SAVRN
Search Contact SAVRN
← Research hub

State Connections

Explore a state’s data center issues, find states with similar evidence, and assemble a sourced working brief.

View my comparison →
Orange is your starting state.
Blue states share the selected kind of evidence.

Source statuses are retained as recorded. Existing tracker records have not all been freshly reverified for this view.

Start with Connected states. Review why a state matches, then add it to your working group.

Who is working through similar issues?

Open a state to inspect its evidence. Add states to a potential working group.

Use the map or state selector above to explore each state's published evidence.

South Dakota: inspect the evidence.

Counts are records, not unique projects. Records can overlap across trackers.

Address departure and reduced load Statutorily defined data centers; electricity providers, water providers, and local governments. · Documented in cited instrument

Cost responsibility includes costs incurred if the customer departs or materially reduces load. The law states cost responsibility; it does not supply a universal exit-fee formula.

Date not recorded

South Dakota SB 135, Chapter 190 ↗
Obtain local supply determinations Statutorily defined data centers; electricity providers, water providers, and local governments. · Documented in cited instrument

Water providers assess compatibility, with board review and allocation limits protecting priority uses. Local supply determinations are distinct from the Minnesota consumptive-use permit review.

Date not recorded

South Dakota SB 135, Chapter 190 ↗
Preserve local regulation Statutorily defined data centers; electricity providers, water providers, and local governments. · Documented in cited instrument

The state may not limit local authority to regulate data-center development or operation. Preservation of local authority is not evidence that a local ban exists.

Date not recorded

South Dakota SB 135, Chapter 190 ↗
Publish water-use data Statutorily defined data centers; electricity providers, water providers, and local governments. · Documented in cited instrument

Operators report usage to the board, which makes usage data available to the public. Operator reporting differs from Virginia supplier category reporting.

Date not recorded

South Dakota SB 135, Chapter 190 ↗
Recover attributable electricity costs Statutorily defined data centers; electricity providers, water providers, and local governments. · Documented in cited instrument

Separate service terms must recover costs fairly attributable to the data center. Applies through provider terms rather than a published statewide minimum billing percentage.

Date not recorded

South Dakota SB 135, Chapter 190 ↗
Applied Digital Toronto data center campus Record-specific: Deuel County / State of South Dakota · paused

Applied Digital told KELOLAND News on 13 March 2026 that its proposed data center near Toronto, South Dakota, is unlikely to go forward, after the 2026 Legislature declined to pass a sales and use tax exemption for data center equipment (House Bill 1005 failed in committee). CEO Wes Cummins said later in March that he does not expect any projects in the state for now.

Company statement 13 March 2026 that the project is unlikely to go forward

KELOLAND (13 March 2026) ↗ KELOLAND (23 March 2026) ↗
Leola Data Center Record-specific: Leola · utility service approved; county permit pending

The South Dakota Public Utilities Commission unanimously approved a settlement letting Montana-Dakota Utilities serve the proposed Leola Data Center, near an MDU substation. The PUC chairman stressed the vote was not a permit to construct; McPherson County recently deferred action on the conditional use permit Montana-Dakota Utilities in place of incumbent FEM Electric under a PUC-approved settlement; minimum 2,000 kW billing demand Investment not disclosed; project website cites $159,000 a year in property taxes, $2 million to EMS at the outset then $200,000 a year, and $1 million to schools About 50 MW on about nine acres

PUC approval reported 8 to 9 September 2026; county conditional use permit deferred

SDPB ↗
Lincoln County data center moratorium amendment (failed; Gemini Sioux Falls data center) Record-specific: Lincoln County Commission · other

At a joint meeting with the Sioux Falls City Council on Tuesday 25 August 2026, the Lincoln County Commission voted 3-2 against Commissioner Joel Arends' amendment to schedule a hearing on a data center moratorium, attached to adoption of the Sioux Falls 2050 comprehensive plan. A companion amendment barring non-disclosure agreements on zoning proposals also failed. The commission instead approved a public hearing on data center regulation for 27 October 2026. The Sioux Falls City Council had approved the controversial Gemini data center.

