New Hampshire Data Center Permits Tracker

New Hampshire has 1,861 MW of generation and storage requested in the interconnection queue and 24 MW of generation planned within 36 months. Every row below links to its primary source.

Last checked Sep 18, 2026

0
Data center & substation permits
of 0 total utility-scale permits tracked here
1,861MW
In the interconnection queue
2 active generation and storage positions
24MW
Planned generation
2 EIA-860M generators due within 36 months
#13
of 51 states with anything on record
Ranked by data center & substation permit count

Where the activity is

Ranked by row count. Counts are never mixed with the MW figures above.

Top counties · queue, substation & state air rows

Rockingham 2

Interconnection queue in New Hampshire

1,861 MW requested across 2 active generation and storage positions. Withdrawn and in-service rows are left out, matching the national page.

ISOProjectFuelMWStatusSource
ISO-NE Seabrook Power Uprate7Rockingham County Nuclear 1,265 MW Interconnection agreement
ISO-NE Essential Power Newington - CNRC IncreaseRockingham County Natural gas 596 MW Active

Planned generation in New Hampshire

24 MW across 2 EIA-860M generators scheduled to enter service within 36 months.

PlantTechnologyMWPlannedStatusSource
Nutes SolarStrafford County Solar Photovoltaic 20 MW Aug 2026 Under construction, less than or equal to 50 percent complete
Kearsarge GrissomSullivan County Solar Photovoltaic 4 MW Jul 2026 Under construction, less than or equal to 50 percent complete

Where New Hampshire stands

Across the whole tracker, 533 data center and substation permits are on record in 51 states and DC. New Hampshire accounts for 0 of them, ranking #13 by that count. Ranking measures documented permit activity, not the size of the eventual buildout.