Cushman & Wakefield Data Center Capex and Sites
Cushman & Wakefield's H2 2025 Americas update reported operational capacity of 43.4 GW, 93.6% of it in the United States, with 25.3 GW under construction at nearly 89% pre-committed and vacancy of 4.2%. Its December 2025 power report notes global operational capacity surpassed 49 GW by H1 2025 and that AI facilities consume 200-400 MW per site versus 10-25 MW for conventional facilities. An explicit C&W powered land moratorium formulation was n.a. in the fetched documents.
Reported and guided spending
Where Cushman & Wakefield builds
Financing transactions
Sourced facts on Cushman & Wakefield
- C&W's H2 2025 Americas update reported operational Americas capacity of 43.4 GW, 93.6% of it in the United States; 25.3 GW under construction at nearly 89% pre-committed; 4.0 GW of new colocation supply delivered in 2025; and vacancy of 4.2%.
- C&W's Data Centres & The Power Challenge (No. 3, December 2025) notes global operational capacity surpassed 49 GW by H1 2025, that conventional facilities need 10-25 MW while AI facilities consume 200-400 MW per site, that GPU white-space power density can exceed 50x standard industrial, and that data centres consumed 415 TWh in 2024, or 1.5% of global electricity.
- An explicit C&W powered land moratorium formulation was n.a. in the fetched documents.
Sources for Cushman & Wakefield
Every source cited on this page, once each. The full atlas source register is at Capital Atlas sources.
- cushmanwakefield.comCushman & Wakefield Americas Data Center Update
- assets.cushmanwakefield.comCushman & Wakefield PDF
Market intelligence: one page each
The figure beside each provider is its count of named sites in the atlas.
Seven references, one system
Capital, delay, policy, water, grid, permits and scarcity are one system seen from seven sides. Each reference is primary-sourced, refreshed on a schedule, and links into the others, so a project can be followed from the money committed to the docket that stopped it.