CAISO runs most of California's grid. 20,049 MW of new generation is planned in California, 8,085 MW of it under construction or built and awaiting operation, against 3,364 MW of planned retirements through 2030. 482 data centers are identified in the state, with 518 MW of data center load in tracked grid queues. Residential electricity averaged 33.25¢/kWh in 2026 through July, +2.5% from a year earlier. Unemployment was 5.1% in August 2026, and construction employment is -0.8% against August 2019. The SAVRN trackers hold 48 local moratoria or restrictions for California across all statuses (30 in force) and 9 named projects on the Delay Watchlist.

Rebuilt 2026-10-08 · refreshed weekly
Grid operator
CAISO
main wholesale grid
Planned generation
20.0 GW
8.1 GW under construction or built
Data center load in queues
518 MW
482 data centers identified
Residential price
33.25¢
▲ 2.5% vs 2025, YTD July
Construction jobs
-0.8%
▼ 0.8% vs Aug 2019
Local measures
48
30 in force · 9 on Delay Watchlist
The finding

What the build-out changed in California

California is at the center of the build-out: the demand is here and the construction economy has moved with it. The data center industry now accounts for 3.9% of California's economy, the 2nd largest share of any state (the median state is 1.8%), counting the industry's in-state suppliers and payrolls. Data processing and hosting jobs grew 57.8% from 2019 to 2025, 9th of 46 states that disclose the industry. Planned generation equals 18% of the power plants California runs today, 16th of 51 (the median state plans 15%). Pushback is organized: the SAVRN trackers hold 48 local moratoria or restrictions in California, 7th in the country.

Then and now

MeasureThenNowChangeU.S. rank
Construction jobs (Aug 2019 → Aug 2026)893.6k886.2k▼ 0.8%44th of 48
Electrical contractor jobs (2019 → 2025)112,727122,326▲ 8.5%39th of 48
Power line construction jobs (2019 → 2025)17,90120,070▲ 12.1%30th of 44
Data processing and hosting jobs (2019 → 2025)51,85381,824▲ 57.8%9th of 46
Unemployment rate (Feb 2020 → Aug 2026)4.4%5.1%▲ 0.7pts—
Residential price, ¢/kWh (YTD Jul 2025 → 2026)32.45¢33.25¢▲ 2.5%44th of 51
Generation fleet → planned additions109.6 GW operating20.0 GW planned18% of fleet16th of 51

Where California ranks among 51

Data center share of state GDP3.9%2nd of 51
Data center load in grid queues518 MW9th of 11
Planned generation vs. today's fleet18%16th of 51
Construction jobs vs. 2019-0.8%44th of 48
Electrical contractor jobs, 2019 to 2025+8.5%39th of 48
Power line construction jobs, 2019 to 2025+12.1%30th of 44
Data processing and hosting jobs, 2019 to 2025+57.8%9th of 46
Commercial electricity sales, YTD change-1.3%47th of 51
Residential electricity price, YTD change+2.5%44th of 51
Local moratoria and restrictions487th of 49

1st = the most. Ranks cover every state and DC that publishes the figure.

Among its neighbors, California leads on data center share of state gdp (3.9%), ahead of Oregon (3.3%).

County spotlight

Santa Clara County holds the most data centers on record in California (197), and its electrical contractor workforce changed +18.4% since 2019 to 10,214 jobs. The largest share of planned generation sits in Fresno County: 3,546 MW, led by Intersect USA, LLC (battery storage). The fastest-growing electrical trade market is Kern County, where contractor jobs grew 53.0% to 2,499.

The map

Where California sits in the power system

Grid operator
CAISO
Operating capacity
109.6 GW
Planned generation
20,049 MW
Under construction or built
8,085 MW
Data centers identified
482
Data center load in queues
518 MW
Unemployment, Aug 2026
5.1%
Residential price change
+2.5%

Neighboring states are shaded. Select one to open its page.

Counties and cities

California, county by county

58 counties in California. Planned generation sits in 30 of them, data centers stand in 28, and local measures are on record in 9. Pick a layer, then select a county for its full record.

