State Connections

Explore a state’s data center issues, find states with similar evidence, and assemble a sourced working brief.

View my comparison →
Orange is your starting state.
Blue states share the selected kind of evidence.

Source statuses are retained as recorded. Existing tracker records have not all been freshly reverified for this view.

Start with Connected states. Review why a state matches, then add it to your working group.

Who is working through similar issues?

Open a state to inspect its evidence. Add states to a potential working group.

Use the map or state selector above to explore each state's published evidence.

Tennessee: inspect the evidence.

Counts are records, not unique projects. Records can overlap across trackers.

Anderson County (Tennessee) two-year data center moratorium Record-specific: Anderson County Commission · moratorium

WVLT reported that the Anderson County Commission unanimously approved a two-year moratorium on future data centers at its meeting on Monday 15 June 2026; commissioners said the time would be used to research and write regulations. The station's headline describes the measure as proposed, so the legal form of the action should be read with that caution.

Approved unanimously 15 June 2026; two years; single outlet

WVLT ↗
Bristol data center moratorium Record-specific: Bristol · moratorium

Bristol, Tennessee, enacted a local data center moratorium or ban, recorded in SAVRN's moratorium tracker as dated January 2025. Two-year moratorium on data processing centers, approved unanimously; effective 24 October 2025. The measure runs to 24 October 2027.

Enacted January 2025

supertalk929.com ↗
Carter County one-year data center and crypto mining moratorium Record-specific: Carter County Commission · moratorium

The Carter County Commission voted to approve a one-year moratorium on data centers and cryptocurrency mining. WJHL reported the motion by Commissioner Keith Range passed 20-1, with Commissioner Aaron Frazier voting no.

Approved 20-1 on Monday 17 August 2026; one year

WCYB ↗ WJHL via Yahoo News ↗
Cedar Hill data center moratorium Record-specific: Cedar Hill · moratorium

Cedar Hill, Tennessee, enacted a local data center moratorium or ban, recorded in SAVRN's moratorium tracker as dated January 2026. Two-year moratorium on data centers and cryptocurrency mining; first Robertson County city to act. The measure runs to 1 June 2028.

Enacted January 2026

mainstreetmediatn.com ↗
Charleston 12-month data center moratorium Record-specific: Charleston City Commission · moratorium

The Charleston City Commission unanimously passed a 12-month moratorium on second reading, under which the city will not accept rezoning requests, site plans, building permits or other land use approvals that would attract a data center. The measure responds to a possible data center and power station on property west of Charleston that is being presented to the City of Cleveland for annexation. The proposal it responds to is Project River, recorded separately; it sits outside Charleston's city limits.

Passed on second reading on a Tuesday evening; reported 12 September 2026; 12 months

Cleveland Daily Banner ↗
Clinton data center moratorium Record-specific: Clinton · moratorium

Clinton, Tennessee, enacted a local data center moratorium or ban, recorded in SAVRN's moratorium tracker as dated January 2026. Six-month moratorium on new data centers, approved unanimously; applies within city limits only. The measure runs to 22 December 2026.

Enacted January 2026

mycouriernews.com ↗
Colossus 1 Record-specific: Memphis · operating

World's largest AI supercomputer at launch with 100,000 NVIDIA Hopper GPUs, fully operational in 122 days, with plans to double to 200,000 Hopper GPUs. By mid-2026, 230k GPUs including 30k GB200s were operational for training Grok. In February 2025 an xAI affiliate purchased a large warehouse and adjacent parcels at 5420 Tulane Road in Whitehaven, Memphis for roughly $80 million. MLGW told the Memphis City Council on 1 September 2026 that a second 150 MW substation for SpaceXAI's Colossus data center at 3231 Paul R. Lowry Road would be completed by fall 2026, with a further 300 MW planned in the Pidgeon Industrial Park in early 2027 subject to TVA approval. The $80 million Colossus Water Recycling Plant, which broke ground in October 2025, has been paused since April 2026, and SpaceXAI uses less than 1 million gallons of MLGW water a day with a 1.82 million gallon peak temporary natural-gas turbines and Tesla Megapack battery systems deployed because the local grid connection was limited affiliate purchased warehouse and adjacent parcels at 5420 Tulane Road for roughly $80 million (Feb 2025); overall site capital n.a. grid connection initially ~8 MW, later upgraded toward 150 MW; combined Colossus campuses on the order of 1 GW of AI compute by mid-2026

fully operational in 122 days; property purchase February 2025; 230k GPUs by mid-2026

xAI ↗ Wikipedia: Colossus ↗ DCD ↗ Commercial Appeal (USA Today network) ↗
Colossus 1 Record-specific: Memphis, TN · other

