Nationwide Data Center Delay Watchlist

A continuously maintained, primary-sourced record of U.S. data center projects, jurisdictional actions, local restrictions, litigation, federal and utility dockets, public-company exposure, and securities filings affected by delay, moratorium, litigation, and grid constraint. Every entry links to its documented public source.

Updated 2026-09-28 Live · sources checked 53 min ago · 16 of 18 sources answered · 52 entries added in the last 7 days · last change 2026-10-03 Version 2.0.0 Coverage from 2024-01-01 Compiled by SAVRN Research
Scale model of a data center campus on a white plan: completed halls, cooling plant, and electrical substation rendered in copper, with queued future phases drawn as blueprint outline and a construction crane standing still
A data center campus rendered as a plan: completed structures shown built, queued phases shown as outline. The watchlist records which projects have moved and which are on hold.
Tracked projects
344
delayed, cancelled, or under review
Local restrictions
1150
county, city, township measures
Utility actions
272
PUC dockets and statements
Active lawsuits
63
filed or in progress
Stalled since Jan 2024
$170B+
across 20 states (Carbon Direct)
Q1 2026 delayed / cancelled
$130B
75 projects (Fortune)
ERCOT capacity at risk
49.8 GW
$8B–$15B revenue (BNEF)
Transformer lead time
128 wks
large power, average

National interconnection queue

Every ISO plus vertically integrated utilities with a public row-level queue, as of 2026-09-28. The full row-level queue is refreshed weekly. ERCOT Batch Zero row-level classifications are not yet published per Market Notice M-A080326-01.

32,382
Total queue rows
4,445 GW
Total capacity requested
46
Rows flagged data center
92
Large-load / DC studies
By status
Withdrawn15,338
IA signed8,099
Active4,163
Unknown2,003
Other1,978
Study706
Suspended95
By source, ISO and utility
PJM9,263
Alliant Energy6,968
MISO3,873
CAISO2,281
Dominion Energy VA2,178
NYISO2,148
ERCOT2,003
ISO-NE1,751
SPP1,028
Ameren Illinois146
AEP Indiana Michigan91
Consumers Energy88
Evergy Kansas88
AEP PSO80
AEP Ohio72
We Energies58
PacifiCorp56
AEP SWEPCO47
Evergy Missouri40
El Paso Electric39
AEP APCo34
MidAmerican Energy32
Ameren Missouri18

Would you like the weekly update?

Every week we re-verify every project on this watchlist and publish what moved. You get one email when it goes out.

Also send me

Receive a short introduction on days 3, 7 and 14, plus the updates you select. Unsubscribe in one click. Privacy ·

You're on the list. The next weekly update will land in your inbox when it publishes.
You are subscribed. Read the latest tracker

Browse a section below. Download the full dataset (JSON) or review all sources and citations.

Filings and disclosures

SEC filings with delay or moratorium disclosure language, plus investor press releases and material news on record for watchlist issuers. Newest first.

