Power Supply Chain and Demand in Mississippi

MISO runs most of Mississippi's grid. 4,563 MW of new generation is planned in Mississippi, 2,169 MW of it under construction or built and awaiting operation, against 1,101 MW of planned retirements through 2030. 14 data centers are identified in the state. Residential electricity averaged 15.19¢/kWh in 2026 through July, +9.1% from a year earlier. Unemployment was 3.4% in August 2026, and construction employment is +25.1% against August 2019. The SAVRN trackers hold 1 local moratoria or restrictions for Mississippi across all statuses (1 in force) and 1 named projects on the Delay Watchlist.
What the build-out changed in Mississippi
Mississippi is at the center of the build-out: the demand is here and the construction economy has moved with it. Developers have announced $74.8B of data center capital in Mississippi, 5th among the 31 states with a disclosed figure. Electrical contractor jobs, the trade every data center, substation and plant needs first, grew 33.2% from 2019 to 2025, 10th in the country. Planned generation equals 25% of the power plants Mississippi runs today, one of the steepest build-outs in the country (11th). Households pay part of the cost: residential prices are +9.1% year to date, the 15th fastest increase of 51. Factory employment is the exception: manufacturing jobs are -6.4% against August 2019.
Then and now
| Measure | Then | Now | Change | U.S. rank |
|---|---|---|---|---|
| Construction jobs (Aug 2019 → Aug 2026) | 44.7k | 55.9k | ▲ 25.1% | 11th of 48 |
| Electrical contractor jobs (2019 → 2025) | 6,000 | 7,994 | ▲ 33.2% | 10th of 48 |
| Power line construction jobs (2019 → 2025) | 2,065 | 2,528 | ▲ 22.4% | 24th of 44 |
| Data processing and hosting jobs (2019 → 2025) | 861 | 1,312 | ▲ 52.4% | 16th of 46 |
| Unemployment rate (Feb 2020 → Aug 2026) | 5.7% | 3.4% | ▼ 2.3pts | — |
| Residential price, ¢/kWh (YTD Jul 2025 → 2026) | 13.92¢ | 15.19¢ | ▲ 9.1% | 15th of 51 |
| Generation fleet → planned additions | 18.1 GW operating | 4.6 GW planned | 25% of fleet | 11th of 51 |
Where Mississippi ranks among 51
1st = the most. Ranks cover every state and DC that publishes the figure.
Regionally, Louisiana leads on announced data center capital at $101.8B; Mississippi is 2nd of 5 in its neighborhood at $74.8B.
County spotlight
Madison County holds the most data centers on record in Mississippi (7). The largest share of planned generation sits in Washington County: 1,019 MW, led by Entergy Mississippi LLC (natural gas). The fastest-growing electrical trade market is Harrison County, where contractor jobs grew 28.7% to 664.
Where Mississippi sits in the power system
- Grid operator
- MISO
- Operating capacity
- 18.1 GW
- Planned generation
- 4,563 MW
- Under construction or built
- 2,169 MW
- Data centers identified
- 14
- Data center load in queues
- —
- Unemployment, Aug 2026
- 3.4%
- Residential price change
- +9.1%
Neighboring states are shaded. Select one to open its page.
Mississippi, county by county
82 counties in Mississippi. Planned generation sits in 14 of them, data centers stand in 6, and local measures are on record in 0. Pick a layer, then select a county for its full record.
