State Connections
Explore a state’s data center issues, find states with similar evidence, and assemble a sourced working brief.
Matches reflect shared provisions or tracker classifications, not identical laws. Local actions keep their local scope.
Source statuses are retained as recorded. Existing tracker records have not all been freshly reverified for this view.
Start with Connected states. Review why a state matches, then add it to your working group.
Who is working through similar issues?
Open a state to inspect its evidence. Add states to a potential working group.
Use the map or state selector above to explore each state's published evidence.
Minnesota: inspect the evidence.
Counts are records, not unique projects. Records can overlap across trackers.
Assign attributable utility costs Scope varies by section: data-center water provisions, public-utility service, and optional clean-energy contracts. · Documented in cited instrument
Commission review of very-large-customer service terms must address attributable costs and protection of other customers. A regulatory framework with customer-class and agreement decisions, not a uniform minimum billing percentage.
Date not recorded
Minnesota 2025 special-session Chapter 12 ↗Evaluate consumptive water demand Scope varies by section: data-center water provisions, public-utility service, and optional clean-energy contracts. · Documented in cited instrument
Preapplication review links covered consumptive demand and permit needs to site-specific water availability. Facility definition and water-use/permit conditions apply together; not all withdrawals trigger this review.
Date not recorded
Minnesota 2025 special-session Chapter 12 ↗Offer optional clean-energy service Scope varies by section: data-center water provisions, public-utility service, and optional clean-energy contracts. · Documented in cited instrument
Utilities must offer a clean-energy and capacity tariff with participating customers paying proportional resource costs. Customer participation is optional; do not classify it as a universal clean-energy purchase mandate.
Date not recorded
Minnesota 2025 special-session Chapter 12 ↗Protect against stranded costs Scope varies by section: data-center water provisions, public-utility service, and optional clean-energy contracts. · Documented in cited instrument
Tariff or agreement review must include protections against other customers paying stranded service costs. Existing-service exceptions appear in subdivision 3.
Date not recorded
Minnesota 2025 special-session Chapter 12 ↗Amazon Becker data center (near Sherco) Record-specific: City of Becker · paused
Becker City Administrator Greg Lerud said on Friday 23 May 2025 that Amazon told the city it was suspending its development activities in Minnesota, including the roughly 350-acre site it bought in 2024 near the Sherco coal plant. An Amazon spokesperson said the company continues to evaluate the Becker location but is redirecting resources to projects that can deliver capacity more quickly, citing uncertainty. Amazon plans to keep owning the property. The pause came as Minnesota lawmakers debated added regulation of large data centers and their sales tax exemption on electricity.
Pause disclosed 23 May 2025
MPR News ↗Apple Valley data center moratorium Record-specific: Apple Valley · moratorium
Apple Valley, Minnesota, enacted a local data center moratorium or ban, recorded in SAVRN's moratorium tracker as dated July 2026. One-year moratorium on new data center development; follows denial of 1M sq ft proposal. The measure runs to 9 July 2027.
Enacted July 2026
hometownsource.com ↗Carlton County data center moratorium Record-specific: Carlton County · moratorium
Carlton County, Minnesota, enacted a local data center moratorium or ban, recorded in SAVRN's moratorium tracker as dated August 2026. One-year interim ordinance, unanimous, effective immediately; bars approval of new data center development in every county township, including crypto mining and AI compute. Directs the planning commission to study whether county regulation is needed, with a progress report due back to the board by February 2027. The measure runs to 24 August 2027.
Enacted August 2026
kaxe.org ↗Carver data center moratorium Record-specific: Carver · moratorium
Carver, Minnesota, enacted a local data center moratorium or ban, recorded in SAVRN's moratorium tracker as dated April 2026. 1-year moratorium, unanimous. Proactive, no pending data center project at time of vote. The measure runs to 6 April 2027.
Enacted April 2026
fox9.com ↗Eagan Capital data center moratorium challenge Record-specific: City of Eagan · litigation
The Eagan City Council adopted an interim data center moratorium on 17 February 2026, running through 17 February 2027. Eagan Capital sued the city on 15 June 2026, arguing only the Minnesota Public Utilities Commission may regulate electricity demand, and seeks to void the moratorium plus damages over $50,000. The city said it will defend the moratorium, noting the company had installed trailer-mounted chillers without permits, which led to denial of an interim use permit.
