Power Supply Chain and Demand in New Hampshire

ISO-NE runs most of New Hampshire's grid. 24 MW of new generation is planned in New Hampshire, 24 MW of it under construction or built and awaiting operation, against 459 MW of planned retirements through 2030. 17 data centers are identified in the state. Residential electricity averaged 26.79¢/kWh in 2026 through July, +15.2% from a year earlier. Unemployment was 2.8% in August 2026, and construction employment is +11.4% against August 2019. The SAVRN trackers hold 5 local moratoria or restrictions for New Hampshire across all statuses (3 in force) and 1 named projects on the Delay Watchlist.
What the build-out changed in New Hampshire
New Hampshire is in the middle of the pack, with a few sharp signals worth watching. The data center industry now accounts for 2.4% of New Hampshire's economy, the 12th largest share of any state (the median state is 1.8%), counting the industry's in-state suppliers and payrolls. Commercial electricity sales, the class that includes data centers, are +3.9% year to date, 12th in the country. Data processing and hosting jobs grew 56.3% from 2019 to 2025, 11th of 46 states that disclose the industry. Households pay part of the cost: residential prices are +15.2% year to date, the 2nd fastest increase of 51. Factory employment is the exception: manufacturing jobs are -4.9% against August 2019.
Then and now
| Measure | Then | Now | Change | U.S. rank |
|---|---|---|---|---|
| Construction jobs (Aug 2019 → Aug 2026) | 28.1k | 31.3k | ▲ 11.4% | 29th of 48 |
| Electrical contractor jobs (2019 → 2025) | 3,787 | 4,607 | ▲ 21.7% | 21st of 48 |
| Power line construction jobs (2019 → 2025) | 710 | 874 | ▲ 23.1% | 22nd of 44 |
| Data processing and hosting jobs (2019 → 2025) | 1,324 | 2,070 | ▲ 56.3% | 11th of 46 |
| Unemployment rate (Feb 2020 → Aug 2026) | 2.6% | 2.8% | ▲ 0.2pts | — |
| Residential price, ¢/kWh (YTD Jul 2025 → 2026) | 23.26¢ | 26.79¢ | ▲ 15.2% | 2nd of 51 |
| Generation fleet → planned additions | 4.6 GW operating | 0.0 GW planned | 1% of fleet | 49th of 51 |
Where New Hampshire ranks among 51
1st = the most. Ranks cover every state and DC that publishes the figure.
Regionally, Massachusetts leads on data center share of state gdp at 2.6%; New Hampshire is 2nd of 4 in its neighborhood at 2.4%.
County spotlight
Hillsborough County holds the most data centers on record in New Hampshire (8), and its electrical contractor workforce changed +13.5% since 2019 to 1,371 jobs. The largest share of planned generation sits in Strafford County: 20 MW, led by Walden Renewables Development LLC (solar). The fastest-growing electrical trade market is Rockingham County, where contractor jobs grew 24.5% to 951.
Where New Hampshire sits in the power system
- Grid operator
- ISO-NE
- Operating capacity
- 4.6 GW
- Planned generation
- 24 MW
- Under construction or built
- 24 MW
- Data centers identified
- 17
- Data center load in queues
- —
- Unemployment, Aug 2026
- 2.8%
- Residential price change
- +15.2%
Neighboring states are shaded. Select one to open its page.
New Hampshire, county by county
10 counties in New Hampshire. Planned generation sits in 2 of them, data centers stand in 5, and local measures are on record in 0. Pick a layer, then select a county for its full record.
