Vertically integrated utilities run most of Hawaii's grid. 471 MW of new generation is planned in Hawaii, 112 MW of it under construction or built and awaiting operation, against 34 MW of planned retirements through 2030. 12 data centers are identified in the state. Residential electricity averaged 46.28¢/kWh in 2026 through July, +12.7% from a year earlier. Unemployment was 2.7% in August 2026. The SAVRN trackers hold 2 local moratoria or restrictions for Hawaii across all statuses (0 in force) and 0 named projects on the Delay Watchlist.

Rebuilt 2026-10-08 · refreshed weekly
Grid operator
Non-RTO (utility-run)
main wholesale grid
Planned generation
0.5 GW
0.1 GW under construction or built
Data center load in queues
—
12 data centers identified
Residential price
46.28¢
▲ 12.7% vs 2025, YTD July
Construction jobs
—
not published separately
Local measures
2
0 in force · 0 on Delay Watchlist
The finding

What the build-out changed in Hawaii

Hawaii feels the boom mostly through its electricity bill: prices are rising faster than in most states while the building happens elsewhere. Data processing and hosting jobs grew 55.8% from 2019 to 2025, 12th of 46 states that disclose the industry. Planned generation equals 13% of the power plants Hawaii runs today, 29th of 51 (the median state plans 15%). The data center industry now accounts for 1.2% of Hawaii's economy, the 40th largest share of any state (the median state is 1.8%), counting the industry's in-state suppliers and payrolls. Households pay part of the cost: residential prices are +12.7% year to date, the 8th fastest increase of 51.

Then and now

MeasureThenNowChangeU.S. rank
Electrical contractor jobs (2019 → 2025)4,8335,170▲ 7.0%41st of 48
Data processing and hosting jobs (2019 → 2025)339528▲ 55.8%12th of 46
Unemployment rate (Feb 2020 → Aug 2026)2.2%2.7%▲ 0.5pts—
Residential price, ¢/kWh (YTD Jul 2025 → 2026)41.08¢46.28¢▲ 12.7%8th of 51
Generation fleet → planned additions3.7 GW operating0.5 GW planned13% of fleet29th of 51

Where Hawaii ranks among 51

Data center share of state GDP1.2%40th of 51
Planned generation vs. today's fleet13%29th of 51
Electrical contractor jobs, 2019 to 2025+7.0%41st of 48
Data processing and hosting jobs, 2019 to 2025+55.8%12th of 46
Commercial electricity sales, YTD change-2.4%50th of 51
Residential electricity price, YTD change+12.7%8th of 51
Local moratoria and restrictions247th of 49

1st = the most. Ranks cover every state and DC that publishes the figure.

County spotlight

Honolulu County holds the most data centers on record in Hawaii (10), and its electrical contractor workforce changed +7.4% since 2019 to 4,027 jobs. The largest share of planned generation sits in Hawaii County: 216 MW, led by AES Clean Energy (battery storage).

The map

Where Hawaii sits in the power system

Grid operator
Non-RTO (utility-run)
Operating capacity
3.7 GW
Planned generation
471 MW
Under construction or built
112 MW
Data centers identified
12
Data center load in queues
—
Unemployment, Aug 2026
2.7%
Residential price change
+12.7%

Neighboring states are shaded. Select one to open its page.

Counties and cities

Hawaii, county by county

5 counties in Hawaii. Planned generation sits in 4 of them, data centers stand in 2, and local measures are on record in 1. Pick a layer, then select a county for its full record.

Maui CountyHawaii CountyKalawao CountyHonolulu CountyKauai County

County leaders

Most planned generation
Hawaii Countybattery storage216 MW
Honolulu Countyother192 MW
Maui Countysolar40 MW
Kauai Countybattery storage24 MW
Most data centers
Fastest electrical contractor growth
Honolulu County4,027 jobs+7.4%

Counties on record 4

CountyData centersPlanned MWBuilding MWLead developerElectrical contractor jobsChange 2019–25Local measuresWatchlist
Honolulu County10192 MW76 MWPuuloa Energy LLC4,027▲ 7.4%——
Maui County140 MW—AES Clean Energy————
Hawaii County—216 MW36 MWAES Clean Energy483—1 (0 in force)—
Kauai County—24 MW—Kauai Island Utility Cooperative————

Every county in Hawaii 5

Each county has its own page: power plants, utilities and prices, jobs since 2019, data centers, local rules and its neighbors.

Cities and towns on record 6

City or townCountyData centersLocal measuresWatchlistLatest record
KapoleiHonolulu County4———
Urban HonoluluHonolulu County + Honolulu County3———
Honolulu—2———
KiheiMaui County1———
Mililani MaukaHonolulu County1———
Big Island Wants——1 (0 in force)—Big Island Wants To Ban Big Data Centers, Once They Agree On What They Are Proposed

Data center counts come from every facility on the SAVRN Data Center Map, counted in the county and the city or community where each building physically stands (Census boundaries), not its mailing address. Jurisdictions appear as the Moratorium Tracker records them.