Moratorium 17 February 2026; suit 15 June 2026
CBS Minnesota ↗ MPR News ↗Elk River one-year data center moratorium (zoning amendment rejected, applications withdrawn) Record-specific: Elk River City Council · moratorium
The Elk River City Council unanimously approved a one-year moratorium on new data center development on 3 August 2026, prohibiting all data center applications while staff draft regulations. On 6 July 2026 the council had unanimously rejected a zoning amendment that would have allowed data centers as a conditional use in Light Industrial districts, and the applicant then formally withdrew its requests for the zoning amendment and a conditional use permit. Staff said the council can end the moratorium early once regulations are ready.
Zoning amendment rejected 6 July 2026; moratorium approved 3 August 2026; one year; single outlet
Elk River Star News ↗Farmington Technology Park (Tract) Record-specific: Farmington, Dakota County · litigation
Denver-based Tract's 340-acre, up-to-12-building, 2.5M-sq-ft campus (~$5B at full buildout) on former golf-course/school land. Residents sued on technical and later environmental grounds; MCEA joined as party. On 9 September 2026 the Coalition for Responsible Data Center Development announced it is withdrawing its lawsuit against the city of Farmington, the Farmington School District and Tract Land Development, with chair Cathy Johnson stating that the merits remain valid but the ongoing high costs of litigation are no longer sustainable by the few residents who have personally shouldered the legal costs. Castle Rock Township's companion lawsuit against Farmington, challenging a breach of the Orderly Annexation Agreement, is unaffected and continues. This is a withdrawal on cost, not a ruling on the merits, and it removes one of the two challenges facing the project.
Nov 29 2025; resident coalition withdrew its suit 9 September 2026, township suit continues
Govtech ↗ Startribune ↗ Blandin on Broadband ↗Former Star Tribune printing facility data center (North Loop) Record-specific: City of Minneapolis · withdrawn
Virginia-based Legacy Investing withdrew its land use application for a 20 MW data center at the former Star Tribune printing facility in Minneapolis's North Loop, a city spokesperson confirmed on 11 September 2026. The proposal drew heavy opposition from North Loop residents over environmental impacts and doubts about job creation. Minneapolis City Council had passed a six-month ban on data centers larger than 350,000 square feet in May 2026. The Star Tribune still owns the site.
Withdrawal confirmed by the city on 11 September 2026
MPR News ↗ KLFD Radio ↗Geronimo Power data center campus (agricultural preservation zoning change denied) Record-specific: Nobles County Board of Commissioners · denied
The Nobles County Board of Commissioners voted 3-2 on Tuesday 21 April 2026 to reject a zoning text change that would have allowed data centers as a conditional use on agricultural preservation land. The vote blocks, for now, Geronimo Power's US$4 billion data center complex planned on about 950 acres of farmland east of Reading and north of Worthington. The Planning and Zoning Commission had recommended against the change on 8 April 2026. Geronimo's president said the company would step back and consider other options in the region.
Planning Commission recommendation 8 April 2026; County Board denial 21 April 2026
MPR News ↗ West Central Tribune ↗Google Hermantown data center (Project Loon) Record-specific: St. Louis County District Court / City of Hermantown · litigation
The citizens' group Stop the Hermantown Data Center sued the City of Hermantown in St. Louis County District Court on 29 April 2026, alleging the city improperly amended its 2045 comprehensive plan and rezoned the Adolph neighborhood for the data center, and violated the open meeting law by closing three meetings. The group asks the court to vacate the plan and undo the rezoning the council approved in October 2025. A separate suit filed in November 2025 with the Minnesota Center for Environmental Advocacy alleges the project's environmental review was inadequate. No ruling in either case was found in the sources reviewed, and the project still needs city council approval.
Environmental review suit filed November 2025; zoning and open meeting suit filed 29 April 2026
MPR News (29 April 2026) ↗ Northern News Now (29 April 2026) ↗Hastings one-year data center moratorium Record-specific: City of Hastings City Council · moratorium
The Hastings City Council approved a one-year moratorium on data center development after a public hearing at its Monday 17 August 2026 meeting. The interim ordinance stops the city from accepting, reviewing or issuing data center permits while staff study the facilities and prepare regulations on location and operation. Community Development Director John Hinzman said the zoning code does not define data centers or address their impacts.
Approved 17 August 2026; one year
Hastings Journal ↗Follow the issue to the utility and the customer.
Named organizations come from explicit record fields. Their presence is not confirmation of a serving-utility relationship, service availability, or customer eligibility.
