Vermont · Power Supply Chain & Demand

Power Supply Chain and Demand in Vermont

Seal of Vermont

ISO-NE runs most of Vermont's grid. 108 MW of new generation is planned in Vermont, 18 MW of it under construction or built and awaiting operation, against 0 MW of planned retirements through 2030. 8 data centers are identified in the state. Residential electricity averaged 23.95¢/kWh in 2026 through July, +6.6% from a year earlier. Unemployment was 2.6% in August 2026, and construction employment is +7.8% against August 2019. The SAVRN trackers hold 3 local moratoria or restrictions for Vermont across all statuses (3 in force) and 0 named projects on the Delay Watchlist.

Rebuilt 2026-10-08 · refreshed weekly
Grid operator
ISO-NE
main wholesale grid
Planned generation
0.1 GW
0.0 GW under construction or built
Data center load in queues
—
8 data centers identified
Residential price
23.95¢
▲ 6.6% vs 2025, YTD July
Construction jobs
+7.8%
▲ 7.8% vs Aug 2019
Local measures
3
3 in force · 0 on Delay Watchlist
The finding

What the build-out changed in Vermont

Vermont is in the middle of the pack, with a few sharp signals worth watching. The data center industry now accounts for 1.7% of Vermont's economy, the 28th largest share of any state (the median state is 1.8%), counting the industry's in-state suppliers and payrolls. Data processing and hosting jobs grew 33.0% from 2019 to 2025, 27th of 46 states that disclose the industry. Planned generation equals 12% of the power plants Vermont runs today, 31st of 51 (the median state plans 15%). The weak spot: construction jobs vs. 2019 ranks 36th of 48 at +7.8%. Factory employment is the exception: manufacturing jobs are -7.6% against August 2019.

Then and now

MeasureThenNowChangeU.S. rank
Construction jobs (Aug 2019 → Aug 2026)15.3k16.5k▲ 7.8%36th of 48
Data processing and hosting jobs (2019 → 2025)373496▲ 33.0%27th of 46
Unemployment rate (Feb 2020 → Aug 2026)2.2%2.6%▲ 0.4pts—
Residential price, ¢/kWh (YTD Jul 2025 → 2026)22.46¢23.95¢▲ 6.6%29th of 51
Generation fleet → planned additions0.9 GW operating0.1 GW planned12% of fleet31st of 51

Where Vermont ranks among 51

Data center share of state GDP1.7%28th of 51
Planned generation vs. today's fleet12%31st of 51
Construction jobs vs. 2019+7.8%36th of 48
Data processing and hosting jobs, 2019 to 2025+33.0%27th of 46
Commercial electricity sales, YTD change+0.0%36th of 51
Residential electricity price, YTD change+6.6%29th of 51
Local moratoria and restrictions346th of 49

1st = the most. Ranks cover every state and DC that publishes the figure.

Regionally, Massachusetts leads on data center share of state gdp at 2.6%; Vermont is 4th of 4 in its neighborhood at 1.7%.

County spotlight

Chittenden County holds the most data centers on record in Vermont (6), and its electrical contractor workforce changed -14.5% since 2019 to 578 jobs. The largest share of planned generation sits in Addison County: 50 MW, led by Viridis Solar (solar).

The map

Where Vermont sits in the power system

Grid operator
ISO-NE
Operating capacity
0.9 GW
Planned generation
108 MW
Under construction or built
18 MW
Data centers identified
8
Data center load in queues
—
Unemployment, Aug 2026
2.6%
Residential price change
+6.6%

Neighboring states are shaded. Select one to open its page.

Counties and cities

Vermont, county by county

14 counties in Vermont. Planned generation sits in 4 of them, data centers stand in 3, and local measures are on record in 0. Pick a layer, then select a county for its full record.

Lamoille CountyWindham CountyFranklin CountyWindsor CountyRutland CountyGrand Isle CountyBennington CountyOrleans CountyChittenden CountyWashington CountyOrange CountyEssex CountyAddison CountyCaledonia County

County leaders

Most planned generation
Addison Countysolar50 MW
Rutland Countysolar20 MW
Chittenden Countybattery storage16 MW

Too few counties disclose contractor jobs.

Counties on record 10

CountyData centersPlanned MWBuilding MWLead developerElectrical contractor jobsChange 2019–25Local measuresWatchlist
Chittenden County616 MW16 MWEssex VT BESS 1 LLC578▼ 14.5%——
Rutland County120 MW—Freepoint Commodities LLC152▲ 21.6%——
Windham County1———136▲ 11.5%——
Addison County—50 MW—Viridis Solar————
Bennington County—22 MW2 MWFreepoint Commodities LLC————
Washington County————200▲ 25.8%——
Orleans County————129▲ 10.3%——
Lamoille County————105▲ 36.4%——
Orange County————103▲ 15.7%——
Caledonia County————74▲ 146.7%——

Every county in Vermont 14

Each county has its own page: power plants, utilities and prices, jobs since 2019, data centers, local rules and its neighbors.

