Find your next data center location.
Check any US address against power lines, substations, fiber, water, gas and the cited record of restrictions, grid rules and project delays. Save a site to compare scenarios, track diligence and build a report. Free, no account needed.
Enter a US address and choose Check this address. Nothing is saved until you choose Save to portfolio.
Screening more than one site? Run your whole list at once →Map every site factor
The public evidence behind the screen
Open the original tracker research and cited sources. Explore water research for additional site context.
Looking up the electric utility, nearby infrastructure, and public records that apply here. Your report will open automatically.
A first screen can take about a minute. Keep this page open.Site screen
Save the screen to your portfolio to compare designs, track documents and export a report.
This screen has not been saved. Saved work stays in this browser.Findings, with sources
What the community gets
Comparable projects
Every screen is built from evidence that already exists.
SAVRN maintains the public record of what is slowing data centers down, then reads that record against your specific location.
Four cited datasets track restrictions, project delays, grid rulings, and capital exposure. Open the illustrated tracker cards above to inspect the public record behind a finding.
Explore the tracker evidence ↑Deterministic matching connects those events to your site by municipality, county, state, utility territory, and grid operator. No scores without receipts: every finding names the events and rules behind it.
Save this assessment to your portfolio. Assign its evidence requirements in Diligence, compare your own assumptions in Scenarios, recheck the record in Monitoring, and export the available evidence from Reports.
Follow the published record: moratorium changes · delay changes · delay sources.
Every state, one page each.
Type an address above for the full screen, or open a state directly for the restrictions, blocked or delayed projects, and permits already on record there.
One site. A connected decision.
Save your screen to carry the evidence into your portfolio, scenarios, diligence and reports. Saved sites and notes stay in this browser; export a copy from Reports.