SAVRN
Search Contact SAVRN
South Carolina · Power Supply Chain & Demand

Power Supply Chain and Demand in South Carolina

Seal of South Carolina

Vertically integrated utilities run most of South Carolina's grid. 2,207 MW of new generation is planned in South Carolina, 204 MW of it under construction or built and awaiting operation, against 1,276 MW of planned retirements through 2030. 35 data centers are identified in the state. Residential electricity averaged 15.93¢/kWh in 2026 through July, +7.6% from a year earlier. Unemployment was 4.1% in August 2026, and construction employment is +20.4% against August 2019. The SAVRN trackers hold 22 local moratoria or restrictions for South Carolina across all statuses (17 in force) and 6 named projects on the Delay Watchlist.

Rebuilt 2026-10-08 · refreshed weekly
Grid operator
Non-RTO (utility-run)
main wholesale grid
Planned generation
2.2 GW
0.2 GW under construction or built
Data center load in queues
—
35 data centers identified
Residential price
15.93¢
▲ 7.6% vs 2025, YTD July
Construction jobs
+20.4%
▲ 20.4% vs Aug 2019
Local measures
22
17 in force · 6 on Delay Watchlist
The finding

What the build-out changed in South Carolina

South Carolina is in the middle of the pack, with a few sharp signals worth watching. Construction employment is +20.4% against August 2019, 18th of 48 states where BLS publishes it. Commercial electricity sales, the class that includes data centers, are +1.9% year to date, 22nd in the country. The data center industry now accounts for 1.6% of South Carolina's economy, the 29th largest share of any state (the median state is 1.8%), counting the industry's in-state suppliers and payrolls. Pushback is organized: the SAVRN trackers hold 22 local moratoria or restrictions in South Carolina, 23rd in the country.

Then and now

MeasureThenNowChangeU.S. rank
Construction jobs (Aug 2019 → Aug 2026)107.1k128.9k▲ 20.4%18th of 48
Electrical contractor jobs (2019 → 2025)11,77312,993▲ 10.4%35th of 48
Power line construction jobs (2019 → 2025)4,3695,050▲ 15.6%29th of 44
Data processing and hosting jobs (2019 → 2025)3,7144,201▲ 13.1%39th of 46
Unemployment rate (Feb 2020 → Aug 2026)2.9%4.1%▲ 1.2pts—
Residential price, ¢/kWh (YTD Jul 2025 → 2026)14.80¢15.93¢▲ 7.6%24th of 51
Generation fleet → planned additions27.3 GW operating2.2 GW planned8% of fleet37th of 51

Where South Carolina ranks among 51

Data center share of state GDP1.6%29th of 51
Announced data center capital$18.6B20th of 31
Planned generation vs. today's fleet8%37th of 51
Construction jobs vs. 2019+20.4%18th of 48
Electrical contractor jobs, 2019 to 2025+10.4%35th of 48
Power line construction jobs, 2019 to 2025+15.6%29th of 44
Data processing and hosting jobs, 2019 to 2025+13.1%39th of 46
Commercial electricity sales, YTD change+1.9%22nd of 51
Residential electricity price, YTD change+7.6%24th of 51
Local moratoria and restrictions2223rd of 49

1st = the most. Ranks cover every state and DC that publishes the figure.

Regionally, North Carolina leads on construction jobs vs. 2019 at +27.8%; South Carolina is 2nd of 3 in its neighborhood at +20.4%.

County spotlight

York County holds the most data centers on record in South Carolina (5), and its electrical contractor workforce changed -12.1% since 2019 to 540 jobs. The largest share of planned generation sits in Darlington County: 425 MW, led by Lotus Solar LLC (solar). The fastest-growing electrical trade market is Greenville County, where contractor jobs grew 59.0% to 3,031.

The map

Where South Carolina sits in the power system

Grid operator
Non-RTO (utility-run)
Operating capacity
27.3 GW
Planned generation
2,207 MW
Under construction or built
204 MW
Data centers identified
35
Data center load in queues
—
Unemployment, Aug 2026
4.1%
Residential price change
+7.6%

Neighboring states are shaded. Select one to open its page.

Counties and cities

South Carolina, county by county

46 counties in South Carolina. Planned generation sits in 16 of them, data centers stand in 13, and local measures are on record in 16. Pick a layer, then select a county for its full record.

