Listed below are 87 data centers operated by Microsoft in the United States, identified from primary sources across 15 states and 38 cities.

Cloud platform 87 buildings 15 states 38 cities Microsoft website ↗
Data centers
87
identified from primary sources
States
15
each links to its own state page
Cities
38
cities and counties with at least one
Floor area published
23
of 87; shown per building, never summed
Power published
6
of 87; shown per building, never summed
The company

What Microsoft does, and what this map holds

Operates data centers to run Azure and Microsoft's own cloud and AI services rather than to lease space to tenants. It also does AI compute (Azure OpenAI, Maia), enterprise software. This map identifies 87 data centers operated by Microsoft across 15 states and 38 cities. Its largest presence is Virginia, with 27 buildings.

After Virginia, Microsoft has the most data centers in Texas (13), Iowa (10), Georgia (8), Washington (6), Arizona (5). Each state below links to that state's own page, which carries every operator in it, the grid operator, and the moratorium, water and delay record that applies there.

Disclosure is uneven and this page does not paper over it. 23 of the 87 publish a floor area, and 6 publish a power figure. Each figure is shown against the building it belongs to and never added into a single total, because operators do not measure the same thing: one states the floor area of one hall, another the full capacity of a campus it has only announced.

25 of these records are marked planned, permitted or under construction rather than operating, and each is labeled as such in the list below.

The list

Every Microsoft data center, by state and city

All 87 Microsoft data centers this map identifies, grouped by the state and then the city each one stands in. Every entry carries the source that names it.

Microsoft data centers in Virginia

All Virginia data centers ↗

Microsoft has 27 data centers in Virginia, in Prince William County, Loudoun County, Leesburg, Elsewhere in Virginia, Aldie, Boydton, Bristow, Fairfax County and Gainesville. 17 publish a floor area and 1 publishes a power figure, shown against each one below.

Prince William County, Virginia9

  1. Microsoft Azure Balls Ford Road Microsoft Azure Balls Ford Road stands in Prince William County, Virginia. The record puts it at 1,145,989 square feet. It is recorded as planned rather than operating. 1,145,989 sq ft
  2. Microsoft Azure Gainesville Tech Park Microsoft Azure Gainesville Tech Park stands in Prince William County, Virginia. The record puts it at 1,245,499 square feet. It is recorded as planned rather than operating. 1,245,499 sq ft
  3. Microsoft Azure MNZ01 11320 BALLS FORD RD Microsoft Azure MNZ01 stands in Prince William County, Virginia. The record puts it at 566,280 square feet. It is recorded as planned rather than operating. 566,280 sq ft
  4. Microsoft Azure MNZ02 11324 BALLS FORD RD Microsoft Azure MNZ02 stands in Prince William County, Virginia. The record puts it at 566,280 square feet. It is recorded as planned rather than operating. 566,280 sq ft
  5. Microsoft Azure MNZ03 13062 HANSEN FARM RD Microsoft Azure MNZ03 stands in Prince William County, Virginia. The record puts it at 310,856 square feet. It is recorded as planned rather than operating. 310,856 sq ft
  6. Microsoft Azure MNZ05 13066 HANSEN FARM RD Microsoft Azure MNZ05 stands in Prince William County, Virginia. The record puts it at 495,709 square feet. It is recorded as planned rather than operating. 495,709 sq ft
  7. Microsoft Azure MNZ07 13490 UNIVERSITY BLVD Microsoft Azure MNZ07 stands in Prince William County, Virginia. The record puts it at 385,100 square feet. 385,100 sq ft
  8. Microsoft Data Center 2 13710 UNIVERSITY BLVD Microsoft Data Center 2 stands in Prince William County, Virginia. The record puts it at 480,200 square feet. 480,200 sq ft
  9. Prince William County datacenters Prince William County datacenters stands in Prince William County, Virginia.