NAACP lawsuit; entrance blockade

May 2026

Florida Data Centers ↗
Colossus 2 Record-specific: Memphis · operating

The first major GPU cluster of roughly 110,000 Nvidia GB200-class processors at about 210 MW came online around January 2026 after a reported 91-day build, followed by a GB300-class cluster, with 300,000 to 350,000+ GPUs and several hundred megawatts of IT load by mid-2026. Epoch AI estimates 1,112k H100-equivalents on 946 MW of IT power at a capital cost of $35.8 B, and cites the company S-1 filing, page 76, for the first cluster figures. The source describes the combined campuses as xAI's Memphis complex; the permanent power plant was permitted in Mississippi. FOX13 reported on 30 July 2026 that Elon Musk disclosed a further Memphis facility called Minihard in Whitehaven, alongside the Macrohard and Macroharder facilities already under construction along Tulane Road. The TVA board approved a direct service agreement of more than 100 MW for MZX Tech on 20 August 2026; MLGW was supplying less than 160 MW across SpaceXAI's two Shelby County campuses, per the Commercial Appeal permanent ~1.2 GW simple-cycle plant (41 turbines) received a Mississippi PSD permit in March 2026; temporary units scheduled for phased removal by mid-2027 $35.8 B capital cost (Epoch AI tracked estimate, not company disclosure); projected $58.0 B in Q1 2027 946 MW of IT power hosting an estimated 1,112k H100-equivalents (Epoch AI estimate); projected 1,531 MW IT power and 1,824k H100-eq in Q1 2027; first cluster ~110,000 GB200-class processors at ~210 MW

first cluster online around January 2026; Epoch projection for Q1 2027

Wikipedia: Colossus ↗ Epoch AI ↗ DCD ↗ FOX13 Memphis ↗ Memphis Commercial Appeal via AOL ↗
Colossus, Memphis Record-specific: Memphis · operating

Part of xAI's Memphis, Tennessee plus Southaven, Mississippi complex per the summary table. An $80M greywater plant was paused in 2026; no campus was cancelled. n.a. (part of the Memphis TN plus Southaven MS complex; ~1 GW combined mid-2026 per summary table) Approximately 1 GW combined across the Memphis and Southaven complex by mid-2026 per summary table

Date not recorded

Wikipedia: Colossus ↗ xAI Series C ↗
Crossville data center moratorium Record-specific: Crossville · moratorium

Crossville, Tennessee, enacted a local data center moratorium or ban, recorded in SAVRN's moratorium tracker as dated August 2026. Two-year moratorium on data centers and high-density computing, passed on third reading; halts new permits for server farms and crypto mining. Mayor chose moratorium over permanent ban to avoid lawsuits. The measure runs to 12 August 2028 and covers new applications.

Enacted August 2026

1025wowcountry.com ↗
DC Blox Nashville Zoo-area data center Record-specific: Metro Nashville-Davidson County · litigation

Metro Nashville adopted a temporary data center moratorium and new regulations in July 2026, and DC Blox's permits were put on hold. On 5 August 2026 Metro Council authorized the city to negotiate for or potentially acquire the property through eminent domain. DC Blox filed a federal lawsuit on 11 August 2026 alleging the moratorium is a targeted attack that violates due process, equal protection and takings protections, and seeks to block enforcement plus damages.

Moratorium July 2026; suit 11 August 2026

Nashville Banner ↗ WSMV ↗
Grundy County data center moratorium Record-specific: Grundy County · moratorium

Grundy County, Tennessee, enacted a local data center moratorium or ban, recorded in SAVRN's moratorium tracker as dated January 2026. Two-year moratorium on data centers, crypto mining, and high-impact data processing in unincorporated areas; approved unanimously by county commission. The measure runs to 18 May 2028.