Greenville CountyBamberg CountyChester CountyUnion CountyFlorence CountySaluda CountyAnderson CountyGreenwood CountyCharleston CountyYork CountyJasper CountyBeaufort CountyChesterfield CountyDorchester CountyClarendon CountyDarlington CountyDillon CountyGeorgetown CountyHampton CountyLancaster CountyLee CountyMcCormick CountyPickens CountySumter CountyAllendale CountyAbbeville CountyWilliamsburg CountyAiken CountyHorry CountyColleton CountyLaurens CountyFairfield CountyKershaw CountyOconee CountySpartanburg CountyBerkeley CountyEdgefield CountyOrangeburg CountyNewberry CountyLexington CountyMarlboro CountyBarnwell CountyCherokee CountyMarion CountyRichland CountyCalhoun County

County leaders

Most planned generation
Berkeley Countybattery storage300 MW
Barnwell Countysolar200 MW
Dillon Countysolar81 MW
Fastest electrical contractor growth
Greenville County3,031 jobs+59.0%
Spartanburg County586 jobs+21.3%
Horry County658 jobs+9.5%

Counties on record 35

CountyData centersPlanned MWBuilding MWLead developerElectrical contractor jobsChange 2019–25Local measuresWatchlist
Berkeley County5300 MW—Pinopolis BESS LLC746▼ 1.3%——
York County5———540▼ 12.1%1 (1 in force)—
Greenville County4———3,031▲ 59.0%——
Horry County374 MW—Holliday Solar I658▲ 9.5%——
Richland County3———811▼ 7.8%——
Spartanburg County3———586▲ 21.3%3 (3 in force)3
Dorchester County3———314———
Aiken County3———233▼ 10.0%——
Allendale County150 MW—Quest Solar————
Charleston County1———1,791▼ 10.9%——
Lexington County1———780▼ 15.7%——
Anderson County1———239▼ 0.4%1 (1 in force)—
Cherokee County1———————
Darlington County—425 MW75 MWLotus Solar LLC————
Georgetown County—413 MW50 MWKingstree East 230 LLC47———
Barnwell County—200 MW—Big Fork Solar————
Orangeburg County—174 MW—SR Cordova, LLC77—1 (1 in force)—
Chesterfield County—151 MW—Duke Energy Carolinas, LLC26—1 (1 in force)—
Dillon County—81 MW—Melsam Solar————
Williamsburg County—75 MW75 MWKingstree West 115 LLC————
Colleton County—75 MW—Colleton Solar——3 (2 in force)—
Newberry County—71 MW—Duke Energy Carolinas, LLC——2 (2 in force)—
Lee County—60 MW—Shorthorn Solar————
Laurens County—45 MW—Duke Energy Carolinas, LLC——1 (1 in force)—
Marion County—10 MW—SolRiver Capital LLC———1
Fairfield County—4 MW4 MWDuke Energy Carolinas, LLC——1 (1 in force)—
Lancaster County————193▲ 105.3%——
Sumter County————155▼ 13.9%——
Chester County————93▲ 86.0%1 (1 in force)—
Greenwood County——————1 (1 in force)1
Jasper County——————1 (0 in force)—
Beaufort County——————1 (0 in force)—
Clarendon County——————1 (1 in force)—
McCormick County——————1 (0 in force)1
Kershaw County——————1 (1 in force)—

Every county in South Carolina 46

Each county has its own page: power plants, utilities and prices, jobs since 2019, data centers, local rules and its neighbors.

Cities and towns on record 14

City or townCountyData centersLocal measuresWatchlistLatest record
ColumbiaRichland County + Lexington County3———
GreenvilleGreenville County3———
Myrtle BeachHorry County3———
Moncks CornerBerkeley County2———
AikenAiken County1———
FairfaxAllendale County1———
Ft. Mills—1———
GaffneyCherokee County1———
North CharlestonCharleston County + Dorchester County1———
RidgevilleDorchester County1———
Rock HillYork County1———
SpartanburgSpartanburg County1———
St. GeorgeDorchester County1———
Mount PleasantCharleston County—1 (0 in force)—Proposed local moratorium on data centers Proposed

Data center counts come from every facility on the SAVRN Data Center Map, counted in the county and the city or community where each building physically stands (Census boundaries), not its mailing address. Jurisdictions appear as the Moratorium Tracker records them.

The chain

South Carolina, from generation to the household bill

1Grid operator

Utility-run territory: resource planning sits with the vertically integrated utilities and the state commission.