TickerFormDateFiling
FRMI DEF 14A 2026-10-02 Fermi America
DEF 14A: ith TensorWave, and to obtain adequate credit support for our obligations thereunder, on acceptable terms or at all; • the anticipated revenues to be generated under the lease with TensorWave, anticipated…
VDTA S-1 2026-10-02 Vertical Data Inc.
Full-text match: data center interconnection delay
EMAT 8-K 2026-10-01 Miami, Florida
Full-text match: data center behind-the-meter
WHK S-1 2026-10-01 WhiteHawk Minerals Corp.
Full-text match: data center curtailment
PWCM 8-K 2026-09-30 POWERCOMPUTE, INC.
Full-text match: data center curtailment
PNW 8-K 2026-09-30 PINNACLE WEST CAPITAL CORP
Full-text match: data center large load
ZONE 8-K 2026-09-30 Zone Frontier Inc.
Full-text match: data center colocation megawatts
BIAI S-1/A 2026-09-29 Bitari Inc
Full-text match: data center moratorium
UEC 10-K 2026-09-29 URANIUM ENERGY CORP
Full-text match: data center curtailment
SGLY 10-K 2026-09-29 Singularity Future Technology Ltd.
Full-text match: data center interconnection delay
IDT 10-K 2026-09-29 IDT CORP
Full-text match: data center interconnection delay
ADRX 424B4 2026-09-28 ADARx Pharmaceuticals, Inc.
Full-text match: data center curtailment
PAAC 8-K 2026-09-28 Proem Acquisition Corp. I
Full-text match: data center interconnection delay
ROZE 424B4 2026-09-28 ROZE AI INC.
Full-text match: data center interconnection delay
ZONE 10-K 2026-09-28 Zone Frontier Inc.
Full-text match: data center interconnection delay
XLAB 10-K 2026-09-28 Exascale Labs Holdings Inc.
Full-text match: data center interconnection delay
DTB 8-K 2026-09-28 DTE ENERGY CO
Full-text match: data center behind-the-meter
CWEN 8-K 2026-09-28 Bates County, Missouri
8-K (1.01 material definitive agreement, 9.01 exhibits): Swan Solar is developing and constructing a solar photovoltaic generating facility, with an approximate installed capacity of 650 megawatts, in Bates County,…
AEE 8-K 2026-09-28 Ameren
8-K (8.01 other events): r develop, which could result from a variety of factors, including failures in system reliability, failure to implement our investment plans or disagreement with those plans, failure to protect…
BACC 8-K 2026-09-25 Blue Acquisition Corp/Cayman
Full-text match: data center curtailment
AESI 8-K 2026-09-25 Atlas Energy Solutions Inc.
Full-text match: data center power purchase
MARA 8-K 2026-09-25 MARA Holdings
8-K (1.01 material definitive agreement): The Milestone consisting of Seller’s retention of a minority interest in the Site upon execution of a data center lease with a third-party tenant is unchanged.
CLSK 8-K 2026-09-25 Sandersville, Georgia
8-K (1.01 material definitive agreement, 2.03 direct financial obligation): CSDC Finance intends to use the net proceeds from the offering to (1) finance the remaining cost of the Sandersville Facility, a data center…
DCI 10-K 2026-09-25 DONALDSON Co INC
Full-text match: data center curtailment
NB 10-K 2026-09-25 NIOCORP DEVELOPMENTS LTD
Full-text match: data center lease kW
VYLR 8-K 2026-09-25 Vylor Inc.
Full-text match: data center curtailment
EMAT S-1/A 2026-09-24 Evolution Metals & Technologies Corp.
Full-text match: data center lease kW
SHPH 10-Q 2026-09-24 Shuttle Pharmaceuticals Holdings, Inc.
Full-text match: data center power purchase
BYOP S-1/A 2026-09-24 KiNRG, Inc.
Full-text match: data center large load
CNTM S-1/A 2026-09-23 ConnectM Technology Solutions, Inc.
Full-text match: data center interconnection delay
SEI 8-K 2026-09-22 Solaris Energy Infrastructure, Inc.
Full-text match: data center behind-the-meter
VRHID S-1/A 2026-09-22 Veri MedTech Holdings, Inc.
Full-text match: data center curtailment
PUMP 8-K 2026-09-22 ProPetro Holding Corp.
Full-text match: data center behind-the-meter
S-1/A 2026-09-21 ADARx Pharmaceuticals, Inc.
Full-text match: data center curtailment
NUAI 8-K 2026-09-21 New ERA Energy & Digital, Inc.
Full-text match: data center power purchase agreement
CNTM S-1/A 2026-09-21 ConnectM Technology Solutions, Inc.
Full-text match: data center interconnection delay
OURA S-1/A 2026-09-21 Oura Inc.
Full-text match: data center curtailment
SBE S-1/A 2026-09-21 SB Energy, Inc.
Full-text match: data center moratorium
RIME 8-K 2026-09-21 Algorhythm Holdings, Inc.
Full-text match: data center behind-the-meter
GRDX 10-Q/A 2026-09-18 GridAI Technologies Corp.
Full-text match: data center power purchase
BLSM 10-Q 2026-09-18 BlossomHill Therapeutics, Inc.
Full-text match: data center curtailment
S-1 2026-09-18 NSCALE Ltd
Full-text match: data center power purchase agreement
VRHID S-1/A 2026-09-18 Veri MedTech Holdings, Inc.
Full-text match: data center curtailment
ETRA 424B4 2026-09-18 Electra Therapeutics, Inc.
Full-text match: data center curtailment
FCCN S-1/A 2026-09-18 SPECTRAL CAPITAL Corp
Full-text match: data center moratorium
HIVE 8-K 2026-09-17 HIVE Digital Technologies Ltd.
Full-text match: data center curtailment
FEAM 10-K 2026-09-17 5E Advanced Materials, Inc.
Full-text match: data center interconnection delay
NMAD 8-K/A 2026-09-17 NOMAD POWER SOLUTIONS, INC.
Full-text match: data center interconnection delay
HCWC 8-K 2026-09-17 HEALTHY CHOICE WELLNESS CORP.
Full-text match: data center interconnection delay
HIVE 8-K 2026-09-16 HIVE Digital Technologies Ltd.
Full-text match: data center curtailment
IHT 10-Q 2026-09-16 INNSUITES HOSPITALITY TRUST
Full-text match: data center ground lease
ALMU 10-K 2026-09-16 Aeluma, Inc.
Full-text match: data center curtailment
APUR 8-K 2026-09-16 Aperture AC
Full-text match: data center moratorium
S-1/A 2026-09-15 KiNRG, Inc.
Full-text match: data center large load
BIAI S-1/A 2026-09-15 Bitari Inc
Full-text match: data center large load
FSHP 8-K 2026-09-15 Flag Ship Acquisition Corp
Full-text match: data center moratorium
ETRA S-1/A 2026-09-14 Electra Therapeutics, Inc.
Full-text match: data center curtailment
ANY 8-K 2026-09-14 Sphere 3D Corp.
Full-text match: data center moratorium
D 8-K 2026-09-14 DOMINION ENERGY, INC
Full-text match: data center large load
UROY 10-Q 2026-09-14 Uranium Royalty Corp.
Full-text match: data center interconnection delay
VRHID S-1/A 2026-09-14 Veri MedTech Holdings, Inc.
Full-text match: data center curtailment
NEE 8-K 2026-09-14 NEXTERA ENERGY INC
Full-text match: data center large load
ZSQR 8-K 2026-09-14 Z Squared Inc.
Full-text match: data center interconnection delay
S-1/A 2026-09-14 ADARx Pharmaceuticals, Inc.
Full-text match: data center curtailment
SLNH 8-K 2026-09-14 Soluna Holdings
8-K (7.01 Regulation FD disclosure, 9.01 exhibits): issued a press release announcing that ERCOT has conditionally classified its 100 MW Project Dorothy campus as Base Load in Batch Zero.
WYFI 8-K 2026-09-14 WhiteFiber, Inc.
Full-text match: data center capacity agreement
AIB 8-K 2026-09-11 AIB Data Centers Inc.
Full-text match: data center moratorium
IOND 8-K 2026-09-11 Ionic Digital Inc.
Full-text match: data center large load
APUR 8-K 2026-09-11 Aperture AC
Full-text match: data center interconnection agreement
OKLO 424B5 2026-09-11 Oklo
424B5: For example, we have signed non-binding letters of intent with Equinix, Diamondback Energy, and Prometheus Hyperscale (formerly Wyoming Hyperscale).
EGAN 10-K 2026-09-10 EGAIN Corp
Full-text match: data center curtailment
VIP 8-K 2026-09-10 Vulcan Infrastructure & Power Inc.
Full-text match: data center moratorium
AIB 8-K 2026-09-10 AIB Data Centers Inc.
Full-text match: data center lease kW
VST 424B5 2026-09-10 Vistra
424B5: Vistra’s generation fleet totals approximately 44,000 megawatts of generation capacity powered by a diverse portfolio, including natural gas, nuclear, coal, solar and battery energy storage facilities.
CNP 8-K 2026-09-09 CENTERPOINT ENERGY INC
Full-text match: data center moratorium