Enacted January 2026

sewaneemessenger.com ↗
Hamblen County data center moratorium Record-specific: Hamblen County · moratorium

Hamblen County, Tennessee, enacted a local data center moratorium or ban, recorded in SAVRN's moratorium tracker as dated January 2026. One-year moratorium on data centers, crypto mining, and high-performance computing with 5+ MW peak demand; exempts First Civil District industrial zone. The measure runs to 7 July 2027.

Enacted January 2026

hamblencountytn.gov ↗
Hamilton County one-year rural data center moratorium Record-specific: Hamilton County · moratorium

Hamilton County commissioners approved a one-year moratorium on new data centers in rural areas on 15 July 2026. Existing projects are exempt. Mayor Weston Wamp said the pause will allow zoning changes that would stand up to legal challenge.

Approved 15 July 2026; one year

NewsChannel 9 ↗ Chattanooga Times Free Press ↗

Follow the issue to the utility and the customer.

Named organizations come from explicit record fields. Their presence is not confirmation of a serving-utility relationship, service availability, or customer eligibility.

Named parties in this state's evidence

Start from your position.

Screen an individual location ↗

Address-level utility verification and service agreements belong in the site screen. Private account data and individual household identities are not part of this public dataset.

Regional grid context and rules
Open the complete grid operator watchlist ↗

Explore generation and interconnection queues ↗ · Explore scarcity and market constraints ↗

Your comparison

See what your selected states have in common.

We bring together the shared issues and source records for the states you choose.

States appear side by side. Compare each topic, then open a cell for sources.

Add your own notes Optional

Notes are included when you open or save the comparison. Save a copy to keep them after leaving this page.

Sharing and data options

The link includes your states and issue filter. It does not include private notes. Source data downloads as JSON.

Your comparison

State comparison

Save a copy
Coverage, sources and how states are connected

All 50 states are selectable. A connection requires the same documented policy mechanism or the same structured tracker classification and status. The map is a discovery tool, not a legal-equivalence score, a project-risk ranking, or a complete census. No match means no matching evidence in this view.

Existing tracker publications supply most records. Their source status and date are retained; a page load is not a new source verification. Proposed, failed, enacted and reversed records remain distinct. Explicitly unverified or pending-review rows are excluded. Narrative and status can disagree in the underlying publication; inspect both before treating a restriction as active. No state-wide effect is inferred from a local action.

Data is read from the current tracker files and published overlays. Source changes invalidate the server's cached connections. Policy mechanisms use a separately reviewed evidence set. Generation queues and broad company commitments are not assigned to a data center or customer. Federal records and records without an explicit state are not assigned to a state by inference.

