State Connections
Explore a state’s data center issues, find states with similar evidence, and assemble a sourced working brief.
Matches reflect shared provisions or tracker classifications, not identical laws. Local actions keep their local scope.
Source statuses are retained as recorded. Existing tracker records have not all been freshly reverified for this view.
Start with Connected states. Review why a state matches, then add it to your working group.
Who is working through similar issues?
Open a state to inspect its evidence. Add states to a potential working group.
Use the map or state selector above to explore each state's published evidence.
Washington: inspect the evidence.
Counts are records, not unique projects. Records can overlap across trackers.
Avista-related project Record-specific: Spokane · moratorium
One-year citywide moratorium on new computer data center permits
Jun 22 2026
Interconnected Capital ↗Bullfrog Flats DC Record-specific: Cle Elum · moratorium
Six-month emergency moratorium after proposal surfaced
Jul 31 2026; capital stated as ~$200M
Baxtel ↗ Interconnected Capital ↗Burien data center moratorium Record-specific: Burien · moratorium
Burien, Washington, enacted a local data center moratorium or ban, recorded in SAVRN's moratorium tracker as dated June 2026. 12-month emergency moratorium, unanimous, effective immediately. The measure runs to 29 June 2027.
Enacted June 2026
b-townblog.com ↗Digital Realty downtown Seattle data center (six-story) Record-specific: Seattle · proposed
Digital Realty submitted a land-use permit application for a six-story data center in downtown Seattle at the end of May 2026, less than two weeks before the City Council approved the one-year moratorium on large data centers. The Seattle Department of Construction and Inspections says the proposal is vested to the previous regulations and is not subject to the moratorium. The street address was not given in the report. Seattle City Light territory; subject to the utility's large data center framework, including curtailment at peak Not disclosed 40 MVA of electric service requested from Seattle City Light (roughly comparable to MW); no MW figure stated
Land-use permit application filed at the end of May 2026; reported vested and proceeding 3 October 2026; single-outlet report (The Seattle Times)
The Seattle Times ↗Equinix proposed SoDo data center (nine-story, 54 MW) Record-specific: Seattle · proposed
Earlier recorded as two Equinix proposals in Seattle City Light territory, captured by Seattle's one-year moratorium on data centers above 20 MVA, adopted 9-0 on June 9, 2026 with an option to extend six months. The Seattle Times reported on 3 October 2026 that Equinix is advancing a single nine-story, 54 MW data center in SoDo that is vested under the rules in place before the moratorium and is not subject to it. The same report attributes the other SoDo proposal (120 MW) to Prologis, not Equinix. Seattle City Light territory 54 MW nine-story facility in SoDo per Seattle City Light staff (The Seattle Times, 3 October 2026); needs a dedicated transmission connection, an Equinix-owned substation and upgrades to the existing SoDo substation, estimated by City Light at about $7.7 million plus about $450,000 of shared mitigation costs
Moratorium adopted 9 June 2026; project reported vested and advancing 3 October 2026 (environmental permit documents submitted to the state June 2026)
The Urbanist ↗ ActiveRain summary ↗ The Seattle Times ↗Federal Way 12-month data center moratorium Record-specific: City of Federal Way · moratorium
The Federal Way City Council voted unanimously on 7 July 2026 to impose a 12-month moratorium on data centers. The measure followed public concern that the planned 1,033,680-square-foot Podium I-5 industrial building on the former Wild Waves site could become a data center; the developer said he had no interest in building one. A public hearing on the moratorium was set for 1 September 2026.
Adopted unanimously 7 July 2026; 12 months
Bellevue Reporter ↗Five proposed "mega" data centers (Equinix, Prologis + 2 withdrawn) Record-specific: Seattle (SoDo, Tukwila) · moratorium
One-year moratorium on DCs >20 MVA approved 9-0, extendable 6 months. The Seattle Times reported on 3 October 2026 that two large projects are moving forward despite the moratorium because their permit applications predate it: a nine-story Equinix data center in Sodo (54 MW; environmental permits submitted to the state in June 2026) and a six-story Digital Realty data center downtown (40 MVA requested; land-use application filed at the end of May 2026), together nearly 100 MW of peak demand. The Seattle Department of Construction and Inspections said both are vested under the earlier rules. Seattle City Light said Prologis has neither submitted a service request nor withdrawn its interest in its 120 MW Sodo and 75 MW Tukwila proposals, which remain exploratory.
