Alaska · Power Supply Chain & Demand

Power Supply Chain and Demand in Alaska

Seal of Alaska

Vertically integrated utilities run most of Alaska's grid. 29 MW of new generation is planned in Alaska, 0 MW of it under construction or built and awaiting operation, against 0 MW of planned retirements through 2030. 6 data centers are identified in the state. Residential electricity averaged 27.09¢/kWh in 2026 through July, +5.0% from a year earlier. Unemployment was 4.3% in August 2026, and construction employment is +12.8% against August 2019. The SAVRN trackers hold 3 local moratoria or restrictions for Alaska across all statuses (1 in force) and 1 named projects on the Delay Watchlist.

Rebuilt 2026-10-08 · refreshed weekly
Grid operator
Non-RTO (utility-run)
main wholesale grid
Planned generation
0.0 GW
0.0 GW under construction or built
Data center load in queues
—
6 data centers identified
Residential price
27.09¢
▲ 5.0% vs 2025, YTD July
Construction jobs
+12.8%
▲ 12.8% vs Aug 2019
Local measures
3
1 in force · 1 on Delay Watchlist
The finding

What the build-out changed in Alaska

Alaska sits at the edge of the build-out. The national boom shows up here in prices and equipment queues more than in new construction. Commercial electricity sales, the class that includes data centers, are +2.4% year to date, 21st in the country. Construction employment is +12.8% against August 2019, 26th of 48 states where BLS publishes it. Planned generation equals 1% of the power plants Alaska runs today, 48th of 51 (the median state plans 15%). The weak spot: data center share of state gdp ranks 49th of 51 at 0.8%. Factory employment is the exception: manufacturing jobs are -0.8% against August 2019.

Then and now

MeasureThenNowChangeU.S. rank
Construction jobs (Aug 2019 → Aug 2026)16.4k18.5k▲ 12.8%26th of 48
Unemployment rate (Feb 2020 → Aug 2026)5.4%4.3%▼ 1.1pts—
Residential price, ¢/kWh (YTD Jul 2025 → 2026)25.81¢27.09¢▲ 5.0%35th of 51
Generation fleet → planned additions3.1 GW operating0.0 GW planned1% of fleet48th of 51

Where Alaska ranks among 51

Data center share of state GDP0.8%49th of 51
Planned generation vs. today's fleet1%48th of 51
Construction jobs vs. 2019+12.8%26th of 48
Commercial electricity sales, YTD change+2.4%21st of 51
Residential electricity price, YTD change+5.0%35th of 51
Local moratoria and restrictions344th of 49

1st = the most. Ranks cover every state and DC that publishes the figure.

County spotlight

Anchorage holds the most data centers on record in Alaska (2), and its electrical contractor workforce changed +3.0% since 2019 to 795 jobs. The largest share of planned generation sits in Juneau: 20 MW, led by Juneau Hydropower, Inc (other).

The map

Where Alaska sits in the power system

Grid operator
Non-RTO (utility-run)
Operating capacity
3.1 GW
Planned generation
29 MW
Under construction or built
0 MW
Data centers identified
6
Data center load in queues
—
Unemployment, Aug 2026
4.3%
Residential price change
+5.0%

Neighboring states are shaded. Select one to open its page.

Counties and cities

Alaska, county by county

29 boroughs and census areas in Alaska. Planned generation sits in 2 of them, data centers stand in 3, and local measures are on record in 2. Pick a layer, then select a county for its full record.

WrangellKusilvakBristol BayHoonah-AngoonPetersburgNorthwest ArcticHainesAleutians EastKodiak IslandLake and PeninsulaValdez-CordovaYukon-KoyukukSoutheast FairbanksPrince of Wales-HyderSitkaNorth SlopeBethelFairbanks North StarDillinghamKetchikan GatewayYakutatJuneauDenaliMatanuska-SusitnaAnchorageAleutians WestKenai PeninsulaNomeSkagway

County leaders

Most planned generation
Juneauother20 MW
Fastest electrical contractor growth
Matanuska-Susitna300 jobs+9.9%
Anchorage795 jobs+3.0%

Counties on record 7

CountyData centersPlanned MWBuilding MWLead developerElectrical contractor jobsChange 2019–25Local measuresWatchlist
Anchorage2———795▲ 3.0%——
Southeast Fairbanks1———————
Fairbanks North Star1—————1 (0 in force)—
Juneau—20 MW—Juneau Hydropower, Inc80———
Ketchikan Gateway—10 MW—Ketchikan Electric Company————
Matanuska-Susitna————300▲ 9.9%——
Petersburg——————1 (0 in force)—

Every county in Alaska 29

Each county has its own page: power plants, utilities and prices, jobs since 2019, data centers, local rules and its neighbors.

