New Hampshire · Power Supply Chain & Demand

Power Supply Chain and Demand in New Hampshire

Seal of New Hampshire

ISO-NE runs most of New Hampshire's grid. 24 MW of new generation is planned in New Hampshire, 24 MW of it under construction or built and awaiting operation, against 459 MW of planned retirements through 2030. 17 data centers are identified in the state. Residential electricity averaged 26.79¢/kWh in 2026 through July, +15.2% from a year earlier. Unemployment was 2.8% in August 2026, and construction employment is +11.4% against August 2019. The SAVRN trackers hold 5 local moratoria or restrictions for New Hampshire across all statuses (3 in force) and 1 named projects on the Delay Watchlist.

Rebuilt 2026-10-08 · refreshed weekly
Grid operator
ISO-NE
main wholesale grid
Planned generation
0.0 GW
0.0 GW under construction or built
Data center load in queues
—
17 data centers identified
Residential price
26.79¢
▲ 15.2% vs 2025, YTD July
Construction jobs
+11.4%
▲ 11.4% vs Aug 2019
Local measures
5
3 in force · 1 on Delay Watchlist
The finding

What the build-out changed in New Hampshire

New Hampshire is in the middle of the pack, with a few sharp signals worth watching. The data center industry now accounts for 2.4% of New Hampshire's economy, the 12th largest share of any state (the median state is 1.8%), counting the industry's in-state suppliers and payrolls. Commercial electricity sales, the class that includes data centers, are +3.9% year to date, 12th in the country. Data processing and hosting jobs grew 56.3% from 2019 to 2025, 11th of 46 states that disclose the industry. Households pay part of the cost: residential prices are +15.2% year to date, the 2nd fastest increase of 51. Factory employment is the exception: manufacturing jobs are -4.9% against August 2019.

Then and now

MeasureThenNowChangeU.S. rank
Construction jobs (Aug 2019 → Aug 2026)28.1k31.3k▲ 11.4%29th of 48
Electrical contractor jobs (2019 → 2025)3,7874,607▲ 21.7%21st of 48
Power line construction jobs (2019 → 2025)710874▲ 23.1%22nd of 44
Data processing and hosting jobs (2019 → 2025)1,3242,070▲ 56.3%11th of 46
Unemployment rate (Feb 2020 → Aug 2026)2.6%2.8%▲ 0.2pts—
Residential price, ¢/kWh (YTD Jul 2025 → 2026)23.26¢26.79¢▲ 15.2%2nd of 51
Generation fleet → planned additions4.6 GW operating0.0 GW planned1% of fleet49th of 51

Where New Hampshire ranks among 51

Data center share of state GDP2.4%12th of 51
Planned generation vs. today's fleet1%49th of 51
Construction jobs vs. 2019+11.4%29th of 48
Electrical contractor jobs, 2019 to 2025+21.7%21st of 48
Power line construction jobs, 2019 to 2025+23.1%22nd of 44
Data processing and hosting jobs, 2019 to 2025+56.3%11th of 46
Commercial electricity sales, YTD change+3.9%12th of 51
Residential electricity price, YTD change+15.2%2nd of 51
Local moratoria and restrictions538th of 49

1st = the most. Ranks cover every state and DC that publishes the figure.

Regionally, Massachusetts leads on data center share of state gdp at 2.6%; New Hampshire is 2nd of 4 in its neighborhood at 2.4%.

County spotlight

Hillsborough County holds the most data centers on record in New Hampshire (8), and its electrical contractor workforce changed +13.5% since 2019 to 1,371 jobs. The largest share of planned generation sits in Strafford County: 20 MW, led by Walden Renewables Development LLC (solar). The fastest-growing electrical trade market is Rockingham County, where contractor jobs grew 24.5% to 951.

The map

Where New Hampshire sits in the power system

Grid operator
ISO-NE
Operating capacity
4.6 GW
Planned generation
24 MW
Under construction or built
24 MW
Data centers identified
17
Data center load in queues
—
Unemployment, Aug 2026
2.8%
Residential price change
+15.2%

Neighboring states are shaded. Select one to open its page.

Counties and cities

New Hampshire, county by county

10 counties in New Hampshire. Planned generation sits in 2 of them, data centers stand in 5, and local measures are on record in 0. Pick a layer, then select a county for its full record.

Coos CountyBelknap CountyCarroll CountyStrafford CountySullivan CountyRockingham CountyHillsborough CountyCheshire CountyMerrimack CountyGrafton County

County leaders

Most planned generation
Fastest electrical contractor growth
Strafford County489 jobs+32.5%
Rockingham County951 jobs+24.5%
Hillsborough County1,371 jobs+13.5%

Counties on record 8

CountyData centersPlanned MWBuilding MWLead developerElectrical contractor jobsChange 2019–25Local measuresWatchlist
Hillsborough County8———1,371▲ 13.5%——
Rockingham County4———951▲ 24.5%——
Cheshire County2———193▲ 24.5%——
Grafton County2———————
Strafford County120 MW20 MWWalden Renewables Development LLC489▲ 32.5%——
Sullivan County—4 MW4 MWKearsarge Grissom LLC————
Merrimack County————373▼ 3.9%——
Belknap County————258▲ 7.5%——

Every county in New Hampshire 10

Each county has its own page: power plants, utilities and prices, jobs since 2019, data centers, local rules and its neighbors.