San Benito CountyShasta CountySierra CountyFresno CountyAmador CountyEl Dorado CountyMonterey CountySan Bernardino CountyTehama CountyNevada CountyTuolumne CountySanta Barbara CountyTrinity CountyStanislaus CountyColusa CountyAlpine CountySiskiyou CountyDel Norte CountyInyo CountySan Joaquin CountyImperial CountyCalaveras CountyButte CountyMadera CountyVentura CountyOrange CountyKern CountyContra Costa CountyKings CountyMendocino CountySonoma CountyYuba CountyMerced CountyTulare CountySacramento CountySolano CountySan Francisco CountyMariposa CountyMarin CountySutter CountyLassen CountyRiverside CountyPlumas CountySanta Clara CountyPlacer CountySan Luis Obispo CountySan Mateo CountyMono CountySan Diego CountyNapa CountyAlameda CountyYolo CountyLake CountyLos Angeles CountyGlenn CountySanta Cruz CountyHumboldt CountyModoc County

County leaders

Most planned generation
Fresno Countybattery storage3,546 MW
Kern Countysolar3,420 MW
Riverside Countybattery storage3,048 MW
San Bernardino Countybattery storage1,500 MW
Los Angeles Countybattery storage1,236 MW
Placer Countysolar1,023 MW
Inyo Countyother1,000 MW
Imperial Countysolar662 MW
Fastest electrical contractor growth
Kern County2,499 jobs+53.0%
Fresno County3,208 jobs+40.0%
Yolo County481 jobs+34.4%
Santa Barbara County967 jobs+29.5%
Sacramento County6,442 jobs+29.5%
Stanislaus County1,423 jobs+26.9%
San Diego County12,988 jobs+22.4%
Tulare County855 jobs+22.0%

Counties on record 46

CountyData centersPlanned MWBuilding MWLead developerElectrical contractor jobsChange 2019–25Local measuresWatchlist
Santa Clara County19750 MW50 MWKifer Energy Storage, LLC10,214▲ 18.4%——
Los Angeles County771,236 MW839 MWSan Gabriel Project LLC19,529▲ 0.9%2 (0 in force)2
San Diego County31224 MW10 MWJVR Energy Park LLC12,988▲ 22.4%——
Alameda County30477 MW301 MWIP Aramis, LLC5,616▼ 13.7%——
Orange County30———13,450▼ 4.9%——
Sacramento County21660 MW300 MWSacramento Valley Energy Center, LLC6,442▲ 29.5%——
San Francisco County18———3,490▼ 19.2%——
San Mateo County103 MW—AMERESCO Ox Mountain Energy LLC1,730▲ 15.3%——
Riverside County73,048 MW948 MWGrace Orchard Interconnection, LLC6,932▼ 0.2%—1
San Joaquin County6360 MW146 MWZeus BESS LLC1,889▲ 17.3%1 (0 in force)—
Stanislaus County6100 MW—Vesper Energy Development LLC1,423▲ 26.9%1 (1 in force)—
Contra Costa County68 MW8 MWPittsburg RV & Boat Storage, LLC2,692▼ 7.7%——
San Bernardino County51,500 MW684 MW99MT 8me, LLC6,172▲ 4.3%——
San Luis Obispo County5600 MW—Premium Energy Holdings807▲ 5.8%——
Fresno County43,546 MW575 MWIntersect USA, LLC3,208▲ 40.0%——
Santa Barbara County410 MW10 MWRPCA Storage 1, LLC967▲ 29.5%——
Kern County33,420 MW3,040 MW26SB 8me LLC2,499▲ 53.0%—1
Solano County360 MW—Vaca Dixon BESS LLC1,127▲ 9.8%——
Napa County326 MW2 MWLaketricity USA Inc.342———
Yolo County326 MW—Emeren US, LLC481▲ 34.4%——
Ventura County2135 MW—Hecate Grid Gwent Storage 1, LLC1,497▲ 1.0%——
Mendocino County21 MW—Form Energy Inc.——1 (1 in force)—
Sonoma County2———1,860▲ 8.6%——
Placer County11,023 MW518 MWClenera DevCo LLC1,782▲ 14.5%——
Imperial County1662 MW—90FI 8me, LLC——3 (1 in force)1
Butte County1———446▼ 23.6%——
Santa Cruz County1———436▲ 3.1%——
Shasta County1———391———
Inyo County—1,000 MW—Premium Energy Holdings39▲ 44.4%——
Tulare County—625 MW225 MW22SV 8ME LLC855▲ 22.0%1 (1 in force)—
Kings County—612 MW—Westlands Cherry, LLC255▲ 140.6%——
Merced County—424 MW424 MWZeta Solar, LLC————
Sutter County—200 MW—Vesper Energy Development LLC————
Monterey County—6 MW—Monterey Regional Waste Mgmt711———
Yuba County—4 MW4 MWZGlobal Inc195▲ 9.6%——
Madera County—3 MW—ZGlobal Inc154———
El Dorado County————1,910▼ 5.3%——
Nevada County————383▲ 1.1%——
San Benito County————203▲ 0.5%——
Tehama County————94———
Del Norte County————22▲ 22.2%——
Mariposa County————22▲ 57.1%——
Colusa County————14▲ 7.7%——
Tuolumne County——————1 (0 in force)—
Calaveras County——————1 (1 in force)—
Humboldt County——————2 (1 in force)—

