Every named site in the Capital Atlas whose developer has recorded on-site, behind-the-meter or off-grid generation: 69 sites, 52 companies, ranked by disclosed capacity.

Sites
69
Companies
52
Off-grid or behind the meter
12
Disclosed capacity
34,754 MW
Data as of October 2, 2026Every figure traces to a source on its company or site record

Self-powered means the defined operating load is supplied by on-site resources under stated conditions. The sites below are the ones whose developers have put a generation arrangement on the record: a gas plant behind the meter, fuel cells, a reactor, a solar field with storage, or on-site generation of a type the source does not name.

The arrangement column quotes the Atlas record, which in turn quotes a fetched page. Capacity is the site's disclosed IT or campus megawatts, whichever the source stated.

Sites with on-site, behind-the-meter or off-grid generation

#DeveloperSiteStateCapacityStatusGenerationPower arrangement, as recordedSources
1Valar AtomicsProject Beehive nuclear-powered data center campusUtah9,600 MWproposedNuclearOn-site small modular reactors (about 456 Valar 25 MWe units), plus a nuclear fuel production facility and waste storage on sitenpr.org
2Alphabet / Google Project Tembo (formerly Project Jade), Switchgrass Industrial ParkWyoming2,700 MWapprovedFuel cellsTallgrass Energy to combine energy resources from Black Hills Energy, fuel cells and its power plant to serve the campuscowboystatedaily.comdatacenterknowledge.comoilcity.news
3Aligned Data Centers Project Phoenix campus, ShippingportPennsylvania2,000 MWunder constructionNatural gas on siteDedicated onsite power rather than the local grid, adjacent to the former Shippingport (Bruce Mansfield) coal plant being redeveloped as a natural gas energy campus; excess capacity expected to return to the gridfinance.yahoo.compennbizreport.com
4Brookfield (BAM / Brookfield Infrastructure Partners) Paducah American Energy HubKentucky1,800 MWannouncedNatural gas on site2 GW of new natural gas-fired generation plus up to 2.6 GW of battery energy storage, with transmission upgrades; Big Rivers Electric provides wholesale service and Jackson Purchase Energy Cooperative retail servicelpm.orgpower-eng.com
5Fermi Inc. (Fermi America) HyperGrid campus, AmarilloTexas1,500 MWconstructionNatural gas on siteBehind-the-meter generation: GE Frame 6B turbines rated 114 MW simple cycle and over 200 MW combined cycle, three Siemens SGT6-5000F units up to 1.1 GW, and six SGT-800 units rated 478 MW at ISO conditions in combined cycle. Grid connection of 86 MW on initial energization ramping to 200 MW. Clean Air Permit of approximately 6 GW with an application for approximately 5 GW more filed 27 March 2026.sec.govsec.govsec.gov
6Keel InfrastructureKeel Scrubgrass data center (former Scrubgrass power plant)Pennsylvania1,300 MWproposedNatural gas on siteExisting Scrubgrass waste-coal plant to be converted to natural gas, plus up to 550 MW of new gas generationmsn.com
7Bell Canada (BCE)Bell AI Fabric Saskatchewan hub (R.M. of Sherwood)Saskatchewan1,200 MWunder constructionNatural gas on site300 MW from the provincial grid; up to 900 MW from partner-developed natural gas generation under Saskatchewan's bring-your-own-power frameworknewswire.caglobalnews.cadiscovermoosejaw.com
8Nebius Group Highridge Business Park AI factoryPennsylvania1,200 MWannouncedBattery storageDedicated Energy Service Agreement with PPL Electric Utilities; battery energy storage providing roughly 30 minutes of backup power; closed-loop coolingnebius.comyahoo.com
9EdgeCore Digital InfrastructureEdgeCore Louisa County campus, Shannon Hill Regional Business ParkVirginia1,100 MWannouncedOn-site generation, type not statedOn-site substations planned for Phase IIdatacenterdynamics.com
10Arizona Land Consulting (Anita Verma-Lallian)Tonopah film studio, retail and data center complex (data center and technology campus)Arizona1,000 MWapprovedNatural gas on siteAPS service territory, interconnection timeline still under negotiation; developer is considering an on-site, off-grid natural gas plant as bridge powerkjzz.org
11Developer not namedSavannah River Site AI data center and energy generation projectSouth Carolina1,000 MWDeveloper selected to negotiate a phased lease; no final leaseNuclearAbout 2 GW of dedicated on-site generation, initially natural gas bridging to advanced nuclearmorningstar.comworld-nuclear-news.orgyahoo.com
12Emerald Energy Technologies (Tourmaline Oil Corp.)Malachite One data centre and power plant (near Banshee Gas Plant)Alberta1,000 MWproposedNatural gas on siteSelf-generated natural gas power with optional carbon sequestrationcbc.ca
13Meta Platforms Meta Sturgeon County data centerAlberta1,000 MWconstructionOn-site generation, type not statedMeta states the site will run on 100% clean and renewable energy, with Meta fully funding new generation and grid infrastructureabout.fb.comcbc.cahowardchai.substack.com