Moratorium amendment failed 3-2 on 25 August 2026; regulation hearing set for 27 October 2026

Argus Leader via Yahoo News ↗ Lennox News ↗
Yankton County six-month data center and bitcoin mining moratorium Record-specific: Yankton County Commission · moratorium

Yankton County commissioners voted unanimously on Tuesday 21 July 2026 to pass a six-month moratorium on data center and bitcoin mining facility permits, shorter than the 12 months on the agenda. The commission may extend it another six months if no ordinance is drafted. The pause gives the county time to study economic and environmental effects and write regulations. The vote followed nearly an hour of public comment.

Approved unanimously 21 July 2026; six months, extendable six months

KTIV ↗ Yankton Press & Dakotan ↗
Brookings city: Brookings · expired

Brookings, South Dakota, City Council voted unanimously to reject a $644K sales-tax rebate for Sequitor Edge's proposed $41 million co-location data center. The denial came alongside state-level defeats: the House State Affairs Committee voted 9-3 against a 50-year data center sales tax break, and the Senate killed two data center incentive bills in a chaotic session when a key senator went missin

2026-02-26

www.brookingsregister.com ↗ www.mykxlg.com ↗ southdakotasearchlight.com ↗ southdakotasearchlight.com ↗
Lincoln County county: Lincoln County · expired

Lincoln County Commissioner Joel Arends proposed a one-year moratorium on hyperscale data centers requiring 100+ MW, calling it an opportunity to 'press pause and further research' the impacts of projects like Gemini Data Center SD LLC's proposed $1.9 billion, 500MW facility on 164 acres. However, no commissioner seconded the motion, killing the measure. Commissioner Jim Schmidt argued projects of

2026-02-24

www.mitchellrepublic.com ↗ www.dakotanewsnetwork.com ↗ kelo.com ↗ siouxfalls.business ↗ www.sdpb.org ↗
Sioux Falls city: Sioux Falls · in_force

Gemini Capital proposed a $1.9B, 500 MW hyperscale data center on 164 acres in eastern Sioux Falls. The City Council voted 7-0 on Jan. 6, 2026 to rezone the farmland for light industrial use, despite 200+ people attending in opposition with over 5 hours of mostly negative testimony. Opponents Samantha Scarlata and Amanda Kendall formed 'Let Sioux Falls Vote' and circulated referendum petitions, bu

2025-12-01

www.siouxfallslive.com ↗ dakotafreepress.com ↗ dakotafreepress.com ↗ siouxfalls.business ↗
Yankton County county: Yankton County · in_force

On June 16, 2026 the Yankton County (SD) Commission held a first reading of a resolution for a temporary moratorium of up to 12 months on data centers and Bitcoin-mining facilities exceeding a power-capacity threshold, prompted by reports of a possible data center; a capacity crowd attended. A1 Development Solutions said it is analyzing eastern SD locations with no current Yankton commitment. [Upd Update 2026-07-21: Yankton County commissioners unanimously passed a six-month moratorium on July 21, 2026, after declining to pass one earlier in the month. The agenda item had proposed 12 months. The moratorium halts permits for data centers and bitcoin mining facilities, and commissioners may extend it by another six months. The commission directed the planning and zoning commission to begin drafting a data center ordinance immediately. (Previously recorded as pending, dated 2026-06-16.)

2026-07-21

www.kynt1450.com ↗ www.yankton.net ↗ www.dakotanewsnow.com ↗
Data Center Bill of Rights for Citizens State: South Dakota · enacted

Signed by Gov. Rhoden on March 30, 2026 and effective July 1, 2026. Requires data centers with peak electrical demand of 10 MW or greater to pay for any rate increases they cause, adds water use regulation, and prohibits the state from limiting local governments' authority to regulate or ban data centers. Lawmakers passed it after rejecting the SB 232 statewide moratorium, moving that decision to localities instead.

2026-03

www.sdpb.org ↗
Limit costs and risks associated with electricity use by data centers and impose a moratorium. State: South Dakota · proposed

South Dakota HB1301 (2026 Regular Session): Limit costs and risks associated with electricity use by data centers and impose a moratorium.. Last action 2026-02-18: State Affairs Deferred to the 41st legislative day, Passed, YEAS 10, NAYS 2..