Every county in California 58

Each county has its own page: power plants, utilities and prices, jobs since 2019, data centers, local rules and its neighbors.

Alameda CountyOakland, FremontAlpine CountyAmador CountyIone, JacksonButte CountyChico, OrovilleCalaveras CountyAngelsColusa CountyColusa, WilliamsContra Costa CountyConcord, AntiochDel Norte CountyCrescent CityEl Dorado CountySouth Lake Tahoe, PlacervilleFresno CountyFresno, ClovisGlenn CountyOrland, WillowsHumboldt CountyEureka, ArcataImperial CountyEl Centro, CalexicoInyo CountyBishopKern CountyBakersfield, DelanoKings CountyHanford, LemooreLake CountyClearlake, LakeportLassen CountySusanvilleLos Angeles CountyLos Angeles, Long BeachMadera CountyMadera, ChowchillaMarin CountySan Rafael, NovatoMariposa CountyMendocino CountyUkiah, Fort BraggMerced CountyMerced, Los BanosModoc CountyAlturasMono CountyMammoth LakesMonterey CountySalinas, SeasideNapa CountyNapa, American CanyonNevada CountyTruckee, Grass ValleyOrange CountyAnaheim, IrvinePlacer CountyRoseville, RocklinPlumas CountyPortolaRiverside CountyRiverside, Moreno ValleySacramento CountySacramento, Elk GroveSan Benito CountyHollister, San Juan BautistaSan Bernardino CountySan Bernardino, FontanaSan Diego CountySan Diego, Chula VistaSan Francisco CountySan FranciscoSan Joaquin CountyStockton, TracySan Luis Obispo CountySan Luis Obispo, El Paso de Robles (Paso Robles)San Mateo CountySan Mateo, Daly CitySanta Barbara CountySanta Maria, Santa BarbaraSanta Clara CountySan Jose, SunnyvaleSanta Cruz CountySanta Cruz, WatsonvilleShasta CountyRedding, AndersonSierra CountySiskiyou CountyYreka, Mount ShastaSolano CountyVallejo, FairfieldSonoma CountySanta Rosa, PetalumaStanislaus CountyModesto, TurlockSutter CountyYuba City, Live OakTehama CountyRed Bluff, CorningTrinity CountyTulare CountyVisalia, TulareTuolumne CountySonoraVentura CountyOxnard, Simi ValleyYolo CountyDavis, WoodlandYuba CountyMarysville, Wheatland

