MISO runs most of Michigan's grid. 5,249 MW of new generation is planned in Michigan, 3,527 MW of it under construction or built and awaiting operation, against 4,596 MW of planned retirements through 2030. 59 data centers are identified in the state. Residential electricity averaged 21.53¢/kWh in 2026 through July, +8.8% from a year earlier. Unemployment was 5.0% in August 2026, and construction employment is +14.5% against August 2019. The SAVRN trackers hold 91 local moratoria or restrictions for Michigan across all statuses (81 in force) and 10 named projects on the Delay Watchlist.

Rebuilt 2026-10-08 · refreshed weekly
Grid operator
MISO
main wholesale grid
Planned generation
5.2 GW
3.5 GW under construction or built
Data center load in queues
—
59 data centers identified
Residential price
21.53¢
▲ 8.8% vs 2025, YTD July
Construction jobs
+14.5%
▲ 14.5% vs Aug 2019
Local measures
91
81 in force · 10 on Delay Watchlist
The finding

What the build-out changed in Michigan

Michigan is in the middle of the pack, with a few sharp signals worth watching. Power and communication line construction jobs grew 30.8% from 2019 to 2025 (15th of 44). Electrical contractor jobs, the trade every data center, substation and plant needs first, grew 23.2% from 2019 to 2025, 19th in the country. The data center industry now accounts for 1.9% of Michigan's economy, the 23rd largest share of any state (the median state is 1.8%), counting the industry's in-state suppliers and payrolls. Pushback is organized: the SAVRN trackers hold 91 local moratoria or restrictions in Michigan, 3rd in the country. Factory employment is the exception: manufacturing jobs are -7.3% against August 2019.

Then and now

MeasureThenNowChangeU.S. rank
Construction jobs (Aug 2019 → Aug 2026)174.0k199.2k▲ 14.5%24th of 48
Electrical contractor jobs (2019 → 2025)22,91728,239▲ 23.2%19th of 48
Power line construction jobs (2019 → 2025)5,2456,861▲ 30.8%15th of 44
Data processing and hosting jobs (2019 → 2025)7,47010,066▲ 34.8%24th of 46
Unemployment rate (Feb 2020 → Aug 2026)3.8%5.0%▲ 1.2pts—
Residential price, ¢/kWh (YTD Jul 2025 → 2026)19.78¢21.53¢▲ 8.8%18th of 51
Generation fleet → planned additions35.8 GW operating5.2 GW planned15% of fleet26th of 51

Where Michigan ranks among 51

Data center share of state GDP1.9%23rd of 51
Announced data center capital$23.4B19th of 31
Planned generation vs. today's fleet15%26th of 51
Construction jobs vs. 2019+14.5%24th of 48
Electrical contractor jobs, 2019 to 2025+23.2%19th of 48
Power line construction jobs, 2019 to 2025+30.8%15th of 44
Data processing and hosting jobs, 2019 to 2025+34.8%24th of 46
Commercial electricity sales, YTD change-0.1%37th of 51
Residential electricity price, YTD change+8.8%18th of 51
Local moratoria and restrictions913rd of 49

1st = the most. Ranks cover every state and DC that publishes the figure.

Regionally, Indiana leads on power line construction jobs, 2019 to 2025 at +51.4%; Michigan is 2nd of 4 in its neighborhood at +30.8%.

County spotlight

Oakland County holds the most data centers on record in Michigan (19), and its electrical contractor workforce changed +45.5% since 2019 to 6,675 jobs. The largest share of planned generation sits in Calhoun County: 1,500 MW, led by Consumers Energy Co - (MI) (natural gas). The fastest-growing electrical trade market is Isabella County, where contractor jobs grew 58.6% to 655.

The map

Where Michigan sits in the power system

Grid operator
MISO
Operating capacity
35.8 GW
Planned generation
5,249 MW
Under construction or built
3,527 MW
Data centers identified
59
Data center load in queues
—
Unemployment, Aug 2026
5.0%
Residential price change
+8.8%

Neighboring states are shaded. Select one to open its page.

Counties and cities

Michigan, county by county

83 counties in Michigan. Planned generation sits in 25 of them, data centers stand in 11, and local measures are on record in 7. Pick a layer, then select a county for its full record.

