Washington, DC has 6 MW of generation planned within 36 months. Every row below links to its primary source.

Last checked Sep 18, 2026

0
Data center & substation permits
of 0 total utility-scale permits tracked here
0MW
In the interconnection queue
0 active generation and storage positions
6MW
Planned generation
1 EIA-860M generator due within 36 months
#13
of 51 states with anything on record
Ranked by data center & substation permit count

Planned generation in Washington, DC

6 MW across 1 EIA-860M generator scheduled to enter service within 36 months.

PlantTechnologyMWPlannedStatusSource
CHP PlantDistrict of Columbia County Natural Gas Fired Combustion Turbine 6 MW Sep 2026 Under construction, more than 50 percent complete

Where Washington, DC stands

Across the whole tracker, 533 data center and substation permits are on record in 51 states and DC. Washington, DC accounts for 0 of them, ranking #13 by that count. Ranking measures documented permit activity, not the size of the eventual buildout.