Power Supply Chain and Demand in New York

Seal of New York

NYISO runs most of New York's grid. 7,143 MW of new generation is planned in New York, 3,313 MW of it under construction or built and awaiting operation, against 40 MW of planned retirements through 2030. 134 data centers are identified in the state, with 17,026 MW of data center load in tracked grid queues. Residential electricity averaged 29.38¢/kWh in 2026 through July, +13.0% from a year earlier. Unemployment was 4.3% in August 2026, and construction employment is -6.5% against August 2019. The SAVRN trackers hold 35 local moratoria or restrictions for New York across all statuses (26 in force) and 6 named projects on the Delay Watchlist.

Rebuilt 2026-10-08 · refreshed weekly
Grid operator
NYISO
main wholesale grid
Planned generation
7.1 GW
3.3 GW under construction or built
Data center load in queues
17,026 MW
134 data centers identified
Residential price
29.38¢
▲ 13.0% vs 2025, YTD July
Construction jobs
-6.5%
▼ 6.5% vs Aug 2019
Local measures
35
26 in force · 6 on Delay Watchlist
The finding

What the build-out changed in New York

New York is in the middle of the pack, with a few sharp signals worth watching. 17,026 MW of data center load is waiting in New York's grid queues, 4th of the 11 states where SAVRN tracks data center queue load. The data center industry now accounts for 2.1% of New York's economy, the 19th largest share of any state (the median state is 1.8%), counting the industry's in-state suppliers and payrolls. Power and communication line construction jobs grew 29.3% from 2019 to 2025 (17th of 44). Households pay part of the cost: residential prices are +13.0% year to date, the 5th fastest increase of 51.

Then and now

MeasureThenNowChangeU.S. rank
Construction jobs (Aug 2019 → Aug 2026)407.5k381.1k▼ 6.5%48th of 48
Electrical contractor jobs (2019 → 2025)61,90357,678▼ 6.8%48th of 48
Power line construction jobs (2019 → 2025)6,0727,850▲ 29.3%17th of 44
Data processing and hosting jobs (2019 → 2025)19,60128,710▲ 46.5%18th of 46
Unemployment rate (Feb 2020 → Aug 2026)4.2%4.3%▲ 0.1pts—
Residential price, ¢/kWh (YTD Jul 2025 → 2026)26.01¢29.38¢▲ 13.0%5th of 51
Generation fleet → planned additions44.4 GW operating7.1 GW planned16% of fleet20th of 51

Where New York ranks among 51

Data center share of state GDP2.1%19th of 51
Announced data center capital$4.2B27th of 31
Data center load in grid queues17,026 MW4th of 11
Planned generation vs. today's fleet16%20th of 51
Construction jobs vs. 2019-6.5%48th of 48
Electrical contractor jobs, 2019 to 2025-6.8%48th of 48
Power line construction jobs, 2019 to 2025+29.3%17th of 44
Data processing and hosting jobs, 2019 to 2025+46.5%18th of 46
Commercial electricity sales, YTD change+0.3%34th of 51
Residential electricity price, YTD change+13.0%5th of 51
Local moratoria and restrictions3513th of 49

1st = the most. Ranks cover every state and DC that publishes the figure.

Among its neighbors, New York leads on data center load in grid queues (17,026 MW), ahead of Pennsylvania (750 MW).

County spotlight

New York County holds the most data centers on record in New York (45), and its electrical contractor workforce changed -18.4% since 2019 to 6,079 jobs. The largest share of planned generation sits in Kings County: 1,140 MW, led by Empire Offshore Wind LLC (wind). The fastest-growing electrical trade market is Albany County, where contractor jobs grew 28.9% to 1,528.

The map

Where New York sits in the power system

Grid operator
NYISO
Operating capacity
44.4 GW
Planned generation
7,143 MW
Under construction or built
3,313 MW
Data centers identified
134
Data center load in queues
17,026 MW
Unemployment, Aug 2026
4.3%
Residential price change
+13.0%

Neighboring states are shaded. Select one to open its page.