Download state evidence JSON · SAVRN methodology

Underlying dataset credits
  • 6abc Philadelphia
  • AEP Ohio Transmission Company (filed with Ohio Power Siting Board)
  • AI GridWatch moratorium tracker, CC BY 4.0 (aigridwatch.com)
  • Alabama Reflector
  • Alaska Beacon
  • American Transmission Company LLC (filed with PSC of Wisconsin)
  • Americus Times-Recorder
  • Arizona Mirror
  • Arkansas Advocate
  • Axios Pro Energy
  • Bisnow
  • Bisnow National
  • Bradenton Herald
  • CNBC Technology
  • Cardinal News VA
  • Central Florida Public Media
  • Chesterfield County public permit records
  • Chicago Construction News
  • City of Atlanta public permit records
  • City of Austin issued construction permits open data
  • City of Buckeye public permit records
  • City of Chandler public permit records
  • City of Charlotte public permit records
  • City of Chicago building permits open data
  • City of Fort Worth public permit records
  • City of Goodyear public permit records
  • City of Hillsboro public permit records
  • City of Mesa building permits open data
  • City of Mesa public permit records
  • City of Minneapolis construction permits (CCS) open data
  • City of Papillion public permit records
  • City of Phoenix public permit records
  • City of Red Oak public permit records
  • City of Reno public permit records
  • City of San Antonio public permit records
  • City of Statesboro, Georgia
  • City of Temple, Texas
  • Clearfield City Council (Utah Public Notice Website)
  • Colorado Newsline
  • Colorado Public Radio
  • Congress.gov (Library of Congress, public domain)
  • ConstructConnect News
  • Construction Dive
  • CourtListener DataCenter Dockets
  • CourtListener Opinions
  • Data Center Dynamics
  • Data Center Dynamics news
  • DataCenterTracker.org, CC BY 4.0
  • Dominion Energy Virginia
  • EIN News
  • East Bay Insiders Newsletter
  • Energy Central
  • FOX19 | Cincinnati
  • FOX5 Vegas
  • FOX6 News Milwaukee
  • Facilities Dive
  • Fairfax County public permit records
  • Florida Phoenix
  • Georgia Department of Community Affairs
  • Georgia EPD air permit records
  • Georgia Recorder
  • GovTech
  • Greensboro News and Record
  • Grist
  • Idaho Capital Sun
  • Illinois EPA air permit records
  • Indiana Capital Chronicle
  • Indiana Department of Environmental Management
  • Indiana IDEM air permit records
  • InkFreeNews.com
  • Iowa Capital Dispatch
  • Iowa DNR air permit records
  • KERA News
  • KEYC News Now
  • KGW
  • KRON4
  • Kansas City MO city issued permits open data
  • Kansas Reflector
  • Kentucky Lantern
  • Law360
  • Law360 Energy
  • LegiScan (legiscan.com) and the state legislature
  • Lehigh Valley Planning Commission
  • Local News Matters
  • Loudoun County public permit records
  • Loudoun Times-Mirror
  • Louisiana DEQ air permit records
  • Louisiana Illuminator
  • Maine Morning Star
  • Maricopa County Air Quality Department air permit records
  • Maricopa County public permit records
  • Maryland Matters
  • Mecklenburg County public permit records
  • Michigan Advance
  • Mid Bay News
  • Missouri Independent
  • Montana Free Press
  • NBC Bay Area
  • NBC4 Washington
  • NC Newsline
  • Native News Online
  • Nebraska Examiner
  • Nevada Current
  • Nevada NDEP air permit records
  • New Hampshire Bulletin
  • New Mexico Environment Department
  • North Carolina DEQ Division of Air Quality air permit records
  • North Dakota Department of Environmental Quality
  • North Dakota Monitor
  • Ohio Capital Journal
  • Ohio EPA air permit records
  • Oklahoma DEQ air permit records
  • Oklahoma Voice
  • OpenStates v3 (openstates.org), CC BY 4.0
  • Oregon Capital Chronicle
  • Orlando Sentinel
  • Pennsylvania Capital-Star
  • Pennsylvania Department of Environmental Protection
  • Pennsylvania Office of Consumer Advocate (filed with PA PUC)
  • Pioneer Press
  • Prince William County public permit records
  • Public Service Commission of Wisconsin
  • Public record (Legistar Web API, Granicus)
  • Rhode Island Current
  • Route Fifty
  • SEC EDGAR company submissions, public domain
  • SEC EDGAR full-text search, public domain
  • Searchlight New Mexico
  • Smithfield Township, Monroe County, PA
  • Source New Mexico
  • South Carolina Department of Environmental Services
  • South Dakota Searchlight
  • Springfield Daily Citizen
  • Stafford County public permit records
  • Statesman Journal
  • Strisker data center notes
  • Tennessee Lookout
  • Texas Commission on Environmental Quality
  • Texas TCEQ air permit records
  • The Baltimore Banner
  • The Current (GA)
  • The Detroit News
  • The Hill Energy
  • The North State Journal
  • The Pantagraph
  • The Real Deal
  • The Register
  • The Texas Tribune
  • The Verge
  • Times-Standard
  • Town of Culpeper public permit records
  • Tuscaloosa Thread
  • U.S. EPA ECHO
  • Union-Bulletin
  • Uprise RI
  • Utah Division of Air Quality
  • Utah Division of Air Quality air permit records
  • Utah News Dispatch
  • Utah Public Radio
  • Utility Dive
  • Virginia Business
  • Virginia DEQ air permit records
  • Virginia Electric and Power Company (filed with Virginia SCC)
  • Virginia Mercury
  • Visalia Times-Delta
  • WBUR
  • WCPO 9 Cincinnati
  • WGLT
  • WHEC.com
  • WJON
  • WKYT
  • WLOS
  • WLUK
  • WPBF
  • WQCS
  • WRAL (NC)
  • WUNC News
  • WVPE
  • Washington County public permit records
  • Washington Ecology air permit records
  • Washington State SEPA Register public permit records
  • Washington State Standard
  • Washoe County public permit records
  • Wausau Pilot & Review
  • West Virginia Watch
  • Winston-Salem Journal
  • Wisconsin Department of Natural Resources
  • Wisconsin Examiner
  • Yale Daily News
  • citybiz
  • contracosta.news
  • ictnews.org
  • indianapublicradio.org
  • inkfreenews.com
  • lex18.com
  • mountaintimesoregon.com
  • newmedia-wi.com
  • newscentermaine.com
  • thegazette.com
  • tuscaloosathread.com
  • wcpo.com
  • www.cities929.com

