Arizona · Power Supply Chain & Demand

Power Supply Chain and Demand in Arizona

Seal of Arizona

Vertically integrated utilities run most of Arizona's grid. 15,413 MW of new generation is planned in Arizona, 6,621 MW of it under construction or built and awaiting operation, against 425 MW of planned retirements through 2030. 201 data centers are identified in the state, with 20,100 MW of data center load in tracked grid queues. Residential electricity averaged 15.44¢/kWh in 2026 through July, +0.9% from a year earlier. Unemployment was 4.9% in August 2026, and construction employment is +33.1% against August 2019. The SAVRN trackers hold 6 local moratoria or restrictions for Arizona across all statuses (5 in force) and 8 named projects on the Delay Watchlist.

Rebuilt 2026-10-08 · refreshed weekly
Grid operator
Non-RTO (utility-run)
main wholesale grid
Planned generation
15.4 GW
6.6 GW under construction or built
Data center load in queues
20,100 MW
201 data centers identified
Residential price
15.44¢
▲ 0.9% vs 2025, YTD July
Construction jobs
+33.1%
▲ 33.1% vs Aug 2019
Local measures
6
5 in force · 8 on Delay Watchlist
The finding

What the build-out changed in Arizona

Arizona is building power faster than most states, and the jobs data shows it. Construction employment is +33.1% against August 2019, 2nd of 48 states where BLS publishes it, well ahead of the national pace. Electrical contractor jobs, the trade every data center, substation and plant needs first, grew 52.3% from 2019 to 2025, 2nd in the country. Power and communication line construction jobs grew 94.1% from 2019 to 2025 (2nd of 44). The weak spot: data processing and hosting jobs, 2019 to 2025 ranks 40th of 46 at +5.1%.

Then and now

MeasureThenNowChangeU.S. rank
Construction jobs (Aug 2019 → Aug 2026)171.4k228.2k▲ 33.1%2nd of 48
Electrical contractor jobs (2019 → 2025)22,19933,799▲ 52.3%2nd of 48
Power line construction jobs (2019 → 2025)2,8095,452▲ 94.1%2nd of 44
Data processing and hosting jobs (2019 → 2025)10,20310,723▲ 5.1%40th of 46
Unemployment rate (Feb 2020 → Aug 2026)4.8%4.9%▲ 0.1pts—
Residential price, ¢/kWh (YTD Jul 2025 → 2026)15.30¢15.44¢▲ 0.9%47th of 51
Generation fleet → planned additions45.0 GW operating15.4 GW planned34% of fleet6th of 51

Where Arizona ranks among 51

Data center share of state GDP2.4%13th of 51
Announced data center capital$25.4B18th of 31
Data center load in grid queues20,100 MW3rd of 11
Planned generation vs. today's fleet34%6th of 51
Construction jobs vs. 2019+33.1%2nd of 48
Electrical contractor jobs, 2019 to 2025+52.3%2nd of 48
Power line construction jobs, 2019 to 2025+94.1%2nd of 44
Data processing and hosting jobs, 2019 to 2025+5.1%40th of 46
Commercial electricity sales, YTD change+14.8%3rd of 51
Residential electricity price, YTD change+0.9%47th of 51
Local moratoria and restrictions635th of 49

1st = the most. Ranks cover every state and DC that publishes the figure.

Among its neighbors, Arizona leads on construction jobs vs. 2019 (+33.1%), ahead of Utah (+31.4%).

County spotlight

Maricopa County holds the most data centers on record in Arizona (183), and its electrical contractor workforce changed +52.6% since 2019 to 28,044 jobs.

The map

Where Arizona sits in the power system

Grid operator
Non-RTO (utility-run)
Operating capacity
45.0 GW
Planned generation
15,413 MW
Under construction or built
6,621 MW
Data centers identified
201
Data center load in queues
20,100 MW
Unemployment, Aug 2026
4.9%
Residential price change
+0.9%

Neighboring states are shaded. Select one to open its page.

Counties and cities

Arizona, county by county

15 counties in Arizona. Planned generation sits in 8 of them, data centers stand in 5, and local measures are on record in 2. Pick a layer, then select a county for its full record.

