
Colovore data centers
Listed below are 20 data centers operated by Colovore in the United States, identified from primary sources across 8 states and 15 cities.
What Colovore does, and what this map holds
Operates high-density, liquid-cooled colocation at 5 to 600 kW per rack, and offers build-to-suit capacity in metro markets. It also does build-to-suit capacity. This map identifies 20 data centers operated by Colovore across 8 states and 15 cities. Its largest presence is California, with 5 buildings.
After California, Colovore has the most data centers in Illinois (5), Texas (3), Nevada (2), New Jersey (2), Georgia (1). Each state below links to that state's own page, which carries every operator in it, the grid operator, and the moratorium, water and delay record that applies there.
Disclosure is uneven and this page does not paper over it. 11 publish a power figure. Each figure is shown against the building it belongs to and never added into a single total, because operators do not measure the same thing: one states the floor area of one hall, another the full capacity of a campus it has only announced.
16 of these records are marked planned, permitted or under construction rather than operating, and each is labeled as such in the list below.
Every Colovore data center, by state and city
All 20 Colovore data centers this map identifies, grouped by the state and then the city each one stands in. Every entry carries the source that names it.
Colovore data centers in California
All California data centers ↗Santa Clara, California3
- Colovore SJC02 3060 RAYMOND STREET Colovore SJC02 stands in Santa Clara, California.
- SJC01 SJC01 stands in Santa Clara, California. The record puts it at 6 MW. It sits on the Silicon Valley campus. 6 MW
- SJC02 SJC02 stands in Santa Clara, California. The record puts it at 6 MW. It sits on the Silicon Valley campus. 6 MW
Los Angeles, California1
- Colovore data center Colovore data center stands in Los Angeles, California. It is recorded as planned rather than operating.
Santa Clara County, California1
- Colovore Colovore stands in Santa Clara County, California. No floor area is published; its outline measures 24,036 square feet on the ground.
Colovore data centers in Illinois
All Illinois data centers ↗Aurora, Illinois3
- ORD01 ORD01 stands in Aurora, DuPage County, Illinois. The record puts it at 6 MW. It is recorded as under construction. It sits on the Chicago campus. 6 MW
- ORD03 ORD03 stands in Aurora, DuPage County, Illinois. The record puts it at 16 MW. It is recorded as under construction. It sits on the Chicago campus. 16 MW
- ORD04 ORD04 stands in Aurora, DuPage County, Illinois. The record puts it at 16 MW. It is recorded as under construction. It sits on the Chicago campus. 16 MW
West Chicago, Illinois1
- ORD02 ORD02 stands in West Chicago, DuPage County, Illinois. The record puts it at 16 MW. It is recorded as under construction. It sits on the Chicago campus. 16 MW
Yorkville, Illinois1
- Colovore data center Colovore data center stands in Yorkville, Kendall County, Illinois. It is recorded as planned rather than operating.
Colovore data centers in Texas
All Texas data centers ↗Fort Worth, Texas1
- DFW02 DFW02 stands in Fort Worth, Tarrant County, Texas. The record puts it at 32 MW. It is recorded as under construction. It sits on the Dallas campus. 32 MW
Hutto, Texas1
- AUS01 AUS01 stands in Hutto, Williamson County, Texas. The record puts it at 40 MW. It is recorded as under construction. It sits on the Austin campus. 40 MW
Mesquite, Texas1
- DFW01 DFW01 stands in Mesquite, Dallas County, Texas. The record puts it at 44.8 MW. It is recorded as under construction. It sits on the Dallas campus. 44.8 MW
Colovore data centers in Nevada
All Nevada data centers ↗Reno, Nevada1
- RNO02 RNO02 stands in Reno, Washoe County, Nevada. The record puts it at 16 MW. It is recorded as under construction. It sits on the Reno campus. 16 MW
Sparks, Nevada1
- RNO01 RNO01 stands in Sparks, Washoe County, Nevada. The record puts it at 16 MW. It is recorded as under construction. It sits on the Reno campus. 16 MW
Colovore data centers in New Jersey
All New Jersey data centers ↗Bridgewater, New Jersey1
- Colovore data center Colovore data center stands in Bridgewater, Somerset County, New Jersey. It is recorded as planned rather than operating.
Nutley, New Jersey1
- Colovore data center Colovore data center stands in Nutley, Essex County, New Jersey. It is recorded as planned rather than operating.
Colovore data centers in Georgia
All Georgia data centers ↗Atlanta, Georgia1
- Colovore data center Colovore data center stands in Atlanta, Fulton County, Georgia. It is recorded as planned rather than operating.
Colovore data centers in Virginia
All Virginia data centers ↗Sterling, Virginia1
- Colovore data center Colovore data center stands in Sterling, Loudoun County, Virginia. It is recorded as planned rather than operating.
Colovore data centers in Washington
All Washington data centers ↗Seattle, Washington1
- Colovore data center Colovore data center stands in Seattle, King County, Washington. It is recorded as planned rather than operating.
Floor area and power appear only where the operator or a government record publishes them, and are never added into one figure. A building a source describes without naming it is listed as a Colovore data center at the city or county it stands in.
Where Colovore data centers cluster
Colovore's 20 data centers across 8 states. Each state links to its own page, which carries every operator in that state alongside the grid operator and the policy record.
Colovore data centers, answered
How many data centers does Colovore have?
This map identifies 20 US data centers operated by Colovore, across 8 states and 15 cities. Each one is listed below with the city and county it stands in and the source that names it. This is a count of what primary sources describe in the United States, not a company-reported global total.
Where are Colovore data centers located?
They are grouped below by state and then by city. Colovore's largest presence is California with 5 buildings, followed by Illinois (5), Texas (3), Nevada (2), New Jersey (2).
How big are Colovore data centers?
0 of the 20 publish a floor area and 11 publish a power figure. Both are shown against the individual building rather than summed, because a floor area for one hall and an announced campus capacity are not the same measurement.
Who is Colovore?
Operates high-density, liquid-cooled colocation at 5 to 600 kW per rack, and offers build-to-suit capacity in metro markets. It also does build-to-suit capacity. On this map it is classified as colocation. Its own site is at https://www.colovore.com.
Counts are what primary sources describe in the United States as of 2026-09-02: the operator's own published facility list, PeeringDB, OpenStreetMap, Wikidata, and county and state building registers. They are not company-reported global totals, and this page never states a figure the record does not carry.