14ONE Nuclear EnergyProject Barracuda energy park and co-located data center (La. 1)Louisiana1,000 MWproposedNatural gas on site1.2 GW natural gas plants, 300 MW / 1,200 MWh BESS and potential 270 MW solar on site; Iberville Parish adopted a two-year moratorium on battery storage construction in July 2026finance.yahoo.comnola.com
15xAI (now operating under SpaceX / "SpaceXAI") Colossus 2Tennessee946 MWoperatingNatural gas on sitepermanent ~1.2 GW simple-cycle plant (41 turbines) received a Mississippi PSD permit in March 2026; temporary units scheduled for phased removal by mid-2027en.wikipedia.orgepoch.aidatacenterdynamics.com
16Rhea Data (subsidiary of Arevia Power)Rhea Data Center (BLM land south of Boise)Idaho600 MWproposedNatural gas on siteRight-of-way application includes a natural gas power generation facility and electrical facilities to connect to Idaho Power (Idaho Press, citing The Washington Sun)localnews8.comidahopress.com
17Geronimo PowerHarmony Energy Park data center (near the Bison Substation)North Dakota540 MWproposedSolar, wind or hydroNew generation; site includes a 200 MW solar farm Geronimo is building next to the Bison Substation and a planned 200 MW battery facility; Otter Tail Power large load tariff under North Dakota PSC reviewyahoo.comkfgo.com
18Azio AI Holdings, Inc.Atlas One compute campus (Project Atlas)Texas500 MWannouncedNatural gas on siteBehind-the-meter natural gas generationenidnews.com
19Anthropic Cedar Creek data center and gas plant campus (382 Earl Callahan Road), Anthropic in lease talksTexas490 MWproposedNatural gas on siteOn-site natural gas turbines, 710 MW site-rated; TCEQ air permit pendingtherealdeal.commsn.comyahoo.com
20Vantage Data Centers Project Latigo campusWyoming480 MWannouncedNatural gas on siteOn-site natural gas generation using Wyoming gas; closed-loop cooling, with the permit application stating that for every 100 gallons of water used 110 will be restoredcapcity.newswyomingnews.com
21Vantage Data Centers Vantage Data Centers Project Latigo (Terry Ranch Road)Wyoming480 MWrezoning approvedNatural gas on siteOnsite power generation planned using Wyoming natural gas; closed-loop cooling with onsite wellswyomingnews.com
22PowerPlay AIPowerPlay AI greater Abilene behind-the-meter AI data centerTexas400 MWplannedNatural gas on siteBehind-the-meter natural gas generation; natural gas service agreements in progress and independent power producer selection pendingfinance.yahoo.com
23Beacon Data Centers (Beacon AI)Beacon Data Centers Lorneville data centre (Spruce Lake Data Centre Hub)New Brunswick390 MWenvironmental impact assessment underwayNatural gas on siteVoltaGrid 190 MW gas generation plus NB Power gridcbc.camsn.combetakit.com
24Panattoni Development Co.Project Shelby (former Ford property, Marietta Avenue NE and Georgetown Road NE)Ohio320 MWproposedOn-site generation, type not statedOne on-site electrical substation; generators set back 500 feet from the nearest residential areamsn.comcantonrep.com
25Blockfusion USA, Inc.Niagara Falls AI campusNew York300 MWunder developmentNuclearPredominantly hydroelectric and nuclear generation in NYISO Zone A, per Blockfusionfinance.yahoo.comsec.govsec.gov
26Soluna HoldingsProject Dorothy 3Texas300 MWplannedSolar, wind or hydroBehind-the-meter access to Soluna's 150 MW Briscoe Wind Farm, whose substation sits across from the parcelsec.gov
27VolitionVolition data center, former Fingerhut warehouse (4000 E. U.S. 6), Spanish Fork CanyonUtah250 MWproposedFuel cellsSelf-generated, fuel cell powered; the city amendment requires energy grid isolation; air permits sought from the Utah Division of Air Qualitymsn.comsltrib.comfox13now.com
28Alpha Compute Corp.Alpha Compute northern Pennsylvania AI data center campusPennsylvania200 MWannouncedNatural gas on siteBehind-the-meter natural gas from about 1,800 net unleased Marcellus mineral acres; company projects power cost of about $0.0585/kWhfinanznachrichten.de
29Developer not namedFleet Data Centers Reno-area hyperscale facility (SV RNO)Nevada200 MWconstructionNatural gas on siteTemporary on-site natural gas plant (South Valley, 144 MW, 37.4 acres at 8990 USA Parkway) approved by the PUCN on 17 September 2026 pending NDEP air and Storey County building permits, to operate two to three years until NV Energy provides permanent service; NV Energy large-load electric service agreement signed May 2026; dedicated electrical substationfleetdatacenters.comeinpresswire.comyahoo.com
30Zone Frontier Inc.Zone Frontier West Texas data center campus (Potter County)Texas200 MWproposedNatural gas on siteSurrounds Southwestern Public Service (Xcel Energy) Potter County 345 kV substation in SPP; at least 1,800 acres reserved for solar, battery storage and supporting infrastructure; near two natural gas pipelinesfinance.yahoo.comw.mediasec.gov