County leaders
Counties on record 8
| County | Data centers | Planned MW | Building MW | Lead developer | Electrical contractor jobs | Change 2019–25 | Local measures | Watchlist | |
|---|---|---|---|---|---|---|---|---|---|
| Hillsborough County | 8 | — | — | — | 1,371 | ▲ 13.5% | — | — | |
| Rockingham County | 4 | — | — | — | 951 | ▲ 24.5% | — | — | |
| Cheshire County | 2 | — | — | — | 193 | ▲ 24.5% | — | — | |
| Grafton County | 2 | — | — | — | — | — | — | — | |
| Strafford County | 1 | 20 MW | 20 MW | Walden Renewables Development LLC | 489 | ▲ 32.5% | — | — | |
| Sullivan County | — | 4 MW | 4 MW | Kearsarge Grissom LLC | — | — | — | — | |
| Merrimack County | — | — | — | — | 373 | ▼ 3.9% | — | — | |
| Belknap County | — | — | — | — | 258 | ▲ 7.5% | — | — |
Every county in New Hampshire 10
Each county has its own page: power plants, utilities and prices, jobs since 2019, data centers, local rules and its neighbors.
Cities and towns on record 10
| City or town | County | Data centers | Local measures | Watchlist | Latest record | |
|---|---|---|---|---|---|---|
| Manchester | Hillsborough County | 5 | — | — | — | |
| Portsmouth | Rockingham County | 3 | — | — | — | |
| Keene | Cheshire County | 2 | 1 (0 in force) | — | Proposed local moratorium on data centers Proposed | |
| Bedford | Hillsborough County | 2 | — | — | — | |
| Lebanon | Grafton County | 2 | — | — | — | |
| Exeter | Rockingham County + Rockingham County | 1 | — | — | — | |
| Nottingham | Rockingham County | — | 1 (1 in force) | 1 | Local moratorium on data centers for a stated term In force | |
| Bow | Merrimack County | — | 1 (0 in force) | — | Proposed town moratorium on data centers Proposed | |
| Canterbury | Merrimack County | — | 1 (1 in force) | — | Local moratorium on data centers with no end date In force | |
| Rochester | Strafford County | — | 1 (1 in force) | — | Local moratorium on data centers with no end date In force |
Data center counts come from every facility on the SAVRN Data Center Map, counted in the county and the city or community where each building physically stands (Census boundaries), not its mailing address. Jurisdictions appear as the Moratorium Tracker records them.
New Hampshire, from generation to the household bill
1Grid operator
- Data center projects in forecast framework
- 2 projects
2Generation pipeline
- Operating capacity
- 4.6 GW
- Planned, all types
- 24 MW
- Under construction or built
- 24 MW
- Planned gas
- 0 MW
- Planned retirements 2026–30
- 459 MW
- Net firm additions derived
- -435 MW
3Data center demand
- Data centers identified
- 17
- Operators
- 7
- Load in tracked queues
- —
- Utility large-load projects
- 0
- Commercial sales, YTD change
- +3.9%
- Industry share of state GDP
- 2.4%
4Jobs and pay
- Unemployment, Aug 2026
- 2.8% (-0.3 pts y/y)
- Construction jobs vs 2019
- +11.4%
- Manufacturing jobs vs 2019
- -4.9%
- Electrical contractor jobs 2019–25
- +21.7%
- Electrician median pay
- $62,840
- Electrician ÷ cashier pay
- 1.86×
5Household bill
- Residential price, YTD Jul 2026
- 26.79¢/kWh
- Change vs YTD 2025
- +15.2%
- All-sector price change
- +12.0%
- Total retail sales change
- +1.0%
6Policy friction
- State measures on record
- 4
- Local measures (in force)
- 5 (3)
- Watchlist projects
- 1
- Lawsuits tracked
- 0
- Announced capital, disclosed
- —
- Dedicated tax incentive
- None listed
Planned power plants in New Hampshire
Every planned generator in New Hampshire in the August 2026 EIA-860M inventory, by technology, then the 15 largest units. Under construction or built covers status codes U, V and TS.
| Technology | Units | Planned MW | Under construction or built |
|---|---|---|---|
| Solar | 2 | 24 MW | 24 MW |
Largest planned generators
| Plant | County | Technology | MW | Status | Year | Owner |
|---|---|---|---|---|---|---|
| Nutes Solar | Strafford | Solar Photovoltaic | 20 MW | Under construction (≤50%) | 2026 | Walden Renewables Development LLC |
| Kearsarge Grissom | Sullivan | Solar Photovoltaic | 4 MW | Built, not yet operating | 2026 | Kearsarge Grissom LLC |
What the New Hampshire build-out runs on
Who is building generation in New Hampshire, which manufacturers and contractors have a plant, expansion or contract recorded here, and how long the critical equipment takes to arrive.
