Data Centers in Michigan
Michigan has 59 data centers identified from primary sources across 11 counties, run by 32 operators, against an industry reference count of 79. Oakland County holds the largest cluster with 19. MISO runs the grid for most of the state. 1 state measure on record (proposed) and 34 local pauses; 7 named projects delayed or blocked, and 2 capital atlas sites carrying $23.3B in announced commitments.
Where Michigan's data centers stand
Key facts
- Data centers identified
- 59 from the operators' own facility lists, PeeringDB, OpenStreetMap and Wikidata, of which 3 are mapped buildings that carry no name
- Target count
- 79 facilities in the industry reference count for Michigan; this map holds 62 of them (78.5 percent), 17 still to identify
- Largest cluster
- Oakland County with 19 facilities
- Largest operator
- ManagedWay with 5 facilities
- Grid operator
- MISO and PJM
- State measures
- 1 on record, strongest status proposed
- Local pauses
- 34 city or county moratoria · 63 local restrictions on the delay watchlist
- Water measures
- 2 state and local, plus the federal measures that apply everywhere
Michigan data centers, in short
Michigan has 59 data centers identified from primary sources, spread across 27 cities and counties and run by 32 operators. The largest concentration is Southfield, with 14 data centers, followed by Detroit with 6 and Grand Rapids with 5.
The operators with the most data centers in Michigan are ManagedWay (5), US Signal (5), 123.Net (4), Liquid Web (3), Lumen (3). Colocation and interconnection providers appear most often because they publish building-level detail; hyperscale campuses appear where the operator or the county names the individual buildings.
Not every operator discloses size. In Michigan, 23 publish a floor area and 17 publish a power figure, and each figure is shown against the data center it belongs to rather than added into one number. They are not the same measurement: one operator states the floor area of a single building, another the full capacity of a campus it has only announced.
MISO runs the wholesale power market and the high-voltage grid for most of Michigan. 1 statewide measure governing data centers is on record, alongside 34 local pauses. 7 named projects in Michigan are delayed, blocked or under challenge, and the capital atlas records 2 sites here carrying $23.3B in announced commitments.
Michigan data centers by city
Every data center identified in Michigan, grouped by the city or county it stands in, 59 of them across 27 places. Each entry names the operator and links to the source that states it.
Data centers in Southfield, Michigan
- 123.NET - DC1 - 24700 Northwestern Hwy. 123.Net 24700 Northwestern Hwy 80,000 sq ft16 MW60 networks
- 123.NET - DC2 - 24275 Northwestern Hwy. 123.Net 24275 Northwestern Hwy. 8 networks
- 123.NET - DC3 - 24245 Northwestern Hwy. 123.Net 24245 Northwestern Hwy 8,000 sq ft1.5 MW9 networks
- 365 Data Centers Detroit (DT1) 365 Data Centers 24660 Lahser Road 12,000 sq ft9 networks
- Colostore Data Center Colostore 38,000 sq ft
- EdgeConneX Detroit (EDCDET01) EdgeConneX 21005 Lahser Rd Bldg 4 14 networks
- Southfield data center Liquid Web 16,000 sq ft
- Lumen Network Colocation market: Southfield (Detroit), MI Lumen
- ManagedWay SFJ1 ManagedWay 24700 Northwestern Hwy 2 networks
- ManagedWay SFJ2 ManagedWay 24275 Northwestern Hwy 8,000 sq ft1 MW2 networks
- DTW-D Metrobloks 27500 Inkster Rd 47,500 sq ft89 MW
- Subrigo DET11 SUBRIGO 24700 Northwestern Highway 1 networks
- EDCDET01 TelNet Worldwide 21005 Lahser Rd 3 networks
- MI04 Detroit Data Center US Signal 21700 Melrose Avenue 16,000 sq ft0.25 MW
Data centers in Detroit, Michigan
- Cogent Detroit Cogent 1320 3rd St 31,149 sq ft3 networks
- Lumen Network Colocation market: Detroit, MI Lumen
- 1050 Woodward Ave. (One Campus Martius) Raeden 1050 Woodward Ave. 10,000 sq ft3 MW