Mohave CountySanta Cruz CountyCoconino CountyLa Paz CountyGila CountyPima CountyGreenlee CountyPinal CountyNavajo CountyYuma CountyMaricopa CountyGraham CountyCochise CountyApache CountyYavapai County

County leaders

Most planned generation
Maricopa Countybattery storage3,792 MW
La Paz Countysolar3,013 MW
Coconino Countysolar2,700 MW
Pinal Countybattery storage2,272 MW
Navajo Countysolar1,900 MW
Yuma Countysolar1,118 MW
Cochise Countybattery storage351 MW
Mohave Countynatural gas267 MW
Fastest electrical contractor growth
Maricopa County28,044 jobs+52.6%
Pima County1,902 jobs+5.5%

Counties on record 12

CountyData centersPlanned MWBuilding MWLead developerElectrical contractor jobsChange 2019–25Local measuresWatchlist
Maricopa County1833,792 MW1,792 MWCopia Power28,044▲ 52.6%—2
Pima County13———1,902▲ 5.5%1 (1 in force)1
Cochise County1351 MW351 MWTorch Operating Company, LLC————
Graham County1———16———
Santa Cruz County1———————
La Paz County—3,013 MW1,588 MWEAGL bn, LLC————
Coconino County—2,700 MW—Clenera DevCo LLC492———
Pinal County—2,272 MW1,172 MWTHSI bn, LLC——1 (1 in force)2
Navajo County—1,900 MW950 MWInvenergy Services LLC————
Yuma County—1,118 MW768 MWYuma bn, LLC————
Mohave County—267 MW—Arizona Electric Pwr Coop Inc571———
Gila County————28———

Every county in Arizona 15

Each county has its own page: power plants, utilities and prices, jobs since 2019, data centers, local rules and its neighbors.

Cities and towns on record 17

City or townCountyData centersLocal measuresWatchlistLatest record
PhoenixMaricopa County57———
MesaMaricopa County411 (0 in force)1Proposed amendments to Chapters 6, 7, 22, 31, 32, and 86 of Title 11 of the Mesa City Code pertaining to Data Proposed
GoodyearMaricopa County22———
ChandlerMaricopa County181 (1 in force)1Rejection of proposed AI data center In force
TucsonPima County111 (1 in force)1Rejection of Project Blue data center annexation In force
TempeMaricopa County11———
ScottsdaleMaricopa County9———
AvondaleMaricopa County8———
El MirageMaricopa County5———
GlendaleMaricopa County4———
GilbertMaricopa County3———
BensonCochise County1———
BuckeyeMaricopa County1———
MaranaPima County1———
NogalesSanta Cruz County1———
Queen CreekMaricopa County + Pinal County1———
Hualapai Indian Reservation——1 (1 in force)—Tribal moratorium on data centers with no end date In force

Data center counts come from every facility on the SAVRN Data Center Map, counted in the county and the city or community where each building physically stands (Census boundaries), not its mailing address. Jurisdictions appear as the Moratorium Tracker records them.

The chain

Arizona, from generation to the household bill

1Grid operator

Utility-run territory: resource planning sits with the vertically integrated utilities and the state commission.

2Generation pipeline

Operating capacity
45.0 GW
Planned, all types
15,413 MW
Under construction or built
6,621 MW
Planned gas
2,181 MW
Planned retirements 2026–30
425 MW
Net firm additions derived
6,196 MW

3Data center demand

Data centers identified
201
Operators
53
Load in tracked queues
20,100 MW
Utility large-load projects
2
Commercial sales, YTD change
+14.8%
Industry share of state GDP
2.4%

4Jobs and pay

Unemployment, Aug 2026
4.9% (+0.5 pts y/y)
Construction jobs vs 2019
+33.1%
Manufacturing jobs vs 2019
+7.1%
Electrical contractor jobs 2019–25
+52.3%
Electrician median pay
$61,060
Electrician ÷ cashier pay
1.76×

5Household bill

Residential price, YTD Jul 2026
15.44¢/kWh
Change vs YTD 2025
+0.9%
All-sector price change
-1.8%
Total retail sales change
+9.3%

6Policy friction

State measures on record
9
Local measures (in force)
6 (5)
Watchlist projects
8
Lawsuits tracked
0
Announced capital, disclosed
$25.4B
Dedicated tax incentive
Yes
Generation

Planned power plants in Arizona

Every planned generator in Arizona in the August 2026 EIA-860M inventory, by technology, then the 15 largest units. Under construction or built covers status codes U, V and TS.

