Power Supply Chain and Demand in Missouri

MISO runs most of Missouri's grid. 3,830 MW of new generation is planned in Missouri, 1,477 MW of it under construction or built and awaiting operation, against 1,194 MW of planned retirements through 2030. 93 data centers are identified in the state. Residential electricity averaged 13.96¢/kWh in 2026 through July, +5.9% from a year earlier. Unemployment was 3.5% in August 2026, and construction employment is +25.8% against August 2019. The SAVRN trackers hold 21 local moratoria or restrictions for Missouri across all statuses (20 in force) and 5 named projects on the Delay Watchlist.
What the build-out changed in Missouri
Missouri is at the center of the build-out: the demand is here and the construction economy has moved with it. The data center industry now accounts for 2.9% of Missouri's economy, the 8th largest share of any state (the median state is 1.8%), counting the industry's in-state suppliers and payrolls. Construction employment is +25.8% against August 2019, 10th of 48 states where BLS publishes it. Commercial electricity sales, the class that includes data centers, are +3.0% year to date, 17th in the country. Pushback is organized: the SAVRN trackers hold 21 local moratoria or restrictions in Missouri, 24th in the country.
Then and now
| Measure | Then | Now | Change | U.S. rank |
|---|---|---|---|---|
| Construction jobs (Aug 2019 → Aug 2026) | 127.6k | 160.5k | ▲ 25.8% | 10th of 48 |
| Electrical contractor jobs (2019 → 2025) | 15,059 | 18,298 | ▲ 21.5% | 24th of 48 |
| Power line construction jobs (2019 → 2025) | 4,836 | 5,988 | ▲ 23.8% | 20th of 44 |
| Data processing and hosting jobs (2019 → 2025) | 10,843 | 14,429 | ▲ 33.1% | 26th of 46 |
| Unemployment rate (Feb 2020 → Aug 2026) | 3.4% | 3.5% | ▲ 0.1pts | — |
| Residential price, ¢/kWh (YTD Jul 2025 → 2026) | 13.18¢ | 13.96¢ | ▲ 5.9% | 32nd of 51 |
| Generation fleet → planned additions | 23.7 GW operating | 3.8 GW planned | 16% of fleet | 19th of 51 |
Where Missouri ranks among 51
1st = the most. Ranks cover every state and DC that publishes the figure.
Among its neighbors, Missouri leads on data center share of state gdp (2.9%), ahead of Illinois (2.1%).
County spotlight
Clay County holds the most data centers on record in Missouri (33), and its electrical contractor workforce changed +40.9% since 2019 to 895 jobs. The largest share of planned generation sits in St. Louis County: 648 MW, led by Union Electric Co - (MO) (natural gas). The fastest-growing electrical trade market is Jasper County, where contractor jobs grew 51.1% to 574.
Where Missouri sits in the power system
- Grid operator
- MISO
- Operating capacity
- 23.7 GW
- Planned generation
- 3,830 MW
- Under construction or built
- 1,477 MW
- Data centers identified
- 93
- Data center load in queues
- —
- Unemployment, Aug 2026
- 3.5%
- Residential price change
- +5.9%
Neighboring states are shaded. Select one to open its page.
Missouri, county by county
115 counties in Missouri. Planned generation sits in 14 of them, data centers stand in 16, and local measures are on record in 6. Pick a layer, then select a county for its full record.