2Generation pipeline

Operating capacity
27.3 GW
Planned, all types
2,207 MW
Under construction or built
204 MW
Planned gas
0 MW
Planned retirements 2026–30
1,276 MW
Net firm additions derived
-1,072 MW

3Data center demand

Data centers identified
35
Operators
12
Load in tracked queues
—
Utility large-load projects
0
Commercial sales, YTD change
+1.9%
Industry share of state GDP
1.6%

4Jobs and pay

Unemployment, Aug 2026
4.1% (-0.5 pts y/y)
Construction jobs vs 2019
+20.4%
Manufacturing jobs vs 2019
+2.6%
Electrical contractor jobs 2019–25
+10.4%
Electrician median pay
$58,740
Electrician ÷ cashier pay
2.06×

5Household bill

Residential price, YTD Jul 2026
15.93¢/kWh
Change vs YTD 2025
+7.6%
All-sector price change
+7.9%
Total retail sales change
+0.7%

6Policy friction

State measures on record
4
Local measures (in force)
22 (17)
Watchlist projects
6
Lawsuits tracked
0
Announced capital, disclosed
$18.6B
Dedicated tax incentive
Yes
Generation

Planned power plants in South Carolina

Every planned generator in South Carolina in the August 2026 EIA-860M inventory, by technology, then the 15 largest units. Under construction or built covers status codes U, V and TS.

Planned generation by fuel 2,207 MW
Solar 1,714 MW 78%Battery storage 379 MW 17%Other 114 MW 5%
Under construction or built 204 MW
Solar 200 MW 98%Battery storage 4 MW 2%
TechnologyUnitsPlanned MWUnder construction or built
Solar241,714 MW200 MW
Battery storage3379 MW4 MW
Other2114 MW—

Largest planned generators

PlantCountyTechnologyMWStatusYearOwner
Pinopolis BESSBerkeleyBatteries300 MWPlanned, approvals not started2027Pinopolis BESS LLC
Kingstree East 230 Solar ProjectGeorgetownSolar Photovoltaic249 MWApprovals received2029Kingstree East 230 LLC
SR CordovaOrangeburgSolar Photovoltaic100 MWApprovals received2027SR Cordova, LLC
Robinson Solar PlantChesterfieldSolar Photovoltaic76 MWApprovals pending2027Duke Energy Carolinas, LLC
Lotus SolarDarlingtonSolar Photovoltaic75 MWApprovals received2027Lotus Solar LLC
Juniper SolarChesterfieldSolar Photovoltaic75 MWApprovals received2027Juniper Solar
Big Fork SolarBarnwellBatteries75 MWApprovals received2027Big Fork Solar
Culpepper SolarDarlingtonSolar Photovoltaic75 MWApprovals received2027Culpepper Solar
Rollins SolarDarlingtonSolar Photovoltaic75 MWApprovals received2027Rollins Solar
Ross SolarDarlingtonSolar Photovoltaic75 MWApprovals received2027Ross Solar
Kingstree West 115WilliamsburgSolar Photovoltaic75 MWBuilt, not yet operating2026Kingstree West 115 LLC
Colleton SolarColletonSolar Photovoltaic75 MWApprovals received2028Colleton Solar
B & K SolarDarlingtonSolar Photovoltaic75 MWUnder construction (>50%)2026B & K Solar
Big Fork SolarBarnwellSolar Photovoltaic75 MWApprovals received2028Big Fork Solar
Holliday Solar IHorrySolar Photovoltaic74 MWApprovals received2028Holliday Solar I
Supply chain

What the South Carolina build-out runs on

Who is building generation in South Carolina, which manufacturers and contractors have a plant, expansion or contract recorded here, and how long the critical equipment takes to arrive.

