show-cause proceeding in abeyance for up to 90 days to develop Section 205 filings; American Municipal Power opposed. Per a docket tracker updated August 23, 2026, FERC granted full abeyance on August 14, 2026, resetting MISO's response to November 16, 2026 with answers due December 16, 2026. Consequence: MISO did NOT file a substantive show-cause response on August 17, 2026.
Zero-Injection Generator Interconnection Agreement (ZGIA) tariff filingER26-3552-000 (accession 20260818-5152) Filed · Aug 18, 2026
Filed — pending at FERC
Section 205(d) filing creating a fast-track interconnection path for generation co-located with large loads behind the same point of interconnection that will not inject power onto the transmission system (injection prevented beyond transient tolerance windows; POIs on the same voltage side of the same substation treated as electrically equivalent). Per the June 29, 2026 LLWG: ZGIA generators must register as market resources; associated loads are classified as firm NITS loads paying transmission on a gross…
Large Load Parallel Study Process (planned tariff filing)Not yet assigned Proposed · Sep 2026
Proposed — pre-filing; announced in MISO's July 20, 2026 informational report
A new, expedited study process for large loads conducted outside MISO's regular interconnection queue, allowing concurrent rather than sequential study of new large loads and their associated ('devoted') generation. MISO also said it intends to develop a non-firm transmission service option for large loads. Developed through the Large Load Working Group, with meetings scheduled through November 2026.
Large Load Interconnection Reliability Requirements (LLWG-2026-3) tariff packageNo FERC docket confirmed as of 2026-08-24 Proposed · Jun 29, 2026
Tariff language drafted; filing not independently confirmed
MISO-wide reliability requirements for large loads: hourly 168-hour forecasts updated hourly plus 5-minute forecasts covering 6 hours; real-time SCADA/ICCP telemetry (MW, MVAR, voltage, breaker status); PMUs at each point of withdrawal streaming IEEE C37.118 data; ramp-rate limits, voltage/frequency ride-through, and remote-disconnect capability; new tariff definitions for computational load, large load customer, and points of withdrawal. Generation over 20 MVA behind the same POI needs individual, un-netted…
Expedited Resource Addition Study (ERAS) — generation fast laneER25-2454 (revised ERAS filing) Effective · Jun 2025
Approved/operating; first cycle reviewing 6.1 GW (~70% gas)
Expedited interconnection track for shovel-ready generation addressing resource adequacy, including generation serving large-load growth; MISO began its first ERAS review with 6.1 GW of projects, about 70% gas. A third-party tracker lists ERAS as sunsetting August 31, 2027 or at a 68-project cap. MISO's large-load page pairs ERAS with Expedited Project Review (EPR) for accelerating transmission solutions.
Attachment GGG (Merchant HVDC Connection Procedures) and Improvements (PAC-2024-6)No 2026 docket confirmed Proposed · May 12, 2026
Active — 'FERC' phase on MISO dashboard (last modified August 12, 2026)
Attachment GGG is MISO's connection-only procedure for merchant HVDC ties: it establishes safe physical interconnection while separating physical connection from injection rights and transmission service. MISO targeted a tariff/BPM filing in Q2-Q3 2026 with FERC action and implementation expected Q4 2026. The connection-only construct has been referenced in MISO's large-load interconnection policy discussions (January 21, 2026 PAC), making it a template of interest for load-only connections.
2026/27 Planning Resource Auction resultsn/a (auction under Module E-1) Effective · Apr 28, 2026
Final — all zones cleared, no shortfalls
Annualized capacity prices fell ~42% to $116-126/MW-day across MISO's zones (from $212-217/MW-day for 2025/26). Summer-season prices cleared at $424.30/MW-day in North/Central, $384.10 in Arkansas/Mississippi, $412.10 in Louisiana/Texas (down from $666.50 footprint-wide). Driven by a 4% increase in offered capacity including 12.2 GW of accredited solar (up 59%).
2026 OMS-MISO Resource Adequacy Surveyn/a Proposed · Jun 3, 2026
Published
Members plan record additions averaging ~15 GW/year of new accredited summer capacity over five years (~100 GW of new supply by 2032; ~60% wind/solar/storage, ~40% gas), against 5.1%/year load growth. Projected surpluses above the planning reserve margin: summer 2028 +11.5 GW, summer 2031 up to +39 GW (November-forecast basis); the April-forecast basis shows materially lower margins. Record 99.5% survey participation.
State commissions' complaint against LRTP Tranche 2.1 benefits/cost allocationEL25-109-000 Filed · Jul 30, 2025
Pending — no FERC merits ruling found as of 2026-08-24
Utility commissions from Arkansas, Louisiana, Mississippi, Montana and North Dakota asked FERC to undo the Tranche 2.1 Multi-Value Project designation, alleging MISO's modeling overstated benefits. MISO, six other state commissions, multiple utilities, the Data Center Coalition, and the governor of Iowa opposed the complaint and sought dismissal. Outcome directly affects cost allocation for the 765 kV backbone that would serve large-load growth.
FERC rulemaking: Interconnection of Large Loads to the Interstate Transmission SystemRM26-4-000 Proposed · Jun 18, 2026
Open rulemaking docket; FERC chose targeted Section 206 show-cause orders over an immediate generic rule
The Secretary of Energy initiated a rulemaking in October 2025 to facilitate timely large-load interconnection ('speed to power'). FERC's June 18, 2026 response was six tailored show cause orders (including EL26-70 for MISO) rather than a single national rule, while keeping the RM26-4 docket open. Binds all six RTO/ISO regions' reform schedules.
MISO proposes fast-track large load, generation study process Proposed · Oct 5, 2026
MISO has proposed a 120-day study process for large loads over 200 MW and new generation in the same local resource zone.
MISO is proposing a fast-track study process that takes 120 days for large loads exceeding 200 MW and new generation located within the same local resource zone. The proposal aims to streamline the study process for these specific cases.
Transmission & interconnection build
LRTP Tranche 2.1 — 765 kV Midwest backbone · Approved by MISO Board December 12, 2024; state siting/regulatory approvals in progress;…
$21.8-21.9 billion, 24 regional projects / 323 facilities across the MISO Midwest subregion; ~1,800 miles of new 765 kV lines forming a 3,631-mile 765 kV backbone; in-service 2032-2034; projected $23-72 billion net benefits over 20 years (benefit-cost 1.8-3.5). Drivers cited include load growth of ~60% by 2040 from data centers, hydrogen, and electrification — the backbone is the principal bulk-delivery build for gigawatt-scale load in MISO Midwest. Cost allocation is under challenge in FERC docket EL25-109.
MTEP24 total package (with Tranche 2.1) · Approved December 12, 2024
Approximately $30 billion total approved December 12, 2024: $21.9B Tranche 2.1 regional projects + $6.7B local projects + $1.7B Joint Targeted Interconnection Queue (JTIQ) projects on the MISO-SPP seam, with PJM interconnections in Illinois, Indiana, and Ohio.
2026 LRTP work — Midwest continuation and new LRTP South · In development through the Planning Advisory Committee, 2026
MISO's 2026 long-range planning includes continued Midwest LRTP work and a new South LRTP effort beginning with a collaborative, investigative approach focused on reliability and load growth (data centers and industrial expansion among cited drivers).
Expedited Project Review (EPR) · Active per MISO's Large Load Additions page
MISO mechanism to accelerate transmission solutions within the MISO Transmission Expansion Plan (MTEP) for fast-arriving needs, listed by MISO alongside ERAS and the ZGIA as its toolkit for large-load integration (loads seeking connection in 18-36 months; MISO cites ability to approve large loads within 120 days with all studies and GIAs signed).

SPP

Southwest Power Pool, Inc. RTO / ISO

First mover on conditional service. FERC approved the High Impact Large Load framework in January 2026, trading speed for curtailability: qualifying loads get interconnection agreements on a compressed timeline in exchange for accepting the lowest curtailment priority when the system is short.

Footprint: After its April 1, 2026 western RTO expansion (adding utilities in AZ, CO, MT, NE, NM, UT, WY, incl. Colorado Springs Utilities, Platte River, Tri-State, Basin Electric, NorthWestern Energy, three WAPA regions), SPP's RTO spans all or part of 17 states across ~732,000 sq mi serving ~20 million… Large-load queue: ERAS (Expedited Resource Adequacy Study) fast-track generation queue: ~13.3 GW across 36 active requests; separately, SPP told FERC that large-load interconnection request submissions peaked at… · Per a consultant analysis (CES), ~26.4 GW of interconnection requests since 2020 from facilities >100 MW, of which ~9 GW are data centers specifically; ~7 GW… (as of 2026-07-20)
Rulings, rules & filings
MeasureStatusWhat it doesSource
High Impact Large Load (HILL) study process, HILLGA, and Load Limited Resource Interconnection Service (LLRIS)ER26-247-000; order 194 FERC ¶ 61,031 Effective · Oct 24, 2025
approved / effective (unanimous; Commissioner Rosner concurrence; compliance filing due within 30 days)
Creates a HILL load category — new or increased commercial/industrial load of 10 MW+ at ≤69 kV or 50 MW+ at >69 kV at a single site (electric storage excluded) — with a 90-day study-and-approval path to interconnection agreements for loads paired with new or existing generation. HILLs must provide real-time telemetry, give the transmission operator remote-disconnect capability, hold ramp rates to no more than 20 MW/minute unless otherwise directed, install a PMU at customer expense, and meet ride-through…
Conditional High Impact Large Load Service (CHILLS) — non-firm bridge transmission serviceER26-1323-000; order 195 FERC ¶ 61,196 Effective · Feb 10, 2026
approved / effective
Adds a new as-available, non-firm transmission service letting customers serving HILLs take energy transfers to designated delivery points, subject to curtailment and interruption when the system is constrained or during emergency conditions, until designated resources and/or network upgrades supporting long-term firm service are in place. Maximum term is seven years, intended to push customers to complete firm-service arrangements through existing tariff processes. FERC found CHILLS just and reasonable given…
Expedited Resource Adequacy Study (ERAS) — one-time fast-track generation interconnection processER25-2296-000; order 192 FERC ¶ 61,062 Effective · Jul 21, 2025
approved / in execution (36 requests ~13.3 GW; GIAs anticipated September 2026)
One-time expedited interconnection framework for generation needed for member resource adequacy, adopted in response to queue backlogs and projected capacity deficits. As of SPP's July 2026 informational reports, 36 active requests totaling ~13.3 GW are in the process, with Generator Interconnection Agreement negotiation/execution expected in September 2026. Thermal resources lead the ERAS mix, followed by hybrid projects.
FERC Section 206 show cause order on large and co-located loads (one of six issued to all RTOs/ISOs)EL26-68-000; order 195 FERC ¶ 61,213 Filed · Jun 18, 2026
pending (SPP filed its 30-day informational report July 20, 2026; the 60-day show-cause response deadline passed Aug 17, 2026 — contents not yet…
FERC preliminarily found SPP's OATT appears unjust, unreasonable, or unduly discriminatory and directed SPP and 22 named transmission owners to either show cause or propose remedies on four gaps: (a) no requirement to evaluate alternative transmission technologies (GETs) or memorialize ongoing operational requirements in a transmission service agreement; (b) transparency on network upgrade costs, a pro forma cost recovery agreement, and a crediting mechanism to prevent cost shifting; (c) rates/terms for…
SPP informational report on resource adequacy for large loads (EL26-68 compliance)EL26-68-000 Filed · Jul 20, 2026 SPP argued its existing framework — ERAS, Provisional Load Process (Attachment AX), HILL/HILLGA, CHILLS, Peak Demand Assessment, and the Consolidated Planning Process — collectively addresses resource adequacy for new large loads and that no immediate tariff overhaul is required. Reported all 65 Load Responsible Entities met summer 2026 resource adequacy requirements, with the East Balancing Authority Area holding a 17.1% reserve margin (~5,752 MW excess capacity).
Price Adaptive Load / Price Adaptive Load Service (PAL/PALS) market participation modelnone yet (FERC filing targeted on or before Nov 16, 2026) Proposed · 2026
proposed / in stakeholder development
A new market participation model and non-firm transmission service for flexible, price-responsive large loads willing to curtail, developed partly in response to the EL26-68 show cause order's directive on flexible-load services. A draft Schedule 16 would assign PALS the lowest non-firm curtailment priority — curtailed before other non-firm customers and well before firm service. Target FERC filing on or before November 16, 2026.
Seasonal planning reserve margins — 36% winter / 16% summerSPP Planning Criteria Rev. 4.6 (published Feb 10, 2026) Effective · 2026
approved / effective
Load Responsible Entities must hold capacity of at least 36% above winter peak (first separately defined winter PRM) and 16% above summer peak, up from the prior 15% requirement in effect since 2023. The summer PRM is scheduled to rise to 17% in 2029. These requirements bind the capacity that must back any new large load served by an LRE.
Consolidated Planning Process (CPP) — merged transmission/interconnection/load planningFERC accepted March 13, 2026; effective March 1, 2026 (filed… Effective · Mar 13, 2026
approved / effective; first CPP planning cycle concludes 2028
Consolidates SPP's transmission planning, generator interconnection, and (large) load processes into a single planning framework, adopted in response to historic load growth, queue backlogs, escalating network-upgrade costs, and project withdrawals. First Interconnection Cluster Study queue window opened 30 days after the effective date; initial GRID-C rate publication expected by end of 2026.
CHILLS refinement revision requests RR767 / RR768SPP stakeholder revision requests (not yet a FERC filing) Proposed · 2026 RR767 clarifies how CHILL-related curtailment commitments must be defined, sequenced, and made operationally feasible; RR768 accommodates planned outages of generators supporting a CHILL while preserving SPP's ability to curtail for reliability. SPP is also developing refinements on resource commitment sequencing and minimum curtailment ramp rates.
Transmission & interconnection build
2025 Integrated Transmission Plan (ITP) portfolio · board-approved Nov 5, 2025; notices to construct being issued, with some 765-kV NTCs…
$8.6 billion in new and upgraded high-voltage projects across the 14-state (pre-expansion) footprint, approved by the SPP board Nov 5, 2025 — surpassing the prior-year record $7.65 billion portfolio. 765-kV backbone development is central (SPP: a 765-kV line carries about four times the power of a 345-kV line); projected $12-$18 in regional benefits per dollar invested. Driver: demand expected to double over the next decade, including data centers.
2026 ITP & CPP Transition Assessment · in progress (2026 study cycle)
The 2026 planning cycle runs as a combined ITP and Consolidated Planning Process transition assessment (scope document v1.3 published by SPP); 20-year load review incorporates future-driver large loads and electrification in peak-demand growth rates.
Western RTO expansion transmission integration · complete (effective April 1, 2026)
April 1, 2026 go-live added the West Balancing Authority with 12,552 miles of transmission (system total 85,531 miles across both interconnections), integrating western utilities across seven states into SPP RTO planning and markets — expanding the footprint within which large-load service and cost allocation are administered.
Highway/Byway cost allocation and large-load network upgrades (EL26-68 scope) · under review in Docket EL26-68 (responses due Aug 17, 2026)
SPP's existing stack — Attachment Z1 (aggregate transmission service studies), Attachment AQ (delivery point assessment), Attachment AX (provisional load process) — with Highway/Byway allocation (facilities ≥300 kV: 100% regional postage-stamp; >100 kV and <300 kV: 33% regional / 67% subregional) governs network upgrades for large loads; FERC's June 18, 2026 show cause order directs additional cost transparency, a pro forma cost recovery agreement, and a crediting mechanism to limit cost shifting from large-load-driven upgrades.

CAISO

California Independent System Operator Corporation (CAISO) RTO / ISO

The least queue-constrained major market, with a surplus above its reliability standard and a comparatively modest data-center forecast. Its large-load rules are still in stakeholder process, with a compliance filing targeted for November 16, 2026.

Footprint: Operates the high-voltage grid serving about 80 percent of California and a small part of Nevada; CPUC-jurisdictional load-serving entities represent approximately 91% of load in CAISO's service territory. Load interconnection occurs at the utility (PTO) level, not at the ISO — a structural fact… Large-load queue: CAISO runs no ISO-level large-load interconnection queue — load interconnects through the utilities. PG&E, where CAISO says data-center growth is most concentrated, reported a 12.7 GW data-center… · Pipeline figures are data-center-specific by PG&E's definition; CAISO's 2025-26 Transmission Plan attributes more than half of its 38 approved projects and… (as of 2026-06-30)
Rulings, rules & filings
MeasureStatusWhat it doesSource
FERC Order to Show Cause and Instituting Section 206 Proceeding — CAISO large loads and co-located loadsEL26-71-000 (195 FERC ¶ 61,214) Filed · Jun 18, 2026
pending (proceeding held in abeyance)
FERC preliminarily found CAISO and Participating TO tariffs may be unjust and unreasonable for large-load integration, noting the tariffs lack a large-load definition and that firm service is effectively the only option; it suggested a definition of 50 MW-plus at above 69 kV. One of six simultaneous show-cause orders to all FERC-jurisdictional RTOs/ISOs; responses to briefing questions were due August 17, 2026, with an option to move for up-to-90-day abeyance by August 3, 2026. FERC cited CEC's forecast of 1.8 GW…
CAISO Informational Report to FERC on large loads and co-located loadsEL26-71-000 Filed · Jul 20, 2026 Describes California's CEC-CPUC-CAISO integrated planning framework (2022 MOU), reporting nearly 36 GW of new generation and storage online January 2020-March 2026 (including over 16 GW of storage), CPUC orders for 24.8 GW of new net qualifying capacity between 2021 and 2032 (including 6 GW ordered in February 2026 for load growth including data centers), and a 2026 summer surplus over 2.5 GW. States the CEC — not CAISO — forecasts data-center load on the CAISO grid to grow 1.8 GW by 2030 and 4.9 GW by 2040 (as…
CAISO Motion for Abeyance in EL26-71; FERC acceptanceEL26-71-000 Proposed · Aug 3, 2026
granted
CAISO moved on August 3, 2026 to hold the show-cause proceeding in abeyance (capped at 90 days under the order's terms) while it completes the Large Loads stakeholder process and prepares a Federal Power Act Section 205 filing. FERC accepted the abeyance request on August 14, 2026. The abeyance supersedes the August 17, 2026 briefing-response deadline; the binding step is now the Section 205 filing CAISO targets for November 16, 2026.
CAISO Large Loads Considerations Straw Proposal (FILI/FLIP, 50 MW definition)Large Loads stakeholder initiative (feeds Section 205 filing in… Filed · Aug 11, 2026
proposed — comments due September 2, 2026
Proposes a tariff definition of Large Load as 'an End User located at a single site interconnecting to the CAISO Controlled Grid, and that has a peak load of 50 MW or greater' — omitting FERC's suggested 69 kV voltage floor, commercial/industrial qualifier, and co-location exclusion, and noting the definition may shift to align with pending NERC computational-load standards. Creates two flexible interconnection services: Flexible Interim Load Interconnection (FILI), a curtailable interim service until network…
CAISO Large Load Technical Requirements Straw Proposal and technical data requestLarge Loads stakeholder initiative Proposed · Jun 15, 2026 Posted June 15, 2026 within the Large Loads initiative, alongside a technical data request to large-load developers, covering technical/operational requirements for large loads (a working-group track that began with a March 10, 2026 technical requirements call). Feeds the same initiative that will produce the November 16, 2026 FERC filing.
CAISO comments on FERC ANOPR on interconnection of large loads to the interstate transmission systemRM26-4 Filed · Nov 21, 2025 CAISO filed comments November 21, 2025 on FERC's advance notice of proposed rulemaking on large-load interconnection, predating the June 2026 show-cause order in EL26-71.
CPUC Order Instituting Rulemaking on California Advanced Electric Rate Design (data-center rate design)R.26-04-009 Proposed · Apr 9, 2026
open — proceeding expected to run roughly 24 months
Statewide rate-design rulemaking whose scope includes whether dedicated rate tariffs or customer classifications should be created for data centers and other large transmission-connected loads, load-flexibility rate incentives, and cost-allocation protections against shifts to residential and small-business customers. In coordination with SB 57 (Padilla, Stats. 2025, ch. 647), which requires a CPUC assessment by January 1, 2027 of potential cost impacts from new large transmission-connected data-center loads on…
PG&E Electric Rule 30 — transmission-level interconnection tariff (interim approval and cost-allocation phase)A.24-11-007 Effective · Nov 21, 2024
interim tariff effective; final cost-allocation/refund decision pending (opening briefs April 10, 2026; reply briefs April 24, 2026)
Rule 30 creates a uniform tariff for transmission-level retail interconnection of large loads (the pathway most CAISO-area data centers use). Interim decision D.25-07-039 (July 2025) approved implementation conditioned on applicants paying up front for transmission infrastructure, with refund/cost-allocation methodology (including the Rule 15 BARC-style refund formula) deferred; a January 9, 2026 ruling ordered further testimony and set April 2026 briefs. PG&E's package includes minimum demand charges, 15-year…
CPUC approvals of site-specific PG&E data-center interconnection agreements (STACK, Microsoft, Google)Resolution E-5420; Resolution E-5439; Advice Letter 7785-E Effective · Oct 30, 2025
E-5420 and E-5439 approved; AL 7785-E pending
CPUC Resolution E-5420 (October 30, 2025) approved terms for STACK Infrastructure's 90 MW San Jose facility, and Resolution E-5439 (January 15, 2026) approved Microsoft's 90 MW San Jose facility, each with annual refunds capped at 75% of actual net revenues over 15 years. PG&E's Advice Letter 7785-E covering 250 MW of Google facilities in San Jose remains pending. These deviations preview the cost-allocation rules being litigated in A.24-11-007.
SB 57 (Padilla) — data-center cost-impact assessment mandateimplemented through CPUC R.26-04-009 Effective · 2025
effective; assessment due January 1, 2027
California statute requiring the CPUC to provide an assessment by January 1, 2027 on potential cost impacts from new, large transmission-connected data-center loads on electrical corporations and their customers. The CPUC is executing the mandate inside R.26-04-009.
CPUC February 2026 procurement order — 6 GW of net qualifying capacity by 2032 for load growthCPUC Integrated Resource Planning (per CAISO's EL26-71 report) Effective · 2026
adopted
In February 2026 the CPUC ordered load-serving entities to procure 6 GW of net qualifying capacity by 2032 specifically to account for projected load growth in the CEC's IEPR demand forecast, including growth driven by expected new data centers. This sits inside the cumulative 24.8 GW of new-resource obligations the CPUC requires online between 2021 and 2032.
Transmission & interconnection build
CAISO 2025-2026 Transmission Plan (Board-approved) · approved by CAISO Board of Governors May 19, 2026 (per CAISO news release)
38 projects, $6.7 billion at full buildout over the next decade (down from ~$7 billion in the April 2026 draft); more than half the projects and more than half the cost driven by forecasted load growth from electrification, manufacturing, and data centers. Based on state projections of +15 GW of California load by 2035 and +20 GW by 2040, with installed capacity to grow by more than 74 GW and 107 GW respectively. Named projects include the Tesla-Trimble-Metcalf 230 kV corridor expansion (Greater Bay Area/Silicon Valley supply), Trout Canyon-Lugo 500 kV…
Silicon Valley large-load transmission project in draft 2025-26 plan · carried into approved plan (as Bay Area corridor expansion)
CAISO's April 2026 draft transmission plan (38 recommended upgrades, ~$7 billion) included a roughly $1.4 billion project serving Silicon Valley large loads, per RTO Insider; the final plan carries the Tesla-Trimble-Metcalf 230 kV corridor expansion for Bay Area supply.
2026-2027 transmission planning process (higher load forecast) · in progress
CAISO is analyzing the CPUC's most recently adopted resource portfolio — which accounts for a higher load forecast than the prior cycle and sensitivity cases with higher electrification and load growth — in its 2026-2027 planning cycle; the 2025-2026 studies had evaluated portfolios with 40 GW of additional resource development over the next decade. Additional transmission investment decisions expected in the 2026-27 plan (spring 2027).
PG&E transmission-level interconnection buildout for data centers (Rule 30) · active; interim tariff in effect, cost-allocation decision pending at CPUC
PG&E is engineering transmission-level interconnections for a 12.7 GW data-center pipeline (June 2026), concentrated in San Jose/Silicon Valley and the greater Bay Area with projects also in the Central Valley and Sacramento; 4 projects (490 MW) hold executed interconnection construction agreements. Under interim Rule 30, applicants fund necessary transmission infrastructure up front in exchange for accelerated connection.

NYISO

New York Independent System Operator, Inc. RTO / ISO

Constrained by state policy as much as by the grid. Gov. Hochul's Executive Order 62 holds state environmental permits for new hyperscale data centers pending a Generic Environmental Impact Statement, and NYISO's own planning shows a statewide resource adequacy violation beginning in 2033, with New York City needs emerging as early as 2031.

Footprint: Operates the bulk power grid and wholesale markets for all of New York State; summer 2026 forecast peak 31,578 MW against 40,872 MW of total capability resources; NYISO called its start-of-summer 2026 baseline margin of 417 MW the lowest in recent history (deficits of 1,679 MW under 90/10 and… Large-load queue: ~12 GW of large-load demand (48 projects) as of Dec 31, 2025 per NYISO; ~11.9 GW across 48 projects as of June 22, 2026 per third-party tracker; up from 6 projects / 1 GW in 2022 · EO 62 recites nearly 12 GW of data-center load requests in the NYISO queue as of May 2026 — i.e., the large-load queue is essentially all data-center-driven;… (as of 2026-06-22)
Rulings, rules & filings
MeasureStatusWhat it doesSource
FERC Section 206 show cause order to NYISO and NY transmission owners on large-load integrationEL26-69-000 Filed · Jun 18, 2026
pending (Section 206 proceeding open)
One of six simultaneous show cause orders to all FERC-jurisdictional RTOs/ISOs, prompted by NERC findings of the fastest demand growth in two decades driven by data centers. FERC preliminarily found NYISO's tariff may be unjust and unreasonable because it lacks clear application, study, and operational rules for large loads, and flagged cost-shifting risk, transparency on network-upgrade assignment, and a pro forma cost-recovery agreement so large loads bear their own upgrade costs. NYISO had 60 days (to Aug 17,…
NYISO informational report to FERC on resource adequacy for large loadsEL26-69-000 Filed · Jul 20, 2026 NYISO's report described existing planning and market processes, acknowledged emerging risk from large-load growth and an aging fleet, and disclosed preliminary 2026 RNA results: a potential statewide resource adequacy violation beginning in 2033 with a deficiency greater than 1,800 MW, and more localized New York City needs beginning as early as 2031. It outlined reforms under stakeholder consideration — an accelerated interconnection study path for reliability-need resources, streamlined repowering treatment,…
Abeyance motions by NYISO, New York Transmission Owners, and non-incumbent TOs in the show cause proceedingEL26-69-000 Filed · Aug 3, 2026
pending FERC ruling as of this research (Aug 24, 2026)
NYISO, the NYTOs, and non-incumbent transmission owners each moved to hold the show cause proceeding in abeyance for 90 days so reforms could be developed through the stakeholder process for a Section 205 filing. FERC issued a notice establishing an answer period with answers due Aug 7, 2026. FERC had said it would heavily scrutinize abeyance requests, cap any abeyance at 90 days, and disfavor extensions; all six RTOs/ISOs sought abeyance.
NYISO large-load interconnection process reform (stakeholder track, incl. BELL/BOLT concept)none yet (NYISO stakeholder process; FERC filing planned) Proposed · Feb 3, 2026
proposed (concept/straw-proposal stage)
NYISO is revising its load interconnection procedures, which currently apply to loads over 10 MW at 115 kV+ or 80 MW+ below 115 kV, to add mandatory (rather than informational) study procedures, clearer modification rules, and defined reliability-planning milestones. Concept materials describe a NYISO-led process for Large Loads (reported as 50 MW+ at higher voltage, dubbed BELL) and a TO-led track for Sizeable Loads (reported 10-50 MW, dubbed BOLT), a firm vs. non-firm withdrawal service split (non-firm subject…
NY PSC Order Instituting Proceeding — Interconnection Reforms for Large Loads (Energize NY Development)Case 26-E-0045 Filed · Feb 12, 2026
pending (comment phases closed; technical conference and staff white paper ahead)
The New York Public Service Commission opened a proceeding to reform planning, interconnection, cost-allocation, and tariff structures for large loads on state-jurisdictional transmission and distribution, implementing Gov. Hochul's Energize NY Development initiative to make projects that drive significant system demand pay their fair share of costs. Stakeholder comments on eight appendix questions were due April 13, 2026, replies May 13, 2026; a technical conference is due before Dec 31, 2026 and a DPS Staff…
New York Executive Order No. 62 — statewide moratorium on hyperscale data centers 50 MW+EO No. 62 Effective · Jul 14, 2026
effective; one-year term to July 14, 2027
First statewide data-center permitting moratorium in the U.S. DEC must pause issuance of discretionary environmental permits for construction or expansion of data centers that consume or can consume 50 MW or more, while DPS completes a Generic Environmental Impact Statement on cumulative energy, water, air, community, and noise impacts; permitting resumes only after the GEIS. Applications already deemed complete by DEC before July 14, 2026 are exempt, as are facilities primarily for manufacturing, research,…
Responsible Data Center Development ActS.10642 / A.11560 Effective · Jun 4, 2026
passed both houses; not yet delivered to or signed by the Governor as of August 2026
Would impose a one-year moratorium on DEC permits and approvals for new large data centers at a 20 MW threshold — broader than EO 62's 50 MW interim approach. The bill must be delivered to the Governor before Dec 31, 2026; once delivered she has 10 days to sign, negotiate amendments, or veto. Hochul has not stated a position.
2026 Reliability Needs Assessment — preliminary resultsNYISO comprehensive system planning process (ESPWG/TPAS) Effective · Jul 23, 2026
preliminary; draft report expected September 2026, final approval/publication later in 2026
Preliminary 2026 RNA results show New York violating its resource adequacy criterion beginning in 2033 with a statewide deficiency greater than 1,800 MW, widening each year, plus localized New York City needs as early as 2031. NYISO characterizes the deficiency as a supply shortfall, not a transmission bottleneck. RNA scenarios under review take data-center/large-load demand toward roughly 4,100 MW by 2036 versus a 2,700 MW base case. Context: the Nov 26, 2025 Comprehensive Reliability Plan had already warned of…
Transmission & interconnection build
Champlain Hudson Power Express (CHPE) · In service — commercial operation date May 13, 2026 (ahead of schedule); commercial…
1,250 MW HVDC, 339-mile fully buried line delivering Hydro-Quebec hydropower to a converter station in Queens; ~$6 billion; expected 10.4 TWh/yr, close to 20% of New York City's electricity. Directly relevant to the NYC locational needs the 2026 RNA flags from 2031. Caveat: NYISO said in August 2026 that CHPE had not yet demonstrated full capability, and the Danskammer plant will stay online into 2027 amid the ripple effects on reliability planning.
Propel NY Energy · Article VII permitting: application filed July 31, 2024; joint proposal submitted 2026…
~90-mile, six-segment underground transmission project (NYPA/New York Transco) across Long Island, Queens, the Bronx, and Westchester, discussed at ~$3.2 billion; the NYISO-selected Long Island Public Policy Transmission Need project moving power bidirectionally between Westchester and Nassau/Suffolk — expands the constrained downstate/Long Island grid where the RNA sees early needs.
EO 62 DPS transmission/infrastructure workstreams · Working group establishment due ~September 12, 2026; DPS transmission report due…
EO 62 directs DPS to form a Data Center Interconnection Working Group (to consider measures such as a New York Grid Acceleration Fund) and to produce a transmission report — the state-side planning response to ~12 GW of data-center queue requests; ESD must issue a Community Investment Framework for host localities.

ISO-NE

ISO New England Inc. RTO / ISO

Has seen little large-load growth so far and is legislating ahead of it: its show-cause response proposes requiring new large loads to bring their own new generation and excluding them from the Installed Capacity Requirement so their costs do not shift onto existing ratepayers.