Lapeer CountyNewaygo CountyIsabella CountySanilac CountyManistee CountyOgemaw CountyClare CountyCrawford CountyMontmorency CountyGladwin CountyOscoda CountyClinton CountyBranch CountyGratiot CountyIonia CountyKalamazoo CountyLake CountyMason CountyMecosta CountyMuskegon CountyOtsego CountyRoscommon CountyWashtenaw CountyBarry CountyMenominee CountyMidland CountyLuce CountyAntrim CountyJackson CountySt. Joseph CountyOsceola CountySaginaw CountyHillsdale CountyArenac CountyKalkaska CountyBay CountyAlpena CountyGogebic CountyDickinson CountyMissaukee CountyMontcalm CountyBaraga CountyOceana CountyAlger CountyHoughton CountyIngham CountyIron CountyOttawa CountyGrand Traverse CountyLivingston CountySt. Clair CountyWayne CountyCass CountyKent CountyCharlevoix CountyLenawee CountyChippewa CountyMackinac CountySchoolcraft CountyBenzie CountyEmmet CountyMonroe CountyShiawassee CountyTuscola CountyHuron CountyAlcona CountyMarquette CountyIosco CountyOntonagon CountyMacomb CountyGenesee CountyVan Buren CountyPresque Isle CountyCheboygan CountyDelta CountyBerrien CountyAllegan CountyLeelanau CountyKeweenaw CountyOakland CountyEaton CountyCalhoun CountyWexford County

County leaders

Most planned generation
Calhoun Countynatural gas1,500 MW
Sanilac Countysolar539 MW
Montcalm Countysolar300 MW
Wayne Countybattery storage237 MW
Jackson Countysolar225 MW
Kalamazoo Countysolar220 MW
Midland Countysolar206 MW
Ionia Countywind200 MW
Fastest electrical contractor growth
Isabella County655 jobs+58.6%
Oakland County6,675 jobs+45.5%
Genesee County824 jobs+34.9%
Wayne County3,464 jobs+31.5%
Macomb County2,760 jobs+19.9%
Clinton County534 jobs+17.6%
Kalamazoo County769 jobs+15.3%
Ingham County500 jobs+15.2%

Counties on record 53

CountyData centersPlanned MWBuilding MWLead developerElectrical contractor jobsChange 2019–25Local measuresWatchlist
Oakland County19———6,675▲ 45.5%——
Wayne County10237 MW237 MWDTE Electric Company3,464▲ 31.5%——
Kent County10———2,628▲ 5.7%—2
Eaton County5———209▲ 30.6%——
Washtenaw County4100 MW100 MWVoyager Energy Storage LLC———2
Genesee County3———824▲ 34.9%——
Cass County2150 MW—Clenera DevCo LLC16▼ 57.9%2 (2 in force)—
Kalamazoo County1220 MW220 MWConsumers Energy Co - (MI)769▲ 15.3%——
Monroe County1100 MW100 MWDTE Electric Company————
Macomb County1———2,760▲ 19.9%1 (1 in force)—
Houghton County1———91▲ 56.9%——
Calhoun County—1,500 MW500 MWConsumers Energy Co - (MI)——1 (1 in force)1
Sanilac County—539 MW539 MWDTE Electric Company27▲ 17.4%——
Montcalm County—300 MW300 MWFreshwater Solar LLC104▼ 21.8%——
Jackson County—225 MW125 MWGeronimo Power————
Midland County—206 MW206 MWDTE Electric Company————
Huron County—200 MW200 MWDTE Electric Company82▼ 18.8%2 (2 in force)—
Ionia County—200 MW—Tupper Lake55———
Arenac County—175 MW175 MWDTE Electric Company18———
Marquette County—150 MW—Invenergy Services LLC————
Presque Isle County—150 MW150 MWDTE Electric Company————
Gladwin County—145 MW145 MWDTE Electric Company184▲ 17.9%——
Saginaw County—120 MW—Eagle Creek Solar Park LLC219▼ 17.7%——
Oceana County—120 MW120 MWHart Solar Partners, LLC75▲ 53.1%——
Branch County—100 MW100 MWDTE Electric Company56▲ 9.8%——
Van Buren County—85 MW85 MWMurch Solar, LLC————
Bay County—80 MW80 MWConsumers Energy Co - (MI)217▲ 29.9%——
Lenawee County—80 MW80 MWDTE Electric Company————
Gratiot County—50 MW50 MWDTE Electric Company————
Ingham County—15 MW15 MWMichigan State University500▲ 15.2%——
Barry County—2 MW—NAPS - Hastings LLC83▲ 69.4%——
Ottawa County————888▲ 15.0%——
Muskegon County————716▲ 3.8%——
Isabella County————655▲ 58.6%——
Clinton County————534▲ 17.6%1 (1 in force)—
Grand Traverse County————374———
St. Clair County————254———
Lapeer County————130▼ 7.8%——
Alpena County————73———
Charlevoix County————66———
Antrim County————63———
Clare County————56▲ 21.7%——
Cheboygan County————53▲ 140.9%——
Chippewa County————49▲ 36.1%——
Roscommon County————45▲ 66.7%——
Benzie County————31▲ 47.6%——
Manistee County————20▲ 53.8%——
Menominee County————17▼ 5.6%——
Iosco County————16▼ 38.5%——
Ogemaw County————10▲ 25.0%——
Kalkaska County———————1
Livingston County——————1 (1 in force)—
Delta County——————1 (1 in force)—

Every county in Michigan 83

Each county has its own page: power plants, utilities and prices, jobs since 2019, data centers, local rules and its neighbors.

