ISO-NE runs most of Connecticut's grid. 625 MW of new generation is planned in Connecticut, 97 MW of it under construction or built and awaiting operation, against 8 MW of planned retirements through 2030. 33 data centers are identified in the state. Residential electricity averaged 27.97¢/kWh in 2026 through July, -7.7% from a year earlier. Unemployment was 5.1% in August 2026, and construction employment is +11.2% against August 2019. The SAVRN trackers hold 6 local moratoria or restrictions for Connecticut across all statuses (6 in force) and 3 named projects on the Delay Watchlist.

Rebuilt 2026-10-08 · refreshed weekly
Grid operator
ISO-NE
main wholesale grid
Planned generation
0.6 GW
0.1 GW under construction or built
Data center load in queues
—
33 data centers identified
Residential price
27.97¢
▼ 7.7% vs 2025, YTD July
Construction jobs
+11.2%
▲ 11.2% vs Aug 2019
Local measures
6
6 in force · 3 on Delay Watchlist
The finding

What the build-out changed in Connecticut

Connecticut is in the middle of the pack, with a few sharp signals worth watching. Data processing and hosting jobs grew 124.2% from 2019 to 2025, 2nd of 46 states that disclose the industry. The data center industry now accounts for 1.5% of Connecticut's economy, the 30th largest share of any state (the median state is 1.8%), counting the industry's in-state suppliers and payrolls. Commercial electricity sales, the class that includes data centers, are +0.7% year to date, 31st in the country. The weak spot: power line construction jobs, 2019 to 2025 ranks 43rd of 44 at -23.2%. Factory employment is the exception: manufacturing jobs are -3.1% against August 2019.

Then and now

MeasureThenNowChangeU.S. rank
Construction jobs (Aug 2019 → Aug 2026)59.8k66.5k▲ 11.2%31st of 48
Electrical contractor jobs (2019 → 2025)9,28410,187▲ 9.7%36th of 48
Power line construction jobs (2019 → 2025)1,6721,284▼ 23.2%43rd of 44
Data processing and hosting jobs (2019 → 2025)1,9964,475▲ 124.2%2nd of 46
Unemployment rate (Feb 2020 → Aug 2026)3.8%5.1%▲ 1.3pts—
Residential price, ¢/kWh (YTD Jul 2025 → 2026)30.29¢27.97¢▼ 7.7%51st of 51
Generation fleet → planned additions11.0 GW operating0.6 GW planned6% of fleet42nd of 51

Where Connecticut ranks among 51

Data center share of state GDP1.5%30th of 51
Planned generation vs. today's fleet6%42nd of 51
Construction jobs vs. 2019+11.2%31st of 48
Electrical contractor jobs, 2019 to 2025+9.7%36th of 48
Power line construction jobs, 2019 to 2025-23.2%43rd of 44
Data processing and hosting jobs, 2019 to 2025+124.2%2nd of 46
Commercial electricity sales, YTD change+0.7%31st of 51
Residential electricity price, YTD change-7.7%51st of 51
Local moratoria and restrictions636th of 49

1st = the most. Ranks cover every state and DC that publishes the figure.

Among its neighbors, Connecticut leads on data processing and hosting jobs, 2019 to 2025 (+124.2%), ahead of New York (+46.5%).

County spotlight

Fairfield County holds the most data centers on record in Connecticut (16). The largest share of planned generation sits in Middlesex County: 275 MW, led by Lighthouse Middletown, LLC (battery storage).

The map

Where Connecticut sits in the power system

Grid operator
ISO-NE
Operating capacity
11.0 GW
Planned generation
625 MW
Under construction or built
97 MW
Data centers identified
33
Data center load in queues
—
Unemployment, Aug 2026
5.1%
Residential price change
-7.7%

Neighboring states are shaded. Select one to open its page.

Counties and cities

Connecticut, county by county

8 counties in Connecticut. Planned generation sits in 4 of them, data centers stand in 4, and local measures are on record in 0. Pick a layer, then select a county for its full record.