County leaders
Counties on record 32
| County | Data centers | Planned MW | Building MW | Lead developer | Electrical contractor jobs | Change 2019–25 | Local measures | Watchlist | |
|---|---|---|---|---|---|---|---|---|---|
| Madison County | 7 | 819 MW | 819 MW | Entergy Mississippi LLC | 292 | — | — | — | |
| Hinds County | 3 | 150 MW | 150 MW | Hinds Solar, LLC | 498 | ▼ 17.0% | — | — | |
| Warren County | 1 | 835 MW | 835 MW | Entergy Mississippi LLC | — | — | — | — | |
| Lowndes County | 1 | 504 MW | — | Tennessee Valley Authority | 420 | ▲ 244.3% | — | — | |
| Lauderdale County | 1 | — | — | — | 224 | ▲ 21.1% | — | — | |
| Oktibbeha County | 1 | — | — | — | 56 | ▼ 23.3% | — | — | |
| Washington County | — | 1,019 MW | 200 MW | Entergy Mississippi LLC | — | — | — | — | |
| DeSoto County | — | 195 MW | — | Entergy Mississippi LLC | 472 | ▲ 14.3% | — | 1 | |
| Monroe County | — | 160 MW | 160 MW | SR Magnolia, LLC | 36 | ▲ 9.1% | — | — | |
| Calhoun County | — | 160 MW | — | Landshark Energy Generation Facility LLC | — | — | — | — | |
| Jasper County | — | 150 MW | — | SR Jasper, LLC | — | — | — | — | |
| Sunflower County | — | 100 MW | — | Girasol Solar Farm LLC | — | — | — | — | |
| Covington County | — | 96 MW | — | Origis Energy USA, Inc | — | — | — | — | |
| Marshall County | — | 55 MW | 5 MW | SR Mount Pleasant, LLC | — | — | — | — | |
| Panola County | — | 20 MW | — | Rye Development | 98 | ▼ 3.9% | — | — | |
| Grenada County | — | 10 MW | — | Rye Development | — | — | — | — | |
| Rankin County | — | — | — | — | 1,128 | ▲ 17.6% | — | — | |
| Harrison County | — | — | — | — | 664 | ▲ 28.7% | — | — | |
| Forrest County | — | — | — | — | 443 | ▲ 20.7% | — | — | |
| Jackson County | — | — | — | — | 247 | ▲ 33.5% | — | — | |
| Lee County | — | — | — | — | 184 | ▼ 5.6% | — | — | |
| Jones County | — | — | — | — | 136 | — | — | — | |
| Lamar County | — | — | — | — | 89 | — | — | — | |
| Lincoln County | — | — | — | — | 88 | ▲ 193.3% | — | — | |
| Scott County | — | — | — | — | 72 | ▼ 18.2% | — | — | |
| Prentiss County | — | — | — | — | 57 | ▲ 42.5% | — | — | |
| Itawamba County | — | — | — | — | 52 | — | — | — | |
| Pontotoc County | — | — | — | — | 48 | ▲ 77.8% | — | — | |
| Alcorn County | — | — | — | — | 48 | ▼ 41.5% | — | — | |
| Pike County | — | — | — | — | 37 | ▼ 2.6% | — | — | |
| Tippah County | — | — | — | — | 35 | ▲ 16.7% | — | — | |
| Marion County | — | — | — | — | 20 | — | — | — |
Every county in Mississippi 82
Each county has its own page: power plants, utilities and prices, jobs since 2019, data centers, local rules and its neighbors.
Cities and towns on record 8
| City or town | County | Data centers | Local measures | Watchlist | Latest record | |
|---|---|---|---|---|---|---|
| Jackson | Hinds County + Madison County | 2 | — | — | — | |
| Canton | Madison County | 1 | — | — | — | |
| Clinton | Hinds County | 1 | — | — | — | |
| Columbus | Lowndes County | 1 | — | — | — | |
| Meridian | Lauderdale County | 1 | — | — | — | |
| Ridgeland | Madison County | 1 | — | — | — | |
| Starkville | Oktibbeha County | 1 | — | — | — | |
| City of Jackson | Hinds County + Madison County | — | 1 (1 in force) | — | 183-day data center moratorium In force |
Data center counts come from every facility on the SAVRN Data Center Map, counted in the county and the city or community where each building physically stands (Census boundaries), not its mailing address. Jurisdictions appear as the Moratorium Tracker records them.
