AI factory sites ready for development
Each SAVRN site starts with the hard parts in hand: land, a power path, natural gas at or near the property and fiber access. We build them out in SAVRN Atom blocks, so a tenant can start with one block and grow with demand. Exact locations are shared with qualified parties under NDA.
Mountain Creek
Mountain Creek is a 100-acre AI factory site south of Dallas, Texas, ready for development up to 300 MW gross on SAVRN Atoms, with natural gas at or near the site, fiber access and onsite turbine or fuel cell power.
- 100 acres
- Site area
- 300 MW
- Gross capacity at full build
- ~23
- SAVRN Atom blocks at 13.2 MW gross each
- ERCOT
- Power market
IVDC Imperial Valley Data Center
IVDC is an Imperial Valley, California AI factory site with biomass generation already on site, a 300 MW first phase, 100 MW of solar and 100 MW of battery storage, and room to grow to 1.8 GW, built in SAVRN Atom blocks.
- 300 MW
- Phase one, gross
- 1.8 GW
- Site capacity at full build
- 100 + 100 MW
- Solar and battery storage
- ~39 MW
- Biomass generation on site today
From listing to first block
- Site packageUnder NDA: the location, power and fuel documents, fiber, zoning and the Site Intelligence screen.
- ConfigurationChoose the power mix and the first blocks. Each SAVRN Atom is 13.2 MW gross.
- First powerFactory-built blocks are set while generation is built alongside them.
- GrowAdd blocks and generation on the tenant's schedule, up to the site's full build.