Counties and cities

New York, county by county

62 counties in New York. Planned generation sits in 43 of them, data centers stand in 24, and local measures are on record in 2. Pick a layer, then select a county for its full record.

Schoharie CountySeneca CountyOrleans CountyWayne CountyGreene CountyAllegany CountyOswego CountyNassau CountyMonroe CountyHerkimer CountyNew York CountySt. Lawrence CountyOrange CountyTompkins CountyOnondaga CountyAlbany CountySuffolk CountyJefferson CountyLivingston CountyWyoming CountySchuyler CountyTioga CountyChemung CountyWestchester CountyNiagara CountyOneida CountyEssex CountyOtsego CountyHamilton CountyMontgomery CountyFranklin CountyLewis CountyBroome CountySchenectady CountySteuben CountyChenango CountySullivan CountyPutnam CountyRockland CountyColumbia CountyClinton CountyKings CountyCattaraugus CountyChautauqua CountyQueens CountyRensselaer CountyRichmond CountyUlster CountyBronx CountySaratoga CountyFulton CountyDutchess CountyCayuga CountyErie CountyCortland CountyMadison CountyWashington CountyGenesee CountyWarren CountyDelaware CountyYates CountyOntario County

County leaders

Most planned generation
Kings Countywind1,140 MW
Suffolk Countywind1,119 MW
Genesee Countysolar861 MW
Allegany Countywind455 MW
Niagara Countysolar333 MW
Fastest electrical contractor growth
Albany County1,528 jobs+28.9%
Ontario County1,055 jobs+14.1%
Rockland County1,490 jobs+13.9%
Rensselaer County457 jobs+7.8%
Monroe County2,213 jobs+6.4%
Suffolk County7,006 jobs+5.1%
Broome County577 jobs+4.5%
Orange County905 jobs+4.0%

