District of Columbia · Power Supply Chain & Demand

Power Supply Chain and Demand in the District of Columbia

DC

PJM runs most of the District of Columbia's grid. 6 MW of new generation is planned in the District of Columbia, 6 MW of it under construction or built and awaiting operation, against 0 MW of planned retirements through 2030. 9 data centers are identified in the District. Residential electricity averaged 24.66¢/kWh in 2026 through July, +17.8% from a year earlier. Unemployment was 5.7% in August 2026. The SAVRN trackers hold no local moratorium or restriction for the District of Columbia and no project on the Delay Watchlist.

Rebuilt 2026-10-08 · refreshed weekly
Grid operator
PJM
main wholesale grid
Planned generation
0.0 GW
0.0 GW under construction or built
Data center load in queues
—
9 data centers identified
Residential price
24.66¢
▲ 17.8% vs 2025, YTD July
Construction jobs
—
not published separately
Local measures
0
0 in force · 0 on Delay Watchlist
The finding

What the build-out changed in the District of Columbia

District of Columbia is in the middle of the pack, with a few sharp signals worth watching. The data center industry now accounts for 2.3% of the the District's economy, the 15th largest share of any state or the District or the District (the median state is 1.8%), counting the industry's in-state suppliers and payrolls. Planned generation equals 8% of the power plants District of Columbia runs today, 38th of 51 (the median state plans 15%). Commercial electricity sales, the class that includes data centers, are -3.1% year to date, 51st in the country. Households pay part of the cost: residential prices are +17.8% year to date, the fastest increase of 51.

Then and now

MeasureThenNowChangeU.S. rank
Unemployment rate (Feb 2020 → Aug 2026)5.7%5.7%● 0.0pts—
Residential price, ¢/kWh (YTD Jul 2025 → 2026)20.93¢24.66¢▲ 17.8%1st of 51
Generation fleet → planned additions0.1 GW operating0.0 GW planned8% of fleet38th of 51

Where District of Columbia ranks among 51

Data center share of state GDP2.3%15th of 51
Planned generation vs. today's fleet8%38th of 51
Commercial electricity sales, YTD change-3.1%51st of 51
Residential electricity price, YTD change+17.8%1st of 51

1st = the most. Ranks cover every state and DC that publishes the figure.

Regionally, Virginia leads on data center share of state gdp at 3.9%; District of Columbia is 2nd of 3 in its neighborhood at 2.3%.

County spotlight

District of Columbia holds the most data centers on record in the District of Columbia (9), and its electrical contractor workforce changed +25.1% since 2019 to 2,324 jobs.

The map

Where District of Columbia sits in the power system

Grid operator
PJM
Operating capacity
0.1 GW
Planned generation
6 MW
Under construction or built
6 MW
Data centers identified
9
Data center load in queues
—
Unemployment, Aug 2026
5.7%
Residential price change
+17.8%

Neighboring states are shaded. Select one to open its page.

Counties and cities

District of Columbia, county by county

1 county-equivalent in the District of Columbia. Planned generation sits in 1 of them, data centers stand in 1, and local measures are on record in 0. Pick a layer, then select a county for its full record.

District of Columbia

County leaders

Most planned generation
District of Columbianatural gas6 MW
Most data centers
Fastest electrical contractor growth
District of Columbia2,324 jobs+25.1%

Counties on record 1

CountyData centersPlanned MWBuilding MWLead developerElectrical contractor jobsChange 2019–25Local measuresWatchlist
District of Columbia96 MW6 MWHoward University2,324▲ 25.1%——

Every county in the District of Columbia 1

Each county has its own page: power plants, utilities and prices, jobs since 2019, data centers, local rules and its neighbors.

Cities and towns on record 1

City or townCountyData centersLocal measuresWatchlistLatest record
WashingtonDistrict of Columbia9———

Data center counts come from every facility on the SAVRN Data Center Map, counted in the county and the city or community where each building physically stands (Census boundaries), not its mailing address. Jurisdictions appear as the Moratorium Tracker records them.