Cities and towns on record 10

City or townCountyData centersLocal measuresWatchlistLatest record
ManchesterHillsborough County5———
PortsmouthRockingham County3———
KeeneCheshire County21 (0 in force)—Proposed local moratorium on data centers Proposed
BedfordHillsborough County2———
LebanonGrafton County2———
ExeterRockingham County + Rockingham County1———
NottinghamRockingham County—1 (1 in force)1Local moratorium on data centers for a stated term In force
BowMerrimack County—1 (0 in force)—Proposed town moratorium on data centers Proposed
CanterburyMerrimack County—1 (1 in force)—Local moratorium on data centers with no end date In force
RochesterStrafford County—1 (1 in force)—Local moratorium on data centers with no end date In force

Data center counts come from every facility on the SAVRN Data Center Map, counted in the county and the city or community where each building physically stands (Census boundaries), not its mailing address. Jurisdictions appear as the Moratorium Tracker records them.

The chain

New Hampshire, from generation to the household bill

1Grid operator

Data center projects in forecast framework
2 projects

2Generation pipeline

Operating capacity
4.6 GW
Planned, all types
24 MW
Under construction or built
24 MW
Planned gas
0 MW
Planned retirements 2026–30
459 MW
Net firm additions derived
-435 MW

3Data center demand

Data centers identified
17
Operators
7
Load in tracked queues
—
Utility large-load projects
0
Commercial sales, YTD change
+3.9%
Industry share of state GDP
2.4%

4Jobs and pay

Unemployment, Aug 2026
2.8% (-0.3 pts y/y)
Construction jobs vs 2019
+11.4%
Manufacturing jobs vs 2019
-4.9%
Electrical contractor jobs 2019–25
+21.7%
Electrician median pay
$62,840
Electrician ÷ cashier pay
1.86×

5Household bill

Residential price, YTD Jul 2026
26.79¢/kWh
Change vs YTD 2025
+15.2%
All-sector price change
+12.0%
Total retail sales change
+1.0%

6Policy friction

State measures on record
4
Local measures (in force)
5 (3)
Watchlist projects
1
Lawsuits tracked
0
Announced capital, disclosed
—
Dedicated tax incentive
None listed
Generation

Planned power plants in New Hampshire

Every planned generator in New Hampshire in the August 2026 EIA-860M inventory, by technology, then the 15 largest units. Under construction or built covers status codes U, V and TS.

Planned generation by fuel 24 MW
Solar 24 MW 100%
Under construction or built 24 MW
Solar 24 MW 100%
TechnologyUnitsPlanned MWUnder construction or built
Solar224 MW24 MW

Largest planned generators

PlantCountyTechnologyMWStatusYearOwner
Nutes SolarStraffordSolar Photovoltaic20 MWUnder construction (≤50%)2026Walden Renewables Development LLC
Kearsarge GrissomSullivanSolar Photovoltaic4 MWBuilt, not yet operating2026Kearsarge Grissom LLC
Supply chain

What the New Hampshire build-out runs on

Who is building generation in New Hampshire, which manufacturers and contractors have a plant, expansion or contract recorded here, and how long the critical equipment takes to arrive.

Developers and owners with planned generation

Developer or ownerUnitsPlanned MWBuilding MWMain technologyCounties
Walden Renewables Development LLC120 MW20 MWSolar1
Kearsarge Grissom LLC14 MW4 MWSolar1

Manufacturers and contractors with a recorded New Hampshire footprint

No plant, expansion or contract in the manufacturer record names New Hampshire. The national suppliers below serve every state.

Order-by check

No planned unit of 50 MW or more in New Hampshire is still waiting on equipment orders.

Lead times, OEM backlogs and the national generation and grid contractors are on the national supply chain section.

Demand

Data center and large-load demand in New Hampshire

17 data centers run by 7 operators are identified in New Hampshire. The full list by city is on the New Hampshire Data Center Map page. Utilities report 0 large customer projects here to EEI.

No large customer projects reported to EEI for this state.