Footprint: Connecticut, Maine, Massachusetts, New Hampshire, Rhode Island, Vermont; 7.6 million retail electricity customers, population 15.1 million; ~9,000 miles of high-voltage transmission (115 kV+); ~29,300 MW of generating capability; $11.3 billion traded in wholesale markets in 2025 Large-load queue: 0.285 GW — two proposed large-load projects in the formal study phase could reach 285 MW combined maximum demand; forecast peak contribution ~110 MW (summer/winter) in the 2030s rising to ~130 MW in… · Effectively the entire large-load forecast; ~800 GWh/yr consumption 2030-2035 rising to ~1,000 GWh/yr in the 2040s; no system demand impact expected before… (as of 2026-05-01)
Rulings, rules & filings
MeasureStatusWhat it doesSource
FERC show cause order on large load and co-located load integration (195 FERC ¶ 61,215)EL26-72-000 Filed · Jun 18, 2026
pending — abeyance granted; Section 205 filing due Nov 16, 2026
FERC opened an FPA Section 206 proceeding against ISO-NE and the Participating Transmission Owners, preliminarily finding the tariff unjust and unreasonable because it lacks large-load and co-located-load integration provisions. The order identifies five reform categories: transmission service application/study procedures (60-90 day study timelines), cost transparency and cost-shifting protections, co-location/behind-the-meter generation rules, new transmission services for flexible loads (interim NITS, firm and…
ISO-NE Informational Report on resource adequacy for large loadsEL26-72-000 Filed · Jul 20, 2026 All six RTOs/ISOs filed the informational reports FERC required within 30 days of the show cause orders. ISO-NE's report states New England load has been flat or declining for a decade, the region is long on supply with a largely uncongested system, and it has not yet encountered significant large-load growth. It gives first formal notice of two large-load-specific reforms — a bring-your-own-new-generation (BYONG) requirement and exclusion of new large loads from the Installed Capacity Requirement — with detailed…
Joint ISO-NE/PTO abeyance motion and FERC grant in the show cause proceedingEL26-72-000 Proposed · Aug 3, 2026
granted — proceeding held in abeyance up to 90 days
Rather than answer the show cause order on Aug 17, ISO-NE and the PTOs jointly moved on Aug 3, 2026 to hold the proceeding in abeyance, which FERC's order allowed for up to 90 days from the response deadline. ISO Newswire reports FERC granted the request on Aug 14, 2026. ISO-NE plans a Federal Power Act Section 205 filing by Nov 16, 2026 addressing all five reform categories after a NEPOOL stakeholder process.
Bring-your-own-new-generation (BYONG) requirement for new large loadsEL26-72-000 (notice expected in Nov 16, 2026 Section 205 filing) Filed · Jul 20, 2026
proposed — detailed implementing rules to be filed in 2027
ISO-NE proposes that new large loads (e.g., large data centers) be responsible for bringing their own incremental new energy supply or be subject to curtailment; the capacity market would not procure incremental capacity on their behalf. ISO-NE intends rules similar to SPP's CHILLS (Conditional High Impact Large Load Service), allowing transmission customers serving large loads to receive energy until sufficient designated resources and network upgrades are in place, subject to…
Exclusion of new large loads from the Installed Capacity Requirement (ICR)EL26-72-000 (notice expected in Nov 16, 2026 Section 205 filing) Filed · Jul 20, 2026
proposed — detailed implementing rules to be filed in 2027
Companion to BYONG: ISO-NE preliminarily proposes to exclude new large loads from the system load forecasts used to set the capacity market's demand curves and Installed Capacity Requirement, so the capacity market does not procure capacity on their behalf and costs do not shift to traditional ratepayers. ISO-NE anticipates a notice statement in its compliance filing and detailed implementing rules regarding the capacity market exclusion in 2027.
Capacity Auction Reforms Phase 1 (CAR-PD): prompt auction and faster deactivationER26-925-000 Effective · Dec 31, 2025
approved — implementation for the capacity commitment period beginning June 1, 2028
Replaces the three-year-forward Forward Capacity Auction with a prompt auction held roughly one month before the delivery period, and shortens the resource deactivation process from four years to one. The first prompt auction is planned for 2028, one to two months before the June 1, 2028 start of the capacity commitment period. Binds all capacity market participants in New England.
Capacity Auction Reforms Phase 2 (CAR-SA): seasonal auctions and accreditationnot yet filed Proposed · 2026
proposed — FERC filing planned end of 2026
Splits the annual capacity commitment period into separate summer and winter seasonal auctions and adopts a marginal-reliability-impact-based capacity accreditation methodology, including treatment of the constrained gas system. If approved, the first prompt and seasonal auction would be administered in May 2028 for the commitment period beginning June 1, 2028.
Pay for Performance rate reduction filingER26-3047-000 Filed · Jul 2026
pending as of July 23, 2026
ISO-NE filed a downward adjustment to the capacity market Performance Payment Rate to $3,500/MWh to reduce resource participation risk while preserving performance incentives. Cited in ISO-NE's resource adequacy report as part of the toolkit relevant to serving load growth.
Transmission & interconnection build
2050 Transmission Study (first Longer-Term Transmission Study) · completed — final study published February 2024
Concluded cumulative transmission upgrade costs of $17 billion to reliably serve a 51 GW regional peak in 2050, or $26 billion for a 57 GW peak, driven by electrification; the baseline for New England's longer-term planning framework under which any future large-load growth would be studied
Longer-Term Transmission Planning (LTTP) 2025 RFP — preliminary preferred solution (CMP/Avangrid + Eversource) · preliminary preferred solution selected July 28, 2026; draft report public comments ran…
$2.2 billion project: ~170 miles of upgrades to existing high-voltage lines across four Maine segments plus southern New Hampshire to Pittsfield, ME, raising north-south transfer capability between northern Maine and southern New England and enabling 1,200 MW of planned Aroostook County wind; six proposals were received from four sponsors under the first-in-the-nation competitive solicitation NESCOE directed to address 2050 Transmission Study needs; potential in-service late 2032; relevance to large loads is added transfer headroom into the southern…
Show-cause-driven large-load transmission service reforms · to be addressed in ISO-NE/PTO Section 205 filing due Nov 16, 2026
FERC's EL26-72 order directs tariff provisions for large-load transmission service: rolling applications with a non-refundable fee, 60-90 day study timelines, public posting of aggregate large-load additions by pricing zone with network upgrade cost estimates, a pro forma cost recovery agreement with minimum contribution to the transmission owner's revenue requirement, and three new services for flexible large loads (interim non-firm NITS during upgrades, firm contract demand, non-firm contract demand)
Surplus Interconnection Service reforms · stakeholder design underway in 2026
ISO-NE is evaluating rules to let new generating facilities speed interconnection by co-locating at points of interconnection with existing resources that have headroom; gap analysis and design concepts being presented to stakeholders through 2026 — a pathway relevant to generation additions that would pair with large loads

FERC

Federal Energy Regulatory Commission Federal regulator

Forced the entire question onto the national calendar. On June 18, 2026 FERC issued Section 206 show-cause orders to all six jurisdictional RTOs and ISOs, preliminarily finding their tariffs unjust and unreasonable for lacking clear large-load and co-located-load rules, and set an August 17, 2026 response deadline. Every operator framework on this page traces to those orders.