Alcona CountyHarrisville Township, Greenbush TownshipAlger CountyMunising Township, MunisingAllegan CountyHolland, Dorr TownshipAlpena CountyAlpena, Alpena TownshipAntrim CountyMancelona Township, Elk Rapids TownshipArenac CountyDeep River Township, Standish TownshipBaraga CountyL'Anse Township, Baraga TownshipBarry CountyThornapple Township, HastingsBay CountyBay City, Bangor TownshipBenzie CountyAlmira Township, Benzonia TownshipBerrien CountyLincoln Township, Niles TownshipBranch CountyColdwater, Quincy TownshipCalhoun CountyBattle Creek, Emmett TownshipCass CountyOntwa Township, Howard TownshipCharlevoix CountyBoyne City, CharlevoixCheboygan CountyCheboygan, Benton TownshipChippewa CountySault Ste. Marie, Kinross TownshipClare CountyHayes Township, Surrey TownshipClinton CountyDeWitt Township, Bath TownshipCrawford CountyGrayling Township, GraylingDelta CountyEscanaba, GladstoneDickinson CountyIron Mountain, Breitung TownshipEaton CountyDelta Township, CharlotteEmmet CountyBear Creek Township, PetoskeyGenesee CountyFlint, Grand Blanc TownshipGladwin CountyGladwin, Tobacco TownshipGogebic CountyIronwood, Ironwood TownshipGrand Traverse CountyGarfield Township, Traverse CityGratiot CountyAlma, St. LouisHillsdale CountyHillsdale, Somerset TownshipHoughton CountyHoughton, Calumet TownshipHuron CountyBad Axe, Sebewaing TownshipIngham CountyLansing, East LansingIonia CountyIonia, Boston TownshipIosco CountyOscoda Township, Plainfield TownshipIron CountyIron River, Crystal Falls TownshipIsabella CountyMount Pleasant, Union TownshipJackson CountyJackson, Blackman TownshipKalamazoo CountyKalamazoo, PortageKalkaska CountyKalkaska Township, Clearwater TownshipKent CountyGrand Rapids, WyomingKeweenaw CountyAllouez TownshipLake CountyWebber Township, Pleasant Plains TownshipLapeer CountyLapeer, Mayfield TownshipLeelanau CountyElmwood Township, Suttons Bay TownshipLenawee CountyAdrian, TecumsehLivingston CountyHamburg Township, Genoa TownshipLuce CountyPentland Township, McMillan TownshipMackinac CountySt. Ignace, Clark TownshipMacomb CountyWarren, Sterling HeightsManistee CountyManistee, Manistee TownshipMarquette CountyMarquette, Forsyth TownshipMason CountyLudington, Hamlin TownshipMecosta CountyBig Rapids, Morton TownshipMenominee CountyMenominee, Menominee TownshipMidland CountyMidland, Larkin TownshipMissaukee CountyLake Township, Richland TownshipMonroe CountyBedford Township, Frenchtown TownshipMontcalm CountyGreenville, Bloomer TownshipMontmorency CountyAlbert Township, Hillman TownshipMuskegon CountyMuskegon, Norton ShoresNewaygo CountyFremont, Brooks TownshipOakland CountyTroy, Farmington HillsOceana CountyShelby Township, Grant TownshipOgemaw CountyMills Township, West Branch TownshipOntonagon CountyOntonagon Township, OntonagonOsceola CountyReed City, Hersey TownshipOscoda CountyBig Creek Township, Comins TownshipOtsego CountyBagley Township, GaylordOttawa CountyGeorgetown Township, Holland TownshipPresque Isle CountyRogers City, Presque Isle TownshipRoscommon CountyDenton Township, Roscommon TownshipSaginaw CountySaginaw, Saginaw TownshipSanilac CountyLexington Township, Worth TownshipSchoolcraft CountyManistique, Hiawatha TownshipShiawassee CountyOwosso, Owosso TownshipSt. Clair CountyPort Huron, Fort Gratiot TownshipSt. Joseph CountySturgis, Three RiversTuscola CountyCaro, Millington TownshipVan Buren CountyAntwerp Township, Paw Paw TownshipWashtenaw CountyAnn Arbor, Ypsilanti TownshipWayne CountyDetroit, DearbornWexford CountyCadillac, Haring Township

