SAVRN Trackers · United States

U.S. Power Supply Chain & Demand

The U.S. power system from equipment order to household bill, state by state. The map ties the generation pipeline, grid operators, data center demand, the state jobs report, electricity prices and local policy into one record, built from EIA, BLS, BEA, Census and the SAVRN trackers. Every state and DC has its own page.

Rebuilt 2026-10-08 · refreshed weekly
Planned generation
288.5 GW
98.7 GW under construction or built
Interconnection queue
2,061 GW
active requests, end-2025
Data centers identified
4,761
SAVRN Data Center Map
Construction jobs
8.364M
all-time high, Sep 2026
Residential prices up
48 of 51
jurisdictions, YTD July 2026
Local measures
1,235
moratoria and restrictions
The finding

What the build-out changed in the U.S. economy

The data center build-out is no longer a forecast. It is in the national accounts. BEA traced part of the upward revision to second-quarter growth to nonresidential structures, mainly data centers, and construction employment passed its 2006 record. The gains reach past the server halls: construction employment is above its 2019 level in 42 of the 48 states where BLS publishes it, and electrical contractor employment grew in 46 of 48, led by Idaho (+66.6%), Arizona (+52.3%), Maine (+44.1%). The cost side is just as measurable. Residential prices rose in 48 of 51 jurisdictions this year, gas turbines take about five years from order to delivery, and factory employment overall is still below 2019 (above it in only 16 of 51). Each state page below shows where its economy sits on that ledger.

Data center construction
9.6×
its August 2019 level: an $85.0B annual rate in August 2026, a record
GDP growth
50.2%
of year-over-year real GDP growth in Q2 2026 came from technology investment, data center construction included
Construction jobs
8.364M
an all-time high in September 2026, above the 2006 housing peak
Grid equipment factories
446,300
electrical equipment manufacturing jobs, the most since February 2004
Electricity use
4,195B kWh
a record in 2025, with commercial sales on track to pass residential for the first time
Utility capital
$238.8B
utility capital spending planned for 2026, up from $204.1B in 2025

Section 02 · States

State by state

Every state and DC. Each tile opens a page with the state's generation pipeline, grid operator, data center demand, jobs report, prices and policy record.