- Raeden Michigan 1 Raeden 615 W Lafayette Blvd 4,500 sq ft500 MW
- DTRT.PP2/DTRRMI Verizon Wireless 2436 Bagley Street, 2nd Floor
- Quicken Loans data center Quicken Loans 1401 Rosa Parks Boulevard
Data centers in Grand Rapids, Michigan
- Bluebird Fiber data center Bluebird Fiber 3950 Sparks Dr. SE, Suite 102
- Grand Rapids Data Center Bluebird Fiber OH
- The Pyramid Campus (Grand Rapids) Switch 237 MW
- GBRKMI Verizon Wireless 2855 Oak Industrial
- GDRP.BFC Verizon Wireless 250 MONROE ST 4TH FLOOR, Suite #400
Data centers in Lansing, Michigan
- Lansing data center - A Liquid Web 32,000 sq ft
- Lansing data center - B Liquid Web 90,000 sq ft
- Lumen Network Colocation market: Lansing, MI Lumen
Data centers in Troy, Michigan
- Troy Office & Data Center Cogent 3331 W. Big Beaver Road 5,624 sq ft
- ManagedWay TYM1 ManagedWay 319 Executive Drive 7 networks
- ManagedWay TYM2 ManagedWay 600 Executive Drive 4 networks
Data centers in Ann Arbor, Michigan
- OTAVA Ann Arbor Data Center OTAVA 19,500 sq ft1.5 MW
- Synergy Fiber SYNERGY BROADBAND 3131 S State St Suit 306
Data centers in Saline Township, Michigan
- Saline Township, Michigan Data Center (The Barn) Oracle
- Related Digital data center Related Digital 1000 MW
Data centers in Auburn Hills, Michigan
- MI05 Detroit Data Center US Signal 1035 W Entrance Drive 76,000 sq ft4 MW
Data centers in Cassopolis, Michigan
- Midwest Energy & Communications Midwest Energy & Communications 60590 Decatur Road Mailing address: Cassopolics
Data centers in Dowagiac, Michigan
- Data center building
Data centers in Gaines Charter Township, Michigan
- Gaines Charter Township datacenter (proposed) Microsoft
Data centers in Houghton, Michigan
- MI Tech - Main Campus Michigan Technological University 1400 Townsend Drive 2 networks
Data centers in Kentwood, Michigan
- MI01 Grand Rapids Data Center US Signal 4765 Barden Court 40,000 sq ft2.2 MW
Data centers in Lowell Charter Township, Michigan
- Lowell Charter Township datacenter (proposed) Microsoft
Data centers in Royal Oak, Michigan
- Liberty Center One Liberty Center One 4815 Delemere Ave. 21,000 sq ft5 networks
Data centers in Southgate, Michigan
- Comcast Comcast 14312 Northline Road
Data centers in Van Buren Township, Michigan
- Google data center Google
Data centers in Westland, Michigan
- Otava Metro Detroit Otava 6435 North Hix Road 33,000 sq ft1.5 MW1 networks
Data centers in Unincorporated Kent County, Michigan
- 123.NET - DC4 - 400 76th St SW 123.Net 400 76th Street SW Mailing address: Byron Center 15,750 sq ft0.25 MW12 networks
- ManagedWay BYK1 ManagedWay 400 76th st Mailing address: Byron Center 2 networks
- US Signal - Grand Rapids South US Signal 400 76th St SW Mailing address: Byron Center 2 networks
Data centers in Unincorporated Eaton County, Michigan
- Liquid Web DC3 CMN-RUS 2703 Ena Dr Mailing address: Lansing 1 networks
- Liquid Web
Data centers in Genesee County, Michigan (exact location not published)
- OTAVA Mid Michigan Data Center OTAVA 32,500 sq ft1.5 MW
Data centers in Unincorporated Genesee County, Michigan
- Data center building 5225 Exchange Drive Mailing address: Flint
Data centers in Unincorporated Kalamazoo County, Michigan
- Aunalytics Kalamazoo Datacenter Aunalytics 6395 Technology Ave Mailing address: Kalamazoo 1 networks
Data centers in Unincorporated Macomb County, Michigan
- Chick-fil-A Hiring Center Dennis Sampier
Data centers in Unincorporated Monroe County, Michigan
- Data center building
Data centers in Unincorporated Wayne County, Michigan
- MI03 Detroit Data Center US Signal 9275 Haggerty Road Mailing address: Belleville 25,000 sq ft1.5 MW
Data centers in Elsewhere in Michigan
- DET01 EdgeConneX 39,900 sq ft3 MW
- MEC Technology Center Midwest Energy & Communications
Floor area and power appear only where the operator or a government record publishes them. A building the sources describe without naming it is listed as a data center building at its county.