The chain

District of Columbia, from generation to the household bill

1Grid operator

2028/29 BRA cleared capacity
138,318 MW UCAP
2028/29 BRA RTO clearing price
325 $/MW-day
2026/27 BRA RTO clearing price
329.17 $/MW-day
2025/26 BRA RTO clearing price
269.92 $/MW-day

2Generation pipeline

Operating capacity
0.1 GW
Planned, all types
6 MW
Under construction or built
6 MW
Planned gas
6 MW
Planned retirements 2026–30
0 MW
Net firm additions derived
6 MW

3Data center demand

Data centers identified
9
Operators
7
Load in tracked queues
—
Utility large-load projects
0
Commercial sales, YTD change
-3.1%
Industry share of state GDP
2.3%

4Jobs and pay

Unemployment, Aug 2026
5.7% (-0.8 pts y/y)
Construction jobs vs 2019
—
Manufacturing jobs vs 2019
-23.1%
Electrical contractor jobs 2019–25
—
Electrician median pay
$78,970
Electrician ÷ cashier pay
2.03×

5Household bill

Residential price, YTD Jul 2026
24.66¢/kWh
Change vs YTD 2025
+17.8%
All-sector price change
+19.0%
Total retail sales change
-2.4%

6Policy friction

State measures on record
0
Local measures (in force)
0 (0)
Watchlist projects
0
Lawsuits tracked
0
Announced capital, disclosed
—
Dedicated tax incentive
Not in NCSL scope
Generation

Planned power plants in the District of Columbia

Every planned generator in the District of Columbia in the August 2026 EIA-860M inventory, by technology, then the 15 largest units. Under construction or built covers status codes U, V and TS.

Planned generation by fuel 6 MW
Natural gas 6 MW 100%
Under construction or built 6 MW
Natural gas 6 MW 100%
TechnologyUnitsPlanned MWUnder construction or built
Natural gas16 MW6 MW

Largest planned generators

PlantCountyTechnologyMWStatusYearOwner
CHP PlantDistrict of ColumbiaNatural Gas Fired Combustion Turbine6 MWUnder construction (>50%)2026Howard University
Supply chain

What the District of Columbia build-out runs on

Who is building generation in the District of Columbia, which manufacturers and contractors have a plant, expansion or contract recorded here, and how long the critical equipment takes to arrive.

Developers and owners with planned generation

Developer or ownerUnitsPlanned MWBuilding MWMain technologyCounties
Howard University16 MW6 MWNatural gas1

Manufacturers and contractors with a recorded District of Columbia footprint

No plant, expansion or contract in the manufacturer record names District of Columbia. The national suppliers below serve every state.

Order-by check

No planned unit of 50 MW or more in the District of Columbia is still waiting on equipment orders.

Lead times, OEM backlogs and the national generation and grid contractors are on the national supply chain section.

Demand

Data center and large-load demand in the District of Columbia

9 data centers run by 7 operators are identified in the District of Columbia. The full list by city is on the District of Columbia Data Center Map page. Utilities report 0 large customer projects here to EEI.

No large customer projects reported to EEI for this state.

Jobs and pay

The District of Columbia jobs report, and who the build-out employs

Median pay, May 2025
Cashiers$38,880
Fast food and counter workers$37,430
Retail salespersons$38,500
All occupations$91,540
Construction laborers$50,020
Welders$60,180
HVAC mechanics$84,390
Plumbers and pipefitters$101,020
Electricians$78,970
Power-line installers$101,240
Construction supervisors$86,520
Electrical engineers$143,000
Cashier median: $38,880

Payroll employment, August 2026 (preliminary)

