Vertically integrated utilities run most of Idaho's grid. 959 MW of new generation is planned in Idaho, 400 MW of it under construction or built and awaiting operation, against 0 MW of planned retirements through 2030. 17 data centers are identified in the state. Residential electricity averaged 12.96¢/kWh in 2026 through July, +12.0% from a year earlier. Unemployment was 3.6% in August 2026, and construction employment is +43.6% against August 2019. The SAVRN trackers hold 4 local moratoria or restrictions for Idaho across all statuses (3 in force) and 4 named projects on the Delay Watchlist.

Rebuilt 2026-10-08 · refreshed weekly
Grid operator
Non-RTO (utility-run)
main wholesale grid
Planned generation
1.0 GW
0.4 GW under construction or built
Data center load in queues
—
17 data centers identified
Residential price
12.96¢
▲ 12.0% vs 2025, YTD July
Construction jobs
+43.6%
▲ 43.6% vs Aug 2019
Local measures
4
3 in force · 4 on Delay Watchlist
The finding

What the build-out changed in Idaho

Idaho is building power faster than most states, and the jobs data shows it. Construction employment is +43.6% against August 2019, 1st of 48 states where BLS publishes it, well ahead of the national pace. Electrical contractor jobs, the trade every data center, substation and plant needs first, grew 66.6% from 2019 to 2025, 1st in the country. Data processing and hosting jobs grew 90.5% from 2019 to 2025, 4th of 46 states that disclose the industry. Households pay part of the cost: residential prices are +12.0% year to date, the 10th fastest increase of 51.

Then and now

MeasureThenNowChangeU.S. rank
Construction jobs (Aug 2019 → Aug 2026)53.7k77.1k▲ 43.6%1st of 48
Electrical contractor jobs (2019 → 2025)4,8368,056▲ 66.6%1st of 48
Power line construction jobs (2019 → 2025)8901,230▲ 38.2%12th of 44
Data processing and hosting jobs (2019 → 2025)6871,309▲ 90.5%4th of 46
Unemployment rate (Feb 2020 → Aug 2026)2.8%3.6%▲ 0.8pts—
Residential price, ¢/kWh (YTD Jul 2025 → 2026)11.57¢12.96¢▲ 12.0%10th of 51
Generation fleet → planned additions6.8 GW operating1.0 GW planned14% of fleet28th of 51

Where Idaho ranks among 51

Data center share of state GDP1.8%26th of 51
Announced data center capital$1.2B29th of 31
Planned generation vs. today's fleet14%28th of 51
Construction jobs vs. 2019+43.6%1st of 48
Electrical contractor jobs, 2019 to 2025+66.6%1st of 48
Power line construction jobs, 2019 to 2025+38.2%12th of 44
Data processing and hosting jobs, 2019 to 2025+90.5%4th of 46
Commercial electricity sales, YTD change+1.6%24th of 51
Residential electricity price, YTD change+12.0%10th of 51
Local moratoria and restrictions442nd of 49

1st = the most. Ranks cover every state and DC that publishes the figure.

Among its neighbors, Idaho leads on construction jobs vs. 2019 (+43.6%), ahead of Utah (+31.4%).

County spotlight

Ada County holds the most data centers on record in Idaho (13), and its electrical contractor workforce changed +67.4% since 2019 to 2,818 jobs. The fastest-growing electrical trade market is Canyon County, where contractor jobs grew 78.4% to 1,222.

The map

Where Idaho sits in the power system

Grid operator
Non-RTO (utility-run)
Operating capacity
6.8 GW
Planned generation
959 MW
Under construction or built
400 MW
Data centers identified
17
Data center load in queues
—
Unemployment, Aug 2026
3.6%
Residential price change
+12.0%

Neighboring states are shaded. Select one to open its page.

Counties and cities

Idaho, county by county

44 counties in Idaho. Planned generation sits in 3 of them, data centers stand in 4, and local measures are on record in 2. Pick a layer, then select a county for its full record.

