Nevada · Power Supply Chain & Demand

Power Supply Chain and Demand in Nevada

Seal of Nevada

Vertically integrated utilities run most of Nevada's grid. 6,672 MW of new generation is planned in Nevada, 2,254 MW of it under construction or built and awaiting operation, against 332 MW of planned retirements through 2030. 61 data centers are identified in the state. Residential electricity averaged 13.53¢/kWh in 2026 through July, +2.6% from a year earlier. Unemployment was 4.8% in August 2026, and construction employment is +20.7% against August 2019. The SAVRN trackers hold 11 local moratoria or restrictions for Nevada across all statuses (10 in force) and 5 named projects on the Delay Watchlist.

Rebuilt 2026-10-08 · refreshed weekly
Grid operator
Non-RTO (utility-run)
main wholesale grid
Planned generation
6.7 GW
2.3 GW under construction or built
Data center load in queues
—
61 data centers identified
Residential price
13.53¢
▲ 2.6% vs 2025, YTD July
Construction jobs
+20.7%
▲ 20.7% vs Aug 2019
Local measures
11
10 in force · 5 on Delay Watchlist
The finding

What the build-out changed in Nevada

Nevada is building power faster than most states, and the jobs data shows it. Planned generation equals 34% of the power plants Nevada runs today, one of the steepest build-outs in the country (5th). Commercial electricity sales, the class that includes data centers, are +9.0% year to date, 5th in the country. Power and communication line construction jobs grew 62.7% from 2019 to 2025 (6th of 44). The weak spot: announced data center capital ranks 25th of 31 at $7.2B.

Then and now

MeasureThenNowChangeU.S. rank
Construction jobs (Aug 2019 → Aug 2026)96.8k116.8k▲ 20.7%16th of 48
Electrical contractor jobs (2019 → 2025)11,08613,994▲ 26.2%14th of 48
Power line construction jobs (2019 → 2025)1,7192,796▲ 62.7%6th of 44
Data processing and hosting jobs (2019 → 2025)2,5533,171▲ 24.2%33rd of 46
Unemployment rate (Feb 2020 → Aug 2026)4.4%4.8%▲ 0.4pts—
Residential price, ¢/kWh (YTD Jul 2025 → 2026)13.19¢13.53¢▲ 2.6%43rd of 51
Generation fleet → planned additions19.4 GW operating6.7 GW planned34% of fleet5th of 51

Where Nevada ranks among 51

Data center share of state GDP1.9%25th of 51
Announced data center capital$7.2B25th of 31
Planned generation vs. today's fleet34%5th of 51
Construction jobs vs. 2019+20.7%16th of 48
Electrical contractor jobs, 2019 to 2025+26.2%14th of 48
Power line construction jobs, 2019 to 2025+62.7%6th of 44
Data processing and hosting jobs, 2019 to 2025+24.2%33rd of 46
Commercial electricity sales, YTD change+9.0%5th of 51
Residential electricity price, YTD change+2.6%43rd of 51
Local moratoria and restrictions1132nd of 49

1st = the most. Ranks cover every state and DC that publishes the figure.

Regionally, Oregon leads on planned generation vs. today's fleet at 40%; Nevada is 2nd of 6 in its neighborhood at 34%.

County spotlight

Clark County holds the most data centers on record in Nevada (28), and its electrical contractor workforce changed +14.5% since 2019 to 10,020 jobs. The fastest-growing electrical trade market is Washoe County, where contractor jobs grew 53.1% to 2,548.

The map

Where Nevada sits in the power system

Grid operator
Non-RTO (utility-run)
Operating capacity
19.4 GW
Planned generation
6,672 MW
Under construction or built
2,254 MW
Data centers identified
61
Data center load in queues
—
Unemployment, Aug 2026
4.8%
Residential price change
+2.6%

Neighboring states are shaded. Select one to open its page.

Counties and cities

Nevada, county by county

17 counties in Nevada. Planned generation sits in 7 of them, data centers stand in 3, and local measures are on record in 3. Pick a layer, then select a county for its full record.