Footprint: Jurisdiction over wholesale power markets and interstate transmission nationwide; its June 2026 large-load actions bind all six jurisdictional RTOs/ISOs — PJM, MISO, SPP, CAISO, NYISO, ISO-NE — and their transmission owners. Composition as of 2026: five commissioners, 3-2 Republican — Chairman… Large-load queue: No single national large-load queue figure; per the July 20, 2026 reports: SPP's ERAS process holds 36 active requests (~13.3 GW); CAISO projects data-center load on its grid growing 1.8 GW by 2030… · Not uniformly quantified across the six reports; MISO has been reported as the fastest-growing data-center region, with data-center capacity growing at a 43%… (as of 2026-07-20)
Rulings, rules & filings
MeasureStatusWhat it doesSource
Six FPA Section 206 show-cause orders on large-load integration — EL26-67 (PJM), EL26-68 (SPP), EL26-69 (NYISO), EL26-70 (MISO),…EL26-67-000 through EL26-72-000 Filed · Jun 18, 2026
pending — responses filed August 17, 2026; 30-day comment window follows
FERC preliminarily found each RTO/ISO tariff appears unjust, unreasonable, or unduly discriminatory for lack of clear, consistent provisions addressing integration of large and co-located loads. Orders bind each RTO/ISO and its transmission owners; large load defined as a new commercial/industrial customer at a single site with peak demand of 50 MW or more interconnecting at transmission voltage above 69 kV, excluding co-location arrangements. Five reform topics: (1) large-load transmission service…
Generation-adequacy informational reports filed by all six RTOs/ISOsEL26-67-000 through EL26-72-000 Filed · Jul 20, 2026 Each RTO/ISO reported how it will ensure adequate generation for existing and new large loads. PJM cited its Reliability Backstop Procurement (RBP) mechanism via the Critical Issue Fast Path and its Expedited Interconnection Track (EIT, accepted June 9, 2026). SPP cited ERAS, CHILLS (effective July 1, 2026), and a planned Price Adaptive Load Service. MISO said it would file a Zero Injection Generator Interconnection Agreement (~July 31, 2026) and a Large Load Parallel Study Process (~end of September 2026). NYISO…
Show-cause responses due from six RTOs/ISOs and transmission ownersEL26-67-000 through EL26-72-000 Filed · Aug 17, 2026
filed (deadline passed; CAISO response confirmed in trade coverage)
Each RTO/ISO was required to either justify its existing tariff or propose remedial tariff revisions. CAISO published a Large Load Considerations straw proposal August 12, 2026 answering EL26-71, proposing two new flexible interconnection services and a 50 MW single-site large-load definition. Interested parties then have 30 days to comment on whether the existing tariffs are just and reasonable or what changes should be adopted. FERC has not announced a decision date on the responses.
Large-load interconnection rulemaking docket (DOE-directed ANOPR) — no NOPR issued; docket held openRM26-4-000 Proposed · Oct 23, 2025
open — FERC acted June 18, 2026 via the six Section 206 show-cause orders instead of a NOPR, leaving the ANOPR docket open 'for further potential…
By letter dated October 23, 2025, Energy Secretary Chris Wright directed FERC to consider an ANOPR on timely, orderly interconnection of large loads (generally defined there as demand greater than 20 MW), including standardized load-interconnection procedures and joint co-located load/generation requests; DOE's proposal contemplated a final rule by April 30, 2026. FERC opened RM26-4-000 on October 27, 2025, drew thousands of pages of comments (including NERC's accelerated large-load action plan), and in April…
PJM co-located load Section 206 proceeding instituted from technical-conference recordEL25-49-000 (record from AD24-11-000 technical conference, Large… Proposed · Feb 20, 2025
instituted (superseded by substantive orders below)
On February 20, 2025, FERC instituted a show-cause proceeding under FPA Section 206 into whether PJM tariff provisions governing co-location of generation and load are just and reasonable, drawing on the record of the commissioner-led technical conference on large loads co-located at generating facilities (Docket AD24-11-000) and related complaint proceedings. PJM filed its response March 24, 2025.
FERC order on PJM co-located load — tariff found unjust and unreasonable; new co-location framework orderedEL25-49-000 et al.; 193 FERC ¶ 61,217 Effective · Dec 18, 2025
issued; compliance ongoing
FERC found PJM's tariff unjust and unreasonable for failing to clearly and consistently specify rates, terms, and conditions for co-location arrangements and for lacking transmission services reflecting that co-located customers may limit withdrawals. It directed PJM to offer three service options for co-located load: interim non-firm NITS (until network upgrades complete), Firm Contract Demand (specified MW withdrawal, firm curtailment priority, minimum 1-year term), and Non-Firm Contract Demand (as-available,…
FERC order partially accepting/rejecting PJM co-location compliance filingER26-1088 (compliance to EL25-49) Effective · Apr 16, 2026
issued; further compliance filed May 18, 2026 (ER26-1088-001), pending FERC review
FERC partially accepted and partially rejected PJM's compliance filing implementing the December 2025 co-location order. It accepted tariff reforms clarifying interconnection pathways but rejected PJM's attempt to alter the Commission-mandated definition of 'Co-Located Load' and to revise behind-the-meter application requirements. PJM filed its further compliance response May 18, 2026 in Docket ER26-1088-001.
FERC order on rehearing and compliance in PJM co-location proceeding — new transmission-service terms accepted in partEL25-49-002, et al. Effective · Jun 18, 2026
issued; PJM directed to make further tariff revisions
Issued the same day as the six show-cause orders, this order addressed rehearing requests of the December 18, 2025 co-location order (accepting in part, rejecting in part), accepted certain rates, terms, and conditions for the three new transmission services applicable to co-located load in PJM, and accepted in part and rejected in part PJM's compliance filing while directing PJM to revise its proposed interconnection processes and transmission service options for load with co-located and behind-the-meter…
Rejection of amended Talen/Susquehanna interconnection service agreement (Amazon co-located data center)ER24-2172-000 Rejected · Nov 1, 2024
rejected (2-1); rehearing deferred December 23, 2024 (ER24-2172-002); Fifth Circuit petition for review briefed August 2025
FERC rejected PJM's amended ISA that would have increased behind-the-meter co-located load at Talen's Susquehanna nuclear plant from 300 MW to 480 MW (toward sales of up to 960 MW in 120-MW increments to an adjacent AWS data center), holding on a 2-1 vote (Christie and See in the majority; Chairman Phillips dissenting; Rosner and Chang not participating) that PJM had not shown the non-conforming provisions were necessary due to specific reliability concerns, novel legal issues, or other unique factors. Talen…
SPP large-load service frameworks accepted — HILL/CHILLS effective; PALS filing plannedSPP tariff filings (HILL approved January 2026; CHILLS effective… Effective · Jul 1, 2026 FERC approved SPP's High Impact Large Load (HILL) framework in January 2026, and SPP's Conditional High Impact Large Load Service (CHILLS) took effect July 1, 2026, providing conditional service terms for large loads ahead of full study completion. SPP targets a Section 205 filing for a Price Adaptive Load Service (PALS) on November 16, 2026. SPP's Expedited Resource Adequacy Study (ERAS) held 36 active requests (~13.3 GW) as of its July 20, 2026 informational report.
PJM Expedited Interconnection Track (EIT) acceptedPJM Section 205 filing (accepted June 9, 2026) Proposed · Jun 9, 2026
accepted
FERC accepted PJM's Expedited Interconnection Track, cited in PJM's July 20, 2026 informational report as a mechanism to accelerate generation additions serving large-load growth, alongside PJM's Reliability Backstop Procurement (RBP) proposals developed through the Critical Issue Fast Path (Board proposals expected July 31 and August 7, 2026).
Order on Rehearing, Clarification, Compliance Filing, and Paper Hearing re PJM Interconnection, L.L.C. et al. under EL25-49. Commissioner Chang is concurring with a separate statement attached.FERC EL25-49, Accession 20260618-3103 Order · Jun 18, 2026
SECRETARY OF THE COMMISSION - FERC, COMMISSIONERS AND IMMEDIATE STAFF (THE COMMISSION)
FERC issued Order on Rehearing, Clarification, Compliance Filing, and Paper Hearing re PJM Interconnection, L.L.C. et al. under EL25-49. Commissioner Chang is concurring with a separate statement attached. in Docket EL25-49 on Jun 18, 2026.
Vistra Corp. submits Request for Clarification or, in the Alternative, Rehearing of the 06/18/2026 Order under EL25-49, et al.FERC EL25-49, Accession 20260720-5170 Filed · Jul 20, 2026
Vistra Corp., Vistra Corp., Vistra Corp.; also docketed in AD24-11-002, EL25-20-002, ER26-1479-001
Vistra Corp., Vistra Corp., Vistra Corp. filed Vistra Corp. submits Request for Clarification or, in the Alternative, Rehearing of the 06/18/2026 Order under EL25-49, et al. in FERC Docket EL25-49 on Jul 20, 2026.
Exelon Corporation and FirstEnergy Service Company submit Request for Rehearing of the 06/18/2026 Order under EL25-49, et al.FERC EL25-49, Accession 20260720-5180 Filed · Jul 20, 2026
Exelon Corporation, The FirstEnergy Transmission Companies, Exelon Corporation; also docketed in EL25-20-002, AD24-11-002, ER26-1479-001
Exelon Corporation, The FirstEnergy Transmission Companies, Exelon Corporation filed Exelon Corporation and FirstEnergy Service Company submit Request for Rehearing of the 06/18/2026 Order under EL25-49, et al. in FERC Docket EL25-49 on Jul 20, 2026.
Constellation Energy Generation, LLC submits Limited Request for Rehearing and Clarification of the 06/18/2026 Order under EL25-49, et al.FERC EL25-49, Accession 20260720-5181 Filed · Jul 20, 2026
Constellation Energy Generation, LLC; also docketed in EL25-20-002, AD24-11-002, ER26-1479-001
Constellation Energy Generation, LLC filed Constellation Energy Generation, LLC submits Limited Request for Rehearing and Clarification of the 06/18/2026 Order under EL25-49, et al. in FERC Docket EL25-49 on Jul 20, 2026.
Eolian, L.P., et. al. submit Request for Clarification or, in the Alternative, Rehearing of the 06/18/2026 Order under EL25-49, et al.FERC EL25-49, Accession 20260720-5199 Filed · Jul 20, 2026
Calibrant Energy, Eolian, L.P., Verrus LLC; also docketed in AD24-11-002, ER26-1479-001, EL25-20-002
Calibrant Energy, Eolian, L.P., Verrus LLC filed Eolian, L.P., et. al. submit Request for Clarification or, in the Alternative, Rehearing of the 06/18/2026 Order under EL25-49, et al. in FERC Docket EL25-49 on Jul 20, 2026.
The PJM Industrial Customer Coalition, et al. submit Request for Rehearing and Clarification of the 06/18/2026 Order under EL25-49, et al.FERC EL25-49, Accession 20260720-5200 Filed · Jul 20, 2026
PJMICC, et al.; also docketed in EL25-20-002, AD24-11-002, ER26-1479-001
PJMICC, et al. filed The PJM Industrial Customer Coalition, et al. submit Request for Rehearing and Clarification of the 06/18/2026 Order under EL25-49, et al. in FERC Docket EL25-49 on Jul 20, 2026.
The Indicated PJM Transmission Owners submit Request for Rehearing and Clarification of the 06/18/2026 Order under EL25-49, et al.FERC EL25-49, Accession 20260720-5201 Filed · Jul 20, 2026
Indicated PJM Transmission Owners, Indicated PJM Transmission Owners, Indicated PJM Transmission Owners; also docketed in EL25-20-002, ER26-1479-001, AD24-11-002
Indicated PJM Transmission Owners, Indicated PJM Transmission Owners, Indicated PJM Transmission Owners filed The Indicated PJM Transmission Owners submit Request for Rehearing and Clarification of the 06/18/2026 Order under EL25-49, et al. in FERC Docket EL25-49 on Jul 20, 2026.
Motion for Extension of Time for Specified Compliance Requirements and Request for Expedited Treatment of PJM Interconnection, L.L.C. under EL25-49 et al.FERC EL25-49, Accession 20260728-5072 Filed · Jul 28, 2026
PJM Interconnection, L.L.C., PJM Interconnection, L.L.C.; also docketed in EL25-20-001, ER26-1479-000, AD24-11-001
PJM Interconnection, L.L.C., PJM Interconnection, L.L.C. filed Motion for Extension of Time for Specified Compliance Requirements and Request for Expedited Treatment of PJM Interconnection, L.L.C. under EL25-49 et al. in FERC Docket EL25-49 on Jul 28, 2026.
Motion for Extension of Compliance Deadline of the Indicated PJM Transmission Owners and Request for Expedited Action and Shortened Comment Period under EL25-49 et al.FERC EL25-49, Accession 20260728-5073 Filed · Jul 28, 2026
Indicated PJM Transmission Owners, Indicated PJM Transmission Owners, Indicated PJM Transmission Owners; also docketed in AD24-11-001, EL25-20-001, ER26-1479-000
Indicated PJM Transmission Owners, Indicated PJM Transmission Owners, Indicated PJM Transmission Owners filed Motion for Extension of Compliance Deadline of the Indicated PJM Transmission Owners and Request for Expedited Action and Shortened Comment Period under EL25-49 et al. in FERC Docket EL25-49 on Jul 28, 2026.
Answer in Support of the PJM Industrial Customer Coalition to the Motions for Extension and Abeyance by PJM Interconnection, L.L.C. under EL25-49 et al.FERC EL25-49, Accession 20260803-5106 Filed · Aug 3, 2026
PJM Industrial Customer Coalition; also docketed in AD24-11-001, EL25-20-001, ER26-1479-000, EL26-67-000
PJM Industrial Customer Coalition filed Answer in Support of the PJM Industrial Customer Coalition to the Motions for Extension and Abeyance by PJM Interconnection, L.L.C. under EL25-49 et al. in FERC Docket EL25-49 on Aug 3, 2026.
Order Instituting Proceeding Under Section 206 etc. re PJM Interconnection, L.L.C. et al. under EL26-67. Chairman Swett and Comm'rs Rosner, See, Chang, and LaCerte are concurring w/ sep. stmts. attached. For errata see accession numberFERC EL26-67, Accession 20260618-3105 Order · Jun 18, 2026
COMMISSIONERS AND IMMEDIATE STAFF (THE COMMISSION), SECRETARY OF THE COMMISSION - FERC
FERC issued Order Instituting Proceeding Under Section 206 etc. re PJM Interconnection, L.L.C. et al. under EL26-67. Chairman Swett and Comm'rs Rosner, See, Chang, and LaCerte are concurring w/ sep. stmts. attached. For errata see accession number 20260813-3025. in Docket EL26-67 on Jun 18, 2026.
Notice of Institution of Section 206 Proceeding and Refund Effective Date re PJM Interconnection, L.L.C. et al. under EL26-67.FERC EL26-67, Accession 20260618-3111 Order · Jun 18, 2026
SECRETARY OF THE COMMISSION - FERC
FERC issued Notice of Institution of Section 206 Proceeding and Refund Effective Date re PJM Interconnection, L.L.C. et al. under EL26-67. in Docket EL26-67 on Jun 18, 2026.
The Pennsylvania Office of Consumer Advocate submits Request for Clarification or, in the alternative, Rehearing of the 06/18/2026 Order under EL26-67.FERC EL26-67, Accession 20260717-5246 Filed · Jul 17, 2026
Pennsylvania Office of Consumer Advocate, Pennsylvania Office of Consumer Advocate, Pennsylvania Office of Consumer Advocate
Pennsylvania Office of Consumer Advocate, Pennsylvania Office of Consumer Advocate, Pennsylvania Office of Consumer Advocate filed The Pennsylvania Office of Consumer Advocate submits Request for Clarification or, in the alternative, Rehearing of the 06/18/2026 Order under EL26-67. in FERC Docket EL26-67 on Jul 17, 2026.
The Maryland Office of People's Counsel, et al. submit Request for Rehearing of the 06/18/2026 Order under EL26-67.FERC EL26-67, Accession 20260717-5258 Filed · Jul 17, 2026
Maryland Office of People's Counsel, DELAWARE DIVISION OF THE PUBLIC ADVOCATE, OHIO CONSUMERS' COUNSEL
Maryland Office of People's Counsel, DELAWARE DIVISION OF THE PUBLIC ADVOCATE, OHIO CONSUMERS' COUNSEL filed The Maryland Office of People's Counsel, et al. submit Request for Rehearing of the 06/18/2026 Order under EL26-67. in FERC Docket EL26-67 on Jul 17, 2026.
Exelon Corporation and FirstEnergy Service Company submit Request for Rehearing of the 06/18/2026 Order under EL26-67.FERC EL26-67, Accession 20260720-5172 Filed · Jul 20, 2026
Exelon Corporation, Exelon Corporation, The FirstEnergy Transmission Companies
Exelon Corporation, Exelon Corporation, The FirstEnergy Transmission Companies filed Exelon Corporation and FirstEnergy Service Company submit Request for Rehearing of the 06/18/2026 Order under EL26-67. in FERC Docket EL26-67 on Jul 20, 2026.
The Indicated PJM Transmission Owners submit Request for Clarification, or in the Alternative, Rehearing of the 06/18/2026 Order under EL26-67.FERC EL26-67, Accession 20260720-5198 Filed · Jul 20, 2026
Indicated PJM Transmission Owners, Indicated PJM Transmission Owners, Indicated PJM Transmission Owners
Indicated PJM Transmission Owners, Indicated PJM Transmission Owners, Indicated PJM Transmission Owners filed The Indicated PJM Transmission Owners submit Request for Clarification, or in the Alternative, Rehearing of the 06/18/2026 Order under EL26-67. in FERC Docket EL26-67 on Jul 20, 2026.
PJM Interconnection, L.L.C. submits Informational Report in compliance with the Commission’s 06/18/2026 Show Cause Order under EL26-67.FERC EL26-67, Accession 20260720-5203 Filed · Jul 20, 2026
PJM Interconnection, L.L.C.
PJM Interconnection, L.L.C. filed PJM Interconnection, L.L.C. submits Informational Report in compliance with the Commission’s 06/18/2026 Show Cause Order under EL26-67. in FERC Docket EL26-67 on Jul 20, 2026.
Eolian, L.P. submits Limited Request for Clarification or, In the Alternative, Rehearing of the 06/18/2026 Order Instituting Proceedings Under Section 206 of the Federal Power Act under EL26-67, et al.FERC EL26-67, Accession 20260720-5218 Filed · Jul 20, 2026
Eolian, L.P.; also docketed in EL26-70-001, EL26-71-001, EL26-69-001, EL26-72-001
Eolian, L.P. filed Eolian, L.P. submits Limited Request for Clarification or, In the Alternative, Rehearing of the 06/18/2026 Order Instituting Proceedings Under Section 206 of the Federal Power Act under EL26-67, et al. in FERC Docket EL26-67 on Jul 20, 2026.
Motion for Abeyance of the Indicated PJM Transmission Owners and Request for Expedited Action and Shortened Comment Period under EL26-67.FERC EL26-67, Accession 20260728-5071 Filed · Jul 28, 2026
Indicated PJM Transmission Owners, Indicated PJM Transmission Owners, Indicated PJM Transmission Owners
Indicated PJM Transmission Owners, Indicated PJM Transmission Owners, Indicated PJM Transmission Owners filed Motion for Abeyance of the Indicated PJM Transmission Owners and Request for Expedited Action and Shortened Comment Period under EL26-67. in FERC Docket EL26-67 on Jul 28, 2026.
Motion of PJM Interconnection, L.L.C. to Hold Proceeding in Abeyance and Request for Shortened Answer Period and Expedited Treatment under EL26-67.FERC EL26-67, Accession 20260728-5084 Filed · Jul 28, 2026
PJM Interconnection, L.L.C.
PJM Interconnection, L.L.C. filed Motion of PJM Interconnection, L.L.C. to Hold Proceeding in Abeyance and Request for Shortened Answer Period and Expedited Treatment under EL26-67. in FERC Docket EL26-67 on Jul 28, 2026.
Notice Establishing Answer Period re PJM Interconnection, L.L.C. et al. under EL26-67.FERC EL26-67, Accession 20260730-3026 Order · Jul 30, 2026
SECRETARY OF THE COMMISSION - FERC
FERC issued Notice Establishing Answer Period re PJM Interconnection, L.L.C. et al. under EL26-67. in Docket EL26-67 on Jul 30, 2026.
Order Instituting Proceeding under Section 206 of the Federal Power Act re Southwest Power Pool, Inc. et al. under EL26-68. Chairman Swett and Commissioners Rosner, See, Chang, and LaCerte are concurring with separate statements attached.FERC EL26-68, Accession 20260618-3110 Order · Jun 18, 2026
COMMISSIONERS AND IMMEDIATE STAFF (THE COMMISSION), SECRETARY OF THE COMMISSION - FERC
FERC issued Order Instituting Proceeding under Section 206 of the Federal Power Act re Southwest Power Pool, Inc. et al. under EL26-68. Chairman Swett and Commissioners Rosner, See, Chang, and LaCerte are concurring with separate statements attached. in Docket EL26-68 on Jun 18, 2026.
Notice of Institution of Section 206 Proceeding and Refund Effective Date re Southwest Power Pool, Inc. et al. under EL26-68.FERC EL26-68, Accession 20260618-3112 Order · Jun 18, 2026
SECRETARY OF THE COMMISSION - FERC
FERC issued Notice of Institution of Section 206 Proceeding and Refund Effective Date re Southwest Power Pool, Inc. et al. under EL26-68. in Docket EL26-68 on Jun 18, 2026.
Southwest Power Pool, Inc. submits request to update the service list under EL26-68.FERC EL26-68, Accession 20260624-5106 Filed · Jun 24, 2026
Southwest Power Pool, Inc.
Southwest Power Pool, Inc. filed Southwest Power Pool, Inc. submits request to update the service list under EL26-68. in FERC Docket EL26-68 on Jun 24, 2026.
Answer of Southwest Power Pool Transmission Owner Group to L.M. Marlowe's 07/08/2026 Motion for Settlement Procedures under EL26-68 et al.FERC EL26-68, Accession 20260715-5116 Filed · Jul 15, 2026
Southwest Power Pool Transmission Owner Group; also docketed in RM26-4-000
Southwest Power Pool Transmission Owner Group filed Answer of Southwest Power Pool Transmission Owner Group to L.M. Marlowe's 07/08/2026 Motion for Settlement Procedures under EL26-68 et al. in FERC Docket EL26-68 on Jul 15, 2026.
Southwest Power Pool, Inc. submits Informational Report in compliance with the Commission’s 06/18/2026 Show Cause Order under EL26-68.FERC EL26-68, Accession 20260720-5205 Filed · Jul 20, 2026
Southwest Power Pool, Inc.
Southwest Power Pool, Inc. filed Southwest Power Pool, Inc. submits Informational Report in compliance with the Commission’s 06/18/2026 Show Cause Order under EL26-68. in FERC Docket EL26-68 on Jul 20, 2026.
Answer of Southwest Power Pool, Inc. in opposition to Motion for the Establishment of Settlement Procedures and Convening of a Settlement Conference, or, in the Alternative, for the Appointment of a Settlement Judge of L.M. MarloweFERC EL26-68, Accession 20260722-5143 Filed · Jul 22, 2026
Southwest Power Pool, Inc.
Southwest Power Pool, Inc. filed Answer of Southwest Power Pool, Inc. in opposition to Motion for the Establishment of Settlement Procedures and Convening of a Settlement Conference, or, in the Alternative, for the Appointment of a Settlement Judge of L.M. Marlowe under EL26-68. in FERC Docket EL26-68 on Jul 22, 2026.
Order Instituting Proceeding Under Section 206 of the Federal Power Act re New York Independent System Operator, Inc. et al., EL26-69. Chmn. Swett, Comm'r. Rosner, Comm'r. See, Comm'r. Chang, and Comm'r. LaCerte are concurring w/ sep. stmtFERC EL26-69, Accession 20260618-3063 Order · Jun 18, 2026
COMMISSIONERS AND IMMEDIATE STAFF (THE COMMISSION), SECRETARY OF THE COMMISSION - FERC
FERC issued Order Instituting Proceeding Under Section 206 of the Federal Power Act re New York Independent System Operator, Inc. et al., EL26-69. Chmn. Swett, Comm'r. Rosner, Comm'r. See, Comm'r. Chang, and Comm'r. LaCerte are concurring w/ sep. stmt attached. in Docket EL26-69 on Jun 18, 2026.
Notice of Institution of Section 206 Proceeding and Refund Effective Date re New York Independent System Operator, Inc. et al. under EL26-69.FERC EL26-69, Accession 20260618-3084 Order · Jun 18, 2026
SECRETARY OF THE COMMISSION - FERC
FERC issued Notice of Institution of Section 206 Proceeding and Refund Effective Date re New York Independent System Operator, Inc. et al. under EL26-69. in Docket EL26-69 on Jun 18, 2026.
New York Independent System Operator, Inc. submits Informational Report in compliance with the Commission’s 06/18/2026 Order under EL26-69.FERC EL26-69, Accession 20260720-5217 Filed · Jul 20, 2026
New York Independent System Operator, Inc.
New York Independent System Operator, Inc. filed New York Independent System Operator, Inc. submits Informational Report in compliance with the Commission’s 06/18/2026 Order under EL26-69. in FERC Docket EL26-69 on Jul 20, 2026.
Order Instituting Proceeding under Section 206 of the Federal Power Act re Midcontinent Independent System Operator, Inc. et al. under EL26-70. Chairman Swett, Commissioners Rosner, See, Chang and LaCerte are concurring with separateFERC EL26-70, Accession 20260618-3047 Order · Jun 18, 2026
COMMISSIONERS AND IMMEDIATE STAFF (THE COMMISSION), SECRETARY OF THE COMMISSION, FERC, SECRETARY OF THE COMMISSION, FERC
FERC issued Order Instituting Proceeding under Section 206 of the Federal Power Act re Midcontinent Independent System Operator, Inc. et al. under EL26-70. Chairman Swett, Commissioners Rosner, See, Chang and LaCerte are concurring with separate statements attached. in Docket EL26-70 on Jun 18, 2026.
Notice of Institution of Section 206 Proceeding and Refund Effective Date re Midcontinent Independent System Operator, Inc. et al. under EL26-70.FERC EL26-70, Accession 20260618-3085 Order · Jun 18, 2026
SECRETARY OF THE COMMISSION - FERC
FERC issued Notice of Institution of Section 206 Proceeding and Refund Effective Date re Midcontinent Independent System Operator, Inc. et al. under EL26-70. in Docket EL26-70 on Jun 18, 2026.
Midcontinent Independent System Operator, Inc. submits Informational Report in compliance with the Commission’s 06/18/2026 Show Cause Order under EL26-70.FERC EL26-70, Accession 20260720-5204 Filed · Jul 20, 2026
Midcontinent Independent System Operator, Inc., Midcontinent Independent System Operator, Inc., Midcontinent Independent System Operator, Inc.
Midcontinent Independent System Operator, Inc., Midcontinent Independent System Operator, Inc., Midcontinent Independent System Operator, Inc. filed Midcontinent Independent System Operator, Inc. submits Informational Report in compliance with the Commission’s 06/18/2026 Show Cause Order under EL26-70. in FERC Docket EL26-70 on Jul 20, 2026.
Order Instituting Proceeding Under Section 206 of the Federal Power Act re California Independent System Operator Corporation et al. under EL26-71. Chairman Swett, and Commissioners Rosner, See, Chang, and LaCerte are concurring w/separateFERC EL26-71, Accession 20260618-3083 Order · Jun 18, 2026
SECRETARY OF THE COMMISSION - FERC, COMMISSIONERS AND IMMEDIATE STAFF (THE COMMISSION)
FERC issued Order Instituting Proceeding Under Section 206 of the Federal Power Act re California Independent System Operator Corporation et al. under EL26-71. Chairman Swett, and Commissioners Rosner, See, Chang, and LaCerte are concurring w/separate stmt. attached. in Docket EL26-71 on Jun 18, 2026.
Notice of Institution of Section 206 Proceeding and Refund Effective Date re California Independent System Operator Corporation et al. under EL26-71.FERC EL26-71, Accession 20260618-3095 Order · Jun 18, 2026
SECRETARY OF THE COMMISSION - FERC
FERC issued Notice of Institution of Section 206 Proceeding and Refund Effective Date re California Independent System Operator Corporation et al. under EL26-71. in Docket EL26-71 on Jun 18, 2026.
The California Independent System Operator Corporation submits Informational Report in compliance with the Commission’s 06/18/2026 Order to Show Cause under EL26-71.FERC EL26-71, Accession 20260720-5202 Filed · Jul 20, 2026
California Independent System Operator Corporation
California Independent System Operator Corporation filed The California Independent System Operator Corporation submits Informational Report in compliance with the Commission’s 06/18/2026 Order to Show Cause under EL26-71. in FERC Docket EL26-71 on Jul 20, 2026.
Order Instituting Proceeding Under Section 206 etc. re ISO New England Inc. et al. under EL26-72. Chairman Swett, and Commissioners Rosner, See, Chang, and LaCerte are concurring w/ sep. statements attached. For errara see accessionFERC EL26-72, Accession 20260618-3076 Order · Jun 18, 2026
COMMISSIONERS AND IMMEDIATE STAFF (THE COMMISSION), SECRETARY OF THE COMMISSION - FERC
FERC issued Order Instituting Proceeding Under Section 206 etc. re ISO New England Inc. et al. under EL26-72. Chairman Swett, and Commissioners Rosner, See, Chang, and LaCerte are concurring w/ sep. statements attached. For errara see accession 20260709-3012. in Docket EL26-72 on Jun 18, 2026.
Notice of Institution of Section 206 Proceeding and Refund Effective Date re ISO New England Inc. et al. under EL26-72.FERC EL26-72, Accession 20260618-3096 Order · Jun 18, 2026
SECRETARY OF THE COMMISSION - FERC
FERC issued Notice of Institution of Section 206 Proceeding and Refund Effective Date re ISO New England Inc. et al. under EL26-72. in Docket EL26-72 on Jun 18, 2026.
Vermont Electric Cooperative, Inc. submits Request for Issuance of an Errata re the Notice of Institution of Section 206 Proceeding and Refund Effective Date re ISO New England Inc. et al. under EL26-72.FERC EL26-72, Accession 20260622-5134 Filed · Jun 22, 2026
Vermont Electric Cooperative, Inc.
Vermont Electric Cooperative, Inc. filed Vermont Electric Cooperative, Inc. submits Request for Issuance of an Errata re the Notice of Institution of Section 206 Proceeding and Refund Effective Date re ISO New England Inc. et al. under EL26-72. in FERC Docket EL26-72 on Jun 22, 2026.
Errata to the Commission issued Order Instituting Proceeding Under Section 206 of the Federal Power Act; correcting the caption re ISO New England Inc. et al. under EL26-72. For order see accession number 20260618-3076.FERC EL26-72, Accession 20260709-3012 Order · Jul 9, 2026
SECRETARY OF THE COMMISSION, FERC, SECRETARY OF THE COMMISSION, FERC, COMMISSIONERS AND IMMEDIATE STAFF (THE COMMISSION)
FERC issued Errata to the Commission issued Order Instituting Proceeding Under Section 206 of the Federal Power Act; correcting the caption re ISO New England Inc. et al. under EL26-72. For order see accession number 20260618-3076. in Docket EL26-72 on Jul 9, 2026.
ISO New England Inc. submits Informational Report in compliance with the Commission’s 06/18/2026 Order under EL26-72.FERC EL26-72, Accession 20260720-5216 Filed · Jul 20, 2026
ISO New England Inc.
ISO New England Inc. filed ISO New England Inc. submits Informational Report in compliance with the Commission’s 06/18/2026 Order under EL26-72. in FERC Docket EL26-72 on Jul 20, 2026.
Joint Motion of ISO New England Inc. and the Participating Transmission Owners Administrative Committee o/b/o of the Participating Transmission Owners to Hold Proceeding in Abeyance and Request for Shortened Comment Period etFERC EL26-72, Accession 20260803-5083 Filed · Aug 3, 2026
ISO New England Inc., ISO New England Inc., PTO AC
ISO New England Inc., ISO New England Inc., PTO AC filed Joint Motion of ISO New England Inc. and the Participating Transmission Owners Administrative Committee o/b/o of the Participating Transmission Owners to Hold Proceeding in Abeyance and Request for Shortened Comment Period et al. under EL26-72. in FERC Docket EL26-72 on Aug 3, 2026.
Motion for Leave and Answer of Constellation Energy Generation, LLC to Transmission Owner's Request for Rehearing or, in the Alternative, Clarification of the 04/16/2026 Order under ER26-1088.FERC ER26-1088, Accession 20260602-5152 Filed · Jun 2, 2026
Constellation Energy Generation, LLC
Constellation Energy Generation, LLC filed Motion for Leave and Answer of Constellation Energy Generation, LLC to Transmission Owner's Request for Rehearing or, in the Alternative, Clarification of the 04/16/2026 Order under ER26-1088. in FERC Docket ER26-1088 on Jun 2, 2026.
Motion for Leave to Answer and Answer of PJM Interconnection, L.L.C. in support of the request for clarification of the Indicated PJM Transmission Owners et al. under ER26-1088.FERC ER26-1088, Accession 20260609-5119 Filed · Jun 9, 2026
PJM Interconnection, L.L.C.
PJM Interconnection, L.L.C. filed Motion for Leave to Answer and Answer of PJM Interconnection, L.L.C. in support of the request for clarification of the Indicated PJM Transmission Owners et al. under ER26-1088. in FERC Docket ER26-1088 on Jun 9, 2026.
Notice of Denial of Rehearing by Operation of Law and Providing for Further Consideration re PJM Interconnection, L.L.C. under ER26-1088.FERC ER26-1088, Accession 20260618-3003 Order · Jun 18, 2026
SECRETARY OF THE COMMISSION, FERC, SECRETARY OF THE COMMISSION, FERC
FERC issued Notice of Denial of Rehearing by Operation of Law and Providing for Further Consideration re PJM Interconnection, L.L.C. under ER26-1088. in Docket ER26-1088 on Jun 18, 2026.
Order Accepting Tariff Revisions, Subject to Condition re Southwest Power Pool, Inc. under ER26-1323.FERC ER26-1323, Accession 20260605-3090 Order · Jun 5, 2026
SECRETARY OF THE COMMISSION, FERC, SECRETARY OF THE COMMISSION, FERC, COMMISSIONERS AND IMMEDIATE STAFF (THE COMMISSION)
FERC issued Order Accepting Tariff Revisions, Subject to Condition re Southwest Power Pool, Inc. under ER26-1323. in Docket ER26-1323 on Jun 5, 2026.
Southwest Power Pool, Inc. submits tariff filing per 35: Compliance Filing - Conditional High Impact Large Load Service to be effective 7/1/2026 under ER26-1323 Filing Type : 80FERC ER26-1323, Accession 20260706-5174 Filed · Jul 6, 2026
Southwest Power Pool, Inc.
Southwest Power Pool, Inc. filed Southwest Power Pool, Inc. submits tariff filing per 35: Compliance Filing - Conditional High Impact Large Load Service to be effective 7/1/2026 under ER26-1323 Filing Type : 80 in FERC Docket ER26-1323 on Jul 6, 2026.
ISO New England Inc. submits tariff filing per 35.13(a)(2)(iii: ISO-NE; Revisions to Change the Capacity Performance Rate to $3,500 per MWh to be effective 9/1/2026 under ER26-3047 Filing Type : 10FERC ER26-3047, Accession 20260630-5201 Filed · Jun 30, 2026
ISO New England Inc., New England Power Pool Participants Committee, New England Power Pool Participants Committee