Lincoln CountyBenewah CountyBoundary CountyCuster CountyJefferson CountyValley CountyGem CountyLemhi CountyIdaho CountyCassia CountyBlaine CountyGooding CountyOneida CountyBoise CountyBonneville CountyShoshone CountyJerome CountyKootenai CountyElmore CountyFremont CountyBonner CountyCamas CountyMinidoka CountyBannock CountyTeton CountyPayette CountyClark CountyPower CountyLewis CountyNez Perce CountyTwin Falls CountyButte CountyClearwater CountyAdams CountyBear Lake CountyFranklin CountyLatah CountyOwyhee CountyMadison CountyBingham CountyWashington CountyAda CountyCanyon CountyCaribou County

County leaders

Most planned generation
Ada Countysolar400 MW
Elmore Countybattery storage200 MW
Fastest electrical contractor growth
Canyon County1,222 jobs+78.4%
Ada County2,818 jobs+67.4%
Kootenai County677 jobs+66.7%

Counties on record 19

CountyData centersPlanned MWBuilding MWLead developerElectrical contractor jobsChange 2019–25Local measuresWatchlist
Ada County13400 MW400 MWBlacks Creek Energy Center, LLC2,818▲ 67.4%—1
Kootenai County2———677▲ 66.7%1 (0 in force)—
Bear Lake County1———————
Madison County1———————
Bonneville County—359 MW—PacifiCorp————
Elmore County—200 MW—Clenera DevCo LLC————
Canyon County————1,222▲ 78.4%——
Jefferson County————243▲ 131.4%——
Bannock County————235—1 (1 in force)2
Bingham County————210———
Latah County————168▲ 61.5%——
Minidoka County————150———
Cassia County————80▲ 3.9%——
Jerome County————75▲ 53.1%——
Payette County————58▲ 13.7%——
Boundary County————44▼ 12.0%——
Gooding County————35▼ 7.9%——
Gem County————32▲ 39.1%——
Valley County————20▲ 42.9%——

Every county in Idaho 44

Each county has its own page: power plants, utilities and prices, jobs since 2019, data centers, local rules and its neighbors.

Cities and towns on record 8

City or townCountyData centersLocal measuresWatchlistLatest record
Boise—5———
Boise CityAda County5———
KunaAda County3———
Coeur d'AleneKootenai County2———
MontpelierBear Lake County1———
RexburgMadison County1———
PocatelloBannock County—1 (1 in force)1City Council affirms denial of AI data center conditional use permit In force
SandpointBonner County—1 (1 in force)—Proposed local moratorium on data centers In force

Data center counts come from every facility on the SAVRN Data Center Map, counted in the county and the city or community where each building physically stands (Census boundaries), not its mailing address. Jurisdictions appear as the Moratorium Tracker records them.

The chain

Idaho, from generation to the household bill

1Grid operator

Utility-run territory: resource planning sits with the vertically integrated utilities and the state commission.

2Generation pipeline

Operating capacity
6.8 GW
Planned, all types
959 MW
Under construction or built
400 MW
Planned gas
0 MW
Planned retirements 2026–30
0 MW
Net firm additions derived
400 MW

3Data center demand

Data centers identified
17
Operators
12
Load in tracked queues
—
Utility large-load projects
2
Commercial sales, YTD change
+1.6%
Industry share of state GDP
1.8%

4Jobs and pay

Unemployment, Aug 2026
3.6% (+0.0 pts y/y)
Construction jobs vs 2019
+43.6%
Manufacturing jobs vs 2019
+10.5%
Electrical contractor jobs 2019–25
+66.6%
Electrician median pay
$63,000
Electrician ÷ cashier pay
2.07×

5Household bill

Residential price, YTD Jul 2026
12.96¢/kWh
Change vs YTD 2025
+12.0%
All-sector price change
+6.2%
Total retail sales change
-0.3%

6Policy friction

State measures on record
7
Local measures (in force)
4 (3)
Watchlist projects
4
Lawsuits tracked
0
Announced capital, disclosed
$1.2B
Dedicated tax incentive
Yes
Generation

Planned power plants in Idaho

Every planned generator in Idaho in the August 2026 EIA-860M inventory, by technology, then the 15 largest units. Under construction or built covers status codes U, V and TS.