Proposals April 2026; one-year moratorium approved 9 June 2026; vested Equinix and Digital Realty projects reported moving forward 3 October 2026
The Urbanist ↗ ActiveRain ↗ PSBJ ↗ The Seattle Times ↗Kittitas County data center application moratorium (extended) Record-specific: Kittitas County Board of Commissioners · moratorium
Kittitas County commissioners approved an emergency six-month moratorium on data center land-use applications in August 2026, then on Tuesday 15 September 2026 approved a six-month extension, making it a year-long ban. Community Development Services Director Chad Bala said the county's codes do not adequately define or classify data centers. The pause covers siting, construction, expansion, conversion and operation of data centers in unincorporated areas while the county writes review criteria and mitigation measures.
Emergency moratorium 10 August 2026; six-month extension approved 15 September 2026 (total one year)
Daily Record (Ellensburg) ↗Klickitat County six-month data center moratorium motion (failed; former Columbia Gorge Aluminum site) Record-specific: Klickitat County Board of Commissioners · other
Commissioner Todd Andrews moved for a six-month data center moratorium at a 3 September 2026 Klickitat County workshop, but neither of the other two commissioners seconded the motion. At the 8 September meeting Chair Ron Ihrig said the county has time to write an ordinance instead, and Commissioner Lori Zoller cited the time and cost of a moratorium. Both said no data center proposal would be ready to apply before an ordinance is adopted. A proposed site sits on the former Columbia Gorge Aluminum plant next to John Day Dam, where data centers are allowed outright.
Moratorium motion died for lack of a second 3 September 2026; explained at 8 September 2026 meeting
Columbia Gorge News ↗ Goldendale Sentinel ↗La Conner data center moratorium Record-specific: La Conner · moratorium
La Conner, Washington, enacted a local data center moratorium or ban, recorded in SAVRN's moratorium tracker as dated July 2026. Six-month moratorium on data center permit applications within town limits; no applications received; town reviewing whether any form of data center is appropriate. The measure runs to 29 January 2027 and covers permits.
Enacted July 2026
goskagit.com ↗Lincoln County data center moratorium Record-specific: Lincoln County · moratorium
Lincoln County, Washington, enacted a local data center moratorium or ban, recorded in SAVRN's moratorium tracker as dated September 2026. Six-month moratorium on data centers and battery energy storage systems; covers facilities over 2,000 sqft or 2+ MW. The measure runs to 10 March 2027 and applies at a threshold of 2,000 sqft.
Enacted September 2026
odessarecord.com ↗Marysville data center moratorium Record-specific: Marysville · moratorium
Marysville, Washington, enacted a local data center moratorium or ban, recorded in SAVRN's moratorium tracker as dated July 2026. 6-month moratorium on buildings/facilities whose principal use is data management/transmission, unanimous. Mayor urged surrounding counties to follow suit. The measure runs to 14 January 2027.
Enacted July 2026
heraldnet.com ↗Merkle Standard data center, former Ponderay Newsprint papermill Record-specific: Usk · proposed
Merkle Standard, owned by Irvine, California-based Allrise Capital, has been in discussions since 2024 with the Pend Oreille County PUD about raising the electricity load at the former Ponderay Newsprint papermill in Usk, a 927-acre property with 29 buildings, for a data center. Records obtained by The Spokesman-Review show talks on a power study for upgrades that could eventually deliver 225 MW, more than seven times the load of the county's residential and small business customers. Nothing has been formally presented to county commissioners or the Kalispel Tribe. The same owner earlier promoted the mill as a cryptocurrency mining site. Pend Oreille County PUD; power study and upgrade costs under discussion Not disclosed Pend Oreille PUD and Merkle are discussing a power study and system upgrades that could eventually deliver 225 MW to the mill site; existing plant electrical capacity is about 100 MW
PUD discussions since 2024; reported 25 September 2026 from records; no formal application; single outlet
The Spokesman-Review, 25 September 2026 ↗Moses Lake data center moratorium Record-specific: Moses Lake · moratorium
Moses Lake, Washington, enacted a local data center moratorium or ban, recorded in SAVRN's moratorium tracker as dated January 2026. Moratorium on new data center development; listed by MRSC (WA state municipal research service) among cities with moratoriums. The measure has a stated duration whose end date is not recorded.
Enacted January 2026
mrsc.org ↗Mount Vernon data center moratorium Record-specific: Mount Vernon · moratorium
Mount Vernon, Washington, enacted a local data center moratorium or ban, recorded in SAVRN's moratorium tracker as dated August 2026. 6-month moratorium, 4-1, with no data center yet proposed. Planning staff to draft rules on electricity and water demand, stormwater and building in the Skagit River floodplain. The measure runs to 12 February 2027.