Mississippi, from generation to the household bill
1Grid operator
- Peak load 2025
- 121 GW
- Peak load forecast 2035
- 163 GW
2Generation pipeline
- Operating capacity
- 18.1 GW
- Planned, all types
- 4,563 MW
- Under construction or built
- 2,169 MW
- Planned gas
- 2,977 MW
- Planned retirements 2026–30
- 1,101 MW
- Net firm additions derived
- 1,068 MW
3Data center demand
- Data centers identified
- 14
- Operators
- 6
- Load in tracked queues
- —
- Utility large-load projects
- 5
- Commercial sales, YTD change
- +0.2%
- Industry share of state GDP
- 0.8%
4Jobs and pay
- Unemployment, Aug 2026
- 3.4% (-0.3 pts y/y)
- Construction jobs vs 2019
- +25.1%
- Manufacturing jobs vs 2019
- -6.4%
- Electrical contractor jobs 2019–25
- +33.2%
- Electrician median pay
- $60,860
- Electrician ÷ cashier pay
- 2.31×
5Household bill
- Residential price, YTD Jul 2026
- 15.19¢/kWh
- Change vs YTD 2025
- +9.1%
- All-sector price change
- +6.7%
- Total retail sales change
- +2.0%
6Policy friction
- State measures on record
- 4
- Local measures (in force)
- 1 (1)
- Watchlist projects
- 1
- Lawsuits tracked
- 0
- Announced capital, disclosed
- $74.8B
- Dedicated tax incentive
- Yes
Planned power plants in Mississippi
Every planned generator in Mississippi in the August 2026 EIA-860M inventory, by technology, then the 15 largest units. Under construction or built covers status codes U, V and TS.
| Technology | Units | Planned MW | Under construction or built |
|---|---|---|---|
| Natural gas | 14 | 2,977 MW | 1,655 MW |
| Solar | 11 | 1,406 MW | 515 MW |
| Battery storage | 1 | 145 MW | — |
| Other | 8 | 35 MW | — |
Largest planned generators
| Plant | County | Technology | MW | Status | Year | Owner |
|---|---|---|---|---|---|---|
| Vicksburg Advanced Power Station | Warren | Natural Gas Fired Combined Cycle | 478 MW | Under construction (≤50%) | 2028 | Entergy Mississippi LLC |
| Traceview Advanced Power Station | Madison | Natural Gas Fired Combined Cycle | 478 MW | Under construction (≤50%) | 2028 | Entergy Mississippi LLC |
| Delta Blues Advanced Power Station | Washington | Natural Gas Fired Combined Cycle | 477 MW | Approvals pending | 2028 | Entergy Mississippi LLC |
| Traceview Advanced Power Station | Madison | Natural Gas Fired Combined Cycle | 342 MW | Under construction (≤50%) | 2028 | Entergy Mississippi LLC |
| Vicksburg Advanced Power Station | Warren | Natural Gas Fired Combined Cycle | 342 MW | Under construction (≤50%) | 2028 | Entergy Mississippi LLC |
| Delta Blues Advanced Power Station | Washington | Natural Gas Fired Combined Cycle | 342 MW | Approvals pending | 2028 | Entergy Mississippi LLC |
| Greer Solar Plant | Washington | Solar Photovoltaic | 200 MW | Under construction (≤50%) | 2026 | Greer Solar, LLC |
| Penton Solar Plant | DeSoto | Solar Photovoltaic | 190 MW | Planned, approvals not started | 2028 | Entergy Mississippi LLC |
| Landshark Energy Generation Facility | Calhoun | Solar Photovoltaic | 160 MW | Planned, approvals not started | 2030 | Landshark Energy Generation Facility LLC |
| SR Magnolia | Monroe | Solar Photovoltaic | 160 MW | Under construction (>50%) | 2027 | SR Magnolia, LLC |
| SR Jasper | Jasper | Solar Photovoltaic | 150 MW | Approvals received | 2029 | SR Jasper, LLC |
| Hinds Solar, LLC | Hinds | Solar Photovoltaic | 150 MW | Under construction (≤50%) | 2027 | Hinds Solar, LLC |
| Okolona Solar | Henderson | Solar Photovoltaic | 145 MW | Approvals pending | 2027 | Okolona Solar, LLC |
| Okolona Solar | Henderson | Batteries | 145 MW | Approvals received | 2028 | Okolona Solar, LLC |
| Girasol Solar Farm | Sunflower | Solar Photovoltaic | 100 MW | Planned, approvals not started | 2028 | Girasol Solar Farm LLC |
What the Mississippi build-out runs on
Who is building generation in Mississippi, which manufacturers and contractors have a plant, expansion or contract recorded here, and how long the critical equipment takes to arrive.