Planned generation by fuel 959 MW
Wind 359 MW 37%Solar 500 MW 52%Battery storage 100 MW 10%
Under construction or built 400 MW
Solar 400 MW 100%
TechnologyUnitsPlanned MWUnder construction or built
Solar2500 MW400 MW
Wind2359 MW—
Battery storage1100 MW—

Largest planned generators

PlantCountyTechnologyMWStatusYearOwner
Blacks Creek SolarAdaSolar Photovoltaic400 MWUnder construction (≤50%)2027Blacks Creek Energy Center, LLC
Arco Wind and Solar ProjectBonnevilleOnshore Wind Turbine206 MWApprovals received2028PacifiCorp
Arco Wind and Solar ProjectBonnevilleOnshore Wind Turbine153 MWApprovals received2027PacifiCorp
Crimson Orchard Solar and BESSElmoreBatteries100 MWApprovals pending2027Clenera DevCo LLC
Crimson Orchard Solar and BESSElmoreSolar Photovoltaic100 MWApprovals pending2027Clenera DevCo LLC
Supply chain

What the Idaho build-out runs on

Who is building generation in Idaho, which manufacturers and contractors have a plant, expansion or contract recorded here, and how long the critical equipment takes to arrive.

Developers and owners with planned generation

Developer or ownerUnitsPlanned MWBuilding MWMain technologyCounties
Blacks Creek Energy Center, LLC1400 MW400 MWSolar1
PacifiCorp2359 MW—Wind1
Clenera DevCo LLC2200 MW—Battery storage1

Manufacturers and contractors with a recorded Idaho footprint

No plant, expansion or contract in the manufacturer record names Idaho. The national suppliers below serve every state.

Order-by check derived

4 of the 4 planned units of 50 MW or more in Idaho that are not yet under construction (559 of 559 MW) are past the date their step-up transformer had to be ordered to meet the planned in-service date. These units hold their schedules only if the equipment is already on order.

PlantTechnologyMWPlanned in serviceTransformer order-byTurbine order-byOwner
Arco Wind and Solar ProjectWind206 MWDec 2028Nov 2025—PacifiCorp
Arco Wind and Solar ProjectWind153 MWDec 2027Nov 2024—PacifiCorp
Crimson Orchard Solar and BESSBattery storage100 MWApr 2027Mar 2024—Clenera DevCo LLC
Crimson Orchard Solar and BESSSolar100 MWApr 2027Mar 2024—Clenera DevCo LLC

Lead times, OEM backlogs and the national generation and grid contractors are on the national supply chain section.

Demand

Data center and large-load demand in Idaho

17 data centers run by 12 operators are identified in Idaho. The full list by city is on the Idaho Data Center Map page. Utilities report 2 large customer projects here to EEI.

UtilityCustomer or typeMW statedInvestment stated
Idaho PowerMeta—$800 million
Idaho PowerMicron—$15 billion
Jobs and pay

The Idaho jobs report, and who the build-out employs

Median pay, May 2025
Cashiers$30,370
Fast food and counter workers$28,940
Retail salespersons$35,080
All occupations$47,970
Construction laborers$46,940
Welders$50,530
HVAC mechanics$56,240
Plumbers and pipefitters$52,380
Electricians$63,000
Power plant operators$124,440
Power-line installers$125,410
Construction supervisors$75,550
Electrical engineers$129,340
Cashier median: $30,370

Payroll employment, August 2026 (preliminary)

IndustryJobsChange vs Aug 2025Change vs Aug 2019
Total nonfarm890.7k▲ 0.9%▲ 16.6% (+127.1k)
Construction77.1k▲ 2.8%▲ 43.6% (+23.4k)
Manufacturing77.7k▲ 3.6%▲ 10.5% (+7.4k)
Mining and logging4.5k▲ 2.3%▲ 18.4% (+0.7k)
Retail trade96.7k▲ 2.3%▲ 11.4% (+9.9k)

Power and data industries, 2019 to 2025

IndustryJobs 2019Jobs 2025ChangeAverage pay 2025
Data processing and hosting6871,309▲ 90.5%$160,177
Electrical contractors4,8368,056▲ 66.6%$77,341
Power and communication line construction8901,230▲ 38.2%$126,803
Electric power generation, transmission, distribution—2,614—$95,317
Transformer manufacturing—not disclosed——

Pay ladder, May 2025

OccupationEmploymentMedian annual payMultiple of cashier pay
Cashiers17,200$30,3701.00×
Fast food and counter workers25,810$28,9400.95×
Retail salespersons20,180$35,0801.16×
All occupations857,440$47,9701.58×
Construction laborers10,850$46,9401.55×
Welders3,300$50,5301.66×
HVAC mechanics4,550$56,2401.85×
Plumbers and pipefitters3,090$52,3801.72×
Electricians5,690$63,0002.07×
Power plant operators310$124,4404.10×
Power-line installers860$125,4104.13×
Construction supervisors6,730$75,5502.49×
Electrical engineers1,000$129,3404.26×

County-level contractor jobs and pay are in the county record above.