Enacted August 2026
cascadiadaily.com ↗Follow the issue to the utility and the customer.
Named organizations come from explicit record fields. Their presence is not confirmation of a serving-utility relationship, service availability, or customer eligibility.
Named parties in this state's evidence
Start from your position.
Screen an individual location ↗Address-level utility verification and service agreements belong in the site screen. Private account data and individual household identities are not part of this public dataset.
Regional grid context and rules
Open the complete grid operator watchlist ↗Explore generation and interconnection queues ↗ · Explore scarcity and market constraints ↗
See what your selected states have in common.
We bring together the shared issues and source records for the states you choose.
States appear side by side. Compare each topic, then open a cell for sources.
Add your own notes Optional
Notes are included when you open or save the comparison. Save a copy to keep them after leaving this page.
Sharing and data options
The link includes your states and issue filter. It does not include private notes. Source data downloads as JSON.
Coverage, sources and how states are connected
All 50 states are selectable. A connection requires the same documented policy mechanism or the same structured tracker classification and status. The map is a discovery tool, not a legal-equivalence score, a project-risk ranking, or a complete census. No match means no matching evidence in this view.
Existing tracker publications supply most records. Their source status and date are retained; a page load is not a new source verification. Proposed, failed, enacted and reversed records remain distinct. Explicitly unverified or pending-review rows are excluded. Narrative and status can disagree in the underlying publication; inspect both before treating a restriction as active. No state-wide effect is inferred from a local action.
Data is read from the current tracker files and published overlays. Source changes invalidate the server's cached connections. Policy mechanisms use a separately reviewed evidence set. Generation queues and broad company commitments are not assigned to a data center or customer. Federal records and records without an explicit state are not assigned to a state by inference.
Download state evidence JSON · SAVRN methodology
Underlying dataset credits
- 6abc Philadelphia
- AEP Ohio Transmission Company (filed with Ohio Power Siting Board)
- AI GridWatch moratorium tracker, CC BY 4.0 (aigridwatch.com)
- Alabama Reflector
- Alaska Beacon
- American Transmission Company LLC (filed with PSC of Wisconsin)
- Americus Times-Recorder
- Arizona Mirror
- Arkansas Advocate
- Axios Pro Energy
- Bisnow
- Bisnow National
- Bradenton Herald
- CNBC Technology
- Cardinal News VA
- Central Florida Public Media
- Chesterfield County public permit records
- Chicago Construction News
- City of Atlanta public permit records
- City of Austin issued construction permits open data
- City of Buckeye public permit records
- City of Chandler public permit records
- City of Charlotte public permit records
- City of Chicago building permits open data
- City of Fort Worth public permit records
- City of Goodyear public permit records
- City of Hillsboro public permit records
- City of Mesa building permits open data
- City of Mesa public permit records
- City of Minneapolis construction permits (CCS) open data
- City of Papillion public permit records
- City of Phoenix public permit records
- City of Red Oak public permit records
- City of Reno public permit records
- City of San Antonio public permit records
- City of Statesboro, Georgia
- City of Temple, Texas
- Clearfield City Council (Utah Public Notice Website)
- Colorado Newsline
- Colorado Public Radio
- Congress.gov (Library of Congress, public domain)
- ConstructConnect News
- Construction Dive
- CourtListener DataCenter Dockets
- CourtListener Opinions
- Data Center Dynamics
- Data Center Dynamics news
- DataCenterTracker.org, CC BY 4.0
- Dominion Energy Virginia
- EIN News
- East Bay Insiders Newsletter
- Energy Central
- FOX19 | Cincinnati
- FOX5 Vegas
- FOX6 News Milwaukee
- Facilities Dive
- Fairfax County public permit records
- Florida Phoenix