Developers and owners with planned generation
| Developer or owner | Units | Planned MW | Building MW | Main technology | Counties |
|---|---|---|---|---|---|
| Entergy Mississippi LLC | 7 | 2,648 MW | 1,639 MW | Natural gas | 4 |
| Tennessee Valley Authority | 6 | 504 MW | — | Natural gas | 1 |
| Okolona Solar, LLC | 2 | 290 MW | — | Solar | 1 |
| Greer Solar, LLC | 1 | 200 MW | 200 MW | Solar | 1 |
| Landshark Energy Generation Facility LLC | 1 | 160 MW | — | Solar | 1 |
| SR Magnolia, LLC | 1 | 160 MW | 160 MW | Solar | 1 |
| Hinds Solar, LLC | 1 | 150 MW | 150 MW | Solar | 1 |
| SR Jasper, LLC | 1 | 150 MW | — | Solar | 1 |
| Girasol Solar Farm LLC | 1 | 100 MW | — | Solar | 1 |
| Origis Energy USA, Inc | 1 | 96 MW | — | Solar | 1 |
| SR Mount Pleasant, LLC | 1 | 50 MW | — | Solar | 1 |
| Rye Development | 8 | 35 MW | — | Other | 3 |
| Ergon Refining Inc | 2 | 16 MW | 16 MW | Natural gas | 1 |
| SR Marshall, LLC | 1 | 5 MW | 5 MW | Solar | 1 |
Manufacturers and contractors with a recorded Mississippi footprint 3
| Tier | Company | Segment | What the record says | |
|---|---|---|---|---|
| Grid equipment OEM | Hitachi Energy | Power transformers, HV equipment | $528 million transformer factory in Mississippi (production 2029) plus $457 million South Boston, VA; ~$1.5 billion total U.S. transformer commitments | |
| Cable | Southwire | Wire and cable | $256 million investment in Starkville, MS operations | |
| Grid equipment OEM | Hitachi Energy | Small and medium power transformers (Gallman, MS) | $528 million Mississippi plant doubling U.S. small/medium transformer output; production 2029 |
Order-by check derived
14 of the 16 planned units of 50 MW or more in Mississippi that are not yet under construction (2,049 of 2,359 MW) are past the date their step-up transformer had to be ordered to meet the planned in-service date, and 2 gas units are (819 MW) past the turbine order date as well. These units hold their schedules only if the equipment is already on order.
| Plant | Technology | MW | Planned in service | Transformer order-by | Turbine order-by | Owner |
|---|---|---|---|---|---|---|
| Delta Blues Advanced Power Station | Natural gas | 477 MW | May 2028 | Apr 2025 | May 2023 | Entergy Mississippi LLC |
| Delta Blues Advanced Power Station | Natural gas | 342 MW | May 2028 | Apr 2025 | May 2023 | Entergy Mississippi LLC |
| Penton Solar Plant | Solar | 190 MW | Mar 2028 | Feb 2025 | — | Entergy Mississippi LLC |
| Okolona Solar | Solar | 145 MW | Dec 2027 | Nov 2024 | — | Okolona Solar, LLC |
| Okolona Solar | Battery storage | 145 MW | Aug 2028 | Jul 2025 | — | Okolona Solar, LLC |
| Girasol Solar Farm | Solar | 100 MW | Dec 2028 | Nov 2025 | — | Girasol Solar Farm LLC |
| Covington (MS) | Solar | 96 MW | Mar 2028 | Feb 2025 | — | Origis Energy USA, Inc |
| New Caledonia | Natural gas | 84 MW | Dec 2028 | Nov 2025 | — | Tennessee Valley Authority |
| New Caledonia | Natural gas | 84 MW | Dec 2028 | Nov 2025 | — | Tennessee Valley Authority |
| New Caledonia | Natural gas | 84 MW | Dec 2028 | Nov 2025 | — | Tennessee Valley Authority |
| New Caledonia | Natural gas | 84 MW | Dec 2028 | Nov 2025 | — | Tennessee Valley Authority |
| New Caledonia | Natural gas | 84 MW | Dec 2028 | Nov 2025 | — | Tennessee Valley Authority |
Lead times, OEM backlogs and the national generation and grid contractors are on the national supply chain section.
