Florida Data Center Moratorium Tracker
Florida has 2 state-level data-center restrictions in force. 45 city and county measures are tracked here, 29 of them in force. Every entry below links to its primary source: a legislature page, a governor's office, a local government, or the reporting of record.
State-level measures in Florida
Every statewide moratorium, pause, siting restriction, or tax-incentive rollback in Florida we can verify against a primary source. Strongest status first.
| Measure | Status | What it does | Source |
|---|---|---|---|
| HB 7031Data-center sales-tax exemption rollback | In force 2025-06 | Raised the exemption eligibility threshold from 15 MW to 100 MW of critical IT load with no grandfather clause, ending the exemption for all sub-100 MW facilities. Effective Aug 1, 2025. | |
| SB 484Data center ratepayer, water and local-authority law | In force 2026-06 | Signed by Gov. DeSantis and effective July 1, 2026. Defines a large-scale data center as a site with an anticipated monthly peak load of 50 MW or more, bars utilities from passing data center costs including electricity onto residential and small business customers, requires large users to pay their full cost of service, protects water resources, requires public disclosure of data center development deals, and preserves local government authority to set stricter standards or deny a project. | |
| HB 1007Florida HB 1007 (2026) regulates data center siting and operations by: (1) limiting the use of non-disclosure agreements in local permitting | Failed / vetoed 2026-02 | Florida HB 1007 (2026) regulates data center siting and operations by: (1) limiting the use of non-disclosure agreements in local permitting; (2) directing the Public Service Commission to set cost-allocation tariffs so data center loads do not shift costs onto residential ratepayers; and (3) requiring state water-use permits for large data center withdrawals. The bill does not ban data centers from agricultural zoning or impose 500-foot setbacks. | |
| HB 1517Florida SB 1517, 'Approval of Data Center Facilities,' sponsored by Rep. Joseph, required developers to disclose projected energy, water, carbon emissions | Failed / vetoed 2026-02 | Florida SB 1517, 'Approval of Data Center Facilities,' sponsored by Rep. Joseph, required developers to disclose projected energy, water, carbon emissions, noise, and environmental impacts at application stage, with the Department of Environmental Protection publishing the data publicly. The bill was filed January 9, 2026 and referred to the Economic Infrastructure Subcommittee, State Affairs, and Commerce committees, but died in the Economic Infrastructure Subcommittee on March 13, 2026. | |
| SB 1118Florida SB 1118 creates a public records exemption allowing local governments to keep data center siting plans confidential for up to 12 months when requested | Failed / vetoed 2026-03 | Florida SB 1118 creates a public records exemption allowing local governments to keep data center siting plans confidential for up to 12 months when requested by the company. A developer's 'proprietary confidential business information' remains exempt until it becomes public or the company stops treating it as proprietary. Includes a 5-year sunset provision expiring October 2031. The bill died in committee alongside companion SB 484, which establishes a comprehensive regulatory framework for hyperscale data centers effective July 1, 2026. |
City and county moratoria in Florida
Most of the movement is local, where a building pause or permit halt does not need a legislative session. 45 tracked measures in Florida, each with its source.
Where Florida stands
Across the whole tracker we hold 334 state-level measures in 49 states and 1253 city and county measures, against 1419 primary sources. Florida accounts for 5 of the state-level measures and 45 of the local ones.
By total measures on record it is #9 of the 50 states and DC carrying any tracked action, and #8 by city and county measures alone. Ranking is by count of sourced entries in this dataset, so it measures documented activity, not the size of the buildout.
Sources for Florida
49 citations behind the entries above. Each opens in a new tab.