Named parties in this state's evidence
Start from your position.
Screen an individual location ↗Address-level utility verification and service agreements belong in the site screen. Private account data and individual household identities are not part of this public dataset.
Regional grid context and rules
Open the complete grid operator watchlist ↗Explore generation and interconnection queues ↗ · Explore scarcity and market constraints ↗
See what your selected states have in common.
We bring together the shared issues and source records for the states you choose.
States appear side by side. Compare each topic, then open a cell for sources.
Add your own notes Optional
Notes are included when you open or save the comparison. Save a copy to keep them after leaving this page.
Sharing and data options
The link includes your states and issue filter. It does not include private notes. Source data downloads as JSON.
Coverage, sources and how states are connected
All 50 states are selectable. A connection requires the same documented policy mechanism or the same structured tracker classification and status. The map is a discovery tool, not a legal-equivalence score, a project-risk ranking, or a complete census. No match means no matching evidence in this view.
Existing tracker publications supply most records. Their source status and date are retained; a page load is not a new source verification. Proposed, failed, enacted and reversed records remain distinct. Explicitly unverified or pending-review rows are excluded. Narrative and status can disagree in the underlying publication; inspect both before treating a restriction as active. No state-wide effect is inferred from a local action.
Data is read from the current tracker files and published overlays. Source changes invalidate the server's cached connections. Policy mechanisms use a separately reviewed evidence set. Generation queues and broad company commitments are not assigned to a data center or customer. Federal records and records without an explicit state are not assigned to a state by inference.
Download state evidence JSON · SAVRN methodology
Underlying dataset credits
- 6abc Philadelphia
- AEP Ohio Transmission Company (filed with Ohio Power Siting Board)
- AI GridWatch moratorium tracker, CC BY 4.0 (aigridwatch.com)
- Alabama Reflector
- Alaska Beacon
- American Transmission Company LLC (filed with PSC of Wisconsin)
- Americus Times-Recorder
- Arizona Mirror
- Arkansas Advocate
- Axios Pro Energy
- Bisnow
- Bisnow National
- Bradenton Herald
- CNBC Technology
- Cardinal News VA
- Central Florida Public Media
- Chesterfield County public permit records
- Chicago Construction News
- City of Atlanta public permit records
- City of Austin issued construction permits open data
- City of Buckeye public permit records
- City of Chandler public permit records
- City of Charlotte public permit records
- City of Chicago building permits open data
- City of Fort Worth public permit records
- City of Goodyear public permit records
- City of Hillsboro public permit records
- City of Mesa building permits open data
- City of Mesa public permit records
- City of Minneapolis construction permits (CCS) open data
- City of Papillion public permit records
- City of Phoenix public permit records
- City of Red Oak public permit records
- City of Reno public permit records
- City of San Antonio public permit records
- City of Statesboro, Georgia
- City of Temple, Texas
- Clearfield City Council (Utah Public Notice Website)
- Colorado Newsline
- Colorado Public Radio
- Congress.gov (Library of Congress, public domain)
- ConstructConnect News
- Construction Dive
- CourtListener DataCenter Dockets
- CourtListener Opinions
- Data Center Dynamics
- Data Center Dynamics news
- DataCenterTracker.org, CC BY 4.0
- Dominion Energy Virginia
- EIN News
- East Bay Insiders Newsletter
- Energy Central
- FOX19 | Cincinnati
- FOX5 Vegas
- FOX6 News Milwaukee
- Facilities Dive
- Fairfax County public permit records
- Florida Phoenix
- Georgia Department of Community Affairs
- Georgia EPD air permit records
- Georgia Recorder
- GovTech
- Greensboro News and Record
- Grist
- Idaho Capital Sun
- Illinois EPA air permit records
- Indiana Capital Chronicle