Seal of AlabamaAlabamaNon-RTO (utility-run)1.9 GW planned · 0.1 GW building+3.6% residential price18 local measures · 5 on Delay WatchlistOpen page ↗Seal of AlaskaAlaskaNon-RTO (utility-run)0.0 GW planned · 0.0 GW building+5.0% residential price3 local measures · 1 on Delay WatchlistOpen page ↗Seal of ArizonaArizonaNon-RTO (utility-run)15.4 GW planned · 6.6 GW building+0.9% residential price6 local measures · 8 on Delay WatchlistOpen page ↗Seal of ArkansasArkansasMISO6.2 GW planned · 3.5 GW building+8.0% residential price13 local measures · 5 on Delay WatchlistOpen page ↗Seal of CaliforniaCaliforniaCAISO20.0 GW planned · 8.1 GW building+2.5% residential price48 local measures · 9 on Delay WatchlistOpen page ↗Seal of ColoradoColoradoNon-RTO (utility-run)6.6 GW planned · 3.1 GW building+8.0% residential price25 local measures · 6 on Delay WatchlistOpen page ↗Seal of ConnecticutConnecticutISO-NE0.6 GW planned · 0.1 GW building-7.7% residential price6 local measures · 3 on Delay WatchlistOpen page ↗Seal of DelawareDelawarePJM0.2 GW planned · 0.1 GW building+6.6% residential price4 local measures · 2 on Delay WatchlistOpen page ↗DCDistrict of ColumbiaPJM0.0 GW planned · 0.0 GW building+17.8% residential price0 local measures · 0 on Delay WatchlistOpen page ↗Seal of FloridaFloridaNon-RTO (utility-run)2.5 GW planned · 2.3 GW building+1.8% residential price45 local measures · 6 on Delay WatchlistOpen page ↗Seal of GeorgiaGeorgiaNon-RTO (utility-run)6.9 GW planned · 0.8 GW building+4.5% residential price60 local measures · 14 on Delay WatchlistOpen page ↗Seal of HawaiiHawaiiNon-RTO (utility-run)0.5 GW planned · 0.1 GW building+12.7% residential price2 local measures · 0 on Delay WatchlistOpen page ↗Seal of IdahoIdahoNon-RTO (utility-run)1.0 GW planned · 0.4 GW building+12.0% residential price4 local measures · 4 on Delay WatchlistOpen page ↗Seal of IllinoisIllinoisPJM7.8 GW planned · 2.9 GW building+10.7% residential price28 local measures · 16 on Delay WatchlistOpen page ↗Seal of IndianaIndianaMISO5.4 GW planned · 1.6 GW building+7.4% residential price40 local measures · 21 on Delay WatchlistOpen page ↗Seal of IowaIowaMISO1.1 GW planned · 0.3 GW building+5.0% residential price31 local measures · 5 on Delay WatchlistOpen page ↗Seal of KansasKansasSPP2.4 GW planned · 0.6 GW building+6.2% residential price24 local measures · 6 on Delay WatchlistOpen page ↗Seal of KentuckyKentuckyNon-RTO (utility-run)3.3 GW planned · 1.6 GW building+8.8% residential price44 local measures · 6 on Delay WatchlistOpen page ↗Seal of LouisianaLouisianaMISO11.3 GW planned · 0.7 GW building+5.9% residential price3 local measures · 1 on Delay WatchlistOpen page ↗Seal of MaineMaineISO-NE0.6 GW planned · 0.1 GW building+9.2% residential price24 local measures · 3 on Delay WatchlistOpen page ↗Seal of MarylandMarylandPJM0.0 GW planned · 0.0 GW building+13.6% residential price31 local measures · 6 on Delay WatchlistOpen page ↗Seal of MassachusettsMassachusettsISO-NE0.7 GW planned · 0.3 GW building-0.3% residential price17 local measures · 4 on Delay WatchlistOpen page ↗Seal of MichiganMichiganMISO5.2 GW planned · 3.5 GW building+8.8% residential price91 local measures · 10 on Delay WatchlistOpen page ↗Seal of MinnesotaMinnesotaMISO1.8 GW planned · 0.9 GW building+4.2% residential price25 local measures · 19 on Delay WatchlistOpen page ↗Seal of MississippiMississippiMISO4.6 GW planned · 2.2 GW building+9.1% residential price1 local measure · 1 on Delay WatchlistOpen page ↗Seal of MissouriMissouriMISO3.8 GW planned · 1.5 GW building+5.9% residential price21 local measures · 5 on Delay