Economy

What the data center industry adds to Idaho

4,150
Direct data center jobs (2024)
17,760
Total jobs supported, in state
$2.4B
Total GDP contribution
1.8%
Share of state GDP
$0.2B
State and local taxes

PwC figures are modeled estimates commissioned by the industry.

Policy

The rules and the pipeline in Idaho

State measures 7

BillMeasureStatusDate
H 897TAXATION, Amends existing law to revise a sales tax exemption for data center equipment and to revise a certain property tax exemption for certain capitalProposed2026-04
HB 895Idaho House passed HB 895 (58-10) on March 20, requiring future data centers to design cooling systems for non-consumptive water use or use waterIn force2026-03
H 609TAXATION, Amends existing law to revise a sales tax exemption for data center equipment and to revise a property tax exemption for certain capital investments.Proposed2026-02
H0739Idaho: Bipartisan bill H0739 would limit sales tax exemptions to data center-specific equipment (excluding construction materials), sunset the exemptionFailed / vetoed2026-02
HB 874Idaho: HB 874, introduced by Rep. Stephanie Mickelsen (R-Idaho Falls), would prevent Idaho's Public Utilities Commission from approving any new customerFailed / vetoed2026-02
HB 756Idaho HB 756 (Rep. Stephanie Mickelsen R-Idaho Falls), introduced February 2026, would prohibit the Idaho PUC from approving any new customer requiring 20+ MWFailed / vetoed2026-01
H 521TAXATION, Adds to and amends existing law to provide a sales and use tax exemption for the purchase or use of eligible server equipment and new data centerIn force2020-03

Delay Watchlist projects 4

ProjectLocationStatusCauseMW
Lex Developments Pocatello Data Center ($2.6B)Pocatello (Bannock County)under appeallitigation—
Meta Kuna Data Center Expansion PauseKuna (Ada County)delayedcorporate realignment—
Hoku site data centerPocatello (Bannock County)denied—
Lex Developments PocatelloPocatellodeniedpermitwater—

Local moratoria and restrictions (4) appear by county and city in the county-by-county section. Counts include every status in the weekly tracker feeds as of October 5, 2026. The Idaho Data Center Map page counts only active local pauses and delayed or blocked projects as of its September 2 rebuild, so its figures are lower. The difference is one of definition and date.

Nearby states

Idaho's neighbors

Questions

Idaho power, answered from the record

How much new power generation is planned in Idaho?

EIA's August 2026 inventory lists 959 MW of planned generators in Idaho, 400 MW of it under construction or built. By capacity the pipeline is solar 52%, wind 37%, battery storage 10%. The largest single unit is Blacks Creek Solar (400 MW, Blacks Creek Energy Center, LLC). Owners plan to retire 0 MW from 2026 to 2030.

Who runs the power grid in Idaho?

Non-RTO (utility-run) serves most of Idaho, which means vertically integrated utilities plan and dispatch generation under the state commission. No data center load is tracked in its queues yet.

Is the build-out creating trade jobs in Idaho?

Construction employment is +43.6% against August 2019. Electrical contractor jobs went from 4,836 in 2019 to 8,056 in 2025 (+66.6%, 1st in the country).

Is planned generation in Idaho on schedule?

4 of 4 planned units of 50 MW or more not yet under construction are past the latest date to order a step-up transformer (more than 160 weeks) for their planned in-service date. They hold schedule only if equipment is already on order.

Are electricity prices rising in Idaho?

Residential electricity averaged 12.96¢/kWh from January to July 2026, +12.0% on a year earlier, the 10th fastest increase of 51. Commercial sales, the class that includes data centers, changed +1.6%.

What do electricians earn in Idaho?

The median electrician in Idaho earned $63,000 in May 2025, 2.07 times the median cashier, and power-line installers earned $125,410 (BLS OEWS).

Which counties in Idaho have the most planned generation?

By planned nameplate capacity: Ada County (400 MW), Bonneville County (359 MW), Elmore County (200 MW).

Does Idaho have a data center moratorium?

The SAVRN Moratorium Tracker holds 7 state-level measures (2 enacted) and 4 local moratoria or restrictions in Idaho, 3 of them in force, 42nd most in the country.

Across SAVRN

Idaho across the SAVRN trackers

Sources

Sources for this page

Every figure links to its original source through the Sources buttons. Values marked derived are calculated from reported figures.