2026-02

sdlegislature.gov ↗

Follow the issue to the utility and the customer.

Named organizations come from explicit record fields. Their presence is not confirmation of a serving-utility relationship, service availability, or customer eligibility.

Named parties in this state's evidence

Start from your position.

Screen an individual location ↗

Address-level utility verification and service agreements belong in the site screen. Private account data and individual household identities are not part of this public dataset.

Regional grid context and rules
Open the complete grid operator watchlist ↗

Explore generation and interconnection queues ↗ · Explore scarcity and market constraints ↗

Your comparison

See what your selected states have in common.

We bring together the shared issues and source records for the states you choose.

States appear side by side. Compare each topic, then open a cell for sources.

Add your own notes Optional

Notes are included when you open or save the comparison. Save a copy to keep them after leaving this page.

Sharing and data options

The link includes your states and issue filter. It does not include private notes. Source data downloads as JSON.

Your comparison

State comparison

Save a copy
Coverage, sources and how states are connected

All 50 states are selectable. A connection requires the same documented policy mechanism or the same structured tracker classification and status. The map is a discovery tool, not a legal-equivalence score, a project-risk ranking, or a complete census. No match means no matching evidence in this view.

Existing tracker publications supply most records. Their source status and date are retained; a page load is not a new source verification. Proposed, failed, enacted and reversed records remain distinct. Explicitly unverified or pending-review rows are excluded. Narrative and status can disagree in the underlying publication; inspect both before treating a restriction as active. No state-wide effect is inferred from a local action.

Data is read from the current tracker files and published overlays. Source changes invalidate the server's cached connections. Policy mechanisms use a separately reviewed evidence set. Generation queues and broad company commitments are not assigned to a data center or customer. Federal records and records without an explicit state are not assigned to a state by inference.