County leaders
Counties on record 49
| County | Data centers | Planned MW | Building MW | Lead developer | Electrical contractor jobs | Change 2019–25 | Local measures | Watchlist | |
|---|---|---|---|---|---|---|---|---|---|
| Clay County | 33 | — | — | — | 895 | ▲ 40.9% | — | — | |
| Jackson County | 16 | — | — | — | 3,612 | ▲ 50.1% | 2 (2 in force) | 1 | |
| St. Louis (city) | 14 | — | — | — | 1,158 | ▲ 7.3% | — | — | |
| St. Louis County | 7 | 648 MW | — | Union Electric Co - (MO) | 4,381 | ▲ 6.1% | — | — | |
| Platte County | 7 | — | — | — | — | — | — | — | |
| Montgomery County | 3 | — | — | — | — | — | — | — | |
| Greene County | 2 | 178 MW | 178 MW | City Utilities of Springfield - (MO) | 1,075 | ▲ 2.2% | — | — | |
| Boone County | 2 | 9 MW | 9 MW | Curators of the University of Missouri | 282 | ▲ 23.1% | — | — | |
| Jasper County | 1 | 109 MW | 109 MW | Evergy Missouri West | 574 | ▲ 51.1% | — | — | |
| Marion County | 1 | 76 MW | — | Missouri Jnt Muni.Pwr Elec. Ut. Comm. | — | — | 1 (0 in force) | — | |
| St. Charles County | 1 | — | — | — | 994 | ▲ 10.7% | 1 (1 in force) | 1 | |
| Webster County | 1 | — | — | — | 110 | ▲ 13.4% | 1 (1 in force) | — | |
| Adair County | 1 | — | — | — | 18 | ▼ 25.0% | — | — | |
| McDonald County | 1 | — | — | — | — | — | — | — | |
| Caldwell County | 1 | — | — | — | — | — | — | — | |
| Randolph County | 1 | — | — | — | — | — | — | — | |
| Nodaway County | — | 490 MW | — | Evergy Missouri West | — | — | 1 (1 in force) | — | |
| Clinton County | — | 419 MW | 419 MW | Associated Electric Coop, Inc | — | — | — | — | |
| Maries County | — | 400 MW | — | Vesper Energy Development LLC | — | — | — | — | |
| Bollinger County | — | 400 MW | — | Vesper Energy Development LLC | — | — | — | — | |
| Henry County | — | 400 MW | 400 MW | Beavertail Solar, LLC | — | — | — | — | |
| Callaway County | — | 266 MW | 250 MW | Show Me State Solar, LLC | — | — | — | — | |
| Dade County | — | 247 MW | — | Buffalo Branch Wind and Solar LLC | — | — | — | — | |
| Saline County | — | 122 MW | 46 MW | Missouri Jnt Muni.Pwr Elec. Ut. Comm. | 48 | — | — | — | |
| Ralls County | — | 66 MW | 66 MW | Birch Creek Development | — | — | 1 (1 in force) | — | |
| Jefferson County | — | — | — | — | 391 | ▲ 3.4% | — | — | |
| Christian County | — | — | — | — | 320 | — | — | — | |
| Cape Girardeau County | — | — | — | — | 233 | ▲ 66.4% | — | — | |
| Franklin County | — | — | — | — | 202 | ▲ 14.8% | — | — | |
| Cass County | — | — | — | — | 125 | — | — | — | |
| Johnson County | — | — | — | — | 123 | ▲ 2.5% | — | — | |
| Ste. Genevieve County | — | — | — | — | 70 | ▲ 16.7% | — | — | |
| Polk County | — | — | — | — | 62 | — | — | — | |
| Scott County | — | — | — | — | 61 | ▼ 51.2% | — | — | |
| Howell County | — | — | — | — | 58 | ▲ 45.0% | — | — | |
| Texas County | — | — | — | — | 49 | — | — | — | |
| Barry County | — | — | — | — | 45 | ▲ 73.1% | — | — | |
| Pulaski County | — | — | — | — | 38 | ▼ 53.7% | — | — | |
| Macon County | — | — | — | — | 36 | ▲ 38.5% | — | — | |
| Butler County | — | — | — | — | 26 | ▲ 36.8% | — | — | |
| Andrew County | — | — | — | — | 22 | ▲ 175.0% | — | — | |
| Lafayette County | — | — | — | — | 21 | — | — | — | |
| Phelps County | — | — | — | — | 19 | ▲ 46.2% | — | — | |
| Perry County | — | — | — | — | 16 | — | — | — | |
| Dallas County | — | — | — | — | 16 | — | — | — | |
| Stone County | — | — | — | — | 15 | ▲ 50.0% | — | — | |
| Laclede County | — | — | — | — | 14 | ▲ 27.3% | — | — | |
| Livingston County | — | — | — | — | 14 | ▼ 12.5% | — | — | |
| Cedar County | — | — | — | — | 9 | ▼ 40.0% | — | — |
Every county in Missouri 115
Each county has its own page: power plants, utilities and prices, jobs since 2019, data centers, local rules and its neighbors.