Counties on record 52

CountyData centersPlanned MWBuilding MWLead developerElectrical contractor jobsChange 2019–25Local measuresWatchlist
New York County456 MW3 MWNew York University6,079▼ 18.4%——
Erie County1224 MW4 MWKey Capture Energy2,550▲ 3.2%——
Albany County115 MW5 MWKnox II PV LLC1,528▲ 28.9%——
Rockland County9———1,490▲ 13.9%——
Onondaga County725 MW18 MWGenerate Capital1,263● 0.0%—1
Westchester County7———3,813▼ 0.1%——
Niagara County6333 MW—Cypress Creek Renewables300▼ 37.6%——
Monroe County54 MW4 MWSL Brockport, LLC2,213▲ 6.4%——
Nassau County53 MW3 MWVillage of Freeport - (NY)4,772▲ 1.7%——
Suffolk County41,119 MW939 MWOrsted Wind Power North America LLC7,006▲ 5.1%—2
Richmond County315 MW15 MWLighthouse Arthur Kill, LLC2,548▼ 17.2%——
Kings County21,140 MW840 MWEmpire Offshore Wind LLC5,415▼ 3.5%——
Franklin County2105 MW5 MWAES Clean Energy87▼ 17.1%——
Dutchess County2———567———
Seneca County2———————
Yates County2———————
St. Lawrence County1340 MW—Rich Road Solar Energy Center226▲ 11.3%1 (0 in force)—
Tompkins County1160 MW—Lydian Energy65▼ 25.3%1 (1 in force)—
Jefferson County1119 MW—EDF Renewables Development, Inc.115● 0.0%——
Oneida County125 MW5 MWSunEast Skyline Solar LLC298▲ 24.2%——
Saratoga County118 MW3 MWBloomfield Solar, LLC436▼ 28.4%——
Broome County115 MW10 MWEndicott NY Solar Farm, LLC577▲ 4.5%——
Clinton County12 MW—Cavern Solar, LLC————
Rensselaer County1———457▲ 7.8%——
Genesee County—861 MW856 MWGreenbacker Renewable Energy Corporation———1
Chautauqua County—528 MW23 MWRepsol Renewables NA180———
Allegany County—455 MW340 MWInvenergy Services LLC————
Montgomery County—340 MW—Repsol Renewables NA————
Livingston County—224 MW4 MWInvenergy Services LLC————
Madison County—182 MW7 MWLiberty Renewables Incorporated————
Orange County—178 MW26 MWKey Capture Energy905▲ 4.0%——
Cayuga County—137 MW38 MWLiberty Renewables Incorporated111———
Orleans County—136 MW10 MWHeritage Wind, LLC————
Greene County—105 MW—Flint Mine Solar, LLC————
Chenango County—103 MW—High Bridge Wind, LLC159▼ 7.0%——
Cortland County—95 MW5 MWEDF Renewables Development, Inc.30● 0.0%——
Herkimer County—82 MW22 MWAltus Power America Management, LLC104▼ 39.5%——
Bronx County—47 MW47 MWNineDot Holdings, LLC1,318▼ 19.6%——
Columbia County—47 MW—Shepherd's Run Solar134———
Fulton County—40 MW—Boralex US Operations LLC————
Steuben County—26 MW6 MWClear View Solar, LLC————
Tioga County—23 MW20 MWAltus Power America Management, LLC30▲ 200.0%——
Ontario County—20 MW—SunEast Manchester Solar LLC1,055▲ 14.1%——
Queens County—15 MW15 MWNineDot Holdings, LLC8,573▼ 23.4%——
Oswego County—14 MW14 MWMallory South PV I LLC————
Schuyler County—10 MW10 MWGenerate Capital————
Warren County—5 MW5 MWGenerate Capital212▲ 12.8%——
Wayne County—5 MW5 MWDimension Energy LLC169▲ 20.7%——
Sullivan County—5 MW5 MWNY Fallsburg II, LLC————
Washington County————89▲ 6.0%——
Delaware County————63▲ 12.5%——
Essex County————46▲ 27.8%——

Every county in New York 62

Each county has its own page: power plants, utilities and prices, jobs since 2019, data centers, local rules and its neighbors.

Albany CountyAlbany, GuilderlandAllegany CountyAlfred, WellsvilleBronx CountyNew YorkBroome CountyUnion, BinghamtonCattaraugus CountyOlean, SalamancaCayuga CountyAuburn, BrutusChautauqua CountyJamestown, PomfretChemung CountyElmira, SouthportChenango CountyNorwich, GuilfordClinton CountyPlattsburgh, PeruColumbia CountyClaverack, HudsonCortland CountyCortland, CortlandvilleDelaware CountySidney, DelhiDutchess CountyPoughkeepsie, East FishkillErie CountyBuffalo, AmherstEssex CountyNorth Elba, TiconderogaFranklin CountyMalone, HarrietstownFulton CountyGloversville, JohnstownGenesee CountyBatavia, Le RoyGreene CountyCairo, GreenvilleHamilton CountyIndian LakeHerkimer CountyGerman Flatts, IlionJefferson CountyLe Ray, WatertownKings CountyNew YorkLewis CountyLowville, New BremenLivingston CountyGeneseo, North DansvilleMadison CountySullivan, OneidaMonroe CountyRochester, GreeceMontgomery CountyAmsterdam, MindenNassau CountyOyster Bay, North HempsteadNew York CountyNew YorkNiagara CountyNiagara Falls, North TonawandaOneida CountyUtica, RomeOnondaga CountySyracuse, ClayOntario CountyFarmington, GenevaOrange CountyKiryas Joel, Palm TreeOrleans CountyRidgeway, MedinaOswego CountyOswego, FultonOtsego CountyOneonta, OtsegoPutnam CountyCarmel, SoutheastQueens CountyNew YorkRensselaer CountyTroy, East GreenbushRichmond CountyNew YorkRockland CountyRamapo, ClarkstownSaratoga CountyClifton Park, Saratoga SpringsSchenectady CountySchenectady, RotterdamSchoharie CountyCobleskill, CarlisleSchuyler CountyHector, DixSeneca CountySeneca Falls, WaterlooSt. Lawrence CountyMassena, OgdensburgSteuben CountyCorning, HornellSuffolk CountyBrookhaven, IslipSullivan CountyThompson, FallsburgTioga CountyBarton, TiogaTompkins CountyIthaca, NewfieldUlster CountyKingston, ShawangunkWarren CountyQueensbury, Glens FallsWashington CountyKingsbury, Hudson FallsWayne CountyArcadia, OntarioWestchester CountyYonkers, GreenburghWyoming CountyWarsaw, PerryYates CountyMilo, Penn Yan