- Georgia Department of Community Affairs
- Georgia EPD air permit records
- Georgia Recorder
- GovTech
- Greensboro News and Record
- Grist
- Idaho Capital Sun
- Illinois EPA air permit records
- Indiana Capital Chronicle
- Indiana Department of Environmental Management
- Indiana IDEM air permit records
- InkFreeNews.com
- Iowa Capital Dispatch
- Iowa DNR air permit records
- KERA News
- KEYC News Now
- KGW
- KRON4
- Kansas City MO city issued permits open data
- Kansas Reflector
- Kentucky Lantern
- Law360
- Law360 Energy
- LegiScan (legiscan.com) and the state legislature
- Lehigh Valley Planning Commission
- Local News Matters
- Loudoun County public permit records
- Loudoun Times-Mirror
- Louisiana DEQ air permit records
- Louisiana Illuminator
- Maine Morning Star
- Maricopa County Air Quality Department air permit records
- Maricopa County public permit records
- Maryland Matters
- Mecklenburg County public permit records
- Michigan Advance
- Mid Bay News
- Missouri Independent
- Montana Free Press
- NBC Bay Area
- NBC4 Washington
- NC Newsline
- Native News Online
- Nebraska Examiner
- Nevada Current
- Nevada NDEP air permit records
- New Hampshire Bulletin
- New Mexico Environment Department
- North Carolina DEQ Division of Air Quality air permit records
- North Dakota Department of Environmental Quality
- North Dakota Monitor
- Ohio Capital Journal
- Ohio EPA air permit records
- Oklahoma DEQ air permit records
- Oklahoma Voice
- OpenStates v3 (openstates.org), CC BY 4.0
- Oregon Capital Chronicle
- Orlando Sentinel
- Pennsylvania Capital-Star
- Pennsylvania Department of Environmental Protection
- Pennsylvania Office of Consumer Advocate (filed with PA PUC)
- Pioneer Press
- Prince William County public permit records
- Public Service Commission of Wisconsin
- Public record (Legistar Web API, Granicus)
- Rhode Island Current
- Route Fifty
- SEC EDGAR company submissions, public domain
- SEC EDGAR full-text search, public domain
- Searchlight New Mexico
- Smithfield Township, Monroe County, PA
- Source New Mexico
- South Carolina Department of Environmental Services
- South Dakota Searchlight
- Springfield Daily Citizen
- Stafford County public permit records
- Statesman Journal
- Strisker data center notes
- Tennessee Lookout
- Texas Commission on Environmental Quality
- Texas TCEQ air permit records
- The Baltimore Banner
- The Current (GA)
- The Detroit News
- The Hill Energy
- The North State Journal
- The Pantagraph
- The Real Deal
- The Register
- The Texas Tribune
- The Verge
- Times-Standard
- Town of Culpeper public permit records
- Tuscaloosa Thread
- U.S. EPA ECHO
- Union-Bulletin
- Uprise RI
- Utah Division of Air Quality
- Utah Division of Air Quality air permit records
- Utah News Dispatch
- Utah Public Radio
- Utility Dive
- Virginia Business
- Virginia DEQ air permit records
- Virginia Electric and Power Company (filed with Virginia SCC)
- Virginia Mercury
- Visalia Times-Delta
- WBUR
- WCPO 9 Cincinnati
- WGLT
- WHEC.com
- WJON
- WKYT
- WLOS
- WLUK
- WPBF
- WQCS
- WRAL (NC)
- WUNC News
- WVPE
- Washington County public permit records
- Washington Ecology air permit records
- Washington State SEPA Register public permit records
- Washington State Standard
- Washoe County public permit records
- Wausau Pilot & Review
- West Virginia Watch
- Winston-Salem Journal
- Wisconsin Department of Natural Resources
- Wisconsin Examiner
- Yale Daily News
- citybiz
- contracosta.news
- ictnews.org
- indianapublicradio.org
- inkfreenews.com
- lex18.com
- mountaintimesoregon.com
- newmedia-wi.com
- newscentermaine.com
- thegazette.com
- tuscaloosathread.com
- wcpo.com
- www.cities929.com
SAVRN Policy Connections
How state policies connect.
Find shared policy mechanisms, compare the differences, and assemble a framework from documented state provisions.
An initial evidence set, not an exhaustive survey. A missing relationship means not documented here, never no policy. Source review verifies the cited instrument, not every later amendment or implementing action. Sources reviewed 3 October 2026.
Shared goals. Different requirements.
Each number opens the provisions connecting a state to a policy family. States can belong to several groups. A shared family is not proof of identical law.