Cities and towns on record 28
| City or town | County | Data centers | Local measures | Watchlist | Latest record | |
|---|---|---|---|---|---|---|
| Kansas City | Jackson County + Clay County + Platte County | 46 | 1 (1 in force) | — | Sponsor: Director of City Planning and Development Department COMMITTEE SUBSTITUTE Amending Chapter 88, the Zo In force | |
| St. Louis | St. Louis (city) | 14 | 1 (1 in force) | — | St. Louis data center moratorium In force | |
| North Kansas City | Clay County | 5 | — | — | — | |
| Maryland Heights | St. Louis County | 4 | — | — | — | |
| Columbia | Boone County | 2 | 1 (1 in force) | — | Local moratorium on data centers for a stated term In force | |
| Springfield | Greene County | 2 | 1 (1 in force) | — | Local moratorium on data centers through November 17, 2026 In force | |
| Lee's Summit | Jackson County + Cass County | 2 | — | — | — | |
| Liberty | Clay County | 2 | — | — | — | |
| New Florence | Montgomery County | 2 | — | — | — | |
| Independence | Jackson County | 1 | 1 (1 in force) | 1 | City moratorium on data centers through January 2, 2027 In force | |
| Berkeley | St. Louis County | 1 | — | — | — | |
| Creve Coeur | St. Louis County | 1 | — | — | — | |
| Hamilton | Caldwell County | 1 | — | — | — | |
| Hannibal | Marion County + Ralls County | 1 | — | — | — | |
| Hazelwood | St. Louis County | 1 | — | — | — | |
| Kirksville | Adair County | 1 | — | — | — | |
| Moberly | Randolph County | 1 | — | — | — | |
| O'Fallon | St. Charles County | 1 | — | — | — | |
| City of Peculiar | Cass County | — | 1 (1 in force) | 1 | Data centers removed from zoning ordinance In force | |
| Camdenton Board of Aldermen | Camden County | — | 1 (1 in force) | — | Camdenton Board of Aldermen, MO data center moratorium In force | |
| City of Camdenton | Camden County | — | 1 (1 in force) | — | One-year data center moratorium In force | |
| City of Neosho | Newton County | — | 1 (1 in force) | — | One-year data center moratorium In force | |
| City of St. Charles | St. Charles County | — | 1 (1 in force) | — | Zoning change banning data centers In force | |
| City of St. Peters | St. Charles County | — | 1 (1 in force) | — | One-year data center moratorium In force | |
| Oak Grove | Jackson County + Lafayette County | — | 1 (1 in force) | — | City moratorium on data centers through August 5, 2027 In force | |
| Pacific | Franklin County + St. Louis County | — | 1 (1 in force) | — | City moratorium on data centers through August 4, 2027 In force | |
| Palmyra | Marion County | — | 1 (1 in force) | — | City moratorium on data centers In force | |
| Missouri | — | — | — | 1 | Google / Meta / Metrobloks Missouri (statewide legislation) |
Data center counts come from every facility on the SAVRN Data Center Map, counted in the county and the city or community where each building physically stands (Census boundaries), not its mailing address. Jurisdictions appear as the Moratorium Tracker records them.
Missouri, from generation to the household bill
1Grid operator
- Peak load 2025
- 121 GW
- Peak load forecast 2035
- 163 GW
2Generation pipeline
- Operating capacity
- 23.7 GW
- Planned, all types
- 3,830 MW
- Under construction or built
- 1,477 MW
- Planned gas
- 1,927 MW
- Planned retirements 2026–30
- 1,194 MW
- Net firm additions derived
- 282 MW
3Data center demand
- Data centers identified
- 93
- Operators
- 41
- Load in tracked queues
- —
- Utility large-load projects
- 4
- Commercial sales, YTD change
- +3.0%
- Industry share of state GDP
- 2.9%
4Jobs and pay
- Unemployment, Aug 2026
- 3.5% (-0.5 pts y/y)
- Construction jobs vs 2019
- +25.8%
- Manufacturing jobs vs 2019
- +0.3%
- Electrical contractor jobs 2019–25
- +21.5%
- Electrician median pay
- $65,410
- Electrician ÷ cashier pay
- 2.14×
5Household bill
- Residential price, YTD Jul 2026
- 13.96¢/kWh
- Change vs YTD 2025
- +5.9%
- All-sector price change
- +4.9%
- Total retail sales change
- +0.7%
6Policy friction
- State measures on record
- 3
- Local measures (in force)
- 21 (20)
- Watchlist projects
- 5
- Lawsuits tracked
- 0
- Announced capital, disclosed
- $27.2B
- Dedicated tax incentive
- Yes
Planned power plants in Missouri
Every planned generator in Missouri in the August 2026 EIA-860M inventory, by technology, then the 15 largest units. Under construction or built covers status codes U, V and TS.