- Indiana Department of Environmental Management
- Indiana IDEM air permit records
- InkFreeNews.com
- Iowa Capital Dispatch
- Iowa DNR air permit records
- KERA News
- KEYC News Now
- KGW
- KRON4
- Kansas City MO city issued permits open data
- Kansas Reflector
- Kentucky Lantern
- Law360
- Law360 Energy
- LegiScan (legiscan.com) and the state legislature
- Lehigh Valley Planning Commission
- Local News Matters
- Loudoun County public permit records
- Loudoun Times-Mirror
- Louisiana DEQ air permit records
- Louisiana Illuminator
- Maine Morning Star
- Maricopa County Air Quality Department air permit records
- Maricopa County public permit records
- Maryland Matters
- Mecklenburg County public permit records
- Michigan Advance
- Mid Bay News
- Missouri Independent
- Montana Free Press
- NBC Bay Area
- NBC4 Washington
- NC Newsline
- Native News Online
- Nebraska Examiner
- Nevada Current
- Nevada NDEP air permit records
- New Hampshire Bulletin
- New Mexico Environment Department
- North Carolina DEQ Division of Air Quality air permit records
- North Dakota Department of Environmental Quality
- North Dakota Monitor
- Ohio Capital Journal
- Ohio EPA air permit records
- Oklahoma DEQ air permit records
- Oklahoma Voice
- OpenStates v3 (openstates.org), CC BY 4.0
- Oregon Capital Chronicle
- Orlando Sentinel
- Pennsylvania Capital-Star
- Pennsylvania Department of Environmental Protection
- Pennsylvania Office of Consumer Advocate (filed with PA PUC)
- Pioneer Press
- Prince William County public permit records
- Public Service Commission of Wisconsin
- Public record (Legistar Web API, Granicus)
- Rhode Island Current
- Route Fifty
- SEC EDGAR company submissions, public domain
- SEC EDGAR full-text search, public domain
- Searchlight New Mexico
- Smithfield Township, Monroe County, PA
- Source New Mexico
- South Carolina Department of Environmental Services
- South Dakota Searchlight
- Springfield Daily Citizen
- Stafford County public permit records
- Statesman Journal
- Strisker data center notes
- Tennessee Lookout
- Texas Commission on Environmental Quality
- Texas TCEQ air permit records
- The Baltimore Banner
- The Current (GA)
- The Detroit News
- The Hill Energy
- The North State Journal
- The Pantagraph
- The Real Deal
- The Register
- The Texas Tribune
- The Verge
- Times-Standard
- Town of Culpeper public permit records
- Tuscaloosa Thread
- U.S. EPA ECHO
- Union-Bulletin
- Uprise RI
- Utah Division of Air Quality
- Utah Division of Air Quality air permit records
- Utah News Dispatch
- Utah Public Radio
- Utility Dive
- Virginia Business
- Virginia DEQ air permit records
- Virginia Electric and Power Company (filed with Virginia SCC)
- Virginia Mercury
- Visalia Times-Delta
- WBUR
- WCPO 9 Cincinnati
- WGLT
- WHEC.com
- WJON
- WKYT
- WLOS
- WLUK
- WPBF
- WQCS
- WRAL (NC)
- WUNC News
- WVPE
- Washington County public permit records
- Washington Ecology air permit records
- Washington State SEPA Register public permit records
- Washington State Standard
- Washoe County public permit records
- Wausau Pilot & Review
- West Virginia Watch
- Winston-Salem Journal
- Wisconsin Department of Natural Resources
- Wisconsin Examiner
- Yale Daily News
- citybiz
- contracosta.news
- ictnews.org
- indianapublicradio.org
- inkfreenews.com
- lex18.com
- mountaintimesoregon.com
- newmedia-wi.com
- newscentermaine.com
- thegazette.com
- tuscaloosathread.com
- wcpo.com
- www.cities929.com
SAVRN Policy Connections
How state policies connect.
Find shared policy mechanisms, compare the differences, and assemble a framework from documented state provisions.
An initial evidence set, not an exhaustive survey. A missing relationship means not documented here, never no policy. Source review verifies the cited instrument, not every later amendment or implementing action. Sources reviewed 3 October 2026.
Shared goals. Different requirements.
Each number opens the provisions connecting a state to a policy family. States can belong to several groups. A shared family is not proof of identical law.
Find states sharing a combination of policies
Choose several mechanisms to find their intersection, or include states with any selected mechanism. These matches use documented records only.