SAVRN Policy Connections

How state policies connect.

Find shared policy mechanisms, compare the differences, and assemble a framework from documented state provisions.

9 states with documented provisions29 provisions · 14 mechanisms · all 50 states available for comparison

An initial evidence set, not an exhaustive survey. A missing relationship means not documented here, never no policy. Source review verifies the cited instrument, not every later amendment or implementing action. Sources reviewed 3 October 2026.

Shared goals. Different requirements.

Each number opens the provisions connecting a state to a policy family. States can belong to several groups. A shared family is not proof of identical law.

Documented relationships by policy family. A dash means not documented in this evidence set.
StateProject readinessCost responsibilityGrid flexibilityWater safeguardsReporting & oversightEnergy & emissionsLocal authorityEnvironmental review
Georgia–2––––––
Indiana–3––1–––
Minnesota–2–1–1––
New York–––1–––2
Ohio–1––––––
Oregon–2––11––
South Dakota–2–11–1–
Texas111––1––
Virginia––––2–––

Choose a mechanism to see states connected by that specific policy tool.

Inspect the provision, not just the category.

All 29 documented provisions. Open a record for its source, scope, and difference from similar tools.

Texas Verify the proposed site Documented in cited instrument

Interconnection standards must include a way to demonstrate a legal interest in the proposed location.

Shared mechanism
Evidence of site control
Scope
ERCOT large-load interconnection; applicability and exceptions in the statute.
Important difference
Evidence of site control does not establish that all permits or financing are secured.
Source location
Section 37.0561(g)
Texas SB 6, enrolled text ↗

Statutory text · Source reviewed 2026-10-03

Texas Back transmission commitments Documented in cited instrument

Standards must set financial commitments supporting transmission infrastructure for covered loads.

Shared mechanism
Financial security
Scope
ERCOT large-load interconnection; applicability and exceptions in the statute.
Important difference
Permitted security forms and release rules depend on implementation; not a minimum energy bill.
Source location
Section 37.0561(h)-(j)
Texas SB 6, enrolled text ↗

Statutory text · Source reviewed 2026-10-03

Texas Define emergency response Documented in cited instrument

Covered backup-equipped loads may be directed to deploy backup generation or curtail after the specified market-service sequence.

Shared mechanism
Emergency response
Scope
ERCOT large-load interconnection; applicability and exceptions in the statute.
Important difference
An emergency mechanism, not a general voluntary demand-response tariff.
Source location
Section 37.0561(e)
Texas SB 6, enrolled text ↗

Statutory text · Source reviewed 2026-10-03

Texas Retain emissions limits Documented in cited instrument

Emergency direction does not authorize violation of emissions or environmental requirements.

Shared mechanism
Emissions safeguards
Scope
ERCOT large-load interconnection; applicability and exceptions in the statute.
Important difference
Backup generation remains constrained by applicable environmental rules.
Source location
Section 37.0561(e)(1)
Texas SB 6, enrolled text ↗

Statutory text · Source reviewed 2026-10-03

Minnesota Assign attributable utility costs Documented in cited instrument

Commission review of very-large-customer service terms must address attributable costs and protection of other customers.