| Technology | Units | Planned MW | Under construction or built |
|---|---|---|---|
| Natural gas | 16 | 1,927 MW | 621 MW |
| Solar | 6 | 1,225 MW | 825 MW |
| Battery storage | 3 | 431 MW | 31 MW |
| Wind | 1 | 247 MW | — |
Largest planned generators
| Plant | County | Technology | MW | Status | Year | Owner |
|---|---|---|---|---|---|---|
| Mullin Creek #1 Generating Station | Nodaway | Natural Gas Fired Combustion Turbine | 490 MW | Approvals received | 2030 | Evergy Missouri West |
| Turney Energy Center | Clinton | Natural Gas Fired Combustion Turbine | 419 MW | Under construction (≤50%) | 2027 | Associated Electric Coop, Inc |
| Beavertail Solar | Henry | Solar Photovoltaic | 400 MW | Under construction (≤50%) | 2027 | Beavertail Solar, LLC |
| Show Me State Solar | Callaway | Solar Photovoltaic | 250 MW | Built, not yet operating | 2026 | Show Me State Solar, LLC |
| Buffalo Branch Wind and Solar LLC | Dade | Onshore Wind Turbine | 247 MW | Planned, approvals not started | 2029 | Buffalo Branch Wind and Solar LLC |
| Castle Bluff Energy Center | St Louis | Natural Gas Fired Combustion Turbine | 216 MW | Planned, approvals not started | 2027 | Union Electric Co - (MO) |
| Castle Bluff Energy Center | St Louis | Natural Gas Fired Combustion Turbine | 216 MW | Planned, approvals not started | 2027 | Union Electric Co - (MO) |
| Castle Bluff Energy Center | St Louis | Natural Gas Fired Combustion Turbine | 216 MW | Planned, approvals not started | 2027 | Union Electric Co - (MO) |
| Vichy Solar | Maries | Solar Photovoltaic | 200 MW | Planned, approvals not started | 2027 | Vesper Energy Development LLC |
| Vichy Solar | Maries | Batteries | 200 MW | Planned, approvals not started | 2027 | Vesper Energy Development LLC |
| Scopus Solar | Bollinger | Solar Photovoltaic | 200 MW | Planned, approvals not started | 2027 | Vesper Energy Development LLC |
| Scopus Solar | Bollinger | Batteries | 200 MW | Planned, approvals not started | 2027 | Vesper Energy Development LLC |
| Foxtrot Solar Energy LLC | Jasper | Solar Photovoltaic | 109 MW | Under construction (≤50%) | 2027 | Evergy Missouri West |
| Blue Jay Road Solar, LLC | Ralls | Solar Photovoltaic | 66 MW | Under construction (≤50%) | 2026 | Birch Creek Development |
| McCartney | Greene | Natural Gas Fired Combustion Turbine | 49 MW | Under construction (≤50%) | 2027 | City Utilities of Springfield - (MO) |
What the Missouri build-out runs on
Who is building generation in Missouri, which manufacturers and contractors have a plant, expansion or contract recorded here, and how long the critical equipment takes to arrive.
Developers and owners with planned generation
| Developer or owner | Units | Planned MW | Building MW | Main technology | Counties |
|---|---|---|---|---|---|
| Vesper Energy Development LLC | 4 | 800 MW | — | Battery storage | 2 |
| Union Electric Co - (MO) | 3 | 648 MW | — | Natural gas | 1 |
| Evergy Missouri West | 2 | 599 MW | 109 MW | Solar | 2 |
| Associated Electric Coop, Inc | 1 | 419 MW | 419 MW | Natural gas | 1 |
| Beavertail Solar, LLC | 1 | 400 MW | 400 MW | Solar | 1 |
| Show Me State Solar, LLC | 1 | 250 MW | 250 MW | Solar | 1 |
| Buffalo Branch Wind and Solar LLC | 1 | 247 MW | — | Wind | 1 |
| Missouri Jnt Muni.Pwr Elec. Ut. Comm. | 7 | 215 MW | 46 MW | Natural gas | 3 |
| City Utilities of Springfield - (MO) | 4 | 178 MW | 178 MW | Natural gas | 1 |
| Birch Creek Development | 1 | 66 MW | 66 MW | Solar | 1 |
| Curators of the University of Missouri | 1 | 9 MW | 9 MW | Natural gas | 1 |
Manufacturers and contractors with a recorded Missouri footprint
No plant, expansion or contract in the manufacturer record names Missouri. The national suppliers below serve every state.