The chain

Hawaii, from generation to the household bill

1Grid operator

Utility-run territory: resource planning sits with the vertically integrated utilities and the state commission.

2Generation pipeline

Operating capacity
3.7 GW
Planned, all types
471 MW
Under construction or built
112 MW
Planned gas
0 MW
Planned retirements 2026–30
34 MW
Net firm additions derived
78 MW

3Data center demand

Data centers identified
12
Operators
9
Load in tracked queues
—
Utility large-load projects
0
Commercial sales, YTD change
-2.4%
Industry share of state GDP
1.2%

4Jobs and pay

Unemployment, Aug 2026
2.7% (+0.6 pts y/y)
Construction jobs vs 2019
—
Manufacturing jobs vs 2019
-9.3%
Electrical contractor jobs 2019–25
+7.0%
Electrician median pay
$96,460
Electrician ÷ cashier pay
2.62×

5Household bill

Residential price, YTD Jul 2026
46.28¢/kWh
Change vs YTD 2025
+12.7%
All-sector price change
+15.7%
Total retail sales change
-0.0%

6Policy friction

State measures on record
0
Local measures (in force)
2 (0)
Watchlist projects
0
Lawsuits tracked
0
Announced capital, disclosed
—
Dedicated tax incentive
None listed
Generation

Planned power plants in Hawaii

Every planned generator in Hawaii in the August 2026 EIA-860M inventory, by technology, then the 15 largest units. Under construction or built covers status codes U, V and TS.

Planned generation by fuel 471 MW
Solar 171 MW 36%Battery storage 160 MW 34%Other 139 MW 30%
Under construction or built 112 MW
Solar 39 MW 35%Battery storage 37 MW 33%Other 36 MW 32%
TechnologyUnitsPlanned MWUnder construction or built
Solar6171 MW39 MW
Battery storage7160 MW37 MW
Other12139 MW36 MW

Largest planned generators

PlantCountyTechnologyMWStatusYearOwner
KeamukuHawaiiSolar Photovoltaic86 MWApprovals pending2030AES Clean Energy
KeamukuHawaiiBatteries86 MWApprovals pending2030AES Clean Energy
Kuihelani Phase 2MauiSolar Photovoltaic40 MWApprovals pending2028AES Clean Energy
Hu Honua Bioenergy FacilityHawaiiOther Waste Biomass36 MWUnder construction (>50%)2027Hu Honua Bioenergy, LLC
AES Waiawa Phase 2 SolarHonoluluBatteries30 MWUnder construction (>50%)2026AES Distributed Energy
AES Waiawa Phase 2 SolarHonoluluSolar Photovoltaic30 MWUnder construction (>50%)2026AES Distributed Energy
KRS I Anahola Solar HybridKauaiBatteries12 MWPlanned, approvals not started2027Kauai Island Utility Cooperative
KRS II Koloa SolarKauaiBatteries12 MWPlanned, approvals not started2027Kauai Island Utility Cooperative
Puuloa EnergyHonoluluOther Waste Biomass9 MWPlanned, approvals not started2029Puuloa Energy LLC
Puuloa EnergyHonoluluOther Waste Biomass9 MWPlanned, approvals not started2029Puuloa Energy LLC
Puuloa EnergyHonoluluOther Waste Biomass9 MWPlanned, approvals not started2029Puuloa Energy LLC
Puuloa EnergyHonoluluOther Waste Biomass9 MWPlanned, approvals not started2029Puuloa Energy LLC
Puuloa EnergyHonoluluOther Waste Biomass9 MWPlanned, approvals not started2029Puuloa Energy LLC
Puuloa EnergyHonoluluOther Waste Biomass9 MWPlanned, approvals not started2029Puuloa Energy LLC
Puuloa EnergyHonoluluOther Waste Biomass9 MWPlanned, approvals not started2029Puuloa Energy LLC
Supply chain

What the Hawaii build-out runs on

Who is building generation in Hawaii, which manufacturers and contractors have a plant, expansion or contract recorded here, and how long the critical equipment takes to arrive.

Developers and owners with planned generation

Developer or ownerUnitsPlanned MWBuilding MWMain technologyCounties
AES Clean Energy3212 MW—Solar2
Puuloa Energy LLC11103 MW—Other1
AES Distributed Energy474 MW74 MWBattery storage1
Hu Honua Bioenergy, LLC136 MW36 MWOther1
Kauai Island Utility Cooperative224 MW—Battery storage1
Puuloa Solar LLC212 MW—Solar1
Hamakua Energy LP18 MW—Battery storage1
Pivot Energy12 MW2 MWSolar1

Manufacturers and contractors with a recorded Hawaii footprint

No plant, expansion or contract in the manufacturer record names Hawaii. The national suppliers below serve every state.

Order-by check derived

Every one of the 2 planned units of 50 MW or more in Hawaii that is not yet under construction still has time to order its step-up transformer before the lead time runs out.

Lead times, OEM backlogs and the national generation and grid contractors are on the national supply chain section.