Cities and towns on record 4

City or townCountyData centersLocal measuresWatchlistLatest record
South BurlingtonChittenden County31 (1 in force)—City moratorium on data centers with no end date In force
BurlingtonChittenden County3———
MorristownLamoille County—1 (1 in force)—Town moratorium on data centers In force
RoyaltonWindsor County—1 (1 in force)—Royalton data center moratorium In force

Data center counts come from every facility on the SAVRN Data Center Map, counted in the county and the city or community where each building physically stands (Census boundaries), not its mailing address. Jurisdictions appear as the Moratorium Tracker records them.

The chain

Vermont, from generation to the household bill

1Grid operator

Data center projects in forecast framework
2 projects

2Generation pipeline

Operating capacity
0.9 GW
Planned, all types
108 MW
Under construction or built
18 MW
Planned gas
0 MW
Planned retirements 2026–30
0 MW
Net firm additions derived
18 MW

3Data center demand

Data centers identified
8
Operators
7
Load in tracked queues
—
Utility large-load projects
0
Commercial sales, YTD change
+0.0%
Industry share of state GDP
1.7%

4Jobs and pay

Unemployment, Aug 2026
2.6% (+0.0 pts y/y)
Construction jobs vs 2019
+7.8%
Manufacturing jobs vs 2019
-7.6%
Electrical contractor jobs 2019–25
—
Electrician median pay
$63,430
Electrician ÷ cashier pay
1.78×

5Household bill

Residential price, YTD Jul 2026
23.95¢/kWh
Change vs YTD 2025
+6.6%
All-sector price change
+6.4%
Total retail sales change
+0.0%

6Policy friction

State measures on record
1
Local measures (in force)
3 (3)
Watchlist projects
0
Lawsuits tracked
0
Announced capital, disclosed
—
Dedicated tax incentive
None listed
Generation

Planned power plants in Vermont

Every planned generator in Vermont in the August 2026 EIA-860M inventory, by technology, then the 15 largest units. Under construction or built covers status codes U, V and TS.

Planned generation by fuel 108 MW
Solar 92 MW 85%Battery storage 16 MW 15%
Under construction or built 18 MW
Solar 2 MW 11%Battery storage 16 MW 89%
TechnologyUnitsPlanned MWUnder construction or built
Solar492 MW2 MW
Battery storage116 MW16 MW

Largest planned generators

PlantCountyTechnologyMWStatusYearOwner
PantonAddisonSolar Photovoltaic50 MWApprovals pending2028Viridis Solar
Fair Haven SolarRutlandSolar Photovoltaic20 MWApprovals received2028Freepoint Commodities LLC
Shaftsbury SolarBenningtonSolar Photovoltaic20 MWApprovals pending2028Freepoint Commodities LLC
Essex VT BESS 1ChittendenBatteries16 MWUnder construction (≤50%)2026Essex VT BESS 1 LLC
Apple Hill SolarBenningtonSolar Photovoltaic2 MWUnder construction (≤50%)2026Ecos Energy LLC
Supply chain

What the Vermont build-out runs on

Who is building generation in Vermont, which manufacturers and contractors have a plant, expansion or contract recorded here, and how long the critical equipment takes to arrive.

Developers and owners with planned generation

Developer or ownerUnitsPlanned MWBuilding MWMain technologyCounties
Viridis Solar150 MW—Solar1
Freepoint Commodities LLC240 MW—Solar2
Essex VT BESS 1 LLC116 MW16 MWBattery storage1
Ecos Energy LLC12 MW2 MWSolar1

Manufacturers and contractors with a recorded Vermont footprint

No plant, expansion or contract in the manufacturer record names Vermont. The national suppliers below serve every state.

Order-by check derived

1 of the 1 planned units of 50 MW or more in Vermont that are not yet under construction (50 of 50 MW) are past the date their step-up transformer had to be ordered to meet the planned in-service date. These units hold their schedules only if the equipment is already on order.

PlantTechnologyMWPlanned in serviceTransformer order-byTurbine order-byOwner
PantonSolar50 MWDec 2028Nov 2025—Viridis Solar

Lead times, OEM backlogs and the national generation and grid contractors are on the national supply chain section.

Demand

Data center and large-load demand in Vermont

8 data centers run by 7 operators are identified in Vermont. The full list by city is on the Vermont Data Center Map page. Utilities report 0 large customer projects here to EEI.

No large customer projects reported to EEI for this state.