Order-by check derived
8 of the 9 planned units of 50 MW or more in Missouri that are not yet under construction (1,938 of 2,185 MW) are past the date their step-up transformer had to be ordered to meet the planned in-service date, and 4 gas units are (1,138 MW) past the turbine order date as well. These units hold their schedules only if the equipment is already on order.
| Plant | Technology | MW | Planned in service | Transformer order-by | Turbine order-by | Owner |
|---|---|---|---|---|---|---|
| Mullin Creek #1 Generating Station | Natural gas | 490 MW | Jan 2030 | Dec 2026 | Jan 2025 | Evergy Missouri West |
| Castle Bluff Energy Center | Natural gas | 216 MW | Oct 2027 | Sep 2024 | Oct 2022 | Union Electric Co - (MO) |
| Castle Bluff Energy Center | Natural gas | 216 MW | Oct 2027 | Sep 2024 | Oct 2022 | Union Electric Co - (MO) |
| Castle Bluff Energy Center | Natural gas | 216 MW | Oct 2027 | Sep 2024 | Oct 2022 | Union Electric Co - (MO) |
| Scopus Solar | Battery storage | 200 MW | Dec 2027 | Nov 2024 | — | Vesper Energy Development LLC |
| Scopus Solar | Solar | 200 MW | Dec 2027 | Nov 2024 | — | Vesper Energy Development LLC |
| Vichy Solar | Battery storage | 200 MW | Dec 2027 | Nov 2024 | — | Vesper Energy Development LLC |
| Vichy Solar | Solar | 200 MW | Dec 2027 | Nov 2024 | — | Vesper Energy Development LLC |
Lead times, OEM backlogs and the national generation and grid contractors are on the national supply chain section.
Data center and large-load demand in Missouri
93 data centers run by 41 operators are identified in Missouri. The full list by city is on the Missouri Data Center Map page. Utilities report 4 large customer projects here to EEI.
| Utility | Customer or type | MW stated | Investment stated | |
|---|---|---|---|---|
| Ameren Missouri | 1,000 MW | $15 billion | ||
| Evergy | — | $1 billion | ||
| Evergy | 700 MW | $10 billion | ||
| Evergy | Meta | — | $1 billion |
The Missouri jobs report, and who the build-out employs
Payroll employment, August 2026 (preliminary)
| Industry | Jobs | Change vs Aug 2025 | Change vs Aug 2019 |
|---|---|---|---|
| Total nonfarm | 3,015.7k | ▲ 1.1% | ▲ 3.5% (+102.5k) |
| Construction | 160.5k | ▲ 5.8% | ▲ 25.8% (+32.9k) |
| Manufacturing | 278.9k | ▼ 0.2% | ▲ 0.3% (+0.8k) |
| Mining and logging | 4.5k | ▲ 2.3% | ▲ 2.3% (+0.1k) |
| Retail trade | 311.4k | ▲ 2.0% | ▲ 2.8% (+8.4k) |
Power and data industries, 2019 to 2025
| Industry | Jobs 2019 | Jobs 2025 | Change | Average pay 2025 |
|---|---|---|---|---|
| Data processing and hosting | 10,843 | 14,429 | ▲ 33.1% | $155,621 |
| Electrical contractors | 15,059 | 18,298 | ▲ 21.5% | $86,490 |
| Power and communication line construction | 4,836 | 5,988 | ▲ 23.8% | $93,182 |
| Electric power generation, transmission, distribution | — | 7,999 | — | $127,612 |
| Transformer manufacturing | — | 2,409 | — | $81,167 |
Pay ladder, May 2025
| Occupation | Employment | Median annual pay | Multiple of cashier pay |
|---|---|---|---|
| Cashiers | 69,430 | $30,520 | 1.00× |
| Fast food and counter workers | 29,360 | $30,390 | 1.00× |
| Retail salespersons | 67,140 | $33,460 | 1.10× |
| All occupations | 2,936,050 | $47,800 | 1.57× |
| Construction laborers | 17,050 | $56,730 | 1.86× |
| Welders | 10,600 | $51,950 | 1.70× |
| HVAC mechanics | 7,220 | $59,950 | 1.96× |
| Plumbers and pipefitters | 8,310 | $66,790 | 2.19× |
| Electricians | 12,780 | $65,410 | 2.14× |
| Power plant operators | — | $101,900 | 3.34× |
| Power-line installers | 3,440 | $96,360 | 3.16× |
| Construction supervisors | 13,330 | $87,520 | 2.87× |
| Electrical engineers | 2,410 | $118,670 | 3.89× |
County-level contractor jobs and pay are in the county record above.