Cities and towns on record 103

City or townCountyData centersLocal measuresWatchlistLatest record
Santa ClaraSanta Clara County101—1GI Partners Santa Clara Data Center (2805 Bowers Avenue)
San JoseSanta Clara County55—1San Jose Data Center Pipeline (multiple Equinix and other projects)
Los AngelesLos Angeles County50———
San DiegoSan Diego County30———
SunnyvaleSanta Clara County20———
San FranciscoSan Francisco County181 (0 in force)—San Francisco supervisors propose 45-day moratorium on new data centers Proposed
IrvineOrange County16———
FremontAlameda County10———
Mountain ViewSanta Clara County + Contra Costa County9———
HaywardAlameda County81 (0 in force)—Council starts process to prohibit future data center approvals Proposed
El SegundoLos Angeles County8———
McClellan ParkSacramento County6———
ModestoStanislaus County6———
Rancho CordovaSacramento County6———
RiversideRiverside County51 (0 in force)—Proposed 90-day data center moratorium Proposed
AnaheimOrange County5———
MilpitasSanta Clara County5———
San Luis ObispoSan Luis Obispo County5———
StocktonSan Joaquin County5———
FresnoFresno County41 (0 in force)—Proposed 10-year citywide data center prohibition Proposed
BurbankLos Angeles County + Santa Clara County4———
EmeryvilleAlameda County4———
Santa AnaOrange County4———
Santa BarbaraSanta Barbara County4———
TustinOrange County4———
VernonLos Angeles County4———
BakersfieldKern County3———
FairfieldSolano County3———
HawthorneLos Angeles County3———
NapaNapa County3———
NewarkAlameda County3———
Palo AltoSanta Clara County3———
SacramentoSacramento County3———
West SacramentoYolo County3———
OaklandAlameda County21 (0 in force)1Oakland Weighs Data Center Moratorium as Opposition Mounts Proposed
ConcordContra Costa County2———
ManchesterMendocino County2———
Menlo ParkSan Mateo County2———
Moffett Field—2———
OntarioSan Bernardino County2———
PleasantonAlameda County2———
San BernardinoSan Bernardino County2———
San MateoSan Mateo County2———
South San FranciscoSan Mateo County2———
CalexicoImperial County11 (1 in force)—Permanent citywide data center ban In force
GilroySanta Clara County11 (1 in force)—Proposed urgency moratorium on data center applications In force
Palm SpringsRiverside County11 (1 in force)—Two-year data center moratorium, extended Sept. 30, 2026 In force
Agoura HillsLos Angeles County1———
Bay PointContra Costa County1———
BerkeleyAlameda County1———
BrisbaneSan Mateo County1———
BurlingameSan Mateo County1———
Citrus HeightsSacramento County1———
La MiradaLos Angeles County1———
Long BeachLos Angeles County1———
Marina del ReyLos Angeles County1———
MenifeeRiverside County1———
OrangeOrange County1———
OrovilleButte County1———
PalmdaleLos Angeles County1———
PasadenaLos Angeles County1———
PetalumaSonoma County1———
ReddingShasta County1———
Redondo BeachLos Angeles County1———
Redwood CitySan Mateo County1———
RialtoSan Bernardino County1———
Rohnert ParkSonoma County1———
RosevillePlacer County1———
San RamonContra Costa County1———
Santa CruzSanta Cruz County1———
Santa Fe SpringsLos Angeles County1———
Santa PaulaVentura County1———
StanfordSanta Clara County1———
VistaSan Diego County1———
Walnut CreekContra Costa County1———
ImperialImperial County—1 (1 in force)1Emergency data center moratorium In force
AlhambraLos Angeles County—1 (1 in force)—City moratorium on data centers with no end date In force
Angels Camp——1 (1 in force)—45-day urgency moratorium on data centers In force
Baldwin ParkLos Angeles County—1 (1 in force)—City moratorium on data centers for a stated term In force
CalipatriaImperial County—1 (0 in force)—Permanent data center ban (in development) Proposed
City of BrawleyImperial County—1 (1 in force)—City of Brawley (data center moratorium passed 3-2), CA data center moratorium In force
City of CalexicoImperial County—1 (0 in force)—City of Calexico (proposed data center moratorium), CA data center moratorium (pause) Paused
City of ImperialImperial County—1 (0 in force)—City of Imperial (hyperscale data center moratorium advancing), CA data center moratorium (proposed) Proposed
CoachellaRiverside County—1 (1 in force)—Permanent citywide ban on large-scale data centers In force
CommerceLos Angeles County—1 (1 in force)—45-day urgency moratorium on data centers In force
Desert Hot SpringsRiverside County—1 (1 in force)—Local moratorium on data centers through June 17, 2028 In force
DixonSolano County—1 (1 in force)—45-day urgency moratorium on data centers In force
El MonteLos Angeles County—1 (1 in force)—City moratorium on data centers through February 2, 2027 In force
EscondidoSan Diego County—1 (1 in force)—45-day moratorium on data centers In force
EurekaHumboldt County—1 (1 in force)—Local moratorium on data centers through October 17, 2026 In force
IndioRiverside County—1 (1 in force)—Urgency data center moratorium In force
IrwindaleLos Angeles County—1 (1 in force)—Ordinance No. 821 banning data centers In force
Lake ElsinoreRiverside County—1 (1 in force)—City moratorium on data centers through October 9, 2026 In force
MontebelloLos Angeles County—1 (0 in force)—Expired city moratorium on data centers through March 28, 2026 Failed / vetoed
Monterey ParkLos Angeles County—1 (1 in force)—Measure NDC permanent data center ban In force
Morgan HillSanta Clara County—1 (1 in force)—City moratorium on data centers through October 10, 2026 In force
Newsom Signs Legislation——1 (1 in force)—Newsom Signs Legislation to Regulate Data Centers in California In force
OakleyContra Costa County—1 (1 in force)—City moratorium on data centers through April 14, 2027 In force
PattersonStanislaus County—1 (1 in force)—City moratorium on data centers through July 15, 2027 In force
PerrisRiverside County—1 (0 in force)—Proposed ordinance prohibiting high-demand data centers Proposed
PowaySan Diego County—1 (0 in force)—Ordinance banning AI data centers, initial approval Proposed
RichmondContra Costa County—1 (1 in force)—Richmond becomes 3rd Bay Area city to impose data center moratorium In force
MercedMerced County——1High-Speed Rail Corridor Data Center Deals (Merced/Madera)