Shared mechanism
Attributable-cost allocation
Scope
Scope varies by section: data-center water provisions, public-utility service, and optional clean-energy contracts.
Important difference
A regulatory framework with customer-class and agreement decisions, not a uniform minimum billing percentage.
Source location
Section 9, subdivision 2
Minnesota 2025 special-session Chapter 12 ↗

Session law · Source reviewed 2026-10-03

Minnesota Protect against stranded costs Documented in cited instrument

Tariff or agreement review must include protections against other customers paying stranded service costs.

Shared mechanism
Departure / reduced-load protection
Scope
Scope varies by section: data-center water provisions, public-utility service, and optional clean-energy contracts.
Important difference
Existing-service exceptions appear in subdivision 3.
Source location
Section 9, subdivision 2(3)
Minnesota 2025 special-session Chapter 12 ↗

Session law · Source reviewed 2026-10-03

Minnesota Evaluate consumptive water demand Documented in cited instrument

Preapplication review links covered consumptive demand and permit needs to site-specific water availability.

Shared mechanism
Water-supply review
Scope
Scope varies by section: data-center water provisions, public-utility service, and optional clean-energy contracts.
Important difference
Facility definition and water-use/permit conditions apply together; not all withdrawals trigger this review.
Source location
Sections 3-4
Minnesota 2025 special-session Chapter 12 ↗

Session law · Source reviewed 2026-10-03

Minnesota Offer optional clean-energy service Documented in cited instrument

Utilities must offer a clean-energy and capacity tariff with participating customers paying proportional resource costs.

Shared mechanism
Clean-energy service terms
Scope
Scope varies by section: data-center water provisions, public-utility service, and optional clean-energy contracts.
Important difference
Customer participation is optional; do not classify it as a universal clean-energy purchase mandate.
Source location
Section 10
Minnesota 2025 special-session Chapter 12 ↗

Session law · Source reviewed 2026-10-03

South Dakota Recover attributable electricity costs Documented in cited instrument

Separate service terms must recover costs fairly attributable to the data center.

Shared mechanism
Attributable-cost allocation
Scope
Statutorily defined data centers; electricity providers, water providers, and local governments.
Important difference
Applies through provider terms rather than a published statewide minimum billing percentage.
Source location
Section 3
South Dakota SB 135, Chapter 190 ↗

Session law · Source reviewed 2026-10-03

South Dakota Address departure and reduced load Documented in cited instrument

Cost responsibility includes costs incurred if the customer departs or materially reduces load.

Shared mechanism
Departure / reduced-load protection
Scope
Statutorily defined data centers; electricity providers, water providers, and local governments.
Important difference
The law states cost responsibility; it does not supply a universal exit-fee formula.
Source location
Section 3
South Dakota SB 135, Chapter 190 ↗

Session law · Source reviewed 2026-10-03

South Dakota Obtain local supply determinations Documented in cited instrument

Water providers assess compatibility, with board review and allocation limits protecting priority uses.

Shared mechanism
Water-supply review
Scope
Statutorily defined data centers; electricity providers, water providers, and local governments.
Important difference
Local supply determinations are distinct from the Minnesota consumptive-use permit review.
Source location
Section 5
South Dakota SB 135, Chapter 190 ↗

Session law · Source reviewed 2026-10-03

South Dakota Publish water-use data Documented in cited instrument

Operators report usage to the board, which makes usage data available to the public.

Shared mechanism
Water-use reporting
Scope
Statutorily defined data centers; electricity providers, water providers, and local governments.
Important difference
Operator reporting differs from Virginia supplier category reporting.
Source location
Section 6
South Dakota SB 135, Chapter 190 ↗

Session law · Source reviewed 2026-10-03

South Dakota Preserve local regulation Documented in cited instrument

The state may not limit local authority to regulate data-center development or operation.

Shared mechanism
Preserved local authority
Scope
Statutorily defined data centers; electricity providers, water providers, and local governments.
Important difference
Preservation of local authority is not evidence that a local ban exists.
Source location
Section 4
South Dakota SB 135, Chapter 190 ↗

Session law · Source reviewed 2026-10-03

Ohio Address underused infrastructure risk Documented in cited instrument

PUCO adopted a settlement aimed at protecting other customers from cost shifting due to underused data-center investments.