Loudoun County, Virginia6

  1. ARCOLA BUSINESS PARK 42010 GROWTH MINDSET LN ARCOLA BUSINESS PARK stands in Loudoun County, Virginia. The record puts it at 223,172 square feet. It is recorded as planned rather than operating. 223,172 sq ft
  2. Arcola Tech Park 42031 GROWTH MINDSET LN Arcola Tech Park stands in Loudoun County, Virginia. The record puts it at 273,010 square feet. It is recorded as under construction. 273,010 sq ft
  3. COMPASS CREEK 19275 COMPASS CREEK PKWY SE COMPASS CREEK stands in Loudoun County, Virginia. The record puts it at 232,886 square feet. It is recorded as under construction. 232,886 sq ft
  4. Loudoun County datacenters Loudoun County datacenters stands in Loudoun County, Virginia.
  5. Microsoft Data Center Microsoft Data Center stands in Loudoun County, Virginia. No floor area is published; its outline measures 1,467,066 square feet on the ground.
  6. Microsoft IAD11 41840 GROWTH MINDSET LN Microsoft IAD11 stands in Loudoun County, Virginia. The record puts it at 238,935 square feet. 238,935 sq ft

Leesburg, Virginia5

  1. COMPASS CREEK 41730 INCLUSION LN COMPASS CREEK stands in Leesburg, Loudoun County, Virginia. The record puts it at 54,896 square feet. 54,896 sq ft
  2. COMPASS CREEK 41720 INCLUSION LN COMPASS CREEK stands in Leesburg, Loudoun County, Virginia. The record puts it at 61,821 square feet. 61,821 sq ft
  3. COMPASS CREEK 41679 INCLUSION LN COMPASS CREEK stands in Leesburg, Loudoun County, Virginia. The record puts it at 282,050 square feet. 282,050 sq ft
  4. Microsoft 19525 COMPASS CREEK PKWY Microsoft stands in Leesburg, Loudoun County, Virginia. The record puts it at 94,554 square feet and 96 MW. 94,554 sq ft96 MW
  5. Microsoft Corporation – Leesburg Data Center (IAD01-02-03-04-05) 19935 Sycolin Road Microsoft Corporation – Leesburg Data Center (IAD01-02-03-04-05) stands in Leesburg, Loudoun County, Virginia.

Elsewhere in Virginia, Virginia2

  1. Hansen Farm datacenter Hansen Farm datacenter is recorded in Virginia. It is recorded as under construction.
  2. Jacksonville datacenter Jacksonville datacenter is recorded in Virginia.

Aldie, Virginia1

  1. Microsoft Blue Ridge (IAD11-12-13) Data Center 24282 Quail Ridge Lane Microsoft Blue Ridge (IAD11-12-13) Data Center stands in Aldie, Loudoun County, Virginia.

Boydton, Virginia1

  1. Boydton datacenter Boydton datacenter stands in Boydton, Mecklenburg County, Virginia.

Bristow, Virginia1

  1. Microsoft - Gainesville Data Center - MNZ03 13050 Hansen Farm Road Microsoft - Gainesville Data Center - MNZ03 stands in Bristow, Prince William County, Virginia.

Fairfax County, Virginia1

  1. Fairfax County datacenters Fairfax County datacenters stands in Fairfax County, Virginia.

Gainesville, Virginia1

  1. Microsoft Data Center 1 13760 UNIVERSITY BLVD Microsoft Data Center 1 stands in Gainesville, Prince William County, Virginia. The record puts it at 600,000 square feet. 600,000 sq ft

Microsoft data centers in Texas

All Texas data centers ↗

Microsoft has 13 data centers in Texas, in Bexar County, San Antonio, Medina County and Pecos. 1 publishes a floor area and 1 publishes a power figure, shown against each one below.

Bexar County, Texas5

  1. Bexar County datacenters Bexar County datacenters stands in Bexar County, Texas.
  2. Microsoft Microsoft stands in Bexar County, Texas. No floor area is published; its outline measures 245,406 square feet on the ground.
  3. Microsoft Microsoft stands in Bexar County, Texas. No floor area is published; its outline measures 150,996 square feet on the ground.
  4. Microsoft Texas Research Park Campus Microsoft Texas Research Park Campus stands in Bexar County, Texas. No floor area is published; its outline measures 7,215,623 square feet on the ground.
  5. Microsoft TRP2 Microsoft TRP2 stands in Bexar County, Texas. No floor area is published; its outline measures 169,187 square feet on the ground.