Download state evidence JSON · SAVRN methodology

Underlying dataset credits
  • 6abc Philadelphia
  • AEP Ohio Transmission Company (filed with Ohio Power Siting Board)
  • AI GridWatch moratorium tracker, CC BY 4.0 (aigridwatch.com)
  • Alabama Reflector
  • Alaska Beacon
  • American Transmission Company LLC (filed with PSC of Wisconsin)
  • Americus Times-Recorder
  • Arizona Mirror
  • Arkansas Advocate
  • Axios Pro Energy
  • Bisnow
  • Bisnow National
  • Bradenton Herald
  • CNBC Technology
  • Cardinal News VA
  • Central Florida Public Media
  • Chesterfield County public permit records
  • Chicago Construction News
  • City of Atlanta public permit records
  • City of Austin issued construction permits open data
  • City of Buckeye public permit records
  • City of Chandler public permit records
  • City of Charlotte public permit records
  • City of Chicago building permits open data
  • City of Fort Worth public permit records
  • City of Goodyear public permit records
  • City of Hillsboro public permit records
  • City of Mesa building permits open data
  • City of Mesa public permit records
  • City of Minneapolis construction permits (CCS) open data
  • City of Papillion public permit records
  • City of Phoenix public permit records
  • City of Red Oak public permit records
  • City of Reno public permit records
  • City of San Antonio public permit records
  • City of Statesboro, Georgia
  • City of Temple, Texas
  • Clearfield City Council (Utah Public Notice Website)
  • Colorado Newsline
  • Colorado Public Radio
  • Congress.gov (Library of Congress, public domain)
  • ConstructConnect News
  • Construction Dive
  • CourtListener DataCenter Dockets
  • CourtListener Opinions
  • Data Center Dynamics
  • Data Center Dynamics news
  • DataCenterTracker.org, CC BY 4.0
  • Dominion Energy Virginia
  • EIN News
  • East Bay Insiders Newsletter
  • Energy Central
  • FOX19 | Cincinnati
  • FOX5 Vegas
  • FOX6 News Milwaukee
  • Facilities Dive
  • Fairfax County public permit records
  • Florida Phoenix
  • Georgia Department of Community Affairs
  • Georgia EPD air permit records
  • Georgia Recorder
  • GovTech
  • Greensboro News and Record
  • Grist
  • Idaho Capital Sun
  • Illinois EPA air permit records
  • Indiana Capital Chronicle
  • Indiana Department of Environmental Management
  • Indiana IDEM air permit records
  • InkFreeNews.com
  • Iowa Capital Dispatch
  • Iowa DNR air permit records
  • KERA News
  • KEYC News Now
  • KGW
  • KRON4
  • Kansas City MO city issued permits open data
  • Kansas Reflector
  • Kentucky Lantern
  • Law360
  • Law360 Energy
  • LegiScan (legiscan.com) and the state legislature
  • Lehigh Valley Planning Commission
  • Local News Matters
  • Loudoun County public permit records
  • Loudoun Times-Mirror
  • Louisiana DEQ air permit records
  • Louisiana Illuminator
  • Maine Morning Star
  • Maricopa County Air Quality Department air permit records
  • Maricopa County public permit records
  • Maryland Matters
  • Mecklenburg County public permit records
  • Michigan Advance
  • Mid Bay News
  • Missouri Independent
  • Montana Free Press
  • NBC Bay Area
  • NBC4 Washington
  • NC Newsline
  • Native News Online
  • Nebraska Examiner
  • Nevada Current
  • Nevada NDEP air permit records
  • New Hampshire Bulletin
  • New Mexico Environment Department
  • North Carolina DEQ Division of Air Quality air permit records
  • North Dakota Department of Environmental Quality
  • North Dakota Monitor
  • Ohio Capital Journal
  • Ohio EPA air permit records
  • Oklahoma DEQ air permit records
  • Oklahoma Voice
  • OpenStates v3 (openstates.org), CC BY 4.0
  • Oregon Capital Chronicle
  • Orlando Sentinel
  • Pennsylvania Capital-Star
  • Pennsylvania Department of Environmental Protection
  • Pennsylvania Office of Consumer Advocate (filed with PA PUC)
  • Pioneer Press
  • Prince William County public permit records
  • Public Service Commission of Wisconsin
  • Public record (Legistar Web API, Granicus)
  • Rhode Island Current
  • Route Fifty
  • SEC EDGAR company submissions, public domain
  • SEC EDGAR full-text search, public domain
  • Searchlight New Mexico
  • Smithfield Township, Monroe County, PA
  • Source New Mexico
  • South Carolina Department of Environmental Services
  • South Dakota Searchlight
  • Springfield Daily Citizen
  • Stafford County public permit records
  • Statesman Journal
  • Strisker data center notes
  • Tennessee Lookout
  • Texas Commission on Environmental Quality
  • Texas TCEQ air permit records
  • The Baltimore Banner
  • The Current (GA)
  • The Detroit News
  • The Hill Energy
  • The North State Journal
  • The Pantagraph
  • The Real Deal
  • The Register
  • The Texas Tribune
  • The Verge
  • Times-Standard
  • Town of Culpeper public permit records
  • Tuscaloosa Thread
  • U.S. EPA ECHO
  • Union-Bulletin
  • Uprise RI
  • Utah Division of Air Quality
  • Utah Division of Air Quality air permit records
  • Utah News Dispatch
  • Utah Public Radio
  • Utility Dive
  • Virginia Business
  • Virginia DEQ air permit records
  • Virginia Electric and Power Company (filed with Virginia SCC)
  • Virginia Mercury
  • Visalia Times-Delta
  • WBUR
  • WCPO 9 Cincinnati
  • WGLT
  • WHEC.com
  • WJON
  • WKYT
  • WLOS
  • WLUK
  • WPBF
  • WQCS
  • WRAL (NC)
  • WUNC News
  • WVPE
  • Washington County public permit records
  • Washington Ecology air permit records
  • Washington State SEPA Register public permit records
  • Washington State Standard
  • Washoe County public permit records
  • Wausau Pilot & Review
  • West Virginia Watch
  • Winston-Salem Journal
  • Wisconsin Department of Natural Resources
  • Wisconsin Examiner
  • Yale Daily News
  • citybiz
  • contracosta.news
  • ictnews.org
  • indianapublicradio.org
  • inkfreenews.com
  • lex18.com
  • mountaintimesoregon.com
  • newmedia-wi.com
  • newscentermaine.com
  • thegazette.com
  • tuscaloosathread.com
  • wcpo.com
  • www.cities929.com

SAVRN Policy Connections

How state policies connect.