Shared mechanism
Attributable-cost allocation
Scope
AEP Ohio data-center tariff proceeding; not a tariff for every Ohio utility.
Important difference
The cited announcement directs tariff filing; consult the filed tariff for binding customer terms.
Source location
Decision announcement, case background
PUCO decision announcement, case 24-508-EL-ATA ↗

Commission decision announcement · Source reviewed 2026-10-03

Indiana Set minimum billing obligations Documented in cited instrument

The approved settlement establishes minimum billing-demand and charge provisions for covered large loads.

Shared mechanism
Minimum payment commitments
Scope
Indiana Michigan Power Tariff I.P., Indiana jurisdiction; covered large-load customers.
Important difference
The approved settlement differs from the original utility proposal; I&M territory only.
Source location
Order pp. 32-35 and ordering paragraphs p. 49
IURC order, Cause 46097 ↗

Commission order · Source reviewed 2026-10-03

Indiana Address early termination Documented in cited instrument

The approved settlement contains contract termination protections for covered large-load service.

Shared mechanism
Departure / reduced-load protection
Scope
Indiana Michigan Power Tariff I.P., Indiana jurisdiction; covered large-load customers.
Important difference
Customer-specific conditions and the settlement govern; not statewide terms for every provider.
Source location
Settlement agreement; order approval pp. 49-50
IURC order, Cause 46097 ↗

Commission order · Source reviewed 2026-10-03

Indiana Require collateral arrangements Documented in cited instrument

The approved settlement includes financial-security terms for covered large-load customers.

Shared mechanism
Financial security
Scope
Indiana Michigan Power Tariff I.P., Indiana jurisdiction; covered large-load customers.
Important difference
Collateral and exceptions depend on tariff eligibility and customer circumstances.
Source location
Settlement agreement; order approval pp. 49-50
IURC order, Cause 46097 ↗

Commission order · Source reviewed 2026-10-03

Indiana Report large-load developments Documented in cited instrument

The order addresses recurring reports and protection of confidential information.

Shared mechanism
Regulatory reporting
Scope
Indiana Michigan Power Tariff I.P., Indiana jurisdiction; covered large-load customers.
Important difference
Regulator access is not equivalent to public disclosure of all reported data.
Source location
Order p. 49
IURC order, Cause 46097 ↗

Commission order · Source reviewed 2026-10-03

Georgia Allocate infrastructure costs Documented in cited instrument

The PSC approved additional service terms addressing site and upstream power-system costs.

Shared mechanism
Attributable-cost allocation
Scope
Georgia Power covered new large-load customers; not every Georgia utility.
Important difference
Applies to the specified Georgia Power customer category; implementation is contract-specific.
Source location
Commission announcement p. 1
Georgia PSC rule approval announcement ↗

Commission decision announcement · Source reviewed 2026-10-03

Georgia Allow longer contracts and minimum bills Documented in cited instrument

The approved rule allows longer contracts and minimum billing for covered high-load customers.

Shared mechanism
Minimum payment commitments
Scope
Georgia Power covered new large-load customers; not every Georgia utility.
Important difference
Authority to impose terms is not a universal mandatory billing percentage.
Source location
Commission announcement p. 1
Georgia PSC rule approval announcement ↗

Commission decision announcement · Source reviewed 2026-10-03

Oregon Create a separate service class Documented in cited instrument

The act calls for tariffs assigning covered service costs to large energy use facilities and mitigating cost shifts.

Shared mechanism
Attributable-cost allocation
Scope
Covered large energy use facilities served by electric companies; tariff and contract provisions have distinct applicability.
Important difference
Separate tariff approval and transition provisions matter; a statute is not itself a completed tariff.
Source location
Section 2
Oregon HB 3546, enrolled text ↗

Enrolled text; Chapter 323 confirmed · Source reviewed 2026-10-03

Oregon Require contractual minimum payments Documented in cited instrument

Covered service contracts must include a minimum payment amount or percentage determined by the commission.

Shared mechanism
Minimum payment commitments
Scope
Covered large energy use facilities served by electric companies; tariff and contract provisions have distinct applicability.
Important difference
The law leaves the amount or percentage to the commission.
Source location
Sections 5-6
Oregon HB 3546, enrolled text ↗

Enrolled text; Chapter 323 confirmed · Source reviewed 2026-10-03

Oregon Consider clean-energy compatibility Documented in cited instrument

Commission tariff review must consider effects on clean-energy targets and compatible resource procurement.