Cities and towns on record 67

City or townCountyData centersLocal measuresWatchlistLatest record
New YorkKings County + Queens County + New York County49———
BuffaloErie County8———
AlbanyAlbany County7———
Pearl RiverRockland County4———
SyracuseOnondaga County4———
RochesterMonroe County3———
CommackSuffolk County2———
Niagara FallsNiagara County2———
OrangeburgRockland County2———
RomulusSeneca County + Seneca County2———
TappanRockland County2———
UniondaleNassau County2———
PlattsburghClinton County11 (0 in force)—Proposed 12-month moratorium on high-energy computing facilities Proposed
PotsdamSt. Lawrence County11 (0 in force)—Proposed town moratorium on data centers Proposed
BarkerNiagara County1———
BinghamtonBroome County1———
BrentwoodSuffolk County1———
DresdenYates County1———
East MeadowNassau County1———
East SyracuseOnondaga County1———
Garden CityNassau County1———
LackawannaErie County1———
LansingTompkins County1———
LathamAlbany County1———
MaloneFranklin County1———
Myers CornerDutchess County1———
New CasselNassau County1———
New York CityKings County + Queens County + New York County1———
ShirleySuffolk County1———
UticaOneida County1———
Wappingers FallsDutchess County1———
WatertownJefferson County1———
White PlainsWestchester County1———
YonkersWestchester County1———
CantonSt. Lawrence County—1 (1 in force)—Town moratorium on data centers through May 31, 2027 In force
City of AuburnCayuga County—1 (1 in force)—12-month moratorium on data storage facilities In force
City of BuffaloErie County—1 (0 in force)—Proposed two-year data center moratorium Proposed
City of North TonawandaNiagara County—1 (1 in force)—North Tonawanda Local Law No. 3 of 2026: 12-month extension of data center and crypto mining moratorium In force
HighlandSullivan County + Ulster County—1 (1 in force)—Local moratorium on data centers through June 18, 2027 In force
IlionHerkimer County—1 (0 in force)—Data center moratorium vote delayed Proposed
IslipSuffolk County + Suffolk County—1 (1 in force)—Local moratorium on data centers through February 12, 2028 In force
LeRay——1 (1 in force)—Local moratorium on data centers through August 1, 2027 In force
LysanderOnondaga County—1 (1 in force)—Local moratorium on data centers through November 6, 2026 In force
MassenaSt. Lawrence County—1 (0 in force)—Town of Massena six-month data center moratorium voted down Failed / vetoed
MohawkHerkimer County—1 (1 in force)—Local moratorium on data centers through February 13, 2027 In force
NewfieldTompkins County + Tompkins County—1 (1 in force)—Local moratorium on data centers through July 9, 2027 In force
PerthFulton County—1 (1 in force)—Local moratorium on data centers through June 4, 2027 In force
TonawandaErie County—1 (1 in force)—Local moratorium on data centers through August 3, 2027 In force
Town of BrookhavenSuffolk County + Suffolk County—1 (1 in force)—18-month data center moratorium In force
Town of ClayOnondaga County—1 (1 in force)—One-year moratorium on data centers and high-intensity computing facilities In force
Town of Clifton ParkSaratoga County—1 (1 in force)—Local Law No. 9 of 2026: 12-month moratorium on data storage centers In force
Town of East FishkillDutchess County—1 (1 in force)—Three-year data center moratorium In force
Town of East GreenbushRensselaer County + Rensselaer County—1 (1 in force)—Six-month moratorium on data center land use approvals In force
Town of LansingTompkins County—1 (0 in force)—Draft local law to prohibit data centers Proposed
Town of LysanderOnondaga County—1 (1 in force)—Six-month data center moratorium In force
Town of ManliusOnondaga County—1 (1 in force)—12-month data center and crypto moratorium In force
Town of MohawkHerkimer County—1 (1 in force)—Six-month moratorium on data center permitting In force
Town of OneontaOtsego County—1 (1 in force)—One-year data center and crypto moratorium In force
Town of OrangetownRockland County—1 (1 in force)—Six-month moratorium on data centers and battery energy storage In force
Town of PerthFulton County—1 (1 in force)—One-year data center moratorium In force
Town of SalinaOnondaga County—1 (1 in force)—One-year data center moratorium In force
Town of SchroeppelOswego County—1 (0 in force)—Proposed 12-month data center moratorium Proposed
Town of TonawandaErie County—1 (1 in force)—One-year moratorium on data centers of 20 MW or more In force
Town of TyreSeneca County—1 (0 in force)—Tyre proposed Local Law 2 of 2026: one-year moratorium on data centers and AI computing facilities Proposed
Town of Van BurenOnondaga County—1 (1 in force)—One-year data center moratorium In force
OrangetownRockland County——1DataBank Orangetown Phase 2
Statewide———1New York Statewide Hyperscale Data Center Moratorium (Executive Order 62)