Data center counts come from every facility on the SAVRN Data Center Map, counted in the county and the city or community where each building physically stands (Census boundaries), not its mailing address. Jurisdictions appear as the Moratorium Tracker records them.

The chain

California, from generation to the household bill

1Grid operator

Data center load increase by 2030
1.8 GW

2Generation pipeline

Operating capacity
109.6 GW
Planned, all types
20,049 MW
Under construction or built
8,085 MW
Planned gas
114 MW
Planned retirements 2026–30
3,364 MW
Net firm additions derived
4,721 MW

3Data center demand

Data centers identified
482
Operators
148
Load in tracked queues
518 MW
Utility large-load projects
4
Commercial sales, YTD change
-1.3%
Industry share of state GDP
3.9%

4Jobs and pay

Unemployment, Aug 2026
5.1% (-0.4 pts y/y)
Construction jobs vs 2019
-0.8%
Manufacturing jobs vs 2019
-6.9%
Electrical contractor jobs 2019–25
+8.5%
Electrician median pay
$76,160
Electrician ÷ cashier pay
2.05×

5Household bill

Residential price, YTD Jul 2026
33.25¢/kWh
Change vs YTD 2025
+2.5%
All-sector price change
+3.2%
Total retail sales change
+1.0%

6Policy friction

State measures on record
17
Local measures (in force)
48 (30)
Watchlist projects
9
Lawsuits tracked
0
Announced capital, disclosed
—
Dedicated tax incentive
None listed
Generation

Planned power plants in California

Every planned generator in California in the August 2026 EIA-860M inventory, by technology, then the 15 largest units. Under construction or built covers status codes U, V and TS.

Planned generation by fuel 20,049 MW
Natural gas 114 MW 1%Wind 344 MW 2%Solar 7,924 MW 40%Battery storage 9,980 MW 50%Other 1,687 MW 8%
Under construction or built 8,085 MW
Wind 213 MW 3%Solar 3,527 MW 44%Battery storage 4,321 MW 53%Other 24 MW <1%
TechnologyUnitsPlanned MWUnder construction or built
Battery storage919,980 MW4,321 MW
Solar927,924 MW3,527 MW
Other221,687 MW24 MW
Wind8344 MW213 MW
Natural gas9114 MW—

