Rhode Island has 2,539 MW of generation and storage requested in the interconnection queue and 718 MW of generation planned within 36 months. Every row below links to its primary source.

Last checked Sep 18, 2026

0
Data center & substation permits
of 0 total utility-scale permits tracked here
2,539MW
In the interconnection queue
4 active generation and storage positions
718MW
Planned generation
2 EIA-860M generators due within 36 months
#13
of 51 states with anything on record
Ranked by data center & substation permit count

Where the activity is

Ranked by row count. Counts are never mixed with the MW figures above.

Top counties · queue, substation & state air rows

NA 2
Providence 2

Interconnection queue in Rhode Island

2,539 MW requested across 4 active generation and storage positions. Withdrawn and in-service rows are left out, matching the national page.

ISOProjectFuelMWStatusSource
ISO-NE Revolution Offshore Wind CNR onlyNA County Onshore wind 751 MW Active
ISO-NE Revoultion Offshore windPDNA County Onshore wind 704 MW Interconnection agreement
ISO-NE Increase RISEC Winter CNRProvidence County Natural gas 613 MW Active
ISO-NE Manchester Street Station increaseProvidence County Natural gas 471 MW Active

Planned generation in Rhode Island

718 MW across 2 EIA-860M generators scheduled to enter service within 36 months.

PlantTechnologyMWPlannedStatusSource
Revolution WindWashington County Offshore Wind Turbine 715 MW Nov 2026 Under construction, more than 50 percent complete
Hope Solar OneProvidence County Solar Photovoltaic 4 MW Jul 2027 Planned for installation, but regulatory approvals not initiated

Where Rhode Island stands

Across the whole tracker, 533 data center and substation permits are on record in 51 states and DC. Rhode Island accounts for 0 of them, ranking #13 by that count. Ranking measures documented permit activity, not the size of the eventual buildout.