San Antonio, Texas5

  1. Microsoft 3823 Wiseman Boulevard Microsoft stands in San Antonio, Bexar County, Texas. No floor area is published; its outline measures 257,279 square feet on the ground.
  2. Microsoft 5200 Rogers Road Microsoft stands in San Antonio, Bexar County, Texas. The record puts it at 150,000 square feet and 30 MW. 150,000 sq ft30 MW
  3. Microsoft San Antonio 5150 Rogers Road Microsoft San Antonio stands in San Antonio, Bexar County, Texas. No floor area is published; its outline measures 476,948 square feet on the ground.
  4. Microsoft SAT 80 18844 FM1957 Microsoft SAT 80 stands in San Antonio, Medina County, Texas. No floor area is published; its outline measures 243,070 square feet on the ground.
  5. Microsoft SAT 82 18844 FM1957 Microsoft SAT 82 stands in San Antonio, Medina County, Texas. No floor area is published; its outline measures 243,070 square feet on the ground.

Medina County, Texas2

  1. Medina County datacenters Medina County datacenters stands in Medina County, Zapata County, Texas.
  2. Microsoft TRP3 (SAT46) Microsoft TRP3 (SAT46) stands in Medina County, Texas. No floor area is published; its outline measures 228,087 square feet on the ground.

Pecos, Texas1

  1. Reeves County (Pecos) datacenter Reeves County (Pecos) datacenter stands in Pecos, Texas.

Microsoft data centers in Iowa

All Iowa data centers ↗

Microsoft has 10 data centers in Iowa, in Dallas County, Warren County, West Des Moines, Elsewhere in Iowa and Polk County.

Dallas County, Iowa4

  1. Microsoft Microsoft stands in Dallas County, Iowa. No floor area is published; its outline measures 38,901 square feet on the ground.
  2. Microsoft Microsoft stands in Dallas County, Iowa. No floor area is published; its outline measures 219,368 square feet on the ground.
  3. Microsoft Microsoft stands in Dallas County, Iowa. No floor area is published; its outline measures 248,937 square feet on the ground.
  4. Microsoft Microsoft stands in Dallas County, Iowa. No floor area is published; its outline measures 248,947 square feet on the ground.

Warren County, Iowa2

  1. Microsoft Microsoft stands in Warren County, Iowa. No floor area is published; its outline measures 237,796 square feet on the ground.
  2. Microsoft Microsoft stands in Warren County, Iowa. No floor area is published; its outline measures 245,675 square feet on the ground.

West Des Moines, Iowa2

  1. Ginger West datacenter 33612 BOONEVILLE RD Ginger West datacenter stands in West Des Moines, Polk County, Iowa. It is recorded as under construction.
  2. West Des Moines datacenter West Des Moines datacenter stands in West Des Moines, Polk County, Iowa.

Elsewhere in Iowa, Iowa1

  1. Ginger East datacenter Ginger East datacenter is recorded in Iowa. It is recorded as under construction.

Polk County, Iowa1

  1. Microsoft Microsoft stands in Polk County, Iowa. No floor area is published; its outline measures 153,009 square feet on the ground.

Microsoft data centers in Georgia

All Georgia data centers ↗

Microsoft has 8 data centers in Georgia, in Palmetto, Atlanta, College Park, Douglasville, East Point, Rome and Tyrone. 4 publish a floor area and 4 publish a power figure, shown against each one below.

Palmetto, Georgia2

  1. Palmetto Azure Campus (Fairweather) 8600 Tatum Rd, Palmetto, GA 30268 Palmetto Azure Campus (Fairweather) stands in Palmetto, Fulton County, Georgia. The record puts it at 250,000 square feet and 37.5 MW. 250,000 sq ft37.5 MW
  2. Palmetto datacenter Palmetto datacenter stands in Palmetto, Fulton County, Georgia. It is recorded as under construction.

Atlanta, Georgia1

  1. ATL06 DATA CENTER 4165 Ben Hill Road, East Point, 30349 ATL06 DATA CENTER stands in Atlanta, Fulton County, Georgia. The record puts it at 250,000 square feet and 37.5 MW. 250,000 sq ft37.5 MW

College Park, Georgia1

  1. Union City (ATL11) 4810 Stonewall Tell Rd, College Park, GA 30349 Union City (ATL11) stands in College Park, Fulton County, Georgia. The record puts it at 2,100,000 square feet and 324 MW. 2,100,000 sq ft324 MW

Douglasville, Georgia1

  1. Douglasville datacenter 1601 North River Road, Douglasville, 30122 Douglasville datacenter stands in Douglasville, Georgia. The record puts it at 1,000,000 square feet and 150 MW. It is recorded as under construction. 1,000,000 sq ft150 MW

East Point, Georgia1

  1. East Point datacenter East Point datacenter stands in East Point, Fulton County, Georgia. It is recorded as under construction.