Cities and towns on record 4

City or townCountyData centersLocal measuresWatchlistLatest record
AnchorageAnchorage21 (1 in force)—Local moratorium on data centers with no end date In force
Delta JunctionSoutheast Fairbanks1———
FairbanksFairbanks North Star1———
Alaska———1HB 259 - Large Energy Use Facilities

Data center counts come from every facility on the SAVRN Data Center Map, counted in the county and the city or community where each building physically stands (Census boundaries), not its mailing address. Jurisdictions appear as the Moratorium Tracker records them.

The chain

Alaska, from generation to the household bill

1Grid operator

Utility-run territory: resource planning sits with the vertically integrated utilities and the state commission.

2Generation pipeline

Operating capacity
3.1 GW
Planned, all types
29 MW
Under construction or built
0 MW
Planned gas
0 MW
Planned retirements 2026–30
0 MW
Net firm additions derived
0 MW

3Data center demand

Data centers identified
6
Operators
4
Load in tracked queues
—
Utility large-load projects
0
Commercial sales, YTD change
+2.4%
Industry share of state GDP
0.8%

4Jobs and pay

Unemployment, Aug 2026
4.3% (-0.3 pts y/y)
Construction jobs vs 2019
+12.8%
Manufacturing jobs vs 2019
-0.8%
Electrical contractor jobs 2019–25
—
Electrician median pay
$89,440
Electrician ÷ cashier pay
2.48×

5Household bill

Residential price, YTD Jul 2026
27.09¢/kWh
Change vs YTD 2025
+5.0%
All-sector price change
+7.2%
Total retail sales change
+5.2%

6Policy friction

State measures on record
2
Local measures (in force)
3 (1)
Watchlist projects
1
Lawsuits tracked
0
Announced capital, disclosed
—
Dedicated tax incentive
None listed
Generation

Planned power plants in Alaska

Every planned generator in Alaska in the August 2026 EIA-860M inventory, by technology, then the 15 largest units. Under construction or built covers status codes U, V and TS.

Planned generation by fuel 29 MW
Other 29 MW 100%

None of the planned capacity is under construction yet.

TechnologyUnitsPlanned MWUnder construction or built
Other429 MW—

Largest planned generators

PlantCountyTechnologyMWStatusYearOwner
Mahoney Lake HydroelectricKetchikan GatewayConventional Hydroelectric10 MWPlanned, approvals not started2027Ketchikan Electric Company
Sweetheart Lake Hydroelectric FacilityJuneauConventional Hydroelectric7 MWApprovals pending2028Juneau Hydropower, Inc
Sweetheart Lake Hydroelectric FacilityJuneauConventional Hydroelectric7 MWApprovals pending2028Juneau Hydropower, Inc
Sweetheart Lake Hydroelectric FacilityJuneauConventional Hydroelectric7 MWApprovals pending2028Juneau Hydropower, Inc
Supply chain

What the Alaska build-out runs on

Who is building generation in Alaska, which manufacturers and contractors have a plant, expansion or contract recorded here, and how long the critical equipment takes to arrive.

Developers and owners with planned generation

Developer or ownerUnitsPlanned MWBuilding MWMain technologyCounties
Juneau Hydropower, Inc320 MW—Other1
Ketchikan Electric Company110 MW—Other1

Manufacturers and contractors with a recorded Alaska footprint

No plant, expansion or contract in the manufacturer record names Alaska. The national suppliers below serve every state.

Order-by check

No planned unit of 50 MW or more in Alaska is still waiting on equipment orders.

Lead times, OEM backlogs and the national generation and grid contractors are on the national supply chain section.

Demand

Data center and large-load demand in Alaska

6 data centers run by 4 operators are identified in Alaska. The full list by city is on the Alaska Data Center Map page. Utilities report 0 large customer projects here to EEI.

No large customer projects reported to EEI for this state.