Planned generation by fuel 15,413 MW
Natural gas 2,181 MW 14%Solar 6,435 MW 42%Battery storage 6,797 MW 44%
Under construction or built 6,621 MW
Natural gas 689 MW 10%Solar 2,310 MW 35%Battery storage 3,622 MW 55%
TechnologyUnitsPlanned MWUnder construction or built
Battery storage286,797 MW3,622 MW
Solar276,435 MW2,310 MW
Natural gas222,181 MW689 MW

Largest planned generators

PlantCountyTechnologyMWStatusYearOwner
Maricopa SolarMaricopaBatteries550 MWUnder construction (≤50%)2026Maricopa Solar
Snowflake A Solar and BESSNavajoBatteries475 MWApprovals pending2027Clenera DevCo LLC
Snowflake A Solar and BESSNavajoSolar Photovoltaic475 MWApprovals pending2027Clenera DevCo LLC
CO Bar Solar and BESSCoconinoSolar Photovoltaic400 MWPlanned, approvals not started2027Clenera DevCo LLC
CO Bar Solar and BESSCoconinoBatteries400 MWPlanned, approvals not started2027Clenera DevCo LLC
Valley Farms Energy CenterPinalBatteries400 MWUnder construction (≤50%)2027Valley Farms Energy Center, LLC
Red Antelope Solar & Energy Storage FarmCoconinoSolar Photovoltaic400 MWPlanned, approvals not started2028302PN 8me LLC
Eagle Eye Solar and StorageLa PazSolar Photovoltaic400 MWApprovals pending2028EAGL bn, LLC
Eagle Eye Solar and StorageLa PazBatteries400 MWApprovals pending2028EAGL bn, LLC
CO Bar D Solar and BESSCoconinoBatteries394 MWPlanned, approvals not started2028Clenera DevCo LLC
CO Bar D Solar and BESSCoconinoSolar Photovoltaic394 MWPlanned, approvals not started2028Clenera DevCo LLC
Saddleback Generation StationMaricopaNatural Gas Fired Combined Cycle375 MWPlanned, approvals not started2030Copia Power
Saddleback Generation StationMaricopaNatural Gas Fired Combined Cycle375 MWPlanned, approvals not started2030Copia Power
Elisabeth SolarYumaSolar Photovoltaic350 MWApprovals pending2028Leeward Asset Management, LLC
AtlasLa PazSolar Photovoltaic300 MWUnder construction (>50%)2026174 Power Global Corp.
Supply chain

What the Arizona build-out runs on

Who is building generation in Arizona, which manufacturers and contractors have a plant, expansion or contract recorded here, and how long the critical equipment takes to arrive.

Developers and owners with planned generation

Developer or ownerUnitsPlanned MWBuilding MWMain technologyCounties
Clenera DevCo LLC82,950 MW—Battery storage2
Copia Power61,506 MW256 MWNatural gas2
Invenergy Services LLC4950 MW950 MWSolar1
EAGL bn, LLC2800 MW—Solar1
Arizona Public Service Co10710 MW710 MWNatural gas2
302PN 8me LLC2700 MW—Solar1
Yuma bn, LLC2600 MW600 MWSolar1
THSI bn, LLC2600 MW—Battery storage1
DESA bn, LLC2600 MW—Battery storage1
Maricopa Solar1550 MW550 MWBattery storage1
EDF Renewables Development, Inc.2500 MW—Battery storage1
ATLAS Solar Manager, LLC2425 MW—Solar1
Valley Farms Energy Center, LLC1400 MW400 MWBattery storage1
Atlas VIII LLC2382 MW382 MWBattery storage1
Torch Operating Company, LLC4351 MW351 MWBattery storage1

Manufacturers and contractors with a recorded Arizona footprint 1

TierCompanySegmentWhat the record says
Grid equipment OEMERMCODistribution transformersNew 566,000 sq ft Maricopa County, AZ facility, 500+ jobs; first plant west of the Mississippi

Order-by check derived

29 of the 31 planned units of 50 MW or more in Arizona that are not yet under construction (8,417 of 8,767 MW) are past the date their step-up transformer had to be ordered to meet the planned in-service date, and 4 gas units are (1,250 MW) past the turbine order date as well. These units hold their schedules only if the equipment is already on order.