ISO New England Inc., New England Power Pool Participants Committee, New England Power Pool Participants Committee filed ISO New England Inc. submits tariff filing per 35.13(a)(2)(iii: ISO-NE; Revisions to Change the Capacity Performance Rate to $3,500 per MWh to be effective 9/1/2026 under ER26-3047 Filing Type : 10 in FERC Docket ER26-3047 on Jun 30, 2026.
Supplemental Comments of New England Power Pool Participants Committee on the 06/30/2026 revisions to the Pay-for-Performance market rules by reducing the Capacity Performance Payment Rate under ER26-3047.FERC ER26-3047, Accession 20260721-5178 Filed · Jul 21, 2026
NEPOOL Participants Committee
NEPOOL Participants Committee filed Supplemental Comments of New England Power Pool Participants Committee on the 06/30/2026 revisions to the Pay-for-Performance market rules by reducing the Capacity Performance Payment Rate under ER26-3047. in FERC Docket ER26-3047 on Jul 21, 2026.
Protest of Constellation Energy Generation, LLC to the 06/30/2026 filing by ISO New England Inc. et al. under ER26-3047.FERC ER26-3047, Accession 20260721-5214 Filed · Jul 21, 2026
Constellation Energy Generation, LLC, Constellation Energy Generation, LLC
Constellation Energy Generation, LLC, Constellation Energy Generation, LLC filed Protest of Constellation Energy Generation, LLC to the 06/30/2026 filing by ISO New England Inc. et al. under ER26-3047. in FERC Docket ER26-3047 on Jul 21, 2026.
PJM Interconnection, L.L.C. submits tariff filing per 35.13(a)(2)(iii: Reliability Backstop Procurement to Address Resource Adequacy and Large Loads to be effective 9/29/2026 under ER26-3380 Filing Type : 10FERC ER26-3380, Accession 20260731-5214 Filed · Jul 31, 2026
PJM Interconnection, L.L.C.
PJM Interconnection, L.L.C. filed PJM Interconnection, L.L.C. submits tariff filing per 35.13(a)(2)(iii: Reliability Backstop Procurement to Address Resource Adequacy and Large Loads to be effective 9/29/2026 under ER26-3380 Filing Type : 10 in FERC Docket ER26-3380 on Jul 31, 2026.
Supplemental Comments of Constellation Energy Generation, LLC on FERC's proposed Advanced Notice of Proposed Rulemaking re Large Load Interconnection under RM26-4.FERC RM26-4, Accession 20260605-5050 Filed · Jun 5, 2026
Constellation Energy Generation, LLC
Constellation Energy Generation, LLC filed Supplemental Comments of Constellation Energy Generation, LLC on FERC's proposed Advanced Notice of Proposed Rulemaking re Large Load Interconnection under RM26-4. in FERC Docket RM26-4 on Jun 5, 2026.
Supplemental Comments of FirstEnergy Service Company on FERC's proposed Advanced Notice of Proposed Rulemaking re Large Load Interconnection under RM26-4.FERC RM26-4, Accession 20260605-5169 Filed · Jun 5, 2026
FirstEnergy Service Company
FirstEnergy Service Company filed Supplemental Comments of FirstEnergy Service Company on FERC's proposed Advanced Notice of Proposed Rulemaking re Large Load Interconnection under RM26-4. in FERC Docket RM26-4 on Jun 5, 2026.
Responsive Comments of Maven Solutions re the Supplemental Comments filed by Constellation Energy Generation, LLC on 06/05/2026 proposing Load-Contingent New Capacity at Existing Plants Service under RM26-4.FERC RM26-4, Accession 20260608-5025 Filed · Jun 8, 2026
MAVEN SOLUTIONS
MAVEN SOLUTIONS filed Responsive Comments of Maven Solutions re the Supplemental Comments filed by Constellation Energy Generation, LLC on 06/05/2026 proposing Load-Contingent New Capacity at Existing Plants Service under RM26-4. in FERC Docket RM26-4 on Jun 8, 2026.
Responsive Comments of Maven Solutions re the Supplemental Comments filed by FirstEnergy Service Company on 06/05/2026 proposing that the Commission adopt a natural-gas-pipeline-style expansion rate for electric transmission upgradesFERC RM26-4, Accession 20260608-5026 Filed · Jun 8, 2026
MAVEN SOLUTIONS
MAVEN SOLUTIONS filed Responsive Comments of Maven Solutions re the Supplemental Comments filed by FirstEnergy Service Company on 06/05/2026 proposing that the Commission adopt a natural-gas-pipeline-style expansion rate for electric transmission upgrades etc. under RM26-4. in FERC Docket RM26-4 on Jun 8, 2026.
Supplemental Comments of the Working for Advanced Transmission Technologies Coalition in response to FERC's proposed Advanced Notice of Proposed Rulemaking on Large Load Interconnection under RM26-4.FERC RM26-4, Accession 20260611-5015 Filed · Jun 11, 2026
WATT Coalition
WATT Coalition filed Supplemental Comments of the Working for Advanced Transmission Technologies Coalition in response to FERC's proposed Advanced Notice of Proposed Rulemaking on Large Load Interconnection under RM26-4. in FERC Docket RM26-4 on Jun 11, 2026.
Supplemental Comments of the Pennsylvania Office of Consumer Advocate et al. in response to FERC's proposed Advanced Notice of Proposed Rulemaking on Large Load Interconnection under RM26-4.FERC RM26-4, Accession 20260615-5141 Filed · Jun 15, 2026
Pennsylvania Office of Consumer Advocate, Pennsylvania Office of Consumer Advocate, Pennsylvania Office of Consumer Advocate
Pennsylvania Office of Consumer Advocate, Pennsylvania Office of Consumer Advocate, Pennsylvania Office of Consumer Advocate filed Supplemental Comments of the Pennsylvania Office of Consumer Advocate et al. in response to FERC's proposed Advanced Notice of Proposed Rulemaking on Large Load Interconnection under RM26-4. in FERC Docket RM26-4 on Jun 15, 2026.
Supplemental Comments of Electricity Customer Alliance on FERC's Advance Notice of Proposed Rulemaking re Large Load Interconnection under RM26-4.FERC RM26-4, Accession 20260615-5164 Filed · Jun 15, 2026
Electricity Customer Alliance
Electricity Customer Alliance filed Supplemental Comments of Electricity Customer Alliance on FERC's Advance Notice of Proposed Rulemaking re Large Load Interconnection under RM26-4. in FERC Docket RM26-4 on Jun 15, 2026.
Transmittal Letter and Public Comments of James V. Cunningham on the Interconnection of Large Loads to the Interstate Transmission System under RM26-4.FERC RM26-4, Accession 20260624-5020 Filed · Jun 24, 2026
Individual No Affiliation
Individual No Affiliation filed Transmittal Letter and Public Comments of James V. Cunningham on the Interconnection of Large Loads to the Interstate Transmission System under RM26-4. in FERC Docket RM26-4 on Jun 24, 2026.
Supplemental Comments of Ashkan Yousefi re Interconnection of Large Loads to the Interstate Transmission System under RM26-4.FERC RM26-4, Accession 20260727-5102 Filed · Jul 27, 2026
Individual No Affiliation
Individual No Affiliation filed Supplemental Comments of Ashkan Yousefi re Interconnection of Large Loads to the Interstate Transmission System under RM26-4. in FERC Docket RM26-4 on Jul 27, 2026.
Transcript of the 1137th Commission Meeting held on June 18, 2026 re Consent-Electric et al.FERC Accession 20260622-4000 Order · Jun 22, 2026
FEDERAL ENERGY REGULATORY COMMISSION
FERC issued Transcript of the 1137th Commission Meeting held on June 18, 2026 re Consent-Electric et al. in eLibrary on Jun 22, 2026. The filing's text matches the eLibrary full-text search for "hyperscale".
Comments of Nikki Gerber in response to FERC's Notice of Technical Conference regarding PJM Interconnection, L.L.C.'s Governance and Stakeholder Reforms under AD26-7.FERC AD26-7, Accession 20260722-5156 Filed · Jul 22, 2026
Individual No Affiliation
Individual No Affiliation filed Comments of Nikki Gerber in response to FERC's Notice of Technical Conference regarding PJM Interconnection, L.L.C.'s Governance and Stakeholder Reforms under AD26-7. in FERC Docket AD26-7 on Jul 22, 2026. The filing's text matches the eLibrary full-text search for "hyperscale".
Environmental Impact Statement for Tennessee Gas Pipeline Company, LLC's et al. Mississippi Crossing Project et al. under CP25-514 et al.FERC CP25-514, Accession 20260626-3002 Order · Jun 26, 2026
OFFICE OF ENERGY PROJECTS; also docketed in CP25-517
FERC issued Environmental Impact Statement for Tennessee Gas Pipeline Company, LLC's et al. Mississippi Crossing Project et al. under CP25-514 et al. in Docket CP25-514 on Jun 26, 2026. The filing's text matches the eLibrary full-text search for "hyperscale".
Alabama Rivers Alliance, et al. submit Request for Rehearing of the 07/31/2026 Order and Motion for Stay under CP25-514, et al.FERC CP25-514, Accession 20260831-5281 Filed · Aug 31, 2026
BlackBelt Women Rising, OGEECHEE-CANOOCHEE RIVERKEEPER, Alabama Rivers Alliance; also docketed in CP25-517
BlackBelt Women Rising, OGEECHEE-CANOOCHEE RIVERKEEPER, Alabama Rivers Alliance filed Alabama Rivers Alliance, et al. submit Request for Rehearing of the 07/31/2026 Order and Motion for Stay under CP25-514, et al. in FERC Docket CP25-514 on Aug 31, 2026. The filing's text matches the eLibrary full-text search for "co-location data center".
Joint Comments of Sierra Club, et al. on the Environmental Assessment for the Mountain Valley Pipeline Boost Project under CP26-14.FERC CP26-14, Accession 20260908-5312 Filed · Sep 8, 2026
Sierra Club, Protect Our Water, Heritage, Rights, Appalachian Voices
Sierra Club, Protect Our Water, Heritage, Rights, Appalachian Voices filed Joint Comments of Sierra Club, et al. on the Environmental Assessment for the Mountain Valley Pipeline Boost Project under CP26-14. in FERC Docket CP26-14 on Sep 8, 2026. The filing's text matches the eLibrary full-text search for "co-location data center".
Fourth Supplemental Comments of Justin Kulovsek re Columbia Gulf Transmission, LLC's 06/23/2026 response to data request re the Maysville Pipeline Project under CP26-25.FERC CP26-25, Accession 20260625-5107 Filed · Jun 25, 2026
Individual No Affiliation
Individual No Affiliation filed Fourth Supplemental Comments of Justin Kulovsek re Columbia Gulf Transmission, LLC's 06/23/2026 response to data request re the Maysville Pipeline Project under CP26-25. in FERC Docket CP26-25 on Jun 25, 2026. The filing's text matches the eLibrary full-text search for "hyperscale".
Fifth Supplemental Comments of Justin Kulovsek with formal exhibit re Columbia Gulf Transmission, LLC's 06/23/2026 response to data request re the Maysville Pipeline Project under CP26-25.FERC CP26-25, Accession 20260708-5031 Filed · Jul 8, 2026
Individual No Affiliation
Individual No Affiliation filed Fifth Supplemental Comments of Justin Kulovsek with formal exhibit re Columbia Gulf Transmission, LLC's 06/23/2026 response to data request re the Maysville Pipeline Project under CP26-25. in FERC Docket CP26-25 on Jul 8, 2026. The filing's text matches the eLibrary full-text search for "hyperscale".
Tenth Supplemental Comments of Justin Kulovsek on the 08/11/2026 Environmental Assessment re the Maysville Project under CP26-25.FERC CP26-25, Accession 20260910-5045 Filed · Sep 10, 2026
Individual No Affiliation
Individual No Affiliation filed Tenth Supplemental Comments of Justin Kulovsek on the 08/11/2026 Environmental Assessment re the Maysville Project under CP26-25. in FERC Docket CP26-25 on Sep 10, 2026. The filing's text matches the eLibrary full-text search for "hyperscale".
Order Authorizing Disposition of Jurisdictional Facilities re Morgantown Power, LLC under EC26-58.FERC EC26-58, Accession 20260729-3047 Order · Jul 29, 2026
COMMISSIONERS AND IMMEDIATE STAFF (THE COMMISSION), SECRETARY OF THE COMMISSION - FERC
FERC issued Order Authorizing Disposition of Jurisdictional Facilities re Morgantown Power, LLC under EC26-58. in Docket EC26-58 on Jul 29, 2026. The filing's text matches the eLibrary full-text search for "behind-the-meter data center".
Answer of the Independent Market Monitor for PJM to Voltus, Inc. and Mission:data's 06/01/2026 Motion to File Supplement to Complaint under EL26-4.FERC EL26-4, Accession 20260616-5073 Filed · Jun 16, 2026
Monitoring Analytics, LLC
Monitoring Analytics, LLC filed Answer of the Independent Market Monitor for PJM to Voltus, Inc. and Mission:data's 06/01/2026 Motion to File Supplement to Complaint under EL26-4. in FERC Docket EL26-4 on Jun 16, 2026. The filing's text matches the eLibrary full-text search for "hyperscale".
Order Granting Complaint in Part and Establishing Paper Hearing Procedures re Voltus, Inc., et al. v. PJM Interconnection, L.L.C. under EL26-4. Commissioner LaCerte is dissenting with a separate statement attached.FERC EL26-4, Accession 20260729-3077 Order · Jul 29, 2026
COMMISSIONERS AND IMMEDIATE STAFF (THE COMMISSION), SECRETARY OF THE COMMISSION - FERC
FERC issued Order Granting Complaint in Part and Establishing Paper Hearing Procedures re Voltus, Inc., et al. v. PJM Interconnection, L.L.C. under EL26-4. Commissioner LaCerte is dissenting with a separate statement attached. in Docket EL26-4 on Jul 29, 2026. The filing's text matches the eLibrary full-text search for "hyperscale".
Comments of Delegate Lorig Charkoudian et al. of the Maryland General Assembly in support of a complaint filed by the Maryland Office of People's Counsel, to stop PJM Interconnection, LLC, from charging billions of dollars to MarylandFERC EL26-63, Accession 20260617-4001 Filed · Jun 17, 2026
MARYLAND GENERAL ASSEMBLY, MARYLAND GENERAL ASSEMBLY, MARYLAND GENERAL ASSEMBLY
MARYLAND GENERAL ASSEMBLY, MARYLAND GENERAL ASSEMBLY, MARYLAND GENERAL ASSEMBLY filed Comments of Delegate Lorig Charkoudian et al. of the Maryland General Assembly in support of a complaint filed by the Maryland Office of People's Counsel, to stop PJM Interconnection, LLC, from charging billions of dollars to Maryland etc. under EL26-63. in FERC Docket EL26-63 on Jun 17, 2026. The filing's text matches the eLibrary full-text search for "hyperscale".
Comments of members of the Maryland Congressional Delegation in support of the complaint filed by the Maryland Office of People's Counsel v. PJM Interconnection, LLC under EL26-63.FERC EL26-63, Accession 20260727-5193 Filed · Jul 27, 2026
United States Senate, United States House of Representatives, UNITED STATES SENATE
United States Senate, United States House of Representatives, UNITED STATES SENATE filed Comments of members of the Maryland Congressional Delegation in support of the complaint filed by the Maryland Office of People's Counsel v. PJM Interconnection, LLC under EL26-63. in FERC Docket EL26-63 on Jul 27, 2026. The filing's text matches the eLibrary full-text search for "hyperscale".
Answer of Sierra Club in support of the complaint filed by the Maryland Office of People's Counsel v. PJM Interconnection, LLC under EL26-63.FERC EL26-63, Accession 20260727-5240 Filed · Jul 27, 2026
Sierra Club, Sierra Club, Sierra Club
Sierra Club, Sierra Club, Sierra Club filed Answer of Sierra Club in support of the complaint filed by the Maryland Office of People's Counsel v. PJM Interconnection, LLC under EL26-63. in FERC Docket EL26-63 on Jul 27, 2026. The filing's text matches the eLibrary full-text search for "hyperscale".
Comments of Pennsylvania Office of Consumer Advocate in response to 05/07/2026 complaint filed by the Maryland Office of People's Counsel v. PJM Interconnection, LLC et al. under EL26-63.FERC EL26-63, Accession 20260727-5267 Filed · Jul 27, 2026
Pennsylvania Office of Consumer Advocate
Pennsylvania Office of Consumer Advocate filed Comments of Pennsylvania Office of Consumer Advocate in response to 05/07/2026 complaint filed by the Maryland Office of People's Counsel v. PJM Interconnection, LLC et al. under EL26-63. in FERC Docket EL26-63 on Jul 27, 2026. The filing's text matches the eLibrary full-text search for "hyperscale".
Protest of the Data Center Coalition in opposition to the complaint filed by the Maryland Office of People's Counsel v. PJM Interconnection, LLC under EL26-63.FERC EL26-63, Accession 20260727-5274 Filed · Jul 27, 2026
Data Center Coalition
Data Center Coalition filed Protest of the Data Center Coalition in opposition to the complaint filed by the Maryland Office of People's Counsel v. PJM Interconnection, LLC under EL26-63. in FERC Docket EL26-63 on Jul 27, 2026. The filing's text matches the eLibrary full-text search for "hyperscale".
Motion for Leave to Answer and Answer of Citizens Utility Board of Wisconsin to the Answer of Midcontinent Independent System Operator, Inc. and the Protests of Viridon Services LLC and the Electricity Transmission Competition CoalitionFERC EL26-83, Accession 20260909-5169 Filed · Sep 9, 2026
Citizens Utility Board of Wisconsin
Citizens Utility Board of Wisconsin filed Motion for Leave to Answer and Answer of Citizens Utility Board of Wisconsin to the Answer of Midcontinent Independent System Operator, Inc. and the Protests of Viridon Services LLC and the Electricity Transmission Competition Coalition under EL26-83. in FERC Docket EL26-83 on Sep 9, 2026. The filing's text matches the eLibrary full-text search for "hyperscale".
Order Accepting Construction Service Agreement re The Dayton Power and Light Company under ER26-2303.FERC ER26-2303, Accession 20260623-3083 Order · Jun 23, 2026
COMMISSIONERS AND IMMEDIATE STAFF (THE COMMISSION), SECRETARY OF THE COMMISSION, FERC, SECRETARY OF THE COMMISSION, FERC
FERC issued Order Accepting Construction Service Agreement re The Dayton Power and Light Company under ER26-2303. in Docket ER26-2303 on Jun 23, 2026. The filing's text matches the eLibrary full-text search for "co-location data center".
Order Accepting Transmission Security Agreement re Commonwealth Edison Company under ER26-2566.FERC ER26-2566, Accession 20260717-3025 Order · Jul 17, 2026
COMMISSIONERS AND IMMEDIATE STAFF (THE COMMISSION), SECRETARY OF THE COMMISSION, FERC, SECRETARY OF THE COMMISSION, FERC
FERC issued Order Accepting Transmission Security Agreement re Commonwealth Edison Company under ER26-2566. in Docket ER26-2566 on Jul 17, 2026. The filing's text matches the eLibrary full-text search for "co-location data center".
Order Accepting Transmission Security Agreement re Commonwealth Edison Company under ER26-2615.FERC ER26-2615, Accession 20260717-3026 Order · Jul 17, 2026
SECRETARY OF THE COMMISSION, FERC, SECRETARY OF THE COMMISSION, FERC, COMMISSIONERS AND IMMEDIATE STAFF (THE COMMISSION)
FERC issued Order Accepting Transmission Security Agreement re Commonwealth Edison Company under ER26-2615. in Docket ER26-2615 on Jul 17, 2026. The filing's text matches the eLibrary full-text search for "co-location data center".
Protest of Powerhouse Hillwood Holding LLC and Request for Confidential Treatment under ER26-3257.FERC ER26-3257, Accession 20260814-5241 Filed · Aug 14, 2026
Powerhouse Hillwood Holding LLC
Powerhouse Hillwood Holding LLC filed Protest of Powerhouse Hillwood Holding LLC and Request for Confidential Treatment under ER26-3257. in FERC Docket ER26-3257 on Aug 14, 2026. The filing's text matches the eLibrary full-text search for "hyperscale".
Protest of Powerhouse Hillwood Holding LLC and Request for Confidential Treatment under ER26-3257.FERC ER26-3257, Accession 20260814-5242 Filed · Aug 14, 2026
Powerhouse Hillwood Holding LLC
Powerhouse Hillwood Holding LLC filed Protest of Powerhouse Hillwood Holding LLC and Request for Confidential Treatment under ER26-3257. in FERC Docket ER26-3257 on Aug 14, 2026. The filing's text matches the eLibrary full-text search for "hyperscale".
Motion for Leave to File Comments Out of Time, Comments, and Limited Protest of Data Center Coalition in response to American Transmission Company LLC's 07/24/2026 tariff filing under ER26-3265.FERC ER26-3265, Accession 20260817-5204 Filed · Aug 17, 2026
Data Center Coalition
Data Center Coalition filed Motion for Leave to File Comments Out of Time, Comments, and Limited Protest of Data Center Coalition in response to American Transmission Company LLC's 07/24/2026 tariff filing under ER26-3265. in FERC Docket ER26-3265 on Aug 17, 2026.
Comments and Limited Protest of Citizens Utility Board of Wisconsin in response to American Transmission Company LLC's 07/24/2026 tariff filing under ER26-3265.FERC ER26-3265, Accession 20260821-5321 Filed · Aug 21, 2026
Citizens Utility Board of Wisconsin
Citizens Utility Board of Wisconsin filed Comments and Limited Protest of Citizens Utility Board of Wisconsin in response to American Transmission Company LLC's 07/24/2026 tariff filing under ER26-3265. in FERC Docket ER26-3265 on Aug 21, 2026. The filing's text matches the eLibrary full-text search for "hyperscale".
Limited Protest of Sierra Club et al. to one aspect of PJM Interconnection, LLC’s proposed Reliability Backstop Procurement under ER26-3380.FERC ER26-3380, Accession 20260821-5180 Filed · Aug 21, 2026
Sierra Club, Sierra Club, Sierra Club
Sierra Club, Sierra Club, Sierra Club filed Limited Protest of Sierra Club et al. to one aspect of PJM Interconnection, LLC’s proposed Reliability Backstop Procurement under ER26-3380. in FERC Docket ER26-3380 on Aug 21, 2026. The filing's text matches the eLibrary full-text search for "hyperscale".
Comments of Equinix Inc. on the PJM Interconnection, LLC filing re Reliability Backstop Procurement to Address Resource Adequacy Concerns Stemming from Large Loads under ER26-3380.FERC ER26-3380, Accession 20260821-5243 Filed · Aug 21, 2026
EQUINIX INC.
EQUINIX INC. filed Comments of Equinix Inc. on the PJM Interconnection, LLC filing re Reliability Backstop Procurement to Address Resource Adequacy Concerns Stemming from Large Loads under ER26-3380. in FERC Docket ER26-3380 on Aug 21, 2026.
Comments of the Data Center Coalition in response to PJM Interconnection, L.L.C.’s 07/31/2026 proposed tariff filing to establish the Reliability Backstop Procurement under ER26-3380.FERC ER26-3380, Accession 20260821-5306 Filed · Aug 21, 2026
Data Center Coalition
Data Center Coalition filed Comments of the Data Center Coalition in response to PJM Interconnection, L.L.C.’s 07/31/2026 proposed tariff filing to establish the Reliability Backstop Procurement under ER26-3380. in FERC Docket ER26-3380 on Aug 21, 2026.
PJM Interconnection, L.L.C. submits tariff filing per 35.13(a)(2)(iii: Revisions to OA, Schedule 12 & RAA, Schedule 17 RE: 2Q 2026 Member Lists to be effective 7/1/2026 under ER26-3496 Filing Type : 10FERC ER26-3496, Accession 20260812-5082 Filed · Aug 12, 2026
PJM Interconnection, L.L.C.
PJM Interconnection, L.L.C. filed PJM Interconnection, L.L.C. submits tariff filing per 35.13(a)(2)(iii: Revisions to OA, Schedule 12 & RAA, Schedule 17 RE: 2Q 2026 Member Lists to be effective 7/1/2026 under ER26-3496 Filing Type : 10 in FERC Docket ER26-3496 on Aug 12, 2026. The filing's text matches the eLibrary full-text search for "hyperscale".
PJM Interconnection, L.L.C. submits tariff filing per 35.13(a)(2)(iii: Proposal to Establish Interim Resource Adequacy Service & a Large Load Registry to be effective 10/12/2026 under ER26-3515 Filing Type : 10FERC ER26-3515, Accession 20260813-5118 Filed · Aug 13, 2026
PJM Interconnection, L.L.C.
PJM Interconnection, L.L.C. filed PJM Interconnection, L.L.C. submits tariff filing per 35.13(a)(2)(iii: Proposal to Establish Interim Resource Adequacy Service & a Large Load Registry to be effective 10/12/2026 under ER26-3515 Filing Type : 10 in FERC Docket ER26-3515 on Aug 13, 2026.
Comments of Neil P. Osnato d/b/a Persistence Analytics Group LLC concerning PJM Interconnection, L.L.C.'s 08/13/2026 proposal to establish Interim Resource Adequacy Service and a Large Load Registry under ER26-3515.FERC ER26-3515, Accession 20260814-5009 Filed · Aug 14, 2026
Individual No Affiliation
Individual No Affiliation filed Comments of Neil P. Osnato d/b/a Persistence Analytics Group LLC concerning PJM Interconnection, L.L.C.'s 08/13/2026 proposal to establish Interim Resource Adequacy Service and a Large Load Registry under ER26-3515. in FERC Docket ER26-3515 on Aug 14, 2026.
Limited Protest of Public Interest Organizations requesting narrow modifications of the proposed Interim Resource Adequacy Service by PJM Interconnection, L.L.C. under ER26-3515.FERC ER26-3515, Accession 20260903-5159 Filed · Sep 3, 2026
Sierra Club, Sierra Club, Sierra Club
Sierra Club, Sierra Club, Sierra Club filed Limited Protest of Public Interest Organizations requesting narrow modifications of the proposed Interim Resource Adequacy Service by PJM Interconnection, L.L.C. under ER26-3515. in FERC Docket ER26-3515 on Sep 3, 2026. The filing's text matches the eLibrary full-text search for "hyperscale".
Comments of the Public Utilities Commission of Ohio's Office of the Federal Energy Advocate on PJM Interconnection, L.L.C.’s filing to establish Interim Resource Adequacy Service under ER26-3515.FERC ER26-3515, Accession 20260903-5190 Filed · Sep 3, 2026
Ohio Federal Energy Advocate
Ohio Federal Energy Advocate filed Comments of the Public Utilities Commission of Ohio's Office of the Federal Energy Advocate on PJM Interconnection, L.L.C.’s filing to establish Interim Resource Adequacy Service under ER26-3515. in FERC Docket ER26-3515 on Sep 3, 2026. The filing's text matches the eLibrary full-text search for "hyperscale".
Comments of ACORE on PJM Interconnection, L.L.C.'s 08/13/2026 proposal to establish Interim Resource Adequacy Service and a large load registry under ER26-3515.FERC ER26-3515, Accession 20260903-5197 Filed · Sep 3, 2026
American Council on Renewable Energy
American Council on Renewable Energy filed Comments of ACORE on PJM Interconnection, L.L.C.'s 08/13/2026 proposal to establish Interim Resource Adequacy Service and a large load registry under ER26-3515. in FERC Docket ER26-3515 on Sep 3, 2026.
Protest and Comments of Constellation Energy Generation, LLC addressing PJM Interconnection, L.L.C.’s filing to establish Interim Resource Adequacy Service and Large Load Registry to address System Reliability under ER26-3515.FERC ER26-3515, Accession 20260903-5201 Filed · Sep 3, 2026
Constellation Energy Generation, LLC
Constellation Energy Generation, LLC filed Protest and Comments of Constellation Energy Generation, LLC addressing PJM Interconnection, L.L.C.’s filing to establish Interim Resource Adequacy Service and Large Load Registry to address System Reliability under ER26-3515. in FERC Docket ER26-3515 on Sep 3, 2026.
Comments of the Pennsylvania Public Utility Commission to the Proposal of PJM Interconnection, L.L.C. to establish Interim Resource Adequacy Service and Large Load Registry to address System Reliability under ER26-3515.FERC ER26-3515, Accession 20260903-5206 Filed · Sep 3, 2026
Pennsylvania Public Utility Commission
Pennsylvania Public Utility Commission filed Comments of the Pennsylvania Public Utility Commission to the Proposal of PJM Interconnection, L.L.C. to establish Interim Resource Adequacy Service and Large Load Registry to address System Reliability under ER26-3515. in FERC Docket ER26-3515 on Sep 3, 2026.
Protest and Comments of Joint Consumer Advocates on the 08/13/2026 filing by PJM Interconnection, L.L.C. under ER26-3515.FERC ER26-3515, Accession 20260903-5212 Filed · Sep 3, 2026
New Jersey Division of Rate Counsel, Office of the Illinois Attorney General, Delaware Division of the Public Advocate
New Jersey Division of Rate Counsel, Office of the Illinois Attorney General, Delaware Division of the Public Advocate filed Protest and Comments of Joint Consumer Advocates on the 08/13/2026 filing by PJM Interconnection, L.L.C. under ER26-3515. in FERC Docket ER26-3515 on Sep 3, 2026. The filing's text matches the eLibrary full-text search for "hyperscale".
Comments and Limited Protests of Ohio Energy Leadership Council in response to the Interim Resource Adequacy Service and Large Load Registry proposed by PJM Interconnection, L.L.C. under ER26-3515.FERC ER26-3515, Accession 20260903-5224 Filed · Sep 3, 2026
Ohio Energy Leadership Council
Ohio Energy Leadership Council filed Comments and Limited Protests of Ohio Energy Leadership Council in response to the Interim Resource Adequacy Service and Large Load Registry proposed by PJM Interconnection, L.L.C. under ER26-3515. in FERC Docket ER26-3515 on Sep 3, 2026.
Comments of the PJM Industrial Customer Coalition in response to the Proposal of PJM Interconnection, L.L.C. to Establish Interim Resource Adequacy Service and A Large Load Registry to Address System Reliability under ER26-3515.FERC ER26-3515, Accession 20260903-5231 Filed · Sep 3, 2026
PJM Industrial Customer Coalition
PJM Industrial Customer Coalition filed Comments of the PJM Industrial Customer Coalition in response to the Proposal of PJM Interconnection, L.L.C. to Establish Interim Resource Adequacy Service and A Large Load Registry to Address System Reliability under ER26-3515. in FERC Docket ER26-3515 on Sep 3, 2026.
Protest of Google LLC regarding PJM Interconnection, L.L.C.’s Interim Resource Adequacy Service and Large Load Registry proposal under ER26-3515.FERC ER26-3515, Accession 20260903-5233 Filed · Sep 3, 2026
Google LLC, Google LLC
Google LLC, Google LLC filed Protest of Google LLC regarding PJM Interconnection, L.L.C.’s Interim Resource Adequacy Service and Large Load Registry proposal under ER26-3515. in FERC Docket ER26-3515 on Sep 3, 2026.
Comments of Microsoft Corporation to the proposal of PJM Interconnection, L.L.C. to establish Interim Resource Adequacy Service and Large Load Registry under ER26-3515.FERC ER26-3515, Accession 20260903-5240 Filed · Sep 3, 2026
Microsoft Corporation
Microsoft Corporation filed Comments of Microsoft Corporation to the proposal of PJM Interconnection, L.L.C. to establish Interim Resource Adequacy Service and Large Load Registry under ER26-3515. in FERC Docket ER26-3515 on Sep 3, 2026.
Comments of Voltus, Inc. on PJM Interconnection LLC’s Federal Power Act Section 205 filing requesting the approval of tariff amendments to establish an Interim Resource Adequacy Service and Large Load Registry under ER26-3515.FERC ER26-3515, Accession 20260904-5010 Filed · Sep 4, 2026
Voltus, Inc.
Voltus, Inc. filed Comments of Voltus, Inc. on PJM Interconnection LLC’s Federal Power Act Section 205 filing requesting the approval of tariff amendments to establish an Interim Resource Adequacy Service and Large Load Registry under ER26-3515. in FERC Docket ER26-3515 on Sep 4, 2026.
Protest, Request for Clarification, and Comments of Equinix Inc. on the Proposal of PJM Interconnection, L.L.C. to Establish Interim Resource Adequacy Service and a Large Load Registry to Adress System Reliability under ER26-3515.FERC ER26-3515, Accession 20260904-5013 Filed · Sep 4, 2026
EQUINIX INC.
EQUINIX INC. filed Protest, Request for Clarification, and Comments of Equinix Inc. on the Proposal of PJM Interconnection, L.L.C. to Establish Interim Resource Adequacy Service and a Large Load Registry to Adress System Reliability under ER26-3515. in FERC Docket ER26-3515 on Sep 4, 2026.
Motion for Leave to File Comments Out-of-Time and Comments of CyrusOne, LP on the proposal of PJM Interconnection, L.L.C. to Establish Interim Resource Adequacy, et al. under ER26-3515.FERC ER26-3515, Accession 20260911-5298 Filed · Sep 11, 2026
CyrusOne LP
CyrusOne LP filed Motion for Leave to File Comments Out-of-Time and Comments of CyrusOne, LP on the proposal of PJM Interconnection, L.L.C. to Establish Interim Resource Adequacy, et al. under ER26-3515. in FERC Docket ER26-3515 on Sep 11, 2026. The filing's text matches the eLibrary full-text search for "hyperscale".
Midcontinent Independent System Operator, Inc. submits tariff filing per 35.13(a)(2)(iii: 2026-08-18_Zero Injection Generator Interconnection Agreement to be effective 10/18/2026 under ER26-3552 Filing Type : 10FERC ER26-3552, Accession 20260818-5152 Filed · Aug 18, 2026
Midcontinent Independent System Operator, Inc., Midcontinent Independent System Operator, Inc., Midcontinent Independent System Operator, Inc.
Midcontinent Independent System Operator, Inc., Midcontinent Independent System Operator, Inc., Midcontinent Independent System Operator, Inc. filed Midcontinent Independent System Operator, Inc. submits tariff filing per 35.13(a)(2)(iii: 2026-08-18_Zero Injection Generator Interconnection Agreement to be effective 10/18/2026 under ER26-3552 Filing Type : 10 in FERC Docket ER26-3552 on Aug 18, 2026. The filing's text matches the eLibrary full-text search for "hyperscale".
Midcontinent Independent System Operator, Inc. submits tariff filing per 35.13(a)(2)(iii: 2026-08-28_Interconnection Reliability Requirements for Large Loads to be effective 12/4/2026 under ER26-3650 Filing Type : 10FERC ER26-3650, Accession 20260828-5278 Filed · Aug 28, 2026
Midcontinent Independent System Operator, Inc., Midcontinent Independent System Operator, Inc.
Midcontinent Independent System Operator, Inc., Midcontinent Independent System Operator, Inc. filed Midcontinent Independent System Operator, Inc. submits tariff filing per 35.13(a)(2)(iii: 2026-08-28_Interconnection Reliability Requirements for Large Loads to be effective 12/4/2026 under ER26-3650 Filing Type : 10 in FERC Docket ER26-3650 on Aug 28, 2026. The filing's text matches the eLibrary full-text search for "hyperscale".
Southwest Power Pool, Inc. submits tariff filing per 35.13(a)(2)(iii: Revisions to Clarify the Conditional High Impact Large Load Policy to be effective 12/31/9998 under ER26-3685 Filing Type : 10FERC ER26-3685, Accession 20260902-5062 Filed · Sep 2, 2026
Southwest Power Pool, Inc.
Southwest Power Pool, Inc. filed Southwest Power Pool, Inc. submits tariff filing per 35.13(a)(2)(iii: Revisions to Clarify the Conditional High Impact Large Load Policy to be effective 12/31/9998 under ER26-3685 Filing Type : 10 in FERC Docket ER26-3685 on Sep 2, 2026.
ITC Midwest LLC submits tariff filing per 35.13(a)(2)(iii: ITCMW RS 239 Contribution in Aid and Construction Agreement to be effective 11/2/2026 under ER26-3689 Filing Type : 10FERC ER26-3689, Accession 20260902-5110 Filed · Sep 2, 2026
ITC Midwest LLC
ITC Midwest LLC filed ITC Midwest LLC submits tariff filing per 35.13(a)(2)(iii: ITCMW RS 239 Contribution in Aid and Construction Agreement to be effective 11/2/2026 under ER26-3689 Filing Type : 10 in FERC Docket ER26-3689 on Sep 2, 2026. The filing's text matches the eLibrary full-text search for "hyperscale".