Developers and owners with planned generation
| Developer or owner | Units | Planned MW | Building MW | Main technology | Counties |
|---|---|---|---|---|---|
| Walden Renewables Development LLC | 1 | 20 MW | 20 MW | Solar | 1 |
| Kearsarge Grissom LLC | 1 | 4 MW | 4 MW | Solar | 1 |
Manufacturers and contractors with a recorded New Hampshire footprint
No plant, expansion or contract in the manufacturer record names New Hampshire. The national suppliers below serve every state.
Order-by check
No planned unit of 50 MW or more in New Hampshire is still waiting on equipment orders.
Lead times, OEM backlogs and the national generation and grid contractors are on the national supply chain section.
Data center and large-load demand in New Hampshire
17 data centers run by 7 operators are identified in New Hampshire. The full list by city is on the New Hampshire Data Center Map page. Utilities report 0 large customer projects here to EEI.
No large customer projects reported to EEI for this state.
The New Hampshire jobs report, and who the build-out employs
Payroll employment, August 2026 (preliminary)
| Industry | Jobs | Change vs Aug 2025 | Change vs Aug 2019 |
|---|---|---|---|
| Total nonfarm | 703.3k | ▲ 0.2% | ▲ 2.8% (+18.8k) |
| Construction | 31.3k | ▼ 3.7% | ▲ 11.4% (+3.2k) |
| Manufacturing | 67.8k | ▲ 0.3% | ▼ 4.9% (-3.5k) |
| Mining and logging | 0.9k | ● 0.0% | ▲ 12.5% (+0.1k) |
| Retail trade | 88.9k | ▼ 0.3% | ▼ 4.9% (-4.6k) |
Power and data industries, 2019 to 2025
| Industry | Jobs 2019 | Jobs 2025 | Change | Average pay 2025 |
|---|---|---|---|---|
| Data processing and hosting | 1,324 | 2,070 | ▲ 56.3% | $158,851 |
| Electrical contractors | 3,787 | 4,607 | ▲ 21.7% | $85,575 |
| Power and communication line construction | 710 | 874 | ▲ 23.1% | $117,975 |
| Electric power generation, transmission, distribution | — | 1,557 | — | $146,879 |
| Transformer manufacturing | — | not disclosed | — | — |
Pay ladder, May 2025
| Occupation | Employment | Median annual pay | Multiple of cashier pay |
|---|---|---|---|
| Cashiers | 17,250 | $33,840 | 1.00× |
| Fast food and counter workers | 14,540 | $31,590 | 0.93× |
| Retail salespersons | 23,880 | $36,200 | 1.07× |
| All occupations | 683,290 | $55,880 | 1.65× |
| Construction laborers | 4,330 | $49,980 | 1.48× |
| Welders | 1,110 | $62,360 | 1.84× |
| HVAC mechanics | 2,560 | $73,850 | 2.18× |
| Plumbers and pipefitters | 1,950 | $66,810 | 1.97× |
| Electricians | 3,330 | $62,840 | 1.86× |
| Power plant operators | 90 | $81,070 | 2.40× |
| Power-line installers | 560 | $102,170 | 3.02× |
| Construction supervisors | 3,590 | $81,220 | 2.40× |
| Electrical engineers | 1,600 | $135,710 | 4.01× |
County-level contractor jobs and pay are in the county record above.