8-K 2026-09-09 Blue Laser Fusion, Inc.
Full-text match: data center lease kW
BRZE 10-Q 2026-09-09 Braze, Inc.
Full-text match: data center interconnection delay
NWE 8-K 2026-09-09 NorthWestern Energy Group, Inc.
Full-text match: data center large load
VST S-3ASR 2026-09-09 Vistra
S-3ASR: Our generation fleet totals approximately 44,000 megawatts of generation capacity powered by a diverse portfolio, including natural gas, nuclear, coal, solar, and battery energy storage facilities.
AMT 424B5 2026-09-09 American Tower
424B5: We also hold other telecommunications infrastructure, fiber and property interests that we lease primarily to communications service providers and third-party tower operators and we also hold a portfolio of…
HNUC S-1/A 2026-09-08 Holtec Nuclear Corp
Full-text match: data center large load
OBDC 8-K 2026-09-08 Blue Owl Capital Corp
Full-text match: data center moratorium
EMAT S-1 2026-09-08 Evolution Metals & Technologies Corp.
Full-text match: data center lease kW
MESH 8-K 2026-09-08 Meshflow Acquisition Corp
Full-text match: data center large load
CBDW 8-K 2026-09-08 Lufkin, Texas
Full-text match: data center behind-the-meter
SLNH 8-K 2026-09-08 Soluna Holdings
8-K (7.01 Regulation FD disclosure, 9.01 exhibits): The Company has energized the final 14 MW at Project Kati 1, completing the 83 MW site, and has been notified that ERCOT has conditionally classified the full 166 MW…
PNW 8-K 2026-09-04 PINNACLE WEST CAPITAL CORP
Full-text match: data center large load
WEC 8-K 2026-09-04 WEC ENERGY GROUP, INC.
Full-text match: data center power purchase
S-1 2026-09-04 ADARx Pharmaceuticals, Inc.
Full-text match: data center curtailment
S-1/A 2026-09-04 SB Energy, Inc.
Full-text match: data center interconnection delay
MTRX 10-K 2026-09-03 MATRIX SERVICE CO
Full-text match: data center interconnection delay
S-1 2026-09-03 Oura Inc.
Full-text match: data center curtailment
LTGO 10-Q 2026-09-03 Latigo Biotherapeutics, Inc.
Full-text match: data center curtailment
PL 10-Q 2026-09-03 Planet Labs PBC
Full-text match: data center interconnection delay
LHSW 424B4 2026-09-03 Lianhe Sowell International Group Ltd
Full-text match: data center interconnection delay
PHR 10-Q 2026-09-03 Phreesia, Inc.
Full-text match: data center moratorium
ZS 10-K 2026-09-03 Zscaler, Inc.
Full-text match: data center interconnection delay
FCEL 8-K 2026-09-02 FUELCELL ENERGY INC
Full-text match: data center power purchase
FCEL 10-Q 2026-09-02 FUELCELL ENERGY INC
Full-text match: data center lease kW
MOVE 8-K 2026-09-02 Corvex, Inc.
Full-text match: data center moratorium
VRT 8-K 2026-09-02 Vertiv Holdings Co
Full-text match: data center behind-the-meter
FNGR S-1 2026-09-01 FingerMotion, Inc.
Full-text match: data center large load
S-1 2026-09-01 SB Energy, Inc.
Full-text match: data center moratorium
FRVO 8-K 2026-09-01 Fervo Energy Co
Full-text match: data center power purchase
RBRK 10-Q 2026-09-01 Rubrik, Inc.
Full-text match: data center interconnection delay
IOND 10-Q 2026-09-01 Ionic Digital Inc.
Full-text match: data center power purchase
SYTN S-1/A 2026-08-31 Syntiant Corp.
Full-text match: data center moratorium
TXNM 424B5 2026-08-31 TXNM Energy (PNM Resources)
424B5: ansmission, distribution, and other projects, including uncertainty related to regulatory approvals and cost recovery, the ability of counterparties to meet their obligations under certain arrangements…
EOSE S-3ASR 2026-08-31 Eos Energy Enterprises
S-3ASR: These applications are increasingly relevant as overall electricity demand continues to rise, including incremental load growth associated with the expansion of artificial intelligence (“AI”), high-performance…
FNGR 8-K 2026-08-28 FingerMotion, Inc.
Full-text match: data center behind-the-meter
QMLS 10-Q/A 2026-08-28 QumulusAI, Inc.
Full-text match: data center colocation megawatts
CORZ 8-K 2026-08-27 Utility agreements supporting Core Scientific data center sites
Core Scientific entered a Credit Agreement on August 25, 2026 with JPMorgan Chase Bank as administrative and collateral agent, providing a senior secured revolving credit facility of up to $100.0 million and a letter…
IREN 10-K 2026-08-27 IREN Ltd
Full-text match: data center power purchase agreement
BTDR 6-K 2026-08-26 Tydal, Norway AI/HPC campus; A102 and A201 facilities, Malaysia
Bitdeer's July 2026 operations update reports a $4.7 billion, sixteen-year AI and HPC data center lease for its Tydal, Norway campus, with potential total contract value reaching $8.0 billion through a one-time…
WYFI 8-K/A 2026-08-26 WhiteFiber
8-K/A (9.01 exhibits): (the “Company”), through its wholly owned subsidiary, Enovum Data Centers Corp., a Canadian corporation, that was described under Item 1.01 of the Original 8-K.
QMLS 10-Q 2026-08-25 QumulusAI, Inc.
Full-text match: data center colocation megawatts
CBDW 8-K 2026-08-25 1606 CORP.
Full-text match: data center behind-the-meter
FNGR 8-K 2026-08-25 FingerMotion, Inc.
Full-text match: data center behind-the-meter
GRDX S-1/A 2026-08-24 GridAI Technologies Corp.
Full-text match: data center behind-the-meter
HNUC S-1/A 2026-08-24 SMR-300-powered
Full-text match: data center power purchase agreement
SLNH DEF 14A 2026-08-24 Soluna Holdings
DEF 14A: Golding's career is focused on building Internet, Cloud, And AI infrastructure for enterprises, colocation providers, hyperscale clouds, and the emerging AI ecosystem.
S-1 2026-08-21 Bitari Inc
Full-text match: data center power purchase agreement
S-1 2026-08-21 CoVolt Power, Inc.
Full-text match: data center behind-the-meter
WYFI 8-K 2026-08-21 WhiteFiber
8-K (1.01 material definitive agreement, 2.03 direct financial obligation, 3.02 unregistered sale of equity, 8.01 other events, 9.01 exhibits): The remaining net proceeds from the Offering are expected to be used…
XEL 8-K 2026-08-20 Xcel Energy
8-K (8.01 other events): uction; rising energy prices and fuel costs; qualified employee workforce and third-party contractor factors; reputational impacts of actions by employees, directors or third-parties; our…
PLMK 8-K 2026-08-20 Powered
Full-text match: data center power purchase agreement
SHAZ S-1/A 2026-08-20 SharonAI Holdings Inc.
Full-text match: data center behind-the-meter
HVII 8-K 2026-08-20 Hennessy Capital Investment Corp. VII
Full-text match: data center power purchase agreement
DUOT 8-K 2026-08-19 DUOS TECHNOLOGIES GROUP, INC.
Full-text match: data center behind-the-meter
DUOT 10-Q 2026-08-19 DUOS TECHNOLOGIES GROUP, INC.
Full-text match: data center colocation megawatts
GPUS 10-Q 2026-08-19 Dowagiac, Michigan
Full-text match: data center colocation megawatts
CHRN 10-K 2026-08-19 ChronoScale Holdings Corp
Full-text match: data center colocation megawatts
AZIO 10-Q 2026-08-18 AZIO AI HOLDINGS, INC.
Full-text match: data center behind-the-meter
SHAZ S-1/A 2026-08-18 SharonAI Holdings Inc.
Full-text match: data center behind-the-meter
WEC 8-K 2026-08-18 WEC Energy Group
8-K (1.01 material definitive agreement): On, August 14, 2026, Wisconsin Electric Power Company (“WEPCO”) entered into a Power Purchase Agreement ("PPA") with Nextera Energy Point Beach LLC (“NEPB”) to purchase 86% of…
EVRG 424B5 2026-08-17 Evergy
424B5: These risks, uncertainties and other factors include, but are not limited to: • economic and weather conditions and any impact on sales, prices and costs; • significant changes in the demand for electricity,…
BKH 8-K 2026-08-17 BLACK HILLS CORP /SD/
Full-text match: large load tariff
NUAI 8-K 2026-08-17 New ERA Energy & Digital, Inc.
Full-text match: data center power purchase agreement
DUOT 8-K 2026-08-17 DUOS TECHNOLOGIES GROUP, INC.
Full-text match: data center colocation megawatts
VIP 8-K 2026-08-17 Vulcan Infrastructure & Power Inc.
Full-text match: data center behind-the-meter