Data center counts come from every facility on the SAVRN Data Center Map, counted in the county and the city or community where each building physically stands (Census boundaries), not its mailing address. Jurisdictions appear as the Moratorium Tracker records them.

The chain

New York, from generation to the household bill

1Grid operator

Large-load projects in queue (May 1 2026)
51 projects
Summer 2026 statewide reliability margin
417 MW

2Generation pipeline

Operating capacity
44.4 GW
Planned, all types
7,143 MW
Under construction or built
3,313 MW
Planned gas
6 MW
Planned retirements 2026–30
40 MW
Net firm additions derived
3,273 MW

3Data center demand

Data centers identified
134
Operators
72
Load in tracked queues
17,026 MW
Utility large-load projects
1
Commercial sales, YTD change
+0.3%
Industry share of state GDP
2.1%

4Jobs and pay

Unemployment, Aug 2026
4.3% (-0.2 pts y/y)
Construction jobs vs 2019
-6.5%
Manufacturing jobs vs 2019
-9.9%
Electrical contractor jobs 2019–25
-6.8%
Electrician median pay
$78,750
Electrician ÷ cashier pay
2.22×

5Household bill

Residential price, YTD Jul 2026
29.38¢/kWh
Change vs YTD 2025
+13.0%
All-sector price change
+12.0%
Total retail sales change
-0.5%

6Policy friction

State measures on record
6
Local measures (in force)
35 (26)
Watchlist projects
6
Lawsuits tracked
0
Announced capital, disclosed
$4.2B
Dedicated tax incentive
Yes
Generation

Planned power plants in New York

Every planned generator in New York in the August 2026 EIA-860M inventory, by technology, then the 15 largest units. Under construction or built covers status codes U, V and TS.