Find states sharing a combination of policies
Choose several mechanisms to find their intersection, or include states with any selected mechanism. These matches use documented records only.
| State | Project readiness | Cost responsibility | Grid flexibility | Water safeguards | Reporting & oversight | Energy & emissions | Local authority | Environmental review |
|---|---|---|---|---|---|---|---|---|
| AlabamaNot yet documented | – | – | – | – | – | – | – | – |
| AlaskaNot yet documented | – | – | – | – | – | – | – | – |
| ArizonaNot yet documented | – | – | – | – | – | – | – | – |
| ArkansasNot yet documented | – | – | – | – | – | – | – | – |
| CaliforniaNot yet documented | – | – | – | – | – | – | – | – |
| ColoradoNot yet documented | – | – | – | – | – | – | – | – |
| ConnecticutNot yet documented | – | – | – | – | – | – | – | – |
| DelawareNot yet documented | – | – | – | – | – | – | – | – |
| FloridaNot yet documented | – | – | – | – | – | – | – | – |
| Georgia | – | 2 | – | – | – | – | – | – |
| HawaiiNot yet documented | – | – | – | – | – | – | – | – |
| IdahoNot yet documented | – | – | – | – | – | – | – | – |
| IllinoisNot yet documented | – | – | – | – | – | – | – | – |
| Indiana | – | 3 | – | – | 1 | – | – | – |
| IowaNot yet documented | – | – | – | – | – | – | – | – |
| KansasNot yet documented | – | – | – | – | – | – | – | – |
| KentuckyNot yet documented | – | – | – | – | – | – | – | – |
| LouisianaNot yet documented | – | – | – | – | – | – | – | – |
| MaineNot yet documented | – | – | – | – | – | – | – | – |
| MarylandNot yet documented | – | – | – | – | – | – | – | – |
| MassachusettsNot yet documented | – | – | – | – | – | – | – | – |
| MichiganNot yet documented | – | – | – | – | – | – | – | – |
| Minnesota | – | 2 | – | 1 | – | 1 | – | – |
| MississippiNot yet documented | – | – | – | – | – | – | – | – |
| MissouriNot yet documented | – | – | – | – | – | – | – | – |
| MontanaNot yet documented | – | – | – | – | – | – | – | – |
| NebraskaNot yet documented | – | – | – | – | – | – | – | – |
| NevadaNot yet documented | – | – | – | – | – | – | – | – |
| New HampshireNot yet documented | – | – | – | – | – | – | – | – |
| New JerseyNot yet documented | – | – | – | – | – | – | – | – |
| New MexicoNot yet documented | – | – | – | – | – | – | – | – |
| New York | – | – | – | 1 | – | – | – | 2 |
| North CarolinaNot yet documented | – | – | – | – | – | – | – | – |
| North DakotaNot yet documented | – | – | – | – | – | – | – | – |
| Ohio | – | 1 | – | – | – | – | – | – |
| OklahomaNot yet documented | – | – | – | – | – | – | – | – |
| Oregon | – | 2 | – | – | 1 | 1 | – | – |
| PennsylvaniaNot yet documented | – | – | – | – | – | – | – | – |
| Rhode IslandNot yet documented | – | – | – | – | – | – | – | – |
| South CarolinaNot yet documented | – | – | – | – | – | – | – | – |
| South Dakota | – | 2 | – | 1 | 1 | – | 1 | – |
| TennesseeNot yet documented | – | – | – | – | – | – | – | – |
| Texas | 1 | 1 | 1 | – | – | 1 | – | – |
| UtahNot yet documented | – | – | – | – | – | – | – | – |
| VermontNot yet documented | – | – | – | – | – | – | – | – |
| Virginia | – | – | – | – | 2 | – | – | – |
| WashingtonNot yet documented | – | – | – | – | – | – | – | – |
| West VirginiaNot yet documented | – | – | – | – | – | – | – | – |
| WisconsinNot yet documented | – | – | – | – | – | – | – | – |
| WyomingNot yet documented | – | – | – | – | – | – | – | – |
Choose a mechanism to see states connected by that specific policy tool.
Compare two states.
Compare documented mechanisms, then inspect each provision's scope and status. Unrecorded mechanisms remain unknown.
Inspect the provision, not just the category.
All 29 documented provisions. Open a record for its source, scope, and difference from similar tools.
Texas Verify the proposed site Documented in cited instrument
Interconnection standards must include a way to demonstrate a legal interest in the proposed location.
- Shared mechanism
- Evidence of site control
- Scope
- ERCOT large-load interconnection; applicability and exceptions in the statute.
- Important difference
- Evidence of site control does not establish that all permits or financing are secured.
- Source location
- Section 37.0561(g)
Statutory text · Source reviewed 2026-10-03
Texas Back transmission commitments Documented in cited instrument
Standards must set financial commitments supporting transmission infrastructure for covered loads.