Cities and towns on record 98

City or townCountyData centersLocal measuresWatchlistLatest record
SouthfieldOakland County14———
DetroitWayne County61 (0 in force)—Proposed local moratorium on data centers Proposed
Grand RapidsKent County5———
LansingIngham County + Eaton County31 (1 in force)—182-day data center moratorium In force
TroyOakland County3———
Ann ArborWashtenaw County2———
Saline TownshipWashtenaw County2———
HoughtonHoughton County11 (1 in force)—Local moratorium on data centers through July 9, 2027 In force
Auburn HillsOakland County1———
CassopolisCass County1———
DowagiacCass County1———
Gaines Charter Township—1———
KentwoodKent County1———
Lowell Charter Township—1———
Royal OakOakland County1———
SouthgateWayne County1———
Van Buren TownshipWayne County1———
WestlandWayne County1———
YpsilantiWashtenaw County—2 (1 in force)160-day emergency moratorium on data center zoning permits Proposed
Howell TownshipLivingston County—1 (1 in force)1Local moratorium on data center approvals In force
Allen ParkWayne County—1 (0 in force)—Proposed local moratorium on data centers Proposed
Allendale TownshipOttawa County—1 (1 in force)—Local moratorium on data centers through June 8, 2027 In force
Ann Arbor TownshipWashtenaw County—1 (1 in force)—Ann Arbor Township data center moratorium In force
Armada TownshipMacomb County—1 (1 in force)—Local moratorium on data center approvals In force
Big Rapids Charter Township——1 (1 in force)—Local moratorium on data centers through February 23, 2027 In force
Big Rapids TownshipMecosta County—1 (1 in force)—Local moratorium on data center approvals In force
Brighton TownshipLivingston County—1 (1 in force)—Michigan Data Centers: The Weekly Download In force
Caledonia TownshipAlcona County—1 (0 in force)—Expired local moratorium on data centers through July 1, 2026 Failed / vetoed
City of PortageKalamazoo County—1 (1 in force)—City of Portage data center moratorium In force
Clark TownshipMackinac County—1 (1 in force)—Local moratorium on data center approvals In force
Comstock Charter Township——1 (1 in force)—One-year data center moratorium (Ordinance 565) In force
DearbornWayne County—1 (1 in force)—Six-month data center moratorium In force
Dexter TownshipWashtenaw County—1 (1 in force)—Dexter Township data center moratorium In force
Dundee TownshipMonroe County—1 (1 in force)—Local moratorium on data center approvals In force
East LansingIngham County + Clinton County—1 (1 in force)—Local moratorium on data centers through March 17, 2027 In force
Elmwood TownshipLeelanau County—1 (1 in force)—Elmwood Township data center moratorium In force
Erie TownshipMonroe County—1 (1 in force)—Erie Township data center moratorium In force
Filer TownshipManistee County—1 (1 in force)—Local moratorium on data centers through June 2, 2027 In force
FlintGenesee County—1 (1 in force)—12-month data center moratorium In force
Forsyth TownshipMarquette County—1 (1 in force)—Local moratorium on data centers through June 25, 2027 In force
Garfield TownshipBay County—1 (1 in force)—One-year moratorium on data centers and cryptocurrency mining In force
Genoa TownshipLivingston County—1 (1 in force)—Local moratorium on data centers In force
GibraltarWayne County—1 (1 in force)—Gibraltar data center moratorium In force
Grand Blanc TownshipGenesee County—1 (1 in force)—Local moratorium on data center approvals In force
Green Charter Township——1 (1 in force)—Local moratorium on data center approvals In force
Hagar TownshipBerrien County—1 (1 in force)—Local moratorium on data centers for a stated term In force
Haring TownshipWexford County—1 (1 in force)—Local moratorium on data centers through January 14, 2027 In force
HartOceana County—1 (1 in force)—Local moratorium on data centers through November 26, 2026 In force
Hayes TownshipCharlevoix County—1 (1 in force)—Local moratorium on data center approvals In force
KalamazooKalamazoo County—1 (1 in force)—One-year data center moratorium In force
Lenox TownshipMacomb County—1 (1 in force)—Local moratorium on data center approvals In force
Lincoln TownshipArenac County—1 (1 in force)—Local moratorium on data centers through April 11, 2027 In force
Lodi TownshipWashtenaw County—1 (1 in force)—Local moratorium on data center approvals In force
Lowell TownshipKent County—1 (0 in force)—Six-month data center moratorium voted down Failed / vetoed
Lyndon TownshipWashtenaw County—1 (1 in force)—Local moratorium on data centers through May 22, 2027 In force
Lyon Charter Township——1 (0 in force)—Expired local moratorium on data centers through August 30, 2026 Failed / vetoed
Lyon TownshipOakland County—1 (1 in force)—Lyon Township data center moratorium In force
Manchester TownshipWashtenaw County—1 (1 in force)—Local moratorium on data center approvals In force
MasonIngham County—1 (0 in force)—Data center moratorium lifted after zoning adopted Failed / vetoed
Meridian TownshipIngham County—1 (1 in force)—Six-month data center and battery storage moratorium In force
Mich. City——1 (0 in force)—Mich. City Says Data Center Moratorium Suit Is Premature Paused
Michigan city——1 (1 in force)—Mich. City Says Data Center Moratorium Suit Is Premature In force
New Buffalo TownshipBerrien County—1 (1 in force)—New Buffalo Township data center moratorium In force
NorthvilleOakland County + Wayne County—1 (1 in force)—Local moratorium on data center approvals In force
Orion TownshipOakland County—1 (1 in force)—Six-month data center moratorium In force
Oshtemo TownshipKalamazoo County—1 (1 in force)—Oshtemo Township data center moratorium In force
Parma TownshipJackson County—1 (1 in force)—Local moratorium on data centers In force
Pittsfield TownshipWashtenaw County—1 (1 in force)—Local moratorium on data center approvals In force
PontiacOakland County—1 (1 in force)—Six-month data center moratorium In force
Port Huron TownshipSt. Clair County—1 (1 in force)—Temporary data center moratorium In force
Porter TownshipCass County—1 (1 in force)—Local moratorium on data centers through May 19, 2027 In force
Prairieville TownshipBarry County—1 (1 in force)—One-year data center moratorium (Ordinance 187) In force
Rochester HillsOakland County—1 (1 in force)—Local moratorium on data centers through March 15, 2027 In force
SaginawSaginaw County—1 (1 in force)—Local moratorium on data center approvals In force
SalineWashtenaw County—1 (1 in force)—Local moratorium on data center approvals In force
Saugatuck TownshipAllegan County—1 (0 in force)—Expired local moratorium on data centers through August 11, 2026 Failed / vetoed
Sault Ste. Marie Tribe of Chippewa Indians——1 (1 in force)—Local moratorium on data centers with no end date In force
Solon TownshipKent County—1 (1 in force)—Local moratorium on data center approvals In force
South LyonOakland County—1 (1 in force)—Local moratorium on data center approvals In force
Springfield TownshipKalkaska County—1 (1 in force)—180-day data center moratorium In force
Sterling HeightsMacomb County—1 (1 in force)—One-year data center moratorium In force
Sylvan TownshipOsceola County—1 (1 in force)—Local moratorium on data center approvals In force
TaylorWayne County—1 (1 in force)—Local moratorium on data center approvals In force
Texas TownshipKalamazoo County—1 (1 in force)—Local moratorium on data centers through July 5, 2027 In force
Tyrone TownshipKent County—1 (1 in force)—Local moratorium on data center approvals In force
Village of RomeoMacomb County—1 (1 in force)—Local moratorium on data center approvals In force
Washington TownshipGratiot County—1 (1 in force)—Local moratorium on data centers through November 23, 2026 In force
Waterford TownshipOakland County—1 (1 in force)—Temporary data center moratorium (Ord. 2026-Z-003) In force
Webster TownshipWashtenaw County—1 (1 in force)—Local moratorium on data centers through April 21, 2027 In force
Weekly Download. Dearborn City——1 (0 in force)—Michigan Data Centers: The Weekly Download Proposed
Weekly Download. Saginaw City——1 (1 in force)—Saginaw City Council votes 8-0 to approve a data center zoning ordinance In force
WixomOakland County—1 (1 in force)—Moratorium replaced by data center zoning restrictions In force
York TownshipWashtenaw County—1 (1 in force)—Local moratorium on data center approvals In force
Ypsilanti Community Utilities Authority——1 (1 in force)—Ypsilanti Community Utilities Authority (YCUA) data center moratorium In force
Ypsilanti TownshipWashtenaw County—1 (1 in force)—180-day moratorium on major electric utility infrastructure In force
Zeeland TownshipOttawa County—1 (1 in force)—One-year data center and energy facility moratorium In force
Green Township, near Big RapidsAlpena County——1Gotion Green Township Battery/Data Plant (abandoned)
Saline Township Planning Commission———1Stargate / The Barn