| State | Project readiness | Cost responsibility | Grid flexibility | Water safeguards | Reporting & oversight | Energy & emissions | Local authority | Environmental review |
|---|---|---|---|---|---|---|---|---|
| AlabamaNot yet documented | – | – | – | – | – | – | – | – |
| AlaskaNot yet documented | – | – | – | – | – | – | – | – |
| ArizonaNot yet documented | – | – | – | – | – | – | – | – |
| ArkansasNot yet documented | – | – | – | – | – | – | – | – |
| CaliforniaNot yet documented | – | – | – | – | – | – | – | – |
| ColoradoNot yet documented | – | – | – | – | – | – | – | – |
| ConnecticutNot yet documented | – | – | – | – | – | – | – | – |
| DelawareNot yet documented | – | – | – | – | – | – | – | – |
| FloridaNot yet documented | – | – | – | – | – | – | – | – |
| Georgia | – | 2 | – | – | – | – | – | – |
| HawaiiNot yet documented | – | – | – | – | – | – | – | – |
| IdahoNot yet documented | – | – | – | – | – | – | – | – |
| IllinoisNot yet documented | – | – | – | – | – | – | – | – |
| Indiana | – | 3 | – | – | 1 | – | – | – |
| IowaNot yet documented | – | – | – | – | – | – | – | – |
| KansasNot yet documented | – | – | – | – | – | – | – | – |
| KentuckyNot yet documented | – | – | – | – | – | – | – | – |
| LouisianaNot yet documented | – | – | – | – | – | – | – | – |
| MaineNot yet documented | – | – | – | – | – | – | – | – |
| MarylandNot yet documented | – | – | – | – | – | – | – | – |
| MassachusettsNot yet documented | – | – | – | – | – | – | – | – |
| MichiganNot yet documented | – | – | – | – | – | – | – | – |
| Minnesota | – | 2 | – | 1 | – | 1 | – | – |
| MississippiNot yet documented | – | – | – | – | – | – | – | – |
| MissouriNot yet documented | – | – | – | – | – | – | – | – |
| MontanaNot yet documented | – | – | – | – | – | – | – | – |
| NebraskaNot yet documented | – | – | – | – | – | – | – | – |
| NevadaNot yet documented | – | – | – | – | – | – | – | – |
| New HampshireNot yet documented | – | – | – | – | – | – | – | – |
| New JerseyNot yet documented | – | – | – | – | – | – | – | – |
| New MexicoNot yet documented | – | – | – | – | – | – | – | – |
| New York | – | – | – | 1 | – | – | – | 2 |
| North CarolinaNot yet documented | – | – | – | – | – | – | – | – |
| North DakotaNot yet documented | – | – | – | – | – | – | – | – |
| Ohio | – | 1 | – | – | – | – | – | – |
| OklahomaNot yet documented | – | – | – | – | – | – | – | – |
| Oregon | – | 2 | – | – | 1 | 1 | – | – |
| PennsylvaniaNot yet documented | – | – | – | – | – | – | – | – |
| Rhode IslandNot yet documented | – | – | – | – | – | – | – | – |
| South CarolinaNot yet documented | – | – | – | – | – | – | – | – |
| South Dakota | – | 2 | – | 1 | 1 | – | 1 | – |
| TennesseeNot yet documented | – | – | – | – | – | – | – | – |
| Texas | 1 | 1 | 1 | – | – | 1 | – | – |
| UtahNot yet documented | – | – | – | – | – | – | – | – |
| VermontNot yet documented | – | – | – | – | – | – | – | – |
| Virginia | – | – | – | – | 2 | – | – | – |
| WashingtonNot yet documented | – | – | – | – | – | – | – | – |
| West VirginiaNot yet documented | – | – | – | – | – | – | – | – |
| WisconsinNot yet documented | – | – | – | – | – | – | – | – |
| WyomingNot yet documented | – | – | – | – | – | – | – | – |
Choose a mechanism to see states connected by that specific policy tool.
Compare two states.
Compare documented mechanisms, then inspect each provision's scope and status. Unrecorded mechanisms remain unknown.
Inspect the provision, not just the category.
All 29 documented provisions. Open a record for its source, scope, and difference from similar tools.
Texas Verify the proposed site Documented in cited instrument
Interconnection standards must include a way to demonstrate a legal interest in the proposed location.
- Shared mechanism
- Evidence of site control
- Scope
- ERCOT large-load interconnection; applicability and exceptions in the statute.
- Important difference
- Evidence of site control does not establish that all permits or financing are secured.
- Source location
- Section 37.0561(g)
Statutory text · Source reviewed 2026-10-03
Texas Back transmission commitments Documented in cited instrument
Standards must set financial commitments supporting transmission infrastructure for covered loads.
- Shared mechanism
- Financial security
- Scope
- ERCOT large-load interconnection; applicability and exceptions in the statute.
- Important difference
- Permitted security forms and release rules depend on implementation; not a minimum energy bill.