Planned generation by fuel 7,143 MW
Natural gas 6 MW <1%Wind 2,584 MW 36%Solar 3,745 MW 52%Battery storage 784 MW 11%Other 25 MW <1%
Under construction or built 3,313 MW
Natural gas 3 MW <1%Wind 2,081 MW 63%Solar 1,092 MW 33%Battery storage 112 MW 3%Other 25 MW 1%
TechnologyUnitsPlanned MWUnder construction or built
Solar873,745 MW1,092 MW
Wind112,584 MW2,081 MW
Battery storage33784 MW112 MW
Other425 MW25 MW
Natural gas26 MW3 MW

Largest planned generators

PlantCountyTechnologyMWStatusYearOwner
Sunrise WindSuffolkOffshore Wind Turbine924 MWUnder construction (≤50%)2027Orsted Wind Power North America LLC
Empire Wind 1KingsOffshore Wind Turbine810 MWUnder construction (>50%)2027Empire Offshore Wind LLC
Hecate Energy Cider Solar LLCGeneseeSolar Photovoltaic557 MWUnder construction (≤50%)2026Greenbacker Renewable Energy Corporation
Alle-Catt Wind Energy LLCAlleganyOnshore Wind Turbine340 MWUnder construction (>50%)2026Invenergy Services LLC
Excelsior Energy CenterGeneseeSolar Photovoltaic280 MWUnder construction (≤50%)2026Excelsior Energy Center, LLC
South Ripley SolarChautauquaSolar Photovoltaic270 MWApprovals pending2027Repsol Renewables NA
Mill Point SolarMontgomerySolar Photovoltaic250 MWPlanned, approvals not started2028Repsol Renewables NA
Rich Road Solar Energy CenterSt LawrenceSolar Photovoltaic240 MWApprovals pending2028Rich Road Solar Energy Center
NISA Electric Generation ProjectKingsBatteries220 MWApprovals received2028NYC Energy LLC
Horseshoe Solar EnergyLivingstonSolar Photovoltaic180 MWApprovals pending2028Invenergy Services LLC
Yellow Barn SolarTompkinsSolar Photovoltaic160 MWPlanned, approvals not started2028Lydian Energy
NY2 BatteryOrangeBatteries152 MWApprovals pending2028Key Capture Energy
Oxbow HillNiagaraSolar Photovoltaic140 MWApprovals pending2029Cypress Creek Renewables
Heritage WindOrleansOnshore Wind Turbine126 MWPlanned, approvals not started2028Heritage Wind, LLC
Empire Solar (NY)ChautauquaSolar Photovoltaic125 MWPlanned, approvals not started2027AES Clean Energy
Supply chain

What the New York build-out runs on

Who is building generation in New York, which manufacturers and contractors have a plant, expansion or contract recorded here, and how long the critical equipment takes to arrive.

Developers and owners with planned generation

Developer or ownerUnitsPlanned MWBuilding MWMain technologyCounties
Orsted Wind Power North America LLC1924 MW924 MWWind1
Empire Offshore Wind LLC1810 MW810 MWWind1
Greenbacker Renewable Energy Corporation1557 MW557 MWSolar1
Repsol Renewables NA3540 MW—Solar2
Invenergy Services LLC2520 MW340 MWWind2
AES Clean Energy6435 MW10 MWSolar5
Key Capture Energy5350 MW—Battery storage3
NYC Energy LLC2300 MW—Battery storage1
Excelsior Energy Center, LLC1280 MW280 MWSolar1
Lydian Energy2250 MW—Solar2
Rich Road Solar Energy Center1240 MW—Solar1
Cypress Creek Renewables2233 MW—Solar1
EDF Renewables Development, Inc.2209 MW—Solar2
Liberty Renewables Incorporated2202 MW—Wind2
Heritage Wind, LLC1126 MW—Wind1

Manufacturers and contractors with a recorded New York footprint 1

TierCompanySegmentWhat the record says
Generation OEMSiemens EnergyUS manufacturing$1 billion U.S. manufacturing investment incl. large power transformers in North Carolina and gas turbine components in FL, AL, NY, TX

Order-by check derived

23 of the 28 planned units of 50 MW or more in New York that are not yet under construction (3,131 of 3,496 MW) are past the date their step-up transformer had to be ordered to meet the planned in-service date. These units hold their schedules only if the equipment is already on order.