Where they cluster, and who runs them
Facilities by county 11
Operators 32
Cities 18
The rules and the pipeline in Michigan
Michigan has 1 state measure on record (proposed), 34 local pauses, and 2 state or local water measures. MISO runs the grid there. Each tracker below holds the full record for Michigan, with every entry sourced.
Michigan's neighbors
Michigan data centers, answered from the record
How many data centers are in Michigan?
The industry reference count for Michigan is 79 facilities. This map places 59 of them from primary sources, each with a source record you can open, and every entry names the operator, the county, and the grid operator that serves it. The rest are mostly small regional colocation providers and enterprise buildings that no public register describes.
Where are Michigan's data centers?
They are listed on this page city by city. By city: Southfield (14), Detroit (6), Grand Rapids (5), Lansing (3). By county: Oakland County (19), Kent County (10), Wayne County (10). Every data center identified in Michigan appears under the city or county it stands in, with its operator and the source that names it.
Who operates data centers in Michigan?
32 operators appear in the registers for Michigan. The largest by facility count: ManagedWay (5), US Signal (5), 123.Net (4), Liquid Web (3), Lumen (3). Interconnection-heavy providers are over-represented because PeeringDB records where networks meet; hyperscalers appear where contributors have mapped their buildings.
Does Michigan have a data center moratorium?
Michigan has 1 state measure on record: HB 5594-5596 / SB 1018-1020: Moratorium on new data center approvals (proposed, Jun 2026). 34 city or county pauses are on record locally. The Michigan Data Center Moratorium Tracker carries each measure with its primary source and a weekly changelog.
Which grid operator serves Michigan data centers?
MISO runs the wholesale power market and the high-voltage transmission system for most of Michigan; PJM covers the rest. Both peninsulas MISO (Lower Peninsula = MISO Zone 7) except Indiana Michigan Power's southwest-corner territory, which is PJM, verified via MPSC capacity demonstration filings.
Are new data centers being built or delayed in Michigan?
7 named projects in Michigan are delayed, blocked, or under challenge (2,500 MW disclosed), with 63 local restrictions, 3 jurisdictional actions, 4 utility dockets, and 0 flagged queue row or large-load studys. The capital atlas records 2 named sites in Michigan with $23.3B in announced commitments and 6 projects blocked, delayed, or halted ($3.9B disclosed).
Facility layer: PeeringDB (Acceptable Use Policy), OpenStreetMap (ODbL, © OpenStreetMap contributors), Wikidata (CC0), US Census Bureau boundaries. Tracker layers: the SAVRN Moratorium Tracker, Water Tracker, Grid Operator Watchlist, Delay Watchlist, and Capital Atlas, each primary-sourced. Method on the national map.
Michigan across the SAVRN trackers
The same state followed through the money, the policy, the water and the delays. Each page is primary-sourced and refreshed on its own schedule, and each links back here.