Largest planned generators

PlantCountyTechnologyMWStatusYearOwner
Bellefield 2 Solar & Energy Storage FarmKernBatteries500 MWUnder construction (>50%)202626SB 8me LLC
Bellefield 2 Solar & Energy Storage FarmKernSolar Photovoltaic500 MWUnder construction (>50%)202626SB 8me LLC
Grace Energy CenterRiversideSolar Photovoltaic500 MWApprovals pending2027Grace Orchard Interconnection, LLC
Grace Energy CenterRiversideBatteries500 MWApprovals pending2027Grace Orchard Interconnection, LLC
Pelicans Jaw Hybrid SolarKernSolar Photovoltaic440 MWBuilt, not yet operating2027Pelicans Jaw Solar LLC
GabrielLos AngelesBatteries400 MWUnder construction (≤50%)2027San Gabriel Project LLC
MariciLos AngelesBatteries400 MWUnder construction (≤50%)2027Marici Project LLC
Lycan Solar ProjectRiversideBatteries400 MWPlanned, approvals not started2030EDF Renewables Development, Inc.
Lycan Solar ProjectRiversideSolar Photovoltaic400 MWApprovals pending2027EDF Renewables Development, Inc.
Country Acres Clean Power LLCPlacerSolar Photovoltaic344 MWUnder construction (≤50%)2026Clenera DevCo LLC
Darden II SolarFresnoSolar Photovoltaic343 MWApprovals received2028Intersect USA, LLC
Darden IV SolarFresnoSolar Photovoltaic343 MWApprovals received2028Intersect USA, LLC
Darden I SolarFresnoSolar Photovoltaic343 MWApprovals received2028Intersect USA, LLC
Darden III SolarFresnoSolar Photovoltaic343 MWApprovals received2028Intersect USA, LLC
Darden II SolarFresnoBatteries304 MWApprovals received2028Intersect USA, LLC
Supply chain

What the California build-out runs on

Who is building generation in California, which manufacturers and contractors have a plant, expansion or contract recorded here, and how long the critical equipment takes to arrive.

Developers and owners with planned generation

Developer or ownerUnitsPlanned MWBuilding MWMain technologyCounties
Intersect USA, LLC82,586 MW—Battery storage1
Premium Energy Holdings71,600 MW—Other2
Vesper Energy Development LLC91,080 MW—Battery storage5
Grace Orchard Interconnection, LLC21,000 MW—Solar1
26SB 8me LLC21,000 MW1,000 MWSolar1
EDF Renewables Development, Inc.2800 MW—Solar1
Pelicans Jaw Solar LLC2678 MW678 MWBattery storage1
IP Easley, LLC2590 MW290 MWSolar1
Terra-Gen Operating Co-Hybrid4578 MW578 MWSolar1
Clenera DevCo LLC2516 MW516 MWBattery storage1
SE Athos II, LLC3402 MW402 MWBattery storage1
San Gabriel Project LLC1400 MW400 MWBattery storage1
Marici Project LLC1400 MW400 MWBattery storage1
99MT 8me, LLC2400 MW—Solar1
22SV 8ME LLC2400 MW—Solar1

Manufacturers and contractors with a recorded California footprint

No plant, expansion or contract in the manufacturer record names California. The national suppliers below serve every state.

Order-by check derived

52 of the 56 planned units of 50 MW or more in California that are not yet under construction (10,584 of 11,498 MW) are past the date their step-up transformer had to be ordered to meet the planned in-service date. These units hold their schedules only if the equipment is already on order.

PlantTechnologyMWPlanned in serviceTransformer order-byTurbine order-byOwner
Grace Energy CenterSolar500 MWAug 2027Jul 2024—Grace Orchard Interconnection, LLC
Grace Energy CenterBattery storage500 MWOct 2027Sep 2024—Grace Orchard Interconnection, LLC
Lycan Solar ProjectSolar400 MWDec 2027Nov 2024—EDF Renewables Development, Inc.
Darden IV SolarSolar343 MWMar 2028Feb 2025—Intersect USA, LLC
Darden III SolarSolar343 MWMar 2028Feb 2025—Intersect USA, LLC
Darden II SolarSolar343 MWMar 2028Feb 2025—Intersect USA, LLC
Darden I SolarSolar343 MWMar 2028Feb 2025—Intersect USA, LLC
Darden III SolarBattery storage304 MWMar 2028Feb 2025—Intersect USA, LLC
Darden IV SolarBattery storage304 MWMar 2028Feb 2025—Intersect USA, LLC
Darden II SolarBattery storage304 MWMar 2028Feb 2025—Intersect USA, LLC
Darden I SolarBattery storage304 MWMar 2028Feb 2025—Intersect USA, LLC
Easley SolarBattery storage300 MWMar 2028Feb 2025—IP Easley, LLC

Lead times, OEM backlogs and the national generation and grid contractors are on the national supply chain section.