The Dayton Power and Light Company submits tariff filing per 35.13(a)(2)(iii: Construction Service Agreement - Piqua Initial Service to be effective 11/9/2026 under ER26-3752 Filing Type : 10FERC ER26-3752, Accession 20260910-5277 Filed · Sep 10, 2026
The Dayton Power and Light Company
The Dayton Power and Light Company filed The Dayton Power and Light Company submits tariff filing per 35.13(a)(2)(iii: Construction Service Agreement - Piqua Initial Service to be effective 11/9/2026 under ER26-3752 Filing Type : 10 in FERC Docket ER26-3752 on Sep 10, 2026. The filing's text matches the eLibrary full-text search for "co-location data center".
Request to file Out of Time Comments of Sierra Club members and supporters re the Desert Southwest Expansion Project under PF26-9.FERC PF26-9, Accession 20260810-5014 Filed · Aug 10, 2026
Sierra Club
Sierra Club filed Request to file Out of Time Comments of Sierra Club members and supporters re the Desert Southwest Expansion Project under PF26-9. in FERC Docket PF26-9 on Aug 10, 2026. The filing's text matches the eLibrary full-text search for "hyperscale".
Supplemental Comments of Relentless Energy Systems LLC to update the Geometric Phase Isolation technical and patent record filed on 07/13/2026 re Interconnection of Large Loads to the Interstate Transmission System under RM26-4.FERC RM26-4, Accession 20260908-5076 Filed · Sep 8, 2026
Relentless Energy Systems LLC
Relentless Energy Systems LLC filed Supplemental Comments of Relentless Energy Systems LLC to update the Geometric Phase Isolation technical and patent record filed on 07/13/2026 re Interconnection of Large Loads to the Interstate Transmission System under RM26-4. in FERC Docket RM26-4 on Sep 8, 2026.
Answer of Constellation Energy Generation, LLC in support of PJM Interconnection, L.L.C's Motion for Extension of Time under EL25-49 et al.FERC EL25-49, Accession 20260803-5236 Filed · Aug 3, 2026
Constellation Energy Generation, LLC; also docketed in AD24-11-001, ER26-1479-000, EL25-20-001
Constellation Energy Generation, LLC filed Answer of Constellation Energy Generation, LLC in support of PJM Interconnection, L.L.C's Motion for Extension of Time under EL25-49 et al. in FERC Docket EL25-49 on Aug 3, 2026.
Motion for Leave and Answer of Constellation Energy Generation, LLC to Indicated PJM Transmission Owner's Rehearing Request under EL25-49 et al.FERC EL25-49, Accession 20260804-5163 Filed · Aug 4, 2026
Constellation Energy Generation, LLC; also docketed in AD24-11-001, EL25-20-001, ER26-1479-000
Constellation Energy Generation, LLC filed Motion for Leave and Answer of Constellation Energy Generation, LLC to Indicated PJM Transmission Owner's Rehearing Request under EL25-49 et al. in FERC Docket EL25-49 on Aug 4, 2026.
Motion for Leave to Answer and Answer of PJM Interconnection, L.L.C. to the Answer of Constellation Energy Generation, LLC filed on 08/03/2026 under EL25-49 et al.FERC EL25-49, Accession 20260810-5120 Filed · Aug 10, 2026
PJM Interconnection, L.L.C., PJM Interconnection, L.L.C.; also docketed in AD24-11-001, ER26-1479-000, EL25-20-001
PJM Interconnection, L.L.C., PJM Interconnection, L.L.C. filed Motion for Leave to Answer and Answer of PJM Interconnection, L.L.C. to the Answer of Constellation Energy Generation, LLC filed on 08/03/2026 under EL25-49 et al. in FERC Docket EL25-49 on Aug 10, 2026.
Notice of Extension of Time re PJM Interconnection, L.L.C. et al. under EL25-49 et al.FERC EL25-49, Accession 20260814-3005 Order · Aug 14, 2026
SECRETARY OF THE COMMISSION, FERC, SECRETARY OF THE COMMISSION, FERC; also docketed in EL25-20-001, AD24-11-001, ER26-1479-000
FERC issued Notice of Extension of Time re PJM Interconnection, L.L.C. et al. under EL25-49 et al. in Docket EL25-49 on Aug 14, 2026.
Motion for Leave to Answer and Answer of Vistra Corp. to Northern Virginia Electric Cooperative, Inc.'s 07/29/2026 Motion for Clarification of the 06/18/2026 Order under EL25-49, et al.FERC EL25-49, Accession 20260818-5146 Filed · Aug 18, 2026
Vistra Corp.; also docketed in AD24-11-001, ER26-1479-000, EL25-20-001
Vistra Corp. filed Motion for Leave to Answer and Answer of Vistra Corp. to Northern Virginia Electric Cooperative, Inc.'s 07/29/2026 Motion for Clarification of the 06/18/2026 Order under EL25-49, et al. in FERC Docket EL25-49 on Aug 18, 2026.
Notice of Denial of Rehearing by Operation of Law and Providing for Further Consideration re PJM Interconnection, L.L.C. et al. v. Constellation Energy Generation, LLC under EL25-49 et al.FERC EL25-49, Accession 20260820-3008 Order · Aug 20, 2026
SECRETARY OF THE COMMISSION - FERC; also docketed in EL25-20-002, AD24-11-002, ER26-1479-001
FERC issued Notice of Denial of Rehearing by Operation of Law and Providing for Further Consideration re PJM Interconnection, L.L.C. et al. v. Constellation Energy Generation, LLC under EL25-49 et al. in Docket EL25-49 on Aug 20, 2026.
Answer of Constellation Energy Generation, LLC in support of PJM Interconnection, L.L.C.'s Motion for Abeyance under EL26-67.FERC EL26-67, Accession 20260803-5234 Filed · Aug 3, 2026
Constellation Energy Generation, LLC
Constellation Energy Generation, LLC filed Answer of Constellation Energy Generation, LLC in support of PJM Interconnection, L.L.C.'s Motion for Abeyance under EL26-67. in FERC Docket EL26-67 on Aug 3, 2026.
Motion for Abeyance and Request for Shortened Answer Period and Expedited Treatment of Silver Run Electric, LLC under EL26-67.FERC EL26-67, Accession 20260803-5261 Filed · Aug 3, 2026
Silver Run Electric, LLC
Silver Run Electric, LLC filed Motion for Abeyance and Request for Shortened Answer Period and Expedited Treatment of Silver Run Electric, LLC under EL26-67. in FERC Docket EL26-67 on Aug 3, 2026.
Notice Establishing Answer Period re PJM Interconnection, L.L.C. et al. under EL26-67.FERC EL26-67, Accession 20260804-3065 Order · Aug 4, 2026
SECRETARY OF THE COMMISSION, FERC, SECRETARY OF THE COMMISSION, FERC
FERC issued Notice Establishing Answer Period re PJM Interconnection, L.L.C. et al. under EL26-67. in Docket EL26-67 on Aug 4, 2026.
Answer of Constellation Energy Generation, LLC in response to Transmission Owner's 07/20/2026 Request for Clarification under EL26-67.FERC EL26-67, Accession 20260804-5159 Filed · Aug 4, 2026
Constellation Energy Generation, LLC
Constellation Energy Generation, LLC filed Answer of Constellation Energy Generation, LLC in response to Transmission Owner's 07/20/2026 Request for Clarification under EL26-67. in FERC Docket EL26-67 on Aug 4, 2026.
Answer of Corporate Energy Buyers Association in support of PJM Interconnection, L.L.C.'s et al. 07/28/2026 Motion for Abeyance under EL26-67.FERC EL26-67, Accession 20260807-5219 Filed · Aug 7, 2026
Corporate Energy Buyers Association
Corporate Energy Buyers Association filed Answer of Corporate Energy Buyers Association in support of PJM Interconnection, L.L.C.'s et al. 07/28/2026 Motion for Abeyance under EL26-67. in FERC Docket EL26-67 on Aug 7, 2026.
Comments of the Natural Gas Supply Association on the Informational Reports re Resource Adequacy Measures and Proposals, PJM Interconnection L.L.C., et al. under EL26-67, et. al.FERC EL26-67, Accession 20260810-5108 Filed · Aug 10, 2026
NATURAL GAS SUPPLY ASSOCIATION (DC); also docketed in EL26-69-000, EL26-68-000, EL26-70-000, EL26-71-000, EL26-72-000
NATURAL GAS SUPPLY ASSOCIATION (DC) filed Comments of the Natural Gas Supply Association on the Informational Reports re Resource Adequacy Measures and Proposals, PJM Interconnection L.L.C., et al. under EL26-67, et. al. in FERC Docket EL26-67 on Aug 10, 2026.
Errata to the 06/18/2026 Commission issued Order Instituting Proceeding Under Section 206 of the Federal Power Act; correcting footnote 13 re PJM Interconnection, L.L.C. et al. under EL26-67. For order see accession number 20260618-3105.FERC EL26-67, Accession 20260813-3025 Order · Aug 13, 2026
COMMISSIONERS AND IMMEDIATE STAFF (THE COMMISSION), SECRETARY OF THE COMMISSION - FERC
FERC issued Errata to the 06/18/2026 Commission issued Order Instituting Proceeding Under Section 206 of the Federal Power Act; correcting footnote 13 re PJM Interconnection, L.L.C. et al. under EL26-67. For order see accession number 20260618-3105. in Docket EL26-67 on Aug 13, 2026.
Letter order granting PJM Interconnection, L.L.C.s et al. 07/28/2026 filing of an Abeyance Motion to hold this proceeding in abeyance for 90 days under EL26-67.FERC EL26-67, Accession 20260814-3059 Order · Aug 14, 2026
SECRETARY OF THE COMMISSION, FERC, COMMISSIONERS AND IMMEDIATE STAFF (THE COMMISSION), SECRETARY OF THE COMMISSION, FERC
FERC issued Letter order granting PJM Interconnection, L.L.C.s et al. 07/28/2026 filing of an Abeyance Motion to hold this proceeding in abeyance for 90 days under EL26-67. in Docket EL26-67 on Aug 14, 2026.
Notice of Denial of Rehearing by Operation of Law and Providing for Further Consideration re PJM Interconnection, L.L.C. et al. under EL26-67.FERC EL26-67, Accession 20260820-3006 Order · Aug 20, 2026
SECRETARY OF THE COMMISSION - FERC
FERC issued Notice of Denial of Rehearing by Operation of Law and Providing for Further Consideration re PJM Interconnection, L.L.C. et al. under EL26-67. in Docket EL26-67 on Aug 20, 2026.
Joint Motion of Southwest Power Pool, Inc. et al. to Hold Section 206 Proceeding in Abeyance under EL26-68.FERC EL26-68, Accession 20260803-5209 Filed · Aug 3, 2026
Southwest Power Pool, Inc.
Southwest Power Pool, Inc. filed Joint Motion of Southwest Power Pool, Inc. et al. to Hold Section 206 Proceeding in Abeyance under EL26-68. in FERC Docket EL26-68 on Aug 3, 2026.
Amended Joint Motion of Southwest Power Pool, Inc. et al. to Hold Section 206 Proceeding in Abeyance under EL26-68.FERC EL26-68, Accession 20260803-5265 Filed · Aug 3, 2026
Southwest Power Pool, Inc., EVERGY, INC., AMERICAN ELECTRIC POWER SERVICE CORPORATION
Southwest Power Pool, Inc., EVERGY, INC., AMERICAN ELECTRIC POWER SERVICE CORPORATION filed Amended Joint Motion of Southwest Power Pool, Inc. et al. to Hold Section 206 Proceeding in Abeyance under EL26-68. in FERC Docket EL26-68 on Aug 3, 2026.
Notice Establishing Answer Period re Southwest Power Pool, Inc. et al. under EL26-68.FERC EL26-68, Accession 20260804-3066 Order · Aug 4, 2026
SECRETARY OF THE COMMISSION - FERC
FERC issued Notice Establishing Answer Period re Southwest Power Pool, Inc. et al. under EL26-68. in Docket EL26-68 on Aug 4, 2026.
Comments of the Southwest Power Pool Regional State Committee in support of Southwest Power Pool, Inc.’s request for an extension of time until 11/20/2026 to respond to the FERC's 06/18/2026 Order to Show Cause under EL26-68.FERC EL26-68, Accession 20260807-5123 Filed · Aug 7, 2026
Southwest Power Pool Regional State Committee
Southwest Power Pool Regional State Committee filed Comments of the Southwest Power Pool Regional State Committee in support of Southwest Power Pool, Inc.’s request for an extension of time until 11/20/2026 to respond to the FERC's 06/18/2026 Order to Show Cause under EL26-68. in FERC Docket EL26-68 on Aug 7, 2026.
Comments of the Public Service Commission of the State of Missouri in support of Southwest Power Pool, Inc.'s et al. request for abeyance filed 08/03/2026 under EL26-68.FERC EL26-68, Accession 20260807-5150 Filed · Aug 7, 2026
Missouri Public Service Commission
Missouri Public Service Commission filed Comments of the Public Service Commission of the State of Missouri in support of Southwest Power Pool, Inc.'s et al. request for abeyance filed 08/03/2026 under EL26-68. in FERC Docket EL26-68 on Aug 7, 2026.
Answer of Corporate Energy Buyers Association in Support of the Amended Motion for Abeyance filed on 08/03/2026 by Southwest Power Pool, Inc. et al. under EL26-68.FERC EL26-68, Accession 20260807-5220 Filed · Aug 7, 2026
Corporate Energy Buyers Association
Corporate Energy Buyers Association filed Answer of Corporate Energy Buyers Association in Support of the Amended Motion for Abeyance filed on 08/03/2026 by Southwest Power Pool, Inc. et al. under EL26-68. in FERC Docket EL26-68 on Aug 7, 2026.
Letter order granting Southwest Power Pool, Inc.'s 08/03/2026 filing of an Abeyance Motion to hold this proceeding in abeyance until 11/20/2026 under EL26-68.FERC EL26-68, Accession 20260814-3060 Order · Aug 14, 2026
SECRETARY OF THE COMMISSION, FERC, COMMISSIONERS AND IMMEDIATE STAFF (THE COMMISSION), SECRETARY OF THE COMMISSION, FERC
FERC issued Letter order granting Southwest Power Pool, Inc.'s 08/03/2026 filing of an Abeyance Motion to hold this proceeding in abeyance until 11/20/2026 under EL26-68. in Docket EL26-68 on Aug 14, 2026.
Request for Abeyance of the New York Transmission Owners and Request for Expedited Commission Action and Shortened Comment Period under EL26-69.FERC EL26-69, Accession 20260803-5210 Filed · Aug 3, 2026
Central Hudson Gas & Electric Corporation, Central Hudson Gas & Electric Corporation, Consolidated Edison Company of New York, Inc.
Central Hudson Gas & Electric Corporation, Central Hudson Gas & Electric Corporation, Consolidated Edison Company of New York, Inc. filed Request for Abeyance of the New York Transmission Owners and Request for Expedited Commission Action and Shortened Comment Period under EL26-69. in FERC Docket EL26-69 on Aug 3, 2026.
Motion of New York Independent System Operator, Inc. for Abeyance, Request for Shortened Comment Period and Request for Expedited Action under EL26-69.FERC EL26-69, Accession 20260803-5229 Filed · Aug 3, 2026
New York Independent System Operator, Inc.
New York Independent System Operator, Inc. filed Motion of New York Independent System Operator, Inc. for Abeyance, Request for Shortened Comment Period and Request for Expedited Action under EL26-69. in FERC Docket EL26-69 on Aug 3, 2026.
Motion for Abeyance and Request for Shortened Answer Period and Expedited Treatment of LS Power Grid New York Corporation I and New York Transco LLC under EL26-69.FERC EL26-69, Accession 20260803-5241 Filed · Aug 3, 2026
LS Power Grid New York Corporation I, New York Transco LLC
LS Power Grid New York Corporation I, New York Transco LLC filed Motion for Abeyance and Request for Shortened Answer Period and Expedited Treatment of LS Power Grid New York Corporation I and New York Transco LLC under EL26-69. in FERC Docket EL26-69 on Aug 3, 2026.
Notice Establishing Answer Period re New York Independent System Operator, Inc. et al. under EL26-69.FERC EL26-69, Accession 20260804-3067 Order · Aug 4, 2026
SECRETARY OF THE COMMISSION, FERC, SECRETARY OF THE COMMISSION, FERC
FERC issued Notice Establishing Answer Period re New York Independent System Operator, Inc. et al. under EL26-69. in Docket EL26-69 on Aug 4, 2026.
Letter order granting New York Independent System Operator, Inc.'s et al. 08/03/2026 filing of an abeyance motions to hold this proceeding in abeyance for 90 days under EL26-69.FERC EL26-69, Accession 20260814-3068 Order · Aug 14, 2026
COMMISSIONERS AND IMMEDIATE STAFF (THE COMMISSION), SECRETARY OF THE COMMISSION - FERC
FERC issued Letter order granting New York Independent System Operator, Inc.'s et al. 08/03/2026 filing of an abeyance motions to hold this proceeding in abeyance for 90 days under EL26-69. in Docket EL26-69 on Aug 14, 2026.
Notice of Denial of Rehearing by Operation of Law and Providing for Further Consideration re New York Independent System Operator, Inc. et al. under EL26-69.FERC EL26-69, Accession 20260820-3007 Order · Aug 20, 2026
SECRETARY OF THE COMMISSION - FERC
FERC issued Notice of Denial of Rehearing by Operation of Law and Providing for Further Consideration re New York Independent System Operator, Inc. et al. under EL26-69. in Docket EL26-69 on Aug 20, 2026.
Motion of Midcontinent Independent System Operator Inc. and the MISO Transmission Owners to Hold Proceeding in Abeyance and Request for Shortened Comment Period and Expedited Treatment under EL26-70.FERC EL26-70, Accession 20260803-5249 Filed · Aug 3, 2026
Midcontinent Independent System Operator Inc., Midcontinent Independent System Operator Inc., Midcontinent Independent System Operator Inc.
Midcontinent Independent System Operator Inc., Midcontinent Independent System Operator Inc., Midcontinent Independent System Operator Inc. filed Motion of Midcontinent Independent System Operator Inc. and the MISO Transmission Owners to Hold Proceeding in Abeyance and Request for Shortened Comment Period and Expedited Treatment under EL26-70. in FERC Docket EL26-70 on Aug 3, 2026.
Notice Establishing Answer Period re Midcontinent Independent System Operator, Inc. et al. under EL26-70.FERC EL26-70, Accession 20260804-3068 Order · Aug 4, 2026
SECRETARY OF THE COMMISSION - FERC
FERC issued Notice Establishing Answer Period re Midcontinent Independent System Operator, Inc. et al. under EL26-70. in Docket EL26-70 on Aug 4, 2026.
Answer of the Organization of MISO States, Inc. in Support of Midcontinent Independent System Operator, Inc.'s et al. 08/03/2026 Motion to Hold Proceeding in Abeyance under EL26-70.FERC EL26-70, Accession 20260807-5186 Filed · Aug 7, 2026
Organization of MISO States, Inc.
Organization of MISO States, Inc. filed Answer of the Organization of MISO States, Inc. in Support of Midcontinent Independent System Operator, Inc.'s et al. 08/03/2026 Motion to Hold Proceeding in Abeyance under EL26-70. in FERC Docket EL26-70 on Aug 7, 2026.
Answer of American Municipal Power, Inc. in Response to the Motion to Hold Abeyance filed by Midcontinent Independent System Operator, Inc. et al. under EL26-70.FERC EL26-70, Accession 20260807-5199 Filed · Aug 7, 2026
American Municipal Power, Inc., American Municipal Power, Inc.
American Municipal Power, Inc., American Municipal Power, Inc. filed Answer of American Municipal Power, Inc. in Response to the Motion to Hold Abeyance filed by Midcontinent Independent System Operator, Inc. et al. under EL26-70. in FERC Docket EL26-70 on Aug 7, 2026.
Answer of Corporate Energy Buyers Association in Support of Midcontinent Independent System Operator, Inc.'s et al. 08/03/2026 Motion for Abeyance under EL26-70.FERC EL26-70, Accession 20260807-5216 Filed · Aug 7, 2026
Corporate Energy Buyers Association
Corporate Energy Buyers Association filed Answer of Corporate Energy Buyers Association in Support of Midcontinent Independent System Operator, Inc.'s et al. 08/03/2026 Motion for Abeyance under EL26-70. in FERC Docket EL26-70 on Aug 7, 2026.
Comments of Sparkfund on Midcontinent Independent System Operator Inc.’s Informational Report filed on 07/20/2026 under EL26-70.FERC EL26-70, Accession 20260812-5036 Filed · Aug 12, 2026
Sparkfund
Sparkfund filed Comments of Sparkfund on Midcontinent Independent System Operator Inc.’s Informational Report filed on 07/20/2026 under EL26-70. in FERC Docket EL26-70 on Aug 12, 2026.
Letter order granting Midcontinent Independent System Operator, Inc.'s et al. 08/03/2026 filing of Abeyance Motion to hold this proceeding in abeyance for 90 days under EL26-70.FERC EL26-70, Accession 20260814-3058 Order · Aug 14, 2026
SECRETARY OF THE COMMISSION - FERC, COMMISSIONERS AND IMMEDIATE STAFF (THE COMMISSION)
FERC issued Letter order granting Midcontinent Independent System Operator, Inc.'s et al. 08/03/2026 filing of Abeyance Motion to hold this proceeding in abeyance for 90 days under EL26-70. in Docket EL26-70 on Aug 14, 2026.
Comments of the Organization of MISO States, Inc. on the Informational Report of the Midcontinent Independent System Operator, Inc. filed on 07/20/2026 under EL26-70.FERC EL26-70, Accession 20260814-5198 Filed · Aug 14, 2026
Organization of MISO States, Inc.
Organization of MISO States, Inc. filed Comments of the Organization of MISO States, Inc. on the Informational Report of the Midcontinent Independent System Operator, Inc. filed on 07/20/2026 under EL26-70. in FERC Docket EL26-70 on Aug 14, 2026.
Notice of Denial of Rehearing by Operation of Law and Providing for Further Consideration re Midcontinent Independent System Operator, Inc. et al. under EL26-70.FERC EL26-70, Accession 20260820-3009 Order · Aug 20, 2026
SECRETARY OF THE COMMISSION - FERC
FERC issued Notice of Denial of Rehearing by Operation of Law and Providing for Further Consideration re Midcontinent Independent System Operator, Inc. et al. under EL26-70. in Docket EL26-70 on Aug 20, 2026.
Request for Abeyance of Southern California Edison Company, et al. in response to the Order issued on 06/18/2026 under EL26-71.FERC EL26-71, Accession 20260803-5166 Filed · Aug 3, 2026
Southern California Edison Company, San Diego Gas & Electric Company, Pacific Gas & Electric Company
Southern California Edison Company, San Diego Gas & Electric Company, Pacific Gas & Electric Company filed Request for Abeyance of Southern California Edison Company, et al. in response to the Order issued on 06/18/2026 under EL26-71. in FERC Docket EL26-71 on Aug 3, 2026.
Motion to Hold Filing Obligation in Abeyance of DCR Transmission, L.L.C. under EL26-71.FERC EL26-71, Accession 20260803-5170 Filed · Aug 3, 2026
DCR Transmission, L.L.C.
DCR Transmission, L.L.C. filed Motion to Hold Filing Obligation in Abeyance of DCR Transmission, L.L.C. under EL26-71. in FERC Docket EL26-71 on Aug 3, 2026.
Motion for Abeyance of the California Independent System Operator Corporation under EL26-71.FERC EL26-71, Accession 20260803-5206 Filed · Aug 3, 2026
California Independent System Operator Corporation
California Independent System Operator Corporation filed Motion for Abeyance of the California Independent System Operator Corporation under EL26-71. in FERC Docket EL26-71 on Aug 3, 2026.
Conditional Motion for Abeyance on Behalf of the Cities of Anaheim, Azusa, Banning, Colton, Pasadena, and Riverside, California, under EL26-71.FERC EL26-71, Accession 20260803-5227 Filed · Aug 3, 2026
Six Cities CA
Six Cities CA filed Conditional Motion for Abeyance on Behalf of the Cities of Anaheim, Azusa, Banning, Colton, Pasadena, and Riverside, California, under EL26-71. in FERC Docket EL26-71 on Aug 3, 2026.
Notice Establishing Answer Period re California Independent System Operator Corporation et al. under EL26-71.FERC EL26-71, Accession 20260804-3069 Order · Aug 4, 2026
SECRETARY OF THE COMMISSION, FERC, SECRETARY OF THE COMMISSION, FERC
FERC issued Notice Establishing Answer Period re California Independent System Operator Corporation et al. under EL26-71. in Docket EL26-71 on Aug 4, 2026.
Notice of Shortened Answer Period re California Independent System Operator Corporation et al. under EL26-71.FERC EL26-71, Accession 20260804-3091 Order · Aug 4, 2026
SECRETARY OF THE COMMISSION, FERC, SECRETARY OF THE COMMISSION, FERC
FERC issued Notice of Shortened Answer Period re California Independent System Operator Corporation et al. under EL26-71. in Docket EL26-71 on Aug 4, 2026.
Answer of Corporate Energy Buyers Association in Support of California Independent System Operator Corporation's et al. 08/03/2026 et al. Motion for Abeyance under EL26-71.FERC EL26-71, Accession 20260807-5215 Filed · Aug 7, 2026
Corporate Energy Buyers Association
Corporate Energy Buyers Association filed Answer of Corporate Energy Buyers Association in Support of California Independent System Operator Corporation's et al. 08/03/2026 et al. Motion for Abeyance under EL26-71. in FERC Docket EL26-71 on Aug 7, 2026.
Answer of Morongo Transmission LLC in response to the Order to Show Cause issued on 06/18/2026 under EL26-71.FERC EL26-71, Accession 20260812-5158 Filed · Aug 12, 2026
Morongo Transmission LLC
Morongo Transmission LLC filed Answer of Morongo Transmission LLC in response to the Order to Show Cause issued on 06/18/2026 under EL26-71. in FERC Docket EL26-71 on Aug 12, 2026.
Order Granting Rescission and Abeyance Requests re California Independent System Operator Corporation et al. under EL26-71.FERC EL26-71, Accession 20260814-3061 Order · Aug 14, 2026
COMMISSIONERS AND IMMEDIATE STAFF (THE COMMISSION), SECRETARY OF THE COMMISSION - FERC
FERC issued Order Granting Rescission and Abeyance Requests re California Independent System Operator Corporation et al. under EL26-71. in Docket EL26-71 on Aug 14, 2026.
Notice of Denial of Rehearing by Operation of Law and Providing for Further Consideration re California Independent System Operator Corporation et al. under EL26-71.FERC EL26-71, Accession 20260820-3010 Order · Aug 20, 2026
SECRETARY OF THE COMMISSION - FERC
FERC issued Notice of Denial of Rehearing by Operation of Law and Providing for Further Consideration re California Independent System Operator Corporation et al. under EL26-71. in Docket EL26-71 on Aug 20, 2026.
Notice Establishing Answer Period re ISO New England Inc. et al. under EL26-72.FERC EL26-72, Accession 20260804-3070 Order · Aug 4, 2026
SECRETARY OF THE COMMISSION - FERC
FERC issued Notice Establishing Answer Period re ISO New England Inc. et al. under EL26-72. in Docket EL26-72 on Aug 4, 2026.
Answer of the New England States Committee on Electricity in Response to Joint Motion for Abeyance filed by ISO New England, Inc. et al. under EL26-72.FERC EL26-72, Accession 20260807-5196 Filed · Aug 7, 2026
New England States Committee on Electricity, New England States Committee on Electricity
New England States Committee on Electricity, New England States Committee on Electricity filed Answer of the New England States Committee on Electricity in Response to Joint Motion for Abeyance filed by ISO New England, Inc. et al. under EL26-72. in FERC Docket EL26-72 on Aug 7, 2026.
Letter order granting ISO New England Inc.'s et al. 08/03/2026 filing of the Abeyance Motion to hold this proceeding in abeyance for 90 days under EL26-72.FERC EL26-72, Accession 20260814-3056 Order · Aug 14, 2026
SECRETARY OF THE COMMISSION - FERC, COMMISSIONERS AND IMMEDIATE STAFF (THE COMMISSION)
FERC issued Letter order granting ISO New England Inc.'s et al. 08/03/2026 filing of the Abeyance Motion to hold this proceeding in abeyance for 90 days under EL26-72. in Docket EL26-72 on Aug 14, 2026.
Notice of Denial of Rehearing by Operation of Law and Providing for Further Consideration re ISO New England Inc. et al. under EL26-72.FERC EL26-72, Accession 20260820-3020 Order · Aug 20, 2026
SECRETARY OF THE COMMISSION - FERC
FERC issued Notice of Denial of Rehearing by Operation of Law and Providing for Further Consideration re ISO New England Inc. et al. under EL26-72. in Docket EL26-72 on Aug 20, 2026.
Comments of Enel North America, Inc. o/b/o Enel X North America, Inc. in support of ISO New England Inc.’s revisions to its Transmission, Markets and Services Tariff to change the Capacity Performance Payment Rate under ER26-3047.FERC ER26-3047, Accession 20260803-5174 Filed · Aug 3, 2026
Enel X North America, Inc.
Enel X North America, Inc. filed Comments of Enel North America, Inc. o/b/o Enel X North America, Inc. in support of ISO New England Inc.’s revisions to its Transmission, Markets and Services Tariff to change the Capacity Performance Payment Rate under ER26-3047. in FERC Docket ER26-3047 on Aug 3, 2026.
Motion for Leave to Answer and Answer of ISO New England Inc. to the Protest of Constellation Energy Generation, LLC et al. under ER26-3047.FERC ER26-3047, Accession 20260805-5184 Filed · Aug 5, 2026
ISO New England Inc., ISO New England Inc., ISO New England Inc.
ISO New England Inc., ISO New England Inc., ISO New England Inc. filed Motion for Leave to Answer and Answer of ISO New England Inc. to the Protest of Constellation Energy Generation, LLC et al. under ER26-3047. in FERC Docket ER26-3047 on Aug 5, 2026.
Comments of East Kentucky Power Cooperative re PJM Interconnection’s recent proposals to FERC for addressing capacity needs in the short and long terms under ER26-3380.FERC ER26-3380, Accession 20260811-4003 Filed · Aug 11, 2026
EAST KENTUCKY POWER COOPERATIVE
EAST KENTUCKY POWER COOPERATIVE filed Comments of East Kentucky Power Cooperative re PJM Interconnection’s recent proposals to FERC for addressing capacity needs in the short and long terms under ER26-3380. in FERC Docket ER26-3380 on Aug 11, 2026.
PJM Interconnection, L.L.C. submits tariff filing per : Supplemental Filing of Croop Affidavit in ER26-3380 to be effective N/A under ER26-3380 Filing Type : 150FERC ER26-3380, Accession 20260814-5244 Filed · Aug 14, 2026
PJM Interconnection, L.L.C.
PJM Interconnection, L.L.C. filed PJM Interconnection, L.L.C. submits tariff filing per : Supplemental Filing of Croop Affidavit in ER26-3380 to be effective N/A under ER26-3380 Filing Type : 150 in FERC Docket ER26-3380 on Aug 14, 2026.
Comments of the Illinois Commerce Commission in support of PJM Interconnection, L.L.C.’s 07/31/2026 filing under ER26-3380.FERC ER26-3380, Accession 20260819-5134 Filed · Aug 19, 2026
Illinois Commerce Commission
Illinois Commerce Commission filed Comments of the Illinois Commerce Commission in support of PJM Interconnection, L.L.C.’s 07/31/2026 filing under ER26-3380. in FERC Docket ER26-3380 on Aug 19, 2026.
Notice Rescinding Prior Notice re PJM Interconnection, L.L.C. under ER26-3515.FERC ER26-3515, Accession 20260820-3043 Order · Aug 20, 2026
SECRETARY OF THE COMMISSION, FERC, SECRETARY OF THE COMMISSION, FERC
FERC issued Notice Rescinding Prior Notice re PJM Interconnection, L.L.C. under ER26-3515. in Docket ER26-3515 on Aug 20, 2026.
PJM Transmission Owners submits Notice of Partial Compliance with the Commission’s 06/18/2026 order under EL25-49, et al.FERC EL25-49, Accession 20260820-5187 Filed · Aug 20, 2026
PJM Transmission Owners, PJM Transmission Owners, PJM Transmission Owners; also docketed in ER26-1479-000, ER26-3537-000, AD24-11-001, EL25-20-001
PJM Transmission Owners, PJM Transmission Owners, PJM Transmission Owners filed PJM Transmission Owners submits Notice of Partial Compliance with the Commission’s 06/18/2026 order under EL25-49, et al. in FERC Docket EL25-49 on Aug 20, 2026.
Motion for Leave to Answer and Answer of Northern Virginia Electric Cooperative, Inc. to the 08/18/2026 Answer et al. of Vistra Corp. under EL25-49, et al.FERC EL25-49, Accession 20260828-5273 Filed · Aug 28, 2026
Northern Virginia Electric Cooperative, Inc., Northern Virginia Electric Cooperative, Inc., Northern Virginia Electric Cooperative, Inc.; also docketed in AD24-11-000, EL25-20-000
Northern Virginia Electric Cooperative, Inc., Northern Virginia Electric Cooperative, Inc., Northern Virginia Electric Cooperative, Inc. filed Motion for Leave to Answer and Answer of Northern Virginia Electric Cooperative, Inc. to the 08/18/2026 Answer et al. of Vistra Corp. under EL25-49, et al. in FERC Docket EL25-49 on Aug 28, 2026.
Order Accepting Tariff Revisions re ISO New England Inc. et al. under ER26-3047.FERC ER26-3047, Accession 20260831-3020 Order · Aug 31, 2026
SECRETARY OF THE COMMISSION - FERC, COMMISSIONERS AND IMMEDIATE STAFF (THE COMMISSION)
FERC issued Order Accepting Tariff Revisions re ISO New England Inc. et al. under ER26-3047. in Docket ER26-3047 on Aug 31, 2026.
Comments of the Organization of PJM States, Inc. in support of PJM Interconnection, L.L.C.’s 07/31/2026 filing under ER26-3380.FERC ER26-3380, Accession 20260821-5096 Filed · Aug 21, 2026
Organization of PJM States, Inc.
Organization of PJM States, Inc. filed Comments of the Organization of PJM States, Inc. in support of PJM Interconnection, L.L.C.’s 07/31/2026 filing under ER26-3380. in FERC Docket ER26-3380 on Aug 21, 2026.
Comments of the Solar Energy Industries Association in response to PJM Interconnection, L.L.C.’s Reliability Backstop Procurement proposal under ER26-3380.FERC ER26-3380, Accession 20260821-5105 Filed · Aug 21, 2026
Solar Energy Industries Association, Solar Energy Industries Association
Solar Energy Industries Association, Solar Energy Industries Association filed Comments of the Solar Energy Industries Association in response to PJM Interconnection, L.L.C.’s Reliability Backstop Procurement proposal under ER26-3380. in FERC Docket ER26-3380 on Aug 21, 2026.
Partial Protest and Comments of Dominion Energy Services, Inc. re PJM Interconnection, L.L.C.’s Reliability Backstop Procurement proposal under ER26-3380.FERC ER26-3380, Accession 20260821-5120 Filed · Aug 21, 2026
Dominion Energy Services, Inc.
Dominion Energy Services, Inc. filed Partial Protest and Comments of Dominion Energy Services, Inc. re PJM Interconnection, L.L.C.’s Reliability Backstop Procurement proposal under ER26-3380. in FERC Docket ER26-3380 on Aug 21, 2026.
Comments of Institute for Policy Integrity at New York University School of Law on PJM Interconnection, L.L.C.’s Section 205 filing to implement Reliability Backstop Procurement under ER26-3380.FERC ER26-3380, Accession 20260821-5125 Filed · Aug 21, 2026
Institute for Policy Integrity, New York University School o
Institute for Policy Integrity, New York University School o filed Comments of Institute for Policy Integrity at New York University School of Law on PJM Interconnection, L.L.C.’s Section 205 filing to implement Reliability Backstop Procurement under ER26-3380. in FERC Docket ER26-3380 on Aug 21, 2026.
Comments of Public Service Commission of West Virginia in response to PJM Interconnection, L.L.C.’s Reliability Backstop Procurement proposal under ER26-3380.FERC ER26-3380, Accession 20260821-5145 Filed · Aug 21, 2026
Public Service Commission of West Virginia
Public Service Commission of West Virginia filed Comments of Public Service Commission of West Virginia in response to PJM Interconnection, L.L.C.’s Reliability Backstop Procurement proposal under ER26-3380. in FERC Docket ER26-3380 on Aug 21, 2026.
Comments of Institute for Policy Integrity at New York University School of Law on PJM Interconnection, L.L.C.’s Section 205 filing to implement Reliability Backstop Procurement under ER26-3380.FERC ER26-3380, Accession 20260821-5155 Filed · Aug 21, 2026
Institute for Policy Integrity, New York University School o
Institute for Policy Integrity, New York University School o filed Comments of Institute for Policy Integrity at New York University School of Law on PJM Interconnection, L.L.C.’s Section 205 filing to implement Reliability Backstop Procurement under ER26-3380. in FERC Docket ER26-3380 on Aug 21, 2026.