Data center counts come from every facility on the SAVRN Data Center Map, counted in the county and the city or community where each building physically stands (Census boundaries), not its mailing address. Jurisdictions appear as the Moratorium Tracker records them.

The chain

Michigan, from generation to the household bill

1Grid operator

Peak load 2025
121 GW
Peak load forecast 2035
163 GW

2Generation pipeline

Operating capacity
35.8 GW
Planned, all types
5,249 MW
Under construction or built
3,527 MW
Planned gas
1,015 MW
Planned retirements 2026–30
4,596 MW
Net firm additions derived
-1,068 MW

3Data center demand

Data centers identified
59
Operators
32
Load in tracked queues
—
Utility large-load projects
3
Commercial sales, YTD change
-0.1%
Industry share of state GDP
1.9%

4Jobs and pay

Unemployment, Aug 2026
5.0% (+0.1 pts y/y)
Construction jobs vs 2019
+14.5%
Manufacturing jobs vs 2019
-7.3%
Electrical contractor jobs 2019–25
+23.2%
Electrician median pay
$76,270
Electrician ÷ cashier pay
2.56×

5Household bill

Residential price, YTD Jul 2026
21.53¢/kWh
Change vs YTD 2025
+8.8%
All-sector price change
+8.4%
Total retail sales change
+0.1%

6Policy friction

State measures on record
13
Local measures (in force)
91 (81)
Watchlist projects
10
Lawsuits tracked
0
Announced capital, disclosed
$23.4B
Dedicated tax incentive
Yes
Generation

Planned power plants in Michigan

Every planned generator in Michigan in the August 2026 EIA-860M inventory, by technology, then the 15 largest units. Under construction or built covers status codes U, V and TS.