What the data center industry adds to Missouri
PwC figures are modeled estimates commissioned by the industry.
The rules and the pipeline in Missouri
State measures 3
| Bill | Measure | Status | Date | |
|---|---|---|---|---|
| HB 3369 | Prohibits the issuance of permits for construction of data centers for one year in St. Louis | Proposed | 2026-05 | |
| Missouri Legislature (data center hearings on risks/rewards and energy demand) | Missouri lawmakers heard industry experts and consumer advocates on benefits/drawbacks of data centers, risks/rewards, and energy demand. | Proposed | 2026-05 | |
| HB 3362 | Missouri has multiple data center bills (proposed by Google / Meta / Metrobloks). | Failed / vetoed | 2026-02 |
Delay Watchlist projects 5
| Project | Location | Status | Cause | MW | |
|---|---|---|---|---|---|
| Nebius Independence | Independence | denied | 1,200 MW | ||
| Harper Road Technology Park | City of Peculiar | cancelled | 750 MW | ||
| Downtown Kansas City High-Rise Data Center (Quality Hill / Western Newspaper Union Building) | Kansas City, Jackson County | permit denied | — | ||
| St. Charles County Data Center Moratorium | St. Charles County | moratorium in force | — | ||
| Google / Meta / Metrobloks Missouri (statewide legislation) | Missouri (statewide legislation) | cancelled | — |
Local moratoria and restrictions (21) appear by county and city in the county-by-county section. Counts include every status in the weekly tracker feeds as of October 5, 2026. The Missouri Data Center Map page counts only active local pauses and delayed or blocked projects as of its September 2 rebuild, so its figures are lower. The difference is one of definition and date.
Missouri's neighbors
Missouri power, answered from the record
How much new power generation is planned in Missouri?
EIA's August 2026 inventory lists 3,830 MW of planned generators in Missouri, 1,477 MW of it under construction or built. By capacity the pipeline is natural gas 50%, solar 32%, battery storage 11%. The largest single unit is Mullin Creek #1 Generating Station (490 MW, Evergy Missouri West). Owners plan to retire 1,194 MW from 2026 to 2030.
Who runs the power grid in Missouri?
MISO serves most of Missouri as the regional wholesale market and grid operator. No data center load is tracked in its queues yet.
How much do data centers add to the Missouri economy?
PwC's 2026 study for the Data Center Coalition credits the industry with 85,260 in-state jobs, $13.3B of GDP (2.9% of the state economy, 8th of 51) and $1.1B in state and local taxes in 2024. These are modeled estimates commissioned by the industry.
Is planned generation in Missouri on schedule?
8 of 9 planned units of 50 MW or more not yet under construction are past the latest date to order a step-up transformer (more than 160 weeks) for their planned in-service date, and 4 gas units are past the turbine order date (about five years). They hold schedule only if equipment is already on order.
Is the build-out creating trade jobs in Missouri?
Construction employment is +25.8% against August 2019. Electrical contractor jobs went from 15,059 in 2019 to 18,298 in 2025 (+21.5%, 24th in the country).
Where are the data centers in Missouri?
93 data centers run by 41 operators are identified in Missouri. The largest clusters are in Clay County (33), Jackson County (16), St. Louis (city) (14).
What do electricians earn in Missouri?
The median electrician in Missouri earned $65,410 in May 2025, 2.14 times the median cashier, and power-line installers earned $96,360 (BLS OEWS).
Does Missouri have a data center moratorium?
The SAVRN Moratorium Tracker holds 3 state-level measures (0 enacted) and 21 local moratoria or restrictions in Missouri, 20 of them in force, 24th most in the country.
Missouri across the SAVRN trackers
Sources for this page
- BEA state GDP via FRED
- BLS LAUS
- BLS OEWS
- BLS QCEW
- BLS State Employment (CES)
- EEI large customer projects
- EIA Electric Power Monthly
- EIA-860M (Aug 2026)
- NCSL
- PwC for the Data Center Coalition
- SAVRN Capital Atlas
- SAVRN Data Center Map
- SAVRN Delay Watchlist
- SAVRN Grid Operator Watchlist
- SAVRN Moratorium Tracker
- U.S. Census Bureau cartographic boundaries (via us-atlas)
Every figure links to its original source through the Sources buttons. Values marked derived are calculated from reported figures.