Skip to page content
SAVRN
Search Plan a project
SAVRN Research · Capital Atlas · REIT and developer

Iron Mountain Data Center Capex and Sites

Iron Mountain's data center capex was $1,767.5M in full-year 2025, up from $1,441.8M in 2024, with first-half 2025 alone at $961.2M. At Q2 2025 it reported 450 MW operating at 96% leased, 202 MW under construction at 60% pre-leased, 628 MW held for development, and roughly 1.3 GW total developable across 30 data centers. The brief's $10B pipeline claim is not confirmed; the company's own materials state ~1.3 GW developable capacity rather than a $10B figure.

Updated October 8, 2026 3 named sites 0 financing transactions 4 sourced facts 9 sources
Iron Mountain
IRM
REIT and developer
Financing regimebalance-sheet / operating cash flow REIT capex
Named sites
3
Site-level commitments the atlas ties to Iron Mountain
Disclosed site capital
$1.0B
Sum of named sites with a stated dollar figure. Not a capex total; see the spending table
Disclosed capacity
628 MW
Sum of named sites with a stated megawatt figure
Financing transactions
0
Transactions naming Iron Mountain or tied to one of its sites
Spending

Reported and guided spending

Audited, reported and guided figures as the filing or release states them. Reported lines are what was spent; guidance is what management said it expects. They are shown side by side and never combined.

PeriodKindAmountAs statedSources
FY2025 reported ≥$1.8B
$1,767.5M in full-year 2025 ($1,747.0M growth + $20.6M recurring)
FY2024 reported $1.4B
up from $1,441.8M in 2024
1H2025 reported $961M
first-half 2025 alone was $961.2M vs. $576.8M in 1H 2024
1H2024 reported $577M
$576.8M in 1H 2024
n.a. backlog n.a.
n.a. The $10B pipeline claim is not confirmed; Iron Mountain's own materials state ~1.3 GW developable capacity rather than a $10B pipeline figure
Named sites

Where Iron Mountain builds

SiteStatePlaceCapitalMWStatusSources
Richmond data center campus (RCH-1 to RCH-4)
Construction started June 2026
Virginia Sandston, Henrico County ≥$1.0B 200 construction
Iron Mountain Manassas holdings
Virginia Manassas n.a. 400 announced
Iron Mountain VA-9
targeted for Q4 2026
Virginia n.a. n.a. 28 announced
Financing

Financing transactions

No financing transaction in the atlas names Iron Mountain or attaches to one of its sites as of October 8, 2026.
The record

Sourced facts on Iron Mountain

  • At Q2 2025 Iron Mountain reported 450 MW operating and 96% leased, 202 MW under construction and 60% pre-leased, 628 MW held for development, and ~1.3 GW total developable across 30 data centers, framed by management as nearly tripling capacity.
  • By mid-2026 roughly 85 MW of new capacity had come online against ~450 MW operating.
  • Iron Mountain added 100+ acres supporting 350+ MW across Richmond and Manassas, toward 1.2 GW globally.
  • Phoenix and Frankfurt site-level figures were n.a. in the fetched record.
Sources

Sources for Iron Mountain

Every source cited on this page, once each. The full atlas source register is at Capital Atlas sources.

REIT and developer: one page each

The figure beside each provider is its count of named sites in the atlas.

Part of the North American Data Center Capital Atlas, refreshed every Tuesday, Thursday and Saturday. Site commitments overlap reported capital expenditure and overlap one another, so this page shows each figure as its source states it and never adds them into a single deployment number. Informational, not investment advice.
The SAVRN reference set

Seven references, one system

Capital, delay, policy, water, grid, permits and scarcity are one system seen from seven sides. Each reference is primary-sourced, refreshed on a schedule, and links into the others, so a project can be followed from the money committed to the docket that stopped it.

Have a specific address? Site Intelligence reads all seven references against one location, county, utility and grid operator included, and cites every finding.
Check an address →