Skip to content
Coming soonExplore the public preview. Connected model, compute and payment services are in development.Service status
SAVRN
Search Contact SAVRN
SAVRN Cloud

Compute

Move to owned capacity

Moving a workload to owned infrastructure should preserve its SAVRN Cloud project history without erasing the identity of earlier deployments. This guide describes the new qualification, observed serving checks and rollback evidence needed for a migration; the preview does not perform one.

Download Markdown

SAVRN Cloud · Coming soon · Public preview · Browser-local simulation · No live compute or payments

Explore portability in the local model

Compare Compute, Deployments and Architecture. The application keeps customer projects, model references, runs and usage records separate from a deployment's provider and placement fields. This demonstrates the structure needed for portability; it does not demonstrate a working migration.

In Capacity, Simulate qualification unlocks configuration for the owned fixture; Export inventory retains the demonstration boundary. No GPU inventory, facility, network, storage or support coverage is verified by these actions. Do not interpret an owned label as a compliance certification or a lower-cost measurement.

Preserve historical evidence

When reviewing a hypothetical move, keep the original deployment identity and placement in earlier receipts. A new placement deserves a new qualification and deployment record. Model names alone are insufficient to prove that weights, precision, templates and behavior stayed equivalent.

Before connected services launch

Commission actual hardware and record usable memory, topology, drivers, connectivity, storage and operator responsibilities. Run the same functional and policy tests on the new target, then measure its limits and costs. Move approved artifacts with verified identities. Canary eligible traffic, retain rollback and compare observed serving identity, errors, latency and accounting. Update offer terms when location or service behavior changes. Drain and destroy rented resources only after preserving promised outputs and confirming the migration acceptance window.

Build toward the work that matters.

Tell SAVRN what your institution needs to run, who reviews the results and where its data must stay. That workload defines the next service to qualify.

Discuss an AI project