Middlesex CountyNew Haven CountyWindham CountyNew London CountyFairfield CountyTolland CountyLitchfield CountyHartford County

County leaders

Most planned generation
Middlesex Countybattery storage275 MW
Hartford Countysolar206 MW
Windham Countysolar139 MW
New London Countysolar5 MW
Most data centers
Fairfield County16
New Haven County8
Hartford County6
New London County2

Too few counties disclose contractor jobs.

Counties on record 6

CountyData centersPlanned MWBuilding MWLead developerElectrical contractor jobsChange 2019–25Local measuresWatchlist
Fairfield County16———————
New Haven County8———————
Hartford County6206 MW2 MWBroadleaf Solar, LLC———1
New London County25 MW5 MWNJR Clean Energy Ventures Corporation————
Middlesex County—275 MW—Lighthouse Middletown, LLC————
Windham County—139 MW90 MWPure Hedge LLC————

Cities and towns on record 18

City or townCountyData centersLocal measuresWatchlistLatest record
Stamford—9———
Hartford—3———
Norwalk—3———
New Haven—21 (1 in force)1Proposed local moratorium on data centers In force
Shelton—2———
Waterbury—2———
Trumbull—11 (1 in force)—Local moratorium on data centers through September 9, 2028 In force
West Haven—11 (1 in force)—City moratorium on data centers through June 8, 2027 In force
Bristol—1———
ColchesterNew London County1———
East HartfordHartford County1———
Glastonbury CenterHartford County1———
New London—1———
Southbury—1———
Groton——1 (1 in force)—Permanent zoning cap replacing 2022 moratorium In force
Morris——1 (1 in force)—Local moratorium on data centers through May 20, 2028 In force
New Haven Board of Alders——1 (1 in force)—Twelve-month data center moratorium In force
WaterfordNew London County——1NE Edge Waterford / East Lyme

Data center counts come from every facility on the SAVRN Data Center Map, counted in the county and the city or community where each building physically stands (Census boundaries), not its mailing address. Jurisdictions appear as the Moratorium Tracker records them.

The chain

Connecticut, from generation to the household bill

1Grid operator

Data center projects in forecast framework
2 projects

2Generation pipeline

Operating capacity
11.0 GW
Planned, all types
625 MW
Under construction or built
97 MW
Planned gas
0 MW
Planned retirements 2026–30
8 MW
Net firm additions derived
89 MW

3Data center demand

Data centers identified
33
Operators
14
Load in tracked queues
—
Utility large-load projects
0
Commercial sales, YTD change
+0.7%
Industry share of state GDP
1.5%

4Jobs and pay

Unemployment, Aug 2026
5.1% (+1.0 pts y/y)
Construction jobs vs 2019
+11.2%
Manufacturing jobs vs 2019
-3.1%
Electrical contractor jobs 2019–25
+9.7%
Electrician median pay
$77,540
Electrician ÷ cashier pay
2.18×

5Household bill

Residential price, YTD Jul 2026
27.97¢/kWh
Change vs YTD 2025
-7.7%
All-sector price change
-7.0%
Total retail sales change
+0.4%

6Policy friction

State measures on record
3
Local measures (in force)
6 (6)
Watchlist projects
3
Lawsuits tracked
0
Announced capital, disclosed
—
Dedicated tax incentive
Yes
Generation

Planned power plants in Connecticut

Every planned generator in Connecticut in the August 2026 EIA-860M inventory, by technology, then the 15 largest units. Under construction or built covers status codes U, V and TS.

Planned generation by fuel 625 MW
Solar 285 MW 46%Battery storage 340 MW 54%
Under construction or built 97 MW
Solar 77 MW 79%Battery storage 20 MW 21%
TechnologyUnitsPlanned MWUnder construction or built
Battery storage3340 MW20 MW
Solar6285 MW77 MW