Jobs and pay

The Vermont jobs report, and who the build-out employs

Median pay, May 2025
Cashiers$35,720
Fast food and counter workers$36,030
Retail salespersons$37,400
All occupations$56,390
Construction laborers$48,580
Welders$60,890
HVAC mechanics$62,150
Plumbers and pipefitters$62,170
Electricians$63,430
Power plant operators$78,240
Power-line installers$108,520
Construction supervisors$82,490
Electrical engineers$111,310
Cashier median: $35,720

Payroll employment, August 2026 (preliminary)

IndustryJobsChange vs Aug 2025Change vs Aug 2019
Total nonfarm310.6k▼ 0.3%▼ 1.6% (-5.0k)
Construction16.5k▲ 0.6%▲ 7.8% (+1.2k)
Manufacturing27.8k▲ 1.5%▼ 7.6% (-2.3k)
Mining and logging0.9k▲ 12.5%▲ 12.5% (+0.1k)
Retail trade34.6k▼ 1.4%▼ 5.2% (-1.9k)

Power and data industries, 2019 to 2025

IndustryJobs 2019Jobs 2025ChangeAverage pay 2025
Data processing and hosting373496▲ 33.0%$158,009
Electrical contractors01,880—$68,963
Power and communication line construction—not disclosed——
Electric power generation, transmission, distribution—986—$143,224

Pay ladder, May 2025

OccupationEmploymentMedian annual payMultiple of cashier pay
Cashiers7,030$35,7201.00×
Fast food and counter workers6,830$36,0301.01×
Retail salespersons8,250$37,4001.05×
All occupations303,890$56,3901.58×
Construction laborers1,430$48,5801.36×
Welders340$60,8901.70×
HVAC mechanics970$62,1501.74×
Plumbers and pipefitters980$62,1701.74×
Electricians1,270$63,4301.78×
Power plant operators140$78,2402.19×
Power-line installers270$108,5203.04×
Construction supervisors1,010$82,4902.31×
Electrical engineers820$111,3103.12×

County-level contractor jobs and pay are in the county record above.

Economy

What the data center industry adds to Vermont

1,520
Direct data center jobs (2024)
6,170
Total jobs supported, in state
$0.8B
Total GDP contribution
1.7%
Share of state GDP
$0.1B
State and local taxes

PwC figures are modeled estimates commissioned by the industry.

Policy

The rules and the pipeline in Vermont

State measures 1

BillMeasureStatusDate
S.205 / H.727Moratorium on new data centers until 2030Failed / vetoed2026-05

Delay Watchlist projects 0

No projects on the Delay Watchlist.

Local moratoria and restrictions (3) appear by county and city in the county-by-county section. Counts include every status in the weekly tracker feeds as of October 5, 2026. The Vermont Data Center Map page counts only active local pauses and delayed or blocked projects as of its September 2 rebuild, so its figures are lower. The difference is one of definition and date.

Nearby states

Vermont's neighbors

Questions

Vermont power, answered from the record

How much new power generation is planned in Vermont?

EIA's August 2026 inventory lists 108 MW of planned generators in Vermont, 18 MW of it under construction or built. By capacity the pipeline is solar 85%, battery storage 15%. The largest single unit is Panton (50 MW, Viridis Solar). Owners plan to retire 0 MW from 2026 to 2030.

Who runs the power grid in Vermont?

ISO-NE serves most of Vermont as the regional wholesale market and grid operator. No data center load is tracked in its queues yet.

Is planned generation in Vermont on schedule?

1 of 1 planned units of 50 MW or more not yet under construction are past the latest date to order a step-up transformer (more than 160 weeks) for their planned in-service date. They hold schedule only if equipment is already on order.

Which counties in Vermont have the most planned generation?

By planned nameplate capacity: Addison County (50 MW), Bennington County (22 MW), Rutland County (20 MW).

Are electricity prices rising in Vermont?

Residential electricity averaged 23.95¢/kWh from January to July 2026, +6.6% on a year earlier, the 29th fastest increase of 51. Commercial sales, the class that includes data centers, changed +0.0%.

How much do data centers add to the Vermont economy?

PwC's 2026 study for the Data Center Coalition credits the industry with 6,170 in-state jobs, $0.8B of GDP (1.7% of the state economy, 28th of 51) and $0.1B in state and local taxes in 2024. These are modeled estimates commissioned by the industry.

Who is building power plants in Vermont?

The largest owners of planned generation are Viridis Solar (50 MW, mostly solar), Freepoint Commodities LLC (40 MW, mostly solar), Essex VT BESS 1 LLC (16 MW, mostly battery storage) (EIA-860M).

Does Vermont have a data center moratorium?

The SAVRN Moratorium Tracker holds 1 state-level measure (0 enacted) and 3 local moratoria or restrictions in Vermont, 3 of them in force, 46th most in the country.

Across SAVRN

Vermont across the SAVRN trackers

Sources

Sources for this page

Every figure links to its original source through the Sources buttons. Values marked derived are calculated from reported figures.