WYFI 8-K 2026-08-17 WhiteFiber
8-K (1.01 material definitive agreement, 7.01 Regulation FD disclosure, 9.01 exhibits): (the “Company”), through its wholly owned subsidiary, Enovum Data Centers Corp., a Canadian corporation (the “Buyer”), and Unifi…
ORCL news 2026-08-17 Oracle drops lawsuit challenging Wisconsin data center credit rules
Litigation over data center tariffs, Port Washington project
NVDA news 2026-08-17 OpenAI to lease Ohio data center backed by NVIDIA guarantee
NVIDIA lease and power payment guarantee for AI data center
FRMI 10-Q 2026-08-14 Project Matador, Amarillo, Texas (private-grid AI data center and nuclear/gas power campus)
Fermi disclosed that Texas's evolving regulatory environment for data centers, including SB6, NOGRR 282, and NPRR 1308, and Governor Abbott's August 3, 2026 directive for PUCT/ERCOT to audit data centers advancing…
COHR 10-K 2026-08-14 COHERENT CORP.
Full-text match: data center capacity agreement
HIVE 10-Q 2026-08-14 HIVE Digital Technologies Ltd.
Full-text match: data center power purchase agreement
10-Q 2026-08-14 StratCap Digital Infrastructure REIT, Inc.
Full-text match: data center ground lease
AGPU 10-Q 2026-08-14 Axe Compute Inc.
Full-text match: data center colocation megawatts
FRMI 8-K 2026-08-14 Fermi Inc.
Full-text match: data center behind-the-meter
DGXX 10-Q 2026-08-14 Digi Power X Inc.
Full-text match: data center colocation megawatts
BGDE 10-Q 2026-08-14 Big Digital Energy, Inc.
Full-text match: data center behind-the-meter
NUAI 10-Q/A 2026-08-14 New ERA Energy & Digital, Inc.
Full-text match: data center behind-the-meter
NUAI 10-Q 2026-08-14 New ERA Energy & Digital, Inc.
Full-text match: data center behind-the-meter
GEDC 10-Q 2026-08-14 TerraVolt Holdings, Inc.
Full-text match: data center behind-the-meter
BSAI 10-Q 2026-08-14 BLUSKY AI INC.
Full-text match: data center ground lease
JTAI 10-Q 2026-08-14 Jet.AI Inc.
Full-text match: data center behind-the-meter
VIP 10-Q 2026-08-14 Underwood, North Dakota
Full-text match: data center behind-the-meter
EDGM 10-Q 2026-08-14 Edgemode, Inc.
Full-text match: data center power purchase agreement
RIOT 8-K 2026-08-14 Riot Platforms
8-K (1.01 material definitive agreement, 2.03 direct financial obligation): The proceeds of the Facility are intended to fund the purchase of long-lead equipment and related project equipment, and certain other…
CORZ 8-K 2026-08-14 Core Scientific reports update on merger with CoreWeave
CoreWeave acquisition of Core Scientific
BTBT 10-Q 2026-08-13 Bit Digital
10-Q: For the three months ended June 30, 2026 and 2025, the GPU server lease expense amounted to $ 5.6 million and $ 3.7 million, respectively and for the six months ended June 30, 2026 and 2025, the GPU server lease…
SLNH 10-Q 2026-08-13 Soluna Holdings
10-Q: The strategic pipeline contract relates to potential renewable energy datacenters that fit in the alignment of the Company structure to expand operations of the Company’s new focus in their business.
IREN 8-K 2026-08-13 IREN delivers Horizon 1 50MW AI data center to Microsoft at Childress Texas
Texas AI data center delivery milestone
IREN news 2026-08-13 IREN delivers Horizon 1 to Microsoft and achieves NVIDIA exemplar cloud status on GB300 NVL72
Texas AI cloud deployment milestone
CRWV 10-Q 2026-08-12 CoreWeave data center delivery / delayed data center site amortization
CoreWeave's Q2 2026 10-Q defines a 'delayed data center site amortization date' in its credit facility terms for data center sites that did not meet certain delivery requirements by a specified date, confirming…
DUK 424B5 2026-08-12 Duke Energy
424B5: customer usage due to cost pressures from inflation, tariffs, or fuel costs, worsening economic health of our service territories, reductions in customer usage patterns, or lower than anticipated load growth,…
TLN 8-K/A 2026-08-12 Lawrenceburg, Indiana
8-K/A (9.01 exhibits): ment and Plan of Merger (the “Merger Agreement”) with affiliates of Energy Capital Partners (“ECP”), pursuant to which the Company acquired all of the equity interests of certain affiliates of…
CEPL 10-Q 2026-08-12 Capstone Energy Plus (formerly Capstone Green Energy)
10-Q: For example, on July 14, 2026, New York State Governor Kathy Hochul signed an executive order barring the construction of new hyperscale data centers using 50 megawatts or more of power for up to one year in the…
NNE 10-Q 2026-08-12 NANO Nuclear Energy
10-Q: These include growth in AI data centers, industrial reshoring, and broader electrification, all driving a significant need for clean and reliable power, energy sustainability and independence, and climate…
WYFI 10-Q 2026-08-12 WhiteFiber
10-Q: OTHER CURRENT ASSETS, NET Other current assets were comprised of the following: June 30, 2026 December 31, 2025 Funds held in escrow $ 4,384 $ 4,000 Prepaid consulting service expenses 336 1,260 Deferred contract…
RIOT 10-Q 2026-08-10 Corsicana Facility and Rockdale Facility, Texas (ERCOT interconnection)
Riot disclosed that on August 3, 2026 Texas Governor Abbott directed the PUCT and ERCOT to conduct a comprehensive audit of all data center projects advancing through ERCOT's interconnection process, which could delay…
DUK 424B5 2026-08-10 Duke Energy
424B5: customer usage due to cost pressures from inflation, tariffs, or fuel costs, worsening economic health of our service territories, reductions in customer usage patterns, or lower than anticipated load growth,…
VST 10-Q 2026-08-10 Vistra
10-Q: The Helix Fund will seek to invest in and manage assets critical to enabling artificial intelligence (AI), including hyperscale data center development and operations; baseload and flexible power generation;…
PLUG 10-Q 2026-08-10 Plug Power
10-Q: Data Centers, LLC (filed as Exhibit 10.2 to Plug Power Inc.’s Current Report on Form 8-K filed on July 13, 2026 and incorporated by reference herein) 10.4* First Amendment to Purchase and Sale Agreement, dated as…
BW 10-Q 2026-08-10 Babcock & Wilcox Enterprises
10-Q: This improvement is primarily due to the increasing need for electricity from fossil fuels driven by the demand from AI, data centers and expanding economies.
RIOT 8-K 2026-08-10 Riot Platforms
8-K (2.02 results of operations, 8.01 other events, 9.01 exhibits): The information included in Exhibit 99.1 under the heading “191 IT MW Data Center Lease with a Leading Frontier AI Lab at Rockdale” shall be…
RIOT 8-K 2026-08-10 $9.1B AI lease at Rockdale + Q2 2026 results
BTDR 6-K 2026-08-10 Bitdeer reports unaudited second quarter 2026 results with AI cloud and HPC leasing update
Q2 results, AI cloud and HPC leasing, Rockdale Texas
META news 2026-08-10 Abbott data center agreement with Meta appears to have no impact on Northeast El Paso project
Texas standards and incentive exposure for El Paso campus
PPL 10-Q 2026-08-07 PPL Corporation
10-Q: (Blackstone Infrastructure) have formed a joint venture, Invitium Energy, LLC (Invitium), to build, own and operate new electricity generation stations to power data centers in Pennsylvania under long-term energy…
CEPL 424B5 2026-08-07 Capstone Energy Plus (formerly Capstone Green Energy)
424B5: is a leading provider of behind-the-meter clean energy solutions for industrial and commercial operations, along with solutions designed for the next generation of artificial intelligence (“AI”) and data center…
OKLO 10-Q 2026-08-07 Oklo
10-Q: Right of First Refusal Liability On February 16, 2024, the Company entered into a letter of intent (the “LOI”) with an unrelated third party (the “third party”) for the purchase of power from the Company’s…
DLR press 2026-08-07 Digital Realty Welcomes Abbott Initiative
DLR press 2026-08-07 Digital Realty welcomes Governor Abbott initiative for responsible Texas data center investment