- Source location
- Section 37.0561(h)-(j)
Statutory text · Source reviewed 2026-10-03
Texas Define emergency response Documented in cited instrument
Covered backup-equipped loads may be directed to deploy backup generation or curtail after the specified market-service sequence.
- Shared mechanism
- Emergency response
- Scope
- ERCOT large-load interconnection; applicability and exceptions in the statute.
- Important difference
- An emergency mechanism, not a general voluntary demand-response tariff.
- Source location
- Section 37.0561(e)
Statutory text · Source reviewed 2026-10-03
Texas Retain emissions limits Documented in cited instrument
Emergency direction does not authorize violation of emissions or environmental requirements.
- Shared mechanism
- Emissions safeguards
- Scope
- ERCOT large-load interconnection; applicability and exceptions in the statute.
- Important difference
- Backup generation remains constrained by applicable environmental rules.
- Source location
- Section 37.0561(e)(1)
Statutory text · Source reviewed 2026-10-03
Minnesota Assign attributable utility costs Documented in cited instrument
Commission review of very-large-customer service terms must address attributable costs and protection of other customers.
- Shared mechanism
- Attributable-cost allocation
- Scope
- Scope varies by section: data-center water provisions, public-utility service, and optional clean-energy contracts.
- Important difference
- A regulatory framework with customer-class and agreement decisions, not a uniform minimum billing percentage.
- Source location
- Section 9, subdivision 2
Session law · Source reviewed 2026-10-03
Minnesota Protect against stranded costs Documented in cited instrument
Tariff or agreement review must include protections against other customers paying stranded service costs.
- Shared mechanism
- Departure / reduced-load protection
- Scope
- Scope varies by section: data-center water provisions, public-utility service, and optional clean-energy contracts.
- Important difference
- Existing-service exceptions appear in subdivision 3.
- Source location
- Section 9, subdivision 2(3)
Session law · Source reviewed 2026-10-03
Minnesota Evaluate consumptive water demand Documented in cited instrument
Preapplication review links covered consumptive demand and permit needs to site-specific water availability.
- Shared mechanism
- Water-supply review
- Scope
- Scope varies by section: data-center water provisions, public-utility service, and optional clean-energy contracts.
- Important difference
- Facility definition and water-use/permit conditions apply together; not all withdrawals trigger this review.
- Source location
- Sections 3-4
Session law · Source reviewed 2026-10-03
Minnesota Offer optional clean-energy service Documented in cited instrument
Utilities must offer a clean-energy and capacity tariff with participating customers paying proportional resource costs.
- Shared mechanism
- Clean-energy service terms
- Scope
- Scope varies by section: data-center water provisions, public-utility service, and optional clean-energy contracts.
- Important difference
- Customer participation is optional; do not classify it as a universal clean-energy purchase mandate.
- Source location
- Section 10
Session law · Source reviewed 2026-10-03
South Dakota Recover attributable electricity costs Documented in cited instrument
Separate service terms must recover costs fairly attributable to the data center.
- Shared mechanism
- Attributable-cost allocation
- Scope
- Statutorily defined data centers; electricity providers, water providers, and local governments.
- Important difference
- Applies through provider terms rather than a published statewide minimum billing percentage.
- Source location
- Section 3
Session law · Source reviewed 2026-10-03
South Dakota Address departure and reduced load Documented in cited instrument
Cost responsibility includes costs incurred if the customer departs or materially reduces load.
- Shared mechanism
- Departure / reduced-load protection
- Scope
- Statutorily defined data centers; electricity providers, water providers, and local governments.
- Important difference
- The law states cost responsibility; it does not supply a universal exit-fee formula.
- Source location
- Section 3
Session law · Source reviewed 2026-10-03
South Dakota Obtain local supply determinations Documented in cited instrument
Water providers assess compatibility, with board review and allocation limits protecting priority uses.
- Shared mechanism
- Water-supply review
- Scope
- Statutorily defined data centers; electricity providers, water providers, and local governments.
- Important difference
- Local supply determinations are distinct from the Minnesota consumptive-use permit review.
- Source location
- Section 5
Session law · Source reviewed 2026-10-03
South Dakota Publish water-use data Documented in cited instrument
Operators report usage to the board, which makes usage data available to the public.
- Shared mechanism
- Water-use reporting
- Scope
- Statutorily defined data centers; electricity providers, water providers, and local governments.