Jobs and pay

The Alaska jobs report, and who the build-out employs

Median pay, May 2025
Cashiers$36,130
Fast food and counter workers$33,280
Retail salespersons$37,290
All occupations$61,000
Construction laborers$58,060
Welders$80,840
HVAC mechanics$77,430
Plumbers and pipefitters$93,920
Electricians$89,440
Power plant operators$88,870
Power-line installers$92,470
Construction supervisors$102,140
Electrical engineers$125,970
Cashier median: $36,130

Payroll employment, August 2026 (preliminary)

IndustryJobsChange vs Aug 2025Change vs Aug 2019
Total nonfarm341.8k▲ 1.3%▲ 3.3% (+10.9k)
Construction18.5k▼ 1.1%▲ 12.8% (+2.1k)
Manufacturing13.2k▲ 6.5%▼ 0.8% (-0.1k)
Mining and logging13.9k▲ 4.5%▲ 3.0% (+0.4k)
Retail trade34.8k▼ 0.3%▼ 2.5% (-0.9k)

Power and data industries, 2019 to 2025

IndustryJobs 2019Jobs 2025ChangeAverage pay 2025
Data processing and hosting—not disclosed——
Electrical contractors01,775—$98,520
Power and communication line construction—not disclosed——
Electric power generation, transmission, distribution—1,843—$117,241

Pay ladder, May 2025

OccupationEmploymentMedian annual payMultiple of cashier pay
Cashiers5,810$36,1301.00×
Fast food and counter workers5,900$33,2800.92×
Retail salespersons7,890$37,2901.03×
All occupations325,570$61,0001.69×
Construction laborers3,690$58,0601.61×
Welders790$80,8402.24×
HVAC mechanics610$77,4302.14×
Plumbers and pipefitters1,200$93,9202.60×
Electricians1,870$89,4402.48×
Power plant operators650$88,8702.46×
Power-line installers490$92,4702.56×
Construction supervisors2,690$102,1402.83×
Electrical engineers350$125,9703.49×

County-level contractor jobs and pay are in the county record above.

Economy

What the data center industry adds to Alaska

940
Direct data center jobs (2024)
3,830
Total jobs supported, in state
$0.6B
Total GDP contribution
0.8%
Share of state GDP
$0.0B
State and local taxes

PwC figures are modeled estimates commissioned by the industry.

Policy

The rules and the pipeline in Alaska

State measures 2

BillMeasureStatusDate
—Alaska senators question legality of state land transfer for possible Mat-Su data centersProposed2026-09
HB 259Alaska HB 259 (introduced January 2026 by Rep. Donna Mears) would require large energy facilities (peak demand ≥20 MW) to enter community benefit agreementsFailed / vetoed2026-01

Delay Watchlist projects 1

ProjectLocationStatusCauseMW
HB 259 - Large Energy Use FacilitiesAlaska (statewide)cancelledinterconnectioncommunity oppositionfinancing—

Local moratoria and restrictions (3) appear by county and city in the county-by-county section. Counts include every status in the weekly tracker feeds as of October 5, 2026. The Alaska Data Center Map page counts only active local pauses and delayed or blocked projects as of its September 2 rebuild, so its figures are lower. The difference is one of definition and date.

Nearby states

Alaska's neighbors

Questions

Alaska power, answered from the record

How much new power generation is planned in Alaska?

EIA's August 2026 inventory lists 29 MW of planned generators in Alaska, 0 MW of it under construction or built. By capacity the pipeline is other 100%. The largest single unit is Mahoney Lake Hydroelectric (10 MW, Ketchikan Electric Company). Owners plan to retire 0 MW from 2026 to 2030.

Who runs the power grid in Alaska?

Non-RTO (utility-run) serves most of Alaska, which means vertically integrated utilities plan and dispatch generation under the state commission. No data center load is tracked in its queues yet.

Are electricity prices rising in Alaska?

Residential electricity averaged 27.09¢/kWh from January to July 2026, +5.0% on a year earlier, the 35th fastest increase of 51. Commercial sales, the class that includes data centers, changed +2.4%.

What do electricians earn in Alaska?

The median electrician in Alaska earned $89,440 in May 2025, 2.48 times the median cashier, and power-line installers earned $92,470 (BLS OEWS).

Which counties in Alaska have the most planned generation?

By planned nameplate capacity: Juneau (20 MW), Ketchikan Gateway (10 MW).

Which data center projects are delayed in Alaska?

The SAVRN Delay Watchlist names 1 project in Alaska, among them HB 259 - Large Energy Use Facilities.

Is the build-out creating trade jobs in Alaska?

Construction employment is +12.8% against August 2019.

Does Alaska have a data center moratorium?

The SAVRN Moratorium Tracker holds 2 state-level measures (0 enacted) and 3 local moratoria or restrictions in Alaska, 1 of them in force, 44th most in the country.

Across SAVRN

Alaska across the SAVRN trackers

Sources

Sources for this page

Every figure links to its original source through the Sources buttons. Values marked derived are calculated from reported figures.