Developers and owners with planned generation

Developer or ownerUnitsPlanned MWBuilding MWMain technologyCounties
Pinopolis BESS LLC1300 MW—Battery storage1
Kingstree East 230 LLC1249 MW—Solar1
Duke Energy Carolinas, LLC4196 MW4 MWSolar4
Big Fork Solar2150 MW—Battery storage1
South Carolina Public Service Authority2114 MW—Other1
SR Cordova, LLC1100 MW—Solar1
Lotus Solar LLC175 MW—Solar1
B & K Solar175 MW75 MWSolar1
Juniper Solar175 MW—Solar1
Culpepper Solar175 MW—Solar1
Kingstree West 115 LLC175 MW75 MWSolar1
Rollins Solar175 MW—Solar1
Ross Solar175 MW—Solar1
Colleton Solar175 MW—Solar1
Shining Sun Solar174 MW—Solar1

Manufacturers and contractors with a recorded South Carolina footprint 3

TierCompanySegmentWhat the record says
Generation OEMGE VernovaGas turbine manufacturing$160 million Greenville, SC investment; output 55 units/yr rising to 70–80 heavy-duty units/yr; combined-cycle lead times ~3.5 years (2023) to ~5 years, up to 7
Grid equipment OEMEatonThree-phase transformersJonesville, SC three-phase transformer plant; hiring from 2027 for 700 jobs
Grid equipment OEMSiemensElectrical equipment (Carolinas)$165 million Carolinas manufacturing investment supporting data centers

Order-by check derived

21 of the 22 planned units of 50 MW or more in South Carolina that are not yet under construction (1,683 of 1,932 MW) are past the date their step-up transformer had to be ordered to meet the planned in-service date. These units hold their schedules only if the equipment is already on order.

PlantTechnologyMWPlanned in serviceTransformer order-byTurbine order-byOwner
Pinopolis BESSBattery storage300 MWSep 2027Aug 2024—Pinopolis BESS LLC
SR CordovaSolar100 MWDec 2027Nov 2024—SR Cordova, LLC
Robinson Solar PlantSolar76 MWDec 2027Nov 2024—Duke Energy Carolinas, LLC
Lotus SolarSolar75 MWOct 2027Sep 2024—Lotus Solar LLC
Juniper SolarSolar75 MWMar 2027Feb 2024—Juniper Solar
Colleton SolarSolar75 MWNov 2028Oct 2025—Colleton Solar
Big Fork SolarSolar75 MWNov 2028Oct 2025—Big Fork Solar
Big Fork SolarBattery storage75 MWMar 2027Feb 2024—Big Fork Solar
Ross SolarSolar75 MWNov 2027Oct 2024—Ross Solar
Rollins SolarSolar75 MWNov 2027Oct 2024—Rollins Solar
Culpepper SolarSolar75 MWNov 2027Oct 2024—Culpepper Solar
Holliday Solar ISolar74 MWNov 2028Oct 2025—Holliday Solar I

Lead times, OEM backlogs and the national generation and grid contractors are on the national supply chain section.

Demand

Data center and large-load demand in South Carolina

35 data centers run by 12 operators are identified in South Carolina. The full list by city is on the South Carolina Data Center Map page. Utilities report 0 large customer projects here to EEI.

No large customer projects reported to EEI for this state.

Jobs and pay

The South Carolina jobs report, and who the build-out employs

Median pay, May 2025
Cashiers$28,530
Fast food and counter workers$27,520
Retail salespersons$30,690
All occupations$46,490
Construction laborers$42,940
Welders$49,980
HVAC mechanics$56,610
Plumbers and pipefitters$53,940
Electricians$58,740
Power plant operators$79,900
Power-line installers$76,870
Construction supervisors$75,350
Electrical engineers$98,440
Cashier median: $28,530

Payroll employment, August 2026 (preliminary)

IndustryJobsChange vs Aug 2025Change vs Aug 2019
Total nonfarm2,426.3k▲ 1.6%▲ 10.2% (+225.4k)
Construction128.9k▲ 3.9%▲ 20.4% (+21.8k)
Manufacturing266.0k▲ 1.4%▲ 2.6% (+6.7k)
Mining and logging4.8k▲ 2.1%▲ 9.1% (+0.4k)
Retail trade272.5k▲ 1.2%▲ 8.0% (+20.2k)

Power and data industries, 2019 to 2025

IndustryJobs 2019Jobs 2025ChangeAverage pay 2025
Data processing and hosting3,7144,201▲ 13.1%$134,980
Electrical contractors11,77312,993▲ 10.4%$74,150
Power and communication line construction4,3695,050▲ 15.6%$95,582
Electric power generation, transmission, distribution—9,192—$125,737
Transformer manufacturing—168—$84,452

Pay ladder, May 2025

OccupationEmploymentMedian annual payMultiple of cashier pay
Cashiers56,550$28,5301.00×
Fast food and counter workers65,070$27,5200.96×
Retail salespersons67,310$30,6901.08×
All occupations2,305,080$46,4901.63×
Construction laborers19,620$42,9401.51×
Welders7,380$49,9801.75×
HVAC mechanics6,920$56,6101.98×
Plumbers and pipefitters5,770$53,9401.89×
Electricians8,010$58,7402.06×
Power plant operators680$79,9002.80×
Power-line installers2,690$76,8702.69×
Construction supervisors13,150$75,3502.64×
Electrical engineers3,490$98,4403.45×

County-level contractor jobs and pay are in the county record above.