PlantTechnologyMWPlanned in serviceTransformer order-byTurbine order-byOwner
Snowflake A Solar and BESSSolar475 MWAug 2027Jul 2024—Clenera DevCo LLC
Snowflake A Solar and BESSBattery storage475 MWAug 2027Jul 2024—Clenera DevCo LLC
Eagle Eye Solar and StorageSolar400 MWMay 2028Apr 2025—EAGL bn, LLC
Red Antelope Solar & Energy Storage FarmSolar400 MWMay 2028Apr 2025—302PN 8me LLC
CO Bar Solar and BESSBattery storage400 MWDec 2027Nov 2024—Clenera DevCo LLC
CO Bar Solar and BESSSolar400 MWDec 2027Nov 2024—Clenera DevCo LLC
Eagle Eye Solar and StorageBattery storage400 MWMay 2028Apr 2025—EAGL bn, LLC
CO Bar D Solar and BESSSolar394 MWMay 2028Apr 2025—Clenera DevCo LLC
CO Bar D Solar and BESSBattery storage394 MWMay 2028Apr 2025—Clenera DevCo LLC
Saddleback Generation StationNatural gas375 MWDec 2030Nov 2027Dec 2025Copia Power
Saddleback Generation StationNatural gas375 MWDec 2030Nov 2027Dec 2025Copia Power
Elisabeth SolarSolar350 MWSep 2028Aug 2025—Leeward Asset Management, LLC

Lead times, OEM backlogs and the national generation and grid contractors are on the national supply chain section.

Demand

Data center and large-load demand in Arizona

201 data centers run by 53 operators are identified in Arizona. The full list by city is on the Arizona Data Center Map page. Utilities report 2 large customer projects here to EEI.

UtilityCustomer or typeMW statedInvestment stated
Arizona Public Service (Pinnacle West)Taiwan Semiconductor Manufacturing Company (TSMC)200 MW$165 billion
Tucson Electric Power (TEP)Beale Infrastructure300 MW—
Jobs and pay

The Arizona jobs report, and who the build-out employs

Median pay, May 2025
Cashiers$34,600
Fast food and counter workers$34,230
Retail salespersons$35,720
All occupations$50,060
Construction laborers$46,590
Welders$55,600
HVAC mechanics$59,400
Plumbers and pipefitters$62,070
Electricians$61,060
Power plant operators$84,970
Power-line installers$75,420
Construction supervisors$78,550
Electrical engineers$100,550
Cashier median: $34,600

Payroll employment, August 2026 (preliminary)

IndustryJobsChange vs Aug 2025Change vs Aug 2019
Total nonfarm3,279.5k▲ 0.6%▲ 10.8% (+320.9k)
Construction228.2k▲ 2.2%▲ 33.1% (+56.8k)
Manufacturing192.2k▼ 0.3%▲ 7.1% (+12.7k)
Mining and logging17.1k▲ 8.2%▲ 26.7% (+3.6k)
Retail trade348.0k▲ 0.5%▲ 7.0% (+22.9k)

Power and data industries, 2019 to 2025

IndustryJobs 2019Jobs 2025ChangeAverage pay 2025
Data processing and hosting10,20310,723▲ 5.1%$149,458
Electrical contractors22,19933,799▲ 52.3%$85,926
Power and communication line construction2,8095,452▲ 94.1%$105,262
Electric power generation, transmission, distribution—10,104—$149,570
Transformer manufacturing—97—$109,163

Pay ladder, May 2025

OccupationEmploymentMedian annual payMultiple of cashier pay
Cashiers72,570$34,6001.00×
Fast food and counter workers77,210$34,2300.99×
Retail salespersons93,920$35,7201.03×
All occupations3,239,430$50,0601.45×
Construction laborers37,630$46,5901.35×
Welders7,270$55,6001.61×
HVAC mechanics10,860$59,4001.72×
Plumbers and pipefitters11,810$62,0701.79×
Electricians21,140$61,0601.76×
Power plant operators390$84,9702.46×
Power-line installers3,360$75,4202.18×
Construction supervisors21,550$78,5502.27×
Electrical engineers5,370$100,5502.91×

County-level contractor jobs and pay are in the county record above.

Economy

What the data center industry adds to Arizona

20,640
Direct data center jobs (2024)
87,760
Total jobs supported, in state
$13.5B
Total GDP contribution
2.4%
Share of state GDP
$1.0B
State and local taxes

PwC figures are modeled estimates commissioned by the industry.