Texas oversight, ERCOT, grid reliability commitment
AMZN news 2026-08-07 Amazon confirmed as backer of 7.65 GW private gas power plant for Texas data centers
Texas behind-the-meter gas power for AI data centers
CLSK 10-Q 2026-08-06 Sandersville, Georgia HPC data center (Sandersville Lease) and Texas ERCOT interconnection sites
CleanSpark disclosed the August 3, 2026 letter from Texas Governor Greg Abbott directing ERCOT and the PUCT to audit all data centers advancing through the ERCOT interconnection process before they can proceed, plus…
MARA 10-Q 2026-08-06 MARA behind-the-meter data center sites (Texas)
MARA's 10-Q references the ERCOT/CenterPoint 'Batch Zero' large-load interconnection review process affecting timing for its behind-the-meter data center power arrangements in Texas.
EVRG 10-Q 2026-08-06 Evergy
10-Q: 18.6 37.1 ( 10.4 ) Transmission 6.1 5.9 12.4 13.3 Other 0.7 ( 0.1 ) 3.4 2.5 Total revenue from contracts with customers $ 436.4 $ 425.1 $ 824.4 $ 775.3 Other operating revenues 52.3 46.1 109.7 123.6 Operating…
SRE 10-Q 2026-08-06 Sempra
10-Q: Some of these plans, as well as the increase in data centers and other large load customers throughout the state, have been the subject of heightened engagement from the public and state and local officials…
BKH 10-Q 2026-08-06 Black Hills
10-Q: Wyoming Electric entered into a generation reservation agreement with a prospective data center customer who will provide refundable advances totaling $377 million under the agreement maturing August 31, 2026.
CWEN 424B5 2026-08-06 Clearway Energy
424B5: Federal Energy Regulatory Commission (“FERC”) because they own or operate FERC jurisdictional facilities, including certain generation interconnection facilities and various “paper” facilities, such as wholesale…
8-K 2026-08-06 Oncor Electric Delivery
8-K (2.02 results of operations, 7.01 Regulation FD disclosure, 9.01 exhibits): severe weather events, natural disasters or wildfires; cyber-attacks on Oncor or Oncor’s third-party vendors; changes in expected ERCOT…
10-Q 2026-08-06 Oncor Electric Delivery
10-Q: This follows ERCOT’s implementation of a PUCT-approved, system-wide approach to sequence large load customer interconnection requests (loads of 75 MW or greater) in a recurring batch interconnection framework,…
ORA 10-Q 2026-08-06 Ormat Technologies
10-Q: • In February 2026, we entered into a long-term geothermal portfolio PPA to supply up to 150MW of new geothermal capacity to support Google’s data center energy needs, through NV Energy’s Clean Transition Tariff…
CEG 10-Q 2026-08-06 Freestone County, Texas
10-Q: New Data Center Facility at Freestone Energy Center In the first quarter of 2026, we signed a new 380 MW agreement with Dallas-based CyrusOne, a leading global data center developer and operator, to connect and…
WULF 10-Q 2026-08-05 Cayuga Site, Lansing, New York (HPC data center development)
TeraWulf disclosed that in July 2026 New York Governor Kathy Hochul issued Executive Order No. 62, temporarily pausing certain discretionary permits and approvals for covered data center projects, directly implicating…
NI 10-Q 2026-08-05 NIPSCO data center contracts with Google/Alphabet (ADS Contract)
NiSource's 10-Q discloses material dependence on performance under its 'ADS Contract' data center agreement with Alphabet subsidiary ADS, warning that any decision by ADS or Alphabet to terminate or reduce committed…
TLN 10-Q 2026-08-05 Talen Energy
10-Q: In October 2025, DOE directed the FERC to consider reforms to expedite and facilitate how large loads interconnect to the interstate transmission system.
EOSE 10-Q 2026-08-05 Eos Energy Enterprises
10-Q: It addresses long duration, response driven use cases across data centers, military bases, manufacturing facilities and critical infrastructure, supported by a domestic FEOC compliant supply chain.
SMR 10-Q 2026-08-05 NuScale Power
10-Q: We are positioning ourselves to support the potential next phase of the collaboration between TVA and ENTRA1 which is contingent on the execution of one or more purchase power agreements between ENTRA1 and TVA In…
BTDR 6-K 2026-08-05 Bitdeer reports AI and HPC colocation lease at Tydal Norway
AI/HPC colocation lease
CIFR 10-Q 2026-08-04 Odessa Facility, Texas (Luminant Lease Agreement) and 700MW HPC hyperscaler pipeline across Texas/Ohio
Cipher disclosed that operations require approval from Oncor, AEP, and/or ERCOT to energize each data center, and that deposits with Oncor and AEP for interconnection infrastructure are contingent on energizing sites…
WEC 10-Q 2026-08-04 WEC Energy large-scale data center customer projects (Wisconsin)
WEC Energy Group's 10-Q lists project termination, cancellation, or delay by data center and other large-scale customers as an explicit risk factor, alongside public opposition to data centers and failure to garner…
HUT 10-Q 2026-08-04 Hut 8 site-level ERCOT interconnection exposure
Hut 8's Q2 2026 10-Q incorporates by reference its annual report risk factor discussion regarding potential impacts from evolving data center regulatory and tax abatement scrutiny across its jurisdictions, without new…
PEG 10-Q 2026-08-04 Public Service Enterprise Group
10-Q: In July 2026, Governor Sherrill also signed the Data Center Fair Share Act into law.
DUK 10-Q 2026-08-04 Duke Energy
10-Q: Demand associated with data center development remains a significant contributor to projected load growth.
PNW 10-Q 2026-08-04 Pinnacle West Capital
10-Q: SAI, SAI is a private corporation that manufactures electrical switchgear equipment used by data centers.
AES 10-Q 2026-08-04 AES Corporation
10-Q: iana's plan to develop and construct specific transmission network upgrades and enhancements required to serve the increasing demand, including seeking approval of a construction service agreement and an electric…
PNW 424B5 2026-08-04 Pinnacle West Capital
424B5: lt in increased competition; ​ • variations in demand for electricity, including those due to weather, seasonality (including large increases in ambient temperatures), the general economy or social conditions,…
NRG 10-Q 2026-08-04 NRG Energy
10-Q: Senate Bill 6, On June 20, 2025, the Governor of Texas signed SB 6 into law, which includes various provisions that concern how both ERCOT, transmission and distribution utilities, and power generation companies…
MARA 8-K 2026-08-04 MARA Holdings
8-K (5.02 officer or director changes, 7.01 Regulation FD disclosure, 9.01 exhibits): Novak is a recognized leader in hyperscale data center development and digital infrastructure innovation.
AEE 10-Q 2026-08-03 Ameren
10-Q: 44 Table of Contents In 2026, Ameren Missouri executed electric service agreements with large load customers under its modified large primary service tariff that was approved in 2025, representing 2.8 gigawatts…
ETR 10-Q 2026-07-31 Meta Platforms data center project, Richland Parish, Louisiana (Entergy Louisiana electric service agreement)
Entergy's 10-Q discloses that in June 2026 intervenors in a Louisiana Public Service Commission (LPSC) proceeding sought a subpoena of Meta Platforms to obtain information about its data center project's investment,…
D 10-Q 2026-07-31 Loudoun County, Virginia data center cluster ('Data Center Alley')
Dominion Energy's 10-Q specifically names Loudoun County, Virginia as a concentration risk for data center-driven demand growth, warning about the ability to obtain regulatory, environmental, and other permits to…
LNT 10-Q 2026-07-31 Alliant Energy
10-Q: In the third quarter of 2025, WPL entered into an electric service agreement with a customer who expected to build a data center in WPL’s service territory.
TXNM 10-Q 2026-07-31 TXNM Energy (PNM Resources)
