Rhode Island Data Center Permits Tracker
Rhode Island has 2,539 MW of generation and storage requested in the interconnection queue and 718 MW of generation planned within 36 months. Every row below links to its primary source.
Last checked Sep 18, 2026
Where the activity is
Ranked by row count. Counts are never mixed with the MW figures above.
Interconnection queue in Rhode Island
2,539 MW requested across 4 active generation and storage positions. Withdrawn and in-service rows are left out, matching the national page.
| ISO | Project | Fuel | MW | Status | Source |
|---|---|---|---|---|---|
| ISO-NE | Revolution Offshore Wind CNR onlyNA County | Onshore wind | 751 MW | Active | |
| ISO-NE | Revoultion Offshore windPDNA County | Onshore wind | 704 MW | Interconnection agreement | |
| ISO-NE | Increase RISEC Winter CNRProvidence County | Natural gas | 613 MW | Active | |
| ISO-NE | Manchester Street Station increaseProvidence County | Natural gas | 471 MW | Active |
Planned generation in Rhode Island
718 MW across 2 EIA-860M generators scheduled to enter service within 36 months.
| Plant | Technology | MW | Planned | Status | Source |
|---|---|---|---|---|---|
| Revolution WindWashington County | Offshore Wind Turbine | 715 MW | Nov 2026 | Under construction, more than 50 percent complete | |
| Hope Solar OneProvidence County | Solar Photovoltaic | 4 MW | Jul 2027 | Planned for installation, but regulatory approvals not initiated |
Where Rhode Island stands
Across the whole tracker, 533 data center and substation permits are on record in 51 states and DC. Rhode Island accounts for 0 of them, ranking #13 by that count. Ranking measures documented permit activity, not the size of the eventual buildout.