Talino: 50 MW per phase, 500 MW at full build-out
Concept stage · national, institutional and enterprise partners invitedTalino is a proposed AI factory campus in Laguna, Philippines: industrial-scale compute powered on site, with data that stays in the country, and a training institute that prepares the local team to run it. It grows one identical 50 MW phase at a time, ten phases to 500 MW. SAVRN builds, powers, operates and takes it to market.
- Per phase
- 50 MW
- Phases over time
- 10
- At full build-out
- 500 MW
- Institute departments
- 8
What is planned
- ConceptA master plan laid out for all ten phases.
- DesignOne repeatable block design, no redesign between phases.
- WorkforceAn eight-department institute planned on campus.
- DeliverySAVRN responsible for build, power, operations and go-to-market.
- Scale50 MW per phase, 500 MW at full build-out.
The power plan
Talino is planned as a self-powered campus: generation is built and firmed on site with each phase, so the campus does not compete with the community for grid capacity or water.
- Onsite generationBehind-the-meter power generated and firmed on the campus, added phase by phase.
- Islanded designEach phase stands on its own power rather than leaning on the local grid.
- Sized for the full buildPower, cooling and roads are laid out from day one for all ten phases.
Built block by block
The campus
Talino is a concept for discussion. Renderings and figures are illustrative and subject to power, structural and feasibility study.
| Location | Laguna province, Luzon, Philippines |
|---|---|
| Compute | Factory-built, liquid-cooled modular blocks, identical in every phase |
| Data residency | Compute and data stay in the Philippines, ready for regulated and national workloads |
| Institute | An eight-department training institute that prepares local residents to run the campus |
| Delivery | Built, powered, operated and taken to market by SAVRN |
| Status | Concept stage, subject to feasibility study |
Engage Talino
For national, institutional and enterprise partners: talk to SAVRN about phase one.
Screening and planning figures are subject to confirmation in diligence. Gross MW includes cooling and facility load. Market: Philippines.
Other available sites
A 100-acre site south of Dallas with natural gas at or near the site and fiber access, built out to 300 MW gross with onsite turbines or fuel cells.
View the Mountain Creek profile →An Imperial Valley site with biomass power already on site, 100 MW of solar and 100 MW of storage, 300 MW gross in phase one and 1.8 GW at full build.
View the IVDC profile →