Switch data centers
Listed below are 20 data centers operated by Switch in the United States, identified from primary sources across 4 states and 8 cities.
What Switch does, and what this map holds
Designs, builds and operates large campus data centers, selling colocation, build-to-suit capacity and network services to enterprise and cloud tenants. It also does build-to-suit (Switch MOD), Switch CONNECT telecom and network services, edge data centers, AI factory capacity. This map identifies 20 data centers operated by Switch across 4 states and 8 cities. Its largest presence is Nevada, with 13 buildings.
After Nevada, Switch has the most data centers in Georgia (3), Texas (3), Michigan (1). Each state below links to that state's own page, which carries every operator in it, the grid operator, and the moratorium, water and delay record that applies there.
Disclosure is uneven and this page does not paper over it. 1 of the 20 publish a floor area, and 4 publish a power figure. Each figure is shown against the building it belongs to and never added into a single total, because operators do not measure the same thing: one states the floor area of one hall, another the full capacity of a campus it has only announced.
PeeringDB records networks meeting in 2 of these buildings, 54 network presences in total. That is a measure of how much traffic exchanges inside the building, not of its size.
Every Switch data center, by state and city
All 20 Switch data centers this map identifies, grouped by the state and then the city each one stands in. Every entry carries the source that names it.
Switch data centers in Nevada
All Nevada data centers ↗McCarran, Nevada5
- Switch Tahoe Reno 1 Superloop Circle Switch Tahoe Reno stands in McCarran, Storey County, Nevada. PeeringDB records 7 networks meeting here. 7 networks
- Tahoe Reno 1 1 Superloop Circle Tahoe Reno 1 stands in McCarran, Storey County, Nevada. No floor area is published; its outline measures 625,286 square feet on the ground.
- Tahoe Reno 2 1 Superloop Circle Tahoe Reno 2 stands in McCarran, Storey County, Nevada. No floor area is published; its outline measures 294,845 square feet on the ground.
- Tahoe Reno 3 1 Superloop Circle Tahoe Reno 3 stands in McCarran, Storey County, Nevada. No floor area is published; its outline measures 388,663 square feet on the ground.
- Tahoe Reno 5 1 Superloop Circle Tahoe Reno 5 stands in McCarran, Storey County, Nevada. No floor area is published; its outline measures 305,006 square feet on the ground.
Clark County, Nevada4
- Switch Las Vegas 14 Switch Las Vegas 14 stands in Clark County, Nevada. No floor area is published; its outline measures 240,584 square feet on the ground.
- Switch Las Vegas 8 Switch Las Vegas 8 stands in Clark County, Nevada. No floor area is published; its outline measures 263,102 square feet on the ground.
- Switch Las Vegas 9 Switch Las Vegas 9 stands in Clark County, Nevada. No floor area is published; its outline measures 284,770 square feet on the ground.
- Switch12 Switch12 stands in Clark County, Nevada. No floor area is published; its outline measures 376,661 square feet on the ground.
Las Vegas, Nevada3
- Switch Las Vegas 7135 S Decatur Boulevard Switch Las Vegas stands in Las Vegas, Clark County, Nevada. No floor area is published; its outline measures 323,111 square feet on the ground. PeeringDB records 47 networks meeting here across 1 exchange. 47 networks
- Switch Las Vegas 4 4495 East Sahara Avenue Switch Las Vegas 4 stands in Las Vegas, Clark County, Nevada. No floor area is published; its outline measures 27,642 square feet on the ground.
- The Core Campus (Las Vegas) The Core Campus (Las Vegas) stands in Las Vegas, Clark County, Nevada. The record puts it at 495 MW. It sits on the The Core Campus campus. 495 MW
Tahoe Reno, Nevada1
- The Citadel Campus (Tahoe Reno) The Citadel Campus (Tahoe Reno) stands in Tahoe Reno, Nevada. It sits on the The Citadel Campus campus.
Switch data centers in Georgia
All Georgia data centers ↗Lithia Springs, Georgia2
- Switch Atlanta 1 Switch Way, Lithia Springs, GA 30122 Switch Atlanta stands in Lithia Springs, Cobb County, Georgia. The record puts it at 1,000,000 square feet and 110 MW. 1,000,000 sq ft110 MW
- Switch Data Center 1 Switch Way Switch Data Center stands in Lithia Springs, Douglas County, Georgia. No floor area is published; its outline measures 170,737 square feet on the ground.
Atlanta, Georgia1
- The Keep Campus (Atlanta) The Keep Campus (Atlanta) stands in Atlanta, Fulton County, Georgia. The record puts it at 150 MW. It sits on the The Keep Campus campus. 150 MW
Switch data centers in Texas
All Texas data centers ↗Austin, Texas1
- The Rock Campus (Austin) The Rock Campus (Austin) stands in Austin, Travis County, Texas. It sits on the The Rock Campus campus.
Houston, Texas1
- Data Foundry locations (Austin/Houston) Data Foundry locations (Austin/Houston) stands in Houston, Harris County, Texas.
Williamson County, Texas1
- Switch: The Rock Switch: The Rock stands in Williamson County, Texas. No floor area is published; its outline measures 173,546 square feet on the ground.
Switch data centers in Michigan
All Michigan data centers ↗Grand Rapids, Michigan1
- The Pyramid Campus (Grand Rapids) The Pyramid Campus (Grand Rapids) stands in Grand Rapids, Kent County, Michigan. The record puts it at 237 MW. It sits on the The Pyramid Campus campus. 237 MW
Floor area and power appear only where the operator or a government record publishes them, and are never added into one figure. A building a source describes without naming it is listed as a Switch data center at the city or county it stands in.
Where Switch data centers cluster
Switch's 20 data centers across 4 states. Each state links to its own page, which carries every operator in that state alongside the grid operator and the policy record.
Switch data centers, answered
How many data centers does Switch have?
This map identifies 20 US data centers operated by Switch, across 4 states and 8 cities. Each one is listed below with the city and county it stands in and the source that names it. This is a count of what primary sources describe in the United States, not a company-reported global total.
Where are Switch data centers located?
They are grouped below by state and then by city. Switch's largest presence is Nevada with 13 buildings, followed by Georgia (3), Texas (3), Michigan (1).
How big are Switch data centers?
1 of the 20 publish a floor area and 4 publish a power figure. Both are shown against the individual building rather than summed, because a floor area for one hall and an announced campus capacity are not the same measurement.
Who is Switch?
Designs, builds and operates large campus data centers, selling colocation, build-to-suit capacity and network services to enterprise and cloud tenants. It also does build-to-suit (Switch MOD), Switch CONNECT telecom and network services, edge data centers, AI factory capacity. On this map it is classified as colocation. Its own site is at https://www.switch.com.
Counts are what primary sources describe in the United States as of 2026-09-02: the operator's own published facility list, PeeringDB, OpenStreetMap, Wikidata, and county and state building registers. They are not company-reported global totals, and this page never states a figure the record does not carry.