Find shared policy mechanisms, compare the differences, and assemble a framework from documented state provisions.

9 states with documented provisions29 provisions · 14 mechanisms · all 50 states available for comparison

An initial evidence set, not an exhaustive survey. A missing relationship means not documented here, never no policy. Source review verifies the cited instrument, not every later amendment or implementing action. Sources reviewed 3 October 2026.

Shared goals. Different requirements.

Each number opens the provisions connecting a state to a policy family. States can belong to several groups. A shared family is not proof of identical law.

Documented relationships by policy family. A dash means not documented in this evidence set.
StateProject readinessCost responsibilityGrid flexibilityWater safeguardsReporting & oversightEnergy & emissionsLocal authorityEnvironmental review
Georgia–2––––––
Indiana–3––1–––
Minnesota–2–1–1––
New York–––1–––2
Ohio–1––––––
Oregon–2––11––
South Dakota–2–11–1–
Texas111––1––
Virginia––––2–––

Choose a mechanism to see states connected by that specific policy tool.

Inspect the provision, not just the category.

All 29 documented provisions. Open a record for its source, scope, and difference from similar tools.

Texas Verify the proposed site Documented in cited instrument

Interconnection standards must include a way to demonstrate a legal interest in the proposed location.

Shared mechanism
Evidence of site control
Scope
ERCOT large-load interconnection; applicability and exceptions in the statute.
Important difference
Evidence of site control does not establish that all permits or financing are secured.
Source location
Section 37.0561(g)
Texas SB 6, enrolled text ↗

Statutory text · Source reviewed 2026-10-03

Texas Back transmission commitments Documented in cited instrument

Standards must set financial commitments supporting transmission infrastructure for covered loads.

Shared mechanism
Financial security
Scope
ERCOT large-load interconnection; applicability and exceptions in the statute.
Important difference
Permitted security forms and release rules depend on implementation; not a minimum energy bill.
Source location
Section 37.0561(h)-(j)
Texas SB 6, enrolled text ↗

Statutory text · Source reviewed 2026-10-03

Texas Define emergency response Documented in cited instrument

Covered backup-equipped loads may be directed to deploy backup generation or curtail after the specified market-service sequence.

Shared mechanism
Emergency response
Scope
ERCOT large-load interconnection; applicability and exceptions in the statute.
Important difference
An emergency mechanism, not a general voluntary demand-response tariff.
Source location
Section 37.0561(e)
Texas SB 6, enrolled text ↗

Statutory text · Source reviewed 2026-10-03

Texas Retain emissions limits Documented in cited instrument

Emergency direction does not authorize violation of emissions or environmental requirements.

Shared mechanism
Emissions safeguards
Scope
ERCOT large-load interconnection; applicability and exceptions in the statute.
Important difference
Backup generation remains constrained by applicable environmental rules.
Source location
Section 37.0561(e)(1)
Texas SB 6, enrolled text ↗

Statutory text · Source reviewed 2026-10-03

Minnesota Assign attributable utility costs Documented in cited instrument

Commission review of very-large-customer service terms must address attributable costs and protection of other customers.

Shared mechanism
Attributable-cost allocation
Scope
Scope varies by section: data-center water provisions, public-utility service, and optional clean-energy contracts.
Important difference
A regulatory framework with customer-class and agreement decisions, not a uniform minimum billing percentage.
Source location
Section 9, subdivision 2
Minnesota 2025 special-session Chapter 12 ↗

Session law · Source reviewed 2026-10-03

Minnesota Protect against stranded costs Documented in cited instrument

Tariff or agreement review must include protections against other customers paying stranded service costs.