PlantTechnologyMWPlanned in serviceTransformer order-byTurbine order-byOwner
South Ripley SolarSolar270 MWDec 2027Nov 2024—Repsol Renewables NA
Mill Point SolarSolar250 MWDec 2028Nov 2025—Repsol Renewables NA
Rich Road Solar Energy CenterSolar240 MWMay 2028Apr 2025—Rich Road Solar Energy Center
NISA Electric Generation ProjectBattery storage220 MWOct 2028Sep 2025—NYC Energy LLC
Horseshoe Solar EnergySolar180 MWNov 2028Oct 2025—Invenergy Services LLC
Yellow Barn SolarSolar160 MWSep 2028Aug 2025—Lydian Energy
NY2 BatteryBattery storage152 MWJul 2028Jun 2025—Key Capture Energy
Oxbow HillSolar140 MWMay 2029Apr 2026—Cypress Creek Renewables
Heritage WindWind126 MWJun 2028May 2025—Heritage Wind, LLC
Empire Solar (NY)Solar125 MWDec 2027Nov 2024—AES Clean Energy
Tracy Solar Energy CenterSolar119 MWNov 2027Oct 2024—EDF Renewables Development, Inc.
Hoffman Falls Wind 2Wind104 MWMar 2029Feb 2026—Liberty Renewables Incorporated

Lead times, OEM backlogs and the national generation and grid contractors are on the national supply chain section.

Demand

Data center and large-load demand in New York

134 data centers run by 72 operators are identified in New York. The full list by city is on the New York Data Center Map page. Utilities report 1 large customer projects here to EEI.

UtilityCustomer or typeMW statedInvestment stated
National GridMicron—$100 billion
Jobs and pay

The New York jobs report, and who the build-out employs

Median pay, May 2025
Cashiers$35,500
Fast food and counter workers$35,250
Retail salespersons$37,720
All occupations$59,670
Construction laborers$55,930
Welders$59,140
HVAC mechanics$74,430
Plumbers and pipefitters$77,490
Electricians$78,750
Power plant operators$106,990
Power-line installers$121,280
Construction supervisors$95,700
Electrical engineers$119,010
Cashier median: $35,500

Payroll employment, August 2026 (preliminary)

IndustryJobsChange vs Aug 2025Change vs Aug 2019
Total nonfarm9,946.0k● 0.0%▲ 1.6% (+157.9k)
Construction381.1k▼ 1.4%▼ 6.5% (-26.4k)
Manufacturing396.3k▼ 1.9%▼ 9.9% (-43.7k)
Mining and logging5.5k▲ 1.9%▲ 5.8% (+0.3k)
Retail trade828.2k▼ 1.0%▼ 9.1% (-83.2k)

Power and data industries, 2019 to 2025

IndustryJobs 2019Jobs 2025ChangeAverage pay 2025
Data processing and hosting19,60128,710▲ 46.5%$239,074
Electrical contractors61,90357,678▼ 6.8%$93,966
Power and communication line construction6,0727,850▲ 29.3%$128,027
Electric power generation, transmission, distribution—35,600—$163,853
Transformer manufacturing—333—$81,807

Pay ladder, May 2025

OccupationEmploymentMedian annual payMultiple of cashier pay
Cashiers158,890$35,5001.00×
Fast food and counter workers168,620$35,2500.99×
Retail salespersons238,540$37,7201.06×
All occupations9,688,000$59,6701.68×
Construction laborers52,090$55,9301.58×
Welders8,310$59,1401.67×
HVAC mechanics24,430$74,4302.10×
Plumbers and pipefitters23,210$77,4902.18×
Electricians40,130$78,7502.22×
Power plant operators1,960$106,9903.01×
Power-line installers5,840$121,2803.42×
Construction supervisors29,600$95,7002.70×
Electrical engineers8,770$119,0103.35×

County-level contractor jobs and pay are in the county record above.