Demand

Data center and large-load demand in California

482 data centers run by 148 operators are identified in California. The full list by city is on the California Data Center Map page. Utilities report 4 large customer projects here to EEI.

UtilityCustomer or typeMW statedInvestment stated
Pacific Gas & Electric Company (PG&E)Microsoft77 MW—
Pacific Gas & Electric Company (PG&E)Equinix40 MW—
Pacific Gas & Electric Company (PG&E)Prologis99 MW—
Pacific Gas & Electric Company (PG&E)Prologis400 MW—
Jobs and pay

The California jobs report, and who the build-out employs

Median pay, May 2025
Cashiers$37,100
Fast food and counter workers$42,280
Retail salespersons$38,440
All occupations$58,240
Construction laborers$60,270
Welders$58,060
HVAC mechanics$72,560
Plumbers and pipefitters$72,830
Electricians$76,160
Power plant operators$105,210
Power-line installers$129,040
Construction supervisors$97,680
Electrical engineers$144,040
Cashier median: $37,100

Payroll employment, August 2026 (preliminary)

IndustryJobsChange vs Aug 2025Change vs Aug 2019
Total nonfarm18,177.2k▲ 0.8%▲ 4.1% (+712.1k)
Construction886.2k▼ 0.8%▼ 0.8% (-7.4k)
Manufacturing1,203.8k▼ 0.8%▼ 6.9% (-89.0k)
Mining and logging18.1k▼ 1.6%▼ 20.6% (-4.7k)
Retail trade1,589.1k▲ 1.4%▼ 3.0% (-48.9k)

Power and data industries, 2019 to 2025

IndustryJobs 2019Jobs 2025ChangeAverage pay 2025
Data processing and hosting51,85381,824▲ 57.8%$327,171
Electrical contractors112,727122,326▲ 8.5%$104,434
Power and communication line construction17,90120,070▲ 12.1%$136,143
Electric power generation, transmission, distribution—22,488—$189,472
Transformer manufacturing—2,427—$105,281

Pay ladder, May 2025

OccupationEmploymentMedian annual payMultiple of cashier pay
Cashiers336,110$37,1001.00×
Fast food and counter workers449,840$42,2801.14×
Retail salespersons376,460$38,4401.04×
All occupations18,213,700$58,2401.57×
Construction laborers88,240$60,2701.62×
Welders26,060$58,0601.56×
HVAC mechanics35,130$72,5601.96×
Plumbers and pipefitters47,660$72,8301.96×
Electricians73,310$76,1602.05×
Power plant operators2,610$105,2102.84×
Power-line installers8,930$129,0403.48×
Construction supervisors71,750$97,6802.63×
Electrical engineers24,230$144,0403.88×

County-level contractor jobs and pay are in the county record above.

Economy

What the data center industry adds to California

145,820
Direct data center jobs (2024)
665,500
Total jobs supported, in state
$159.2B
Total GDP contribution
3.9%
Share of state GDP
$14.1B
State and local taxes

PwC figures are modeled estimates commissioned by the industry.

Policy

The rules and the pipeline in California

State measures 17

BillMeasureStatusDate
AB 1577Data center reporting requirementsIn force2026-09
AB 2383Fair Share in Energy ActIn force2026-09
AB 2469Data centers: water use disclosuresIn force2026-09
SB 1168Data center electricity rate structuresIn force2026-09
SB 886California Technology Innovation and Ratepayer Protection ActIn force2026-09
SB 887CEQA treatment of data centersIn force2026-09
AB 2619California AB 2619 would establish comprehensive water reporting requirements with three data center size categories: hyperscale (>25 MW), mid-range (2-25 MW)In force2026-09
—Seven bills to improve data center transparencyIn force2026-09
—Newsom clamps down on California data centers as voters turn against the industryIn force2026-09
—Cities get more say in data center development under new California lawsIn force2026-09
—Data centers are black boxes, but California wants to change thatIn force2026-09
—Executive Order on AI SafetyIn force2026-09
—Governors take major actions on AIPaused2026-09
—Bill to create California PUC inspector generalFailed / vetoed2026-09
—What bills did Gavin Newsom sign into law — or veto — in his final year leading California?Failed / vetoed2026-09
AB 222California Assembly Bill 222 would require data center operators to report energy consumption and efficiency metrics, including Power Usage EffectivenessFailed / vetoed2026-08
SB 57California SB 57 directs the CPUC to assess whether investor-owned utility costs from new data center loads result in cost shifts to other retail customers.In force2025-10

