Montana Data Center Permits Tracker
Montana has 300 MW of generation and storage requested in the interconnection queue and 454 MW of generation planned within 36 months. Every row below links to its primary source.
Last checked Sep 18, 2026
Where the activity is
Ranked by row count. Counts are never mixed with the MW figures above.
Interconnection queue in Montana
300 MW requested across 1 active generation and storage position. Withdrawn and in-service rows are left out, matching the national page.
| ISO | Project | Fuel | MW | Status | Source |
|---|---|---|---|---|---|
| SPP | ASGI-2024-012Big Horn County | Solar | 300 MW | None |
Planned generation in Montana
454 MW across 4 EIA-860M generators scheduled to enter service within 36 months.
| Plant | Technology | MW | Planned | Status | Source |
|---|---|---|---|---|---|
| Anthelope Hills Solar Generation BESSBeaverhead County | Solar Photovoltaic | 200 MW | Dec 2027 | Regulatory approvals pending. Not under construction | |
| Anthelope Hills Solar Generation BESSBeaverhead County | Batteries | 200 MW | Dec 2027 | Regulatory approvals pending. Not under construction | |
| Beartooth Energy Storage LLCYellowstone County | Batteries | 50 MW | Dec 2027 | Regulatory approvals pending. Not under construction | |
| HauserLewis and Clark County | Conventional Hydroelectric | 4 MW | Jun 2028 | Planned for installation, but regulatory approvals not initiated |
Where Montana stands
Across the whole tracker, 533 data center and substation permits are on record in 51 states and DC. Montana accounts for 0 of them, ranking #13 by that count. Ranking measures documented permit activity, not the size of the eventual buildout.