Cushman & Wakefield Data Center Capex and Sites

Cushman & Wakefield's H2 2025 Americas update reported operational capacity of 43.4 GW, 93.6% of it in the United States, with 25.3 GW under construction at nearly 89% pre-committed and vacancy of 4.2%. Its December 2025 power report notes global operational capacity surpassed 49 GW by H1 2025 and that AI facilities consume 200-400 MW per site versus 10-25 MW for conventional facilities. An explicit C&W powered land moratorium formulation was n.a. in the fetched documents.

Updated October 8, 2026 0 named sites 0 financing transactions 3 sourced facts 2 sources
Cushman & Wakefield
Market intelligence
Financing regimebrokerage research and advisory, no principal capital position stated
Named sites
0
Site-level commitments the atlas ties to Cushman & Wakefield
Disclosed site capital
n.a.
Sum of named sites with a stated dollar figure. Not a capex total; see the spending table
Disclosed capacity
n.a.
Sum of named sites with a stated megawatt figure
Financing transactions
0
Transactions naming Cushman & Wakefield or tied to one of its sites
Spending

Reported and guided spending

Cushman & Wakefield has no reported or guided spending line in the atlas. Its position is recorded through its named sites, its transactions and its sourced facts below.
Named sites

Where Cushman & Wakefield builds

Cushman & Wakefield has no named site commitment on record in the atlas as of October 8, 2026. That is normal for a market intelligence position: the capital shows up in the transactions below rather than on a site of its own.
Financing

Financing transactions

No financing transaction in the atlas names Cushman & Wakefield or attaches to one of its sites as of October 8, 2026.
The record

Sourced facts on Cushman & Wakefield

  • C&W's H2 2025 Americas update reported operational Americas capacity of 43.4 GW, 93.6% of it in the United States; 25.3 GW under construction at nearly 89% pre-committed; 4.0 GW of new colocation supply delivered in 2025; and vacancy of 4.2%.
  • C&W's Data Centres & The Power Challenge (No. 3, December 2025) notes global operational capacity surpassed 49 GW by H1 2025, that conventional facilities need 10-25 MW while AI facilities consume 200-400 MW per site, that GPU white-space power density can exceed 50x standard industrial, and that data centres consumed 415 TWh in 2024, or 1.5% of global electricity.
  • An explicit C&W powered land moratorium formulation was n.a. in the fetched documents.
Sources

Sources for Cushman & Wakefield

Every source cited on this page, once each. The full atlas source register is at Capital Atlas sources.

Market intelligence: one page each

The figure beside each provider is its count of named sites in the atlas.

Part of the North American Data Center Capital Atlas, refreshed every Tuesday, Thursday and Saturday. Site commitments overlap reported capital expenditure and overlap one another, so this page shows each figure as its source states it and never adds them into a single deployment number. Informational, not investment advice.
The SAVRN reference set

Seven references, one system

Capital, delay, policy, water, grid, permits and scarcity are one system seen from seven sides. Each reference is primary-sourced, refreshed on a schedule, and links into the others, so a project can be followed from the money committed to the docket that stopped it.