- Shared mechanism
- Financial security
- Scope
- ERCOT large-load interconnection; applicability and exceptions in the statute.
- Important difference
- Permitted security forms and release rules depend on implementation; not a minimum energy bill.
- Source location
- Section 37.0561(h)-(j)
Statutory text · Source reviewed 2026-10-03
Texas Define emergency response Documented in cited instrument
Covered backup-equipped loads may be directed to deploy backup generation or curtail after the specified market-service sequence.
- Shared mechanism
- Emergency response
- Scope
- ERCOT large-load interconnection; applicability and exceptions in the statute.
- Important difference
- An emergency mechanism, not a general voluntary demand-response tariff.
- Source location
- Section 37.0561(e)
Statutory text · Source reviewed 2026-10-03
Texas Retain emissions limits Documented in cited instrument
Emergency direction does not authorize violation of emissions or environmental requirements.
- Shared mechanism
- Emissions safeguards
- Scope
- ERCOT large-load interconnection; applicability and exceptions in the statute.
- Important difference
- Backup generation remains constrained by applicable environmental rules.
- Source location
- Section 37.0561(e)(1)
Statutory text · Source reviewed 2026-10-03
Minnesota Assign attributable utility costs Documented in cited instrument
Commission review of very-large-customer service terms must address attributable costs and protection of other customers.
- Shared mechanism
- Attributable-cost allocation
- Scope
- Scope varies by section: data-center water provisions, public-utility service, and optional clean-energy contracts.
- Important difference
- A regulatory framework with customer-class and agreement decisions, not a uniform minimum billing percentage.
- Source location
- Section 9, subdivision 2
Session law · Source reviewed 2026-10-03
Minnesota Protect against stranded costs Documented in cited instrument
Tariff or agreement review must include protections against other customers paying stranded service costs.
- Shared mechanism
- Departure / reduced-load protection
- Scope
- Scope varies by section: data-center water provisions, public-utility service, and optional clean-energy contracts.
- Important difference
- Existing-service exceptions appear in subdivision 3.
- Source location
- Section 9, subdivision 2(3)
Session law · Source reviewed 2026-10-03
Minnesota Evaluate consumptive water demand Documented in cited instrument
Preapplication review links covered consumptive demand and permit needs to site-specific water availability.
- Shared mechanism
- Water-supply review
- Scope
- Scope varies by section: data-center water provisions, public-utility service, and optional clean-energy contracts.
- Important difference
- Facility definition and water-use/permit conditions apply together; not all withdrawals trigger this review.
- Source location
- Sections 3-4
Session law · Source reviewed 2026-10-03
Minnesota Offer optional clean-energy service Documented in cited instrument
Utilities must offer a clean-energy and capacity tariff with participating customers paying proportional resource costs.
- Shared mechanism
- Clean-energy service terms
- Scope
- Scope varies by section: data-center water provisions, public-utility service, and optional clean-energy contracts.
- Important difference
- Customer participation is optional; do not classify it as a universal clean-energy purchase mandate.
- Source location
- Section 10
Session law · Source reviewed 2026-10-03
South Dakota Recover attributable electricity costs Documented in cited instrument
Separate service terms must recover costs fairly attributable to the data center.
- Shared mechanism
- Attributable-cost allocation
- Scope
- Statutorily defined data centers; electricity providers, water providers, and local governments.
- Important difference
- Applies through provider terms rather than a published statewide minimum billing percentage.
- Source location
- Section 3
Session law · Source reviewed 2026-10-03
South Dakota Address departure and reduced load Documented in cited instrument
Cost responsibility includes costs incurred if the customer departs or materially reduces load.
- Shared mechanism
- Departure / reduced-load protection
- Scope
- Statutorily defined data centers; electricity providers, water providers, and local governments.
- Important difference
- The law states cost responsibility; it does not supply a universal exit-fee formula.
- Source location
- Section 3
Session law · Source reviewed 2026-10-03
South Dakota Obtain local supply determinations Documented in cited instrument
Water providers assess compatibility, with board review and allocation limits protecting priority uses.
- Shared mechanism
- Water-supply review
- Scope
- Statutorily defined data centers; electricity providers, water providers, and local governments.
- Important difference
- Local supply determinations are distinct from the Minnesota consumptive-use permit review.
- Source location
- Section 5
Session law · Source reviewed 2026-10-03
South Dakota Publish water-use data Documented in cited instrument
Operators report usage to the board, which makes usage data available to the public.