Shared mechanism
Departure / reduced-load protection
Scope
Scope varies by section: data-center water provisions, public-utility service, and optional clean-energy contracts.
Important difference
Existing-service exceptions appear in subdivision 3.
Source location
Section 9, subdivision 2(3)
Minnesota 2025 special-session Chapter 12 ↗

Session law · Source reviewed 2026-10-03

Minnesota Evaluate consumptive water demand Documented in cited instrument

Preapplication review links covered consumptive demand and permit needs to site-specific water availability.

Shared mechanism
Water-supply review
Scope
Scope varies by section: data-center water provisions, public-utility service, and optional clean-energy contracts.
Important difference
Facility definition and water-use/permit conditions apply together; not all withdrawals trigger this review.
Source location
Sections 3-4
Minnesota 2025 special-session Chapter 12 ↗

Session law · Source reviewed 2026-10-03

Minnesota Offer optional clean-energy service Documented in cited instrument

Utilities must offer a clean-energy and capacity tariff with participating customers paying proportional resource costs.

Shared mechanism
Clean-energy service terms
Scope
Scope varies by section: data-center water provisions, public-utility service, and optional clean-energy contracts.
Important difference
Customer participation is optional; do not classify it as a universal clean-energy purchase mandate.
Source location
Section 10
Minnesota 2025 special-session Chapter 12 ↗

Session law · Source reviewed 2026-10-03

South Dakota Recover attributable electricity costs Documented in cited instrument

Separate service terms must recover costs fairly attributable to the data center.

Shared mechanism
Attributable-cost allocation
Scope
Statutorily defined data centers; electricity providers, water providers, and local governments.
Important difference
Applies through provider terms rather than a published statewide minimum billing percentage.
Source location
Section 3
South Dakota SB 135, Chapter 190 ↗

Session law · Source reviewed 2026-10-03

South Dakota Address departure and reduced load Documented in cited instrument

Cost responsibility includes costs incurred if the customer departs or materially reduces load.

Shared mechanism
Departure / reduced-load protection
Scope
Statutorily defined data centers; electricity providers, water providers, and local governments.
Important difference
The law states cost responsibility; it does not supply a universal exit-fee formula.
Source location
Section 3
South Dakota SB 135, Chapter 190 ↗

Session law · Source reviewed 2026-10-03

South Dakota Obtain local supply determinations Documented in cited instrument

Water providers assess compatibility, with board review and allocation limits protecting priority uses.

Shared mechanism
Water-supply review
Scope
Statutorily defined data centers; electricity providers, water providers, and local governments.
Important difference
Local supply determinations are distinct from the Minnesota consumptive-use permit review.
Source location
Section 5
South Dakota SB 135, Chapter 190 ↗

Session law · Source reviewed 2026-10-03

South Dakota Publish water-use data Documented in cited instrument

Operators report usage to the board, which makes usage data available to the public.

Shared mechanism
Water-use reporting
Scope
Statutorily defined data centers; electricity providers, water providers, and local governments.
Important difference
Operator reporting differs from Virginia supplier category reporting.
Source location
Section 6
South Dakota SB 135, Chapter 190 ↗

Session law · Source reviewed 2026-10-03

South Dakota Preserve local regulation Documented in cited instrument

The state may not limit local authority to regulate data-center development or operation.

Shared mechanism
Preserved local authority
Scope
Statutorily defined data centers; electricity providers, water providers, and local governments.
Important difference
Preservation of local authority is not evidence that a local ban exists.
Source location
Section 4
South Dakota SB 135, Chapter 190 ↗

Session law · Source reviewed 2026-10-03

Ohio Address underused infrastructure risk Documented in cited instrument

PUCO adopted a settlement aimed at protecting other customers from cost shifting due to underused data-center investments.

Shared mechanism
Attributable-cost allocation
Scope
AEP Ohio data-center tariff proceeding; not a tariff for every Ohio utility.
Important difference
The cited announcement directs tariff filing; consult the filed tariff for binding customer terms.
Source location
Decision announcement, case background
PUCO decision announcement, case 24-508-EL-ATA ↗

Commission decision announcement · Source reviewed 2026-10-03

Indiana Set minimum billing obligations Documented in cited instrument

The approved settlement establishes minimum billing-demand and charge provisions for covered large loads.