Planned generation by fuel 5,249 MW
Natural gas 1,015 MW 19%Wind 200 MW 4%Solar 3,612 MW 69%Battery storage 420 MW 8%Other 2 MW <1%
Under construction or built 3,527 MW
Natural gas 15 MW <1%Solar 3,192 MW 91%Battery storage 320 MW 9%
TechnologyUnitsPlanned MWUnder construction or built
Solar263,612 MW3,192 MW
Natural gas31,015 MW15 MW
Battery storage3420 MW320 MW
Wind1200 MW—
Other12 MW—

Largest planned generators

PlantCountyTechnologyMWStatusYearOwner
MEC SouthCalhounNatural Gas Fired Combined Cycle500 MWApprovals pending2034MEC South
MEC NorthCalhounNatural Gas Fired Combined Cycle500 MWApprovals received2034MEC North
Sunfish Solar 2CalhounSolar Photovoltaic360 MWUnder construction (≤50%)2026Consumers Energy Co - (MI)
Trenton Channel Energy CenterWayneBatteries220 MWUnder construction (>50%)2026DTE Electric Company
Liberty Solar Energy CenterKalamazooSolar Photovoltaic220 MWUnder construction (≤50%)2027Consumers Energy Co - (MI)
Poseyville Solar ParkMidlandSolar Photovoltaic206 MWUnder construction (≤50%)2028DTE Electric Company
Tupper Lake WindIoniaOnshore Wind Turbine200 MWApprovals pending2029Tupper Lake
Deckerville Solar ParkSanilacSolar Photovoltaic200 MWUnder construction (≤50%)2028DTE Electric Company
Silver Creek Solar ParkHuronSolar Photovoltaic200 MWUnder construction (≤50%)2028DTE Electric Company
Freshwater Solar, LLCMontcalmSolar Photovoltaic200 MWUnder construction (≤50%)2027Freshwater Solar LLC
Peatville Solar ParkSanilacSolar Photovoltaic185 MWUnder construction (≤50%)2028DTE Electric Company
Au Gres Solar ParkArenacSolar Photovoltaic175 MWUnder construction (≤50%)2028DTE Electric Company
Watertown SolarSanilacSolar Photovoltaic154 MWUnder construction (≤50%)2027Watertown Solar, LLC
Little Trout SolarPresque IsleSolar Photovoltaic150 MWUnder construction (>50%)2026DTE Electric Company
Superior Solar Project, LLCMarquetteSolar Photovoltaic150 MWPlanned, approvals not started2028Invenergy Services LLC
Supply chain

What the Michigan build-out runs on

Who is building generation in Michigan, which manufacturers and contractors have a plant, expansion or contract recorded here, and how long the critical equipment takes to arrive.

Developers and owners with planned generation

Developer or ownerUnitsPlanned MWBuilding MWMain technologyCounties
DTE Electric Company141,828 MW1,828 MWSolar11
Consumers Energy Co - (MI)4800 MW800 MWSolar3
MEC South1500 MW—Natural gas1
MEC North1500 MW—Natural gas1
Tupper Lake1200 MW—Wind1
Freshwater Solar LLC1200 MW200 MWSolar1
Watertown Solar, LLC1154 MW154 MWSolar1
Clenera DevCo LLC1150 MW—Solar1
Invenergy Services LLC1150 MW—Solar1
Geronimo Power1125 MW125 MWSolar1
Hart Solar Partners, LLC1120 MW120 MWSolar1
Eagle Creek Solar Park LLC1120 MW—Solar1
Grand Basin Energy Storage, LLC1100 MW—Battery storage1
Freshwater Solar II, LLC1100 MW100 MWSolar1
Voyager Energy Storage LLC1100 MW100 MWBattery storage1

Manufacturers and contractors with a recorded Michigan footprint

No plant, expansion or contract in the manufacturer record names Michigan. The national suppliers below serve every state.

Order-by check derived

4 of the 7 planned units of 50 MW or more in Michigan that are not yet under construction (520 of 1,720 MW) are past the date their step-up transformer had to be ordered to meet the planned in-service date. These units hold their schedules only if the equipment is already on order.