Largest planned generators

PlantCountyTechnologyMWStatusYearOwner
Elevate MiddletownMiddlesexBatteries275 MWPlanned, approvals not started2027Lighthouse Middletown, LLC
Broadleaf SolarHartfordSolar Photovoltaic200 MWApprovals pending2028Broadleaf Solar, LLC
Pure Hedge LLCWindhamSolar Photovoltaic70 MWUnder construction (≤50%)2027Pure Hedge LLC
KCE CT 1, LLCWindhamBatteries45 MWPlanned, approvals not started2031Key Capture Energy
Pure Hedge LLCWindhamBatteries20 MWUnder construction (≤50%)2027Pure Hedge LLC
Groton Flanders Road LandfillNew LondonSolar Photovoltaic5 MWUnder construction (≤50%)2027NJR Clean Energy Ventures Corporation
Putnam Meadow Solar StationWindhamSolar Photovoltaic4 MWApprovals pending2027Putnam Meadow Solar Station, LLC
CT Airport Authority Solar OneHartfordSolar Photovoltaic4 MWPlanned, approvals not started2027CAA CT Solar One, LLC
Windsor LocksHartfordSolar Photovoltaic2 MWUnder construction (≤50%)2026ENGIE Distributed Renewables Development LLC
Supply chain

What the Connecticut build-out runs on

Who is building generation in Connecticut, which manufacturers and contractors have a plant, expansion or contract recorded here, and how long the critical equipment takes to arrive.

Developers and owners with planned generation

Developer or ownerUnitsPlanned MWBuilding MWMain technologyCounties
Lighthouse Middletown, LLC1275 MW—Battery storage1
Broadleaf Solar, LLC1200 MW—Solar1
Pure Hedge LLC290 MW90 MWBattery storage1
Key Capture Energy145 MW—Battery storage1
NJR Clean Energy Ventures Corporation15 MW5 MWSolar1
CAA CT Solar One, LLC14 MW—Solar1
Putnam Meadow Solar Station, LLC14 MW—Solar1
ENGIE Distributed Renewables Development LLC12 MW2 MWSolar1

Manufacturers and contractors with a recorded Connecticut footprint

No plant, expansion or contract in the manufacturer record names Connecticut. The national suppliers below serve every state.

Order-by check derived

2 of the 2 planned units of 50 MW or more in Connecticut that are not yet under construction (475 of 475 MW) are past the date their step-up transformer had to be ordered to meet the planned in-service date. These units hold their schedules only if the equipment is already on order.

PlantTechnologyMWPlanned in serviceTransformer order-byTurbine order-byOwner
Elevate MiddletownBattery storage275 MWDec 2027Nov 2024—Lighthouse Middletown, LLC
Broadleaf SolarSolar200 MWApr 2028Mar 2025—Broadleaf Solar, LLC

Lead times, OEM backlogs and the national generation and grid contractors are on the national supply chain section.

Demand

Data center and large-load demand in Connecticut

33 data centers run by 14 operators are identified in Connecticut. The full list by city is on the Connecticut Data Center Map page. Utilities report 0 large customer projects here to EEI.

No large customer projects reported to EEI for this state.

Jobs and pay

The Connecticut jobs report, and who the build-out employs

Median pay, May 2025
Cashiers$35,550
Fast food and counter workers$35,380
Retail salespersons$36,490
All occupations$59,690
Construction laborers$58,290
Welders$64,880
HVAC mechanics$76,610
Plumbers and pipefitters$77,280
Electricians$77,540
Power plant operators$97,460
Power-line installers$126,850
Construction supervisors$92,260
Electrical engineers$104,160
Cashier median: $35,550

Payroll employment, August 2026 (preliminary)

IndustryJobsChange vs Aug 2025Change vs Aug 2019
Total nonfarm1,730.5k▲ 0.9%▲ 2.2% (+36.9k)
Construction66.5k▲ 3.7%▲ 11.2% (+6.7k)
Manufacturing156.6k▲ 3.0%▼ 3.1% (-5.1k)
Mining and logging0.5k● 0.0%▼ 16.7% (-0.1k)
Retail trade164.1k▼ 0.2%▼ 5.8% (-10.1k)

Power and data industries, 2019 to 2025

IndustryJobs 2019Jobs 2025ChangeAverage pay 2025
Data processing and hosting1,9964,475▲ 124.2%$203,642
Electrical contractors9,28410,187▲ 9.7%$87,401
Power and communication line construction1,6721,284▼ 23.2%$132,129
Electric power generation, transmission, distribution—3,778—$177,857
Transformer manufacturing—not disclosed——