10-Q: On February 6, 2026, the PUCT adopted Rule 25.370, which requires the power demands of large load customers of 75 MW or more, to be incorporated into ERCOT’s Regional Transmission Plan and resource adequacy…
POR 10-Q 2026-07-31 Portland General Electric
10-Q: HB 3546 also directed the OPUC to require that electric companies serving data centers enter into a contract for services with such customer under terms and conditions specified 47 Table of Contents by the law.
HE 8-K 2026-07-31 Hawaiian Electric Industries
8-K (1.01 material definitive agreement): (Kalaeloa), entered into a Power Purchase Agreement for Firm Capacity Renewable Dispatchable Generation (New PPA).
DLR 10-Q 2026-07-31 Digital Realty Trust Q2 2026 Form 10-Q, quarterly report with data center portfolio and development
Dallas metro and Texas development exposure
AMZN 10-Q 2026-07-31 Amazon.com Q2 2026 Form 10-Q, quarterly report with elevated data center capital expenditures
AWS data center buildout and capex
XEL 10-Q 2026-07-30 Xcel Energy data center customer tariffs (multi-state)
Xcel Energy's 10-Q discusses new data center-specific tariffs including minimum demand/revenue requirements and termination or exit fees, designed to ensure data center customers pay the incremental costs to serve…
AEP 10-Q 2026-07-30 American Electric Power
10-Q: ERCOT expects to provide load ramp information to eligible Batch Zero projects in April 2027, enabling large load customers to determine whether to proceed with an interconnection agreement and reserve its…
SO 10-Q 2026-07-30 Southern Company
10-Q: Since 2023, the traditional electric operating companies have contracts with new data centers and other large load customers covering approximately 11 gigawatts of electric load, with each contract individually…
META 10-Q 2026-07-30 Meta Platforms Q2 2026 Form 10-Q, quarterly report with data center and AI capital expenditures
Data center capex and El Paso venture context
APLD 10-K 2026-07-29 Applied Digital HPC data center campuses (Texas/North Dakota development pipeline)
Applied Digital's 10-K risk factors note that governmental authorities have historically imposed moratoria on data center development citing energy usage concerns, and that lessees may terminate leases if construction…
MSFT 10-K 2026-07-29 Microsoft fiscal 2026 Form 10-K, annual report with cloud and AI infrastructure spending
Data center capital commitments and lease disclosures
CORZ 10-Q 2026-07-28 Core Scientific data center delivery to CoreWeave
Core Scientific's 10-Q addresses ERCOT interconnection timing risk and community opposition to data center development as factors that could delay conversion of its Texas sites into HPC colocation capacity for…
BE 10-Q 2026-07-28 New York hyperscale data center moratorium (statewide)
Bloom Energy's 10-Q dedicates a section to 'Increasing Opposition to Data Center Development,' citing the July 2026 New York executive order creating a moratorium on new hyperscale data centers and temporarily pausing…
CMS 10-Q 2026-07-28 CMS Electric Supply Plan / Michigan data center load growth
CMS Energy's 10-Q flags risk that regulatory action could prohibit, delay, or impair implementation of its Electric Supply Plan, and that anticipated demand growth from data center expansion may not materialize as…
CORZ 8-K 2026-07-28 Core Scientific and AMD announce infrastructure partnership for up to 2.5 GW including Texas Pecos and Hunt…
Texas AMD AI data center leases
META press 2026-07-28 Meta announces strategic venture with BlackRock to develop El Paso Texas data center
Texas AI data center, 1 GW, over 10 billion dollar investment
GOOGL 10-Q 2026-07-23 Alphabet Q2 2026 Form 10-Q, quarterly report with technical infrastructure investment
Data center capex and buildout
CLSK 8-K 2026-07-14 CleanSpark secures twenty year Sandersville Georgia data center lease and Texas 885 MW portfolio letter of…
data center lease and Texas power portfolio LOI
CLSK press 2026-07-14 CleanSpark secures twenty year lease with high investment grade global technology company for data center in…
data center lease and Texas portfolio LOI
MARA 8-K 2026-07-09 MARA reports Volt Texas acquisition of Texas site with 2,000 MW power capacity subject to ERCOT approval
Texas data center site, ERCOT interconnection
ORCL 10-K 2026-06-22 Oracle Cloud Infrastructure data center expansion pipeline
Oracle's 10-K explicitly warns that government-imposed limits or moratoria on data center construction in a given market could hinder its ability to execute expansion plans, citing delays across design, engineering,…
HIVE 10-K 2026-06-02 HIVE data center sites in Canada, Sweden, and Paraguay
HIVE's 10-K warns that securing power interconnection agreements and permits for its data centers may be delayed, denied, or become cost-prohibitive due to regulatory processes, and that community opposition to siting…
GOOGL news 2026-05-26 Court halts construction on Google Pine Island Minnesota data center
Litigation, temporary restraining order over environmental review
IREN 10-Q 2026-05-08 IREN Texas and British Columbia data center sites
IREN's 10-Q flags 'large load interconnection' risk factors tied to ERCOT-region development, echoing the broader Texas regulatory scrutiny of data center interconnection queues affecting its Childress buildout.
CIFR 10-Q 2026-05-05 Cipher Texas/Ohio 4.4GW pipeline sites
Cipher's Q1 2026 10-Q reiterates 'large load interconnection' as a specific named risk category for its Texas and Ohio pipeline of 4.4GW across seven sites, noting substation and grid interconnection advancement as…
APLD 8-K 2026-05-05 Applied Digital reports completion of financing tied to CoreWeave North Dakota data center lease
AI data center lease financing
BTDR 20-F 2026-04-30 Bitdeer US data center / ASIC hosting facilities
Bitdeer's annual report references ERCOT interconnection exposure for its Texas hosting operations amid heightened regulatory scrutiny of large-load data center interconnection requests in the state.
MARA 8-K 2026-04-30 MARA reports transaction with FTAI Infrastructure for 485 MW co-located data center power asset
data center power asset transaction
BE press 2026-04-27 Oracle, BorderPlex and Bloom Energy to power Project Jupiter with fuel cell technology
On-site fuel cell power replacing gas turbines for Texas data center
APLD 10-Q 2026-04-08 Applied Digital data center campuses (construction supply chain)
Applied Digital disclosed that global supply logistics delays affecting power and cooling equipment for HPC/AI data centers have been, and may continue to be, impacted by tariffs, extending construction timelines.
GOOGL news 2026-04-07 Google to use natural gas to power off grid data center in Armstrong County Texas
Behind-the-meter gas power, Texas, Crusoe Goodnight campus
BITF 10-K 2026-03-31 Panther Creek, Nesquehoning, Pennsylvania (PJM interconnection) and Magog, Quebec lease termination
Bitfarms (now Keel Infrastructure) disclosed PJM's 2025 Regional Transmission Expansion Plan indicates transmission enhancements needed to serve new data center power demand could take more than five years, and…
GREE 10-K 2026-03-31 Greenidge/Vulcan data center and power generation facilities (New York, Texas)
Greenidge (now Vulcan Infrastructure & Power) references general data center construction and permitting delay risk in its 10-K following its corporate rebrand and pivot toward broader infrastructure/power generation…
BTBT 10-K 2026-03-27 WhiteFiber subsidiary data centers (MTL-1, MTL-2, MTL-3 Montreal; North Carolina)
Bit Digital's 10-K, discussing its WhiteFiber subsidiary, disclosed that development delays could arise from zoning and permitting requirements, and specifically from local community resistance or protests in response…
WYFI 10-K 2026-03-26 WhiteFiber Montreal (MTL-1/2/3) and North Carolina data centers