PlantTechnologyMWPlanned in serviceTransformer order-byTurbine order-byOwner
Gemstone Solar LLCSolar150 MWOct 2028Sep 2025—Clenera DevCo LLC
Superior Solar Project, LLCSolar150 MWDec 2028Nov 2025—Invenergy Services LLC
Eagle Creek Solar Park LLCSolar120 MWMar 2027Feb 2024—Eagle Creek Solar Park LLC
Grand Basin Energy StorageBattery storage100 MWMar 2027Feb 2024—Grand Basin Energy Storage, LLC

Lead times, OEM backlogs and the national generation and grid contractors are on the national supply chain section.

Demand

Data center and large-load demand in Michigan

59 data centers run by 32 operators are identified in Michigan. The full list by city is on the Michigan Data Center Map page. Utilities report 3 large customer projects here to EEI.

UtilityCustomer or typeMW statedInvestment stated
Consumers EnergyNot identified1,000 MW—
DTE EnergyOpenAI, Oracle, Related Digital1,400 MW$7 billion
DTE EnergyGoogle2,700 MW$1.7 billion
Jobs and pay

The Michigan jobs report, and who the build-out employs

Median pay, May 2025
Cashiers$29,740
Fast food and counter workers$28,930
Retail salespersons$34,640
All occupations$49,270
Construction laborers$49,590
Welders$49,990
HVAC mechanics$60,850
Plumbers and pipefitters$80,190
Electricians$76,270
Power plant operators$105,820
Power-line installers$106,890
Construction supervisors$78,180
Electrical engineers$106,070
Cashier median: $29,740

Payroll employment, August 2026 (preliminary)

IndustryJobsChange vs Aug 2025Change vs Aug 2019
Total nonfarm4,496.1k▲ 0.2%▲ 1.1% (+47.3k)
Construction199.2k▼ 2.0%▲ 14.5% (+25.2k)
Manufacturing583.3k▼ 0.4%▼ 7.3% (-46.3k)
Mining and logging7.3k▲ 5.8%● 0.0% (+0.0k)
Retail trade454.4k▲ 0.4%▼ 2.0% (-9.5k)

Power and data industries, 2019 to 2025

IndustryJobs 2019Jobs 2025ChangeAverage pay 2025
Data processing and hosting7,47010,066▲ 34.8%$138,764
Electrical contractors22,91728,239▲ 23.2%$91,896
Power and communication line construction5,2456,861▲ 30.8%$105,432
Electric power generation, transmission, distribution—16,503—$158,869
Transformer manufacturing—336—$109,608

Pay ladder, May 2025

OccupationEmploymentMedian annual payMultiple of cashier pay
Cashiers92,930$29,7401.00×
Fast food and counter workers103,130$28,9300.97×
Retail salespersons111,010$34,6401.16×
All occupations4,403,730$49,2701.66×
Construction laborers28,490$49,5901.67×
Welders13,330$49,9901.68×
HVAC mechanics12,590$60,8502.05×
Plumbers and pipefitters14,120$80,1902.70×
Electricians23,530$76,2702.56×
Power plant operators1,220$105,8203.56×
Power-line installers2,800$106,8903.59×
Construction supervisors16,660$78,1802.63×
Electrical engineers10,840$106,0703.57×

County-level contractor jobs and pay are in the county record above.

Economy

What the data center industry adds to Michigan

23,520
Direct data center jobs (2024)
98,030
Total jobs supported, in state
$13.5B
Total GDP contribution
1.9%
Share of state GDP
$1.3B
State and local taxes

PwC figures are modeled estimates commissioned by the industry.

Policy

The rules and the pipeline in Michigan

State measures 13

BillMeasureStatusDate
—Environmentalists push Michigan lawmakers to forge ahead on moratorium and regulations for data centersProposed2026-09
—Environmentalists push lawmakers to forge ahead on moratorium and regulations for data centersProposed2026-09
—Benson, James pitch tariff remedies, business boosts & data center limits at Detroit Economic ClubProposed2026-09
HB 5594-5596 / SB 1018-1020Moratorium on new data center approvalsProposed2026-06
SB 1020Public utilities: public service commission; moratorium on approvals by the Michigan public service commission of any new enterprise data centersProposed2026-06
HB 5396-5398Michigan: ~200-person bipartisan 'People Over Data Centers' rally at the Michigan Capitol (gubernatorial candidate Perry Johnson, Rep. Wegela, Rep. DeSana)Proposed2026-06
SB 1018-1020Michigan: On June 18, 2026 Michigan Senate Democrats introduced a seven-bill package to regulate data centersProposed2026-06
HB 5882Local government: other; requirements for a moratorium imposed by a local unit of government on large-scale data centers or cryptocurrency mining facilitiesProposed2026-04
HB 5595Public utilities: public service commission; moratorium on approvals by the Michigan public service commission of any new enterprise data centersProposed2026-03
HR 240A resolution to urge a temporary pause on discretionary state-level incentives for data center construction, request a comprehensive review of the fiscalProposed2026-02
Michigan (statewide)Michigan: Bipartisan House Bills 5594-5596 would create the 'Data Center Regulation Act' and halt construction of new data centers in Michigan until April 1Proposed2026-02
SB 761-763Michigan Senate Bills 761, 762, and 763 (Sens. Rosemary Bayer D-West Bloomfield, Sue Shink D-Northfield Township, Erika Geiss D-Taylor) introduced DecemberProposed2025-12
HB 5398Property tax: exemptions; general property tax act; reflect repeal of data center tax exemptions. Amends sec. 7ff of 1893 PA 206 (MCL 211.7ff). TIE BARProposed2025-12