- Shared mechanism
- Water-use reporting
- Scope
- Statutorily defined data centers; electricity providers, water providers, and local governments.
- Important difference
- Operator reporting differs from Virginia supplier category reporting.
- Source location
- Section 6
Session law · Source reviewed 2026-10-03
Ohio Address underused infrastructure risk Documented in cited instrument
PUCO adopted a settlement aimed at protecting other customers from cost shifting due to underused data-center investments.
- Shared mechanism
- Attributable-cost allocation
- Scope
- AEP Ohio data-center tariff proceeding; not a tariff for every Ohio utility.
- Important difference
- The cited announcement directs tariff filing; consult the filed tariff for binding customer terms.
- Source location
- Decision announcement, case background
Commission decision announcement · Source reviewed 2026-10-03
Indiana Set minimum billing obligations Documented in cited instrument
The approved settlement establishes minimum billing-demand and charge provisions for covered large loads.
- Shared mechanism
- Minimum payment commitments
- Scope
- Indiana Michigan Power Tariff I.P., Indiana jurisdiction; covered large-load customers.
- Important difference
- The approved settlement differs from the original utility proposal; I&M territory only.
- Source location
- Order pp. 32-35 and ordering paragraphs p. 49
Commission order · Source reviewed 2026-10-03
Indiana Address early termination Documented in cited instrument
The approved settlement contains contract termination protections for covered large-load service.
- Shared mechanism
- Departure / reduced-load protection
- Scope
- Indiana Michigan Power Tariff I.P., Indiana jurisdiction; covered large-load customers.
- Important difference
- Customer-specific conditions and the settlement govern; not statewide terms for every provider.
- Source location
- Settlement agreement; order approval pp. 49-50
Commission order · Source reviewed 2026-10-03
Indiana Require collateral arrangements Documented in cited instrument
The approved settlement includes financial-security terms for covered large-load customers.
- Shared mechanism
- Financial security
- Scope
- Indiana Michigan Power Tariff I.P., Indiana jurisdiction; covered large-load customers.
- Important difference
- Collateral and exceptions depend on tariff eligibility and customer circumstances.
- Source location
- Settlement agreement; order approval pp. 49-50
Commission order · Source reviewed 2026-10-03
Indiana Report large-load developments Documented in cited instrument
The order addresses recurring reports and protection of confidential information.
- Shared mechanism
- Regulatory reporting
- Scope
- Indiana Michigan Power Tariff I.P., Indiana jurisdiction; covered large-load customers.
- Important difference
- Regulator access is not equivalent to public disclosure of all reported data.
- Source location
- Order p. 49
Commission order · Source reviewed 2026-10-03
Georgia Allocate infrastructure costs Documented in cited instrument
The PSC approved additional service terms addressing site and upstream power-system costs.
- Shared mechanism
- Attributable-cost allocation
- Scope
- Georgia Power covered new large-load customers; not every Georgia utility.
- Important difference
- Applies to the specified Georgia Power customer category; implementation is contract-specific.
- Source location
- Commission announcement p. 1
Commission decision announcement · Source reviewed 2026-10-03
Georgia Allow longer contracts and minimum bills Documented in cited instrument
The approved rule allows longer contracts and minimum billing for covered high-load customers.
- Shared mechanism
- Minimum payment commitments
- Scope
- Georgia Power covered new large-load customers; not every Georgia utility.
- Important difference
- Authority to impose terms is not a universal mandatory billing percentage.
- Source location
- Commission announcement p. 1
Commission decision announcement · Source reviewed 2026-10-03
Oregon Create a separate service class Documented in cited instrument
The act calls for tariffs assigning covered service costs to large energy use facilities and mitigating cost shifts.
- Shared mechanism
- Attributable-cost allocation
- Scope
- Covered large energy use facilities served by electric companies; tariff and contract provisions have distinct applicability.
- Important difference
- Separate tariff approval and transition provisions matter; a statute is not itself a completed tariff.
- Source location
- Section 2
Enrolled text; Chapter 323 confirmed · Source reviewed 2026-10-03
Oregon Require contractual minimum payments Documented in cited instrument
Covered service contracts must include a minimum payment amount or percentage determined by the commission.
- Shared mechanism
- Minimum payment commitments
- Scope
- Covered large energy use facilities served by electric companies; tariff and contract provisions have distinct applicability.
- Important difference
- The law leaves the amount or percentage to the commission.