WhiteFiber's 10-K states its data center operations are currently limited to Montreal, Canada, with North Carolina coming online, and discloses that development activities face delays from zoning and permitting…
MSFT news 2026-03-24 Microsoft to rent Abilene Texas data center dropped by OpenAI and Oracle
Texas Stargate-adjacent lease, capacity reshuffle
ORCL news 2026-03-06 Oracle and OpenAI end plans to expand flagship Abilene Texas data center
Texas Stargate expansion abandoned
CORZ 10-K 2026-03-02 Core Scientific HPC/AI data center conversions (Texas colocation sites); Texas Senate Bill 6
Core Scientific disclosed that Texas enacted Senate Bill 6 in June 2025, introducing significant new requirements for large-load electricity customers exceeding 75MW in ERCOT, including new obligations to contribute to…
CRWV 10-K 2026-03-02 Third-party-provided data centers (widely reported to involve Core Scientific)
CoreWeave's 10-K explicitly discloses delays announced in November 2025 regarding delivery of certain data centers to be provided by a third-party data center provider, warning that failure by third-party providers to…
WULF 10-K 2026-02-27 Justified Data Campus (up to 480MW gross power availability)
TeraWulf's 10-K describes construction of the Justified Data Campus HPC/AI data center, noting the buildout is subject to site planning and phased construction beginning in 2026 extending through 2027, dependent on…
VST 10-K 2026-02-27 Vistra nuclear/gas generation serving data center large-load customers (ERCOT and PJM)
Vistra's 10-K discusses risks tied to serving large-load data center customers, including project termination, cancellation, or delay risk, and the need for regulatory approval of new tariffs designed to allocate…
HUT 10-K 2026-02-25 Hut 8 HPC data center sites (Texas/North America)
Hut 8's 10-K risk factors cite tax abatement scrutiny and local moratoria as increasing constraints on new data center development in jurisdictions where the company operates.
NVDA 10-K 2026-02-25 Customer/partner AI data center build-outs dependent on Nvidia hardware
NVIDIA's 10-K warns that power or water shortages, land or permitting constraints, or regulations limiting energy, water, or land availability could impair customers' ability to expand data center capacity and consume…
CIFR 10-K 2026-02-24 Cipher 5.3GW data center portfolio across 11 sites (Texas and Ohio)
Cipher's 10-K states its ~5.3GW portfolio across 11 sites is at various stages of interconnection, with 700MW of HPC facilities under development across three sites for hyperscaler tenants, and warns that community…
CEG 10-K 2026-02-24 Crane Clean Energy Center (Three Mile Island Unit 1 restart) for Microsoft PPA
Constellation's 10-K discloses that under its agreement, Microsoft will purchase the output of the restarted Crane Clean Energy Center (formerly Three Mile Island Unit 1, retired in 2019) to power its data centers,…
NRG 10-K 2026-02-24 PJM region data center large-load interconnection studies
NRG's 10-K discloses that all 13 PJM-region governors signed a Statement of Principles urging PJM to address revenue certainty for new generation and allocate new resource costs to data centers, and that project delays…
AMT 10-K 2026-02-24 American Tower data centers segment (ground-up builds and expansions)
American Tower's 10-K states that local authorities and community residents periodically oppose data center construction, which can delay or prevent new builds, and that power constraints, delays, and unfavorable…
DLR 10-K 2026-02-13 Digital Realty global data center development pipeline
Digital Realty's 10-K risk factors cite zoning and permitting delays, including public or government opposition, as risks that could delay completion of its global data center development pipeline (769 MW of projects…
IRM 10-K 2026-02-12 Iron Mountain Global Data Center Business
Iron Mountain's 10-K discloses that its Global Data Center Business is susceptible to regional/local power costs, shortages, and outages, and that connectivity interruptions or terminations could adversely affect its…
EQIX 10-K 2026-02-11 Equinix global colocation/interconnection data center portfolio
Equinix's 10-K risk factors discuss supply chain and procurement disruptions leading to construction delays, plus zoning, permitting, and community/government opposition risk affecting new data center construction…
BE 10-K 2026-02-09 FERC/DOE large load co-located generation rulemaking
Bloom Energy's 10-K discusses that grid constraints and permitting delays are extending time-to-power for traditional data center facilities and expansions, and that local moratoria, protests, or siting restrictions on…
RIOT 8-K 2026-01-16 Riot acquires Rockdale land and signs first data center lease with AMD in Texas
Rockdale Texas AMD data center lease
RIOT news 2026-01-16 Riot announces fee simple acquisition of land and first data center lease with AMD at the Rockdale site
Rockdale Texas AMD lease detail
BE news 2026-01-08 American Electric Power agrees to deploy up to 1 GW of Bloom Energy fuel cells
Utility-scale on-site power for data centers bypassing grid queue
AMZN news 2025-12-16 Hobart Indiana officials sued by residents over rezoning for Amazon data center
Litigation over data center rezoning
AMZN news 2025-12-02 Amazon pulls out of Project Blue data center campus in Tucson Arizona
Data center cancellation over water and power concerns
CLSK 10-K 2025-11-25 Sandersville, Georgia HPC data center campus
CleanSpark's 10-K risk factors warn that if it fails to complete the Sandersville facility on time under the Sandersville Lease, the customer may terminate the agreement, seek damages, or pursue other remedies, and…
NVDA 10-Q 2025-11-19 NVIDIA Q3 fiscal 2026 Form 10-Q, quarterly report noting no assurance of definitive OpenAI agreements
SEC risk disclosure on OpenAI data center commitment
IREN 8-K 2025-11-03 IREN secures approximately 9.7 billion dollar AI cloud contract with Microsoft at Childress Texas
Texas AI cloud contract with Microsoft
GOOGL news 2025-09-22 Google withdraws proposed data center in Franklin Township Indiana after opposition
Data center cancellation after community pushback
NVDA press 2025-09-22 OpenAI and NVIDIA announce strategic partnership to deploy 10 gigawatts of NVIDIA systems
Up to 100 billion dollar OpenAI data center investment
APLD 8-K 2025-08-29 Applied Digital finalizes additional 150MW CoreWeave lease at Polaris Forge 1 Ellendale campus
150MW AI/HPC lease, North Dakota
IREN 10-K 2025-08-28 Childress, Texas facility (Horizon 1 direct-to-chip liquid cooling deployment)
IREN disclosed that ERCOT issued a July 23, 2025 market notice requesting information on voltage ride-through capabilities for data center and crypto-mining loads of 75MW or greater, to determine reliable…
APLD 8-K 2025-06-02 Applied Digital announces 250MW AI data center lease with CoreWeave at Ellendale North Dakota
250MW AI/HPC lease, North Dakota
MSFT news 2025-03-21 Microsoft halts work on future phases of Wisconsin Mount Pleasant data center
Data center project pause and design reevaluation
TLN EX-99.1 2025-02-27 Susquehanna nuclear plant co-located data center campus (Pennsylvania)
Talen's earnings materials reference its data center campus adjacent to the Susquehanna nuclear generating station and the interconnection/regulatory review process for co-located large loads that FERC and PJM were…
CORZ press 2025-02-26 Core Scientific and CoreWeave announce 1.2 billion dollar expansion at Denton Texas site
Denton Texas HPC expansion
RIOT 8-K 2025-01-21 Riot Platforms launches formal evaluation of AI and HPC uses for remaining 600 MW at Corsicana Texas
Corsicana Texas AI/HPC evaluation
No matches.

