New Mexico Data Center Permits Tracker

New Mexico has 6,267 MW of generation and storage requested in the interconnection queue and 4,115 MW of generation planned within 36 months. Every row below links to its primary source.

Last checked Sep 18, 2026

0
Data center & substation permits
of 0 total utility-scale permits tracked here
6,267MW
In the interconnection queue
28 active generation and storage positions
4,115MW
Planned generation
52 EIA-860M generators due within 36 months
#13
of 51 states with anything on record
Ranked by data center & substation permit count

Where the activity is

Ranked by row count. Counts are never mixed with the MW figures above.

Top counties · queue, substation & state air rows

Roosevelt 5
Hobbs 3
Lea 3
Roswell 3
Chaves 2
Kirtland 2
Bloomfield 1
Eddy 1

Interconnection queue in New Mexico

6,267 MW requested across 28 active generation and storage positions. Withdrawn and in-service rows are left out, matching the national page.

ISOProjectFuelMWStatusSource
SPP GEN-2020-065Gaines County Natural gas 1,003 MW Ia fully executed/on schedule
SPP GEN-2024-303Roosevelt County Solar plus storage 500 MW Disis stage
SPP GEN-2024-304Roosevelt County Solar plus storage 500 MW Disis stage
SPP ERAS-2025-020Lovington County Solar plus storage 400 MW Eras
SPP GEN-2024-221Roosevelt County Onshore wind 400 MW Disis stage
SPP 2018-G6San Juan County County Solar plus storage 360 MW Ia pending
SPP ERAS-2025-030Roswell County Solar plus storage 350 MW Eras
SPP GEN-2024-159Roosevelt County Solar 300 MW Disis stage
SPP ERAS-2025-018Portales County Solar plus storage 256 MW Eras
SPP GEN-2024-043Roosevelt County Onshore wind 250 MW Disis stage
SPP GEN-2024-281Lea County Solar plus storage 250 MW Disis stage
SPP GEN-2024-311Chaves County Solar 225 MW Disis stage
SPP FEUS-3Kirtland County Natural gas 180 MW Facility study stage
SPP ERAS-2025-014Hobbs County Natural gas 160 MW Eras
SPP GEN-2024-265Lea County Solar plus storage 155 MW Disis stage
SPP GEN-2024-261Lea County Solar plus storage 140 MW Disis stage
SPP GEN-2025-GR2Elida County Onshore wind 120 MW Facility study stage
SPP GEN-2024-295Eddy County Battery storage 115 MW Disis stage
SPP GEN-2026-PR22Rogers County Battery storage 104 MW Special study
SPP FEUS-5La Plata County Natural gas 85 MW Facility study stage
SPP GEN-2024-310Chaves County Battery storage 75 MW Disis stage
SPP GEN-2025-SR29Hobbs County Battery storage 75 MW Ia pending
SPP FEUS-2Kirtland County Natural gas 60 MW Ia fully executed/on schedule
SPP FEUS-4Bloomfield County Natural gas 60 MW Ia fully executed/on schedule
SPP GEN-2025-SR27Roswell County Battery storage 50 MW Special study
SPP GEN-2025-SR32Roswell County Battery storage 50 MW Special study
SPP GEN-2026-PR18Lea County County Other 30 MW Special study
SPP GEN-2026-PR19Hobbs County Battery storage 14 MW Special study

Planned generation in New Mexico

4,115 MW across 52 EIA-860M generators scheduled to enter service within 36 months.