Delay Watchlist projects 10

ProjectLocationStatusCauseMW
Saline Township 'The Barn', OpenAI/Oracle Stargate CampusSaline Township, Washtenaw Countyrezoning denied then litigation settledrezoning deniallitigation1,400 MW
Stargate / The BarnSaline Township Planning Commissiondeniedzoning denialpermitwatercommunity opposition1,400 MW
Alterra Development Marshall Data Center (Brooks Industrial Park)Marshall, Calhoun Countymoratorium delaycity moratoriumcommunity opposition1,000 MW
Rocklocker LLC Kalkaska CountyKalkaska Countycancelledinterconnectionwatercommunity opposition1,000 MW
University of Michigan / Los Alamos High-Performance Computing FacilityYpsilanti Township, Washtenaw Countyopposed plannedcommunity oppositioncity council resolution against100 MW
University of Michigan / Los Alamos Data CenterYpsilantidelayedwater disputelocal moratorium—
Microsoft / Franklin Partners Covenant Business Park (Lowell-area township)Township adjacent to Lowell (Kent County)rezoning pausedcommunity oppositionplanning commission postponement—
West Michigan Hyperscale Proposals (Solon, Lowell, Gaines Townships)Solon, Lowell, and Gaines Townships (Kent County)opposed proposedcommunity oppositiontransparency concerns—
Gotion Green Township Battery/Data Plant (abandoned)Green Township, near Big Rapidsabandonedlitigationcommunity oppositionchina ties backlash—
Meta Howell TownshipHowell Townshipcancelledlocal moratoriumcommunity opposition—

Local moratoria and restrictions (91) appear by county and city in the county-by-county section. Counts include every status in the weekly tracker feeds as of October 5, 2026. The Michigan Data Center Map page counts only active local pauses and delayed or blocked projects as of its September 2 rebuild, so its figures are lower. The difference is one of definition and date.

Nearby states

Michigan's neighbors

Questions

Michigan power, answered from the record

How much new power generation is planned in Michigan?

EIA's August 2026 inventory lists 5,249 MW of planned generators in Michigan, 3,527 MW of it under construction or built. By capacity the pipeline is solar 69%, natural gas 19%, battery storage 8%. The largest single unit is MEC South (500 MW, MEC South). Owners plan to retire 4,596 MW from 2026 to 2030.

Who runs the power grid in Michigan?

MISO serves most of Michigan as the regional wholesale market and grid operator. No data center load is tracked in its queues yet.

Which data center projects are delayed in Michigan?

The SAVRN Delay Watchlist names 10 projects in Michigan, among them Saline Township 'The Barn', OpenAI/Oracle Stargate Campus (1,400 MW), Stargate / The Barn (1,400 MW), Alterra Development Marshall Data Center (Brooks Industrial Park) (1,000 MW).

Is planned generation in Michigan on schedule?

4 of 7 planned units of 50 MW or more not yet under construction are past the latest date to order a step-up transformer (more than 160 weeks) for their planned in-service date. They hold schedule only if equipment is already on order.

Are electricity prices rising in Michigan?

Residential electricity averaged 21.53¢/kWh from January to July 2026, +8.8% on a year earlier, the 18th fastest increase of 51. Commercial sales, the class that includes data centers, changed -0.1%.

What do electricians earn in Michigan?

The median electrician in Michigan earned $76,270 in May 2025, 2.56 times the median cashier, and power-line installers earned $106,890 (BLS OEWS).

Is the build-out creating trade jobs in Michigan?

Construction employment is +14.5% against August 2019. Electrical contractor jobs went from 22,917 in 2019 to 28,239 in 2025 (+23.2%, 19th in the country).

Does Michigan have a data center moratorium?

The SAVRN Moratorium Tracker holds 13 state-level measures (0 enacted) and 91 local moratoria or restrictions in Michigan, 81 of them in force, 3rd most in the country.

Across SAVRN

Michigan across the SAVRN trackers

Sources

Sources for this page

Every figure links to its original source through the Sources buttons. Values marked derived are calculated from reported figures.