What the data center industry adds to New Hampshire
PwC figures are modeled estimates commissioned by the industry.
The rules and the pipeline in New Hampshire
State measures 4
| Bill | Measure | Status | Date | |
|---|---|---|---|---|
| Announced budget proposal (2027 session) | Proposed statewide multi-year data center moratorium | Proposed | 2026-09 | |
| LSR 2027-0002 / LSR 2027-0048 | Proposed 24-month statewide moratorium on data center development (2027 session) | Proposed | 2026-09 | |
| HB 1265 | One-year data center construction moratorium | Failed / vetoed | 2026-03 | |
| HB 1724 | New Hampshire: In New Hampshire, HB 1724, Sponsored by Rep. Wendy Thomas, Requires public utilities to submit annual reports detailing transmission costs | Failed / vetoed | 2026-01 |
Delay Watchlist projects 1
| Project | Location | Status | Cause | MW | |
|---|---|---|---|---|---|
| Nottingham Business Park Data Center | Nottingham | withdrawn | — |
Local moratoria and restrictions (5) appear by county and city in the county-by-county section. Counts include every status in the weekly tracker feeds as of October 5, 2026. The New Hampshire Data Center Map page counts only active local pauses and delayed or blocked projects as of its September 2 rebuild, so its figures are lower. The difference is one of definition and date.
New Hampshire's neighbors
New Hampshire power, answered from the record
How much new power generation is planned in New Hampshire?
EIA's August 2026 inventory lists 24 MW of planned generators in New Hampshire, 24 MW of it under construction or built. By capacity the pipeline is solar 100%. The largest single unit is Nutes Solar (20 MW, Walden Renewables Development LLC). Owners plan to retire 459 MW from 2026 to 2030.
Who runs the power grid in New Hampshire?
ISO-NE serves most of New Hampshire as the regional wholesale market and grid operator. No data center load is tracked in its queues yet.
Are electricity prices rising in New Hampshire?
Residential electricity averaged 26.79¢/kWh from January to July 2026, +15.2% on a year earlier, the 2nd fastest increase of 51. Commercial sales, the class that includes data centers, changed +3.9%.
How much do data centers add to the New Hampshire economy?
PwC's 2026 study for the Data Center Coalition credits the industry with 18,290 in-state jobs, $2.9B of GDP (2.4% of the state economy, 12th of 51) and $0.2B in state and local taxes in 2024. These are modeled estimates commissioned by the industry.
Where are the data centers in New Hampshire?
17 data centers run by 7 operators are identified in New Hampshire. The largest clusters are in Hillsborough County (8), Rockingham County (4), Cheshire County (2).
Which counties in New Hampshire have the most planned generation?
By planned nameplate capacity: Strafford County (20 MW), Sullivan County (4 MW).
Is the build-out creating trade jobs in New Hampshire?
Construction employment is +11.4% against August 2019. Electrical contractor jobs went from 3,787 in 2019 to 4,607 in 2025 (+21.7%, 21st in the country).
Does New Hampshire have a data center moratorium?
The SAVRN Moratorium Tracker holds 4 state-level measures (0 enacted) and 5 local moratoria or restrictions in New Hampshire, 3 of them in force, 38th most in the country.
New Hampshire across the SAVRN trackers
Sources for this page
- BEA state GDP via FRED
- BLS LAUS
- BLS OEWS
- BLS QCEW
- BLS State Employment (CES)
- EEI large customer projects
- EIA Electric Power Monthly
- EIA-860M (Aug 2026)
- NCSL
- PwC for the Data Center Coalition
- SAVRN Capital Atlas
- SAVRN Data Center Map
- SAVRN Delay Watchlist
- SAVRN Grid Operator Watchlist
- SAVRN Moratorium Tracker
- U.S. Census Bureau cartographic boundaries (via us-atlas)
Every figure links to its original source through the Sources buttons. Values marked derived are calculated from reported figures.