WatchlistOpen page ↗Seal of MontanaMontanaNon-RTO (utility-run)1.2 GW planned · 0.1 GW building+11.3% residential price5 local measures · 2 on Delay WatchlistOpen page ↗Seal of NebraskaNebraskaSPP2.1 GW planned · 0.1 GW building+7.2% residential price23 local measures · 2 on Delay WatchlistOpen page ↗Seal of NevadaNevadaNon-RTO (utility-run)6.7 GW planned · 2.3 GW building+2.6% residential price11 local measures · 5 on Delay WatchlistOpen page ↗Seal of New HampshireNew HampshireISO-NE0.0 GW planned · 0.0 GW building+15.2% residential price5 local measures · 1 on Delay WatchlistOpen page ↗Seal of New JerseyNew JerseyPJM0.0 GW planned · 0.0 GW building+8.7% residential price108 local measures · 4 on Delay WatchlistOpen page ↗Seal of New MexicoNew MexicoNon-RTO (utility-run)4.0 GW planned · 1.5 GW building+2.8% residential price12 local measures · 5 on Delay WatchlistOpen page ↗Seal of New YorkNew YorkNYISO7.1 GW planned · 3.3 GW building+13.0% residential price35 local measures · 6 on Delay WatchlistOpen page ↗Seal of North CarolinaNorth CarolinaNon-RTO (utility-run)2.1 GW planned · 0.9 GW building+9.0% residential price62 local measures · 14 on Delay WatchlistOpen page ↗Seal of North DakotaNorth DakotaSPP2.7 GW planned · 0.2 GW building+7.4% residential price5 local measures · 1 on Delay WatchlistOpen page ↗Seal of OhioOhioPJM3.4 GW planned · 1.8 GW building+13.0% residential price105 local measures · 11 on Delay WatchlistOpen page ↗Seal of OklahomaOklahomaSPP5.6 GW planned · 2.7 GW building+7.8% residential price15 local measures · 9 on Delay WatchlistOpen page ↗Seal of OregonOregonNon-RTO (utility-run)7.8 GW planned · 0.5 GW building+1.4% residential price7 local measures · 7 on Delay WatchlistOpen page ↗Seal of PennsylvaniaPennsylvaniaPJM6.5 GW planned · 0.3 GW building+12.5% residential price36 local measures · 24 on Delay WatchlistOpen page ↗Seal of Rhode IslandRhode IslandISO-NE0.7 GW planned · 0.7 GW building-1.1% residential price5 local measures · 1 on Delay WatchlistOpen page ↗Seal of South CarolinaSouth CarolinaNon-RTO (utility-run)2.2 GW planned · 0.2 GW building+7.6% residential price22 local measures · 6 on Delay WatchlistOpen page ↗Seal of South DakotaSouth DakotaSPP0.4 GW planned · 0.1 GW building+10.3% residential price4 local measures · 2 on Delay WatchlistOpen page ↗Seal of TennesseeTennesseeNon-RTO (utility-run)4.0 GW planned · 1.1 GW building+4.9% residential price38 local measures · 7 on Delay WatchlistOpen page ↗Seal of TexasTexasERCOT94.2 GW planned · 31.7 GW building+5.7% residential price25 local measures · 32 on Delay WatchlistOpen page ↗Seal of UtahUtahNon-RTO (utility-run)3.8 GW planned · 1.0 GW building+3.4% residential price10 local measures · 3 on Delay WatchlistOpen page ↗Seal of VermontVermontISO-NE0.1 GW planned · 0.0 GW building+6.6% residential price3 local measures · 0 on Delay WatchlistOpen page ↗Seal of VirginiaVirginiaPJM7.4 GW planned · 3.6 GW building+13.1% residential price13 local measures · 58 on Delay WatchlistOpen page ↗Seal of WashingtonWashingtonNon-RTO (utility-run)3.6 GW planned · 0.4 GW building+13.0% residential price21 local measures · 4 on Delay WatchlistOpen page ↗Seal of West VirginiaWest VirginiaPJM0.9 GW planned · 0.0 GW building+0.8% residential price0 local measures · 2 on Delay WatchlistOpen page ↗Seal of WisconsinWisconsinMISO4.9 GW planned · 1.2 GW building+5.4% residential price49 local measures · 11 on Delay WatchlistOpen page ↗Seal of WyomingWyomingNon-RTO (utility-run)7.2 GW planned · 3.6 GW building+7.8% residential price2 local measures · 4 on Delay WatchlistOpen page ↗
Ranking