Data center and large-load demand in Mississippi
14 data centers run by 6 operators are identified in Mississippi. The full list by city is on the Mississippi Data Center Map page. Utilities report 5 large customer projects here to EEI.
| Utility | Customer or type | MW stated | Investment stated | |
|---|---|---|---|---|
| Entergy Mississippi | AWS | — | $21 billion | |
| Entergy Mississippi | AWS | — | $3 billion | |
| Entergy Mississippi | AWS | — | $1 billion | |
| Entergy Mississippi | AVAIO Digital | 116 MW | $6 billion | |
| Mississippi Power (Southern Company) | Compass Datacenters | 500 MW | $10 billion |
The Mississippi jobs report, and who the build-out employs
Payroll employment, August 2026 (preliminary)
| Industry | Jobs | Change vs Aug 2025 | Change vs Aug 2019 |
|---|---|---|---|
| Total nonfarm | 1,199.8k | ▲ 0.4% | ▲ 3.5% (+40.3k) |
| Construction | 55.9k | ▲ 3.7% | ▲ 25.1% (+11.2k) |
| Manufacturing | 137.7k | ▼ 0.7% | ▼ 6.4% (-9.4k) |
| Mining and logging | 5.8k | ▲ 1.8% | ▼ 12.1% (-0.8k) |
| Retail trade | 139.2k | ▲ 0.9% | ▲ 2.8% (+3.8k) |
Power and data industries, 2019 to 2025
| Industry | Jobs 2019 | Jobs 2025 | Change | Average pay 2025 |
|---|---|---|---|---|
| Data processing and hosting | 861 | 1,312 | ▲ 52.4% | $82,376 |
| Electrical contractors | 6,000 | 7,994 | ▲ 33.2% | $71,285 |
| Power and communication line construction | 2,065 | 2,528 | ▲ 22.4% | $87,879 |
| Electric power generation, transmission, distribution | — | 6,012 | — | $119,050 |
| Transformer manufacturing | — | not disclosed | — | — |
Pay ladder, May 2025
| Occupation | Employment | Median annual pay | Multiple of cashier pay |
|---|---|---|---|
| Cashiers | 30,490 | $26,390 | 1.00× |
| Fast food and counter workers | 31,220 | $22,610 | 0.86× |
| Retail salespersons | 38,400 | $28,640 | 1.09× |
| All occupations | 1,163,030 | $40,120 | 1.52× |
| Construction laborers | 8,800 | $37,710 | 1.43× |
| Welders | 6,460 | $51,100 | 1.94× |
| HVAC mechanics | 2,700 | $48,680 | 1.84× |
| Plumbers and pipefitters | 3,360 | $55,480 | 2.10× |
| Electricians | 6,610 | $60,860 | 2.31× |
| Power plant operators | 450 | $102,400 | 3.88× |
| Power-line installers | 2,290 | $75,890 | 2.88× |
| Construction supervisors | 7,040 | $66,910 | 2.54× |
| Electrical engineers | 1,130 | $104,990 | 3.98× |
County-level contractor jobs and pay are in the county record above.