Rome, Georgia1

  1. Rome Campus Huffaker Road NW, Rome, GA 30165 Rome Campus stands in Rome, Floyd County, Georgia.

Tyrone, Georgia1

  1. Tyrone datacenter Tyrone datacenter stands in Tyrone, Fayette County, Georgia.

Microsoft data centers in Washington

All Washington data centers ↗

Microsoft has 6 data centers in Washington, in East Wenatchee, Douglas County, Grant County, Malaga and Quincy.

East Wenatchee, Washington2

  1. East Wenatchee datacenter East Wenatchee datacenter stands in East Wenatchee, Douglas County, Washington. It is recorded as planned rather than operating.
  2. Microsoft EAT02 875 B Urban Industrial Way Microsoft EAT02 stands in East Wenatchee, Douglas County, Washington. No floor area is published; its outline measures 244,276 square feet on the ground.

Douglas County, Washington1

  1. Microsoft EAT04 Microsoft EAT04 stands in Douglas County, Washington. No floor area is published; its outline measures 233,060 square feet on the ground.

Grant County, Washington1

  1. Microsoft Microsoft stands in Grant County, Washington. No floor area is published; its outline measures 150,113 square feet on the ground.

Malaga, Washington1

  1. Malaga datacenter Malaga datacenter stands in Malaga, Washington. It is recorded as planned rather than operating.

Quincy, Washington1

  1. Quincy datacenters Quincy datacenters stands in Quincy, Grant County, Washington.

Microsoft data centers in Arizona

All Arizona data centers ↗

Microsoft has 5 data centers in Arizona, in Goodyear and El Mirage. 1 publishes a floor area, shown against each one below.

Goodyear, Arizona4

  1. Goodyear datacenter Goodyear datacenter stands in Goodyear, Maricopa County, Arizona.
  2. PHX-10 14250 W Broadway Rd PHX-10 stands in Goodyear, Maricopa County, Arizona. The record puts it at 250,000 square feet. 250,000 sq ft
  3. PHX-12 14250 West Broadway Road PHX-12 stands in Goodyear, Maricopa County, Arizona. No floor area is published; its outline measures 246,063 square feet on the ground.
  4. PHX-14 14250 West Broadway Road PHX-14 stands in Goodyear, Maricopa County, Arizona. No floor area is published; its outline measures 246,030 square feet on the ground.

El Mirage, Arizona1

  1. El Mirage datacenter El Mirage datacenter stands in El Mirage, Maricopa County, Arizona.

Microsoft data centers in California

All California data centers ↗

Microsoft has 3 data centers in California, in Santa Clara County and Santa Clara.

Santa Clara County, California2

  1. San Jose Data Center San Jose Data Center stands in Santa Clara County, California.
  2. Santa Clara County datacenter campus Santa Clara County datacenter campus stands in Santa Clara County, California. It is recorded as under construction.

Santa Clara, California1

  1. Microsoft 2055 Lafayette Street Microsoft stands in Santa Clara, California. No floor area is published; its outline measures 165,786 square feet on the ground.

Microsoft data centers in North Carolina

All North Carolina data centers ↗

Microsoft has 3 data centers in North Carolina, in Conover, Hickory and Person County.

Conover, North Carolina1

  1. Conover - Lyle Creek datacenter Conover - Lyle Creek datacenter stands in Conover, Catawba County, North Carolina. It is recorded as under construction.

Hickory, North Carolina1

  1. Hickory datacenter Hickory datacenter stands in Hickory, Catawba County, North Carolina. It is recorded as under construction.

Person County, North Carolina1

  1. Person County datacenter Person County datacenter stands in Person County, North Carolina. It is recorded as planned rather than operating.

Microsoft data centers in Illinois

All Illinois data centers ↗

Microsoft has 2 data centers in Illinois, in Elsewhere in Illinois and Melrose Park.

Elsewhere in Illinois, Illinois1

  1. Chicagoland datacenters Chicagoland datacenters is recorded in Illinois.

Melrose Park, Illinois1

  1. Microsoft - Azure Datacenter 601 NORTHWEST AVE Microsoft - Azure Datacenter stands in Melrose Park, Cook County, Illinois. No floor area is published; its outline measures 304,844 square feet on the ground.