Comments of PJM Industrial Customer Coalition on PJM Interconnection, L.L.C.’s Reliability Backstop Procurement Proposal under ER26-3380.FERC ER26-3380, Accession 20260821-5176 Filed · Aug 21, 2026
PJM Industrial Customer Coalition
PJM Industrial Customer Coalition filed Comments of PJM Industrial Customer Coalition on PJM Interconnection, L.L.C.’s Reliability Backstop Procurement Proposal under ER26-3380. in FERC Docket ER26-3380 on Aug 21, 2026.
Protest, Motion to Reject, and Alternative Request for the Imposition of Conditions of Delaware Division of the Public Advocate et al. under ER26-3380.FERC ER26-3380, Accession 20260821-5183 Filed · Aug 21, 2026
Delaware Division of the Public Advocate, District of Columbia Office of People's Counsel, Illinois Citizens Utility Board
Delaware Division of the Public Advocate, District of Columbia Office of People's Counsel, Illinois Citizens Utility Board filed Protest, Motion to Reject, and Alternative Request for the Imposition of Conditions of Delaware Division of the Public Advocate et al. under ER26-3380. in FERC Docket ER26-3380 on Aug 21, 2026.
Comments of New Jersey Board of Public Utilities in response to PJM Interconnection, L.L.C.’s Reliability Backstop Procurement proposal under ER26-3380.FERC ER26-3380, Accession 20260821-5192 Filed · Aug 21, 2026
New Jersey Board of Public Utilities, New Jersey Board of Public Utilities, New Jersey Board of Public Utilities
New Jersey Board of Public Utilities, New Jersey Board of Public Utilities, New Jersey Board of Public Utilities filed Comments of New Jersey Board of Public Utilities in response to PJM Interconnection, L.L.C.’s Reliability Backstop Procurement proposal under ER26-3380. in FERC Docket ER26-3380 on Aug 21, 2026.
Comments of the Public Utilities Commission of Ohio's Office of the Federal Energy Advocate re PJM Interconnection, L.L.C.'s 07/31/2026 revisions to the Open Access Transmission Tariff and the Reliability Assurance AgreementFERC ER26-3380, Accession 20260821-5197 Filed · Aug 21, 2026
Ohio Federal Energy Advocate
Ohio Federal Energy Advocate filed Comments of the Public Utilities Commission of Ohio's Office of the Federal Energy Advocate re PJM Interconnection, L.L.C.'s 07/31/2026 revisions to the Open Access Transmission Tariff and the Reliability Assurance Agreement under ER26-3380. in FERC Docket ER26-3380 on Aug 21, 2026.
Comments of Google LLC re PJM Interconnection, L.L.C.’s Reliability Backstop Procurement Proposal under ER26-3380.FERC ER26-3380, Accession 20260821-5206 Filed · Aug 21, 2026
Google LLC, Google LLC, Google LLC
Google LLC, Google LLC, Google LLC filed Comments of Google LLC re PJM Interconnection, L.L.C.’s Reliability Backstop Procurement Proposal under ER26-3380. in FERC Docket ER26-3380 on Aug 21, 2026.
Comments of American Municipal Power, Inc. re PJM Interconnection, L.L.C.’s 07/31/2026 filing under ER26-3380.FERC ER26-3380, Accession 20260821-5215 Filed · Aug 21, 2026
American Municipal Power, Inc., American Municipal Power, Inc.
American Municipal Power, Inc., American Municipal Power, Inc. filed Comments of American Municipal Power, Inc. re PJM Interconnection, L.L.C.’s 07/31/2026 filing under ER26-3380. in FERC Docket ER26-3380 on Aug 21, 2026.
Protest of the Pennsylvania Office of Consumer Advocate to PJM Interconnection, L.L.C.’s Reliability Backstop Procurement proposal under ER26-3380.FERC ER26-3380, Accession 20260821-5217 Filed · Aug 21, 2026
Pennsylvania Office of Consumer Advocate, Pennsylvania Office of Consumer Advocate
Pennsylvania Office of Consumer Advocate, Pennsylvania Office of Consumer Advocate filed Protest of the Pennsylvania Office of Consumer Advocate to PJM Interconnection, L.L.C.’s Reliability Backstop Procurement proposal under ER26-3380. in FERC Docket ER26-3380 on Aug 21, 2026.
Comments of Advanced Energy United in response to PJM Interconnection, L.L.C.’s 07/31/2026 filing under ER26-3380.FERC ER26-3380, Accession 20260821-5220 Filed · Aug 21, 2026
Advanced Energy United
Advanced Energy United filed Comments of Advanced Energy United in response to PJM Interconnection, L.L.C.’s 07/31/2026 filing under ER26-3380. in FERC Docket ER26-3380 on Aug 21, 2026.
Comments of Southern Maryland Electric Cooperative, Inc. re PJM Interconnection, L.L.C.’s Reliability Backstop Procurement filing under ER26-3380.FERC ER26-3380, Accession 20260821-5263 Filed · Aug 21, 2026
Southern Maryland Electric Cooperative, Inc.
Southern Maryland Electric Cooperative, Inc. filed Comments of Southern Maryland Electric Cooperative, Inc. re PJM Interconnection, L.L.C.’s Reliability Backstop Procurement filing under ER26-3380. in FERC Docket ER26-3380 on Aug 21, 2026.
Limited Protest of Constellation Energy Generation, LLC re PJM Interconnection, L.L.C.’s 07/31/2026 filing under ER26-3380.FERC ER26-3380, Accession 20260821-5266 Filed · Aug 21, 2026
Constellation Energy Generation, LLC
Constellation Energy Generation, LLC filed Limited Protest of Constellation Energy Generation, LLC re PJM Interconnection, L.L.C.’s 07/31/2026 filing under ER26-3380. in FERC Docket ER26-3380 on Aug 21, 2026.
Limited Protest of the NRG Companies re PJM Interconnection, L.L.C.’s 07/31/2026 filing proposing a Reliability Backstop Procurement under ER26-3380.FERC ER26-3380, Accession 20260821-5273 Filed · Aug 21, 2026
Riverside Generating Company, LLC, University Park Energy, LLC, NRG Business Marketing LLC
Riverside Generating Company, LLC, University Park Energy, LLC, NRG Business Marketing LLC filed Limited Protest of the NRG Companies re PJM Interconnection, L.L.C.’s 07/31/2026 filing proposing a Reliability Backstop Procurement under ER26-3380. in FERC Docket ER26-3380 on Aug 21, 2026.
Protest of the Indicated PJM Transmission Owners re PJM Interconnection, L.L.C.’s proposed tariff amendment under ER26-3380.FERC ER26-3380, Accession 20260821-5274 Filed · Aug 21, 2026
American Transmission Systems, Inc., American Transmission Systems, Inc., Trans-Allegheny Interstate Line Company
American Transmission Systems, Inc., American Transmission Systems, Inc., Trans-Allegheny Interstate Line Company filed Protest of the Indicated PJM Transmission Owners re PJM Interconnection, L.L.C.’s proposed tariff amendment under ER26-3380. in FERC Docket ER26-3380 on Aug 21, 2026.
Comments and Protest of FirstEnergy Service Company re PJM Interconnection, L.L.C.'s 07/31/2026 filing proposing to establish a Reliability Backstop Procurement mechanism under ER26-3380.FERC ER26-3380, Accession 20260821-5276 Filed · Aug 21, 2026
FirstEnergy Service Company, FirstEnergy Service Company, FirstEnergy Service Company
FirstEnergy Service Company, FirstEnergy Service Company, FirstEnergy Service Company filed Comments and Protest of FirstEnergy Service Company re PJM Interconnection, L.L.C.'s 07/31/2026 filing proposing to establish a Reliability Backstop Procurement mechanism under ER26-3380. in FERC Docket ER26-3380 on Aug 21, 2026.
The Ohio Consumers' Counsel submits Protest and Request for Rejection of Filing or in the Alternative for Evidentiary Hearings and/or Settlement Proceedings re PJM Interconnection, L.L.C.’s Reliability Backstop Procurement filingFERC ER26-3380, Accession 20260821-5281 Filed · Aug 21, 2026
Office of the Ohio Consumers' Counsel, Office of the Ohio Consumers' Counsel
Office of the Ohio Consumers' Counsel, Office of the Ohio Consumers' Counsel filed The Ohio Consumers' Counsel submits Protest and Request for Rejection of Filing or in the Alternative for Evidentiary Hearings and/or Settlement Proceedings re PJM Interconnection, L.L.C.’s Reliability Backstop Procurement filing under ER26-3380. in FERC Docket ER26-3380 on Aug 21, 2026.
Limited Protest of American Electric Power Service Corporation to PJM Interconnection, LLC’s proposed revisions to the Open Access Transmission Tariff and Reliability Assurance Agreement Among Load Serving Entities under ER26-3380.FERC ER26-3380, Accession 20260821-5283 Filed · Aug 21, 2026
American Electric Power Service Corporation
American Electric Power Service Corporation filed Limited Protest of American Electric Power Service Corporation to PJM Interconnection, LLC’s proposed revisions to the Open Access Transmission Tariff and Reliability Assurance Agreement Among Load Serving Entities under ER26-3380. in FERC Docket ER26-3380 on Aug 21, 2026.
Protest of East Kentucky Power Cooperative, Inc. on the 07/31/2026 filing of PJM Interconnection, L.L.C. proposing revisions to the Open Access Transmission Tariff and Reliability Assurance Agreement under ER26-3380. Erroneously filed.FERC ER26-3380, Accession 20260821-5290 Filed · Aug 21, 2026
East Kentucky Power Cooperative, Inc., East Kentucky Power Cooperative, Inc., East Kentucky Power Cooperative, Inc.
East Kentucky Power Cooperative, Inc., East Kentucky Power Cooperative, Inc., East Kentucky Power Cooperative, Inc. filed Protest of East Kentucky Power Cooperative, Inc. on the 07/31/2026 filing of PJM Interconnection, L.L.C. proposing revisions to the Open Access Transmission Tariff and Reliability Assurance Agreement under ER26-3380. Erroneously filed. in FERC Docket ER26-3380 on Aug 21, 2026.
Comments of Ohio Energy Leadership Council on the Reliability Backstop Procurement proposed by PJM Interconnection, L.L.C. under ER26-3380.FERC ER26-3380, Accession 20260821-5296 Filed · Aug 21, 2026
Ohio Energy Leadership Council
Ohio Energy Leadership Council filed Comments of Ohio Energy Leadership Council on the Reliability Backstop Procurement proposed by PJM Interconnection, L.L.C. under ER26-3380. in FERC Docket ER26-3380 on Aug 21, 2026.
Comments of North Carolina Electric Membership Corporation re PJM Interconnection, L.L.C.'s 07/31/2026 filing under ER26-3380.FERC ER26-3380, Accession 20260821-5297 Filed · Aug 21, 2026
North Carolina Electric Membership Corporation, North Carolina Electric Membership Corporation, North Carolina Electric Membership Corporation
North Carolina Electric Membership Corporation, North Carolina Electric Membership Corporation, North Carolina Electric Membership Corporation filed Comments of North Carolina Electric Membership Corporation re PJM Interconnection, L.L.C.'s 07/31/2026 filing under ER26-3380. in FERC Docket ER26-3380 on Aug 21, 2026.
Limited Protest of Vistra Corp. re PJM Interconnection, L.L.C.’s proposed Reliability Backstop Procurement mechanism under ER26-3380.FERC ER26-3380, Accession 20260821-5299 Filed · Aug 21, 2026
Vistra Corp., Vistra Corp.
Vistra Corp., Vistra Corp. filed Limited Protest of Vistra Corp. re PJM Interconnection, L.L.C.’s proposed Reliability Backstop Procurement mechanism under ER26-3380. in FERC Docket ER26-3380 on Aug 21, 2026.
Comments of Calibrant Energy requesting clarification re the PJM Interconnection, LLC’s proposed revisions to the Open Access Transmission Tariff and the Reliability Assurance Agreement Among Load Serving Entities under ER26-3380.FERC ER26-3380, Accession 20260821-5300 Filed · Aug 21, 2026
Calibrant Energy
Calibrant Energy filed Comments of Calibrant Energy requesting clarification re the PJM Interconnection, LLC’s proposed revisions to the Open Access Transmission Tariff and the Reliability Assurance Agreement Among Load Serving Entities under ER26-3380. in FERC Docket ER26-3380 on Aug 21, 2026.
Comments of Blue Ridge Power Agency re PJM Interconnection, L.L.C.'s Reliability Backstop Procurement proposal under ER26-3380.FERC ER26-3380, Accession 20260821-5304 Filed · Aug 21, 2026
BLUE RIDGE POWER AGENCY, BLUE RIDGE POWER AGENCY
BLUE RIDGE POWER AGENCY, BLUE RIDGE POWER AGENCY filed Comments of Blue Ridge Power Agency re PJM Interconnection, L.L.C.'s Reliability Backstop Procurement proposal under ER26-3380. in FERC Docket ER26-3380 on Aug 21, 2026.
Protest of Northern Virginia Electric Cooperative, Inc. to the PJM Reliability Backstop Procurement Proposal under ER26-3380.FERC ER26-3380, Accession 20260821-5307 Filed · Aug 21, 2026
Northern Virginia Electric Cooperative, Inc., Northern Virginia Electric Cooperative, Inc., Northern Virginia Electric Cooperative, Inc.
Northern Virginia Electric Cooperative, Inc., Northern Virginia Electric Cooperative, Inc., Northern Virginia Electric Cooperative, Inc. filed Protest of Northern Virginia Electric Cooperative, Inc. to the PJM Reliability Backstop Procurement Proposal under ER26-3380. in FERC Docket ER26-3380 on Aug 21, 2026.
Comments of Old Dominion Electric Cooperative re PJM Interconnection, L.L.C.’s Reliability Backstop Procurement filing under ER26-3380.FERC ER26-3380, Accession 20260821-5314 Filed · Aug 21, 2026
Old Dominion Electric Cooperative
Old Dominion Electric Cooperative filed Comments of Old Dominion Electric Cooperative re PJM Interconnection, L.L.C.’s Reliability Backstop Procurement filing under ER26-3380. in FERC Docket ER26-3380 on Aug 21, 2026.
Protest of the Independent Market Monitor for PJM re PJM Interconnection, LLC's 07/31/2026 proposed Reliability Backstop Procurement filing under ER26-3380.FERC ER26-3380, Accession 20260821-5317 Filed · Aug 21, 2026
Monitoring Analytics, LLC
Monitoring Analytics, LLC filed Protest of the Independent Market Monitor for PJM re PJM Interconnection, LLC's 07/31/2026 proposed Reliability Backstop Procurement filing under ER26-3380. in FERC Docket ER26-3380 on Aug 21, 2026.
Comments of Voltus, Inc. on the PJM Interconnection LLC’s Federal Power Act Section 205 filing requesting the approval of tariff amendments to establish a Reliability Backstop Procurement under ER26-3380.FERC ER26-3380, Accession 20260821-5318 Filed · Aug 21, 2026
Voltus, Inc.
Voltus, Inc. filed Comments of Voltus, Inc. on the PJM Interconnection LLC’s Federal Power Act Section 205 filing requesting the approval of tariff amendments to establish a Reliability Backstop Procurement under ER26-3380. in FERC Docket ER26-3380 on Aug 21, 2026.
Protest of East Kentucky Power Cooperative, Inc. to PJM Interconnection, L.L.C.’s Reliability Backstop Procurement proposal under ER26-3380.FERC ER26-3380, Accession 20260821-5322 Filed · Aug 21, 2026
East Kentucky Power Cooperative, Inc., East Kentucky Power Cooperative, Inc., East Kentucky Power Cooperative, Inc.
East Kentucky Power Cooperative, Inc., East Kentucky Power Cooperative, Inc., East Kentucky Power Cooperative, Inc. filed Protest of East Kentucky Power Cooperative, Inc. to PJM Interconnection, L.L.C.’s Reliability Backstop Procurement proposal under ER26-3380. in FERC Docket ER26-3380 on Aug 21, 2026.
Comment, Protest, and Motion for Leave to File One Day Out of Time of E-Cubed Policy Associates, LLC in response to PJM Interconnection, L.L.C.’s 07/31/2026 filing under ER26-3380.FERC ER26-3380, Accession 20260824-5017 Filed · Aug 24, 2026
E-Cubed Policy Associates, LLC
E-Cubed Policy Associates, LLC filed Comment, Protest, and Motion for Leave to File One Day Out of Time of E-Cubed Policy Associates, LLC in response to PJM Interconnection, L.L.C.’s 07/31/2026 filing under ER26-3380. in FERC Docket ER26-3380 on Aug 24, 2026.
Motion for Leave to Answer and Answer of the Attorney General of the Commonwealth of Kentucky to the comments and protests of PJM Interconnections, L.L.C.’s 07/31/2026 filing under ER26-3380.FERC ER26-3380, Accession 20260902-5075 Filed · Sep 2, 2026
Kentucky Attorney General, Kentucky Attorney General
Kentucky Attorney General, Kentucky Attorney General filed Motion for Leave to Answer and Answer of the Attorney General of the Commonwealth of Kentucky to the comments and protests of PJM Interconnections, L.L.C.’s 07/31/2026 filing under ER26-3380. in FERC Docket ER26-3380 on Sep 2, 2026.
Supplemental Comments of Persistence Analytics Group LLC re Cost-Causation Revalidation related to PJM Interconnection, L.L.C.’s proposed Reliability Backstop Procurement under ER26-3380.FERC ER26-3380, Accession 20260902-5087 Filed · Sep 2, 2026
PERSISTENCE ANALYTICS GROUP LLC
PERSISTENCE ANALYTICS GROUP LLC filed Supplemental Comments of Persistence Analytics Group LLC re Cost-Causation Revalidation related to PJM Interconnection, L.L.C.’s proposed Reliability Backstop Procurement under ER26-3380. in FERC Docket ER26-3380 on Sep 2, 2026.
Motion for Extension of Time of the Organization of PJM States, Inc. to submit comments in response to PJM Interconnection, L.L.C.'s 08/13/2026 proposal under ER26-3515.FERC ER26-3515, Accession 20260828-5287 Filed · Aug 28, 2026
Organization of PJM States, Inc.
Organization of PJM States, Inc. filed Motion for Extension of Time of the Organization of PJM States, Inc. to submit comments in response to PJM Interconnection, L.L.C.'s 08/13/2026 proposal under ER26-3515. in FERC Docket ER26-3515 on Aug 28, 2026.
Notice Shortening Answer Period re PJM Interconnection, L.L.C. under ER26-3515.FERC ER26-3515, Accession 20260831-3082 Order · Aug 31, 2026
SECRETARY OF THE COMMISSION, FERC, SECRETARY OF THE COMMISSION, FERC
FERC issued Notice Shortening Answer Period re PJM Interconnection, L.L.C. under ER26-3515. in Docket ER26-3515 on Aug 31, 2026.
Answer of Google LLC in Support of the Organization of PJM States, Inc.’s 08/28/2026 Motion for Extension of Time under ER26-3515.FERC ER26-3515, Accession 20260831-5121 Filed · Aug 31, 2026
Google LLC, Google LLC
Google LLC, Google LLC filed Answer of Google LLC in Support of the Organization of PJM States, Inc.’s 08/28/2026 Motion for Extension of Time under ER26-3515. in FERC Docket ER26-3515 on Aug 31, 2026.
Answer of the Pennsylvania Public Utility Commission in support of the Organization of PJM States, Inc.’s motion for extension of time to submit comments in response to PJM Interconnection, L.L.C.’s filing under ER26-3515.FERC ER26-3515, Accession 20260901-5028 Filed · Sep 1, 2026
Pennsylvania Public Utility Commission
Pennsylvania Public Utility Commission filed Answer of the Pennsylvania Public Utility Commission in support of the Organization of PJM States, Inc.’s motion for extension of time to submit comments in response to PJM Interconnection, L.L.C.’s filing under ER26-3515. in FERC Docket ER26-3515 on Sep 1, 2026.
Answer of East Kentucky Power Cooperative, Inc. in support of the Organization of PJM States, Inc.’s motion for extension of time to submit comments in response to PJM Interconnection, L.L.C.’s filing under ER26-3515.FERC ER26-3515, Accession 20260901-5250 Filed · Sep 1, 2026
East Kentucky Power Cooperative, Inc., East Kentucky Power Cooperative, Inc., East Kentucky Power Cooperative, Inc.
East Kentucky Power Cooperative, Inc., East Kentucky Power Cooperative, Inc., East Kentucky Power Cooperative, Inc. filed Answer of East Kentucky Power Cooperative, Inc. in support of the Organization of PJM States, Inc.’s motion for extension of time to submit comments in response to PJM Interconnection, L.L.C.’s filing under ER26-3515. in FERC Docket ER26-3515 on Sep 1, 2026.
Notice Denying Extension of Time re PJM Interconnection, L.L.C. under ER26-3515.FERC ER26-3515, Accession 20260902-3019 Order · Sep 2, 2026
SECRETARY OF THE COMMISSION, FERC, SECRETARY OF THE COMMISSION, FERC
FERC issued Notice Denying Extension of Time re PJM Interconnection, L.L.C. under ER26-3515. in Docket ER26-3515 on Sep 2, 2026.
Supplemental Comments of Persistence Analytics Group LLC re the Interim Resource Adequacy Service proposed by PJM Interconnection, L.L.C. under ER26-3515.FERC ER26-3515, Accession 20260902-5055 Filed · Sep 2, 2026
Individual No Affiliation
Individual No Affiliation filed Supplemental Comments of Persistence Analytics Group LLC re the Interim Resource Adequacy Service proposed by PJM Interconnection, L.L.C. under ER26-3515. in FERC Docket ER26-3515 on Sep 2, 2026.
Comments of Hans Royal re the Interim Resource Adequacy Service proposed by PJM Interconnection, L.L.C. under ER26-3515.FERC ER26-3515, Accession 20260903-5020 Filed · Sep 3, 2026
Individual No Affiliation
Individual No Affiliation filed Comments of Hans Royal re the Interim Resource Adequacy Service proposed by PJM Interconnection, L.L.C. under ER26-3515. in FERC Docket ER26-3515 on Sep 3, 2026.
Comments of the Solar Energy Industries Association in response to PJM Interconnection, L.L.C.’s filing to establish Interim Resource Adequacy Service under ER26-3515.FERC ER26-3515, Accession 20260903-5060 Filed · Sep 3, 2026
Solar Energy Industries Association
Solar Energy Industries Association filed Comments of the Solar Energy Industries Association in response to PJM Interconnection, L.L.C.’s filing to establish Interim Resource Adequacy Service under ER26-3515. in FERC Docket ER26-3515 on Sep 3, 2026.
Limited Comments of Buckeye Power, Inc. on PJM Interconnection, L.L.C.’s proposal filed on 08/13/2026 under ER26-3515.FERC ER26-3515, Accession 20260903-5125 Filed · Sep 3, 2026
Buckeye Power, Inc.
Buckeye Power, Inc. filed Limited Comments of Buckeye Power, Inc. on PJM Interconnection, L.L.C.’s proposal filed on 08/13/2026 under ER26-3515. in FERC Docket ER26-3515 on Sep 3, 2026.
Comments of the Public Service Commission of West Virginia re PJM Interconnection, L.L.C.’s filing to establish Interim Resource Adequacy Service under ER26-3515.FERC ER26-3515, Accession 20260903-5133 Filed · Sep 3, 2026
Public Service Commission of West Virginia
Public Service Commission of West Virginia filed Comments of the Public Service Commission of West Virginia re PJM Interconnection, L.L.C.’s filing to establish Interim Resource Adequacy Service under ER26-3515. in FERC Docket ER26-3515 on Sep 3, 2026.
Comments of Dominion Energy Services, Inc. o/b/o its affiliate, Virginia Electric and Power Company d/b/a Dominion Energy Virginia re PJM Interconnection, L.L.C.’s filing to establish Interim Resource Adequacy Service under ER26-3515.FERC ER26-3515, Accession 20260903-5134 Filed · Sep 3, 2026
Dominion Energy Services, Inc.
Dominion Energy Services, Inc. filed Comments of Dominion Energy Services, Inc. o/b/o its affiliate, Virginia Electric and Power Company d/b/a Dominion Energy Virginia re PJM Interconnection, L.L.C.’s filing to establish Interim Resource Adequacy Service under ER26-3515. in FERC Docket ER26-3515 on Sep 3, 2026.
Comments and Limited Protest of NRG Business Marketing LLC, et. al. re the Interim Resource Adequacy Service proposed by PJM Interconnection, L.L.C. under ER26-3515.FERC ER26-3515, Accession 20260903-5156 Filed · Sep 3, 2026
Enerwise Global Technologies, LLC, Green Mountain Energy Company, Green Mountain Energy Company
Enerwise Global Technologies, LLC, Green Mountain Energy Company, Green Mountain Energy Company filed Comments and Limited Protest of NRG Business Marketing LLC, et. al. re the Interim Resource Adequacy Service proposed by PJM Interconnection, L.L.C. under ER26-3515. in FERC Docket ER26-3515 on Sep 3, 2026.
Protest of PJM Power Providers Group re the Interim Resource Adequacy Service under ER26-3515.FERC ER26-3515, Accession 20260903-5157 Filed · Sep 3, 2026
PJM Power Providers Group
PJM Power Providers Group filed Protest of PJM Power Providers Group re the Interim Resource Adequacy Service under ER26-3515. in FERC Docket ER26-3515 on Sep 3, 2026.
Motion of Michigan Environmental Justice Coalition, et al. for Extension of Time to Submit Comments on the 08/18/2026 filing by the Midcontinent Independent System Operator, Inc. under ER26-3552.FERC ER26-3552, Accession 20260828-5285 Filed · Aug 28, 2026
Community Collaboration on Climate Change, Michigan Environmental Justice Coalition, Natural Resources Defense Council
Community Collaboration on Climate Change, Michigan Environmental Justice Coalition, Natural Resources Defense Council filed Motion of Michigan Environmental Justice Coalition, et al. for Extension of Time to Submit Comments on the 08/18/2026 filing by the Midcontinent Independent System Operator, Inc. under ER26-3552. in FERC Docket ER26-3552 on Aug 28, 2026.
Answer of Southern Regulators in Support of Motion for Extension of Time filed by the Public Interest Organizations filed on 08/28/2026 under ER26-3552.FERC ER26-3552, Accession 20260902-5107 Filed · Sep 2, 2026
Louisiana Public Service Commission, Arkansas Public Service Commission, Mississippi Public Service Commission
Louisiana Public Service Commission, Arkansas Public Service Commission, Mississippi Public Service Commission filed Answer of Southern Regulators in Support of Motion for Extension of Time filed by the Public Interest Organizations filed on 08/28/2026 under ER26-3552. in FERC Docket ER26-3552 on Sep 2, 2026.
Notice Denying Extension of Time re Midcontinent Independent System Operator, Inc. under ER26-3552.FERC ER26-3552, Accession 20260903-3033 Order · Sep 3, 2026
SECRETARY OF THE COMMISSION, FERC, SECRETARY OF THE COMMISSION, FERC
FERC issued Notice Denying Extension of Time re Midcontinent Independent System Operator, Inc. under ER26-3552. in Docket ER26-3552 on Sep 3, 2026.
Answer of Mississippi Public Service Commission et al. in Support of Motion for Extension of Time filed by the Public Interest Organizations filed on 08/28/2026 under ER26-3552.FERC ER26-3552, Accession 20260903-5021 Filed · Sep 3, 2026
Council of the City of New Orleans, Louisiana, Arkansas Public Service Commission, Mississippi Public Service Commission
Council of the City of New Orleans, Louisiana, Arkansas Public Service Commission, Mississippi Public Service Commission filed Answer of Mississippi Public Service Commission et al. in Support of Motion for Extension of Time filed by the Public Interest Organizations filed on 08/28/2026 under ER26-3552. in FERC Docket ER26-3552 on Sep 3, 2026.
Limited Protest and Comments of Constellation Energy Generation, LLC in response to PJM Interconnection, L.L.C.'s 08/17/2026 Compliance Filing under EL25-49 et al.FERC EL25-49, Accession 20260908-5326 Filed · Sep 8, 2026
Constellation Energy Generation, LLC; also docketed in AD24-11-000, EL25-20-000, ER26-1479-000, ER26-1479-002
Constellation Energy Generation, LLC filed Limited Protest and Comments of Constellation Energy Generation, LLC in response to PJM Interconnection, L.L.C.'s 08/17/2026 Compliance Filing under EL25-49 et al. in FERC Docket EL25-49 on Sep 8, 2026.
Motion for Leave to File Limited Answer, and Limited Answer, of East Kentucky Power Cooperative, Inc. in support of Protest filed by American Electric Power Service Corporation et al. under ER26-3380.FERC ER26-3380, Accession 20260904-5056 Filed · Sep 4, 2026
East Kentucky Power Cooperative, Inc.
East Kentucky Power Cooperative, Inc. filed Motion for Leave to File Limited Answer, and Limited Answer, of East Kentucky Power Cooperative, Inc. in support of Protest filed by American Electric Power Service Corporation et al. under ER26-3380. in FERC Docket ER26-3380 on Sep 4, 2026.
Motion for Leave to Answer and Answer of Constellation Energy Generation, LLC to certain comments and protests re the PJM Reliability Backstop Procurement Proposal et al. under ER26-3380.FERC ER26-3380, Accession 20260908-5260 Filed · Sep 8, 2026
Constellation Energy Generation, LLC
Constellation Energy Generation, LLC filed Motion for Leave to Answer and Answer of Constellation Energy Generation, LLC to certain comments and protests re the PJM Reliability Backstop Procurement Proposal et al. under ER26-3380. in FERC Docket ER26-3380 on Sep 8, 2026.
Motion for Leave to Answer and Answer of PJM Interconnection, L.L.C. to Comments and Protests re the 07/31/2026 revised Open Access Transmission Tariff filing et al. under ER26-3380.FERC ER26-3380, Accession 20260910-5296 Filed · Sep 10, 2026
PJM Interconnection, L.L.C.
PJM Interconnection, L.L.C. filed Motion for Leave to Answer and Answer of PJM Interconnection, L.L.C. to Comments and Protests re the 07/31/2026 revised Open Access Transmission Tariff filing et al. under ER26-3380. in FERC Docket ER26-3380 on Sep 10, 2026.
Motion for Leave to Answer and Answer of PPL Electric Utilities Corporation to the 09/10/2026 Motion for Leave to Answer and Answer of PJM Interconnection, L.L.C. under ER26-3380.FERC ER26-3380, Accession 20260915-5145 Filed · Sep 15, 2026
PPL Electric Utilities Corporation
PPL Electric Utilities Corporation filed Motion for Leave to Answer and Answer of PPL Electric Utilities Corporation to the 09/10/2026 Motion for Leave to Answer and Answer of PJM Interconnection, L.L.C. under ER26-3380. in FERC Docket ER26-3380 on Sep 15, 2026.
Comments of Tesla, Inc. re PJM Interconnection, L.L.C.’s filing to establish Interim Resource Adequacy Service under ER26-3515.FERC ER26-3515, Accession 20260903-5167 Filed · Sep 3, 2026
Tesla, Inc.
Tesla, Inc. filed Comments of Tesla, Inc. re PJM Interconnection, L.L.C.’s filing to establish Interim Resource Adequacy Service under ER26-3515. in FERC Docket ER26-3515 on Sep 3, 2026.
Supportive Comments and Limited Protest of the New Jersey Board of Public Utilities re PJM Interconnection, L.L.C.’s filing to establish Interim Resource Adequacy Service under ER26-3515.FERC ER26-3515, Accession 20260903-5170 Filed · Sep 3, 2026
New Jersey Board of Public Utilities, New Jersey Board of Public Utilities
New Jersey Board of Public Utilities, New Jersey Board of Public Utilities filed Supportive Comments and Limited Protest of the New Jersey Board of Public Utilities re PJM Interconnection, L.L.C.’s filing to establish Interim Resource Adequacy Service under ER26-3515. in FERC Docket ER26-3515 on Sep 3, 2026.
Limited Protest of American Municipal Power, Inc. to PJM Interconnection, L.L.C.’s proposal filed on 08/13/2026 under ER26-3515.FERC ER26-3515, Accession 20260903-5176 Filed · Sep 3, 2026
American Municipal Power, Inc., American Municipal Power, Inc.
American Municipal Power, Inc., American Municipal Power, Inc. filed Limited Protest of American Municipal Power, Inc. to PJM Interconnection, L.L.C.’s proposal filed on 08/13/2026 under ER26-3515. in FERC Docket ER26-3515 on Sep 3, 2026.
Protest of Office of the Ohio Consumers' Counsel to PJM Interconnection, L.L.C.'s 08/13/2026 Interim Resource Adequacy Service Filing under ER26-3515.FERC ER26-3515, Accession 20260903-5189 Filed · Sep 3, 2026
Office of the Ohio Consumers' Counsel, Office of the Ohio Consumers' Counsel
Office of the Ohio Consumers' Counsel, Office of the Ohio Consumers' Counsel filed Protest of Office of the Ohio Consumers' Counsel to PJM Interconnection, L.L.C.'s 08/13/2026 Interim Resource Adequacy Service Filing under ER26-3515. in FERC Docket ER26-3515 on Sep 3, 2026.
Comments of the Chief Energy Officer Josephus M. Allmond et al. of the Commonwealth of Virginia re the PJM Interconnection, L.L.C.'s proposed Interim Resource Adequacy Service Filing under ER26-3515.FERC ER26-3515, Accession 20260903-5195 Filed · Sep 3, 2026
Individual No Affiliation
Individual No Affiliation filed Comments of the Chief Energy Officer Josephus M. Allmond et al. of the Commonwealth of Virginia re the PJM Interconnection, L.L.C.'s proposed Interim Resource Adequacy Service Filing under ER26-3515. in FERC Docket ER26-3515 on Sep 3, 2026.
Comments and Limited Protest of Southern Maryland Electric Cooperative, Inc. regarding PJM Interconnection, L.L.C.’s 08/13/2026 filing under ER26-3515.FERC ER26-3515, Accession 20260903-5204 Filed · Sep 3, 2026
Southern Maryland Electric Cooperative, Inc.
Southern Maryland Electric Cooperative, Inc. filed Comments and Limited Protest of Southern Maryland Electric Cooperative, Inc. regarding PJM Interconnection, L.L.C.’s 08/13/2026 filing under ER26-3515. in FERC Docket ER26-3515 on Sep 3, 2026.
Limited Protest and Comments of FirstEnergy Service Company et al. in response to PJM Interconnection, L.L.C.’s 08/13/2026 filing to establish Interim Resource Adequacy Service mechanism under ER26-3515.FERC ER26-3515, Accession 20260903-5207 Filed · Sep 3, 2026
Ohio Edison Company, The Cleveland Electric Illuminating Company, FirstEnergy Service Company
Ohio Edison Company, The Cleveland Electric Illuminating Company, FirstEnergy Service Company filed Limited Protest and Comments of FirstEnergy Service Company et al. in response to PJM Interconnection, L.L.C.’s 08/13/2026 filing to establish Interim Resource Adequacy Service mechanism under ER26-3515. in FERC Docket ER26-3515 on Sep 3, 2026.
Comments of Calibrant Energy requesting clarifications of PJM Interconnection, L.L.C.’s proposal filed on 08/13/2026 under ER26-3515.FERC ER26-3515, Accession 20260903-5209 Filed · Sep 3, 2026
Calibrant Energy
Calibrant Energy filed Comments of Calibrant Energy requesting clarifications of PJM Interconnection, L.L.C.’s proposal filed on 08/13/2026 under ER26-3515. in FERC Docket ER26-3515 on Sep 3, 2026.
Limited Comments of North Carolina Electric Membership Corporation on PJM Interconnection, L.L.C.’s filing proposing revisions to the Open Access Transmission Tariff et al. under ER26-3515.FERC ER26-3515, Accession 20260903-5218 Filed · Sep 3, 2026
North Carolina Electric Membership Corporation, North Carolina Electric Membership Corporation, North Carolina Electric Membership Corporation
North Carolina Electric Membership Corporation, North Carolina Electric Membership Corporation, North Carolina Electric Membership Corporation filed Limited Comments of North Carolina Electric Membership Corporation on PJM Interconnection, L.L.C.’s filing proposing revisions to the Open Access Transmission Tariff et al. under ER26-3515. in FERC Docket ER26-3515 on Sep 3, 2026.
Protest of America's Power re PJM Interconnection, L.L.C.’s filing to establish Interim Resource Adequacy Service under ER26-3515.FERC ER26-3515, Accession 20260903-5219 Filed · Sep 3, 2026
America's Power
America's Power filed Protest of America's Power re PJM Interconnection, L.L.C.’s filing to establish Interim Resource Adequacy Service under ER26-3515. in FERC Docket ER26-3515 on Sep 3, 2026.
Protest of Vistra Corp. regarding PJM Interconnection, L.L.C.’s proposed Interim Resource Adequacy Service filing under ER26-3515.FERC ER26-3515, Accession 20260903-5221 Filed · Sep 3, 2026
Vistra Corp., Vistra Corp.