31KKR CyrusOne DFW10 campus (Thad Hill Energy Center)Texas190 MWconstructionOn-site generation, type not stateddedicated generation from Calpine's Thad Hill Energy Center; Constellation later signed a 380MW agreement near the Freestone Energy Center with a second phase of another 380MWcyrusone.comreuters.com
32Soluna HoldingsProject Kati (Kati 1 and Kati 2)Texas166 MWoperating (Kati 1); planned (Kati 2)Solar, wind or hydroBehind the meter, powered by the Las Majadas wind energy project; full 166 MW conditionally classified as Base Load in ERCOT Batch Zerosec.govsec.gov
33Menlo EquitiesMenlo Equities data center at Western Digital campus (Charlotte Drive)California100 MWproposed (development plans filed)On-site generation, type not statedOnsite substation; Tier 4 backup generators; closed-loop air-cooled chillersmsn.commsn.commsn.com
34PrologisPrologis North San Jose data center (326 Charcot Avenue)California99 MWspecial use permit filedOn-site generation, type not statedPG&E grid with onsite substation, backup generator yard and a second independently routed transmission line; enrollment in San Jose Total Clean Energy intendedmsn.com
35Keel Infrastructure (formerly Bitfarms)Sherbrooke data center projectQuebec96 MWplannedSolar, wind or hydroHydro-Sherbrooke; consolidates existing power without requesting additional capacitysec.govsec.gov
36QTS Realty Trust (Blackstone) QTS East Windsor campus, 159 Princeton-Hightstown RoadNew Jersey70 MWdelayedOn-site generation, type not stated70+ MW of critical power and an on-site substationidcnova.com
37Armada Nowlit Energy Ltd.Clive-area gas-fired power and modular data centre (Haynes Road)Alberta20 MWproposedNatural gas on siteOn-site 19.8 MW natural gas-fired generationcentralalbertaonline.com
38FingerMotion, Inc.FingerMotion Brooks Campus #1 (behind-the-meter AI compute site)Alberta10 MWproposedNatural gas on siteBehind-the-meter natural gas generation (generating equipment of the prior operator excluded from the sale); new gas supply agreement with Pivotal Energy Partners is a closing conditionfinanznachrichten.debrooksbulletin.com
39Energy VaultSnyder AI CampusTexas8 MWunder constructionBattery storagePowered land with battery energy storage and N+1 redundancymarkets.ft.comsec.gov
404-3 Glenbrook GroupSalem 3 data center campusPennsylvaniaannouncedNuclearOn-site power generation planned; site is near the Susquehanna nuclear planttimesleader.comtimesleader.comtimesleader.com
41614 Prospect RD LLCMisty Hollow Energy and Data Campus (614 Prospect Road)Pennsylvaniaproposed (preliminary plan filed)Natural gas on siteOn-site gas-fired generation (power station facilities on about 10 acres) per the township manager; Marcellus Drilling News headline reports a 300 MW plant tied to a gas well pad (unconfirmed)butlereagle.combutlereagle.commsn.com
42Alphabet / GoogleGoogle potential Lea County data centerNew MexicoexploringSolar, wind or hydro2 GW solar field by Excelsior Energy Capital about 3 miles from the site; companies say they will cover 100% of new generation costsblog.googleyahoo.com
43Alphabet / Google Midlothian / Red Oak campuses (Ellis County)TexasexpansionSolar, wind or hydro375 MW of carbon-free energy capacity in new solar PPAsdatacenterdynamics.com
44Alphabet / Google Project Clydesdale data center campus, near Cherokee Industrial ParkOklahomaunder constructionOn-site generation, type not statedPublic Service Company of Oklahoma (PSO) grid service with a new Beale-funded on-site substationkrmg.comnewson6.comfox23.com
45Alphabet / Google Project Rise 1A and Rise 2A data centers, VernonTexasfiledOn-site generation, type not statedGoogle said in February 2026 its Wilbarger County data center would be co-located with on-site clean energy from AESconstructionreviewonline.comtdlr.texas.govtdlr.texas.gov
46Alphabet / Google Texas program (Armstrong County, Haskell County, Midlothian)TexasannouncedOn-site generation, type not statedMore than 6,200 MW of new energy generation and capacity contracted through PPAsblog.googledatacenterdynamics.comtdlr.texas.gov
47AltigenJurassic Spark data center and power campusUtahproposedNatural gas on siteOn-site natural gas plant, 250 MW initially and up to 3 GW; gas via a pipeline right-of-way across BLM land that the county agreed preliminarily to take ownership of in May 2026msn.com
48Amazon (AWS) AWS data center campus, Energy Way Industrial Park (Airport Road), HamletNorth Carolinaunder constructionNatural gas on siteDuke Energy grid service from an adjacent Duke natural gas turbine plant; 57 Duke bridge-power diesel engines for up to 364 days until grid connection, plus 588 Amazon backup generatorsrichmondobserver.comwfae.orgyourdailyjournal.com
49Amazon (AWS) AWS data center campus, Scioto Darby Road (Hilliard area) with AEP Ohio fuel cell plantOhiounder constructionFuel cells72.9 MW AEP Ohio fuel cell facility using 228 Bloom Energy units, supplied by natural gasmsn.comwosu.org