Methodology and scope

This watchlist tracks U.S. data center projects, operators, and jurisdictional actions that carry a documented public paper trail: securities filings, regulatory dockets, litigation, government statements, utility filings, and trade press. It is maintained as a neutral reference. Entries are recorded as observed; the tracker does not rank projects or advocate an outcome.

  • Status reflects the most recent public signal for each entry. Where a project continues on schedule, that is recorded as plainly as a delay.
  • Capacity is shown in megawatts where reported, and left blank where not disclosed.
  • Local restrictions, utility dockets, lawsuits, and federal actions are drawn from primary filings and reputable outlets, each linked to its source.
  • The ERCOT queue snapshot is extracted directly from the ERCOT GIS Report.
  • Signals are collected on a recurring basis and reconciled into a single source of truth before publication.

Every citation on one page: Sources and citations. Companion policy map: SAVRN Data Center Moratorium Tracker. Capital side: North American Data Center Capital Atlas. Founder essay: The Queue Was the Fiction.

The SAVRN reference set

Seven references, one system

Capital, delay, policy, water, grid, permits and scarcity are one system seen from seven sides. Each reference is primary-sourced, refreshed on a schedule, and links into the others, so a project can be followed from the money committed to the docket that stopped it.

Have a specific address? Site Intelligence reads all seven references against one location, county, utility and grid operator included, and cites every finding.
Check this address →
What is the Nationwide Data Center Delay Watchlist?

It is a continuously maintained, primary-sourced record of U.S. data center projects, jurisdictional actions, public-company exposure, and securities filings affected by delay, moratorium, litigation, and grid constraint. Each entry links to its documented public source, and it is maintained as a neutral reference.

How is a project's status determined?

Status reflects the most recent public signal for each entry: halted, delayed, cancelled, pending review, litigation active, audit paused, under appeal, or withdrawn. Where a project continues on schedule, that is recorded as plainly as a delay.

How are delay days measured?

Delay days are measured against the original announced target where available, or against the first documented delay date.

How often is the watchlist updated?

Signals are collected on a recurring basis from SEC EDGAR and trade-press feeds and reconciled into the single source of truth before publication.

How is this different from the Data Center Moratorium Tracker?

The Moratorium Tracker maps state and local policy measures. This watchlist tracks named projects, operators, public-company exposure, and securities filings, with delay status and cause for each. The two are companion references.

Nationwide Data Center Delay Watchlist

Get these tracker updates by email

A short introduction on days 3, 7 and 14, plus updates for this tracker. Unsubscribe at any time.

We use your address to send the introduction and updates described above. See our Privacy Policy.

You’re on the list. Your subscription is saved.