Microsoft data centers in Indiana

All Indiana data centers ↗

Microsoft has 2 data centers in Indiana, in La Porte and St. Joseph County.

La Porte, Indiana1

  1. La Porte datacenter La Porte datacenter stands in La Porte, LaPorte County, Indiana. It is recorded as under construction.

St. Joseph County, Indiana1

  1. St. Joseph County datacenter (proposed) St. Joseph County datacenter (proposed) stands in St. Joseph County, Allen County, Indiana.

Microsoft data centers in Michigan

All Michigan data centers ↗

Microsoft has 2 data centers in Michigan, in Gaines Charter Township and Lowell Charter Township.

Gaines Charter Township, Michigan1

  1. Gaines Charter Township datacenter (proposed) Gaines Charter Township datacenter (proposed) stands in Gaines Charter Township, Genesee County, Michigan.

Lowell Charter Township, Michigan1

  1. Lowell Charter Township datacenter (proposed) Lowell Charter Township datacenter (proposed) stands in Lowell Charter Township, Kent County, Michigan.

Microsoft data centers in Ohio

All Ohio data centers ↗

Microsoft has 2 data centers in Ohio, in Heath and Hebron.

Heath, Ohio1

  1. Heath datacenter Heath datacenter stands in Heath, Licking County, Ohio. It is recorded as under construction.

Hebron, Ohio1

  1. Hebron datacenter Hebron datacenter stands in Hebron, Licking County, Ohio. It is recorded as under construction.

Microsoft data centers in Wyoming

All Wyoming data centers ↗

Microsoft has 2 data centers in Wyoming, in Laramie County.

Laramie County, Wyoming2

  1. CYS41 Datacenter CYS41 Datacenter stands in Laramie County, Wyoming. No floor area is published; its outline measures 45,930 square feet on the ground.
  2. CYS42 Datacenter CYS42 Datacenter stands in Laramie County, Wyoming. No floor area is published; its outline measures 59,998 square feet on the ground.

Microsoft data centers in Nevada

All Nevada data centers ↗

Microsoft has 1 data center in Nevada, in Elsewhere in Nevada.

Elsewhere in Nevada, Nevada1

  1. Nevada datacenter (proposed) Nevada datacenter (proposed) is recorded in Nevada.

Microsoft data centers in Wisconsin

All Wisconsin data centers ↗

Microsoft has 1 data center in Wisconsin, in Mount Pleasant.

Mount Pleasant, Wisconsin1

  1. Racine County datacenter campus (Mount Pleasant) Racine County datacenter campus (Mount Pleasant) stands in Mount Pleasant, Racine County, Wisconsin. It is recorded as under construction.

Floor area and power appear only where the operator or a government record publishes them, and are never added into one figure. A building a source describes without naming it is listed as a Microsoft data center at the city or county it stands in.

Distribution

Where Microsoft data centers cluster

Microsoft's 87 data centers across 15 states. Each state links to its own page, which carries every operator in that state alongside the grid operator and the policy record.

Questions

Microsoft data centers, answered

How many data centers does Microsoft have?

This map identifies 87 US data centers operated by Microsoft, across 15 states and 38 cities. Each one is listed below with the city and county it stands in and the source that names it. This is a count of what primary sources describe in the United States, not a company-reported global total.

Where are Microsoft data centers located?

They are grouped below by state and then by city. Microsoft's largest presence is Virginia with 27 buildings, followed by Texas (13), Iowa (10), Georgia (8), Washington (6).

How big are Microsoft data centers?

23 of the 87 publish a floor area and 6 publish a power figure. Both are shown against the individual building rather than summed, because a floor area for one hall and an announced campus capacity are not the same measurement.

Who is Microsoft?

Operates data centers to run Azure and Microsoft's own cloud and AI services rather than to lease space to tenants. It also does AI compute (Azure OpenAI, Maia), enterprise software. On this map it is classified as cloud platform. Its own site is at https://datacenters.microsoft.com/.

Counts are what primary sources describe in the United States as of 2026-09-02: the operator's own published facility list, PeeringDB, OpenStreetMap, Wikidata, and county and state building registers. They are not company-reported global totals, and this page never states a figure the record does not carry.