Esmeralda CountyLincoln CountyMineral CountyEureka CountyHumboldt CountyWashoe CountyDouglas CountyClark CountyPershing CountyLander CountyStorey CountyCarson CityWhite Pine CountyElko CountyNye CountyLyon CountyChurchill County

County leaders

Most planned generation
Clark Countysolar4,230 MW
Lyon Countybattery storage1,400 MW
White Pine Countybattery storage600 MW
Churchill Countysolar400 MW
Lander Countysolar14 MW
Storey Countysolar1 MW
Fastest electrical contractor growth
Washoe County2,548 jobs+53.1%
Clark County10,020 jobs+14.5%

Counties on record 11

CountyData centersPlanned MWBuilding MWLead developerElectrical contractor jobsChange 2019–25Local measuresWatchlist
Clark County284,230 MW440 MWNoble Solar LLC10,020▲ 14.5%—1
Washoe County17———2,548▲ 53.1%——
Storey County101 MW1 MWTesla Inc.———1
Lyon County—1,400 MW1,400 MWLibra Solar LLC————
White Pine County—600 MW—Repsol Renewables NA53▲ 278.6%1 (1 in force)—
Churchill County—400 MW400 MWSierra Pacific Power Co————
Esmeralda County—26 MW—Fish Lake Geothermal LLC————
Lander County—14 MW14 MWOrmat Nevada Inc————
Carson City————618———
Nye County————84—2 (2 in force)—
Humboldt County——————1 (1 in force)—

Every county in Nevada 17

Each county has its own page: power plants, utilities and prices, jobs since 2019, data centers, local rules and its neighbors.

Cities and towns on record 13

City or townCountyData centersLocal measuresWatchlistLatest record
Las VegasClark County11———
RenoWashoe County93 (3 in force)1Extended data center moratorium In force
EnterpriseClark County6———
North Las VegasClark County3———
ParadiseClark County3———
Sunrise ManorClark County3———
HendersonClark County21 (0 in force)1Rejected local moratorium on data centers Failed / vetoed
SparksWashoe County2———
Tahoe Reno—1———
Fallon Paiute-Shoshone Tribe——1 (1 in force)—Tribal moratorium on data centers with no end date In force
Pyramid Lake Paiute Tribe——1 (1 in force)—Tribal moratorium on data centers with no end date In force
WellsElko County—1 (1 in force)—City moratorium on data centers In force
Boulder CityClark County——1Boulder City BLM Site

Data center counts come from every facility on the SAVRN Data Center Map, counted in the county and the city or community where each building physically stands (Census boundaries), not its mailing address. Jurisdictions appear as the Moratorium Tracker records them.

The chain

Nevada, from generation to the household bill

1Grid operator

Utility-run territory: resource planning sits with the vertically integrated utilities and the state commission.

2Generation pipeline

Operating capacity
19.4 GW
Planned, all types
6,672 MW
Under construction or built
2,254 MW
Planned gas
0 MW
Planned retirements 2026–30
332 MW
Net firm additions derived
1,922 MW

3Data center demand

Data centers identified
61
Operators
27
Load in tracked queues
—
Utility large-load projects
2
Commercial sales, YTD change
+9.0%
Industry share of state GDP
1.9%

4Jobs and pay

Unemployment, Aug 2026
4.8% (-0.4 pts y/y)
Construction jobs vs 2019
+20.7%
Manufacturing jobs vs 2019
+15.7%
Electrical contractor jobs 2019–25
+26.2%
Electrician median pay
$73,570
Electrician ÷ cashier pay
2.46×

5Household bill

Residential price, YTD Jul 2026
13.53¢/kWh
Change vs YTD 2025
+2.6%
All-sector price change
+3.6%
Total retail sales change
+5.4%

6Policy friction

State measures on record
2
Local measures (in force)
11 (10)
Watchlist projects
5
Lawsuits tracked
0
Announced capital, disclosed
$7.2B
Dedicated tax incentive
Yes
Generation

Planned power plants in Nevada

Every planned generator in Nevada in the August 2026 EIA-860M inventory, by technology, then the 15 largest units. Under construction or built covers status codes U, V and TS.