Demand

Data center and large-load demand in Hawaii

12 data centers run by 9 operators are identified in Hawaii. The full list by city is on the Hawaii Data Center Map page. Utilities report 0 large customer projects here to EEI.

No large customer projects reported to EEI for this state.

Jobs and pay

The Hawaii jobs report, and who the build-out employs

Median pay, May 2025
Cashiers$36,780
Fast food and counter workers$35,250
Retail salespersons$37,790
All occupations$56,320
Construction laborers$77,110
Welders$79,000
HVAC mechanics$65,450
Plumbers and pipefitters$78,060
Electricians$96,460
Power plant operators$121,700
Power-line installers$134,340
Construction supervisors$102,630
Electrical engineers$106,350
Cashier median: $36,780

Payroll employment, August 2026 (preliminary)

IndustryJobsChange vs Aug 2025Change vs Aug 2019
Total nonfarm643.0k▲ 0.2%▼ 2.1% (-13.7k)
Manufacturing12.7k▼ 2.3%▼ 9.3% (-1.3k)
Retail trade62.8k▼ 1.9%▼ 11.9% (-8.5k)

Power and data industries, 2019 to 2025

IndustryJobs 2019Jobs 2025ChangeAverage pay 2025
Data processing and hosting339528▲ 55.8%$189,058
Electrical contractors4,8335,170▲ 7.0%$94,141
Power and communication line construction—not disclosed——
Electric power generation, transmission, distribution—2,946—$141,124

Pay ladder, May 2025

OccupationEmploymentMedian annual payMultiple of cashier pay
Cashiers10,780$36,7801.00×
Fast food and counter workers24,130$35,2500.96×
Retail salespersons19,180$37,7901.03×
All occupations627,530$56,3201.53×
Construction laborers4,580$77,1102.10×
Welders520$79,0002.15×
HVAC mechanics1,300$65,4501.78×
Plumbers and pipefitters2,500$78,0602.12×
Electricians3,070$96,4602.62×
Power plant operators290$121,7003.31×
Power-line installers600$134,3403.65×
Construction supervisors2,890$102,6302.79×
Electrical engineers1,080$106,3502.89×

County-level contractor jobs and pay are in the county record above.

Economy

What the data center industry adds to Hawaii

2,780
Direct data center jobs (2024)
9,990
Total jobs supported, in state
$1.4B
Total GDP contribution
1.2%
Share of state GDP
$0.2B
State and local taxes

PwC figures are modeled estimates commissioned by the industry.

Policy

The rules and the pipeline in Hawaii

State measures 0

No state-level measures on record.

Delay Watchlist projects 0

No projects on the Delay Watchlist.

Local moratoria and restrictions (2) appear by county and city in the county-by-county section. Counts include every status in the weekly tracker feeds as of October 5, 2026. The Hawaii Data Center Map page counts only active local pauses and delayed or blocked projects as of its September 2 rebuild, so its figures are lower. The difference is one of definition and date.

Nearby states

Hawaii's neighbors

Questions

Hawaii power, answered from the record

How much new power generation is planned in Hawaii?

EIA's August 2026 inventory lists 471 MW of planned generators in Hawaii, 112 MW of it under construction or built. By capacity the pipeline is solar 36%, battery storage 34%, other 30%. The largest single unit is Keamuku (86 MW, AES Clean Energy). Owners plan to retire 34 MW from 2026 to 2030.

Who runs the power grid in Hawaii?

Non-RTO (utility-run) serves most of Hawaii, which means vertically integrated utilities plan and dispatch generation under the state commission. No data center load is tracked in its queues yet.

Are electricity prices rising in Hawaii?

Residential electricity averaged 46.28¢/kWh from January to July 2026, +12.7% on a year earlier, the 8th fastest increase of 51. Commercial sales, the class that includes data centers, changed -2.4%.

What do electricians earn in Hawaii?

The median electrician in Hawaii earned $96,460 in May 2025, 2.62 times the median cashier, and power-line installers earned $134,340 (BLS OEWS).

Which counties in Hawaii have the most planned generation?

By planned nameplate capacity: Hawaii County (216 MW), Honolulu County (192 MW), Maui County (40 MW).

Who is building power plants in Hawaii?

The largest owners of planned generation are AES Clean Energy (212 MW, mostly solar), Puuloa Energy LLC (103 MW, mostly other), AES Distributed Energy (74 MW, mostly battery storage) (EIA-860M).

Is planned generation in Hawaii on schedule?

0 of 2 planned units of 50 MW or more not yet under construction are past the latest date to order a step-up transformer (more than 160 weeks) for their planned in-service date. They hold schedule only if equipment is already on order.

Does Hawaii have a data center moratorium?

The SAVRN Moratorium Tracker holds 0 state-level measures (0 enacted) and 2 local moratoria or restrictions in Hawaii, 0 of them in force, 47th most in the country.

Across SAVRN

Hawaii across the SAVRN trackers

Sources

Sources for this page

Every figure links to its original source through the Sources buttons. Values marked derived are calculated from reported figures.