Ranking

Section 03 · Supply chain

Upstream: equipment lead times and backlogs

Order-by date = required in-service date minus lead time.

Manufacturers and contractors on record

TierCompanySegmentWhat the record says
Generation OEMGE VernovaHeavy-duty & aeroderivative gas turbinesGas turbine backlog plus slot reservations 116 GW (53 GW backlog + 63 GW slot reservations); expects at least 125 GW by year-end 2026; 2030 output mostly contracted, more than half of 2031 contracted
Generation OEMGE VernovaCompany-wideTotal backlog $176 billion, roughly evenly split between equipment and services
Generation OEMGE VernovaGas turbine manufacturing$160 million Greenville, SC investment; output 55 units/yr rising to 70–80 heavy-duty units/yr; combined-cycle lead times ~3.5 years (2023) to ~5 years, up to 7
Generation OEMSiemens EnergyGas turbinesGas turbine backlog ~69 GW; ~15 GW of orders in the quarter; lead times three years or more; large-turbine output 35 units plus 15 more in 2027; medium turbines 80 to 100 by 2028
Generation OEMSiemens EnergyGrid TechnologiesGrid Technologies backlog €51 billion
Generation OEMSiemens EnergyUS manufacturing$1 billion U.S. manufacturing investment incl. large power transformers in North Carolina and gas turbine components in FL, AL, NY, TX
Grid equipment OEMSiemens EnergyLarge power transformers (Charlotte, NC)$421 million North Carolina expansion creating 500 jobs, building on $150 million announced Feb 2024
Generation OEMMitsubishi Heavy IndustriesLarge-frame gas turbinesLarge-frame gas turbine backlog 35 GW (23 GW a year earlier); deliveries 2028–2030; plans to double capacity
Generation OEMDoosan EnerbilityLarge-frame gas turbinesU.S. order for seven 380 MW-class gas turbines; deliveries monthly from May 2029
Generation OEMBaker HughesIndustrial gas turbinesOrder for 76 NovaLT16 turbines (~1.3 GW) for data center and oil & gas power (Dynamis)
Generation OEMCaterpillarReciprocating engines, gensets, Solar TurbinesRecord order backlog $72 billion at end of Q2 2026, +92% y/y; 59% deliverable within 12 months
Generation OEMWärtsiläReciprocating gas enginesAnnounced U.S. orders include 790 MW (Texas), 412 MW (Ohio) and 282 MW (Oct 5 2026)
Generation OEMINNIO (Jenbacher)Reciprocating gas engines450 MW firm order for J624 containerized engines for U.S. behind-the-meter data center power, booked Q3 2026
Generation OEMINNIO (Jenbacher)Reciprocating gas engines1.1 GW gas engine order for a major data center campus, booked Q2 2026
Generation OEMINNIO (Jenbacher)Reciprocating gas enginesVoltaGrid agreement for 1.5 GW of behind-the-meter generation including 300 Jenbacher engines
Generation OEMBloom EnergySolid-oxide fuel cellsOracle partnership up to 2.8 GW (1.2 GW contracted); delivered an operational system to Oracle in 55 days vs a 90-day schedule
Generation OEMFuelCell EnergyCarbonate fuel cellsCommitted backlog $1.3 billion plus $2.4 billion awarded capacity backlog (Fit Energy option up to 350 MW); first data center capacity reservation agreement
Generation OEMFuelCell EnergyCarbonate fuel cells500 MW Torrington capacity expansion fully funded ($200–275 million); production rate rising toward 100 MW/yr
Generation OEMWestinghouse ElectricAP1000 nuclear reactorsDOE conditional commitment of $17.5 billion in loans for long-lead items for up to 10 AP1000 reactors; U.S. partnership targeting at least $80 billion of new reactors
Generation OEMFirst SolarThin-film PV modulesFive U.S. factories (OH x3, AL, LA) with 17+ GW/yr collective capacity when fully operational
Generation OEMFluence EnergyBattery energy storage systemsRecord backlog ~$6.4 billion; production behind expectations at new U.S. contract manufacturing sites
Grid equipment OEMHitachi EnergyPower transformers, HV equipment$528 million transformer factory in Mississippi (production 2029) plus $457 million South Boston, VA; ~$1.5 billion total U.S. transformer commitments
Grid equipment OEMHyosung Heavy Industries765 kV transformers; HV breakersMemphis, TN plant (765 kV-capable); breaker JV with Quanta in Canonsburg, PA up to 800 kV
Grid equipment OEMHD Hyundai ElectricPower transformersMontgomery, AL plant expansion
Grid equipment OEMProlec GE WaukeshaPower transformers$140 million Goldsboro, NC expansion creating 330 jobs
Grid equipment OEMVirginia Transformer Corp.Power transformers 2–500 MVANew 600,000 sq ft Muscle Shoals, AL plant, 1,100 jobs; Rincon, GA expansion +50% capacity
Grid equipment OEMERMCODistribution transformersNew 566,000 sq ft Maricopa County, AZ facility, 500+ jobs; first plant west of the Mississippi
Grid equipment OEMEatonSwitchgear, transformers, modular power$242+ million North Little Rock, AR modular enclosure plant, 1,200 jobs
Grid equipment OEMEatonSwitchgearNew 370,000 sq ft Omaha-area switchgear facility, production 2027
Grid equipment OEMEatonThree-phase transformersJonesville, SC three-phase transformer plant; hiring from 2027 for 700 jobs
Grid equipment OEMEatonU.S. footprint$2.9 billion planned U.S. investment through 2030
Grid equipment OEMSchneider ElectricSwitchgear, UPS, PDUsMore than 20 U.S. supply-chain facilities certified NEMA Make it American
Grid equipment OEMABBElectrification, MV/LV equipmentMore than $14 billion invested in the U.S. over 15 years; $120 million in two sites (Mar 2025) for data center and utility demand
Grid equipment OEMPowell IndustriesMV switchgear, power control roomsBacklog $2.4 billion (+69% y/y); record $934 million orders in the quarter