Planned generation by fuel 6,672 MW
Solar 3,726 MW 56%Battery storage 2,920 MW 44%Other 26 MW <1%
Under construction or built 2,254 MW
Solar 1,428 MW 63%Battery storage 826 MW 37%
TechnologyUnitsPlanned MWUnder construction or built
Solar143,726 MW1,428 MW
Battery storage102,920 MW826 MW
Other526 MW—

Largest planned generators

PlantCountyTechnologyMWStatusYearOwner
Libra SolarLyonSolar Photovoltaic700 MWUnder construction (≤50%)2027Libra Solar LLC
Libra SolarLyonBatteries700 MWUnder construction (≤50%)2027Libra Solar LLC
Sierra Solar HybridChurchillSolar Photovoltaic400 MWBuilt, not yet operating2026Sierra Pacific Power Co
Purple Sage Energy CenterClarkSolar Photovoltaic400 MWPlanned, approvals not started2028Noble Solar LLC
Purple Sage Energy CenterClarkBatteries400 MWPlanned, approvals not started2028Noble Solar LLC
Rough HatClarkSolar Photovoltaic400 MWApprovals pending2027Candela Renewables, LLC
Arida Solar (Hybrid)ClarkBatteries370 MWPlanned, approvals not started2029326FW 8me LLC
Arida Solar (Hybrid)ClarkSolar Photovoltaic370 MWPlanned, approvals not started2029326FW 8me LLC
Bonanza Solar and Storage ProjectClarkSolar Photovoltaic300 MWApprovals pending2027EDF Renewables Development, Inc.
Robinson SolarWhite PineBatteries300 MWPlanned, approvals not started2029Repsol Renewables NA
Southern Bighorn Solar HybridClarkSolar Photovoltaic300 MWPlanned, approvals not started2028300MS 8me LLC
Southern Bighorn Solar HybridClarkBatteries300 MWPlanned, approvals not started2028300MS 8me LLC
Vitex StorageClarkBatteries300 MWApprovals pending2028Cypress Creek Renewables
Robinson SolarWhite PineSolar Photovoltaic300 MWPlanned, approvals not started2029Repsol Renewables NA
Dry Lake East Energy CenterClarkSolar Photovoltaic200 MWUnder construction (>50%)2026Dry Lake East Energy Center
Supply chain

What the Nevada build-out runs on

Who is building generation in Nevada, which manufacturers and contractors have a plant, expansion or contract recorded here, and how long the critical equipment takes to arrive.

Developers and owners with planned generation

Developer or ownerUnitsPlanned MWBuilding MWMain technologyCounties
Libra Solar LLC21,400 MW1,400 MWBattery storage1
Noble Solar LLC2800 MW—Battery storage1
326FW 8me LLC2740 MW—Solar1
Repsol Renewables NA2600 MW—Battery storage1
300MS 8me LLC2600 MW—Battery storage1
EDF Renewables Development, Inc.2495 MW—Battery storage1
Sierra Pacific Power Co1400 MW400 MWSolar1
Candela Renewables, LLC1400 MW—Solar1
Cypress Creek Renewables1300 MW—Battery storage1
174 Power Global Corp.2256 MW—Solar1
Dry Lake East Energy Center1200 MW200 MWSolar1
425LM 8ME LLC2200 MW—Solar1
Roccasecca BESS LLC1126 MW126 MWBattery storage1
Boulder Flats Solar, LLC1113 MW113 MWSolar1
Fish Lake Geothermal LLC526 MW—Other1

Manufacturers and contractors with a recorded Nevada footprint

No plant, expansion or contract in the manufacturer record names Nevada. The national suppliers below serve every state.