50Amazon (AWS) AWS data centers at Homer City Energy Campus (Center and Blacklick townships)PennsylvaniaproposedNatural gas on siteFirstEnergy supply supported by HCR's 4.5 GW gas-fired generation at the former Homer City Generating Stationindianagazette.comwccsradio.com
51Amazon (AWS) GW Ranch data center and power campusTexasunder constructionNatural gas on siteOff-grid natural gas turbines (up to 7.65 GW permitted), planned solar and batteries; designed to transition to grid service laterenr.comfinance.yahoo.com
52Amazon (AWS) Pennsylvania campuses (Salem Township and Falls Township)PennsylvaniaannouncedNuclearTied by Amazon's own statement to the Talen Susquehanna 1,920 MW nuclear PPApa.govir.talenenergy.com
53Anthropic Nexus Data Centers Hubbard AI campus (Anthropic anchor tenant)Texasunder constructionNatural gas on siteBehind-the-meter natural gas generation on site, reported at 1.6 GWcnbc.comtradingview.comrutlandherald.com
54Copia PowerMonarch Data CenterNevadaapprovedNatural gas on siteAssociated gas-fired plant with 500 MW of natural gas generation and 500 MW of battery storage per KRNVmynews4.comkolotv.com
55DataOneDataOne AI factory campus (Logix Innovation Campus)IndianaannouncedFuel cells350 MW of utility power through IMPA plus 175 MW from Bloom Energy natural gas fuel cells, per the project electrical engineer at the 21 September 2026 open houseclintoncountydailynews.comjconline.comclintoncountydailynews.com
56Developer not namedProject Thunderbird data center campusesOklahomaannouncedOn-site generation, type not statedUp to 3.3 GW of on-site generation, with infrastructure tied to backup power for Vance Air Force Basenews9.comenidnews.comkfor.com
57Falmouth TechAccokeek Center data center complexVirginiaannouncedOn-site generation, type not statedOn-site electrical substation proposedyahoo.com
58Meta Platforms Meta Bowling Green data center (Middleton Township)Ohiounder constructionOn-site generation, type not statedOnsite power plant under construction per BG Independent Newsyahoo.combgindependentmedia.orgmsn.com
59Microsoft (Azure) Microsoft MNZ07 Wellington Data Center (13490 University Boulevard, Gainesville)VirginiapermittingOn-site generation, type not statedOn-site substationpatch.comdatacenterdynamics.com
60Microsoft (Azure) Mount Pleasant datacenter campus (Fairwater Wisconsin)WisconsinconstructionSolar, wind or hydro250 MW solar project built with National Grid Renewables; additional 250 MW solar project in Portage Countynews.microsoft.comblogs.microsoft.comreuters.com
61Nexus Data CentersNexus Data Centers Hubbard AI campusTexasunder constructionNatural gas on siteOn-site gas-fired generation, behind the meterw.mediathenextweb.com
62NorthMark Strategies (Valara)Valara data center (former Kohler plant, Pine Street)South Carolinaunder constructionNatural gas on siteOn-site natural gas turbines and generators; SC DES air permit granted 18 September 2026 for 11 turbines adding 408 MW to 48 MW already permittedmsn.comyahoo.comwspa.com
63One Nuclear EnergyProject Cayman energy project and co-located data center campusLouisianaannouncedNatural gas on sitePlanned 2.88 GW natural gas plant and 700 MW / 2.88 GWh battery storagepowermag.comfinance.yahoo.comsec.gov
64QTS Data CentersQTS data center campus on Lancium Clean Campus (near Turkey)TexasannouncedSolar, wind or hydroLancium to provide electrical and civil infrastructure with its own power from battery storage and solar; companies fund 100% of energy infrastructure improvementsnewschannel10.commsn.com
65Site Layer 4, LLCSite Layer 4 Goshen Hole data center and energy campusWyomingrezoning approvedBattery storageCo-located utility-scale generation and energy storage planned; project would generate its own powercowboystatedaily.comcowboystatedaily.comwyomingnews.com
66The Carlyle Group Copia Power site west of PhoenixArizonaconstructionSolar, wind or hydro1.5GW of solarcarlyle.comirei.com
67Wave InfrastructureWave Infrastructure AI research lab and HPC facility (Junction 42 Business Park)AlbertaproposedOn-site generation, type not statedPower generation details provided by the purchaser; Alberta Utilities Commission approval required for any generation or grid connectioncentralalbertaonline.comtodayinbc.com
68Wright Industrial Group (Wright family)Project River energy and data center campusTennesseeannouncedNatural gas on siteOn-site energy campus powered by natural gas and woody biomass per WUTCtimesfreepress.comwutc.orgtimesfreepress.com
69xAI (now operating under SpaceX / "SpaceXAI") Colossus 1TennesseeoperatingNatural gas on sitetemporary natural-gas turbines and Tesla Megapack battery systems deployed because the local grid connection was limitedx.aien.wikipedia.orgdatacenterdynamics.com
Questions this page answers
Which companies are building self-powered AI data centers?