MaterialsCleveland-CliffsGrain-oriented electrical steel (GOES)Sole U.S. GOES producer; $200 million Butler, PA project (with $75 million DOE award) to raise GOES output up to 25% by early 2028
CableSouthwireWire and cable$256 million investment in Starkville, MS operations
CablePrysmian; Nexans; NKTHV subsea/land cableHigh-voltage subsea cable capacity reported booked through 2029
EPC / contractorQuanta ServicesUtility T&D, generation EPCRecord total backlog $53.4 billion; RPO $33.6 billion
EPC / contractorMasTecPower delivery, clean energy, pipelineRecord 18-month backlog $21.4 billion (+30% y/y)
EPC / contractorPrimoris ServicesPower generation, T&DRecord total backlog $13.9 billion; strong natural gas generation bookings
EPC / contractorMYR GroupTransmission & distributionRecord backlog $3.16 billion (+20% y/y)
EPC / contractorBechtel; KiewitGeneration EPCSelected for Japan-backed $33 billion, 10 GW Ohio (Piketon/Pike County) power program for a data center; 9.2 GW natural gas
EPC / contractorZachry GroupCombined-cycle EPCEPC contracts for NiSource combined-cycle project (2,600 MW, Indiana) and Duke Energy Person County CC
EPC / contractorBurns & McDonnellCombined-cycle EPCEPC for NPPD $3.1 billion Princeton Road Station (online 2029; two Siemens F-class units)
EPC / contractorPCL Construction; Burns & McDonnellCombined-cycle construction$4 billion ~1.5 GW dual-unit combined-cycle plant for Basin Electric (ND), online from 2029
EPC / contractorKiewitNatural gas generation EPCNatural gas generation EPC market participant (company page)
MaterialsTransformer supply (U.S. market)Power and distribution transformersU.S. transformer supply deficit 30% in 2025 and 15% shortage in 2026; roughly 80% of U.S. supply imported
MaterialsTransformer supply (U.S. market)Bulk-power equipment importsEO 14421 (Aug 26, 2026) restricts foreign-adversary bulk-power equipment; Wood Mackenzie estimates more than $22 billion of imports affected
MaterialsTransformer supply (U.S. market)Producer pricesPPI for electric power and specialty transformers +7.8% y/y, August 2026
MaterialsSwitchgear supply (U.S. market)Producer pricesPPI for switchgear and switchboard apparatus +13.3% y/y, August 2026
MaterialsCleveland-CliffsGrain-oriented electrical steel (GOES)Sole U.S. producer of GOES; about 85% of U.S. GOES imports come from South Korea
Grid equipment OEMHitachi EnergySmall and medium power transformers (Gallman, MS)$528 million Mississippi plant doubling U.S. small/medium transformer output; production 2029
Grid equipment OEMHD Hyundai ElectricPower transformers (Montgomery, AL)$200 million Alabama expansion
Grid equipment OEMHyosung Heavy IndustriesUHV transformers$287 million of U.S. orders for UHV transformers
Grid equipment OEMTrench GroupBushings, instrument transformers, reactorsBushing lead times up to two years; company in sale process
Grid equipment OEMPowell IndustriesMV switchgear, power control roomsFiscal Q3 2026 orders $934 million; backlog $2.4 billion
Grid equipment OEMABBElectrificationQ2 2026 Electrification orders $7.23 billion
Grid equipment OEMEatonMV switchgear (Bellevue, NE)$30 million medium-voltage switchgear plant in Bellevue, Nebraska
Grid equipment OEMSiemensElectrical equipment (Carolinas)$165 million Carolinas manufacturing investment supporting data centers
Generation OEMCaterpillarEngines, gensets, Solar TurbinesBacklog $72.1 billion at Q2 2026; turbine availability cited as back half of 2028 into 2029
Generation OEMCumminsHigh-horsepower engines and gensetsAdding about 20 GW of power-generation capacity
Generation OEMGeneracLarge gensetsAmazon supply agreement of about $2.4 billion with deliveries in 2027–2028
Generation OEMGE VernovaGas turbine slotsFirm gas backlog 53 GW plus 63 GW slot reservations; output 20 to 24 to 30 GW/yr; selling 2032 slots
Generation OEMMitsubishi PowerLarge-frame gas turbinesOrders stretch to 2030; about five-year delivery
Generation OEMU.S. large gas turbine orders by OEMH1 2026 order countH1 2026 U.S. large-turbine orders: GE Vernova 13, MHI 8, Doosan 7, Siemens Energy 1
Generation OEMAnsaldo EnergiaHeavy-duty gas turbinesEntering U.S. market amid equipment crunch; Siemens Energy 69 GW firm plus 26 GW reserved
Generation OEMBoom Supersonic (Superpower)Aeroderivative turbinesCrusoe abandoned a $1.25 billion plan to use Boom turbines at AI data centers
Generation OEMSmall gas turbines (market)Aeroderivative and small industrial turbinesAeroderivative lead times about 40 months; rising data-center cost impact
Generation OEMINNIO (Jenbacher, Waukesha)Reciprocating gas enginesQ2 2026 backlog $6.6 billion
Generation OEMEverllenceGas engines480 MW supply for an off-grid U.S. data center
Generation OEMBloom EnergySolid-oxide fuel cellsQ2 2026 revenue $1.065 billion; full-year 2026 guidance $3.9–4.2 billion
Generation OEMFuelCell EnergyCarbonate fuel cellsFirst data-center power agreement (Fit Energy) up to 380 MW
CablePrysmianWire, cable, conduitAtkore acquisition cleared U.S. antitrust review
CablePrysmianWire, cable, conduitAgreed to acquire Atkore for $3.8 billion; Atkore 10-15% of revenue from data centers
MaterialsCopper (LME)Conductor inputLME three-month copper record intraday high $14,694/t on Sep 8, 2026
EPC / contractorNew-build gas plant cost (market)Combined-cycle and peakersNew-build gas generation about $2.0 million per MW versus lower acquisition cost of operating plants
Methodology