What the data center industry adds to Mississippi
PwC figures are modeled estimates commissioned by the industry.
The rules and the pipeline in Mississippi
State measures 4
| Bill | Measure | Status | Date | |
|---|---|---|---|---|
| HB 1635 | Mississippi: In Mississippi, HB 1635 was introduced to redirect 80% of local ad-valorem taxes collected above $1B from large projects (including data centers) | Failed / vetoed | 2026-02 | |
| HB 1239 | Data center enterprises; revise certain definitions and other provisions relating to tax exemptions. | Failed / vetoed | 2025-03 | |
| SB 3106 | Tax exemptions; revise qualifying standards for business enterprises operating data centers. | Failed / vetoed | 2024-04 | |
| HB 1429 | Tax exemptions; revise the requirements that a data center must meet to be eligible for. | Failed / vetoed | 2019-03 |
Delay Watchlist projects 1
| Project | Location | Status | Cause | MW | |
|---|---|---|---|---|---|
| xAI Southaven Data Center & Gas Turbine Plant (noise/class action) | Southaven, DeSoto County | active litigation | — |
Local moratoria and restrictions (1) appear by county and city in the county-by-county section. Counts include every status in the weekly tracker feeds as of October 5, 2026. The Mississippi Data Center Map page counts only active local pauses and delayed or blocked projects as of its September 2 rebuild, so its figures are lower. The difference is one of definition and date.
Mississippi's neighbors
Mississippi power, answered from the record
How much new power generation is planned in Mississippi?
EIA's August 2026 inventory lists 4,563 MW of planned generators in Mississippi, 2,169 MW of it under construction or built. By capacity the pipeline is natural gas 65%, solar 31%, battery storage 3%. The largest single unit is Vicksburg Advanced Power Station (478 MW, Entergy Mississippi LLC). Owners plan to retire 1,101 MW from 2026 to 2030.
Who runs the power grid in Mississippi?
MISO serves most of Mississippi as the regional wholesale market and grid operator. No data center load is tracked in its queues yet.
Is planned generation in Mississippi on schedule?
14 of 16 planned units of 50 MW or more not yet under construction are past the latest date to order a step-up transformer (more than 160 weeks) for their planned in-service date, and 2 gas units are past the turbine order date (about five years). They hold schedule only if equipment is already on order.
Is the build-out creating trade jobs in Mississippi?
Construction employment is +25.1% against August 2019. Electrical contractor jobs went from 6,000 in 2019 to 7,994 in 2025 (+33.2%, 10th in the country).
Are electricity prices rising in Mississippi?
Residential electricity averaged 15.19¢/kWh from January to July 2026, +9.1% on a year earlier, the 15th fastest increase of 51. Commercial sales, the class that includes data centers, changed +0.2%.
What do electricians earn in Mississippi?
The median electrician in Mississippi earned $60,860 in May 2025, 2.31 times the median cashier, and power-line installers earned $75,890 (BLS OEWS).
Which counties in Mississippi have the most planned generation?
By planned nameplate capacity: Washington County (1,019 MW), Warren County (835 MW), Madison County (819 MW).
Does Mississippi have a data center moratorium?
The SAVRN Moratorium Tracker holds 4 state-level measures (0 enacted) and 1 local moratoria or restrictions in Mississippi, 1 of them in force, 49th most in the country.
Mississippi across the SAVRN trackers
Sources for this page
- BEA state GDP via FRED
- BLS LAUS
- BLS OEWS
- BLS QCEW
- BLS State Employment (CES)
- EEI large customer projects
- EIA Electric Power Monthly
- EIA-860M (Aug 2026)
- NCSL
- PwC for the Data Center Coalition
- SAVRN Capital Atlas
- SAVRN Data Center Map
- SAVRN Delay Watchlist
- SAVRN Grid Operator Watchlist
- SAVRN Moratorium Tracker
- U.S. Census Bureau cartographic boundaries (via us-atlas)
Every figure links to its original source through the Sources buttons. Values marked derived are calculated from reported figures.