- Important difference
- Operator reporting differs from Virginia supplier category reporting.
- Source location
- Section 6
Session law · Source reviewed 2026-10-03
Ohio Address underused infrastructure risk Documented in cited instrument
PUCO adopted a settlement aimed at protecting other customers from cost shifting due to underused data-center investments.
- Shared mechanism
- Attributable-cost allocation
- Scope
- AEP Ohio data-center tariff proceeding; not a tariff for every Ohio utility.
- Important difference
- The cited announcement directs tariff filing; consult the filed tariff for binding customer terms.
- Source location
- Decision announcement, case background
Commission decision announcement · Source reviewed 2026-10-03
Indiana Set minimum billing obligations Documented in cited instrument
The approved settlement establishes minimum billing-demand and charge provisions for covered large loads.
- Shared mechanism
- Minimum payment commitments
- Scope
- Indiana Michigan Power Tariff I.P., Indiana jurisdiction; covered large-load customers.
- Important difference
- The approved settlement differs from the original utility proposal; I&M territory only.
- Source location
- Order pp. 32-35 and ordering paragraphs p. 49
Commission order · Source reviewed 2026-10-03
Indiana Address early termination Documented in cited instrument
The approved settlement contains contract termination protections for covered large-load service.
- Shared mechanism
- Departure / reduced-load protection
- Scope
- Indiana Michigan Power Tariff I.P., Indiana jurisdiction; covered large-load customers.
- Important difference
- Customer-specific conditions and the settlement govern; not statewide terms for every provider.
- Source location
- Settlement agreement; order approval pp. 49-50
Commission order · Source reviewed 2026-10-03
Indiana Require collateral arrangements Documented in cited instrument
The approved settlement includes financial-security terms for covered large-load customers.
- Shared mechanism
- Financial security
- Scope
- Indiana Michigan Power Tariff I.P., Indiana jurisdiction; covered large-load customers.
- Important difference
- Collateral and exceptions depend on tariff eligibility and customer circumstances.
- Source location
- Settlement agreement; order approval pp. 49-50
Commission order · Source reviewed 2026-10-03
Indiana Report large-load developments Documented in cited instrument
The order addresses recurring reports and protection of confidential information.
- Shared mechanism
- Regulatory reporting
- Scope
- Indiana Michigan Power Tariff I.P., Indiana jurisdiction; covered large-load customers.
- Important difference
- Regulator access is not equivalent to public disclosure of all reported data.
- Source location
- Order p. 49
Commission order · Source reviewed 2026-10-03
Georgia Allocate infrastructure costs Documented in cited instrument
The PSC approved additional service terms addressing site and upstream power-system costs.
- Shared mechanism
- Attributable-cost allocation
- Scope
- Georgia Power covered new large-load customers; not every Georgia utility.
- Important difference
- Applies to the specified Georgia Power customer category; implementation is contract-specific.
- Source location
- Commission announcement p. 1
Commission decision announcement · Source reviewed 2026-10-03
Georgia Allow longer contracts and minimum bills Documented in cited instrument
The approved rule allows longer contracts and minimum billing for covered high-load customers.
- Shared mechanism
- Minimum payment commitments
- Scope
- Georgia Power covered new large-load customers; not every Georgia utility.
- Important difference
- Authority to impose terms is not a universal mandatory billing percentage.
- Source location
- Commission announcement p. 1
Commission decision announcement · Source reviewed 2026-10-03
Oregon Create a separate service class Documented in cited instrument
The act calls for tariffs assigning covered service costs to large energy use facilities and mitigating cost shifts.
- Shared mechanism
- Attributable-cost allocation
- Scope
- Covered large energy use facilities served by electric companies; tariff and contract provisions have distinct applicability.
- Important difference
- Separate tariff approval and transition provisions matter; a statute is not itself a completed tariff.
- Source location
- Section 2
Enrolled text; Chapter 323 confirmed · Source reviewed 2026-10-03
Oregon Require contractual minimum payments Documented in cited instrument
Covered service contracts must include a minimum payment amount or percentage determined by the commission.
- Shared mechanism
- Minimum payment commitments
- Scope
- Covered large energy use facilities served by electric companies; tariff and contract provisions have distinct applicability.
- Important difference
- The law leaves the amount or percentage to the commission.
- Source location
- Sections 5-6
Enrolled text; Chapter 323 confirmed · Source reviewed 2026-10-03
Oregon Consider clean-energy compatibility Documented in cited instrument
Commission tariff review must consider effects on clean-energy targets and compatible resource procurement.