Order-by check derived

14 of the 16 planned units of 50 MW or more in Nevada that are not yet under construction (3,791 of 4,391 MW) are past the date their step-up transformer had to be ordered to meet the planned in-service date. These units hold their schedules only if the equipment is already on order.

PlantTechnologyMWPlanned in serviceTransformer order-byTurbine order-byOwner
Rough HatSolar400 MWDec 2027Nov 2024—Candela Renewables, LLC
Purple Sage Energy CenterBattery storage400 MWNov 2028Oct 2025—Noble Solar LLC
Purple Sage Energy CenterSolar400 MWNov 2028Oct 2025—Noble Solar LLC
Arida Solar (Hybrid)Solar370 MWJun 2029May 2026—326FW 8me LLC
Arida Solar (Hybrid)Battery storage370 MWJun 2029May 2026—326FW 8me LLC
Bonanza Solar and Storage ProjectSolar300 MWDec 2027Nov 2024—EDF Renewables Development, Inc.
Vitex StorageBattery storage300 MWJun 2028May 2025—Cypress Creek Renewables
Southern Bighorn Solar HybridBattery storage300 MWJul 2028Jun 2025—300MS 8me LLC
Southern Bighorn Solar HybridSolar300 MWJul 2028Jun 2025—300MS 8me LLC
Bonanza Solar and Storage ProjectBattery storage195 MWDec 2027Nov 2024—EDF Renewables Development, Inc.
Boulder Solar III LLCSolar128 MWJun 2027May 2024—174 Power Global Corp.
Boulder Solar III LLCBattery storage128 MWJun 2027May 2024—174 Power Global Corp.

Lead times, OEM backlogs and the national generation and grid contractors are on the national supply chain section.

Demand

Data center and large-load demand in Nevada

61 data centers run by 27 operators are identified in Nevada. The full list by city is on the Nevada Data Center Map page. Utilities report 2 large customer projects here to EEI.

UtilityCustomer or typeMW statedInvestment stated
NV Energy (Berkshire Hathaway Energy)Vantage Data Centers224 MW$3 billion
NV Energy (Berkshire Hathaway Energy)Google——
Jobs and pay

The Nevada jobs report, and who the build-out employs

Median pay, May 2025
Cashiers$29,870
Fast food and counter workers$31,950
Retail salespersons$34,190
All occupations$47,660
Construction laborers$48,990
Welders$61,520
HVAC mechanics$60,510
Plumbers and pipefitters$61,610
Electricians$73,570
Power plant operators$131,400
Power-line installers$96,560
Construction supervisors$81,990
Electrical engineers$107,400
Cashier median: $29,870

Payroll employment, August 2026 (preliminary)

IndustryJobsChange vs Aug 2025Change vs Aug 2019
Total nonfarm1,619.4k▲ 1.3%▲ 13.6% (+193.9k)
Construction116.8k▲ 3.2%▲ 20.7% (+20.0k)
Manufacturing68.6k▲ 0.4%▲ 15.7% (+9.3k)
Mining and logging15.1k▲ 2.7%▲ 2.7% (+0.4k)
Retail trade151.9k▲ 0.1%▲ 2.6% (+3.8k)

Power and data industries, 2019 to 2025

IndustryJobs 2019Jobs 2025ChangeAverage pay 2025
Data processing and hosting2,5533,171▲ 24.2%$187,512
Electrical contractors11,08613,994▲ 26.2%$94,657
Power and communication line construction1,7192,796▲ 62.7%$111,505
Electric power generation, transmission, distribution—3,071—$143,688
Transformer manufacturing—204—$97,461

Pay ladder, May 2025

OccupationEmploymentMedian annual payMultiple of cashier pay
Cashiers30,160$29,8701.00×
Fast food and counter workers45,850$31,9501.07×
Retail salespersons43,920$34,1901.14×
All occupations1,551,540$47,6601.60×
Construction laborers11,890$48,9901.64×
Welders1,600$61,5202.06×
HVAC mechanics4,170$60,5102.03×
Plumbers and pipefitters5,370$61,6102.06×
Electricians8,350$73,5702.46×
Power plant operators250$131,4004.40×
Power-line installers920$96,5603.23×
Construction supervisors9,680$81,9902.74×
Electrical engineers1,100$107,4003.60×

County-level contractor jobs and pay are in the county record above.