Economy

What the data center industry adds to New York

51,700
Direct data center jobs (2024)
227,910
Total jobs supported, in state
$49.9B
Total GDP contribution
2.1%
Share of state GDP
$5.1B
State and local taxes

PwC figures are modeled estimates commissioned by the industry.

Policy

The rules and the pipeline in New York

State measures 6

BillMeasureStatusDate
S10642 / A11560Responsible Data Center Development Act (one-year moratorium)Proposed2026-08
EO 62Statewide moratorium on data centers until a condition is metIn force2026-07
Executive Order 62Statewide hyperscale data center moratorium (executive)Paused2026-07
S8540New York S8540, the Accountability for Computing and Data Centers (ACDC) Act, would require electric and gas corporations to establish an independentProposed2025-10
New YorkNew York S6394A, the Sustainable Data Centers Act, would regulate energy consumption by data centers in the state.Proposed2025-03
A 10141 / S 9144Three-year halt on data center constructionProposed2025

Delay Watchlist projects 6

ProjectLocationStatusCauseMW
STAMP Data Center (Stream U.S. Data Centers / Genesee County)Town of Alabama, Genesee County (STAMP industrial park)litigation activelitigationstate moratoriumlocal moratoriumzoning denial250 MW
DataBank Orangetown Phase 2Orangetown / Orangeburgdelayedenvironmental reviewcommunity opposition—
New York Statewide Hyperscale Data Center Moratorium (Executive Order 62)Statewidehaltedstate moratoriumlocal moratorium—
Wildflower Yaphank Data CenterYaphank, Town of Brookhaven (Suffolk County)haltedlocal moratorium—
Lysander Data Center MoratoriumLysander (Onondaga County, Syracuse area)haltedlocal moratorium—
Islip Data Center Moratorium ConsiderationIslip (Suffolk County)pending reviewlocal moratorium—

Local moratoria and restrictions (35) appear by county and city in the county-by-county section. Counts include every status in the weekly tracker feeds as of October 5, 2026. The New York Data Center Map page counts only active local pauses and delayed or blocked projects as of its September 2 rebuild, so its figures are lower. The difference is one of definition and date.

Nearby states

New York's neighbors

Questions

New York power, answered from the record

How much new power generation is planned in New York?

EIA's August 2026 inventory lists 7,143 MW of planned generators in New York, 3,313 MW of it under construction or built. By capacity the pipeline is solar 52%, wind 36%, battery storage 11%. The largest single unit is Sunrise Wind (924 MW, Orsted Wind Power North America LLC). Owners plan to retire 40 MW from 2026 to 2030.

Who runs the power grid in New York?

NYISO serves most of New York as the regional wholesale market and grid operator. 17,026 MW of data center load sits in tracked queues, 4th in the country.

Are electricity prices rising in New York?

Residential electricity averaged 29.38¢/kWh from January to July 2026, +13.0% on a year earlier, the 5th fastest increase of 51. Commercial sales, the class that includes data centers, changed +0.3%.

Is planned generation in New York on schedule?

23 of 28 planned units of 50 MW or more not yet under construction are past the latest date to order a step-up transformer (more than 160 weeks) for their planned in-service date. They hold schedule only if equipment is already on order.

What do electricians earn in New York?

The median electrician in New York earned $78,750 in May 2025, 2.22 times the median cashier, and power-line installers earned $121,280 (BLS OEWS).

How much do data centers add to the New York economy?

PwC's 2026 study for the Data Center Coalition credits the industry with 227,910 in-state jobs, $49.9B of GDP (2.1% of the state economy, 19th of 51) and $5.1B in state and local taxes in 2024. These are modeled estimates commissioned by the industry.

Which counties in New York have the most planned generation?

By planned nameplate capacity: Kings County (1,140 MW), Suffolk County (1,119 MW), Genesee County (861 MW).

Does New York have a data center moratorium?

The SAVRN Moratorium Tracker holds 6 state-level measures (1 enacted) and 35 local moratoria or restrictions in New York, 26 of them in force, 13th most in the country.