Delay Watchlist projects 9

ProjectLocationStatusCauseMW
Behring AI Campus / Data Center (415 20th St.)Oaklanddelayedcommunity opposition20 MW
Imperial Valley $10B AI Data CenterImperiallitigation activelitigationpermit denial—
Imperial Data Center (Imperial Valley Computer Manufacturing / IVCM)Imperial County (near city of Imperial)delayedlocal moratoriumwater disputecommunity opposition—
GI Partners Santa Clara Data Center (2805 Bowers Avenue)Santa Claradelayedlitigationpermit denial—
Coachella Valley Technology CampusCoachella (Riverside County)cancelledlocal moratoriumcommunity opposition—
Eight Form El Segundo Data Center (750 N. Nash Street)El Segundo (Los Angeles County)withdrawncommunity opposition—
Monterey Park Data Center (HMC StratCap)Monterey Park (Los Angeles County)cancelledcommunity opposition—
San Jose Data Center Pipeline (multiple Equinix and other projects)San Josepending reviewstate moratoriumlocal moratoriumcommunity opposition—
High-Speed Rail Corridor Data Center Deals (Merced/Madera)Merced / Madera / Kern Countypending reviewwater dispute—

Local moratoria and restrictions (48) appear by county and city in the county-by-county section. Counts include every status in the weekly tracker feeds as of October 5, 2026. The California Data Center Map page counts only active local pauses and delayed or blocked projects as of its September 2 rebuild, so its figures are lower. The difference is one of definition and date.

Nearby states

California's neighbors

Questions

California power, answered from the record

How much new power generation is planned in California?

EIA's August 2026 inventory lists 20,049 MW of planned generators in California, 8,085 MW of it under construction or built. By capacity the pipeline is battery storage 50%, solar 40%, other 8%. The largest single unit is Bellefield 2 Solar & Energy Storage Farm (500 MW, 26SB 8me LLC). Owners plan to retire 3,364 MW from 2026 to 2030.

Who runs the power grid in California?

CAISO serves most of California as the regional wholesale market and grid operator. 518 MW of data center load sits in tracked queues, 9th in the country.

How much do data centers add to the California economy?

PwC's 2026 study for the Data Center Coalition credits the industry with 665,500 in-state jobs, $159.2B of GDP (3.9% of the state economy, 2nd of 51) and $14.1B in state and local taxes in 2024. These are modeled estimates commissioned by the industry.

Is planned generation in California on schedule?

52 of 56 planned units of 50 MW or more not yet under construction are past the latest date to order a step-up transformer (more than 160 weeks) for their planned in-service date. They hold schedule only if equipment is already on order.

Are electricity prices rising in California?

Residential electricity averaged 33.25¢/kWh from January to July 2026, +2.5% on a year earlier, the 44th fastest increase of 51. Commercial sales, the class that includes data centers, changed -1.3%.

Where are the data centers in California?

482 data centers run by 148 operators are identified in California. The largest clusters are in Santa Clara County (197), Los Angeles County (77), San Diego County (31).

What do electricians earn in California?

The median electrician in California earned $76,160 in May 2025, 2.05 times the median cashier, and power-line installers earned $129,040 (BLS OEWS).

Does California have a data center moratorium?

The SAVRN Moratorium Tracker holds 17 state-level measures (13 enacted) and 48 local moratoria or restrictions in California, 30 of them in force, 7th most in the country.

Across SAVRN

California across the SAVRN trackers

Sources

Sources for this page

Every figure links to its original source through the Sources buttons. Values marked derived are calculated from reported figures.