Compact learned predictors and controllers for industrial setpoint control, tested against tuned PI and MPC on simulated plants: a two-pump pressure manifold, the Johansson four-tank system, and a thermal CSTR. It includes a C99 predictor for edge devices. All plants are synthetic, and the methods are adaptations of published papers, not reproductions. The offline FKDPP adaptation underperformed PI. Every outcome, including the losses, is kept in the reports. - The saved predictor is 12,484 bytes, with fixed-size inference. - The decision time is about 0.61 ms at the 95th percentile on an Apple ARM host. That excludes communication, PLC scans and admission checks. - The C99 predictor…