Shared mechanism
Clean-energy service terms
Scope
Covered large energy use facilities served by electric companies; tariff and contract provisions have distinct applicability.
Important difference
A tariff-review criterion differs from Minnesota optional clean-energy procurement.
Source location
Section 2(3)
Oregon HB 3546, enrolled text ↗

Enrolled text; Chapter 323 confirmed · Source reviewed 2026-10-03

Oregon Report load trends to lawmakers Documented in cited instrument

The commission must report on large-load trends and implications while protecting proprietary information.

Shared mechanism
Regulatory reporting
Scope
Covered large energy use facilities served by electric companies; tariff and contract provisions have distinct applicability.
Important difference
A legislative reporting mechanism, not disclosure of every customer contract.
Source location
Section 7
Oregon HB 3546, enrolled text ↗

Enrolled text; Chapter 323 confirmed · Source reviewed 2026-10-03

Virginia Separate potable and reclaimed volumes Enacted, future effective

The future-effective code adds supplier reporting by customer category, separating potable and reclaimed water.

Shared mechanism
Water-use reporting
Scope
Registered water users supplying water offsite; categorized reporting, not universal facility-level public disclosure.
Important difference
Monthly data can be replaced by quarterly totals where unavailable; facility-specific disclosure is not established here.
Effective date in source
2027-01-01
Source location
Subsection C, version effective January 1, 2027
Virginia Code 62.1-44.38, future-effective subsection C ↗

Enacted, future effective · Source reviewed 2026-10-03

Virginia Connect electricity, water and generators Official report listed

The official report listing describes a cross-resource account of service agreements, water usage and generator permits.

Shared mechanism
Regulatory reporting
Scope
Report description covers utility agreements, water use and generator permitting; underlying report data not ingested.
Important difference
This confirms the report description, not completeness or accuracy of individual facility records.
Source location
RD637 executive summary
Virginia SCC RD637 report listing ↗

Official report listing · Source reviewed 2026-10-03

New York Assess cumulative development impacts Documented in cited instrument

The order directs a generic environmental impact statement for covered data-center development.

Shared mechanism
Environmental assessment
Scope
Covered data centers and discretionary DEC permits; definition and exemptions must be checked.
Important difference
A statewide review process differs from a project-specific approval.
Source location
Order section 1
New York Executive Order 62 ↗

Executive order · Source reviewed 2026-10-03

New York Link permit restraint to review Documented in cited instrument

The order holds covered discretionary DEC permits in abeyance subject to its scope and exclusions.

Shared mechanism
Interim permit restraint
Scope
Covered data centers and discretionary DEC permits; definition and exemptions must be checked.
Important difference
Applies to covered DEC applications not determined complete before the order; local-government permits are excluded. Not proof that a named project stopped.
Source location
Order section 1 and definition in section 6
New York Executive Order 62 ↗

Executive order · Source reviewed 2026-10-03

New York Review water-withdrawal rules Agency review directed

DEC must assess whether water-withdrawal rules, reporting or guidance should change for large users.

Shared mechanism
Water-supply review
Scope
Covered data centers and discretionary DEC permits; definition and exemptions must be checked.
Important difference
Agency review direction, not an enacted new facility-level water cap.
Source location
Order section 5
New York Executive Order 62 ↗

Executive order · Source reviewed 2026-10-03

How relationships and coverage are defined

One relationship joins a state, an instrument, and a specific provision to a normalized mechanism. States are connected when documented provisions share a mechanism. Groups overlap; the system does not infer legal equivalence, adoption by neighboring states, policy effectiveness, or an absence of policy from missing records.

The matrix counts provisions in this dataset, not laws or affected projects. Comparison and framework selections can be shared by URL. Downloads preserve scope, source location, status, and review date. Future-effective provisions and agency review directions keep their labels.

The initial taxonomy was informed by Ahmed Saeed and Josiah Hester's Governing Datacenter Growth and research paper. SAVRN's source-backed comparison extends beyond the study. Framework purposes, dependencies, and tradeoff prompts are SAVRN analysis, not measured outcomes or statements of law.

Download the evidence dataset (JSON) · Research methodology