Pay ladder, May 2025

OccupationEmploymentMedian annual payMultiple of cashier pay
Cashiers30,920$35,5501.00×
Fast food and counter workers35,720$35,3801.00×
Retail salespersons42,410$36,4901.03×
All occupations1,696,170$59,6901.68×
Construction laborers7,360$58,2901.64×
Welders1,790$64,8801.83×
HVAC mechanics3,800$76,6102.15×
Plumbers and pipefitters5,410$77,2802.17×
Electricians7,710$77,5402.18×
Power plant operators250$97,4602.74×
Power-line installers940$126,8503.57×
Construction supervisors6,980$92,2602.60×
Electrical engineers2,930$104,1602.93×

County-level contractor jobs and pay are in the county record above.

Economy

What the data center industry adds to Connecticut

9,710
Direct data center jobs (2024)
32,170
Total jobs supported, in state
$5.6B
Total GDP contribution
1.5%
Share of state GDP
$0.5B
State and local taxes

PwC figures are modeled estimates commissioned by the industry.

Policy

The rules and the pipeline in Connecticut

State measures 3

BillMeasureStatusDate
SB 245Repeal of data center tax incentivesFailed / vetoed2026-05
SB 1292Connecticut enacted SB 1292, requiring AI data center owners and operators to submit quarterly reports to the Commissioner of Energy and EnvironmentalFailed / vetoed2025-01
SB 79AN ACT ELIMINATING THE TAX EXEMPTIONS FOR QUALIFIED DATA CENTERS.Failed / vetoed2024-02

Delay Watchlist projects 3

ProjectLocationStatusCauseMW
NE Edge Waterford / East LymeWaterford / East Lymedeniedzoning denialinterconnectioncommunity opposition300 MW
Atlas Capital Group Bloomfield Data CenterBloomfield (Hartford County)pending reviewzoning denial—
New Haven Data Center Moratorium ProposalNew Havenpending reviewlocal moratorium—

Local moratoria and restrictions (6) appear by county and city in the county-by-county section. Counts include every status in the weekly tracker feeds as of October 5, 2026. The Connecticut Data Center Map page counts only active local pauses and delayed or blocked projects as of its September 2 rebuild, so its figures are lower. The difference is one of definition and date.

Nearby states

Connecticut's neighbors

Questions

Connecticut power, answered from the record

How much new power generation is planned in Connecticut?

EIA's August 2026 inventory lists 625 MW of planned generators in Connecticut, 97 MW of it under construction or built. By capacity the pipeline is battery storage 54%, solar 46%. The largest single unit is Elevate Middletown (275 MW, Lighthouse Middletown, LLC). Owners plan to retire 8 MW from 2026 to 2030.

Who runs the power grid in Connecticut?

ISO-NE serves most of Connecticut as the regional wholesale market and grid operator. No data center load is tracked in its queues yet.

Are electricity prices rising in Connecticut?

Residential electricity averaged 27.97¢/kWh from January to July 2026, -7.7% on a year earlier, one of the few jurisdictions where it fell. Commercial sales, the class that includes data centers, changed +0.7%.

Is planned generation in Connecticut on schedule?

2 of 2 planned units of 50 MW or more not yet under construction are past the latest date to order a step-up transformer (more than 160 weeks) for their planned in-service date. They hold schedule only if equipment is already on order.

What do electricians earn in Connecticut?

The median electrician in Connecticut earned $77,540 in May 2025, 2.18 times the median cashier, and power-line installers earned $126,850 (BLS OEWS).

Which counties in Connecticut have the most planned generation?

By planned nameplate capacity: Middlesex County (275 MW), Hartford County (206 MW), Windham County (139 MW).

Which data center projects are delayed in Connecticut?

The SAVRN Delay Watchlist names 3 projects in Connecticut, among them NE Edge Waterford / East Lyme (300 MW), Atlas Capital Group Bloomfield Data Center, New Haven Data Center Moratorium Proposal.

Does Connecticut have a data center moratorium?

The SAVRN Moratorium Tracker holds 3 state-level measures (0 enacted) and 6 local moratoria or restrictions in Connecticut, 6 of them in force, 36th most in the country.