Economy

What the data center industry adds to Nevada

6,610
Direct data center jobs (2024)
29,310
Total jobs supported, in state
$5.0B
Total GDP contribution
1.9%
Share of state GDP
$0.4B
State and local taxes

PwC figures are modeled estimates commissioned by the industry.

State studies and incentive costs

Economic study findingsDisclosed tax-incentive cost
—Nevada $140.0M (2024)
Policy

The rules and the pipeline in Nevada

State measures 2

BillMeasureStatusDate
Executive Order 2026-005Nevada Standard for Responsible Data Center DevelopmentIn force2026-09
—Executive Order on Data CentersProposed2026-09

Delay Watchlist projects 5

ProjectLocationStatusCauseMW
Boulder City BLM SiteBoulder Cityunder appealwater disputecommunity opposition—
Boulder City BLM Data Center (Townsite Solar 2 / Eldorado Valley)Boulder City (Clark County)haltedlitigationenvironmental review—
Tract Northern Nevada Land Portfolio (Storey County/Reno area)Storey County / Washoe Countylitigation activelitigation—
Reno Data Center Pipeline (city-wide moratorium)Renohaltedlocal moratorium—
NevadaHendersonwithdrawnother—

Local moratoria and restrictions (11) appear by county and city in the county-by-county section. Counts include every status in the weekly tracker feeds as of October 5, 2026. The Nevada Data Center Map page counts only active local pauses and delayed or blocked projects as of its September 2 rebuild, so its figures are lower. The difference is one of definition and date.

Nearby states

Nevada's neighbors

Questions

Nevada power, answered from the record

How much new power generation is planned in Nevada?

EIA's August 2026 inventory lists 6,672 MW of planned generators in Nevada, 2,254 MW of it under construction or built. By capacity the pipeline is solar 56%, battery storage 44%, other 0%. The largest single unit is Libra Solar (700 MW, Libra Solar LLC). Owners plan to retire 332 MW from 2026 to 2030.

Who runs the power grid in Nevada?

Non-RTO (utility-run) serves most of Nevada, which means vertically integrated utilities plan and dispatch generation under the state commission. No data center load is tracked in its queues yet.

Are electricity prices rising in Nevada?

Residential electricity averaged 13.53¢/kWh from January to July 2026, +2.6% on a year earlier, the 43rd fastest increase of 51. Commercial sales, the class that includes data centers, changed +9.0%.

Is planned generation in Nevada on schedule?

14 of 16 planned units of 50 MW or more not yet under construction are past the latest date to order a step-up transformer (more than 160 weeks) for their planned in-service date. They hold schedule only if equipment is already on order.

Is the build-out creating trade jobs in Nevada?

Construction employment is +20.7% against August 2019. Electrical contractor jobs went from 11,086 in 2019 to 13,994 in 2025 (+26.2%, 14th in the country).

What do electricians earn in Nevada?

The median electrician in Nevada earned $73,570 in May 2025, 2.46 times the median cashier, and power-line installers earned $96,560 (BLS OEWS).

Which counties in Nevada have the most planned generation?

By planned nameplate capacity: Clark County (4,230 MW), Lyon County (1,400 MW), White Pine County (600 MW).

Does Nevada have a data center moratorium?

The SAVRN Moratorium Tracker holds 2 state-level measures (1 enacted) and 11 local moratoria or restrictions in Nevada, 10 of them in force, 32nd most in the country.

Across SAVRN

Nevada across the SAVRN trackers

Sources

Sources for this page

Every figure links to its original source through the Sources buttons. Values marked derived are calculated from reported figures.