Shared mechanism
Minimum payment commitments
Scope
Indiana Michigan Power Tariff I.P., Indiana jurisdiction; covered large-load customers.
Important difference
The approved settlement differs from the original utility proposal; I&M territory only.
Source location
Order pp. 32-35 and ordering paragraphs p. 49
IURC order, Cause 46097 ↗

Commission order · Source reviewed 2026-10-03

Indiana Address early termination Documented in cited instrument

The approved settlement contains contract termination protections for covered large-load service.

Shared mechanism
Departure / reduced-load protection
Scope
Indiana Michigan Power Tariff I.P., Indiana jurisdiction; covered large-load customers.
Important difference
Customer-specific conditions and the settlement govern; not statewide terms for every provider.
Source location
Settlement agreement; order approval pp. 49-50
IURC order, Cause 46097 ↗

Commission order · Source reviewed 2026-10-03

Indiana Require collateral arrangements Documented in cited instrument

The approved settlement includes financial-security terms for covered large-load customers.

Shared mechanism
Financial security
Scope
Indiana Michigan Power Tariff I.P., Indiana jurisdiction; covered large-load customers.
Important difference
Collateral and exceptions depend on tariff eligibility and customer circumstances.
Source location
Settlement agreement; order approval pp. 49-50
IURC order, Cause 46097 ↗

Commission order · Source reviewed 2026-10-03

Indiana Report large-load developments Documented in cited instrument

The order addresses recurring reports and protection of confidential information.

Shared mechanism
Regulatory reporting
Scope
Indiana Michigan Power Tariff I.P., Indiana jurisdiction; covered large-load customers.
Important difference
Regulator access is not equivalent to public disclosure of all reported data.
Source location
Order p. 49
IURC order, Cause 46097 ↗

Commission order · Source reviewed 2026-10-03

Georgia Allocate infrastructure costs Documented in cited instrument

The PSC approved additional service terms addressing site and upstream power-system costs.

Shared mechanism
Attributable-cost allocation
Scope
Georgia Power covered new large-load customers; not every Georgia utility.
Important difference
Applies to the specified Georgia Power customer category; implementation is contract-specific.
Source location
Commission announcement p. 1
Georgia PSC rule approval announcement ↗

Commission decision announcement · Source reviewed 2026-10-03

Georgia Allow longer contracts and minimum bills Documented in cited instrument

The approved rule allows longer contracts and minimum billing for covered high-load customers.

Shared mechanism
Minimum payment commitments
Scope
Georgia Power covered new large-load customers; not every Georgia utility.
Important difference
Authority to impose terms is not a universal mandatory billing percentage.
Source location
Commission announcement p. 1
Georgia PSC rule approval announcement ↗

Commission decision announcement · Source reviewed 2026-10-03

Oregon Create a separate service class Documented in cited instrument

The act calls for tariffs assigning covered service costs to large energy use facilities and mitigating cost shifts.

Shared mechanism
Attributable-cost allocation
Scope
Covered large energy use facilities served by electric companies; tariff and contract provisions have distinct applicability.
Important difference
Separate tariff approval and transition provisions matter; a statute is not itself a completed tariff.
Source location
Section 2
Oregon HB 3546, enrolled text ↗

Enrolled text; Chapter 323 confirmed · Source reviewed 2026-10-03

Oregon Require contractual minimum payments Documented in cited instrument

Covered service contracts must include a minimum payment amount or percentage determined by the commission.

Shared mechanism
Minimum payment commitments
Scope
Covered large energy use facilities served by electric companies; tariff and contract provisions have distinct applicability.
Important difference
The law leaves the amount or percentage to the commission.
Source location
Sections 5-6
Oregon HB 3546, enrolled text ↗

Enrolled text; Chapter 323 confirmed · Source reviewed 2026-10-03

Oregon Consider clean-energy compatibility Documented in cited instrument

Commission tariff review must consider effects on clean-energy targets and compatible resource procurement.