Jobs and pay

The New Hampshire jobs report, and who the build-out employs

Median pay, May 2025
Cashiers$33,840
Fast food and counter workers$31,590
Retail salespersons$36,200
All occupations$55,880
Construction laborers$49,980
Welders$62,360
HVAC mechanics$73,850
Plumbers and pipefitters$66,810
Electricians$62,840
Power plant operators$81,070
Power-line installers$102,170
Construction supervisors$81,220
Electrical engineers$135,710
Cashier median: $33,840

Payroll employment, August 2026 (preliminary)

IndustryJobsChange vs Aug 2025Change vs Aug 2019
Total nonfarm703.3k▲ 0.2%▲ 2.8% (+18.8k)
Construction31.3k▼ 3.7%▲ 11.4% (+3.2k)
Manufacturing67.8k▲ 0.3%▼ 4.9% (-3.5k)
Mining and logging0.9k● 0.0%▲ 12.5% (+0.1k)
Retail trade88.9k▼ 0.3%▼ 4.9% (-4.6k)

Power and data industries, 2019 to 2025

IndustryJobs 2019Jobs 2025ChangeAverage pay 2025
Data processing and hosting1,3242,070▲ 56.3%$158,851
Electrical contractors3,7874,607▲ 21.7%$85,575
Power and communication line construction710874▲ 23.1%$117,975
Electric power generation, transmission, distribution—1,557—$146,879
Transformer manufacturing—not disclosed——

Pay ladder, May 2025

OccupationEmploymentMedian annual payMultiple of cashier pay
Cashiers17,250$33,8401.00×
Fast food and counter workers14,540$31,5900.93×
Retail salespersons23,880$36,2001.07×
All occupations683,290$55,8801.65×
Construction laborers4,330$49,9801.48×
Welders1,110$62,3601.84×
HVAC mechanics2,560$73,8502.18×
Plumbers and pipefitters1,950$66,8101.97×
Electricians3,330$62,8401.86×
Power plant operators90$81,0702.40×
Power-line installers560$102,1703.02×
Construction supervisors3,590$81,2202.40×
Electrical engineers1,600$135,7104.01×

County-level contractor jobs and pay are in the county record above.

Economy

What the data center industry adds to New Hampshire

4,780
Direct data center jobs (2024)
18,290
Total jobs supported, in state
$2.9B
Total GDP contribution
2.4%
Share of state GDP
$0.2B
State and local taxes

PwC figures are modeled estimates commissioned by the industry.

Policy

The rules and the pipeline in New Hampshire

State measures 4

BillMeasureStatusDate
Announced budget proposal (2027 session)Proposed statewide multi-year data center moratoriumProposed2026-09
LSR 2027-0002 / LSR 2027-0048Proposed 24-month statewide moratorium on data center development (2027 session)Proposed2026-09
HB 1265One-year data center construction moratoriumFailed / vetoed2026-03
HB 1724New Hampshire: In New Hampshire, HB 1724, Sponsored by Rep. Wendy Thomas, Requires public utilities to submit annual reports detailing transmission costsFailed / vetoed2026-01

Delay Watchlist projects 1

ProjectLocationStatusCauseMW
Nottingham Business Park Data CenterNottinghamwithdrawncommunity opposition—

Local moratoria and restrictions (5) appear by county and city in the county-by-county section. Counts include every status in the weekly tracker feeds as of October 5, 2026. The New Hampshire Data Center Map page counts only active local pauses and delayed or blocked projects as of its September 2 rebuild, so its figures are lower. The difference is one of definition and date.

Nearby states

New Hampshire's neighbors

Questions

New Hampshire power, answered from the record

How much new power generation is planned in New Hampshire?

EIA's August 2026 inventory lists 24 MW of planned generators in New Hampshire, 24 MW of it under construction or built. By capacity the pipeline is solar 100%. The largest single unit is Nutes Solar (20 MW, Walden Renewables Development LLC). Owners plan to retire 459 MW from 2026 to 2030.

Who runs the power grid in New Hampshire?

ISO-NE serves most of New Hampshire as the regional wholesale market and grid operator. No data center load is tracked in its queues yet.

Are electricity prices rising in New Hampshire?

Residential electricity averaged 26.79¢/kWh from January to July 2026, +15.2% on a year earlier, the 2nd fastest increase of 51. Commercial sales, the class that includes data centers, changed +3.9%.

How much do data centers add to the New Hampshire economy?

PwC's 2026 study for the Data Center Coalition credits the industry with 18,290 in-state jobs, $2.9B of GDP (2.4% of the state economy, 12th of 51) and $0.2B in state and local taxes in 2024. These are modeled estimates commissioned by the industry.

Where are the data centers in New Hampshire?

17 data centers run by 7 operators are identified in New Hampshire. The largest clusters are in Hillsborough County (8), Rockingham County (4), Cheshire County (2).

Which counties in New Hampshire have the most planned generation?

By planned nameplate capacity: Strafford County (20 MW), Sullivan County (4 MW).

Is the build-out creating trade jobs in New Hampshire?

Construction employment is +11.4% against August 2019. Electrical contractor jobs went from 3,787 in 2019 to 4,607 in 2025 (+21.7%, 21st in the country).

Does New Hampshire have a data center moratorium?

The SAVRN Moratorium Tracker holds 4 state-level measures (0 enacted) and 5 local moratoria or restrictions in New Hampshire, 3 of them in force, 38th most in the country.