52 developers have at least one named site with on-site or behind-the-meter generation on record in the SAVRN Capital Atlas, among them 4-3 Glenbrook Group, 614 Prospect RD LLC, Aligned Data Centers, Alpha Compute Corp., Alphabet / Google, Altigen, Amazon (AWS), Anthropic. The largest by disclosed capacity are Valar Atomics at Project Beehive nuclear-powered data center campus (9,600 MW), Alphabet / Google at Project Tembo (formerly Project Jade), Switchgrass Industrial Park (2,700 MW), Aligned Data Centers at Project Phoenix campus, Shippingport (2,000 MW).

Which of these sites are off-grid?

12 sites describe the arrangement as off-grid, behind the meter or islanded from the local grid, including Project Phoenix campus, Shippingport (Aligned Data Centers), HyperGrid campus, Amarillo (Fermi Inc. (Fermi America)), Tonopah film studio, retail and data center complex (data center and technology campus) (Arizona Land Consulting (Anita Verma-Lallian)), Atlas One compute campus (Project Atlas) (Azio AI Holdings, Inc.). Most self-powered campuses keep a grid connection for startup, backup or later transition and say so.

What kind of generation do self-powered data centers use?

On this page: Natural gas on site (33 sites), On-site generation, type not stated (15 sites), Solar, wind or hydro (9 sites), Nuclear (5 sites), Fuel cells (4 sites), Battery storage (3 sites). The classification reads the power arrangement recorded for each site; where a source names more than one technology the first named is used.

How does SAVRN power its own AI factory?

A SAVRN campus runs on its own fuel-cell baseload with grid-forming storage, islanding and black start, delivered as the Atom block and the Proton power plant. That design is a reference design verified per site, not a site in the Atlas, so it is described on the solutions pages rather than ranked here.

Keep going
The SAVRN reference set

Seven references, one system

Capital, delay, policy, water, grid, permits and scarcity are one system seen from seven sides. Each reference is primary-sourced, refreshed on a schedule, and links into the others, so a project can be followed from the money committed to the docket that stopped it.

Have a specific address? Site Intelligence reads all seven references against one location, county, utility and grid operator included, and cites every finding.
Check this address →