- Shared mechanism
- Clean-energy service terms
- Scope
- Covered large energy use facilities served by electric companies; tariff and contract provisions have distinct applicability.
- Important difference
- A tariff-review criterion differs from Minnesota optional clean-energy procurement.
- Source location
- Section 2(3)
Enrolled text; Chapter 323 confirmed · Source reviewed 2026-10-03
Oregon Report load trends to lawmakers Documented in cited instrument
The commission must report on large-load trends and implications while protecting proprietary information.
- Shared mechanism
- Regulatory reporting
- Scope
- Covered large energy use facilities served by electric companies; tariff and contract provisions have distinct applicability.
- Important difference
- A legislative reporting mechanism, not disclosure of every customer contract.
- Source location
- Section 7
Enrolled text; Chapter 323 confirmed · Source reviewed 2026-10-03
Virginia Separate potable and reclaimed volumes Enacted, future effective
The future-effective code adds supplier reporting by customer category, separating potable and reclaimed water.
- Shared mechanism
- Water-use reporting
- Scope
- Registered water users supplying water offsite; categorized reporting, not universal facility-level public disclosure.
- Important difference
- Monthly data can be replaced by quarterly totals where unavailable; facility-specific disclosure is not established here.
- Effective date in source
- 2027-01-01
- Source location
- Subsection C, version effective January 1, 2027
Enacted, future effective · Source reviewed 2026-10-03
Virginia Connect electricity, water and generators Official report listed
The official report listing describes a cross-resource account of service agreements, water usage and generator permits.
- Shared mechanism
- Regulatory reporting
- Scope
- Report description covers utility agreements, water use and generator permitting; underlying report data not ingested.
- Important difference
- This confirms the report description, not completeness or accuracy of individual facility records.
- Source location
- RD637 executive summary
Official report listing · Source reviewed 2026-10-03
New York Assess cumulative development impacts Documented in cited instrument
The order directs a generic environmental impact statement for covered data-center development.
- Shared mechanism
- Environmental assessment
- Scope
- Covered data centers and discretionary DEC permits; definition and exemptions must be checked.
- Important difference
- A statewide review process differs from a project-specific approval.
- Source location
- Order section 1
Executive order · Source reviewed 2026-10-03
New York Link permit restraint to review Documented in cited instrument
The order holds covered discretionary DEC permits in abeyance subject to its scope and exclusions.
- Shared mechanism
- Interim permit restraint
- Scope
- Covered data centers and discretionary DEC permits; definition and exemptions must be checked.
- Important difference
- Applies to covered DEC applications not determined complete before the order; local-government permits are excluded. Not proof that a named project stopped.
- Source location
- Order section 1 and definition in section 6
Executive order · Source reviewed 2026-10-03
New York Review water-withdrawal rules Agency review directed
DEC must assess whether water-withdrawal rules, reporting or guidance should change for large users.
- Shared mechanism
- Water-supply review
- Scope
- Covered data centers and discretionary DEC permits; definition and exemptions must be checked.
- Important difference
- Agency review direction, not an enacted new facility-level water cap.
- Source location
- Order section 5
Executive order · Source reviewed 2026-10-03
SAVRN synthesis · proposed framework
Combine provisions into a coherent system.
Select state provisions above. The builder organizes their purposes, surfaces dependencies and tradeoffs, and preserves the source of every selection. It does not turn selected provisions into enacted law or establish which policy works best.
How relationships and coverage are defined
One relationship joins a state, an instrument, and a specific provision to a normalized mechanism. States are connected when documented provisions share a mechanism. Groups overlap; the system does not infer legal equivalence, adoption by neighboring states, policy effectiveness, or an absence of policy from missing records.
The matrix counts provisions in this dataset, not laws or affected projects. Comparison and framework selections can be shared by URL. Downloads preserve scope, source location, status, and review date. Future-effective provisions and agency review directions keep their labels.
The initial taxonomy was informed by Ahmed Saeed and Josiah Hester's Governing Datacenter Growth and research paper. SAVRN's source-backed comparison extends beyond the study. Framework purposes, dependencies, and tradeoff prompts are SAVRN analysis, not measured outcomes or statements of law.
Explore the full trackers
Go deeper into a topic. Each tracker opens in a new tab, keeping your state comparison here.
Permits and development ↗Permits, facilities and power development