- Statewide · HB 7031 — Data-center sales-tax exemption rollback flsenate.gov →
- Statewide · SB 484 — Data center ratepayer, water and local-authority law flgov.com →
- Statewide · HB 1007 — Florida HB 1007 (2026) regulates data center siting and operations by: (1) limiting the use of non-disclosure agreements in local permitting flhouse.gov →
- Statewide · HB 1517 — Florida SB 1517, 'Approval of Data Center Facilities,' sponsored by Rep. Joseph, required developers to disclose projected energy, water, carbon emissions flsenate.gov →
- Statewide · SB 1118 — Florida SB 1118 creates a public records exemption allowing local governments to keep data center siting plans confidential for up to 12 months when requested flsenate.gov →
- Bay County — County moratorium on data centers through January 8, 2027 wjhg.com →
- Citrus County — One-year data center moratorium wfla.com →
- Clay County — One-year data center moratorium firstcoastnews.com →
- Collier County — County moratorium on data centers until a condition is met winknews.com →
- DeSoto County — Local moratorium on data centers through July 29, 2027 wgcu.org →
- Edgewater — Proposed city moratorium on data centers with no end date fox35orlando.com →
- Escambia County — Local moratorium on data centers with no end date weartv.com →
- Flagler County — Local moratorium on data centers through August 3, 2027 observerlocalnews.com →
- Hernando County — One-year data center moratorium wtsp.com →
- Holmes County and 1 other locality — 2 separate measures, cited together wjhg.com →
- Jackson County — County moratorium on data centers with no end date wctv.tv →
- Jackson County (1-year AI data center moratorium), FL — Jackson County (1-year AI data center moratorium), FL data center moratorium wctv.tv →
- Lake County — Local moratorium on data centers through December 7, 2026 cfpublic.org →
- Lakeland — Local moratorium on data centers through August 3, 2027 lkldnow.com →
- Levy County — County moratorium on data centers through September 30, 2027 wcjb.com →
- Madison County — County moratorium on data centers through July 22, 2027 greenepublishing.com →
- Manatee County — Local moratorium on data centers wmnf.org →
- Marion County — Proposed county moratorium on data centers 352today.com →
- Nassau County — Up to 12-month data center moratorium nassaucountyfl.com →
- North Port — Proposed 18-month data center moratorium winknews.com →
- Palm Beach County — One-year moratorium on new hyperscale data centers wflx.com →
- Panama City — One-year ban on new large-scale data center proposals wjhg.com →
- Pasco County — One-year data center moratorium wusf.org →
- Putnam County — County moratorium on data centers through September 8, 2027 wcjb.com →
- Sarasota County — 12-month hyperscale data center moratorium businessobserverfl.com →
- Wakulla County — County moratorium on data centers with no end date fox49.tv →
- Walton County — County moratorium on data centers with no end date wjhg.com →
- Washington County — One-year moratorium on data center applications washingtoncounty.news →
- Zephyrhills — One-year data center moratorium wusf.org →
- Alachua — Alachua City Commission moves to draft 12-month data center moratorium wuft.org →
- Orange County — Proposed county moratorium on data centers yahoo.com →
- Hendry County — Proposed county moratorium on data centers wgcu.org →
- Hernando County (1-year data center moratorium), FL — Hernando County (1-year data center moratorium), FL data center moratorium (proposed) hernandosun.com →
- Hillsborough County — Proposed county moratorium on data centers businessobserverfl.com →
- Leon County — Eighteen-month moratorium on large-scale data centers fox49.tv →
- Martin County — Proposed county moratorium on data centers wflx.com →
- Santa Rosa County — 12-month data center moratorium (in development) wuwf.org →
- St. Johns County — Proposed county moratorium on data centers stjohnscountybuzz.com →
- Village of Palmetto Bay — Palmetto Bay weighs outright ban on data centers cbsnews.com →
- Volusia County — Proposed county moratorium on data centers with no end date orlandoweekly.com →
- Indiantown — Rejected pause on large-scale data center applications wflx.com →
- Okaloosa County — 12-month data center moratorium voted down getthecoast.com →
- Tallahassee — Rejected proposal to define and prohibit AI data centers wtxl.com →
- Taylor County — Rejected local moratorium on data centers wctv.tv →
What does bind large loads in Florida
A moratorium is only one way a data center gets stopped. The grid operator decides whether it can connect at all, and on what terms. Florida sits in 1 footprint.
Vertically integrated (FPL, Duke Florida, TECO); FRCC reliability region, no RTO.
States next door
2 of the 2 states bordering Florida have at least one data-center measure on record. Restrictions tend to travel between neighbors, so this is usually where the next one comes from.
Data centers in Florida
The US Data Center Map identifies 117 facilities run by 55 operators in Florida, each one placed from primary sources and listed by city and by operator, with the measures on this page beside them.
Open the Florida data center map → · The US Data Center Map →
How to read this page
In force = a moratorium, siting restriction, or tax-incentive rollback that is currently enacted, by statute or executive order. Paused = a temporary hold on new incentives or applications. Proposed = introduced and still pending. Failed / vetoed = died in committee, was voted down, or was vetoed.
This page is generated from the same primary-sourced dataset as the national U.S. Data Center Moratorium Tracker and is re-checked on the same weekly cycle, whether or not anything changed. Legislative status changes quickly; it is informational, not legal advice. Spot something out of date in Florida? Tell us.
Companion references: the Data Center Grid Operator Watchlist for the interconnection and curtailment rules that bind here, the Data Center Water Tracker for water mandates, and the Data Center Delay Watchlist for named projects.
Why Florida is pushing back
The objections repeat from state to state: strain on the electric grid, water drawn for cooling, and the sense that a facility takes local resources without giving much back. SAVRN builds AI factories designed around those three objections: on-site power that does not lean on the public grid, direct-to-chip cooling that does not consume municipal water, and a training institute that puts local people to work inside the building.