IndustryJobsChange vs Aug 2025Change vs Aug 2019
Total nonfarm719.9k▼ 3.6%▼ 9.7% (-77.1k)
Manufacturing1.0k▼ 9.1%▼ 23.1% (-0.3k)
Retail trade19.8k▲ 0.5%▼ 14.3% (-3.3k)

Power and data industries, 2019 to 2025

IndustryJobs 2019Jobs 2025ChangeAverage pay 2025
Data processing and hosting1,1891,653▲ 39.0%$258,622
Electrical contractors1,8582,324▲ 25.1%$96,590
Power and communication line construction—not disclosed——
Electric power generation, transmission, distribution—812—$160,000

Pay ladder, May 2025

OccupationEmploymentMedian annual payMultiple of cashier pay
Cashiers6,060$38,8801.00×
Fast food and counter workers5,500$37,4300.96×
Retail salespersons4,660$38,5000.99×
All occupations701,920$91,5402.35×
Construction laborers2,090$50,0201.29×
Welders280$60,1801.55×
HVAC mechanics400$84,3902.17×
Plumbers and pipefitters1,010$101,0202.60×
Electricians2,440$78,9702.03×
Power-line installers150$101,2402.60×
Construction supervisors1,420$86,5202.23×
Electrical engineers330$143,0003.68×

County-level contractor jobs and pay are in the county record above.

Economy

What the data center industry adds to District of Columbia

7,730
Direct data center jobs (2024)
18,610
Total jobs supported, in state
$4.4B
Total GDP contribution
2.3%
Share of state GDP
$0.3B
State and local taxes

PwC figures are modeled estimates commissioned by the industry.

Policy

The rules and the pipeline in the District of Columbia

State measures 0

No state-level measures on record.

Delay Watchlist projects 0

No projects on the Delay Watchlist.

Local moratoria and restrictions (0) appear by county and city in the county-by-county section. Counts include every status in the weekly tracker feeds as of October 5, 2026. The District of Columbia Data Center Map page counts only active local pauses and delayed or blocked projects as of its September 2 rebuild, so its figures are lower. The difference is one of definition and date.

Nearby states

The the District's neighbors

Questions

District of Columbia power, answered from the record

How much new power generation is planned in the District of Columbia?

EIA's August 2026 inventory lists 6 MW of planned generators in the District of Columbia, 6 MW of it under construction or built. By capacity the pipeline is natural gas 100%. The largest single unit is CHP Plant (6 MW, Howard University). Owners plan to retire 0 MW from 2026 to 2030.

Who runs the power grid in the District of Columbia?

PJM serves most of the District of Columbia as the regional wholesale market and grid operator. No data center load is tracked in its queues yet.

Are electricity prices rising in the District of Columbia?

Residential electricity averaged 24.66¢/kWh from January to July 2026, +17.8% on a year earlier, the fastest increase of 51. Commercial sales, the class that includes data centers, changed -3.1%.

How much do data centers add to the District of Columbia economy?

PwC's 2026 study for the Data Center Coalition credits the industry with 18,610 in-state jobs, $4.4B of GDP (2.3% of the state economy, 15th of 51) and $0.3B in state and local taxes in 2024. These are modeled estimates commissioned by the industry.

What do electricians earn in the District of Columbia?

The median electrician in the District of Columbia earned $78,970 in May 2025, 2.03 times the median cashier, and power-line installers earned $101,240 (BLS OEWS).

Which counties in the District of Columbia have the most planned generation?

By planned nameplate capacity: District of Columbia (6 MW).

Where are the data centers in the District of Columbia?

9 data centers run by 7 operators are identified in the District of Columbia. The largest clusters are in the District of Columbia (9).

Does District of Columbia have a data center moratorium?

No. The SAVRN Moratorium Tracker holds no state or local data center measure for the District of Columbia as of the latest weekly feed.

Across SAVRN

District of Columbia across the SAVRN trackers

Sources

Sources for this page

Every figure links to its original source through the Sources buttons. Values marked derived are calculated from reported figures.