Vistra Corp., Vistra Corp. filed Protest of Vistra Corp. regarding PJM Interconnection, L.L.C.’s proposed Interim Resource Adequacy Service filing under ER26-3515. in FERC Docket ER26-3515 on Sep 3, 2026.
Protest of the Electric Power Supply Association to PJM Interconnection, L.L.C.’s filing to establish Interim Resource Adequacy Service under ER26-3515.FERC ER26-3515, Accession 20260903-5222 Filed · Sep 3, 2026
Electric Power Supply Association
Electric Power Supply Association filed Protest of the Electric Power Supply Association to PJM Interconnection, L.L.C.’s filing to establish Interim Resource Adequacy Service under ER26-3515. in FERC Docket ER26-3515 on Sep 3, 2026.
Limited Protest of East Kentucky Power Cooperative, Inc. to PJM Interconnection, L.L.C.’s 08/13/2026 proposed revisions to the Open Access Transmission Tariff et al. under ER26-3515.FERC ER26-3515, Accession 20260903-5229 Filed · Sep 3, 2026
East Kentucky Power Cooperative, Inc.
East Kentucky Power Cooperative, Inc. filed Limited Protest of East Kentucky Power Cooperative, Inc. to PJM Interconnection, L.L.C.’s 08/13/2026 proposed revisions to the Open Access Transmission Tariff et al. under ER26-3515. in FERC Docket ER26-3515 on Sep 3, 2026.
Comments and Request for Clarification of American Electric Power Service Corporation re PJM Interconnection, LLC’s proposed revisions to the PJM Open Access Transmission Tariff et al. under ER26-3515.FERC ER26-3515, Accession 20260903-5230 Filed · Sep 3, 2026
American Electric Power Corporation, American Electric Power Corporation, American Electric Power Corporation
American Electric Power Corporation, American Electric Power Corporation, American Electric Power Corporation filed Comments and Request for Clarification of American Electric Power Service Corporation re PJM Interconnection, LLC’s proposed revisions to the PJM Open Access Transmission Tariff et al. under ER26-3515. in FERC Docket ER26-3515 on Sep 3, 2026.
Comments of Advanced Energy United in response to PJM Interconnection, L.L.C.’s 08/13/2026 filing to establish Interim Resource Adequacy Service et al. under ER26-3515.FERC ER26-3515, Accession 20260903-5236 Filed · Sep 3, 2026
Advanced Energy United
Advanced Energy United filed Comments of Advanced Energy United in response to PJM Interconnection, L.L.C.’s 08/13/2026 filing to establish Interim Resource Adequacy Service et al. under ER26-3515. in FERC Docket ER26-3515 on Sep 3, 2026.
Comments of Old Dominion Electric Cooperative re PJM Interconnection, L.L.C.’s filing to establish Interim Resource Adequacy Service under ER26-3515.FERC ER26-3515, Accession 20260903-5241 Filed · Sep 3, 2026
Old Dominion Electric Cooperative
Old Dominion Electric Cooperative filed Comments of Old Dominion Electric Cooperative re PJM Interconnection, L.L.C.’s filing to establish Interim Resource Adequacy Service under ER26-3515. in FERC Docket ER26-3515 on Sep 3, 2026.
Protest of the Independent Market Monitor for PJM to the 08/13/2026 filing by PJM Interconnection, L.L.C. proposing to establish Interim Resource Adequacy Service under ER26-3515.FERC ER26-3515, Accession 20260903-5243 Filed · Sep 3, 2026
Monitoring Analytics, LLC
Monitoring Analytics, LLC filed Protest of the Independent Market Monitor for PJM to the 08/13/2026 filing by PJM Interconnection, L.L.C. proposing to establish Interim Resource Adequacy Service under ER26-3515. in FERC Docket ER26-3515 on Sep 3, 2026.
Comments, Request for Clarification, and in the Alternative, Request to Sever of the Organization of PJM States, Inc. re PJM Interconnection, L.L.C.’s proposal filed on 08/13/2026 under ER26-3515.FERC ER26-3515, Accession 20260904-5003 Filed · Sep 4, 2026
Organization of PJM States, Inc.
Organization of PJM States, Inc. filed Comments, Request for Clarification, and in the Alternative, Request to Sever of the Organization of PJM States, Inc. re PJM Interconnection, L.L.C.’s proposal filed on 08/13/2026 under ER26-3515. in FERC Docket ER26-3515 on Sep 4, 2026.
Motion of Equinix Inc. for Leave to Protest, Seek Clarification on and Comment Out-of-Time on the Proposal of PJM Interconnection, L.L.C. to Establish Interim Resource Adequacy, et al. under ER26-3515.FERC ER26-3515, Accession 20260904-5197 Filed · Sep 4, 2026
EQUINIX INC.
EQUINIX INC. filed Motion of Equinix Inc. for Leave to Protest, Seek Clarification on and Comment Out-of-Time on the Proposal of PJM Interconnection, L.L.C. to Establish Interim Resource Adequacy, et al. under ER26-3515. in FERC Docket ER26-3515 on Sep 4, 2026.
Motion for Acceptance of Late-Filed Comments and Comments of the Virginia State Corporation Commission on the proposal of PJM Interconnection, L.L.C. to Establish Interim Resource Adequacy, et al. under ER26-3515.FERC ER26-3515, Accession 20260908-5273 Filed · Sep 8, 2026
Virginia State Corporation Commission
Virginia State Corporation Commission filed Motion for Acceptance of Late-Filed Comments and Comments of the Virginia State Corporation Commission on the proposal of PJM Interconnection, L.L.C. to Establish Interim Resource Adequacy, et al. under ER26-3515. in FERC Docket ER26-3515 on Sep 8, 2026.
Comments of the Industrial Energy Consumers of America in response to PJM Interconnection, L.L.C.’s proposal to Establish Interim Resources Adequacy, et al. under ER26-3515.FERC ER26-3515, Accession 20260915-5111 Filed · Sep 15, 2026
Industrial Energy Consumers of America
Industrial Energy Consumers of America filed Comments of the Industrial Energy Consumers of America in response to PJM Interconnection, L.L.C.’s proposal to Establish Interim Resources Adequacy, et al. under ER26-3515. in FERC Docket ER26-3515 on Sep 15, 2026.
Motion for Leave to Answer and Answer of Josh Shapiro, Governor of the Commonwealth of Pennsylvania in Support of PJM Interconnection, LLC’s proposal to Establish Interim Resources Adequacy, et al. under ER26-3515.FERC ER26-3515, Accession 20260916-5131 Filed · Sep 16, 2026
Josh Shapiro, Governor of the Commonwealth of Pennsylvania
Josh Shapiro, Governor of the Commonwealth of Pennsylvania filed Motion for Leave to Answer and Answer of Josh Shapiro, Governor of the Commonwealth of Pennsylvania in Support of PJM Interconnection, LLC’s proposal to Establish Interim Resources Adequacy, et al. under ER26-3515. in FERC Docket ER26-3515 on Sep 16, 2026.
Comments of the Solar Energy Industries Association in Support of Midcontinent Independent System Operator, Inc.’s filing proposing revisions to establish the Zero Injection Generator Interconnection Agreement under ER26-3552.FERC ER26-3552, Accession 20260908-5257 Filed · Sep 8, 2026
Solar Energy Industries Association
Solar Energy Industries Association filed Comments of the Solar Energy Industries Association in Support of Midcontinent Independent System Operator, Inc.’s filing proposing revisions to establish the Zero Injection Generator Interconnection Agreement under ER26-3552. in FERC Docket ER26-3552 on Sep 8, 2026.
Comments of Google LLC on Midcontinent Independent System Operator Inc.’s Zero Injection Generator Interconnection Agreement proposal under ER26-3552.FERC ER26-3552, Accession 20260908-5266 Filed · Sep 8, 2026
Google LLC, Google LLC
Google LLC, Google LLC filed Comments of Google LLC on Midcontinent Independent System Operator Inc.’s Zero Injection Generator Interconnection Agreement proposal under ER26-3552. in FERC Docket ER26-3552 on Sep 8, 2026.
Comments of Advanced Energy United in response to the Midcontinent Independent System Operator’s proposal to establish a Zero Injection Generator Interconnection Agreement framework under ER26-3552.FERC ER26-3552, Accession 20260908-5332 Filed · Sep 8, 2026
Advanced Energy United
Advanced Energy United filed Comments of Advanced Energy United in response to the Midcontinent Independent System Operator’s proposal to establish a Zero Injection Generator Interconnection Agreement framework under ER26-3552. in FERC Docket ER26-3552 on Sep 8, 2026.
Protest of Community Collaboration on Climate Change, et al. re the Midcontinent Independent System Operator, Inc.’s filing proposing revisions to establish the Zero Injection Generator Interconnection Agreement under ER26-3552.FERC ER26-3552, Accession 20260908-5341 Filed · Sep 8, 2026
Midwest Tribal Energy Resources Association, Community Collaboration on Climate Change, Michigan Environmental Justice Coalition
Midwest Tribal Energy Resources Association, Community Collaboration on Climate Change, Michigan Environmental Justice Coalition filed Protest of Community Collaboration on Climate Change, et al. re the Midcontinent Independent System Operator, Inc.’s filing proposing revisions to establish the Zero Injection Generator Interconnection Agreement under ER26-3552. in FERC Docket ER26-3552 on Sep 8, 2026.
Motion for Acceptance of Late-Filed Comments and Comments in Conditional Support of the Organization of MISO States, Inc. re Midcontinent Independent System Operator, Inc.’s proposed tariff revisions under ER26-3552.FERC ER26-3552, Accession 20260911-5203 Filed · Sep 11, 2026
Organization of MISO States, Inc.
Organization of MISO States, Inc. filed Motion for Acceptance of Late-Filed Comments and Comments in Conditional Support of the Organization of MISO States, Inc. re Midcontinent Independent System Operator, Inc.’s proposed tariff revisions under ER26-3552. in FERC Docket ER26-3552 on Sep 11, 2026.
Answer of PJM Power Providers Group in response to PJM Interconnection, L.L.C.'s 09/10/2026 Motion for Leave to Answer and Answer under ER26-3380.FERC ER26-3380, Accession 20260917-5316 Filed · Sep 17, 2026
PJM Power Providers Group
PJM Power Providers Group filed Answer of PJM Power Providers Group in response to PJM Interconnection, L.L.C.'s 09/10/2026 Motion for Leave to Answer and Answer under ER26-3380. in FERC Docket ER26-3380 on Sep 17, 2026.
Motion for Leave to Answer and Answer of Data Center Coalition to the Comments, Protests and Answers filed by American Transmission Company LLC et al. under ER26-3265.FERC ER26-3265, Accession 20260918-5324 Filed · Sep 18, 2026
Data Center Coalition
Data Center Coalition filed Motion for Leave to Answer and Answer of Data Center Coalition to the Comments, Protests and Answers filed by American Transmission Company LLC et al. under ER26-3265. in FERC Docket ER26-3265 on Sep 18, 2026.
Motion for Leave to Answer and Answer of Buckeye Power, Inc. to certain Comments and Protests re PJM Interconnection, LLC’s proposal to Establish Interim Resources Adequacy, et al. under ER26-3515.FERC ER26-3515, Accession 20260918-5262 Filed · Sep 18, 2026
Buckeye Power, Inc.
Buckeye Power, Inc. filed Motion for Leave to Answer and Answer of Buckeye Power, Inc. to certain Comments and Protests re PJM Interconnection, LLC’s proposal to Establish Interim Resources Adequacy, et al. under ER26-3515. in FERC Docket ER26-3515 on Sep 18, 2026. The filing's text matches the eLibrary full-text search for "hyperscale".
Motion For Leave to File Second Limited Answer and Second Limited Answer of East Kentucky Power Cooperative, Inc. under ER26-3380.FERC ER26-3380, Accession 20260918-5364 Filed · Sep 18, 2026
East Kentucky Power Cooperative, Inc., East Kentucky Power Cooperative, Inc., East Kentucky Power Cooperative, Inc.
East Kentucky Power Cooperative, Inc., East Kentucky Power Cooperative, Inc., East Kentucky Power Cooperative, Inc. filed Motion For Leave to File Second Limited Answer and Second Limited Answer of East Kentucky Power Cooperative, Inc. under ER26-3380. in FERC Docket ER26-3380 on Sep 18, 2026.
Motion for Leave to Answer and Answer of the New Jersey Board of Public Utilities to the protests and comments of Buckeye Power, Inc., et al. under ER26-3515.FERC ER26-3515, Accession 20260918-5365 Filed · Sep 18, 2026
New Jersey Board of Public Utilities, New Jersey Board of Public Utilities, New Jersey Board of Public Utilities
New Jersey Board of Public Utilities, New Jersey Board of Public Utilities, New Jersey Board of Public Utilities filed Motion for Leave to Answer and Answer of the New Jersey Board of Public Utilities to the protests and comments of Buckeye Power, Inc., et al. under ER26-3515. in FERC Docket ER26-3515 on Sep 18, 2026.
Comments of Google LLC on Midcontinent Independent System Operator Inc.’s Interconnection Reliability Requirements for Large Loads Proposal under ER26-3650.FERC ER26-3650, Accession 20260918-5386 Filed · Sep 18, 2026
Google LLC, Google LLC
Google LLC, Google LLC filed Comments of Google LLC on Midcontinent Independent System Operator Inc.’s Interconnection Reliability Requirements for Large Loads Proposal under ER26-3650. in FERC Docket ER26-3650 on Sep 18, 2026.
Comments of Verrus LLC in Support of Midcontinent Independent System Operator, Inc.'s proposed Interconnection Reliability Requirements for Large Loads under ER26-3650.FERC ER26-3650, Accession 20260918-5391 Filed · Sep 18, 2026
Verrus LLC
Verrus LLC filed Comments of Verrus LLC in Support of Midcontinent Independent System Operator, Inc.'s proposed Interconnection Reliability Requirements for Large Loads under ER26-3650. in FERC Docket ER26-3650 on Sep 18, 2026.
Comments of Rowan Digital Infrastructure, LLC re the 08/28/2026 filing by Midcontinent Independent System Operator, Inc. proposing Interconnection Reliability Requirements for Large Loads under ER26-3650.FERC ER26-3650, Accession 20260921-5084 Filed · Sep 21, 2026
Rowan Digital Infrastructure
Rowan Digital Infrastructure filed Comments of Rowan Digital Infrastructure, LLC re the 08/28/2026 filing by Midcontinent Independent System Operator, Inc. proposing Interconnection Reliability Requirements for Large Loads under ER26-3650. in FERC Docket ER26-3650 on Sep 21, 2026.
Order Dismissing Request for Rehearing and Clarification re PJM Interconnection, L.L.C. et al. under EL26-67.FERC EL26-67, Accession 20260921-3020 Order · Sep 21, 2026
SECRETARY OF THE COMMISSION, FERC, SECRETARY OF THE COMMISSION, FERC, COMMISSIONERS AND IMMEDIATE STAFF (THE COMMISSION)
FERC issued Order Dismissing Request for Rehearing and Clarification re PJM Interconnection, L.L.C. et al. under EL26-67. in Docket EL26-67 on Sep 21, 2026.
Order Dismissing Request for Rehearing and Clarification re New York Independent System Operator, Inc. et al. under EL26-69.FERC EL26-69, Accession 20260921-3021 Order · Sep 21, 2026
SECRETARY OF THE COMMISSION, FERC, COMMISSIONERS AND IMMEDIATE STAFF (THE COMMISSION), SECRETARY OF THE COMMISSION, FERC
FERC issued Order Dismissing Request for Rehearing and Clarification re New York Independent System Operator, Inc. et al. under EL26-69. in Docket EL26-69 on Sep 21, 2026.
Order Dismissing Request for Rehearing and Clarification re Midcontinent Independent System Operator, Inc. et al. under EL26-70.FERC EL26-70, Accession 20260921-3047 Order · Sep 21, 2026
SECRETARY OF THE COMMISSION - FERC, COMMISSIONERS AND IMMEDIATE STAFF (THE COMMISSION)
FERC issued Order Dismissing Request for Rehearing and Clarification re Midcontinent Independent System Operator, Inc. et al. under EL26-70. in Docket EL26-70 on Sep 21, 2026.
Order Dismissing Request for Rehearing and Clarification re California Independent System Operator Corporation et al. under EL26-71.FERC EL26-71, Accession 20260921-3019 Order · Sep 21, 2026
COMMISSIONERS AND IMMEDIATE STAFF (THE COMMISSION), SECRETARY OF THE COMMISSION, FERC, SECRETARY OF THE COMMISSION, FERC
FERC issued Order Dismissing Request for Rehearing and Clarification re California Independent System Operator Corporation et al. under EL26-71. in Docket EL26-71 on Sep 21, 2026.
Order Dismissing Request for Rehearing and Clarification re ISO New England Inc. et al. under EL26-72.FERC EL26-72, Accession 20260921-3056 Order · Sep 21, 2026
SECRETARY OF THE COMMISSION, FERC, SECRETARY OF THE COMMISSION, FERC, COMMISSIONERS AND IMMEDIATE STAFF (THE COMMISSION)
FERC issued Order Dismissing Request for Rehearing and Clarification re ISO New England Inc. et al. under EL26-72. in Docket EL26-72 on Sep 21, 2026.
Motion for Leave to Answer and Answer of American Electric Power Service Corporation to PJM Interconnection, L.L.C.'s 09/10/2026 Answer under ER26-3380.FERC ER26-3380, Accession 20260918-5413 Filed · Sep 18, 2026
American Electric Power Service Corporation
American Electric Power Service Corporation filed Motion for Leave to Answer and Answer of American Electric Power Service Corporation to PJM Interconnection, L.L.C.'s 09/10/2026 Answer under ER26-3380. in FERC Docket ER26-3380 on Sep 18, 2026.
Motion for Leave to Answer and Answer of Constellation Energy Generation, LLC to the Motion for Leave to Answer and Answer of PJM Interconnection, L.L.C. filed on 09/10/2026 under ER26-3380.FERC ER26-3380, Accession 20260921-5148 Filed · Sep 21, 2026
Constellation Energy Generation, LLC
Constellation Energy Generation, LLC filed Motion for Leave to Answer and Answer of Constellation Energy Generation, LLC to the Motion for Leave to Answer and Answer of PJM Interconnection, L.L.C. filed on 09/10/2026 under ER26-3380. in FERC Docket ER26-3380 on Sep 21, 2026.
Motion for Leave to Answer and Answer of Indicated PJM Transmission Owners to the Motion for Leave to Answer and Answer of PJM Interconnection, L.L.C. filed on 09/10/2026 under ER26-3380.FERC ER26-3380, Accession 20260922-5110 Filed · Sep 22, 2026
Mid-Atlantic Interstate Transmission, LLC, Keystone Appalachian Transmission Company, Keystone Appalachian Transmission Company
Mid-Atlantic Interstate Transmission, LLC, Keystone Appalachian Transmission Company, Keystone Appalachian Transmission Company filed Motion for Leave to Answer and Answer of Indicated PJM Transmission Owners to the Motion for Leave to Answer and Answer of PJM Interconnection, L.L.C. filed on 09/10/2026 under ER26-3380. in FERC Docket ER26-3380 on Sep 22, 2026.
FERC rejects ComEd’s cancellation of PowerHouse Hillwood data center contract Rejected · Sep 23, 2026
FERC rejected ComEd’s cancellation of the data center contract.
FERC rejected Commonwealth Edison's attempt to cancel a data center contract for a 1.8-GW, $20-billion facility. The project was backed by a minimal $1 letter of credit, which drew skepticism from a FERC commissioner.
Motion for Leave to Answer and Limited Answer of FirstEnergy Service Company to the Motion for Leave to Answer and Answer of PJM Interconnection, L.L.C. filed on 09/10/2026 under ER26-3380.FERC ER26-3380, Accession 20260923-5060 Filed · Sep 23, 2026
FirstEnergy Service Company, FirstEnergy Service Company
FirstEnergy Service Company, FirstEnergy Service Company filed Motion for Leave to Answer and Limited Answer of FirstEnergy Service Company to the Motion for Leave to Answer and Answer of PJM Interconnection, L.L.C. filed on 09/10/2026 under ER26-3380. in FERC Docket ER26-3380 on Sep 23, 2026.
Motion for Leave to Answer and Answer of PJM Interconnection, L.L.C. under ER26-3515.FERC ER26-3515, Accession 20260923-5114 Filed · Sep 23, 2026
PJM Interconnection, L.L.C.
PJM Interconnection, L.L.C. filed Motion for Leave to Answer and Answer of PJM Interconnection, L.L.C. under ER26-3515. in FERC Docket ER26-3515 on Sep 23, 2026.
Motion for Leave to Answer and Answer of Northern Virginia Electric Cooperative, Inc. to the Answer et al. of PJM Interconnection, L.L.C. filed on 09/10/2026 under ER26-3380.FERC ER26-3380, Accession 20260923-5149 Filed · Sep 23, 2026
Northern Virginia Electric Cooperative, Inc., Northern Virginia Electric Cooperative, Inc., Northern Virginia Electric Cooperative, Inc.
Northern Virginia Electric Cooperative, Inc., Northern Virginia Electric Cooperative, Inc., Northern Virginia Electric Cooperative, Inc. filed Motion for Leave to Answer and Answer of Northern Virginia Electric Cooperative, Inc. to the Answer et al. of PJM Interconnection, L.L.C. filed on 09/10/2026 under ER26-3380. in FERC Docket ER26-3380 on Sep 23, 2026.
Motion for Leave to Answer and Answer of Midcontinent Independent System Operator Inc. to the comments and protests in response to the 08/18/2026 proposed tariff revisions under ER26-3552.FERC ER26-3552, Accession 20260923-5148 Filed · Sep 23, 2026
Midcontinent Independent System Operator Inc., Midcontinent Independent System Operator Inc.
Midcontinent Independent System Operator Inc., Midcontinent Independent System Operator Inc. filed Motion for Leave to Answer and Answer of Midcontinent Independent System Operator Inc. to the comments and protests in response to the 08/18/2026 proposed tariff revisions under ER26-3552. in FERC Docket ER26-3552 on Sep 23, 2026.
Motion for Leave to Answer and Limited Answer of ON Energy Storage, Inc. in response to comments and protests re Midcontinent Independent System Operator, Inc. proposal to establish Interconnection Reliability Requirements for Large LoadsFERC ER26-3650, Accession 20260924-5153 Filed · Sep 24, 2026
ON Energy Storage, Inc.
ON Energy Storage, Inc. filed Motion for Leave to Answer and Limited Answer of ON Energy Storage, Inc. in response to comments and protests re Midcontinent Independent System Operator, Inc. proposal to establish Interconnection Reliability Requirements for Large Loads under ER26-3650. in FERC Docket ER26-3650 on Sep 24, 2026.
Coal Plants Have a Role; Forcing Them to Remain Online is Bad Business and Bad Policy. Filed · Sep 25, 2026
The Trump administration issued emergency orders under §202(c) of the Federal Power Act to compel coal plants to remain online.
The article discusses the use of emergency orders by the U.S. Department of Energy to force coal-fired power plants to remain operational for grid reliability, primarily due to rising load from data centers. It argues that such orders are generally inappropriate and should be handled through negotiated reliability agreements rather than government mandates.
The North Dakota Public Service Commission et al. submit additional Request for Expedited Action re the 07/30/2025 Complaint v. Midcontinent Independent System Operator, Inc. under EL25-109.FERC EL25-109, Accession 20260925-5055 Filed · Sep 25, 2026
Mississippi Public Service Commission, North Dakota Public Service Commission, Montana Public Service Commission
Mississippi Public Service Commission, North Dakota Public Service Commission, Montana Public Service Commission filed The North Dakota Public Service Commission et al. submit additional Request for Expedited Action re the 07/30/2025 Complaint v. Midcontinent Independent System Operator, Inc. under EL25-109. in FERC Docket EL25-109 on Sep 25, 2026.
Motion for Leave to Answer and Answer of the New Jersey Board of Public Utilities to the Answer et al. of PJM Interconnection, L.L.C. filed on 09/10/2026 under ER26-3380.FERC ER26-3380, Accession 20260924-5183 Filed · Sep 24, 2026
New Jersey Board of Public Utilities, New Jersey Board of Public Utilities, New Jersey Board of Public Utilities
New Jersey Board of Public Utilities, New Jersey Board of Public Utilities, New Jersey Board of Public Utilities filed Motion for Leave to Answer and Answer of the New Jersey Board of Public Utilities to the Answer et al. of PJM Interconnection, L.L.C. filed on 09/10/2026 under ER26-3380. in FERC Docket ER26-3380 on Sep 24, 2026.
Motion for Leave to Reply and Reply Comments of American Electric Power Service Corporation under ER26-3515.FERC ER26-3515, Accession 20260925-5186 Filed · Sep 25, 2026
American Electric Power Service Corporation, American Electric Power Service Corporation, American Electric Power Service Corporation
American Electric Power Service Corporation, American Electric Power Service Corporation, American Electric Power Service Corporation filed Motion for Leave to Reply and Reply Comments of American Electric Power Service Corporation under ER26-3515. in FERC Docket ER26-3515 on Sep 25, 2026.
Answer and Motion for Leave to Answer of the Independent Market Monitor for PJM Interconnection, L.L.C. to the Answer of PJM Interconnection, L.L.C. filed on 09/10/2026 under ER26-3380.FERC ER26-3380, Accession 20260925-5208 Filed · Sep 25, 2026
Monitoring Analytics, LLC
Monitoring Analytics, LLC filed Answer and Motion for Leave to Answer of the Independent Market Monitor for PJM Interconnection, L.L.C. to the Answer of PJM Interconnection, L.L.C. filed on 09/10/2026 under ER26-3380. in FERC Docket ER26-3380 on Sep 25, 2026.
Motion for Leave to Answer and Answer of Corporate Energy Buyers Association to PJM Interconnection, L.L.C.'s 09/23/2026 Answer re the Establish Interim Resource Adequacy, et al. under ER26-3515.FERC ER26-3515, Accession 20260928-5172 Filed · Sep 28, 2026
Corporate Energy Buyers Association
Corporate Energy Buyers Association filed Motion for Leave to Answer and Answer of Corporate Energy Buyers Association to PJM Interconnection, L.L.C.'s 09/23/2026 Answer re the Establish Interim Resource Adequacy, et al. under ER26-3515. in FERC Docket ER26-3515 on Sep 28, 2026.
Motion for Leave to Answer and Answer of Vistra Corp. in response to certain pleadings and answers filed under ER26-3515.FERC ER26-3515, Accession 20260928-5175 Filed · Sep 28, 2026
Vistra Corp., Vistra Corp.
Vistra Corp., Vistra Corp. filed Motion for Leave to Answer and Answer of Vistra Corp. in response to certain pleadings and answers filed under ER26-3515. in FERC Docket ER26-3515 on Sep 28, 2026.
Order Accepting Reliability Backstop Procurement and Establishing Further Procedures re PJM Interconnection, L.L.C. under ER26-3380 et al. Chairman Swett and Commissioners Rosner, See, and LaCerte are concurring with a separate statementFERC ER26-3380, Accession 20260929-3099 Order · Sep 29, 2026
COMMISSIONERS AND IMMEDIATE STAFF (THE COMMISSION), SECRETARY OF THE COMMISSION - FERC; also docketed in EL26-108-000
FERC issued Order Accepting Reliability Backstop Procurement and Establishing Further Procedures re PJM Interconnection, L.L.C. under ER26-3380 et al. Chairman Swett and Commissioners Rosner, See, and LaCerte are concurring with a separate statement attached. in Docket ER26-3380 on Sep 29, 2026.
Supplemental Comments of Voltus, Inc. in response to PJM Interconnection, L.L.C.'s 09/23/2026 et al. Answers re the Proposal to Establish Interim Resource Adequacy, et al. under ER26-3380 et al.FERC ER26-3380, Accession 20260929-5071 Filed · Sep 29, 2026
Voltus, Inc.; also docketed in ER26-3515-000
Voltus, Inc. filed Supplemental Comments of Voltus, Inc. in response to PJM Interconnection, L.L.C.'s 09/23/2026 et al. Answers re the Proposal to Establish Interim Resource Adequacy, et al. under ER26-3380 et al. in FERC Docket ER26-3380 on Sep 29, 2026.
Motion for Leave to Answer and Answer of Advanced Energy United to PJM Interconnection, L.L.C.'s 09/23/2026 Answer re the Proposal to Establish Interim Resource Adequacy, et al. under ER26-3515.FERC ER26-3515, Accession 20260929-5145 Filed · Sep 29, 2026
Advanced Energy United
Advanced Energy United filed Motion for Leave to Answer and Answer of Advanced Energy United to PJM Interconnection, L.L.C.'s 09/23/2026 Answer re the Proposal to Establish Interim Resource Adequacy, et al. under ER26-3515. in FERC Docket ER26-3515 on Sep 29, 2026.
Motion for Leave to Answer and Answer of Constellation Energy Generation, LLC to the Answers filed by Pennsylvania Governor Josh Shapiro et al. re the Interim Resource Adequacy Service proposed by PJM InterconnectionFERC ER26-3515, Accession 20260929-5169 Filed · Sep 29, 2026
Constellation Energy Generation, LLC
Constellation Energy Generation, LLC filed Motion for Leave to Answer and Answer of Constellation Energy Generation, LLC to the Answers filed by Pennsylvania Governor Josh Shapiro et al. re the Interim Resource Adequacy Service proposed by PJM Interconnection, L.L.C. under ER26-3515. in FERC Docket ER26-3515 on Sep 29, 2026.
Answer of Google LLC in response to pleadings re PJM Interconnection, L.L.C.’s filing to establish Interim Resource Adequacy Service under ER26-3515.FERC ER26-3515, Accession 20260930-5211 Filed · Sep 30, 2026
Google LLC, Google LLC
Google LLC, Google LLC filed Answer of Google LLC in response to pleadings re PJM Interconnection, L.L.C.’s filing to establish Interim Resource Adequacy Service under ER26-3515. in FERC Docket ER26-3515 on Sep 30, 2026.
Motion for Leave to Answer and Answer of Data Center Coalition to the answer of PJM Interconnection, L.L.C. and certain other comments and answers re the proposal to establish Interim Resource Adequacy Service et al. under ER26-3515.FERC ER26-3515, Accession 20261001-5356 Filed · Oct 1, 2026
Data Center Coalition
Data Center Coalition filed Motion for Leave to Answer and Answer of Data Center Coalition to the answer of PJM Interconnection, L.L.C. and certain other comments and answers re the proposal to establish Interim Resource Adequacy Service et al. under ER26-3515. in FERC Docket ER26-3515 on Oct 1, 2026.
Midcontinent Independent System Operator, Inc. submits tariff filing per 35.13(a)(2)(iii: 2026-10-02_Large Load Addition Resource Study (LARS) to be effective 12/2/2026 under ER27-25 Filing Type : 10FERC ER27-25, Accession 20261002-5074 Filed · Oct 2, 2026
Midcontinent Independent System Operator, Inc., Midcontinent Independent System Operator, Inc., Midcontinent Independent System Operator, Inc.
Midcontinent Independent System Operator, Inc., Midcontinent Independent System Operator, Inc., Midcontinent Independent System Operator, Inc. filed Midcontinent Independent System Operator, Inc. submits tariff filing per 35.13(a)(2)(iii: 2026-10-02_Large Load Addition Resource Study (LARS) to be effective 12/2/2026 under ER27-25 Filing Type : 10 in FERC Docket ER27-25 on Oct 2, 2026. The filing's text matches the eLibrary full-text search for "hyperscale".
Motion for Leave to Answer and Limited Answer of FirstEnergy Service Company to PJM Interconnection, L.L.C.’s 09/23/2026 Answer re Interim Resource Adequacy Service filing under ER26-3515.FERC ER26-3515, Accession 20261002-5153 Filed · Oct 2, 2026
FirstEnergy Service Company
FirstEnergy Service Company filed Motion for Leave to Answer and Limited Answer of FirstEnergy Service Company to PJM Interconnection, L.L.C.’s 09/23/2026 Answer re Interim Resource Adequacy Service filing under ER26-3515. in FERC Docket ER26-3515 on Oct 2, 2026.
New Mexico AG challenges federal commission’s review of proposed Project Jupiter gas pipeline Filed · Oct 6, 2026
New Mexico Attorney General Raúl Torrez filed a challenge to the U.S. Federal Energy Regulatory Commission’s review of the proposed Project Jupiter gas pipeline.
New Mexico Attorney General Raúl Torrez called the Federal Energy Regulatory Commission’s review of the proposed Project Jupiter gas pipeline inadequate and challenged it. The pipeline is intended to serve the Project Jupiter data center under construction in Doña Ana County.
Motion for Leave to Answer and Limited Answer of PPL Electric Utilities Corporation to the 09/23/2026 Answer et al. of PJM Interconnection, L.L.C. under ER26-3515.FERC ER26-3515, Accession 20261006-5150 Filed · Oct 6, 2026
PPL Electric Utilities Corporation
PPL Electric Utilities Corporation filed Motion for Leave to Answer and Limited Answer of PPL Electric Utilities Corporation to the 09/23/2026 Answer et al. of PJM Interconnection, L.L.C. under ER26-3515. in FERC Docket ER26-3515 on Oct 6, 2026.
Motion for Leave to File Limited Answer and Answer of Southern Maryland Electric Cooperative, Inc. to PJM Interconnection, L.L.C.'s 09/23/2026 Answer under ER26-3515.FERC ER26-3515, Accession 20261007-5161 Filed · Oct 7, 2026
Southern Maryland Electric Cooperative, Inc.
Southern Maryland Electric Cooperative, Inc. filed Motion for Leave to File Limited Answer and Answer of Southern Maryland Electric Cooperative, Inc. to PJM Interconnection, L.L.C.'s 09/23/2026 Answer under ER26-3515. in FERC Docket ER26-3515 on Oct 7, 2026.
Motion for Leave to File Answer, and Answer, of East Kentucky Power Cooperative, Inc. to the 09/23/2026 Answer of PJM Interconnection, L.L.C. under ER26-3515.FERC ER26-3515, Accession 20261007-5190 Filed · Oct 7, 2026
East Kentucky Power Cooperative, Inc.
East Kentucky Power Cooperative, Inc. filed Motion for Leave to File Answer, and Answer, of East Kentucky Power Cooperative, Inc. to the 09/23/2026 Answer of PJM Interconnection, L.L.C. under ER26-3515. in FERC Docket ER26-3515 on Oct 7, 2026.
Transmission & interconnection build
Order No. 1920 / 1920-A long-term regional transmission planning compliance · compliance filings in progress through 2026; appellate challenge pending
Requires transmission providers to conduct 20-year, multi-scenario long-term regional transmission planning with cost-allocation reforms; most compliance plans are due during 2026. Directly relevant to data-center developers because large-load growth scenarios drive the long-term plans; Commissioner Chang cautioned that without adequate transmission planning, faster interconnection alone may be ineffective. Order 1920 is under challenge at the Fourth Circuit, which FERC defended in a January 5, 2026 filing.
New PJM co-located-load transmission service classes · framework accepted in part; further compliance pending
Three FERC-ordered service options for co-located large loads in PJM: interim non-firm NITS pending network upgrades; Firm Contract Demand (specified MW withdrawal, firm curtailment priority, minimum 1-year term); Non-Firm Contract Demand (as-available, 1-hour to 1-month terms). Rates, terms, and conditions accepted in part June 18, 2026 (EL25-49-002) with further tariff revisions directed — the template other RTOs are expected to reference in their show-cause responses.
Susquehanna front-of-the-meter transmission reconfiguration (Talen/AWS) · expected completion spring 2026 (per June 2025 announcement)
Transmission and interconnection reconfigurations at the Susquehanna nuclear plant to shift the existing 300-MW behind-the-meter AWS co-location arrangement to a front-of-the-meter framework under the June 2025 1,920-MW PPA; reconfigurations were expected to complete in spring 2026, removing the arrangement from FERC ISA approval requirements.