Economy

What the data center industry adds to South Carolina

10,780
Direct data center jobs (2024)
44,120
Total jobs supported, in state
$5.6B
Total GDP contribution
1.6%
Share of state GDP
$0.5B
State and local taxes

PwC figures are modeled estimates commissioned by the industry.

Policy

The rules and the pipeline in South Carolina

State measures 4

BillMeasureStatusDate
HJR 5526Data Center Moratorium (joint resolution)Proposed2026-04
S 867Data Center Development ActProposed2026-04
H 5286Data Center MoratoriumFailed / vetoed2026-02
S 902Data center siting permits through the PSCProposed2026

Delay Watchlist projects 6

ProjectLocationStatusCauseMW
NorthMark Strategies / Valara Holdings Computing Center (former Kohler plant)Spartanburg Countypermitting challengedregulatory reviewenvironmental petition450 MW
Stream Data Centers Marion County (abandoned)Marion Countyabandonedutility interconnection timingwithdrawal400 MW
Project SperoSpartanburg County (NorthMark/Project Spero)cancelledinterconnectionwatercommunity oppositionfinancing400 MW
LightHouse Data Centers campus at 300 Jones Road (former paper mill site)Spartanburg Countyhaltedpermit deniallocal moratoriumcommunity opposition60 MW
Greenwood County Data Center MoratoriumGreenwood Countymoratorium in forcecounty moratorium—
Pollard data center projectMcCormick Countyapproved amid opposition—

Local moratoria and restrictions (22) appear by county and city in the county-by-county section. Counts include every status in the weekly tracker feeds as of October 5, 2026. The South Carolina Data Center Map page counts only active local pauses and delayed or blocked projects as of its September 2 rebuild, so its figures are lower. The difference is one of definition and date.

Nearby states

South Carolina's neighbors

Questions

South Carolina power, answered from the record

How much new power generation is planned in South Carolina?

EIA's August 2026 inventory lists 2,207 MW of planned generators in South Carolina, 204 MW of it under construction or built. By capacity the pipeline is solar 78%, battery storage 17%, other 5%. The largest single unit is Pinopolis BESS (300 MW, Pinopolis BESS LLC). Owners plan to retire 1,276 MW from 2026 to 2030.

Who runs the power grid in South Carolina?

Non-RTO (utility-run) serves most of South Carolina, which means vertically integrated utilities plan and dispatch generation under the state commission. No data center load is tracked in its queues yet.

Is planned generation in South Carolina on schedule?

21 of 22 planned units of 50 MW or more not yet under construction are past the latest date to order a step-up transformer (more than 160 weeks) for their planned in-service date. They hold schedule only if equipment is already on order.

What do electricians earn in South Carolina?

The median electrician in South Carolina earned $58,740 in May 2025, 2.06 times the median cashier, and power-line installers earned $76,870 (BLS OEWS).

Is the build-out creating trade jobs in South Carolina?

Construction employment is +20.4% against August 2019. Electrical contractor jobs went from 11,773 in 2019 to 12,993 in 2025 (+10.4%, 35th in the country).

Which counties in South Carolina have the most planned generation?

By planned nameplate capacity: Darlington County (425 MW), Georgetown County (413 MW), Berkeley County (300 MW).

Are electricity prices rising in South Carolina?

Residential electricity averaged 15.93¢/kWh from January to July 2026, +7.6% on a year earlier, the 24th fastest increase of 51. Commercial sales, the class that includes data centers, changed +1.9%.

Does South Carolina have a data center moratorium?

The SAVRN Moratorium Tracker holds 4 state-level measures (0 enacted) and 22 local moratoria or restrictions in South Carolina, 17 of them in force, 23rd most in the country.

Across SAVRN

South Carolina across the SAVRN trackers

Sources

Sources for this page

Every figure links to its original source through the Sources buttons. Values marked derived are calculated from reported figures.