SAVRN
Search Contact SAVRN
Colocation pricing

Sources and method

Every figure behind colocation pricing by market, and how the pieces are combined. Power stacks are for a 25 MW load at 85% load factor, served at the highest voltage each tariff offers, read Oct 10, 2026.

Method

How the index is built

  1. Base rent. JLL North America 1-5 MW asking bands for each market (plus electricity), moved to year-end 2025 levels (+6.4%). Deployment size (racks x kW) sets JLL's national size ratio: under 1 MW x1.20, 1-5 MW x1.00, 5-20 MW x0.93, 20 MW+ x0.84.
  2. Two engines. High-density colo (30-100 kW) phases the cooling premium in from 0% for air to 15% for liquid-ready racks and carries an air-cooling PUE penalty below 60 kW. AI factory (150-250 kW) is direct-to-chip throughout: premium 18-25%, fit-out $2.2-3.0M per MW, and warm-water cooling that trims PUE at the top end. Premiums follow broker ladders (+10-30%); fit-out follows Core Scientific, JLL and IREN filings.
  3. Power. Delivered retail cost per kWh x 730 h x PUE. The delivered cost is built for a 25 MW load at 85% load factor from the serving utility's current tariff: energy and fuel, capacity or generation demand, transmission, distribution, riders, and taxes billed on the power bill. In retail-choice markets (Texas, Illinois, Ohio) energy is the grid operator's 2025 zone price and capacity is the cleared auction price. Each stack is compared with EIA's state average and with prices printed in SEC filings; gaps over 15% are flagged with the reason. PUE = market climate band (hours above 95°F) + density adjustment.
  4. Term. Rent and add-ons escalate 3% a year; power is held at the year-1 rate.
Power

Power tariff sources by market

MarketUtility and scheduleDelivered, per kWhRead from
Northern VirginiaDominion Energy VirginiaSchedule GS-4, transmission voltage, rates effective Jan 1, 20269.95¢Dominion Schedule GS-4
Dominion consumption tax sheet
Virginia data center electricity tax (Williams Mullen, Jul 1, 2026)
ChicagoComEd delivery plus hourly wholesale supplyRate RDS, High Voltage Delivery Class (69 kV and above), 20267.50¢PJM State of the Market 2025, zonal prices
ComEd ratebook
PJM 2027/28 capacity auction report
Columbus, OHAEP Ohio delivery plus wholesale supplySchedule DCT (data center tariff), transmission voltage, sheets effective Aug 28, 20267.98¢AEP Ohio tariff book, Oct 2026
PJM State of the Market 2025, zonal prices
PJM network transmission rates, Aug 2026
Dallas-Fort WorthOncor delivery plus ERCOT North supplyOncor Rate 6.1.1.1.7 Transmission Service, base rates Jun 1, 2026; riders Oct 4, 20265.09¢ERCOT State of the Market 2025 (Potomac Economics)
Oncor Tariff for Retail Delivery Service
West Texas AI campus (Abilene / Midland)AEP Texas (Abilene) plus ERCOT West supplyAEP Texas Rate 6.1.1.1.5 Transmission Voltage Service, tariff effective Sep 29, 20265.54¢ERCOT State of the Market 2025 (Potomac Economics)
AEP Texas tariffs
West Texas AI campus (Abilene / Midland)Oncor (Midland / Odessa) plus ERCOT West supplyOncor Rate 6.1.1.1.7 Transmission Service, base rates Jun 1, 2026; riders Oct 4, 20265.61¢ERCOT State of the Market 2025 (Potomac Economics)
Oncor Tariff for Retail Delivery Service
AtlantaGeorgia PowerPower and Light Large (PLL-19) with fuel, environmental and franchise riders, Jun 20269.46¢Georgia Power PLL tariff
Georgia Power fuel cost recovery
Charlotte, NCDuke Energy CarolinasSchedule OPT-V, transmission service, Jan 1, 2026; riders Sep 1, 20267.09¢Duke Energy Carolinas Schedule OPT-V
Duke Energy Carolinas rider summary
Portland / HillsboroPortland General ElectricSchedule 96, Data Center Standard Service (20 MW and above), effective Jul 8, 202611.53¢PGE Schedule 96
Oregon PUC Order 26-154 (UM 2377)
PhoenixArizona Public ServiceRate Schedule E-35, Extra Large Time of Use, transmission voltage; adjustors as of 20268.36¢APS Rate Schedule E-35
PhoenixSalt River ProjectE-67 Large Load Substation price plan (required for new loads of 20 MW and above since Nov 2025)8.26¢SRP E-67 ratebook
Reno, NVNV Energy North (Sierra Pacific Power)Schedule GS-4, Large Transmission Service; fuel riders from Jul 1, 20267.82¢NV Energy Schedule GS-4 (North)
Salt Lake CityRocky Mountain PowerSchedule 9, General Service High Voltage6.84¢Rocky Mountain Power Schedule 9
Silicon ValleySilicon Valley Power (Santa Clara)Schedule CB-6, large combined service at 60 kV, effective Jan 1, 202615.93¢Silicon Valley Power rates
Silicon ValleyPG&E (outside Santa Clara)Schedule B-20, transmission voltage, bundled, effective Mar 1, 202615.83¢PG&E Schedule B-20
Los Angeles / SoCalSouthern California EdisonSchedule TOU-8 Option D, above 50 kV, bundled, effective Oct 1, 202613.09¢SCE tariff books
Los Angeles / SoCalLADWP (City of Los Angeles)Schedule A-3, subtransmission (34.5 kV), calendar 2026 average of adjustment factors27.25¢LADWP electric rates and adjustment factors
Imperial Valley, CAImperial Irrigation DistrictSchedule LL (large load, adopted Sep 15, 2026); priced by proxy on Schedule A-214.36¢IID large-load customers
North Dakota (Ellendale)Montana-Dakota UtilitiesRate 45, High Density Contracted Demand Response (contract pricing confidential)8.18¢MDU Rate 45
MISO 2026/27 capacity auction
U.S. averageAll U.S. utilitiesEIA national average, industrial customers, 2026 through July9.03¢EIA Electric Power Monthly, Table 5.6.B
Filings

Power prices printed in SEC filings

Back to colocation pricing by market