State studies and incentive costs

Economic study findingsDisclosed tax-incentive cost
—$19M (2024); $38.5M (2025)
Policy

The rules and the pipeline in Arizona

State measures 9

BillMeasureStatusDate
FY2027 budgetThree-year pause on data center sales-tax exemptionIn force2026-07
HB 4168Statewide moratorium on data centers through June 30, 2029In force2026-07
Arizona statewide (3-year pause on new data center tax exemptions, signed in FY budget)Arizona: On June 15, 2026 Gov. Katie Hobbs signed Arizona's ~$18B FY budget, which includes a three-year moratorium on NEW data center sales/use tax exemptions.In force2026-06
Arizona (Senate disclosure bill)Arizona: On April 17, 2026, the Arizona Senate passed a bill that would require the state's major utilities to file reports every six months to the ArizonaProposed2026-04
HB 2631Arizona: Governor Katie Hobbs called for repealing data center tax incentives which cost Arizona approximately $38.5 million per year.Failed / vetoed2026-02
HB 2795Arizona: In Arizona, HB 2795 would prohibit counties (<500K pop) from denying zoning approval for small modular reactors after federal design certificationFailed / vetoed2026-02
SB 1463Arizona SB 1463 (Sen. Priya Sundareshan, D - Senate Minority Leader) would repeal the state's transaction privilege and use tax exemption for qualifying largeFailed / vetoed2026-01
HB 2756Rules for extra high load factor customersProposed2026
HB 2649computer data centers; tax incentivesIn force2021-04

Delay Watchlist projects 8

ProjectLocationStatusCauseMW
Project RangeMaricopa Countycancelledzoning denialwatercommunity opposition1,800 MW
Project Blue (Amazon-linked)Tucsoncancelledzoning denialwater disputecommunity opposition—
Project Blue (Tucson)Pima County / Tucsonlitigation activecommunity opposition—
Chandler AI Data Center (Sinema-lobbied project)Chandlercancelledzoning denial—
NTT Mesa Data CenterMesadelayedwater disputecommunity opposition—
Casa Grande 480-Acre Data Center Campus (Willis/Barnes parcels)Casa Grande (Pinal County)under appealzoning denialtax incentive change—
Tract Goodyear/Buckeye Data CenterGoodyear and Buckeye (Maricopa County)withdrawnzoning denialcommunity opposition—
Vermaland data center campusPinal County (south of Eloy)denied—

Local moratoria and restrictions (6) appear by county and city in the county-by-county section. Counts include every status in the weekly tracker feeds as of October 5, 2026. The Arizona Data Center Map page counts only active local pauses and delayed or blocked projects as of its September 2 rebuild, so its figures are lower. The difference is one of definition and date.

Nearby states

Arizona's neighbors

Questions

Arizona power, answered from the record

How much new power generation is planned in Arizona?

EIA's August 2026 inventory lists 15,413 MW of planned generators in Arizona, 6,621 MW of it under construction or built. By capacity the pipeline is battery storage 44%, solar 42%, natural gas 14%. The largest single unit is Maricopa Solar (550 MW, Maricopa Solar). Owners plan to retire 425 MW from 2026 to 2030.

Who runs the power grid in Arizona?

Non-RTO (utility-run) serves most of Arizona, which means vertically integrated utilities plan and dispatch generation under the state commission. 20,100 MW of data center load sits in tracked queues, 3rd in the country.

Is the build-out creating trade jobs in Arizona?

Construction employment is +33.1% against August 2019. Electrical contractor jobs went from 22,199 in 2019 to 33,799 in 2025 (+52.3%, 2nd in the country).

Are electricity prices rising in Arizona?

Residential electricity averaged 15.44¢/kWh from January to July 2026, +0.9% on a year earlier, the 47th fastest increase of 51. Commercial sales, the class that includes data centers, changed +14.8%.

Is planned generation in Arizona on schedule?

29 of 31 planned units of 50 MW or more not yet under construction are past the latest date to order a step-up transformer (more than 160 weeks) for their planned in-service date, and 4 gas units are past the turbine order date (about five years). They hold schedule only if equipment is already on order.

How much do data centers add to the Arizona economy?

PwC's 2026 study for the Data Center Coalition credits the industry with 87,760 in-state jobs, $13.5B of GDP (2.4% of the state economy, 13th of 51) and $1.0B in state and local taxes in 2024. These are modeled estimates commissioned by the industry.

Where are the data centers in Arizona?

201 data centers run by 53 operators are identified in Arizona. The largest clusters are in Maricopa County (183), Pima County (13), Santa Cruz County (1).

Does Arizona have a data center moratorium?

The SAVRN Moratorium Tracker holds 9 state-level measures (4 enacted) and 6 local moratoria or restrictions in Arizona, 5 of them in force, 35th most in the country.

Across SAVRN

Arizona across the SAVRN trackers

Sources

Sources for this page

Every figure links to its original source through the Sources buttons. Values marked derived are calculated from reported figures.