PlantTechnologyMWPlannedStatusSource
AC Ranch IILea County Solar Photovoltaic 230 MW Jun 2029 Regulatory approvals pending. Not under construction
Tip Top Solar Energy Center LLCLea County Solar Photovoltaic 220 MW Dec 2026 Under construction, more than 50 percent complete
Blackwater Solar Center - NMRoosevelt County Solar Photovoltaic 200 MW Dec 2027 Regulatory approvals received. Not under construction
Cunningham Solar IILea County Solar Photovoltaic 196 MW Apr 2027 Regulatory approvals received. Not under construction
Gallegos Wind Farm, Phase 1Union County Onshore Wind Turbine 190 MW Nov 2028 Planned for installation, but regulatory approvals not initiated
Foxtail Flats Solar, LLCSan Juan County Solar Photovoltaic 170 MW Jun 2027 Under construction, less than or equal to 50 percent complete
Santa Teresa SolarDona Ana County Batteries 150 MW Sep 2026 Under construction, more than 50 percent complete
Santa Teresa SolarDona Ana County Solar Photovoltaic 150 MW Sep 2026 Construction complete, but not yet in commercial operation
Corazon Energy StorageBernalillo County Batteries 150 MW Sep 2027 Regulatory approvals received. Not under construction
Rockmont Solar and Storage ProjectSan Juan County Solar Photovoltaic 100 MW Dec 2027 Regulatory approvals pending. Not under construction
Star Light Energy CenterValencia County Batteries 100 MW Dec 2026 Under construction, less than or equal to 50 percent complete
Star Light Energy CenterValencia County Solar Photovoltaic 100 MW Dec 2026 Under construction, less than or equal to 50 percent complete
Buena Vista Energy Center IIIOtero County Batteries 100 MW Dec 2026 Under construction, less than or equal to 50 percent complete
Buena Vista Energy Center IIIOtero County Solar Photovoltaic 100 MW Dec 2026 Under construction, less than or equal to 50 percent complete
Four Mile Mesa Solar, LLCSan Juan County Solar Photovoltaic 100 MW Jul 2027 Under construction, less than or equal to 50 percent complete
Four Mile Mesa Solar, LLCSan Juan County Batteries 100 MW Jul 2027 Under construction, less than or equal to 50 percent complete
Oso NegroBernalillo County Batteries 100 MW May 2028 Regulatory approvals received. Not under construction
Wildcat Solar Power Plant LLCMcKinley County Solar Photovoltaic 90 MW Dec 2028 Planned for installation, but regulatory approvals not initiated
Windy Lane Energy CenterDe Baca County Solar Photovoltaic 90 MW Dec 2026 Under construction, less than or equal to 50 percent complete
Foxtail Flats Solar, LLCSan Juan County Batteries 80 MW May 2027 Under construction, less than or equal to 50 percent complete
AC Ranch ILea County Solar Photovoltaic 75 MW May 2027 Under construction, less than or equal to 50 percent complete
Windy Lane Energy CenterDe Baca County Batteries 68 MW Dec 2026 Under construction, less than or equal to 50 percent complete
NTEC Gas PlantSan Juan County Natural Gas Fired Combustion Turbine 60 MW Jun 2028 Regulatory approvals pending. Not under construction
NTEC Gas PlantSan Juan County Natural Gas Fired Combustion Turbine 60 MW Jun 2028 Regulatory approvals pending. Not under construction
NTEC Gas PlantSan Juan County Natural Gas Fired Combustion Turbine 60 MW Jun 2028 Regulatory approvals pending. Not under construction
NTEC Gas PlantSan Juan County Natural Gas Fired Combustion Turbine 60 MW Jun 2028 Regulatory approvals pending. Not under construction
NTEC Gas PlantSan Juan County Natural Gas Fired Combustion Turbine 60 MW Jun 2028 Regulatory approvals pending. Not under construction
NTEC Gas PlantSan Juan County Natural Gas Fired Combustion Turbine 60 MW Jun 2028 Regulatory approvals pending. Not under construction
NTEC Gas PlantSan Juan County Natural Gas Fired Combustion Turbine 60 MW Jun 2028 Regulatory approvals pending. Not under construction
NTEC Gas PlantSan Juan County Natural Gas Fired Combustion Turbine 60 MW Jun 2028 Regulatory approvals pending. Not under construction
NTEC Gas PlantSan Juan County Natural Gas Fired Combustion Turbine 60 MW Jun 2028 Regulatory approvals pending. Not under construction
NTEC Gas PlantSan Juan County Natural Gas Fired Combustion Turbine 60 MW Jun 2028 Regulatory approvals pending. Not under construction
NTEC Gas PlantSan Juan County Natural Gas Fired Combustion Turbine 60 MW Jun 2028 Regulatory approvals pending. Not under construction
NTEC Gas PlantSan Juan County Natural Gas Fired Combustion Turbine 60 MW Jun 2028 Regulatory approvals pending. Not under construction
NTEC Gas PlantSan Juan County Natural Gas Fired Combustion Turbine 60 MW Jun 2028 Regulatory approvals pending. Not under construction
NTEC Gas PlantSan Juan County Natural Gas Fired Combustion Turbine 60 MW Jun 2028 Regulatory approvals pending. Not under construction
NTEC Gas PlantSan Juan County Natural Gas Fired Combustion Turbine 60 MW Jun 2028 Regulatory approvals pending. Not under construction
NTEC Gas PlantSan Juan County Natural Gas Fired Combustion Turbine 60 MW Jun 2028 Regulatory approvals pending. Not under construction
NTEC Gas PlantSan Juan County Natural Gas Fired Combustion Turbine 60 MW Jun 2028 Regulatory approvals pending. Not under construction
NTEC Gas PlantSan Juan County Natural Gas Fired Combustion Turbine 60 MW Jun 2028 Regulatory approvals pending. Not under construction
Wildcat Solar Power Plant LLCMcKinley County Batteries 50 MW Dec 2028 Planned for installation, but regulatory approvals not initiated
Rockmont Solar and Storage ProjectSan Juan County Batteries 30 MW Dec 2027 Regulatory approvals pending. Not under construction
Westside - (NM)San Juan County Natural Gas Internal Combustion Engine 24 MW Jan 2028 Under construction, less than or equal to 50 percent complete
Westside - (NM)San Juan County Natural Gas Internal Combustion Engine 20 MW May 2028 Under construction, less than or equal to 50 percent complete
Westside - (NM)San Juan County Natural Gas Internal Combustion Engine 16 MW Mar 2027 Under construction, more than 50 percent complete
SLO-2Sandoval County Solar Photovoltaic 5 MW Sep 2026 Under construction, more than 50 percent complete
USS Jornada SolarDona Ana County Solar Photovoltaic 5 MW Dec 2026 Under construction, less than or equal to 50 percent complete
Pluma - SLT GrantGrant County Solar Photovoltaic 5 MW Aug 2026 Construction complete, but not yet in commercial operation
USS Gold SolarLuna County Solar Photovoltaic 4 MW Dec 2026 Under construction, less than or equal to 50 percent complete
USS Hermanas SolarLuna County Solar Photovoltaic 3 MW Dec 2026 Under construction, less than or equal to 50 percent complete
USS Meadow Lake SolarValencia County Solar Photovoltaic 3 MW Dec 2026 Under construction, less than or equal to 50 percent complete
USS Fletcher SolarHidalgo County Solar Photovoltaic 2 MW Oct 2026 Under construction, less than or equal to 50 percent complete

Other filings in New Mexico

NRC reactor projects (1)

ProjectStageDateSource
Eden Radioisotopes, LLC, Eden Isotope Production ComplexLea County, New Mexico Construction permit May 5, 2026

Where New Mexico stands

Across the whole tracker, 533 data center and substation permits are on record in 51 states and DC. New Mexico accounts for 0 of them, ranking #13 by that count. Ranking measures documented permit activity, not the size of the eventual buildout.