NERC

North American Electric Reliability Corporation (NERC) Reliability organization

The reliability layer. NERC's Large Loads Task Force is documenting how data centers behave during grid disturbances — including simultaneous voltage-sensitive load loss — and its reliability assessments now attribute the sharpest demand-growth revisions in decades to data centers.

Footprint: Continental United States, Canada, and the northern portion of Baja California, Mexico; users, owners, and operators of the bulk power system across the Eastern, Western, ERCOT, and Quebec interconnections Large-load queue: NERC does not operate an interconnection queue. Forecasts submitted by registered entities responding to the September 2025 Level 2 Alert indicate large-load demand could increase by as much as 300… · Data centers (traditional, AI, and crypto mining) make up the overwhelming share of the forecast growth, per the aggregated Level 2 Alert report (as of 2026-03-17)
Rulings, rules & filings
MeasureStatusWhat it doesSource
Incident Review: Considering Simultaneous Voltage-Sensitive Load Reductions (July 10, 2024 Virginia event) Proposed · Jan 8, 2025
published
NERC's incident review of the July 10, 2024 event in which a lightning-arrestor failure on a 230 kV line in Loudoun County, Virginia produced six successive faults in 82 seconds and roughly 1,500 MW of exclusively data-center load disconnected across 60 load points and 25 substations, transferring to on-site UPS/backup power. Voltage rose to 1.07 per unit and frequency to 60.047 Hz, settling in about 4 minutes. The review recommended models for large loads, consideration of NERC registration for large loads, and…
LLTF White Paper 1: Characteristics and Risks of Emerging Large Loads Proposed · 2025
published
First deliverable of the Large Loads Task Force (established by NERC's Reliability and Security Technical Committee in August 2024; since renamed the Large Loads Working Group). Characterizes loads from several MW to several GW (data centers including crypto and AI, industrial facilities, hydrogen production) and defines reliability risks across seven categories: observability/data, long-term planning, operations/balancing, stability, power quality, physical/cyber security, and load shedding/restoration.
Level 2 Alert — Industry Recommendation: Large Load Interconnection, Study, Commissioning, and Operations Effective · Sep 9, 2025
issued; responses were due January 28, 2026
Level 2 Alert recommending practices for large-load interconnection, dynamic modeling, simulation, commissioning, and operational coordination. Required responses from Transmission Owners, Resource Planners, Transmission Operators, Transmission Planners, Balancing Authorities, Planning Coordinators, Distribution Providers, and Reliability Coordinators on the NERC Compliance Registry by January 28, 2026. Response analysis showed entities generally lacked processes, procedures, or methods to address emerging…
NERC comments in FERC large-load interconnection ANOPR docketRM26-4-000 Filed · Nov 21, 2025 Following DOE's October 2025 ANOPR directive (large loads generally defined as demand greater than 20 MW) and FERC's October 27, 2025 Notice Inviting Comments, NERC filed comments including a timeline for its large-load action plan and requested that future FERC actions reference NERC's full FPA Section 215 authority over users, owners, and operators of the BPS.
2025 Long-Term Reliability Assessment Proposed · Jan 29, 2026
published
Forecasts 10-year summer peak demand growth of 224 GW (24%) and winter growth of 246 GW, mostly from new data centers; 69% above the 2024 LTRA growth forecast. Flags MISO, PJM, ERCOT, and the Pacific Northwest for elevated risk within five years; projects 105 GW of retirements over 10 years and notes fossil capacity fell 21 GW during 2024-2025.
Aggregated Report on Level 2 Alert responses Proposed · 2026
published
Summarizes January 2026 industry responses to the September 2025 Level 2 Alert. Nearly two-thirds of responding entities reported no experience integrating modern data centers or large loads; most entities had not met the alert's recommendations. Entity forecasts indicated large-load growth of up to 300 GW between 2028 and 2030, overwhelmingly data centers. Findings were presented at NERC's February 24-25, 2026 large loads technical conference and underpinned the decision to accelerate the action plan.
LLWG White Paper 2: Assessment of Gaps in Existing Practices, Requirements, and Reliability Standards for Emerging Large Loads Effective · Mar 11, 2026
approved by RSTC March 11, 2026; published March 2026
Finds existing NERC Reliability Standards and industry processes inadequate for reliable integration of emerging large loads, including computational loads. Recommends updates to registration criteria, Reliability Standards, processes, and requirements, addressed to NERC, the LLWG, registered entities, regulators, and policymakers.
Project 2026-02 Computational Loads — SAR accepted, drafting team appointedNERC Project 2026-02 Proposed · Mar 18, 2026
SAR accepted; standards drafting underway
NERC Standards Committee accepted the Phase 1 Standard Authorization Request, appointed a standard drafting team, and authorized SAR posting (comment period April 1-30, 2026). The SAR proposes Glossary definitions for Computational Load and Computational Load Entity plus a new near-term ('bridge') Reliability Standard for integrating large computational loads; broader standards work begins in 2027. A Computational Load Short-Term Advisory Group (105 members per NERC's August 2026 FAQ) supports the drafting team.
NERC Accelerated Large Load Action Plan (supplemental letter to FERC)RM26-4-000 Filed · Mar 20, 2026 CEO letter committing NERC to file revised registry criteria and initial Reliability Standards on or before December 31, 2026, and announcing a Level 3 Alert for early May 2026. Recaps the February 24-25, 2026 technical conference, the March 11 RSTC approval of the gap-assessment white paper, and the March 18 Standards Committee actions; cites grid events in Virginia and Texas where large data-center loads responded to and amplified grid instability.
Rules of Procedure revisions — registration of Computational Load Entities (Appendices 2, 5A, 5B)NERC Rules of Procedure, Appendix 5B Statement of Compliance… Effective · Apr 1, 2026
proposed; second 30-day comment period August 19 - September 18, 2026; registry criteria must be finalized by end of 2026
Proposes new registered entity types — Computational Load Owner and Computational Load Operator — that would be subject to Reliability Standards. Initial draft posted April 1, 2026 for a 45-day comment period (comments due May 15, 2026); in response to feedback, the August 19, 2026 reposting raised the MW and kV registration thresholds and added a 'Computational Load Site' definition.
Level 3 Alert — Essential Actions on computational loads Effective · May 4, 2026
issued; acknowledgment due May 11, 2026; full responses were due August 3, 2026
NERC's highest-urgency alert tier, prompted by multiple events since 2022 (concentrated in 2024-2025) in which 1,000 MW or more of computational load disconnected unexpectedly in the Eastern and Texas interconnections. Directs seven Essential Actions to Transmission Planners, Planning Coordinators, Transmission Owners, Transmission Operators, Balancing Authorities, and Reliability Coordinators: develop modeling data/settings/parameter lists; study stability margins at least annually in areas with computational…
Reliability Guideline: Risk Mitigation for Emerging Large Loads Effective · 2026
published (voluntary, non-binding); RSTC-approved, posted April 30, 2026
47-page guideline covering modeling practices, studies, coordination, data collection, real-time monitoring, and event analysis for large loads including data centers, crypto mining, hydrogen production, manufacturing, and arc furnaces. NERC received more than 800 comments on the draft. Intended to supplement, not replace, existing or future Reliability Standards.
2026 Summer Reliability Assessment Proposed · May 19, 2026
published
All assessment areas expected to meet normal 2026 summer peaks; elevated risk under above-normal or extreme conditions in NPCC-New England, MRO-SaskPower, and WECC-Northwest. More than 58 GW of new capacity added since summer 2025 (16.4 GW solar, 14.7 GW battery, 6.7 GW gas, 1.6 GW wind); aggregate peak demand up more than 11 GW year over year. NERC reduced ERCOT's net internal demand 3.7 GW (4.6%) to reflect data centers that grid operators can curtail, citing Texas's mandatory curtailment framework for large…
2026 State of Reliability report — computational load events section Proposed · Jun 24, 2026
published
Documents two 2025 customer-initiated data-center load reductions exceeding 1,000 MW: approximately 1,800 MW in February 2025 (Loudoun and Fairfax Counties, Virginia; UPS systems tripped to backup during a normally cleared fault) and roughly 1,300 MW in June 2025, plus Eastern Interconnection events of 428 MW (February), 227 MW (March), and 540 MW (May), and nine ERCOT crypto-mining load-loss events over 100 MW in 2025. Warns that as facilities grow and co-locate, load-loss events will likely grow and could…
FERC order directing NERC computational-load standards and registrationRD26-7-000 Effective · Jul 16, 2026
issued (unanimous 5-0 vote); binding on NERC
FERC directed NERC to file new or modified Reliability Standards addressing computational-load integration risks, plus Glossary changes, registry criteria revisions, and Rules of Procedure changes for registering computational load entities under FPA Section 215, all by December 31, 2026 — converting NERC's voluntary accelerated timeline into a mandatory one. A detailed informational workplan filing for additional computational-load standards is due March 1, 2027.
Draft Reliability Standards CLO-001-1, CLO-002-1, CLO-003-1 posted for comment and ballotNERC Project 2026-02 Effective · Aug 19, 2026
posted for 30-day formal comment (August 19 - September 18, 2026) with ballot in the final 10 days
Three foundational standards for registered computational load entities: CLO-001-1 (Computational Load Interconnection, Studies, and Modeling Data), CLO-002-1 (Computational Load Operational Data and Communications), and CLO-003-1 (Computational Load Protection Coordination and Disturbance Monitoring), plus limited conforming updates to FAC-001-5 and FAC-002-5. Requirements are drawn from currently enforced, compliance-vetted standards; NERC states the package aligns with FERC's July 16, 2026 order. Ballot pool…
NERC Industry Recommendation: Large Load Interconnection, Study, Commissioning, and OperationsNERC Alert 2025-09-09, Large Load Interconnection, Study, Commissioning, and Operations Posted · Sep 9, 2025
Industry Recommendation
NERC issued the alert Large Load Interconnection, Study, Commissioning, and Operations (Industry Recommendation) on Sep 9, 2025 to Transmission Owners (TO), Resource Planners (RPs), Transmission Operators (TOP), Transmission Planner (TP), Balancing Authorities (BA), Planning Coordinator (PC), Distribution Provider (DP) and Reliability Coordinators (RC).
NERC Essential Actions to Industry: Level 3 Computational Load Alert: Level 3 Computational Load AlertNERC Alert 2026-05-04, Level 3 Computational Load Alert Order · May 4, 2026
Essential Actions to Industry: Level 3 Computational Load Alert
NERC issued the alert Level 3 Computational Load Alert (Essential Actions to Industry: Level 3 Computational Load Alert) on May 4, 2026 to Transmission Planner (TP), Planning Coordinator (PC), Transmission Owner (TO), Balancing Authority (BA), Reliability Coordinator (RC), and Transmission Operator (TOP).
NERC Large Loads Action Plan: Aggregated Report Level 2 Large Load Interconnection Study Commissioning and OperationsNERC Large Loads Action Plan, Aggregated Report Level 2 Large Load Interconnection Study Commissioning and Operations Posted · Mar 17, 2026
Resources
NERC posted Aggregated Report Level 2 Large Load Interconnection Study Commissioning and Operations on its Large Loads Action Plan page, dated Mar 17, 2026.
NERC Large Loads Action Plan: Assessment of Gaps in Existing Practices, Requirements, and Reliability Standards for Emerging Large LoadsNERC Large Loads Action Plan, Assessment of Gaps in Existing Practices, Requirements, and Reliability Standards for Emerging Large Loads Posted · Mar 11, 2026
Resources
NERC posted Assessment of Gaps in Existing Practices, Requirements, and Reliability Standards for Emerging Large Loads on its Large Loads Action Plan page, dated Mar 11, 2026.
NERC Large Loads Action Plan: Checklist for Computational Load EntitiesNERC Large Loads Action Plan, Checklist for Computational Load Entities Posted · May 28, 2026
Resources
NERC posted Checklist for Computational Load Entities on its Large Loads Action Plan page, dated May 28, 2026.
NERC Large Loads Action Plan: CLE ROP CommentsNERC Large Loads Action Plan, CLE ROP Comments Posted · May 28, 2026
Resources
NERC posted CLE ROP Comments on its Large Loads Action Plan page, dated May 28, 2026.
NERC Large Loads Action Plan: Computational Load Disturbance Performance SARNERC Large Loads Action Plan, Computational Load Disturbance Performance SAR Posted · Aug 26, 2026
Resources
NERC posted Computational Load Disturbance Performance SAR on its Large Loads Action Plan page, dated Aug 26, 2026.
NERC Large Loads Action Plan: Disturbance Performance Computational Loads Comment MatrixNERC Large Loads Action Plan, Disturbance Performance Computational Loads Comment Matrix Posted · Aug 26, 2026
Resources
NERC posted Disturbance Performance Computational Loads Comment Matrix on its Large Loads Action Plan page, dated Aug 26, 2026.
NERC Large Loads Action Plan: FERC Order on Computational Loads - July 16NERC Large Loads Action Plan, FERC Order on Computational Loads - July 16 Posted · Aug 19, 2026
Resources
NERC posted FERC Order on Computational Loads - July 16 on its Large Loads Action Plan page, dated Aug 19, 2026.
NERC Large Loads Action Plan: Incident Review: Considering Simultaneous Voltage-Sensitive Load ReductionsNERC Large Loads Action Plan, Incident Review: Considering Simultaneous Voltage-Sensitive Load Reductions Posted · Jan 8, 2025
Resources
NERC posted Incident Review: Considering Simultaneous Voltage-Sensitive Load Reductions on its Large Loads Action Plan page, dated Jan 8, 2025.
NERC Large Loads Action Plan: Incident Review: Voltage-Sensitive Crypto Load ReductionsNERC Large Loads Action Plan, Incident Review: Voltage-Sensitive Crypto Load Reductions Posted · Jan 13, 2026
Resources
NERC posted Incident Review: Voltage-Sensitive Crypto Load Reductions on its Large Loads Action Plan page, dated Jan 13, 2026.
NERC Large Loads Action Plan: Large Loads Frequently Asked QuestionsNERC Large Loads Action Plan, Large Loads Frequently Asked Questions Posted · Aug 21, 2026
Resources
NERC posted Large Loads Frequently Asked Questions on its Large Loads Action Plan page, dated Aug 21, 2026.
NERC Large Loads Action Plan: LL Action Plan - Q1 2026NERC Large Loads Action Plan, LL Action Plan - Q1 2026 Posted · Apr 6, 2026
Updates
NERC posted LL Action Plan - Q1 2026 on its Large Loads Action Plan page, dated Apr 6, 2026.
NERC Large Loads Action Plan: LL Action Plan - Q2 2025NERC Large Loads Action Plan, LL Action Plan - Q2 2025 Posted · Mar 10, 2026
Updates
NERC posted LL Action Plan - Q2 2025 on its Large Loads Action Plan page, dated Mar 10, 2026.
NERC Large Loads Action Plan: LL Action Plan - Q2 2026NERC Large Loads Action Plan, LL Action Plan - Q2 2026 Posted · Jul 7, 2026
Updates
NERC posted LL Action Plan - Q2 2026 on its Large Loads Action Plan page, dated Jul 7, 2026.
NERC Large Loads Action Plan: LL Action Plan - Q3 2025NERC Large Loads Action Plan, LL Action Plan - Q3 2025 Posted · Mar 10, 2026
Updates
NERC posted LL Action Plan - Q3 2025 on its Large Loads Action Plan page, dated Mar 10, 2026.
NERC Large Loads Action Plan: LL Action Plan - Q4 2025NERC Large Loads Action Plan, LL Action Plan - Q4 2025 Posted · Mar 10, 2026
Updates
NERC posted LL Action Plan - Q4 2025 on its Large Loads Action Plan page, dated Mar 10, 2026.
NERC Large Loads Action Plan: NERC Comments to FERC, March 2026NERC Large Loads Action Plan, NERC Comments to FERC, March 2026 Posted · Apr 29, 2026
Resources
NERC posted NERC Comments to FERC, March 2026 on its Large Loads Action Plan page, dated Apr 29, 2026.
NERC Large Loads Action Plan: Primer for Computational LoadsNERC Large Loads Action Plan, Primer for Computational Loads Posted · Jun 9, 2026
Resources
NERC posted Primer for Computational Loads on its Large Loads Action Plan page, dated Jun 9, 2026.
NERC Large Loads Action Plan: Risk Mitigation For Emerging Large LoadsNERC Large Loads Action Plan, Risk Mitigation For Emerging Large Loads Posted · May 1, 2026
Resources
NERC posted Risk Mitigation For Emerging Large Loads on its Large Loads Action Plan page, dated May 1, 2026.
NERC Large Loads Action Plan: Standard Authorization RequestNERC Large Loads Action Plan, Standard Authorization Request Posted · May 14, 2026
Resources
NERC posted Standard Authorization Request on its Large Loads Action Plan page, dated May 14, 2026.
NERC Large Loads Action Plan: Timeline of Actions CompletedNERC Large Loads Action Plan, Timeline of Actions Completed Posted · Jun 11, 2026
Resources
NERC posted Timeline of Actions Completed on its Large Loads Action Plan page, dated Jun 11, 2026.
NERC Large Loads Action Plan: White Paper Characteristics and Risks of Emerging Large LoadsNERC Large Loads Action Plan, White Paper Characteristics and Risks of Emerging Large Loads Posted · Mar 16, 2026
Resources
NERC posted White Paper Characteristics and Risks of Emerging Large Loads on its Large Loads Action Plan page, dated Mar 16, 2026.
NERC Large Loads Working Group: Computational Loads Standard Authorization Request RoadmapNERC Large Loads Working Group, Computational Loads Standard Authorization Request Roadmap Posted · Sep 3, 2026
Resources
NERC posted Computational Loads Standard Authorization Request Roadmap on its Large Loads Working Group page, dated Sep 3, 2026.
NERC Large Loads Working Group: LLWG ScopeNERC Large Loads Working Group, LLWG Scope Posted · May 7, 2026
Resources
NERC posted LLWG Scope on its Large Loads Working Group page, dated May 7, 2026.
NERC news: Lauby Briefs FERC on NERC Actions to Address Reliability Impacts from Large Load IntegrationNERC News 2025-04-16, Lauby Briefs FERC on NERC Actions to Address Reliability Impacts from Large Load Integration Posted · Apr 16, 2025
News release
During today’s FERC open meeting, Mark Lauby, NERC’s senior vice president and chief engineer, briefed FERC about recent load loss events.
NERC news: NERC Files Comments in Response to FERC’s Large Loads ANOPRNERC News 2025-11-21, NERC Files Comments in Response to FERC’s Large Loads ANOPR Posted · Nov 21, 2025
News release
NERC filed comments with the Federal Energy Regulatory Commission (FERC) today on the Advance Notice of Proposed Rulemaking (ANOPR) addressing the reliable interconnection of large loads.
NERC news: NERC Q2 Standards Quarterly Outlook: Ride-Through Revisions, Large Loads, Compliance Dates, and How to EngageNERC News 2026-04-22, NERC Q2 Standards Quarterly Outlook: Ride-Through Revisions, Large Loads, Compliance Dates, and How to Engage Posted · Apr 22, 2026
News release
The Standards Quarterly Outlook is intended to increase awareness of ongoing projects and upcoming activities in the Standards space each quarter.
NERC news: NERC Issues Level 3 Alert, Reliability Guideline Focused on Large Load ChallengesNERC News 2026-05-04, NERC Issues Level 3 Alert, Reliability Guideline Focused on Large Load Challenges Posted · May 4, 2026
News release
As the grid faces unprecedented challenges from a surge in large power consumers, NERC is taking significant steps to ensure the reliability of the bulk power system (BPS).
NERC news: FERC Sets Year-End Deadline for NERC to Finalize Registry Criteria and Standards for Computational LoadsNERC News 2026-07-16, FERC Sets Year-End Deadline for NERC to Finalize Registry Criteria and Standards for Computational Loads Posted · Jul 16, 2026
News release
Today, at its monthly open meeting, the Federal Energy Regulatory Commission (FERC) directed NERC to act by the end of 2026 to finalize registry criteria and initial Reliability Standards pertaining to the integration of computational loads on the bulk power system. This is consistent with NERC’s ongoing large loads activities under its authority as the Electric Reliability Organization.
NERC news: Letter to CEOs Outlines Near-Term Actions on Large Loads and Standards Development ProcessNERC News 2026-08-18, Letter to CEOs Outlines Near-Term Actions on Large Loads and Standards Development Process Posted · Aug 18, 2026
News release
NERC recently sent a letter to chief executive officers outlining near-term actions on two initiatives: computational loads and the standards development process.
NERC news: Reliability Insights | Large Computational Load Risks Due to Voltage SensitivityNERC News 2026-09-08, Reliability Insights | Large Computational Load Risks Due to Voltage Sensitivity Posted · Sep 8, 2026
News release
This new Reliability Insights examines the reliability risks associated with voltage-sensitive large computational loads and efforts to mitigate them.
Project 2026-02 Computational Loads: draft CLO-001-1 posted (Formal Posting 1)NERC Project 2026-02, CLO-001-1, Formal Posting 1 Posted · Aug 18, 2026
Formal Posting 1
NERC posted draft standard CLO-001-1 for Project 2026-02 Computational Loads (Formal Posting 1) on Aug 18, 2026.
Project 2026-02 Computational Loads: draft CLO-002-1 posted (Formal Posting 1)NERC Project 2026-02, CLO-002-1, Formal Posting 1 Posted · Aug 18, 2026
Formal Posting 1
NERC posted draft standard CLO-002-1 for Project 2026-02 Computational Loads (Formal Posting 1) on Aug 18, 2026.
Project 2026-02 Computational Loads: draft CLO-003-1 posted (Formal Posting 1)NERC Project 2026-02, CLO-003-1, Formal Posting 1 Posted · Aug 18, 2026
Formal Posting 1
NERC posted draft standard CLO-003-1 for Project 2026-02 Computational Loads (Formal Posting 1) on Aug 18, 2026.
Project 2026-02 Computational Loads: Drafting Team appointedNERC Project 2026-02, Drafting Team appointed Posted · Mar 18, 2026
Important date
Project 2026-02 Computational Loads: Drafting Team appointed (Mar 18, 2026).
Project 2026-02 Computational Loads: draft FAC-001-5 posted (Formal Posting 1)NERC Project 2026-02, FAC-001-5, Formal Posting 1 Posted · Aug 18, 2026
Formal Posting 1
NERC posted draft standard FAC-001-5 for Project 2026-02 Computational Loads (Formal Posting 1) on Aug 18, 2026.
Project 2026-02 Computational Loads: draft FAC-002-5 posted (Formal Posting 1)NERC Project 2026-02, FAC-002-5, Formal Posting 1 Posted · Aug 18, 2026
Formal Posting 1
NERC posted draft standard FAC-002-5 for Project 2026-02 Computational Loads (Formal Posting 1) on Aug 18, 2026.
Project 2026-02 Computational Loads: Initial posting authorizedNERC Project 2026-02, Initial posting authorized Posted · Aug 19, 2026
Important date
Project 2026-02 Computational Loads: Initial posting authorized (Aug 19, 2026).
Project 2026-02 Computational Loads: The Standards Committee accepted the SARNERC Project 2026-02, The Standards Committee accepted the SAR Posted · Mar 18, 2026
Important date
Project 2026-02 Computational Loads: The Standards Committee accepted the SAR (Mar 18, 2026).
Project 2026-02 Computational Loads: The Standards Committee authorized standard(s) draftingNERC Project 2026-02, The Standards Committee authorized standard(s) drafting Posted · May 20, 2026
Important date
Project 2026-02 Computational Loads: The Standards Committee authorized standard(s) drafting (May 20, 2026).
NERC Rules of Procedure: Appendix 2 Clean - April 2026 PostingNERC Rules of Procedure, Appendix 2 Clean - April 2026 Posting Posted · Apr 2, 2026
Appendix 2
NERC posted Appendix 2 Clean - April 2026 Posting on its Rules of Procedure page, dated Apr 2, 2026.
NERC Rules of Procedure: Appendix 2 Clean - August 2026 PostingNERC Rules of Procedure, Appendix 2 Clean - August 2026 Posting Posted · Aug 19, 2026
Appendix 2
NERC posted Appendix 2 Clean - August 2026 Posting on its Rules of Procedure page, dated Aug 19, 2026.
NERC Rules of Procedure: Appendix 5A Clean - April 2026 PostingNERC Rules of Procedure, Appendix 5A Clean - April 2026 Posting Posted · Apr 2, 2026
Appendix 5A
NERC posted Appendix 5A Clean - April 2026 Posting on its Rules of Procedure page, dated Apr 2, 2026.
NERC Rules of Procedure: Appendix 5A Clean - August 2026 PostingNERC Rules of Procedure, Appendix 5A Clean - August 2026 Posting Posted · Aug 19, 2026
Appendix 5A
NERC posted Appendix 5A Clean - August 2026 Posting on its Rules of Procedure page, dated Aug 19, 2026.
NERC Rules of Procedure: Appendix 5B Clean - April 2026 PostingNERC Rules of Procedure, Appendix 5B Clean - April 2026 Posting Posted · Apr 2, 2026
Appendix 5B
NERC posted Appendix 5B Clean - April 2026 Posting on its Rules of Procedure page, dated Apr 2, 2026.
NERC Rules of Procedure: Appendix 5B Clean - August 2026 PostingNERC Rules of Procedure, Appendix 5B Clean - August 2026 Posting Posted · Aug 19, 2026
Appendix 5B
NERC posted Appendix 5B Clean - August 2026 Posting on its Rules of Procedure page, dated Aug 19, 2026.
NERC Rules of Procedure: August Posting Technical ReasoningNERC Rules of Procedure, August Posting Technical Reasoning Posted · Aug 19, 2026
Supporting Materials
NERC posted August Posting Technical Reasoning on its Rules of Procedure page, dated Aug 19, 2026.
NERC Rules of Procedure: CLE Technical ReasoningNERC Rules of Procedure, CLE Technical Reasoning Posted · Apr 2, 2026
Supporting Materials
NERC posted CLE Technical Reasoning on its Rules of Procedure page, dated Apr 2, 2026.
NERC Rules of Procedure: Computational Load Entity Summary of Changes April 2026 PostingNERC Rules of Procedure, Computational Load Entity Summary of Changes April 2026 Posting Posted · Aug 18, 2026
Supporting Materials
NERC posted Computational Load Entity Summary of Changes April 2026 Posting on its Rules of Procedure page, dated Aug 18, 2026.
NERC Rules of Procedure: Computational Load Owner or Operator Summary of Changes August 2026 PostingNERC Rules of Procedure, Computational Load Owner or Operator Summary of Changes August 2026 Posting Posted · Aug 19, 2026
Supporting Materials
NERC posted Computational Load Owner or Operator Summary of Changes August 2026 Posting on its Rules of Procedure page, dated Aug 19, 2026.
NERC Rules of Procedure: Response to Comments Document for August PostingNERC Rules of Procedure, Response to Comments Document for August Posting Posted · Aug 19, 2026
Supporting Materials
NERC posted Response to Comments Document for August Posting on its Rules of Procedure page, dated Aug 19, 2026.
NERC news: Computational Loads Standards Advance Following Initial BallotNERC News 2026-09-19, Computational Loads Standards Advance Following Initial Ballot Posted · Sep 19, 2026
News release
Today, NERC reached an important milestone in its work to address the reliability impacts of rapidly growing large loads, with preliminary results indicating the foundational Computational Loads Reliability Standards have passed initial ballot. NERC will validate the ballot results and post the report of comments next week.
Bringing a Power Plant’s Worth of Load Onto the Grid: NERC’s Interconnection Reckoning Filed · Sep 17, 2026 Data centers are connecting to the transmission system faster than existing reliability rules were designed to handle and are behaving differently from the passive load those rules assumed. NERC has introduced a Large Loads Action Plan, a new class of registered entity, and a hard 2026 deadline to address these challenges.
NERC Rules of Procedure: CLO/CLOP ROP Comments - August PostingNERC Rules of Procedure, CLO/CLOP ROP Comments - August Posting Posted · Sep 22, 2026
Supporting Materials
NERC posted CLO/CLOP ROP Comments - August Posting on its Rules of Procedure page, dated Sep 22, 2026.
NERC Large Loads Action Plan: CLE ROP Comments - April PostingNERC Large Loads Action Plan, CLE ROP Comments - April Posting Posted · Sep 24, 2026
Resources
NERC posted CLE ROP Comments - April Posting on its Large Loads Action Plan page, dated Sep 24, 2026.
NERC Rules of Procedure: CLE Technical Reasoning - April PostingNERC Rules of Procedure, CLE Technical Reasoning - April Posting Posted · Sep 24, 2026
Supporting Materials
NERC posted CLE Technical Reasoning - April Posting on its Rules of Procedure page, dated Sep 24, 2026.
NERC Rules of Procedure: Consideration of Comments on April PostingNERC Rules of Procedure, Consideration of Comments on April Posting Posted · Sep 24, 2026
Supporting Materials
NERC posted Consideration of Comments on April Posting on its Rules of Procedure page, dated Sep 24, 2026.
NERC Rules of Procedure: Consideration of Comments from August PostingNERC Rules of Procedure, Consideration of Comments from August Posting Posted · Sep 30, 2026
Supporting Materials
NERC posted Consideration of Comments from August Posting on its Rules of Procedure page, dated Sep 30, 2026.
Transmission & interconnection build
Not applicable — NERC does not plan or build transmission · context
NERC is the reliability regulator, not a transmission developer; expansion projects sit with RTOs/ISOs and utilities in its footprint. Its levers on large-load growth are assessments, alerts, standards, and registration. The 2025 LTRA attributes most of the 224 GW (summer) / 246 GW (winter) 10-year demand growth to data centers and flags MISO, PJM, ERCOT, and the Pacific Northwest as elevated-risk areas within five years.
System capacity context from 2026 Summer Reliability Assessment · published May 19, 2026
More than 58 GW of new generation capacity added across North America since summer 2025 (16.4 GW solar, 14.7 GW battery storage, 6.7 GW natural gas, 1.6 GW wind), against aggregate peak demand growth of more than 11 GW year over year driven largely by data centers; the 2025 LTRA reports fossil capacity fell 21 GW during 2024-2025 and projects 105 GW of retirements over 10 years.

Frequently asked

What is an RTO or ISO, and why does it matter for a data center?

Regional transmission organizations and independent system operators run the high-voltage grid and the wholesale power market for their footprint — PJM, MISO, SPP, CAISO, NYISO, ISO New England, and (inside Texas) ERCOT. A data center cannot energize until the operator for its location studies and approves the interconnection, so each operator's queue rules, study timelines, and curtailment conditions directly set how fast a project can come online.

Which grid operator serves my state?

The map above shows the dominant operator for each state, and clicking a state lists every operator with territory in it. Several states are split — Illinois divides between PJM (ComEd, in the north) and MISO; Texas is mostly ERCOT with SPP in the Panhandle and MISO in the southeast; and much of the Southeast and non-coastal West sits outside RTO markets entirely, served by utilities like Southern Company, Duke Energy, and TVA.

What did FERC's 2026 show-cause orders do?

On June 18, 2026, FERC issued Section 206 show-cause orders to all six FERC-jurisdictional RTOs and ISOs (dockets EL26-67 through EL26-72), preliminarily finding their tariffs unjust and unreasonable for lacking clear rules on large-load and co-located-load interconnection. Each operator had to file its response by August 17, 2026 — either defending its tariff or proposing reforms — which is why every operator on this page filed new large-load rules within the same window.

What is happening with ERCOT and the Texas queue?

Under Gov. Abbott's August 3, 2026 directive, ERCOT is auditing its entire large-load interconnection queue — roughly 474 GW of requests, about 90% of it data centers — before new data centers may connect. ERCOT told the PUCT it aims to file the verification report by December 10, 2026, and has said its 'Batch Zero' study will miss its April 2027 deadline. Projects in the Texas queue are effectively waiting on that audit calendar.

What does 'bring your own generation' or 'curtailment-first' mean?

Most operators are converging on conditional interconnection for very large loads: connect faster if you bring new generation capacity with you (PJM's Bring Your Own New Capacity, ISO-NE's proposed requirement, SPP's frameworks), or accept being curtailed first — ahead of residential customers — when the grid is short (PJM's proposed Interim Resource Adequacy Service, SPP's conditional service, ERCOT's SB 6 curtailment authority).

How is this different from SAVRN's other trackers?

The Moratorium Tracker maps state and local policy restrictions. The Delay Watchlist tracks named projects and public-company exposure. This watchlist covers the grid layer itself — the operators and federal bodies whose queues, tariffs, and audits determine interconnection speed everywhere in the country. The three are companion references.

How to read this watchlist

Effective = a rule or order currently binding. Filed = formally submitted to a regulator and awaiting decision. Proposed = announced or in stakeholder process, not yet filed. Rejected = voted down, withdrawn, or denied. Queue figures are each operator's own most recent public disclosure and are not directly comparable across operators — some count requests, some count studied capacity.

This is a curated reference built from primary sources — operator filings, FERC dockets, and reputable trade reporting — and every entry links to its source. Regulatory status changes quickly; we update as filings move. It is informational, not legal or investment advice. Spot something out of date? Tell us.

Companion references: the Data Center Moratorium Tracker (state and local policy) and the Data Center Delay Watchlist (named projects and filings).

See all 1039 sources on one page →

The SAVRN reference set

Seven references, one system

Capital, delay, policy, water, grid, permits and scarcity are one system seen from seven sides. Each reference is primary-sourced, refreshed on a schedule, and links into the others, so a project can be followed from the money committed to the docket that stopped it.

Have a specific address? Site Intelligence reads all seven references against one location, county, utility and grid operator included, and cites every finding.
Check this address →

Why this list matters

Every operator on this page is converging on the same position: data-center-scale load connects faster when it brings its own generation and does not lean on the shared grid. That is the design SAVRN builds — AI factories with on-site power, so a project's schedule depends on its own equipment rather than a 474 GW queue and an audit calendar.