How this map is built

Each state record joins BEA state GDP, BLS LAUS, CES, QCEW and OEWS, EIA Electric Power Monthly and EIA-860M, PwC's 2026 data center study, NCSL incentive status, and the SAVRN Data Center Map, Moratorium Tracker, Delay Watchlist, Grid Operator Watchlist and Capital Atlas. Federal statistics are grade A. PwC (industry-commissioned, modeled) and SAVRN-compiled fields are grade B. Derived values are labeled. Null means the agency does not publish the figure. The record of truth is the typed state dataset, and the pages are generated from it on every weekly refresh. County pages add Census population, BLS county jobs, pay and unemployment, the EIA operating fleet with plants added and retired since 2019, and the utilities serving each county from EIA-861.

Questions

U.S. power, answered from the record

How much new generation is planned in the United States?

The August 2026 EIA-860M inventory lists 288.5 GW of planned generators across the 50 states and DC, 98.7 GW of it under construction or built and awaiting operation. Each state page lists its pipeline by technology and its largest planned units.

Why is new power slow to arrive?

Heavy-duty gas turbines now take about five years from order to delivery, large power transformers more than two years, and the median interconnection request takes more than five years to reach commercial operation. The lead-time table on this page carries each figure with its source.

Which states have the most data center load waiting in grid queues?

Ranked by data center load in tracked queues: Virginia (70,532 MW), Georgia (60,773 MW), Arizona (20,100 MW), New York (17,026 MW), Ohio (13,023 MW). Queue figures come from the SAVRN Grid Operator Watchlist.

Where are electricity prices rising fastest?

Residential prices rose year to date through July 2026 in 48 of 51 jurisdictions. The largest increases: District of Columbia (+17.8%), New Hampshire (+15.2%), Maryland (+13.6%), Virginia (+13.1%), New York (+13.0%) (EIA Electric Power Monthly).

Is the build-out creating jobs?

U.S. construction employment reached an all-time high of 8.364 million in September 2026, and electrical equipment manufacturing employment reached 446,300, its highest since February 2004 (BLS). Total manufacturing employment remains 1.1% below August 2019. Each state page carries its own payroll, industry and pay data.