- Source location
- Sections 5-6
Enrolled text; Chapter 323 confirmed · Source reviewed 2026-10-03
Oregon Consider clean-energy compatibility Documented in cited instrument
Commission tariff review must consider effects on clean-energy targets and compatible resource procurement.
- Shared mechanism
- Clean-energy service terms
- Scope
- Covered large energy use facilities served by electric companies; tariff and contract provisions have distinct applicability.
- Important difference
- A tariff-review criterion differs from Minnesota optional clean-energy procurement.
- Source location
- Section 2(3)
Enrolled text; Chapter 323 confirmed · Source reviewed 2026-10-03
Oregon Report load trends to lawmakers Documented in cited instrument
The commission must report on large-load trends and implications while protecting proprietary information.
- Shared mechanism
- Regulatory reporting
- Scope
- Covered large energy use facilities served by electric companies; tariff and contract provisions have distinct applicability.
- Important difference
- A legislative reporting mechanism, not disclosure of every customer contract.
- Source location
- Section 7
Enrolled text; Chapter 323 confirmed · Source reviewed 2026-10-03
Virginia Separate potable and reclaimed volumes Enacted, future effective
The future-effective code adds supplier reporting by customer category, separating potable and reclaimed water.
- Shared mechanism
- Water-use reporting
- Scope
- Registered water users supplying water offsite; categorized reporting, not universal facility-level public disclosure.
- Important difference
- Monthly data can be replaced by quarterly totals where unavailable; facility-specific disclosure is not established here.
- Effective date in source
- 2027-01-01
- Source location
- Subsection C, version effective January 1, 2027
Enacted, future effective · Source reviewed 2026-10-03
Virginia Connect electricity, water and generators Official report listed
The official report listing describes a cross-resource account of service agreements, water usage and generator permits.
- Shared mechanism
- Regulatory reporting
- Scope
- Report description covers utility agreements, water use and generator permitting; underlying report data not ingested.
- Important difference
- This confirms the report description, not completeness or accuracy of individual facility records.
- Source location
- RD637 executive summary
Official report listing · Source reviewed 2026-10-03
New York Assess cumulative development impacts Documented in cited instrument
The order directs a generic environmental impact statement for covered data-center development.
- Shared mechanism
- Environmental assessment
- Scope
- Covered data centers and discretionary DEC permits; definition and exemptions must be checked.
- Important difference
- A statewide review process differs from a project-specific approval.
- Source location
- Order section 1
Executive order · Source reviewed 2026-10-03
New York Link permit restraint to review Documented in cited instrument
The order holds covered discretionary DEC permits in abeyance subject to its scope and exclusions.
- Shared mechanism
- Interim permit restraint
- Scope
- Covered data centers and discretionary DEC permits; definition and exemptions must be checked.
- Important difference
- Applies to covered DEC applications not determined complete before the order; local-government permits are excluded. Not proof that a named project stopped.
- Source location
- Order section 1 and definition in section 6
Executive order · Source reviewed 2026-10-03
New York Review water-withdrawal rules Agency review directed
DEC must assess whether water-withdrawal rules, reporting or guidance should change for large users.
- Shared mechanism
- Water-supply review
- Scope
- Covered data centers and discretionary DEC permits; definition and exemptions must be checked.
- Important difference
- Agency review direction, not an enacted new facility-level water cap.
- Source location
- Order section 5
Executive order · Source reviewed 2026-10-03
SAVRN synthesis · proposed framework
Combine provisions into a coherent system.
Select state provisions above. The builder organizes their purposes, surfaces dependencies and tradeoffs, and preserves the source of every selection. It does not turn selected provisions into enacted law or establish which policy works best.
How relationships and coverage are defined
One relationship joins a state, an instrument, and a specific provision to a normalized mechanism. States are connected when documented provisions share a mechanism. Groups overlap; the system does not infer legal equivalence, adoption by neighboring states, policy effectiveness, or an absence of policy from missing records.
The matrix counts provisions in this dataset, not laws or affected projects. Comparison and framework selections can be shared by URL. Downloads preserve scope, source location, status, and review date. Future-effective provisions and agency review directions keep their labels.
The initial taxonomy was informed by Ahmed Saeed and Josiah Hester's Governing Datacenter Growth and research paper. SAVRN's source-backed comparison extends beyond the study. Framework purposes, dependencies, and tradeoff prompts are SAVRN analysis, not measured outcomes or statements of law.
Explore the full trackers
Go deeper into a topic. Each tracker opens in a new tab, keeping your state comparison here.
Permits and development ↗Permits, facilities and power development