Shared mechanism
Clean-energy service terms
Scope
Covered large energy use facilities served by electric companies; tariff and contract provisions have distinct applicability.
Important difference
A tariff-review criterion differs from Minnesota optional clean-energy procurement.
Source location
Section 2(3)
Oregon HB 3546, enrolled text ↗

Enrolled text; Chapter 323 confirmed · Source reviewed 2026-10-03

Oregon Report load trends to lawmakers Documented in cited instrument

The commission must report on large-load trends and implications while protecting proprietary information.

Shared mechanism
Regulatory reporting
Scope
Covered large energy use facilities served by electric companies; tariff and contract provisions have distinct applicability.
Important difference
A legislative reporting mechanism, not disclosure of every customer contract.
Source location
Section 7
Oregon HB 3546, enrolled text ↗

Enrolled text; Chapter 323 confirmed · Source reviewed 2026-10-03

Virginia Separate potable and reclaimed volumes Enacted, future effective

The future-effective code adds supplier reporting by customer category, separating potable and reclaimed water.

Shared mechanism
Water-use reporting
Scope
Registered water users supplying water offsite; categorized reporting, not universal facility-level public disclosure.
Important difference
Monthly data can be replaced by quarterly totals where unavailable; facility-specific disclosure is not established here.
Effective date in source
2027-01-01
Source location
Subsection C, version effective January 1, 2027
Virginia Code 62.1-44.38, future-effective subsection C ↗

Enacted, future effective · Source reviewed 2026-10-03

Virginia Connect electricity, water and generators Official report listed

The official report listing describes a cross-resource account of service agreements, water usage and generator permits.

Shared mechanism
Regulatory reporting
Scope
Report description covers utility agreements, water use and generator permitting; underlying report data not ingested.
Important difference
This confirms the report description, not completeness or accuracy of individual facility records.
Source location
RD637 executive summary
Virginia SCC RD637 report listing ↗

Official report listing · Source reviewed 2026-10-03

New York Assess cumulative development impacts Documented in cited instrument

The order directs a generic environmental impact statement for covered data-center development.

Shared mechanism
Environmental assessment
Scope
Covered data centers and discretionary DEC permits; definition and exemptions must be checked.
Important difference
A statewide review process differs from a project-specific approval.
Source location
Order section 1
New York Executive Order 62 ↗

Executive order · Source reviewed 2026-10-03

New York Link permit restraint to review Documented in cited instrument

The order holds covered discretionary DEC permits in abeyance subject to its scope and exclusions.

Shared mechanism
Interim permit restraint
Scope
Covered data centers and discretionary DEC permits; definition and exemptions must be checked.
Important difference
Applies to covered DEC applications not determined complete before the order; local-government permits are excluded. Not proof that a named project stopped.
Source location
Order section 1 and definition in section 6
New York Executive Order 62 ↗

Executive order · Source reviewed 2026-10-03

New York Review water-withdrawal rules Agency review directed

DEC must assess whether water-withdrawal rules, reporting or guidance should change for large users.

Shared mechanism
Water-supply review
Scope
Covered data centers and discretionary DEC permits; definition and exemptions must be checked.
Important difference
Agency review direction, not an enacted new facility-level water cap.
Source location
Order section 5
New York Executive Order 62 ↗

Executive order · Source reviewed 2026-10-03

How relationships and coverage are defined

One relationship joins a state, an instrument, and a specific provision to a normalized mechanism. States are connected when documented provisions share a mechanism. Groups overlap; the system does not infer legal equivalence, adoption by neighboring states, policy effectiveness, or an absence of policy from missing records.

The matrix counts provisions in this dataset, not laws or affected projects. Comparison and framework selections can be shared by URL. Downloads preserve scope, source location, status, and review date. Future-effective provisions and agency review directions keep their labels.

The initial taxonomy was informed by Ahmed Saeed and Josiah Hester's Governing Datacenter Growth and research paper. SAVRN's source-backed comparison extends beyond the study. Framework purposes, dependencies, and tradeoff prompts are SAVRN analysis, not measured outcomes or statements of law.

Download the evidence dataset (JSON) · Research methodology